Construction e_zone

80
C ontractor’s Z one weekly newspaper November 5, 2012 Vol. 6, No. 46 Placer County Contractors Association & Builders Exchange

description

Weekly publication for contractors to find bidding projects, education, networking opportunties and group discounts.

Transcript of Construction e_zone

Page 1: Construction e_zone

Contractor’s Zone

Contractor’s Zoneweekly newspaper

November 5, 2012Vol. 6, No. 46Placer County Contractors Association & Builders Exchange

Page 2: Construction e_zone

November 5, 2012Page 2 Contractor’s Zone• .Contractor’s Zone

VIEW OUR INVENTORY 24/7 ONLINEAT WWW.WHYBUYNEWAUTOS.COM

flat beds work trucks

utility trucks hd duallies

We offer value for your money by selling low mileage high quality trucks!

Over 100 trucks in stock.

WhyBuyNewAutos.com4429 Granite Dr

Rocklin, CA 95677(916) 624-8100facebook.com/whybuynewautos

Page 3: Construction e_zone

Contractor’s ZoneContractor’s Zone

Inside This Issue

This table of contents is linked to make it easy for you to get to the information you want. If it looks like a link (blue & underlined) then it is! Just click on it to go directly to the page you want. Use the navigation bar at the bottom of the right-hand pages to return to this page.

InspirationfortheWeek Page2

YourWeeklySmile Page2

IndustryLinks Page2

TheWeek’sWeatherForecast Page3

PCCACalendarofEvents Pages4-5

ContractorYellowPages Page6

NewsBriefs Pages7-9

IndustryNews Pages10-16

WeeklySafetyMeeting Page17

ClassifiedAds Pages18-19

NewPlanArrivals Page21-23

WeekAtAGlance Pages24-26

CalTransProjects Pages28-29

PlansOnFile Pages30-71

LegaAds Pages72-75

BidResults Pages75-76

BottomlineLawyers Page6 WebsiteBozzutoInsurance Page36 WebsiteDiamondPacific Page76 WebsiteHansenBros.Enterprises Page27 WebsiteInlandBusinesSystems Page11 WebsiteJensenMasonry Page6 WebsitePhiladelphiaInsurance Page71Q&AInsurance Page13 WebsiteSmithChiropracticandMassage Page6 WebsiteTheCappsGroup Page6 WebsiteTrePazziTrattoria Page6 WebsiteStateFundInsurance Page23 WebsiteWhyBuyNewAutos.com PageIFC WebSite

SUPPORT OUR ADVERTISERS!They support the PCCA

and deserve your business!

Don’t let the money ship

sail without you!A recent study confirmed that Internet sales accounted for a whopping 5% of all US sales in 2010 — and it’s growing yearly. Don’t be left behind. Run your affordable ad in this modern, digital newspaper, published weekly. Call Steve Berlin at 916.729.5432 for advertising rates. PCCA members get 15% off published ad rates!

Page 4: Construction e_zone

November 5, 2012Page 2 Contractor’s Zone• .Contractor’s Zone

Association Links CSLB Contractor’s State License Board OSHA Occupational Safety & Health Administration GSBE Golden State Builders Exchange AIA American Institute of Architects AGC Associated general Contractors BIA Building Industry Association SCIF State Compensation Insurance Fund Employers Guardian Human Resources American Subcontractors Association

Projects Online DGS Contracts DOT DOT District 3 SMUD CSI Code List Fed Biz Opps

Safety OSHA Hazard Communication OSHA Safety & Health Topics Click SafetyOnline OSHA Safety Classes Employer Records of Occupational Injury & Illness Governor’s Office of Emergency Services Injury & Illness Prevention Program Risk Management – IIPP

State & Federal Links California Building Standards California Prevailing Wage Rates Federal Prevailing Wage Rates California Dept. of Industrial Relations California Environmental Protection Agency Mechanics Lien Law Information Mechanics Lien Guide

Local Government Links California Chamber of Commerce City of Auburn City of Rocklin City of Roseville City of Lincoln County of Placer

Construction Industry Links

First say to yourself what you would be;and then do what you have to do.

— Epictetus

The Right Experience?

Someone advertising on Craigslist said she was well suited for child care. After all, she had plenty of experience in “CPR and Choking Children.”

Howcomputerizationmadeourworkinglivessomucheasier

Page 5: Construction e_zone

Contractor’s ZoneContractor’s Zone

PCCA:

Patrick Remington - PresidentRemington Construction

Chris Harris - Vice PresidentJames L. Harris Painting

George Henley – TreasurerHenley Homes, Inc

Mike Garman – SecretaryCalifornia construction and Renovation Inc.

Michelle Strange – DirectorTriCounties Bank

Cheryl Gibson – DirectorVon Jac Developments, Inc.

Cyndi Cook – DirectorCook Design Company

Tim Busk – Public Relations DirectorHeritage Painting

Jack Remington – VP of Governmental Af-fairsAndregg Geomatics

PBX:John Brun – PresidentJohn Brun Masonry, 530-269-2044

Michael Bennett Bennett Tile Company, 916-773-8453

Chad Twardus – SecretaryTwardus Construction, 530-878-1790

Nick ForestiereGurnee & Daniels LLP, 916-797-3100

Ed Simpson

Staff:Chae Gale-Director of [email protected]

Jeff Henry-Director of Business [email protected]

Kellie Russell-Auburn Planroom [email protected]

Dianne Barnao-Roseville Planroom [email protected]

Jim Couk - Scan Technician

Placer County Contractors Association10656 Industrial Ave., Ste.160, Roseville, CA 95678

916-771-7229231 Cherry Ave., Ste.101, Auburn, CA 95603

530-889-3953Open Monday-Friday: 8am-5pm

www.placerbx.com

Board of Directors

RosevilleToday75oCloudy75o-45o

75o

45o

Tuesday Wednesday Thursday Friday

72o

44o66o

39o56o

39o

AuburnToday75oCloudy75o-54o

74o

51o

Tuesday Wednesday Thursday Friday

69o

47o62o

39o54o

42o

Page 6: Construction e_zone

November 5, 2012Page 4 Contractor’s Zone• .Contractor’s Zone

N o v e m b e r6 ElectionDay.Don’tForgetToVote!

6 PlansOnlineandNewMember Orientation.9:30amtoNoonat theRosevillePCCAClassroom.

8 CPRClass9:00amto1:00pm atRoseville$75.00PerPerson

8 CalOSHA8Class8:00amto 5:00pmatRoseville$50.00 PerPerson

8 AerialWorkPlatformCertification 8:00amto2:00pm$50.00 PerPerson

8 HealthFairandOpenEnrollment 2:00pmto4:30pmatRoseville

15 WorkersCompEmployersTraining andInformationSeminar.3:00pm to4:00pmattheRoseville PCCAClassroom.

22 HappyThanksgiving.ThePCCA andRosevilleOfficeswillbeclosed today.

23 HappyThanksgiving.ThePCCA andRosevilleOfficeswillbeclosed today

27 MembertoMemberMixer5:00pm to7:00pm.LoomisBasinBrewery. NoChargetoattendthisnetworkin event.ChiliCookoff!

D e c e m b e r

4 PlansOnlineandNewMember Orientation.9:30amtoNoonat theRosevillePCCAClassroom.

5 CPRandFirstAid2year certificationcourse.9:00am atRoseville.

11 QSP/QSDTrainingSeminarhosted byBTConsulting8:30amto4:30pm Roseville

Annual DinnerFriday, January 18th 2013

at the

Contractor Of The Year AwardsCocktails at 5pm

Presentation & Dinner at 6pm

Dinner $50.00 Per Ticket

Meals purchased in advance ~ No Refunds

Reserve the date on your calendar, so you don’t miss this great event. Dinner, Networking, Raffle Prizes,

Sponsorships, Opportunities and more.Tri-Tip, Grilled Salmon, Salad, Potatoes, Green Beans, Chocolate Dessert

Meet the PCCA and PBX Leadership, as well as our Contractor and Project and Volunteers of the year awards.

2020 Golf Course Rd, Auburn, California

Company Phone Number No. Dinners Names of Guest 1. 3. 2. 4.If you have more guest please call 916-771-7229 Final Dinner Sales Jan. 18th 2011- No Refunds You must send check to: 10656 Industrial Ave., Ste 160 Roseville, Ca 95678Pay Online by Credit Card: http://www.placerbx.com/Payment.htm

Page 7: Construction e_zone

Contractor’s ZoneContractor’s Zone

HappyThanksgiving

PCCA & Roseville offices closed

NovemberSUNDAY MONDAY TUESDAY WED. THURSDAY FRIDAY SAT.

2 5 2 7 30

12

6

1 4 15

9 10

19

13

21 22

16

24

11

2 6

2 0

2 9

2 3

Dec. 1

1 8

2 8

7

17

5Nov. 4ElectionDay.Don’tForgetToVote!

PlansOnlineandNewMemberOrientation.

CPRClass

CalOSHA8Class

WorkersCompEmployersTrainingandInformationSeminar.3:00pmto4:00

8

AerialWorkPlatformCertification

HealthFairandOpenEnrollment

Page 8: Construction e_zone

November 5, 2012Page 6 Contractor’s Zone• .Contractor’s Zone

Contractor Yellow Pages

MasonryJensen

Full Service Masonry ContractorLicense # 804650

Mark Jensen916.663.3429

[email protected]

Smith Chiropractic and MassageAuburn

13136LincolnWayAuburn,CA95603-4114

[email protected]

http://www.smithchiropractic.net

Family runand family friendlyhealthcarefor all ages. Includes chiropractic careandmassagetherapy.ServingtheAuburnregion formore than49years.Call (530) 885-8205foranappointment.

928 Lincoln Way, AuburnOpen 11:30 am - 9:00 pm M-F

Open at 4:30 Saturday & Sunday

530.823.2994

Traditional Italian Cuisinein Downtown Auburn

www.trepazzi.net Outdoor dining!

The Capps GroupA Professional Real Estate Team

Kevin Capps - Managing [email protected] (DRE 01705659)

Carolyn Hearn - [email protected] (DRE 01483632)

530-823-2111 Office www.cappsgroup.com856 Lincoln Way, Auburn, CA 95603

LegaloptionstoimproveyourfinancialfutureBankruptcy•Company&PersonalDebt•Foreclosure

CALL TODAY (530) 888-7100www.BottomLineLawyers.com985LincolnWay,Auburn,CA95603

Page 9: Construction e_zone

Contractor’s ZoneContractor’s Zone

Yolo Courthouse Project Going Out To Bid

The State Treasurer’s Office heldits bond sale right on schedule lastmonth.That’sgoodnewsfortheYoloCountyCourthouse slated for down-town Woodland. Construction of thenewcourthousehasnowbeengiven“agreenlight”afterthetreasurersold$133.8million in lease-revenue con-struction bonds, according to state-mentfromYoloSuperiorCourt.

The project, slated for 1000 MainStreet, is for a 14-courtroom,163,000-square-foot structure to re-place the historic Woodland Court-house nearby on Court Street. Thatbuilding is antiquated and no longeruptothetaskofservingYoloCounty,according to Superior Court JudgeDave Rosenberg, who is amongthose spearheading the effort to geta new courhouse built. Rosenbergsaysthehistoricbuildingistoosmall,poorly designed for its current uses,andhasseismic,plumbingandotherproblems.

Construction is expected to beginearlynextyear,withtheprojectcom-pletedbyMay2015atacostofabout$160.6 million. Rosenberg has said,“Oncethecashislinedup,therearenofurtherhoopsthatwehavetojumpthrough.”

Thenextstep in theprocess issub-contractorbidding,tobeoverseenbyconstructionmanagerHenselPhelpsConstructionCo.Moreinformationonthecourthouseisonlineathttp://www.courts.ca.gov/facilities-yolo.htm

Sacramento Promotes Construction Work

Asdevelopment springsback to life,the city of Sacramento is streamlin-ingitsbuildingpermitpoliciestomakethem more efficient and business-

News Briefs

Continued on next page

friendly. The City Council has ap-provedupdatedparkingcodes thatease restrictions and encouragedevelopment. Last July, the citycombined its planning and designreviewcommissions intooneentitytoexpeditepermitapprovals.

There are more changes to comeunderthecampaign,whichthecityhas dubbed Sacramento Stream-line.Alonglistofreformsaresched-uled to be adopted through June2013,cityofficialssay.

Recently the City unveiled ePlanCheck – the latest improvementas part of Sacramento Stream-line, a comprehensive program toeliminate barriers for development.ePlan Check enables commercialcustomers tosubmitbuildingplanselectronically, thereby reducing theneed to reproduce several sets ofhardcopyplans. Inaddition,ePlanCheck saves time during the ap-proval and permitting process fordevelopmentprojects.

“It has been our goal to provide aservice to our customers that willeliminatetheneedtoprintcostlyandenvironmentally unfriendly build-ingplans,”saidRyanDeVore,chiefbuilding official. “In the past, hardcopyprocessingrequirednumeroussetsofbuildingplans.Today,com-mercialcustomerscansubmit theirbuildingplansusingadiskorflashdrive,andonlyasinglehardcopyatcompletionisnecessary.”

The immediate roll out of this newprogramwillyielddividendsfor thecustomer. First, there will be im-mediate cost savings with the al-mosteliminationofpaperplans.Forexample, on a four-story, 48,000squarefootbuilding, it isestimatedthat reproductioncostsareroughly$7,000. Secondly, this mostly pa-perlessprocessingwillalsoresultin

improved processing time that willbepasseddowntothecustomer.

“Delivering services in an morestreamlinedway isenvironmentallyand pocket book friendly but willalso improve our time on servicedelivery,”saidDeVore.“Byvirtueofgoing digital, thiswill allow staff toreview and approve building plansdigitally.”

TheePlanCheckproject ispartofasundryofimprovementsthathavebeenimplementedunderlastyear’slaunchof theSacramentoStream-line program. Since then, the Cityhas incorporated a solar fee pro-gramthatallowssignificantsavingsonbothcommercialandresidentialsolar projects. In September, thean express linewas at its buildingcounter to provide a quick way ofgetting simple requests completedinlessthan30minutes.

“ePlan Check further exemplifiesthe city’s commitment to be busi-ness-friendly,” said Councilmem-ber Darrell Fong. “This new toolprovides customers with an easierwaytodobusinesswithus,andourhopeisthattheeaseofusewillalsoincreaseourabilitytoprocessproj-ectsquicker.”

Other streamlined improvementsareonthehorizonthisyear,includ-ing an electronic permit programthatwill allowcustomers toconve-niently obtain building permits on-linewithout having to come to theCity’spubliccounter.Click here for more information.

Theatre Project Goes Out To Bid

CorningCityCouncilwoman

Page 10: Construction e_zone

November 5, 2012Page 8 Contractor’s Zone• .Contractor’s Zone

PCCAPlacer County Contractors Association & Builders Exchange

November 27th 2012 - 4:30-7pmThe Loomis Basin Brewery

Located at 3277 Swetzer Rd. Loomis, CA 95650.

Join us November 27th at the Loomis Basin Brewery for our monthly networking mixer. Bring your best chili and compete for the win!

The last mixer was a great one, don’t miss this!

Thanks!Cyndi Cook, Ambassador Team LeadCook Design Company, Inc.3444 Swetzer Rd. Ste KLoomis, CA 95650916-660-1593 office • 916-660-1594 faxwww.cookdesigncompany.com

The PCCA Monthly Networking Mixer!

