Construction Progress for TechTown 1st Floor Renovation | July 1 - July 31

25
Slide Show of Construction Progress at TechTown - Detroit TechTown 1st Floor Renovation July 1 - July 31 Construction 2013 CentricdesignStudio | www.centricdesignstudio.com

description

Progress continues despite this late posting of month number three of TechTown’s 1st Floor Renovation Project. Every month I track and post the construction progress of this project. My firm Centric Design Studio designed this space for Detroit based TechTown. You can view the previous two slide share months of progress (starting in May 2013) to see how far we’ve come. Come back next month and see the progress. Thanks for viewing.

Transcript of Construction Progress for TechTown 1st Floor Renovation | July 1 - July 31

Page 1: Construction Progress for TechTown 1st Floor Renovation | July 1 - July 31

Slide Show of Construction Progress at TechTown - DetroitTechTown 1st Floor Renovation

July 1 - July 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Page 2: Construction Progress for TechTown 1st Floor Renovation | July 1 - July 31

Mail Boxes ProgressTechTown 1st Floor Renovation

July 1 - July 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Page 3: Construction Progress for TechTown 1st Floor Renovation | July 1 - July 31

Plumbing Work at Food Prep Room TechTown 1st Floor Renovation

July 1 - July 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Page 4: Construction Progress for TechTown 1st Floor Renovation | July 1 - July 31

View of Future Event SpaceTechTown 1st Floor Renovation

July 1 - July 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Page 5: Construction Progress for TechTown 1st Floor Renovation | July 1 - July 31

Future Event Space ProgressTechTown 1st Floor Renovation

July 1 - July 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Page 6: Construction Progress for TechTown 1st Floor Renovation | July 1 - July 31

Corridor 2 + Future Meeting RoomsTechTown 1st Floor Renovation

July 1 - July 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Page 7: Construction Progress for TechTown 1st Floor Renovation | July 1 - July 31

Future Co-Working Area Facing Burroughs St.TechTown 1st Floor Renovation

July 1 - July 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Page 8: Construction Progress for TechTown 1st Floor Renovation | July 1 - July 31

Concrete Repair (Before) TechTown 1st Floor Renovation

July 1 - July 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Page 9: Construction Progress for TechTown 1st Floor Renovation | July 1 - July 31

Concrete Repair (After) TechTown 1st Floor Renovation

July 1 - July 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Page 10: Construction Progress for TechTown 1st Floor Renovation | July 1 - July 31

Fire Extinguisher (Future Location) TechTown 1st Floor Renovation

July 1 - July 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Page 11: Construction Progress for TechTown 1st Floor Renovation | July 1 - July 31

Overhead Door Structural Steel (at Event Space 1) TechTown 1st Floor Renovation

July 1 - July 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Page 12: Construction Progress for TechTown 1st Floor Renovation | July 1 - July 31

Overhead Door Structural Steel (at Event Spaces 1 & 2) TechTown 1st Floor Renovation

July 1 - July 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Page 13: Construction Progress for TechTown 1st Floor Renovation | July 1 - July 31

Overhead Door Structural Steel (at Event Spaces 1 & 2) TechTown 1st Floor Renovation

July 1 - July 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Page 14: Construction Progress for TechTown 1st Floor Renovation | July 1 - July 31

Structural Steel for Operable Partition (at Event Spaces 1 & 2) TechTown 1st Floor Renovation

July 1 - July 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Page 15: Construction Progress for TechTown 1st Floor Renovation | July 1 - July 31

Structural Steel for Operable Partition (at Event Spaces 1 & 2) TechTown 1st Floor Renovation

July 1 - July 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Page 16: Construction Progress for TechTown 1st Floor Renovation | July 1 - July 31

Soffit Enclosure of Structural Steel (at Event Spaces 1 & 2) TechTown 1st Floor Renovation

July 1 - July 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Page 17: Construction Progress for TechTown 1st Floor Renovation | July 1 - July 31

Soffit Enclosure of Structural Steel (at Event Spaces 1 & 2) TechTown 1st Floor Renovation

July 1 - July 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Page 18: Construction Progress for TechTown 1st Floor Renovation | July 1 - July 31

Enclosure of Overhead Structural Steel (at Event Space 1) TechTown 1st Floor Renovation

July 1 - July 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Page 19: Construction Progress for TechTown 1st Floor Renovation | July 1 - July 31

Co-Working Space - Polished Concrete Floor Mock-Up - 1 TechTown 1st Floor Renovation

July 1 - July 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Page 20: Construction Progress for TechTown 1st Floor Renovation | July 1 - July 31

Co-Working Space - Polished Concrete Floor Mock-Up - 2 TechTown 1st Floor Renovation

July 1 - July 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Page 21: Construction Progress for TechTown 1st Floor Renovation | July 1 - July 31

Painting Begins (at Conference Room 5) TechTown 1st Floor Renovation

July 1 - July 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Page 22: Construction Progress for TechTown 1st Floor Renovation | July 1 - July 31

Existing Lighting (Retrofitted) Mock-Up TechTown 1st Floor Renovation

July 1 - July 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Page 23: Construction Progress for TechTown 1st Floor Renovation | July 1 - July 31

Future Co-Working Area (Looking West) TechTown 1st Floor Renovation

July 1 - July 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Page 24: Construction Progress for TechTown 1st Floor Renovation | July 1 - July 31

Exterior View of Future Co-Working Area (From Burroughs St.) TechTown 1st Floor Renovation

July 1 - July 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com

Page 25: Construction Progress for TechTown 1st Floor Renovation | July 1 - July 31

More Construction Progress Photos Will Be Posted Next Month TechTown 1st Floor Renovation

July 1 - July 31 Construction 2013

CentricdesignStudio | www.centricdesignstudio.com