Page 11: Construction e_zone

Contractor’s ZoneContractor’s Zone

and Corning Community Founda-tionmemberDarleneDickisonhaveannouncedthatphaseIIoftheRod-ger’sTheatrerestorationprojecthasgoneouttobid.Bidsfortheproject,which focuses on refurbishing themen’s and women’s restrooms onthemainfloorandreconstructingthelogeseating,willcloseNov.15,CityManagerandPublicWorksDirectorJohnBrewersaid.

We’re refurbishing themwith previ-ously purchased fixtures, Brewersaid.Wealreadyremovedasbestosand lead-containing paint and tilesandarereadyfortheinstallation(ofthefixtures).

Oneofthenewfeaturesofthelogeareaistheadditionofstorageareasabovetherestroomandunderneaththeloge,whichmaketheauditoriumfloorleveltoallowittobeamultipur-posearea,hesaid.

Thefirstphaseoftheproject,whichusedparkbondmoneyandanEn-ergy Efficiency Grant, took care ofgetting rid of asbestos, reinforcingthe roof structure, new roofing andinstalling a new heating, ventilationandairconditioningunitandputtingininsulation.

September Construction Numbers Good

U.S. builders spent more on homeconstruction in September. Con-structionspendinggrew0.6percentcompared to August when spend-inghadfallen0.1percent,theCom-merceDepartmentsaidlastweek.

The strength in September camefrom a 2.8 percent rise in homebuilding. The September increasepushed construction spending to aseasonally adjusted annual rate of$851.6 billion, 14.1 percent higher

than a 12-year low hit in February2011.NewhomesalesinSeptemberjumpedtothehighestannualpaceinthepasttwoandahalfyears.

Spendingonresidentialconstructionclimbedtoanannualrateof$285.9billioninSeptember,up20.9percentfromayearago.Single-familycon-struction,thebiggestpartofthemar-ket, was up 25.7 percent over thepastyearwhileapartmentconstruc-tionwasup48.9percent.

Althoughnewhomesrepresentlessthan20percentofthehousingsalesmarket,theyhaveanoutsizeimpacton the economy. Each home builtcreatesanaverageofthreejobsforayearandgeneratesabout$90,000intaxrevenue,accordingtotheNa-tionalAssociationofHomeBuilders.

Homebuilders startedwork onnewhomesandapartmentsatthefastestpaceinmorethanfouryearsinSep-tember.Theyalsorequestedthemostbuildingpermitsinfouryears,asignthat many are confident that recentgainsinhomesaleswillcontinue.

Judge Rules In Favor of Construction

A federal judge has refused to haltconstruction on the Willits Bypasshighwayproject,afterenvironmentalgroupshadrequestedapreliminaryinjunction. The proposed four-lanefreewaywouldrerouteU.S.Highway101 around the downtown Willitsarea, and has caused controversywithenvironmentalgroupswhosaythe project would harm wetlands,salmon streams and endangeredplants.The groups have a pendinglawsuit challenging thepermitsandapprovals of the project, but thatwon’t be heard until December, apressreleasefromtheEnvironmen-tal Protection InformationCenter inArcatasaid.

Themotionforapreliminaryinjunc-tionwasrequestedbytheCenterforBiological Diversity, Willits Environ-mentalCenter,RedwoodChapteroftheSierraClubandEPIC.

The court agreed there is a risk ofenvironmentalharminallowingcut-ting of legacy oak trees and ripar-ian vegetation to continue forwardbefore the trial,but its rulingallowsCaltrans to initiate the constructionprocess.

Stockton Rail Project Gets $11 Million Allocation

Statetransportationofficialsallocat-ednearly $11million in high-speedrailfundstoshoreuptheinfrastruc-ture for existingpassenger rail ser-vice passing through Stockton toother points in Northern California.Approved by the California Trans-portationCommissionlastweek,themoneywillpayfor2.6milesoftrackto connect the downtown CabralStationusedby theAltamontCom-muterExpresstoamaintenancefa-cilitynorthofthestation.

The$61millionproject on64acresnorthof thedowntownstation is thebiggest construction for ACE in therailservice’s14-yearhistory.It’salsoimportant in efforts to build a state-widebullettrain,becausebuildingthetrackisasteptowardimprovingandgrowing service for ACE and otherpassenger trains through Stockton,transportationofficialssaid.

Thenewmaintenancefacilityisunderconstructionnorthofthestation.TheSanJoaquinRegionalRailCommis-sionalreadyhas themoney tobuildthe facility and a bridge over MinerStreet to get there.The bridge alsowillhaveawalkwayforpedestrians.Butthelatest$11millionpaysmostofthecosttobuildtheactualtrack,saidACEspokesmanThomasReeves.

News BriefsContinued from last page

Page 12: Construction e_zone

November 5, 2012Page 10 Contractor’s Zone• .Contractor’s Zone

Industry News

Construction projects often involve tracking hundreds, or even thousands, of details. Every day presents an oppor-tunity for project expenditures to spiral out of control. Minimizing costly jobsite errors requires a shift in process. Identify and Track the Details

It’s typically not the large expenditures that derail a project. Instead, the devil is in the details. The best step toward preventing er-rors from derailing a project is to ensure that the team actively manages small expenses.

Project Cost Management

A mistake can easily be overlooked until a project is underway, and once all hands are on the jobsite, it’s too late—or very expen-sive—to make corrections.

Zeroing in on details before ground is broken is important for owners and con-tractors. Owners need to be clear upfront about expectations and include as much detail as possible in the contract. After the contract has been signed, contractors have little room to avoid doing what is asked or to claim they didn’t know what the project entailed.

Setting a unit of measurement before the project begins keeps the owner and contractor on the same page. The unit itself—cubic yards, linear feet—doesn’t matter, but the point is to standardize the measurement among all involved parties so that expectations are aligned, report-ing is clear and progress is visible. After a unit of measurement is agreed upon, the number of units that must be reached each day can be determined in order for the project to stay on schedule and on budget. When these two standards are set, add them to the contract alongside

Minimize costly jobsite errors with a simple process shift

Page 13: Construction e_zone

Contractor’s ZoneContractor’s Zone

a requirement for weekly reports to give the project total visibility. Report Weekly

While monthly reports are the norm for most projects, weekly reports can go a long way toward preventing costly mis-takes. This increased reporting frequen-cy gives the owner more visibility into project status regarding materials, labor availability and other potentially fluc-tuating factors. Unpredictable elements such as weather must be taken into ac-count so that additional costs and delays are avoided or minimized. Reviewing historical data, specifically prior projects completed on the same calendar dates, can help the team gauge and prepare for potential weather-induced setbacks. By evaluating historical data and staying on top of weekly reports, alternate jobsite plans can be mapped out ahead of time. The best way to handle weekly report-ing is for the contractor to receive job-site data daily and to compile that data into weekly reports delivered to the

owner. When the owner is able to view the status of the moving parts of a proj-ect on a weekly basis, adjustments can be made quickly to ensure that progress is not slowed and costs remain within the budget.

Another way that weekly reporting saves money and expedites progress is by keeping earned value front and center. Earned value instantly tells the owner whether the project is on track. Continual monitoring of the project’s earned value allows for the scheduling performance and cost performance to be gauged. Weekly reporting is crucial for providing owners with the information they need in order to identify errors in a timely manner. Support the Shift

Implementing these changes may sound easy, but objections are bound to surface. Such objections may stem from a fear of change, and it’s important to know how to respond to them. Showing contrac-

tors and coworkers the logic is one ef-fective way to curtail these doubts. By implementing a logical, consistent pay-item structure, for instance, reporting is easier and the collections process is simplified, resulting in faster payments. If objections are based on a reluctance to change longstanding practices, make it clear that the market is changing and adaptation is necessary to survive. Help the team to understand that giving own-ers more visibility allows for more ef-fective project management.

Although not every construction proj-ect possibility can be accounted for in advance, covering as many bases as possible before work begins helps cur-tail costly jobsite mistakes. Insist on upfront, detailed contracts, and trust contractors to deliver weekly reports so you can make amendments to the plan as the need arises. Shifting the process from haphazard to fully-planned will eliminate money-wasting delays and al-low you to get the job done on time and within budget.

1500 North Market Boulevard, Sacramento, CA 95834Sacramento Area (916) 928-0770 • Grass Valley Area (530) 272-1801

At Inland, we don’t just sell copiers, we provide digital printing solutions. Our account representatives will assess your printing needs and develop an individualized plan of products and services that will serve your company best.

&Dealer

Your Authorizedwww.igoinland.com

PCCA member since 2004

Page 14: Construction e_zone

November 5, 2012Page 12 Contractor’s Zone• .Contractor’s Zone

Safety regulations aim to minimize preventable tragedies on the jobsite and ensure that companies take the proper precautions to protect work-ers from serious injury. Currently, many regulations focus specifical-ly on better equipping workers to more quickly and efficiently relay information. For many contractors, the emphasis on jobsite communi-cation not only preserves the health and safety of the workers, but also increases productivity.

Current Regulations

The Occupational Health and Safety Administration (OSHA) addresses the issue of adequate communication for workers in dif-ferent types of construction proj-ects, from underground tunneling to crane and bulldozer operations. OSHA has mandated communica-tions standards in nearly every area of the construction industry, and these changes have vastly improved working conditions for crews.

• Communication tower construc-tion—OSHA requires that the hoist operator or signal person remain in continuous sight and/or in direct communication with the employee being hoisted. The use of a signal person and hand signals is recom-mended, except when direct visual contact is not possible.

• Underground construction and

ing electronic signaling through a dedicated channel and a hands-free system.

In addition to requiring adequate communication for workers on a jobsite, OSHA also requires hear-ing protection when the time-weighted average noise level ex-ceeds 85 decibels (dB)—a standard routinely surpassed in construc-tion and industrial environments due to noisy machinery, tools and vehicles. While the average hu-man threshold of pain is typically around 110dB, many of the opera-tions outlined to the left in Figure 1 can lead to severe or permanent hearing loss, even with limited ex-posure.

Wireless Advantage

Despite the clear need for safety regulations, construction managers often face challenges in implement-ing guidelines and complying with industry standards. Many compa-nies are turning to hands-free, self-contained wireless communication headsets for construction safety—eliminating the need for two-way radios and hand signals in many cases.

With improvements in communica-tion methods on jobsites, the num-ber of accidents, injuries and deaths has greatly decreased. Beyond safety improvements, enhanced

Industry News

Effective Site Communication

tunneling—OSHA requires that em-ployers maintain open lines of com-munication through power-assisted communication systems with an independent power supply. These systems ensure communication be-tween the work face, the bottom of the shaft and the surface when nat-ural unassisted voice communica-tion is ineffective. In addition, two effective means of communication are required for shafts under devel-opment. Hoist operators must have a closed-circuit voice communica-tion system connected to each land-ing station.

• Heavy equipment operations—No specific requirements exist regard-ing the operation of backhoes, exca-vators, front-end loaders, bulldoz-ers, scrapers, dump trucks, wagons, rollers and graders. However, at a minimum, hand signals and two-way radios should be implemented to ensure constant communication between operators and workers on the ground. OSHA also suggests hearing protection when working around heavy equipment.

• Crane operations—Today’s re-vised crane rules for construction represent the most significant over-haul of crane safety regulations in more than 40 years. Of particular importance are new rules govern-ing communication among the crane operator, signal person and spotter, specifically those requir-

Stay in compliance with OSHA regulations by using wireless headsets

Page 15: Construction e_zone

Contractor’s ZoneContractor’s Zone

communication also benefits the business owner by increasing team effectiveness and business produc-tivity, contributing to lower in-surance costs and enhancing new business acquisition through a rep-utation for safety and efficiency.

The advent of advanced digital communication technology has brought the benefits of wireless communication to several jobsites. Construction managers should con-sider the following attributes:

• Hands-free—Hands-free operation encourages workers to communicate without interrupting their work.

• Duplex communication—Full du-

plex communication afforded by wireless headsets allows verbal warnings to be delivered instantly, even if someone else is talking.

• Closed circuit channels—Digital-ly encoded, dedicated radio chan-nels meet OSHA requirements for many projects.

• Radio integration—Seamless in-tegration with existing radio sys-tems enables both monitoring of multiple radios and push-to-talk radio transmit capabilities on head-sets.

• Noise reduction—Hearing pro-tection headsets reduce noise by at least 24dB.

• Long range—New systems with ranges up to 1,600 feet are suffi-cient to cover most construction applications, including crane op-erations.

• Power supply—Battery-powered, portable base stations offer full-day operation and application flexibil-ity, while direct-powered base sta-tions can be mounted on vehicles, equipment or structures.

Construction managers need to con-sider these benefits as they explore wireless and digital communica-tion tools. With higher standards and new technology, the industry is poised to make great strides in worker well-being.

Page 16: Construction e_zone

November 5, 2012Page 14 Contractor’s Zone• .Contractor’s Zone

We have the projects, make sure you and your estimators know how to find them.

Learnhowtodriveless,printless,andsavemoretimeandmoneywhilebidding.

November 6th, 20129:30 AM through 12:00 Noon

Roseville PCCA Classroom10656 Industrial Ave, Suite 160

Roseville, CA 95678

RSVP to Jeff Henry916-771-7229

New Member Orientation And Plans Online Class

Attendanceisfree,andencouragedforallnewmembersaswellasExistingmemberswhojustwishtobebroughtuptospeedontheDifferentbenefitsofthePCCA,orarefreshercourseontheUseoftheOnlinePlanService.

MakesureyourestimatorsattendsotheyarealsofamiliarwiththeOnlinePlanRoom,andyourAdminStaffsotheyareawareofthevariousGroupHealth,WorkersCompandotherinsuranceprogramsthatareavailableThroughmem-bership.

Page 17: Construction e_zone

Contractor’s ZoneContractor’s Zone

By Shauna Krause and David KalbCapitol Services, Inc.

Can an oldCA contractor’s licensebebrought back to life againwhenit ‘died’adecadeago?The ‘mettle’ofaframingcontractoristestedandwe finish by helping readers learnwhatittakestopulltogethertoforma‘jointventure’effort…

Q: My husband had a CA licenseandfailedtorenewitontime.Itex-piredbackin2000.Nowhewantstorenewit.HecurrentlyhasanArizona“K-11”(Electrical)licensethathehasheldforapprox12yrs.Howdoeshegoaboutthisinthequickestway,aswearelookingtomovetoCAearlynextyear?A:Thankyou forcontactingCapitolServices Inc. Because his CA li-cense has been expired for over 5yearshecannolonger‘renew’it.Hecanhoweverre-applyforthelicenseandrequest that thenumberbere-issued. Asyoumayknow, there isareciprocalagreementbetweenCAandAZsohecanrequest towaivethetradeexambasedonthefactthathe has been licensed for the pastfive years inArizona. He’ll still berequired to take the law testagain.Theprocesstoobtainthelicensewilllikely takeabout8weeks,so ifyoubeginsoon,hewillhavethelicensebefore you move. Let us know ifyou’dlikehelpwiththeprocess.

Q:Ineedassistancewithdetermin-ingwhatclassificationmycompanywillneedtomeettherequirementstodometalstudframingintheStateofCalifornia.Idon’tdoStructuralSteel,just themetal stud framing. I also

Capitol Connection Q&A Resource For Contractors

handlethedrywallandinsulationtofinishoff thewall,so I’mnotsure ifIneedseparateclassificationstodothat,orifitwouldbecoveredundertheframing.Thankyouinadvance.A:Inordertodothemetalstudfram-ingyou’llneeda“C-5”(FramingandRough Carpentry) classification.Even though drywall and insulationarepartofyourprojects, theCSLBwill require you to have the “C-2”(Insulation)and“C-9”(Drywall)clas-sifications to perform this work be-causethe“C-5”doesn’tcoverthesetrades.AccordingtotheCSLB,the“B” classification would cover youforall three trades;however, inourexperiencewe have found it is dif-ficulttoqualifyfortheexamwithoutelectrical, concrete, roofing and/orplumbingexperience.

Q:IaminquiringaboutthefeesandrequirementstosetupaJointVen-turewith another contractor. Iwantto bid a project that requires both“C-20”(HVAC)and“C-10”(Electrical)licenses. My firm only holds theHVACandwouldliketopartnerwith

anothercontractorwhomholdsboth.Please let me knowwhat all is re-quired, particularly the applicationprocess.

A: A Joint Venture (JV) consists oftwo ormore entities, each of whichholdsavalidCAcontractor’slicenseingoodstanding.Sinceyouholdthe“C-20”,youcould locateacompanywiththe“C-10”or,asindicated,“an-othercontractorwhomholdsboth”.AJVapplicationsignedbyallQualifiersandanOfficerofrecordforeachenti-tyisrequired.You’llalsoneedtoposta$12,500Contractor’sBond,whichis in addition to the bond you pres-entlyhaveonyourcorporatelicense.Further,anewWorker’sComppolicy(orcertifiedExemption)isnecessary.TheStatefeewillrun$555.00.

Knowingwheretogofortheanswersis half the battle. Get expert assis-tanceimmediatelywhenyoucall866-443-0657, email [email protected],orwriteusatCapitolServices,Inc., 1225 8th St. Ste. 580, Sacra-mento,CA95814.Researchpastcol-umnsatwww.cutredtape.com.

Shauna KrauseDavid Kalb

Kalb Q & A

Page 18: Construction e_zone

November 5, 2012Page 16 Contractor’s Zone• .Contractor’s Zone

Page 19: Construction e_zone

Contractor’s ZoneContractor’s Zone

DuringNationalFireProtectionWeek inOctober (7-13),attentionisplacedonfiresafetyawarenessandprevention.StateFundwouldliketoremindourpolicy-holdersandtheiremployeestheimportanceofpractic-ingfiresafetyyearround.

Themosteffectiveway tofightafire is tokeeponefromoccurringthroughawarenessandcorrectingpo-tentialfirehazards.Ifafiredoesoccur,workersmustbepreparedtokeepthemselvessafefrominjury.

Housekeeping Amajorcauseofafireintheworkplaceisduetoim-properorlackofhousekeepingonthejobsite.•Keepheatingandelectricalequipmentclean,andingoodworkingcondition.•Regularlycleanductsandfumehoodfilters.•Keeppaperproducts,aerosolsorotherflammablematerialsawayfromheatingelements.•Storeflammableliquidsawayfromheatsources,exitsorescaperoutes.•Toavoidanelectricalfire,check,replaceorprofessionallyrepairanyapplianceswithfrayedorloosecordsandwiresorcordsthatbecomehotduringuse.•Avoidrunningcordsorwiresunderrugsandcarpetsornearaheatsourcewheretheycanoverheat.•Keepcordsoutofdoorwayswheretheycanbecomeworn.

In Case of Fire

Company Name: Job Name: Date:

Special topics for your project:

Employee Safety Recommendations:

Reviewed MSDS # Subject

Meeting attended by:

Supervisor’s Signature: Date:

Weekly Safety Meeting

Fire detection and/or suppression devices Ensurethatfireprotectionequipment(i.e.,sprinklers,smoke/heat detectors, alarms, fire hoses, fire extin-guishers,andfireblankets)aremaintained,andread-ilyavailableforuse.•Educateworkersontheproperuseoffireextinguishersandtheirlocation.•Makesureallfiresuppressionequipment,includingfireextinguishers,correspondtothepotentialrisk.Usetherightfireextinguisherforthetypeoffire.

Staff training in fire prevention/emergency proce-dures Periodicallytrainallemployeesinfiresafety,emergen-cycommunication,andevacuationprocedures.•Posttelephonenumbersofemergencyresponsepersonnelwheretheycanbequicklyretrieved.•Incaseofanevacuation,makesureworkersknowthenumber,location,andaccessibilityofexits,alongwiththelocationoffirealarms.•Intheeventofafire,workersshouldnothesitatetocallthefiredepartment

Allworkerssharearesponsibilityforpreventingfires,butnottoputoutamajorfire.Workersshouldonlyfightafireiftheycandoitsafelywithproperextinguishingmaterials.Firefightingisbesthandledbytrainedpro-fessionals.

Page 20: Construction e_zone

November 5, 2012Page 18 Contractor’s Zone• .Contractor’s Zone

Classified Ads2003ChevroletSilverado3500ExtendedCab$75kmilesNewtiresUtilitybedw/rackDualrearwheelsNew100gallonfueltransfertank&pump$15,000orbestoffer

ContactGaryat(530)886-3100duringbusinesshoursor(916)826-8931afterhours.Picturesbelow.

Evolvedecks Building Enterprises isseekingContractorsexperiencedinLightGaugeMetalFramingtoassistinongoingshorttermprojectsCallRodgerat263-5854And/orsendresponseto:[email protected]

Page 21: Construction e_zone

Contractor’s ZoneContractor’s Zone

Page 22: Construction e_zone

November 5, 2012Page 20 Contractor’s Zone• .Contractor’s Zone

Thursday November 8th 9:00 am to Noon

CPR 2 Year Certification Class

Roseville PCCA Classroom10656 Industrial Ave, Suite 160,

Roseville, CA 95678

CourseandCertificate$70.00PerStudent.Youcanpayatthedoor.

AlloftheclassesofferedbySimplyCPRarebasedontheAmericanHeartAssociationstandards.StudentscompletingtherequirementsoftheSimplyCPRcourseswillreceiveaCPRorfirstaidcard.

MonthlyTrainingProgramtohavethecertificationclassesavailableonaregularbasis.

Calltoscheduleatrainingsessionforlargergroupsinyourownofficeifyouwouldpreferanonsiteclass.

Register Now! Call Jeff at 916-771-7229 or fax this back to 916-771-0556

Name

Name

Name

Name

WebSiteAboutUsOfficeInfoNewPatientsBulletinsProductsCouponSpecialsLife&ChiropracticHydroMassageAvailable

Smith Chiropractic and MassageAuburn

Back Pain? You don’t need to live with the pain.Chiropractic care can help. Call Dr. Keith Smith inAuburnforafreeconsultation.ServingtheAuburncommunityfor49years.Clickalink,attheright,formoreinformation.

Page 23: Construction e_zone

Contractor’s ZoneContractor’s Zone

All published entries in this report are obtained from sources deemed reliable. Placer County Contractors Association and Builders Exchange assumes no responsibility for any inaccuracies listed in this report. It is up to the individual to verify all information.

Yuba City ROOFING & EXTERIOR IMPROVEMENTS @ 517/519 TEESDALE ROAD 2019Turlock FIRE STATION NO. 4 ROOF REPLACEMENT 37009Yuba City ROOFING AND EXTERIOR IMPROVEMENTS 188089Pleasanton SPORTS PARK CONCESSION STAND 80065Folsom RED ROBIN T.I. FOLSOM 85059Chico DICK’S SPORTING GOODS TENANT IMPROVEMENT 86064San Jose TEMPORARY FENCING RENTAL AND REPAIRS 223090San Francisco MONROE ELEMENTARY SCHOOL 316005Redwood City WOODSIDE ROAD MEDIAN AND ROADWAY CLEANUP PROJECT 90082San Joaquin RFP-CIVIL ENGINEERING SERVICES - MOUNTAIN VIEW 177091Hanford ULTA -636 89069Modesto ROSS DRESS FOR LESS TI - 1621 114081San Pablo CCS - AT DOWNER SCHOOL 159075Sacramento/Place LICENSED GENERAL CONTRACTOR - HANDYMAN SERVICE 172001Coachella SEWER PIPELINE REHABILITATION PROJECT-ESMERALDA RESORT AND PGA 87071Running Springs PALI MOUNTAIN CABINS 317006Cupertino HOMESTEAD SQUARE 119080Citrus Heights 7101 BONITA WAY SEWER LOWER LATERAL RELOCATION 123080Various Locations ALARM MONITORING AT VARIOUS CHP CENTRAL DIVISION AREA OFFICES 186088Sac/Placer/Yolo/A REFRIGERATION PREVENTATIVE MAINTENANCE 216086West Sacramento WEST SAC TRIANGLE (70 UNIT MULTI-FAMILY HOUSING PROJECT) 102087North Highlands DOLLAR TREE TI 106089Tracy SILAGE COVERING SERVICES (2-YR CONTRACT) 215079Mill Valley STORAGE, POOL AND SPA IMPROVEMENTS 228089Oakland RCD BOILER REPLACEMENT 235091San Jose INSTALL SAFETY STAIR AND DECK COVERS AT GUADALUPE LRT DIVISION 237087Alameda FALL 2012 ROOFING PROJECT - ALAMEDA UNIFIED SCHOOL DISTRICT 318005San Jose VILLAGE OAKS SITEWORK 4010Murrietta SAM’S CLUB - 4822-202RM 55095San Francisco ARELIOUS WALKER STAIRWAY REPLACEMENT 125081West Palmdale SAM’S CLUB 4767-201 286044Martinez RENTAL PROPERTY IMPROVEMENTS 306010San Diego PUBLIC STORAGE - 2046 320005San Francisco 1701 DIVISADERO 1ST FLOOR - GI CLINIC EXPANSION 131069Citrus Heights RFP -COMPLETEING LOMA’S AND FEMA ELEVATION CERTIFICATES FOR 174099San Francisco LANDSCAPE AND INTERIOR PLANT MAINTENANCE 229092Los Banos DOLLAR GENERAL STORE 271045Alpine Co. OUT VALLEY TRANSMISSION LINE PROJECT - PREQUALIFICATION 310006Modesto TUOLUMNE RIVER REGIONAL PARK GATEWAY PHASE 1.3 TRAILS 18023Modesto MODESTO WEST BASIN IMPROVEMENTS 19023Palo Alto RFP - DESIGN OF DMF PERFORMANCE OPTIMIZATON 176006Santa Rosa FIRE ALARM UPGRADE/STEELE LANE COMMUNITY CENTER 0Redwood City SANITARY SEWER PUMP STATION 10 IMPROVEMENTS PROJECT 21017Ukiah ORCHARD SUBSTATION LANDSCAPE CONSTRUCTION 45097Sacramento CURTIS PARK AND OAK PARK WATER METER RETROFIT PROJECT 206090Dublin RFQ - ERECTION OF 2 METAL BUILDINGS S.A.R. BUILDING PROJECT 282054Fairfield CLAYBANK ROAD PAVEMENT REHABILITATION AND SSWA TOLENAS LATERAL 6031Corning RODGERS THEATER PHASE II IMPROVEMENTS 41012Carson JOINT WATER POLLUTION CONTROL PLANT AND SAN JOSE CREEK WATER 147059

New Plans

Page 24: Construction e_zone

November 5, 2012Page 22 Contractor’s Zone• .Contractor’s Zone

Page 25: Construction e_zone

Contractor’s ZoneContractor’s Zone

Kentfield AUSTIN SWING SPACE 148060Santa Cruz RECOATING AND REPAIR OF DELAVEAGA TANK NO.1 162058Roseville PARKING LOT SWEEP/STEAM ROSEVILLE DMV - REBID 214089Santa Cruz NEWELL CREEK DAM PIPELINE INSPECTION SERVICES 170094Marysville 2012 SEWER/STORM TRENCH REPAIR PROJECT 181096Marysville 2012 PAVEMENT REPAIR PROJECT 203098Alameda JOB ORDER CONTRACTING - 13004 266042Alameda JOB ORDER CONTRACTING - 13005 270041Alameda JOB ORDER CONTRACTING - 13003 275045West Sacramento WEST CAPITAL COMMONS 25017Sacramento POLE REPLACEMENT AND OTHER LINE WORK 88064Alameda Co. ELMHURST HAZMAT ABATEMENT - JOB ORDER 204001Rancho Cordova HAGAN PICNIC PAVILION IMPROVEMENTS 198095Santa Clara Co. STEVENS CREEK PIPELINE REHABILITATION PROJECT 299043Union City UNION CITY INTERMODAL STATION PHASE 2 - BART STATION IMPROVEMENTS 109082Tuolumne County QUALIFIED CONTRACTORS LIST - TUOLUMNE COUNTY 319005Stanislaus Co. RFP - CROWS LANDING AIR FACILITY 231087

New Plans

Page 26: Construction e_zone

November 5, 2012Page 24 Contractor’s Zone• .Contractor’s Zone

Monday, November 05, 2012

LAGUNA CREEK TRAIL CONNECTION AT CAMADA COURT IMPROVEMENT Elk Grove Plan # 9022PROJECTBARRETT MIDDLE SCHOOL RESTROOM UPGRADES Carmichael Plan # 16018FAIRFIELD WALGREENS - 15432 Fairfield Plan # 62098HOMESTEAD SQUARE Cupertino Plan # 1190807101 BONITA WAY SEWER LOWER LATERAL RELOCATION Citrus Heights Plan # 123080FOLSOM LAKE COLLEGE - ATHLETIC FIELDS PHASE 2 Folsom Plan # 141055OLD CANYON ROAD BRIDGE PROTECTION REPAIR PROJECT Fremont Plan # 175090ALARM MONITORING AT VARIOUS CHP CENTRAL DIVISION AREA OFFICES Various Locations Plan # 186088REFRIGERATION PREVENTATIVE MAINTENANCE Sac/Placer/Yolo/Amador Plan # 216086UNION PACIFIC RAILROAD FENCE PROJECT Elk Grove Plan # 272049SECURITY SYSTEMS INSTALLATION AND TESTING Sacramento Plan # 287041

Tuesday, November 06, 2012

WASTEWATER TREATMENT PLANT CAKE HOPPER EQUIPMENT San Mateo Plan # 7017COUNCIL CHAMBERS A/V SYSTEM RENOVATION Antioch Plan # 12003JAMES DONLON & LARKSPUR WATER STORAGE RESERVOIR Antioch Plan # 20001LIGHTING UPGRADES OF SOFTBALL FIELDS Fresno Plan # 29008CARMICHAEL E.S./WHITNEY E.S. RESTROOMS UPGRADES Carmichael/Sacramento Plan # 50096DIXON STREET IMPROVEMENTS Hayward Plan # 54004MARIEMONT ELEMENTARY SCHOOL, RESTROOM UPGRADES Sacramento Plan # 56003JONAS SALK MIDDLE SCHOOL AKA THOMAS EDISON LANGUAGE INSTITUTE Sacramento Plan # 57098K-6 RESTROOM UPGRADESCALISTOGA LIBRARY RE-ROOF Calistoga Plan # 61076SIMPKINS STADIUM CENTER KITCHEN ANSUL SYSTEM PROJECT San Jose Plan # 81073WEST SAC TRIANGLE (70 UNIT MULTI-FAMILY HOUSING PROJECT) West Sacramento Plan # 102087DOLLAR TREE TI North Highlands Plan # 106089VETERINARY GENETICS LABORATORY SAMPLE STORAGE CONTAINERS Davis Plan # 144058HOSPITAL WIRELESS ACCESS POINTS INSTALLATION EAST WING Sacramento Plan # 164072WIRELESS ACCESS POINTSSANITARY LIFT STATION LINING REHABILITATION Modesto Plan # 193088HOUSEHOLD HAZARDOUS WASTE STATION IMPROVEMENT PROJECT Palo Alto Plan # 202095ANNUAL STORM DRAIN MAINTENANCE Placer Co. Plan # 210098FIRE DAMAGE REPAIRS AT LAS DELTAS UNITS 606 & 607 Richmond Plan # 211097SILAGE COVERING SERVICES (2-YR CONTRACT) Tracy Plan # 215079DMF VALVE REPLACEMENT AND HIGH PRESSURE PIPING Redwood City Plan # 217082RFQ - CIVIL ENGINEERING SERVICES - LA RUE BRIDGE OVER PUTAH Davis Plan # 226090CREEK WIDENING PROJECTSTORAGE, POOL AND SPA IMPROVEMENTS Mill Valley Plan # 228089RCD BOILER REPLACEMENT Oakland Plan # 235091INSTALL SAFETY STAIR AND DECK COVERS AT GUADALUPE LRT DIVISION San Jose Plan # 237087HANFORD NON CHEMICAL LANDSCAPE MAINTENANCE-RE-BID Hanford Plan # 241091RFP - PROFESSIONAL SERVICES - COMPRESSED NATURAL GAS SERVICES Palo Alto Plan # 243050MAINTENANCE AND REPAIR OF SECURITY VIDEO EQUIPMENT Various Locations Plan # 260050L-612 STUDENT SERVICE REMODEL Pittsburg Plan # 274041

Week At A Glance

Page 27: Construction e_zone

Contractor’s ZoneContractor’s Zone

HOUSEHOLD HAZARDOUS WASTE (HHW) DISPOSAL Stanislaus Co. Plan # 284043IPIC THEATERS WESTWOOD - BID PKG 2 Los Angeles Plan # 303011FALL 2012 ROOFING PROJECT - ALAMEDA UNIFIED SCHOOL DISTRICT Alameda Plan # 318005

Wednesday, November 07, 2012

VILLAGE OAKS SITEWORK San Jose Plan # 4010WASTEWATER TREATMENT PLANT ENERGY OPTIMIZATION IMPROVEMENT Grass Valley Plan # 17007PROJECTSAM’S CLUB - 4822-202RM Murrietta Plan # 550951640/1650 MISSION STREET EMERGENCY GENERATOR, DESIGN/BUILD San Francisco Plan # 105082ALTERATION & TENANT IMPROVEMENTS REMODEL RE-BIDARELIOUS WALKER STAIRWAY REPLACEMENT San Francisco Plan # 125081COSUMNES RIVER BOULEVARD EXTENSION I-5 TO FRANKLIN BOULEVARD Sacramento Plan # 133063SANTA CRUZ RIVER FRONT PARKING STRUCTURE PARCS SYSTEMS Santa Cruz Plan # 153062DISTRIBUTION SYSTEM VALVE REPLACEMENT Daly City Plan # 183073SLIDE-IN ASPHALT PATCH BOX Yuba City Plan # 196085KITCHEN HOODS - FIRE SUPPRESSION SYSTEM UPGRADES - RE-BID 2 San Quentin Plan # 197092TOWNPLACE SUITES Lancaster Plan # 277035LEVEE MAINTENANCE PROJECT - 2012 EROSION REPAIRS AT VARIOUS San Joaquin Co. Plan # 280044LOCATIONSSAM’S CLUB 4767-201 West Palmdale Plan # 286044SPROUTS FARMERS MARKET Petaluma Plan # 294033MH58 STRUCTURAL IMPROVEMENTS PROJECT Port of Stockton Plan # 296042JOANN FABRIC & CRAFT STORE RENOVATION Redding Plan # 304010RENTAL PROPERTY IMPROVEMENTS Martinez Plan # 306010PUBLIC STORAGE - 2046 San Diego Plan # 320005

Thursday, November 08, 2012

CHEVRON GAS STATION San Jose Plan # 1019GATEWAY EAST STORM SEWER IMPROVEMENT PROJECT San Jose Plan # 3013SCHOOL STREET PLAZA PROJECT Bridgeport Plan # 14012SAVERS -1197 Vacaville Plan # 30018HATCH-MOFFETT WELL NO. 23 ELECTRICAL UPGRADE PROJECT Ceres Plan # 66082LONG BEACH MAIN PUMPING PLANT PORTABLE PUMP CONNECCTIONS Long Beach Plan # 107084INTERIM POLICE STATION & G-2010 OFFICES San Jose Plan # 1280661701 DIVISADERO 1ST FLOOR - GI CLINIC EXPANSION San Francisco Plan # 1310694-PLEX HOUSING UNIT Merced Plan # 138057EL CAMINO - STREET AND SIDEWALK IMPROVEMENT PROJECT Sacramento Plan # 140047BRIDGE PREVENTIVE MAINTENANCE PROJECT Siskiyou County Plan # 146058RECLAIMED WATER SYSTEM IMPROVEMENTS (CONSTRUCTION) San Rafael Plan # 161058RFP -COMPLETEING LOMA’S AND FEMA ELEVATION CERTIFICATES FOR Citrus Heights Plan # 174099HABITABLE STRUCTURES WITHIN THE BASE FLOOD ELEVATIONNORTH TRUXEL STREETSCAPES Sacramento Plan # 208078LANDSCAPE AND INTERIOR PLANT MAINTENANCE San Francisco Plan # 229092NON-CHEMICAL LANDSCAPE MAINTENANCE SERVICES FOR THE HAYWARD Hayward Plan # 236092DMV FIELD OFFICE!!CANCELLED!!ASPHALT MAINTENANCE AND REPAIR Soledad Plan # 248049M STREET HISTORIC HOMES RESTORATION Fresno Plan # 268042

Page 28: Construction e_zone

November 5, 2012Page 26 Contractor’s Zone• .Contractor’s Zone

Week At A Glance

Thursday, November 08, 2012

POLICE VEHICLE EMERGENCY EQUIPMENT PARTS AND INSTALLATION Berkeley Plan # 302010LANDSCAPE MAINTENANCE FOR NORTH CORDELIA, SOUTHBROOK, Fairfield Plan # 311006CREEKSIDE LIGHTING & LANDSCAPE MAINTENANCE DISTRICTSLANDSCAPE MAINTENANCE FOR ROLLING HILLS-KOLOB-WATERMAN Fairfield Plan # 312004HIGHLANDS LIGHTING & LANDSCAPE MAINTENANCE DISTRICTSLANDSCAPE MAINTENANCE FOR VARIOUS PUBLIC FACILITIES Fairfield Plan # 313006LANDSCAPE MAINTENANCE - AIR BASE PARKWAY INTERCHANGE, TRAVIS Fairfield Plan # 314006BLVD INTERCHANGE AND INTERSTATE 80NORMAN Y. MINETA SAN JOSE INT’L AIRPORT - MECHANICAL SERVICES San Jose Plan # 315004CONTRACT 12-13

Friday, November 09, 2012

RFQ - ALL-INCLUSIVE BRIDGE ENGINEERING SERVICES ON VARIOUS Stanislaus Co. Plan # 168071PROJECTSREQUEST FOR STATEMENT OF QUALIFICATIONS - 1608 FOURTH STREET Berkeley Plan # 190087RFP - LANDSCAPE MANAGEMENT AND MAINTENANCE San Jose Plan # 200089STREET LIGHT POLE DELAMINATION REPAIR Sacramento Plan # 209002RFP - PROFESSIONAL ENGINEERING SERVICES - FOUR BRIDGES Sacramento Co. Plan # 242080CITY AUDITORIUM BOILERS Richmond Plan # 244092SEWER MAIN MANHOLE REHABILITATION PROJECT Woodland Plan # 249058MAIN LIBRARY EMERGENCY GENERATOR Richmond Plan # 261050RFQ - INTEREST FOR AIRPORT CONSULTING SERVICES AT EL DORADO Placerville/Georgetown Plan # 264043COUNTY AIRPORTSDOLLAR GENERAL STORE Los Banos Plan # 271045.

We have created a menu consisting of Traditional Italian Cuisine. All of our dishes are made in house and prepared to order using local ingredients when available. Simplicity and freshness are the key to authentic Italian cooking. Our menu will change frequently depending on seasonality. All wines & beer imported from Italy.

Traditional Italian Cuisine in Auburn

928 Lincoln Way, Auburn530.823.2994www.trepazzi.net

Outdoor dining in downtown!

To Run Your Legal Ad, Please Visit www.thedailyreporter.net Or Give Us A Call 916-729-5432

Page 29: Construction e_zone

Contractor’s ZoneContractor’s Zone

Mon. – Fri. 8-5Sat. 8-12, Sun. Closed

From large to small,HBE can do it all!

Rental Equipment & Tools

RENTALSRENTALSCarpet Cleaners

Chippers & CompressorsBackhoes & Excavators

Dozers & TrenchersTile Saws & Trailers

Tillers & ForkliftsScaffolding

& much more

CSL 207705

Est. 1953

273-338111727 LaBarr Meadows Rd.

Grass Valley

346-817445 Central Street

Colfax

Page 30: Construction e_zone

November 5, 2012Page 28 Contractor’s Zone• .Contractor’s Zone

CDOT 44

CDOT 30

CDOT 57

CDOT 30

CDOT 37

CDOT 30

CDOT 30

CDOT 30

CDOT 30

CDOT 23

CDOT 37

CDOT 23

CDOT 9

CDOT 2

CDOT 30

CDOT 30

11/06/2012

11/06/2012

11/07/2012

11/07/2012

11/08/2012

11/08/2012

11/08/2012

11/08/2012

11/08/2012

11/08/2012

11/14/2012

11/14/2012

11/14/2012

11/14/2012

11/15/2012

11/15/2012

1

1

2

1

1

1

1

0

0

1

0

1

0

0 1

0

MENDOCINO COUNTY

NEVADA COUNTY

ALAMEDA COUNTY

KERN COUNTY

SAN BERNARDINO COUNTY

LOS ANGELES COUNTY

LOS ANGELES COUNTY

LOS ANGELES COUNTY

SAN DIEGO COUNTY

LOS ANGELES COUNTY

HUMBOLDT COUNTY

HUMBOLDT COUNTY

MONO COUNTY

SHASTA COUNTY

LOS ANGELES COUNTY

SAN BERNARDINO COUNTY

CalTransDOT 01-385724 CONSTRUCT NEW BRIDGE AND ROCK FISH WEIR.

DOT 03-2F35U4 PAVEMENT REHABILITA-TION.

DOT 04-014074 PERFORM HIGHWAY PLANT-ING AND INSTALL IRRIGATION SYSTEM

DOT 06-0K3904 REPLACE EXISTING BRIDGE AND RECONSTRUCT RAMPS.

DOT 08-0K2604 COLD PLANE AND OVERLAY, UPGRADE MBGR, DIKES, REPLACE OVER-SIDE DRAINS

DOT 07-259104 CONSTRUCT STORM WATER TREATMENT BMPS.

DOT 07-267504 INSTALL MBGR AND CON-CRETE BARRIER, COLD PLANE AND OVER-LAY SHOULDER

DOT 07-2X9604 CONSTRUCT ROCK BLAN-KET AND INLETS AND HIGHWAY PLANTING.

DOT 11-290304 FOOTING/COLUMN RETRO-FIT, CONCRETE BARRIER, PLANTING AND IRRIGATION.

DOT 07-252614 REPLACE CONCRETE SLABS WITH PRECAST CONCRETE PANELS.

DOT 01-423704 RECONSTRUCT ROADWAY WITH HMA OVER AB AND CONSTRUCT RE-TAINING WALLS.

DOT 01-463914 RECONSTRUCT METAL BEAM GUARD RAILING

DOT 09-354504 PLACE ASPHALT-RUBBER SEAL COAT ON EXISTING PAVEMENT.

DOT 02-2E8704 REFURBISH BUILDING INTE-RIORS AND ADA PARKING. 1

DOT 07-2770U4 APPLY EROSION CONTROL.

DOT 08-0K2704 MILL, OVERLAY AC, METAL BEAM GUARD RAILS, DIKES AND OVER SIDE DRAINS

Page 31: Construction e_zone

Contractor’s ZoneContractor’s Zone

CDOT 23

CDOT 16

CDOT 16

CDOT 16

CDOT 9

CDOT 2

CDOT 16

CDOT 16

CDOT 30

CDOT 23

CDOT 16

CDOT 9

CDOT 37

CDOT 16

CDOT 2

11/15/2012

11/15/2012

11/27/2012

11/27/2012

11/27/2012

11/27/2012

11/28/2012

11/28/2012

11/29/2012

11/29/2012

11/29/2012

11/29/2012

12/06/2012

12/06/2012

12/12/2012

LOS ANGELES COUNTY

LOS ANGELES COUNTY

EL DORADO COUNTY

SAN LUIS OBISPO COUNTY

SOLANO COUNTY

TULARE COUNTY

BUTTE COUNTY

CONTRA COSTA COUNTY

ORANGE COUNTY

LOS ANGELES COUNTY

SAN DIEGO COUNTY

VENTURA COUNTY SAN BERNARDINOCOUNTY

SAN DIEGO COUNTY

FRESNO, KERN, MADERA AND TULARE COUNTIES

0

0

0

0

0

0

0

0

0

0

0

0 3

0

0

DOT 07-258704 PLACE HMA TEXURED PAVING AND SLOPE PAVING.

DOT 07-274304 UPGRADE MBGR, CRASH CUSH-IONS AND END TREATMENTS.

DOT 03-1A7324 PLACE HMA CONCRETE SUR-FACING AND MODIFY DRAINAGE SYSTEM

DOT 05-0C3304 CONSTRUCT SOLDIER PILE RE-TAINING WALL.

DOT 04-4A2504 INSTALL METAL BEAM GUARD RAILING.

DOT 06-0N5404 COLD PLANE AC PAVEMENT AND PLACE HMA SURFACING.

DOT 03-1E5104 RETROFIT STEEL MEMBERS, CLEAN AND PAINT STEEL, PREPARE BRIDGE DECK.

DOT 04-2285H4 WIDEN FREEWAY, CONSTRUCT RETAINING WALLS AND SOUND WALLS.

DOT 12-0C5704 ROUTE 91 WESTBOUND IM-PROVEMENTS OF RAMPS AND BRIDGE WID-ENING

DOT 07-3X0104 REPAIR SLOPE AND APPLY EROSION CONTROL.

DOT 11-298604 CONCRETE BARRIER, METAL BEAM GUARDRAIL AND END TREATMENT UP-GRADES.

DOT 07-228204 REPLACE SEAWALL AND RE-PAIR SHOLDER.

DOT 08-0Q7304 PAVEMENT REHABILITATION

DOT 11-2T1824 REPLACE STRUCTURE AND CONSTRUCT DIRECT ACCESS RAMP (DAR).

DOT 06-0C1304 RETROFIT BRIDGES WITH COM-POSITE COLUMN CASING, IN-FILL WALLS, CIDH

Page 32: Construction e_zone

November 5, 2012Page 30 Contractor’s Zone• .Contractor’s Zone

Monday, November 05, 2012

LAGUNA CREEK TRAIL CONNECTION AT CAMADA COURT IMPROVEMENT PROJECTPLAN #: 9022 Bid Date: 11/5/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Elk Grove Est Cost: $40,000.00OWNER: City of Elk Grove DESCR: Contact, David Lawson, 916-691-1243. Asphalt Conrete paving of an existing dirt path from the end of Camada Ct to the existing LagunaBIDDERS LIST:General Contractor: Bobo Construction, Inc. 916-685-2285 916-714-4850

BARRETT MIDDLE SCHOOL RESTROOM UPGRADESPLAN #: 16018 Bid Date: 11/5/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Carmichael Online & Print On Est Cost: $625,000.00 # OF ADDENDA: 3Demand PREBID: MAND 10/24 @ 3pm OWNER: San Juan Unified School District DESCR: Contact, Danny Martin, Innovative Construcction Services, Inc., 916-333-5701. The project consists of, but is not limited to the following scope(s) of work:Modernization of three gang rest rooms located at the end of wings #1-#8, #9-#16, and #17-#21. Locker room rest rooms also included. Modernization includes new flooring, wall finishes, new efficient fixtures, and water closets. Modernization will also bring rest rooms up to current ADA compliance codes. Construction of ADA compliant path from office to all rest rooms included in project.PLANS & SPECS ARE NOT AVAILABLE AT THIS TIME.BIDDERS LIST: Pre-bid Online 530-889-3953 530-889-3956General Contractor: D.g. Granade, Inc. 530-677-7484 530-677-7550 Hometown 916-991-2486 916-991-2881 D.g. Granade, Inc. 530-677-7484 530-677-7550 Bobo Construction, Inc. 916-685-2285 916-714-4850 Landmark Construction 916-663-1953 916-663-1867 S W Allen Construction 916-344-2098 916-344-0307 Owens Construction 530-878-3905 530-878-3906 Peterson Development 916-961-4756 916-966-0943 Younger General Cont 916-631-8000 916-631-8293 Seward L. Schreder 530-229-0001 530-229-0070

FAIRFIELD WALGREENS - 15432PLAN #: 62098 Bid Date: 11/5/2012 Bid Time: 5:00 PM PLANS AT: Roseville Office Location: Fairfield # OF ADDENDA: 2

G.C.: Woodland Construction Ph: (209) 545-1987 FAX: (209) 545-2114DESCR: Contact, Woodland Construction, Curtis Basore, 209-545-1987. Site demolition,; concrete; -unit masonry; -structural metal framing, metal joists/metal decking, cold formed metal framing, metal fabrications; carpentry; thermal insulation, aluminum-faced composite panel system, membrane roofing, built-up roofing system, thermoplastic membrane roofing (canopy roofs), flashing & sheet metal, joint protection, metal doors & frames, wood doors, specialty doors & frames, sliding decorative door assembly, folding grilles, storefronts & automatic entrancesm hardware, glazing; exterior portland cement plaster, gypsum boards, thin set tiling, acoustic ceilings, resilient flooring, carpeting, special wall surfacing, painting & vinyl wallcovering; miscellaneous specialties, toilet partitions & accessories, fire protection specialtyies, pre-manufactured canopy; drive-thru equipment; motorized roller shades, floor mats & frames; general mechanical; water based fire suppression; plumbing, HVAC; lighting & electrical systems; communications; sitework/excavation; paving, ornamental fence, planting/irrigation; site mechanical utilities. BIDDERS LIST:Sub Contractor: On-site Engineering 916-652-0600 916-652-0610Supplier: Groeniger & Company 916-455-3333 916-455-3402

HOMESTEAD SQUAREPLAN #: 119080 Bid Date: 11/5/2012 Bid Time: 12:00 PM PLANS AT: Roseville Office # OF ADDENDA: 2 Location: Cupertino G.C.: South Bay Construction Ph: 408-379-5500 FAX: 408-379-3256DESCR: Contact, South Bay Construction, Richard Furtado, ([email protected]) Seeking sub-bids for New Safeway, retail shopts / pad buildings consisting of facade remodel & site Improvements.BIDDERS LIST:Sub Contractor: H.a. Bowen Electric, Inc. 510-483-0500 510-483-7210

7101 BONITA WAY SEWER LOWER LATERAL RELOCATIONPLAN #: 123080 Bid Date: 11/5/2012 Bid Time: 11:00 AM PLANS AT: Roseville Office Location: Citrus Heights Online and Planroom Est Cost: $22,000.00OWNER: Citrus Heights Water District Ph: 916-725-6873 DESCR: Contact, Robert Churchill, 916-725-6873. Installing and connecting one 4-inch residential sewer service for the City of Citrus

Plans On File

Page 33: Construction e_zone

Contractor’s ZoneContractor’s Zone

Page 34: Construction e_zone

November 5, 2012Page 32 Contractor’s Zone• .Contractor’s Zone

Plans On File

Monday, November 05, 2012

FOLSOM LAKE COLLEGE - ATHLETIC FIELDS PHASEPLAN #: 141055 Bid Date: 11/5/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Folsom Planroom Est Cost: $1,953,000.00 # OF ADDENDA: 2PREBID: 10/24 @ 10am OWNER: Los Rios Community College District Ph: 916-856-3441 FAX: 916-856-3448DESCR: Contact, Janet DeBerard, 916-568-3077. Earthwork, grading and drainage, and site utility improvements. The Athletic Facilities are tennis court complex, interpretive trail and cross country course. BIDDERS LIST:General Contractor: F & H Construction 209-931-3738 209-931-4427 Bobo Construction, Inc. 916-685-2285 916-714-4850 Lamon Construction Co., 530-671-1370 530-671-7482 Otto Construction 916-441-6870 916-441-2486 Diede Construction 209-369-8255 209-368-0600 American River Const 530-621-1785 530-621-0360 Flintco 916-351-5400 916-294-0557Supplier: Blain Stumpf Sand 916-933-1555 916-933-2925

OLD CANYON ROAD BRIDGE PROTECTION REPAIR PROJECTPLAN #: 175090 Bid Date: 11/5/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Fremont Online and PlanroomOWNER: City of Fremont DESCR: Contact, City of Fremont, (510) 494-4620. Field

reconnaissance, site assessment, environmental review, permit acquisition, engineering design, and construction technical support for installing scour countermeasure improvements at the Old Canyon Road Bridge over the Alameda Creek.

ALARM MONITORING AT VARIOUS CHP CENTRAL DIVISION AREA OFFICESPLAN #: 186088 Bid Date: 11/5/2012 Bid Time: 4:00 PM PLANS AT: Roseville Office Location: Various Online and PlanroomOWNER: California Highway Patrol Ph: 916-375-2940 FAX: 916-375-2944DESCR: Contact, Kimberly Vlahos. 916-843-3800. Alarm Monitoring at Various CHP Central Division Area Offices.

REFRIGERATION PREVENTATIVE MAINTENANCEPLAN #: 216086 Bid Date: 11/5/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Sac/Placer/Yol Online and PlanroomOWNER: Department of Rehabilitation DESCR: Contact, Shari Cooley, 916-558-5690. Department of Rehabilitation is requesting bids for Refrigeration Preventative Maintenance, for the Sac/Placer/Yolo/Amador Counties.

UNION PACIFIC RAILROAD FENCE PROJECTPLAN #: 272049 Bid Date: 11/5/2012

Bid Time: 4:00 PM PLANS AT: Roseville Office Location: Elk Grove Planroom Est Cost: $25,000.00 OWNER: City of Elk Grove DESCR: Contact, Avtar Banwait, 916-478-3613. Furnish and install approx 1,200 ft of chain link fence along Union Pacific Railroad tracks just south of Elk Grove Blvd.

SECURITY SYSTEMS INSTALLATION AND TESTINGPLAN #: 287041 Bid Date: 11/5/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office

Continued from last page

Located in the heart of Downtown Auburn, serving Buyers & Sellers since 1987 Residential, Commercial & Investment

The Capps GroupA Professional Real Estate Team 530-823-2111 Office

www.cappsgroup.com

856 Lincoln Way, Auburn, CA 95603

Kevin Capps - Managing [email protected] (DRE # 01705659)

Carolyn Hearn - [email protected] (DRE # 01483632)

Page 35: Construction e_zone

Contractor’s ZoneContractor’s Zone

Location: Sacramento PlanroomEst Cost: $1,250,000.00 # OF ADDENDA: 2PREBID: 10/25 @ 1:30pm OWNER: Sacramento Municipal Utility District Ph: 888-742-7683 DESCR: Contact, Phleacia Christopher ([email protected]). Furnish, install, unit test, configure, calibrate, optimize, turn-up and test a perimeter zone security system at designated SMUD facilities, including installation of SMUD furnished surveillance cameras and infared illuminators.

Tuesday, November 06, 2012

WASTEWATER TREATMENT PLANT CAKE HOPPER EQUIPMENTPLAN #: 7017 Bid Date: 11/6/2012 Bid Time: 2:00 PM Location: San Mateo PLANS AT: Auburn & Roseville OfficeOnline & Print On Demand# OF ADDENDA: 1 OWNER: City of San Mateo DESCR: Contact, City of San Mateo, (650) 522-7300. Project consists of furnishing all applicable labor, materials including all applicable sales taxes, equipment, permits (if necessary), fees & other appurtenances of services to furnish & deliver a cake hopper per technical specs for the purpose of conveying cake at the San Mateo WTP. Installation of the equipment is not included BIDDERS LIST:Supplier: Jbi 916-933-5500 916-933-5573

COUNCIL CHAMBERS A/V SYSTEM RENOVATIONPLAN #: 12003 Bid Date: 11/6/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Antioch Online & Print On Demand PREBID: 10/17/12 @ 10:00 am # OF ADDENDA: 2 OWNER: City of Antioch DESCR: Contact, City of Antioch, (925) 779-7050. Complete renovation of the City of Antioch’s Council Chambers’ audiovisual systems, which consists of, but not limited to, cameras, production environment/switcher, sound system, graphics generator, projector and screen, etc.

JAMES DONLON & LARKSPUR WATER STORAGE RESERVOIR REHABILITATIONPLAN #: 20001 Bid Date: 11/6/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Antioch Est Cost: $890,000.00# OF ADDENDA: 1 OWNER: City of Antioch DESCR: Contact, City of Antioch - Capital Improvements (925) 779-7050. Project consists of Interior & exterior relining & repainting of two existing 2.0 million gallon, welded steel, potable water storage reservoir tanks, furnishing

& installing multi-level reservoir water quality sampling stations, submersible reservoir mixing systems, and removal & replacement of cathodic protection BIDDERS LIST:General Contractor: Cf Contracting 415-721-7160 415-296-6437

LIGHTING UPGRADES OF SOFTBALL FIELDSPLAN #: 29008 Bid Date: 11/6/2012Bid Time: 3:00 PM PLANS AT: Roseville Office Location: Fresno Est Cost: $306,700.00 # OF ADDENDA: 2 PREBID: 10-15-12 @ 10AM OWNER: City of Fresno DESCR: Contact, Fresno Purchasing Dept (559) 621-1332. Replacement of wood sports lighting poles, fixtures, and associated electrical with new wood sports lighting poles, fixtures, and associated electrical at Einstein and Quigley Playgrounds.

CARMICHAEL E.S./WHITNEY E.S. RESTROOMS UPGRADESPLAN #: 50096 Bid Date: 11/6/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Carmichael/Sa Online and PlanroomEst Cost: $525,000.00 # OF ADDENDA: 4PREBID: MAND 10/25 @ 2:30pm OWNER: San Juan Unified School District DESCR: Contact, Danny Martin, Innovative Construction Services, Inc., 916-333-5701. Carmichael ES: Modernization of two student gang restrooms; including new flooring, wall finishes, new efficient fixtures and water closets & ADA Compliance.Whitney ES: Modernization of two gang restrooms located at A & D Wings. Includes new flooring, wall finishes, new efficient fixtures and water closets, ADA Compliance.BIDDERS LIST: Pre-bid Online 530-889-3953 530-889-3956General Contractor: Hometown 916-991-2486 916-991-2881 D.g. Granade, Inc. 530-677-7484 530-677-7550 S W Allen Construction 916-344-2098 916-344-0307 Owens Construction 530-878-3905 530-878-3906 Younger General Cont 916-631-8000 916-631-8293 Seward L. Schreder 530-229-0001 530-229-0070

Continued on next page

Page 36: Construction e_zone

November 5, 2012Page 34 Contractor’s Zone• .Contractor’s Zone

Tuesday, November 06, 2012

DIXON STREET IMPROVEMENTSPLAN #: 54004 Bid Date: 11/6/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Hayward Online and PlanroomPREBID: 10/17 @ 2pm OWNER: City of Hayward DESCR: Contact, City of Hayward, (510) 583-4738. To improve vehicle, pedestrian and bicycle access. Removal of exidting curb and gutter, sidewalk, trees, overhead utilities and utility poles. Placement of nuew curb and gutter, joint trench, permeable pavers, sidewalk, sanitary sewer, strom drain, landscaping, signing and striping, street lighting and traffic signal and performing other items or details. BIDDERS LIST:General Contractor:

Cf Contracting 415-721-7160 415-296-6437 Ghilotti Construction Co 707-585-1221 707-585-1601

MARIEMONT ELEMENTARY SCHOOL, RESTROOM UPGRADESPLAN #: 56003 Bid Date: 11/6/2012 Bid Time: 3:00 PM PLANS AT: Roseville Office Location: Sacramento Online & Print On Demand PREBID: MAND 10/18 @ 3:30# OF ADDENDA: 1 OWNER: San Juan Unified School District DESCR: Contact, Vanir Construction Mgmt., Jeff Scruggs, 916-275-8440. Modernization of two sets of boys/girls restrooms, one set of single use restrooms and Kindergarten restrooms for ADA compliance and ADA path of travel flatwork leading to the restrooms.BIDDERS LIST:General Contractor: Hometown 916-991-2486 916-991-2881 Bobo Construction, Inc. 916-685-2285 916-714-4850 Landmark Construction 916-663-1953 916-663-1867 C & C Construction 916-434-5280 916-434-5288 Division 5-15, Inc. 916-638-1520 916-638-1521 Owens Construction 530-878-3905 530-878-3906 Peterson Development 916-961-4756 916-966-0943 Seward L. Schreder 530-229-0001 530-229-0070 American River Const 530-621-1785 530-621-0360

JONAS SALK MIDDLE SCHOOL AKA THOMAS EDISON LANGUAGE INSTITUTE K-6 RESTROOM UPGRADESPLAN #: 57098 Bid Date: 11/6/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: SacramentoPREBID: MAND 10/18 @ 1:30pm OWNER: San Juan Unified School District DESCR: Contact, Vanir Construction Mgmt., Jeff Scruggs, 916-275-8440. Site work, Concrete,Metals, Wood & Plastic, Thermal & Moisture Control, Doors and Windows, Finishes, Specialties, Mechanical, Electrical & Technology.BIDDERS LIST:General Contractor: Hometown 916-991-2486 916-991-2881 Landmark Construction 916-663-1953 916-663-1867 Division 5-15, Inc. 916-638-1520 916-638-1521 Owens Construction 530-878-3905 530-878-3906 Treehenge 530-269-2816 530-269-0289 Seward L. Schreder 530-229-0001 530-229-0070 American River Const 530-621-1785 530-621-0360Sub Contractor: Guardian Environmental 916-997-1830 916-641-5690

Continued from last page

Plans On File

[email protected]

www.Jensen-Masonry.com

Mark Jensen, Master Mason

• BBQ’s • Fireplaces • Brick • Rock • Etc.

JensenMasonry

916.663.3429

CCL#:804650

Page 37: Construction e_zone

Contractor’s ZoneContractor’s Zone

Ph: 916-630-7200 FAX: 916-630-4982DESCR: Contact, Tilton Pacific Construction, 916-630-7200. Construct 11,647 SF of tenant improvements, including demolition, construction staking, earthwork, grading, asphalt paving, striping, signage, asphalt slurry seal, underground utilities, landscaping, irrigation, concrete masonry, structural steel, rough carpentry, insulation, roofing, sheet metal flashings, caulking, doors, frames, hardware, storefront, lath / plaster, EIFS, metal studs / drywall, tile, acoustical ceilings, painting, flooring, FRP, sealed concrete, toilet accessories, fixtures, awnings, fire sprinklers, plumbing, HVAC, electrical and fire alarm. BIDDERS LIST:Supplier: Sunbelt Rentals 916-789-1234 916-789-7077

VETERINARY GENETICS LABORATORY SAMPLE STORAGE CONTAINERSPLAN #: 144058 Bid Date: 11/6/2012

Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Davis Online & Print OnEst Cost: $130,000.00 DemandPREBID: MAND 10/23 @ 9:30 AM OWNER: University Of California, Davis DESCR: Contact, Heather Eckels ([email protected]) (530) 752-6115. Install a new 51’ x 60’ - 8” minimum AB base cargo container pad and concrete sidewalk, including moving five existing cargo containers located at the grounds, furnishing / installing two new cargo containers on to the new AB pad, electrical connection improvements to all seven cargo containers, removal of cargo doors, construction of new insulated exterior walls with new 3’ x 6’ - 8” doors, new insulated interior walls, ceilings and florescent lighting.

HOSPITAL WIRELESS ACCESS POINTS INSTALLATION EAST WING WIRELESS ACCESS POINTSPLAN #: 164072 Bid Date: 11/6/2012 Bid Time: 11:00 AM PLANS AT: Roseville Office Location: Sacramento Online & Print On Est Cost: $359,000.00 DemandPREBID: MAND 10/23 @ 10 AM OWNER: University of California, Davis Health System DESCR: Contact, UC, Davis Health System (UCDHS) Lavell Tyler, Jr. (916) 734-7024. Relocate & install new and existing wireless access points; provide & install new surface wiremold raceway system for WAP cabling installation; terminate CAT6 cabling from each wireless access point device to new or existing patch panel; perform system testing; protect existing equipment and systems; patch & repair existing construction reuqired for new work or relocate existing WAPs and relocate up to 5% of WAPs after system testing for signal coverage.

CALISTOGA LIBRARY RE-ROOFPLAN #: 61076 Bid Date: 11/6/2012

Bid Time: 3:30 PM PLANS AT: Print On Demand Location: Calistoga Online & Print On Demand PREBID:MAND 10/30@ 8:30 amOWNER: County of Napa Ph: 707-253-4351 FAX: 707-253-4627DESCR: Contact: County of Napa (707) 253-4351.Re-roofing of approximately 2,900 square feet of sloped roof and 625 square feet of flat roof of the Calistoga Library.

SIMPKINS STADIUM CENTER KITCHEN ANSUL SYSTEM PROJECTPLAN #: 81073 Bid Date: 11/6/2012 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: San Jose Online & Print On Est Cost: $22,000.00 DemandPREBID: 10/23 @ 1:30PM OWNER: San Jose State University Ph: 408-924-2246 FAX: 408-924-7243DESCR: Contact, [email protected] and [email protected]. To provide all supervision, engineering, design, labor and materials necessary to install a complete new pre-engineered wet chemical fire extinguishing system for the protection of the existing cooking equipment, including exhaust hoods and ducts and related work.

WEST SAC TRIANGLE (70 UNIT MULTI-FAMILY HOUSING PROJECT)PLAN #: 102087 Bid Date: 11/6/2012Bid Time: 2:00 PM PLANS AT: Roseville Office Location: West Online & Print On DemandG.C.: Sunseri Associates Ph: 916-455-8200 FAX: 916-455-8229DESCR: Contact, SUNSERI Associates, Inc.., Julie Meeker, [email protected] Phone: (916) 455-8200 Fax: (916) 455-8229 West Sacramento Triangle Affordable Apartments will be a new 5-story building, housing 70 residential apartments with accessory use spaces and a one level podium garage. The structure will be reinforced concrete at the first level, with four levels of wood frame construction above. BIDDERS LIST:Supplier: Teichert Ready-mix 916-480-5535 916-978-9254

DOLLAR TREE TIPLAN #: 106089 Bid Date: 11/6/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: North Online & Print On DemandG.C.: Tilton Pacific Construction Continued on next page

Page 38: Construction e_zone

November 5, 2012Page 36 Contractor’s Zone• .Contractor’s Zone

Bid Time: 3:00 PM PLANS AT: Roseville Office Location: Palo Alto Online and Planroom# OF ADDENDA: 2 PREBID: MAND 10/24 @ 10am OWNER: City of Palo Alto DESCR: Contact, John Montenero, 650-329-2319. Requesting proposals for Household Hazardous Waste Station Improvement Project.BIDDERS LIST:General Contractor: Wickman Development 415-215-3473 415-341-0155Sub Contractor: Bennett Fencing 530-852-2618 000-000-0000 Mission City Rebar, Inc 925-449-6999 925-447-8797

FIRE DAMAGE REPAIRS AT LAS DELTAS UNITS 606 PLAN #: 211097 Bid Date: 11/6/2012 Bid Time: 2:30 PM PLANS AT: Roseville Office Location: Richmond PlanroomPREBID: 10/23/2012@11am OWNER: Housing Authority of the County of Contra Costa Ph: 925-957-8012 DESCR: Contact, Lorita K. Childress 925-957-8058. Fire Damage Repairs, 606 & 607 Las Deltas, North Richmond, Ca

ANNUAL STORM DRAIN MAINTENANCEPLAN #: 210098 Bid Date: 11/6/2012 Bid Time: 3:30 PM PLANS AT: Roseville Office Location: Placer Co. Online and Planroom# OF ADDENDA: 1OWNER: County of Placer Procurement Dept DESCR: Contact, County of Placer, Procurement, 530-889-7776. Annual storm drain maintenance in various locations.

SILAGE COVERING SERVICES (2-YR CONTRACT)PLAN #: 215079 Bid Date: 11/6/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Tracy PlanroomOWNER: California Prison Industry Authority DESCR: Contact, Kathi Young, ([email protected]) CALPIA is soliciting for Silage Covering Services at Deuel Vocational Institution.

DMF VALVE REPLACEMENT AND HIGH PRESSUREPLAN #: 217082 Bid Date: 11/6/2012 Bid Time: 2:00 PM PLANS AT: Roseville OfficeLocation: Redwood City Online & Print On Demand PREBID: 10/23 @ 10am OWNER: South Bayside System Authority DESCR: Contact, South Bayside System Authority (650) 591-7121. Project consists of non-shrink grout, protective coatings,

Tuesday, November 06, 2012

SANITARY LIFT STATION LINING REHABILITATIONPLAN #: 193088 Bid Date: 11/6/2012 Bid Time: 11:00 AM PLANS AT: Roseville Office Location: Modesto Online and Planroom# OF ADDENDA: 1 PREBID: 10/9 & 10/10 @ 9am OWNER: City of Modesto, Public Works Dept. DESCR: Contact, City of Modesto, 209-577-5462, Lou Schlitz ([email protected]) Sanitary Lift Station Lining Rehabilitation

HOUSEHOLD HAZARDOUS WASTE STATION IMPROVEMENT PROJECTPLAN #: 202095 Bid Date: 11/6/2012

Continued from last page

Plans On File

Page 39: Construction e_zone

Contractor’s ZoneContractor’s Zone

identifying devices, pipe supports, piping & accessories, butterfly valves, potable water system & high pressure air piping.

RFQ - CIVIL ENGINEERING SERVICES - LA RUE BRIDGE OVER PUTAH CREEK WIDENING PROJECTPLAN #: 226090 Bid Date: 11/6/2012 Bid Time: 4:00 PM PLANS AT: Roseville Office Location: Davis Online and PlanroomEst Cost: $2,000,000.00OWNER: University Of California, Davis DESCR: Contact, Kurt Wengler at ([email protected]). Provide civil engineering services for the La Rue Bridge over Putah Creek

STORAGE, POOL AND SPA IMPROVEMENTSPLAN #: 228089 Bid Date: 11/6/2012 Bid Time: 10:00 AM PLANS AT: Roseville Office Location: Mill Valley Online and PlanroomEst Cost: $710,000.00PREBID: MAND 10/29/12 @ 10:00 am OWNER: Strawberry Recreation District DESCR: Contact, Nute Engineering (415) 453-4480. Newly construct maintenance building and add rentable storage, relocate trash enclosure, relocate pool equipment, construct new Adult Spa, construct new Teaching Pool (relocate), construct new “Zero Depth” Children’s Water Play Area, rebuild east pool enclosure, improve/construct path of travel, improve parking lot, entry, and two dugouts. BIDDERS LIST:General Contractor: Romkon Inc. 415-525-4432 415-529-2073 Cf Contracting 415-721-7160 415-296-6437 A.e. Nelson Construction 707-636-1750 707-636-1755

RCD BOILER REPLACEMENTPLAN #: 235091 Bid Date: 11/6/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Oakland PlanroomOWNER: County of Alameda DESCR: Contact, County of Alameda, Tim Wesig, 510-208-9517. Furnish and install a new, low-pressure steam boiler equipped with a non-resettable gas meter in the boiler room of the Rene C. Davidson

INSTALL SAFETY STAIR AND DECK COVERS AT GUADALUPE LRT DIVISIONPLAN #: 237087 Bid Date: 11/6/2012 Bid Time: 1:30 PM PLANS AT: Roseville Office Location: San Jose Online and PlanroomPREBID: 10/29 @ 10:30 AM at 3331 North First St., Bldg A, San Jose OWNER: Santa Clara Valley Transportation Authority

Ph: 408-321-7189 FAX: 408-955-9729DESCR: Contact: VTA (408) 952-8981.Installation of safety tread stair covers & deck civers at the VTA Guadalupe Division Bldg A external staircase

HANFORD NON CHEMICAL LANDSCAPE MAINTENANCE-RE-BIDPLAN #: 241091 Bid Date: 11/6/2012Bid Time: 1:30 PM PLANS AT: Roseville Office Location: Hanford Online and PlanroomOWNER: Department of Motor Vehicles Ph: 916-657-7822 DESCR: Contact, Dyan Rose-Clemons, DMV, 916-657-6977. Provide Non Chemical Landscape Maintenance for the City of Hanford DMV.

RFP - PROFESSIONAL SERVICES - COMPRESSED NATURAL GAS SERVICESPLAN #: 243050 Bid Date: 11/6/2012 Bid Time: 3:00 PM PLANS AT: Roseville Office Location: Palo Alto Online and PlanroomOWNER: City of Palo Alto DESCR: Contact, ([email protected]) The City of Palo Alto is requesting proposals for Compressed Natural Gas Services.

MAINTENANCE AND REPAIR OF SECURITY VIDEO EQUIPMENTPLAN #: 260050 Bid Date: 11/6/2012Bid Time: 3:00 PM PLANS AT: Roseville Office Location: Various Online and PlanroomOWNER: State of CA - Dept. of Transportation Ph: 916-227-6033 FAX: 916-227-6112DESCR: Contact, Arlena Zavala, Fax: 916-227-6138. Provide Maintenance and Repair of Security Video Equipment for the Department of Transportation, Division of Procurement and Contracts.

Continued on next page

C&S Publishing has several key publications that go directly to the companies who will be getting those major work contracts, and who will need to buy services, supplies and materials. Is that money going to go to you or your competitors?

For rates, call Steve today at (916) 729.5432 or email him at [email protected]

Page 40: Construction e_zone

November 5, 2012Page 38 Contractor’s Zone• .Contractor’s Zone

Tuesday, November 06, 2012

L-612 STUDENT SERVICE REMODELPLAN #: 274041 Bid Date: 11/6/2012Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Pittsburg Online & Print On Est Cost: $10,000,000.00 # OF ADDENDA: 5DemandPREBID: MAND 9/27 @ 10am OWNER: Contra Costa Community College District Ph: 925-229-1000 FAX: 925-370-2019DESCR: Contact, Contra Costa Community College District Jovan Esprit ([email protected]) FAX: (925) 370-6517. Construct alterations to a two-story section, +/- 38,110 SF of the existing College Complex and a new two-story 7,470 SF addition, including demolition / hazardous material removal, a new steel-frame structural system, exterior enclosure, roofing system, elevator, interior partitions, casework, finishes, mechanical, pluming, fire protection, electrical, security, telecommunications, temporary relocation of existing main telephone and internet cables, etc. BIDDERS LIST: Cooper Pugeda Manag 415-552-5511 415-543-6510General Contractor: F & H Construction 209-931-3738 209-931-4427 C. Overaa And Co. 510-234-0926 510-237-2435 Landmark Construction 916-663-1953 916-663-1867Sub Contractor: G. D. Long Electric Co 707-252-3512 707-252-8340 Quality Erectors & Const 707-746-1233 707-751-3962 Mission City Rebar, Inc 925-449-6999 925-447-8797

HOUSEHOLD HAZARDOUS WASTE (HHW) DISPOSALPLAN #: 284043 Bid Date: 11/6/2012 Bid Time: 2:30 PM PLANS AT: Roseville Office Location: Stanislaus Co. Planroom# OF ADDENDA: 3 OWNER: County of Stanislaus DESCR: Contact, Stephanie Shafer ([email protected]), 209-525-7787. Household Hazardous Waste (HHW) Disposal

IPIC THEATERS WESTWOOD - BID PKG 2PLAN #: 303011 Bid Date: 11/6/2012

Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Los Angeles # OF ADDENDA: 5G.C.: RSR Construction Co. Ph: 503-645-8531 FAX: 503-645-5357DESCR: Contact, RSR Construction, Becki Wildschut, 503-645-8531 ext.#537 Fax: 503-645-5357 ([email protected]) Construct an upscale 6 screen theater with 2 kitchens with restaurant & bar. Also, includes office space. Bid Package #2 includes all scopes of work except

FALL 2012 ROOFING PROJECT - ALAMEDA UNIFIED SCHOOL DISTRICTPLAN #: 318005 Bid Date: 11/6/2012 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Alameda Online and PlanroomPREBID: MAND 10/29 @ 1 pm @ 210 Central Avenue, Alameda DESCR: Contact: Counterpoint Construction Services Inc (707) 824-8440. 1. ENCINAL HIGH SCHOOL- 210 Central Avenue, Alameda, CA • Re-Roof 400 Wing as shown (refer to aerial plan for location of building) and asspecified herein 2. Island High School-1900 Third Street, Alameda, CA • Re-roof

Continued from last page

Plans On File

INFO CENTER

CONTACT

WEB SITE

ABOUT

LegaloptionstoimproveyourfinancialfutureBankruptcy•Company&PersonalDebt•Foreclosure

CALL TODAY (530) 888-7100www.BottomLineLawyers.com 985 Lincoln Way, Auburn, CA 95603

Page 41: Construction e_zone

Contractor’s ZoneContractor’s Zone

classroom wings as shown (refer to aerial plan for location). 3. Lincoln Middle School-1250 Ferndale Blvd, Alameda, CA • Re-roof Media Center as shown (refer to aerial plan for location).

Wednesday, November 07, 2012

VILLAGE OAKS SITEWORKPLAN #: 4010 Bid Date: 11/7/2012 Bid Time: 10:00 AM PLANS AT: Roseville Office Location: San Jose Online & Print On DemandG.C.: SD Deacon Corp. Ph: 916-969-0900 FAX: 916-735-0800DESCR: Contact, SD Deacon, [email protected]. Site Work (30 Acres). Trades to include: Surveying/staking, SWPPP’s, Grading,AC Paving, underground utilities, stripping and signage, conrete, biotreatment basins,landscaping, CMU, rough carpentry, structural steel, site amenities, roofing, sheetmetal/flashing, plaster ,painting and electrical. BIDDERS LIST:General Contractor: Mcguire & Hester 510-632-7676 510-562-5209

WASTEWATER TREATMENT PLANT ENERGY OPTIMIZATION IMPROVEMENT PROJECTPLAN #: 17007 Bid Date: 11/7/2012 Bid Time: 3:30 PM PLANS AT: Roseville Office Location: Grass Valley Online and PlanroomEst Cost: $110,000.00 # OF ADDENDA: 1OWNER: City of Grass Valley Dept Of Public Works DESCR: Contact, City of Grass Valley, Department of Public Works (530) 274-4352. Construct improvements, including modifications to controls for the aeration system and the WAS storage and conveyance system.

POLICE BUILDING REMODEL PROJECTPLAN #: 36005 Bid Date: 11/7/2012Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Wheatland Planroom Est Cost: $80,000.00PREBID: MAND 10/29 @ 2pm OWNER: City of Wheatland DESCR: Contact, City of Wheatland, 530.633.2761. Work consists of the improvements to an existing unoccupied 3,808 SF building including: interior demolition, parition walls, cover and add exterior openings, electrical, plumbing, HVAC, interior finishes, painting and various other items of work. BIDDERS LIST:General Contractor: B & B General Engin. 530-277-7305 530-237-1798 Peterson Development 916-961-4756 916-966-0943 Owens Construction 530-878-3905 530-878-3906

Supplier: Cavolt & Sons Inc 916-624-8222 916-624-0878

SAM’S CLUB - 4822-202RMPLAN #: 55095 Bid Date: 11/7/2012 Bid Time: 11:00 AM PLANS AT: Roseville Office Location: MurriettaG.C.: Shames Construction Ph: 925-606-3000 FAX: 925-606-6656DESCR: Contact, Shames Construction, 925-606-3000. Scopeofworkincludes:Interior/lition,ErosionControl,Paving,TileWarningSystem,SiteConcrete,StripingandSignage,PavementSealcat,Masonry,PartialInteriorSlabConcreteReplacement,ConcretePolishing,poxyFlooring,Structural/MiscSteel,SheetMetal,Roofing,Stucco/EIFS,Paint,Caulking&Sealants,MetalStudDrywall,Insulation,CeramicTile,,Fiing,Flooring,AcousticalCeiAccessories,FixtureAnchoring,DockEquipment,OverheadDoors,Fencing,FireSprinklers,HVAC,Plumbing,Electrical,Refrigeration,EMS,Se

1640/1650 MISSION STREET EMERGENCY GENERATOR, DESIGN/BUILD ALTERATION & TENANT IMPROVEMENTS REMODEL RE-BIDPLAN #: 105082 Bid Date: 11/7/2012 Bid Time: 2:30 PM PLANS AT: Roseville Office Location: San Francisco Online & Print On Est Cost: $1,400,000.00 # OF ADDENDA: 3Demand PREBID: 10/*18 @ 1:30pm OWNER: City & County of San Francisco DESCR: Contact, Paul Travis, 415-557-4631. The work is replacement of the emergency power system at 1640/1650 Mission Street building, including, but not limited to, design services, demolition, furnishing and installing new diesel generator and automatic transfer switch, sound enclosure, concrete pads, tank system, fire alarm system, structural supports, tenant improvements, and all appurtenant work.

ARELIOUS WALKER STAIRWAY REPLACEMENTPLAN #: 125081 Bid Date: 11/7/2012 Bid Time: 2:30 PM PLANS AT: Roseville Office Location: San Francisco Online & Print On Est Cost: $500,000.00 Demand# OF ADDENDA: 1 PREBID: 10/25 @ 1:30pm OWNER: City & County of San Francisco DESCR: Contact, Raymond Lui, 415-558-4585. The work to be done under this contract is located at Arelious Walker Drive between Innes Avenue and Northridge Road in the northwestern portion of the Bayview Hunters Point District in San Francisco and includes demolition of existing concrete stairway and work to furnish and install new concrete stairway with anti-slip strip at noising, metal railing, and vandal

Continued on next page

Page 42: Construction e_zone

November 5, 2012Page 40 Contractor’s Zone• .Contractor’s Zone

Wednesday, November 07, 2012

COSUMNES RIVER BOULEVARD EXTENSION I-5 TO FRANKLIN BOULEVARDPLAN #: 133063 Bid Date: 11/7/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Sacramento Online & Print On Est Cost: $68,238,450.00 # OF ADDENDA: 4Demand PREBID: 10/16 @ 10am OWNER: City of Sacramento DESCR: Contact, Nader Kamal, 916-808-7035. Construction of the extension of Cosumnes River Blvd., from Franklin Rd., to Freeport Blvd., including the construction of a new interchange and overcrossing at Interstate-5 and bridge over Morrison Creek. Includes; construction of new roadways, curb, gutters, sidewalks, drainage facilities, water lines, sewer facilities, landscaping and street lighting and traffic signal BIDDERS LIST:General Contractor: Shasta Constructors 530-365-3930 530-365-5465Supplier: Blain Stumpf Sand 916-933-1555 916-933-2925

SANTA CRUZ RIVER FRONT PARKING STRUCTURE PARCS SYSTEMSPLAN #: 153062 Bid Date: 11/7/2012Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Santa Cruz Online & Print On Est Cost: $535,000.00 DemandPREBID: MAND 10/22 @ 10AM # OF ADDENDA: 2 OWNER: City of Santa Cruz DESCR: Contact, City of Santa Cruz (831) 420-5160. Demolition and installation of new PARCS system and prefabricated office and existing open air parking structure,

COSUMNES RIVER BOULEVARD EXTENSION I-5 TO FRANKLIN BOULEVARDPLAN #: 133063 Bid Date: 11/7/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Sacramento Online & Print On Est Cost: $68,238,450.00 # OF ADDENDA: 3Demand PREBID: 10/16 @ 10am OWNER: City of Sacramento DESCR: Contact, Nader Kamal, 916-808-7035. Construction of the extension of Cosumnes River Blvd., from Franklin Rd., to Freeport Blvd., including the construction of a new interchange and overcrossing at Interstate-5 and bridge over Morrison Creek. Includes; construction of new roadways,

Continued from last page

Plans On Filecurb, gutters, sidewalks, drainage facilities, water lines, sewer facilities, landscaping and street lighting and traffic signal BIDDERS LIST:General Contractor: Shasta Constructors 530-365-3930 530-365-5465Supplier: Blain Stumpf Sand 916-933-1555 916-933-2925

DISTRIBUTION SYSTEM VALVE REPLACEMENTPLAN #: 183073 Bid Date: 11/7/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Daly City Online and Planroom Est Cost: $97,000.00 OWNER: City of Daly City DESCR: Contact, Tom Piccolotti, 650-991-8207. Installation of (24) new water main valves with restrained connections, new valve pots with risers, valve extensions, excavation, shoring, locating and spupporting of other utilites within the trench area, backfill of trench and temporary restoration of sidewalk/driveway/walkway/planting/roadway.

SLIDE-IN ASPHALT PATCH BOXPLAN #: 196085 Bid Date: 11/7/2012Bid Time: 10:00 AM PLANS AT: Roseville Office Location: Yuba City Online and PlanroomOWNER: County of Sutter DESCR: Contact, Sutter County Public Works, 530-822-7473. (1) One Slide-In Asphalt Patch Box to be frnished to the Sutter County Department of Public Works/Roads Division.

KITCHEN HOODS - FIRE SUPPRESSION SYSTEM UPGRADES - RE-BID 2PLAN #: 197092 Bid Date: 11/7/2012 Bid Time: 3:00 PM PLANS AT: Print On Demand Location: San Quentin Online & Print On Est Cost: $75,000.00 DemandPREBID: MAND 10/24 @ 10am OWNER: State of CA - Dept of Corrections & Rehabilitation DESCR: Contact, Xavier Contreras, 916-255-6165. Contractor shall provide all labor, supplies, materials, transportation, bonds, insurance, travel and per diem, tools, mobilization, waste disposal, testing and every other item of expense necessary to install six (6) kitchen hood fire suppression systems to meet the California State Fire Code application of Underwriters Laboratories Standard 300 (UL300) and as per the attached plans and specifications at San Quentin State Prison (SQSP), at San Quentin, California 94964.

TOWNPLACE SUITESPLAN #: 277035 Bid Date: 11/7/2012 Bid Time: 2:00 PM PLANS AT: Print On Demand

Page 43: Construction e_zone

Contractor’s ZoneContractor’s Zone

MH58 STRUCTURAL IMPROVEMENTS PROJECTPLAN #: 296042 Bid Date: 11/7/2012 Bid Time: 3:00 PM PLANS AT: Roseville Office Location: Port of Stockton Online and PlanroomPREBID: MAND 10/24 @ 10 AM OWNER: Port of Stockton DESCR: Contact, Port of Stockton Steve Escobar (209) 946-0246. Construct site improvements for an existing material storage building, including sawcutting pavement, asphalt grinding, excavation, grading, compaction, installation of base rock, installation of concrete, storm water pollution control, etc.BIDDERS LIST:General Contractor: Andrew L. Lee, Inc. 209-369-8077 209-368-2435 Diede Construction 209-369-8255 209-368-0600

JOANN FABRIC & CRAFT STORE RENOVATIONPLAN #: 304010 Bid Date: 11/7/2012

Bid Time: 4:00 PM PLANS AT: Auburn & Roseville Location: Redding # OF ADDENDA: 1PREBID: 10/29 to 10/31 from 8 AM to 5 PM G.C.: Construction 1 IncPh: 614-961-1117 FAX: 614-961-1317DESCR: Contact, Construction One, Inc., (614) 961-1115 Fax:(614) 961-1315. Renovate an +/- 28,535 SF building, including selective demolition, asphalt repair, site and building concrete, concrete cutting, masonry, steel, carpentry, insulation, EIFS, roofing, storefront, drywall, acoustical ceiling, flooring (installation of Owner-supplied VCT and sheet vinyl and furnishing / installation of ceramic tile), painting, FRP, loading dock equipment, sprinklers, plumbing, HVAC and electrical. **Do NOT contact the vendors, architect or owner. RENTAL PROPERTY IMPROVEMENTSPLAN #: 306010 Bid Date: 11/7/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Martinez Est Cost: $55,000.00PREBID: 10/30 @ 10am OWNER: Central Contra Costa Sanitary Dist. DESCR: Contact, Chathu Abeyrathna, 925-335-7764. Improvements to office spaces, including ADA improvements.

Location: Lancaster Online & Print On # OF ADDENDA: 1 DemandG.C.: Tricorp/Hearn Construction Ph: 916-779-8010 FAX: 916-779-8011DESCR: Contact, James Morefield ([email protected]) Scope of Work:New construction of a new 52,594 sq. ft., 4 story, 92 room hotel with associated site work. Project is to have a small prep kitchen, outdoor pool to be under separate deferred submittal.This is NOT a Prevailing Wage project.All bids to be good for a minimum of 60 days from bid dateSubcontractor bonds may be required – provide your bond rating with your bid submittal.

LEVEE MAINTENANCE PROJECT - 2012 EROSION REPAIRS AT VARIOUS LOCATIONSPLAN #: 280044 Bid Date: 11/7/2012

Bid Time: 2:30 PM PLANS AT: Roseville Office Location: San Joaquin Planroom Est Cost: $85,000.00OWNER: Reclamation District No. 2 DESCR: Contact, Kjeldsen, Sinnock & Neudeck, Inc., 209-946-0268. Preparing the levee waterside erosion repair sites for slope protection and furnishing and placing approximately 3,570 tons of 18-inch minus quarry stone riprap along the designated.,

SAM’S CLUB 4767-201PLAN #: 286044 Bid Date: 11/7/2012Bid Time: 11:00 AM PLANS AT: Roseville Office Location: West G.C.: Shames Construction Ph: 925-606-3000 FAX: 925-606-6656DESCR: Contact, Shames Construction, 925-606-3000. Interior/ExteriorDemolition, ErosionControl,SiteConcrete,StripingandSignage,PavementSealcoat,PartialInteriorSlabConcreteReplacement,ConcretePolishing,EpoxyFlooring,Structural/MiscSteel,SheetMetal,Roofing,InteriorPaint,Caulking&Sealants,MetalStudDrywall,Insulation,CeramicTile,FRP,DFH,Fixturing,Millwork,RoughCarpentry,GlassandGlazing,AcousticalCeilings,ToiletAccessories,FixtureAnchoring,DockEquipment,OverheadDoors,Fencing,FireSprinklers,HVAC,Plumbing,Electrical, Refrigeration, EMS, Seismic Protection, Tire

SPROUTS FARMERS MARKETPLAN #: 294033 Bid Date: 11/7/2012

Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Petaluma Online & Print On DemandG.C.: Midstate Construction Ph: (707) 762-3200 FAX: (707) 762-0700DESCR: Contact, Midstate Construction, 707-559-2320. New Costruction, approximately 25,100 SQ. FT. Continued on next page

Page 44: Construction e_zone

November 5, 2012Page 42 Contractor’s Zone• .Contractor’s Zone

Wednesday, November 07, 2012

PUBLIC STORAGE - 2046PLAN #: 320005 Bid Date: 11/7/2012 Bid Time: 11:00 AM PLANS AT: Roseville Office Location: San Diego Online & Print On DemandG.C.: Shames Construction Ph: 925-606-3000 FAX: 925-606-6656DESCR: Contact, Shames Construction, 925-606-Construction of a New 3 Story Storage Facility. TradesNeeded:SiteDemolition,ErosionControl,Survey,Grading/Paving/triping,UndergroundUtilitiesscape,SiteConcrete,BldgConcrete,Masonry,StructuralSteel,Plaster/,Waterproofing,SingleplyroofingoverRidgidInsulation,MetalRoofing,hitectualSheetMetal,StorefrontGlazing,DFH,OverheadDoors,Insulation,ToiletAccessories,Caulking/Sealants,Drywall,Flooring,FRP,Painting,Elevators,

Thursday, November 08, 2012

CHEVRON GAS STATIONPLAN #: 1019 Bid Date: 11/8/2012

Bid Time: 5:00 PM PLANS AT: Roseville Office Location: San JoseG.C.: Town & Country Contractors Ph: 916-636-9500 FAX: 916-636-9507DESCR: Contact, Town & County Contractors, Dave Frazierr ([email protected]) 916-636-9500, Fax:916-636-9507. Ground up construction for a Chevron Gas Station in San Jose

GATEWAY EAST STORM SEWER IMPROVEMENT PROJECTPLAN #: 3013 Bid Date: 11/8/2012 Bid Time: 3:00 PM PLANS AT: Roseville Office Location: San Jose OWNER: City of San Jose # OF ADDENDA: 1DESCR: Contact, Greg Card, 408-535-8300. Construction, Sewer and Storm Drain, Maintenance and Repair, Sewer and Storm drain ( Including

SCHOOL STREET PLAZA PROJECTPLAN #: 14012 Bid Date: 11/8/2012Bid Time: 4:30 PM PLANS AT: Roseville Office Location: Bridgeport Online & Print On DemandPREBID: MAND 10/25 @ 11am OWNER: County of Mono FAX: 760-932-5441

DESCR: Contact, County of Mono, 760-932-5440. Removal of existing sidewalk, curb, gutter, asphalt and landscape and placement of new sidewalk, curb and gutter, pedestrian ramps, electrical installation and

SAVERS -1197PLAN #: 30018 Bid Date: 11/8/2012 Bid Time: 3:00 PM PLANS AT: Roseville Office Location: VacavilleG.C.: R & O Construction Ph: 702-895-9322 FAX: 702-895-9388DESCR: Contact, R & O Construction, Don Mataya, 702-895-9322 x 1001. Project Description:28,262 sq ft Tenant Improvement for new Savers Retail Store. Includes all interior and exterior finishes. Miscellaneous Onsite Improvements will be included for front parking and back loading

HATCH-MOFFETT WELL NO. 23 ELECTRICAL UPGRADE PROJECTPLAN #: 66082 Bid Date: 11/8/2012

Bid Time: 10:00 AM PLANS AT: Print On Demand Location: Ceres Online & Print On # OF ADDENDA: 1 DemandOWNER: City of Ceres DESCR: Contact, City of Ceres, (209) 538-5792. Installation of one (1) new standby generator, transfer switch, removal & disposal of existing generator, transfer switch & associated work.

LONG BEACH MAIN PUMPING PLANT PORTABLE PUMP CONNECCTIONSPLAN #: 107084 Bid Date: 11/8/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Long Beach Planroom # OF ADDENDA: 2 PREBID: MAND 9/25 @ 10am OWNER: Sanitation Districts of Los Angeles County DESCR: Contact, Melissa Fischer, 562-908-4288, ext. 6807. Portable pump connections at the Long Beach Main Pumping Plant.

INTERIM POLICE STATION & G-2010 OFFICESPLAN #: 128066 Bid Date: 11/8/2012 Bid Time: 3:00 PM PLANS AT: Roseville Office Location: San Jose Online & Print On Est Cost: $900,000.00 DemandPREBID: MAND 10/24/12 AT 2 PM OWNER: San Jose/Evergreen Community College District DESCR: Contact, Program Manager ([email protected]) Project consists of selective structure demolition, concrete topping, rough & finish carpentry, blanket insulation, expansion

Continued from last page

Plans On File

Page 45: Construction e_zone

Contractor’s ZoneContractor’s Zone

joint cover assemblies, custom hollow metal doors & frames, bullet resistant hollow metal door & frame assembly, bullet resistant transaction windows, door hardware, gyspsum board assemblies, bullet resistant fiberglass, acoustical panel ceilings (T-Bar Ceilings), resilient base & accessories, sheet linoleum floor covering, tile carpeting, painting, horizontal louver blinds, educational/library casework (plywood), plumbing, HVAC, lighting, electrical, communications, fire alarm, access control & alarm monitoring system, video surveillance, security testing, soils for earthwork, site clearing, rough grading, excavation & fill, trenching, backfill, aggregate base course, asphalt pavement, concrete paving, chain link fenceBIDDERS LIST:General Contractor: Clp Construction 916-344-6646 916-331-4335 Strawn Construction, Inc 408-286-1299 408-286-1288

1701 DIVISADERO 1ST FLOOR - GI CLINICPLAN #: 131069 Bid Date: 11/8/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: San Francisco Est Cost: $500,000.00PREBID: MAND 10/30/12 AT 10 AM OWNER: University of California, S.F. Medical Center DESCR: Contact, UCSF - Ben La (415) 476-5030. Project consists of complete & selective demolition of the project area including removing finishes, casework, walls, ceilings, plumbing & electrical work as called for on the drawings or required for installation of the new work. The General Scope of new work includes Architectural, Mechanical, Plumbing, Electrical, and Fire & Life Safety upgrade work BIDDERS LIST:General Contractor: Cf Contracting 415-721-7160 415-296-6437

4-PLEX HOUSING UNITPLAN #: 138057 Bid Date: 11/8/2012

Bid Time: 4:00 PM PLANS AT: Roseville Office Location: Merced Online & Print On # OF ADDENDA: 1 DemandPREBID: 10/16 @ 2pm OWNER: Merced County Community Action Agency Ph: 209-381-5221DESCR: Contact, Merced Co Community Action Agency (209) 381-5221. Scope of work involves, but not limited to: On & Off Site Improvements and Construction of a new wood framed, slab on grade building consisting of four residential units.

EL CAMINO - STREET AND SIDEWALK IMPROVEMENT PROJECTPLAN #: 140047 Bid Date: 11/8/2012 Bid Time: 2:00 PM PLANS AT: Roseville OfficeLocation: Sacramento Online and Planroom Est Cost: $2,540,000.00

OWNER: County of Sacramento - Municipal Services Agency Ph: 916-875-6789 :DESCR: Contact, Sacramento County Municipal Services Agency (916) 874-6544. The work to be performed under this contract includes the furnishing of all labor, materials, and equipment for clearing and grubbing, pavement grinding and removal, tree removal, roadway excavation, installation of curb gutter & sidewalk, installation of drainage pipes, manholes & inlets, aggregate base and asphalt pavement, traffic striping, traffic signal modifications, street lighting, median construction, placement of landscaping and other incidental work. BIDDERS LIST:General Contractor: Doug Veerkamp General 530-626-0825 530-626-7917 C & C Construction 916-434-5280 916-434-5288 Westcon Construction 916-663-2425 916-663-2448 Lamon Construction Co. 530-671-1370 530-671-7482Sub Contractor: Studebaker Brown Elect 530-333-3423 530-823-1341

BRIDGE PREVENTIVE MAINTENANCE PROJECTPLAN #: 146058 Bid Date: 11/8/2012 Bid Time: 10:00 AM PLANS AT: Location: Siskiyou County Online and PlanroomOWNER: County of Siskiyou FAX: 530-842-8288DESCR: Contact: County of Siskiyou 530-842-8250.The bridge work consists of repairing bridge deck surfaces, applying waterproofing membranes and asphalt concrete overlays, repairing roadway approach settlements, applying asphalt concrete roadway approach overlays, raising and or repairing guardrail and bridge barrier heights, repairing isolated substructure spalls, and joint seal BIDDERS LIST:General Contractor: Timberworks 530-926-4093 530-926-2118

RECLAIMED WATER SYSTEM IMPROVEMENTS (CONSTRUCTION)PLAN #: 161058 Bid Date: 11/8/2012 Bid Time: 10:30 PM PLANS AT: Roseville Office Location: San Rafael Planroom Est Cost: $500,000.00 PREBID: 10/25 @ 10AM OWNER: Central Marin Sanitation Agency Ph: 415-459-1455 DESCR: Contact, Ken Katen, 415-459-1455. Demolish existing hydropneumatic tank, reclaimed water ppumps, reclaimed water strainers and associated electrical equipment and install new Agency-supplied replacement hydropneumatic tanks, reclaimed water pumps reclaimed water strainers and associate electrical equipment etc.BIDDERS LIST:General Contractor: Cf Contracting 415-721-7160 415-296-6437

Continued on next page

Page 46: Construction e_zone

November 5, 2012Page 44 Contractor’s Zone• .Contractor’s Zone

Thursday, November 08, 2012

RFP -COMPLETEING LOMA’S AND FEMA ELEVATION CERTIFICATES FOR HABITABLE STRUCTURES WITHIN THE BASE FLOOD ELEVATIONPLAN #: 174099 Bid Date: 11/8/2012 Bid Time: 3:30 PM PLANS AT: Roseville Office Location: Citrus Heights Online and PlanroomPREBID: MAND 10/30 @ 2pm OWNER: City of Citrus Heights DESCR: Contact, Cesar Montes de Oca, (916) 727-4770. The City of Citrus Heights Gener5al Services Department invites proposals to conduct the survey field work and complete the paperwork required by FEMA to file FEMA elevation certificates and LOMAs.

NORTH TRUXEL STREETSCAPESPLAN #: 208078 Bid Date: 11/8/2012

Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Sacramento Online and PlanroomOWNER: City of Sacramento DESCR: Contact, Sheryl Fox, City of Sacramento, 916-808-4959. Landscape maintenance, repair of traffic control systems, strrecapes.

LANDSCAPE AND INTERIOR PLANT MAINTENANCEPLAN #: 229092 Bid Date: 11/8/2012Bid Time: 2:00 AM PLANS AT: Roseville Office Location: San Francisco Online and PlanroomPREBID: MAND 10/ 30 @ 10am OWNER: California Dept. of General Services DESCR: Contact, Whitney Lemont, 916-323-3750. The Contractor shall provide all labor, equipment, and materials required to provide landscaping maintenance for all exterior plants and trees, including planters and beds on all four (4)sides of the facility and maintenance of all interior plants.

NON-CHEMICAL LANDSCAPE MAINTENANCE SERVICES FOR THE HAYWARD DMV FIELD OFFICEPLAN #: 236092 Bid Date: 11/8/2012 Bid Time: 1:30 PM PLANS AT: Roseville OfficeLocation: Hayward Online and PlanroomPREBID: MAND 10/18 @ 9:00am OWNER: DMV Ph: 916-657-7822 DESCR: Contact, Allison Stanek, 916-657-9810. Seeking proposals for Non-Chemical Landscape Maintenance Services for the Hayward DMV

NON-CHEMICAL LANDSCAPE MAINTENANCE SERVICES FOR THE HAYWARD DMV FIELD OFFICEPLAN #: 236092 Bid Date: 11/8/2012 Bid Time: 1:30 PM PLANS AT: Roseville Office Location: Hayward Online and PlanroomPREBID: MAND 10/18 @ 9:00am OWNER: Department of Motor Vehicles Ph: 916-657-7822 DESCR: Contact, Allison Stanek, 916-657-9810. Seeking proposals for Non-Chemical Landscape Maintenance Services for the Hayward DMV

!!CANCELLED!ASPHALT MAINTENANCE AND REPAIRPLAN #: 248049 Bid Date: 11/8/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Soledad Online and PlanroomPREBID: MAND 10/30 @ 9am OWNER: State of CA - Dept of Corrections & Rehabilitation DESCR: Contact, Tracey Morrison, 916-255-5658. Asphalt Maintenance and Repair at the Correctional Training Facility located in Soledad, Ca.

M STREET HISTORIC HOMES RESTORATIONPLAN #: 261042 Bid Date: 11/8/2012 Bid Time: 3:00 PM PLANS AT: Roseville OfficeLocation: Fresno Online & Print On Est Cost: $950,000.00 Demand# OF ADDENDA: 2 OWNER: City of Fresno PREBID: MAND 10-23-12 @ 10AM DESCR: Contact, City of Fresno, (559) 621-1332. Restoration of five (5) Historic Homes. The homes exteriors will be finished. All missing siding and finish trim will be installed. All windows and doors in storage will be fully abated and returned to working condition. Windows and doors that are missing will be installed to match existing windows. The porch decorative ballastraids, columns, posts and spindles will be reinstalled if existing and replicated where missing. Final grades will be verified and finished for installation of site work items: finish concrete, parking lot, accessible ramps, landscaping and irrigation. The exteriors will be painted. The summer kitchen needs to be structurally stabilized. Standard stick framing and four corner posts will be installed as well as new 1x skip sheathing. Minimum Class “C” comp roof over 15# felt over new plywood will then be installed.

POLICE VEHICLE EMERGENCY EQUIPMENT PARTS AND INSTALLATIONPLAN #: 302010 Bid Date: 11/8/2012

Continued from last page

Plans On File

Page 47: Construction e_zone

Contractor’s ZoneContractor’s Zone

Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Berkeley PlanroomOWNER: City of Berkeley DESCR: Contact, City of Berkeley, Senior Electrical Supervisor, Mike Loyola, ([email protected]) Requesting bids for the purchase of Police Vehicle Emergency Equipment Parts and Installation.

LANDSCAPE MAINTENANCE FOR NORTH CORDELIA, SOUTHBROOK, CREEKSIDE LIGHTING & LANDSCAPE MAINTENANCE DISTRICTSPLAN #: 311006 Bid Date: 11/8/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Fairfield PlanroomPREBID: MAND 10/31 @ 9AM OWNER: City of Fairfield DESCR: Contact, City of Fairfield (707) 428-7485. Landscape Maintenance consists of furnishing all labor, materials, equipment and other services necessary for the complete maintenance of all the landscape areas, hardscapes and irrigation.

LANDSCAPE MAINTENANCE FOR ROLLING HILLS- KOLOB-WATERMAN HIGHLANDS LIGHTING & LANDSCAPE MAINTENANCE DISTRICTSPLAN #: 312004 Bid Date: 11/8/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Fairfield PlanroomPREBID: MAND 10/31 @ 9AM OWNER: City of Fairfield DESCR: Contact, City of Fairfield (707) 428-7485. Landscape Maintenance consists of furnishing all labor, materials, equipment and other services necessary for the complete

maintenance of all the landscape areas, hardscapes and irrigation.

LANDSCAPE MAINTENANCE FOR VARIOUS PUBLIC FACILITIESPLAN #: 313006 Bid Date: 11/8/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Fairfield PlanroomPREBID: MAND 10/31 @ 9am # OF ADDENDA: 1 OWNER: City of Fairfield DESCR: Contact, City of Fairfield (707) 428-7485. Landscape Maintenance consists of furnishing all labor, materials, equipment and other services necessary for the complete maintenance of all the landscape areas, hardscapes and irrigation.

NORMAN Y. MINETA SAN JOSE INT’L AIRPORT - MECHANICAL SERVICES CONTRACT 12-13PLAN #: 315004 Bid Date: 11/8/2012

Bid Time: 3:00 PM PLANS AT: Roseville Office Location: San Jose Online and PlanroomOWNER: City of San Jose DESCR: Contact, Greg Card, 408-535-8300. Plumbing Equipment and Fixtures Maintenance and Repair, Plumbing Repair and Maintenance Services, Plumbing, HVAC Maintenance and Repair Services & HVAC

Friday, November 09, 2012

RFQ - ALL-INCLUSIVE BRIDGE ENGINEERING SERVICES ON VARIOUS PROJECTSPLAN #: 168071 Bid Date: 11/9/2012 Bid Time: 5:00 PM PLANS AT: Roseville Office Location: Stanislaus Co. Online and PlanroomOWNER: County of Stanislaus DESCR: Contact, David Leamon, by fax: 209-541-2509. County of Stanislaus is soliciting a Letter of Interest and Statement of Qualifications from consultants for the Bridge Engineering Services on Various

REQUEST FOR STATEMENT OF QUALIFICATIONS - 1608 FOURTH STREETPLAN #: 190087 Bid Date: 11/9/2012 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Berkeley Online and PlanroomOWNER: University of California - Berkeley DESCR: Contact, David Hunsberger, 510-643-0924. University of California invites designers to submit written statement of qualifications for the design team of Telecom, AV, Data aand security upgrade for an existing four story building.

Continued on next page

Don’t get thrown out on your way home! DVBE/UDBE Good Faith ads are

often required.This newspaper is state-certified.

Email your ad to: [email protected]

Page 48: Construction e_zone

November 5, 2012Page 46 Contractor’s Zone• .Contractor’s Zone

Friday, November 09, 2012

RFP - LANDSCAPE MANAGEMENT AND MAINTENANCEPLAN #: 200089 Bid Date: 11/9/2012 Bid Time: 5:00 PM PLANS AT: Print On Demand Location: San Jose Online & Print On DemandPREBID: MAND 10/29 @ 1pm OWNER: City of San Jose DESCR: Contact, Rosa Marie Velez, 408-535-7047, ([email protected])The City of San José (City) is soliciting proposals from qualified Contractors to provide all labor, materials, equipment and vehicles for Landscape Management and Maintenance (Services) in areas within the public right-of-way managed by the Department of Transportation (DOT). The areas are funded by two distinctly different sources that define the level of service for each of the different landscape areas.Special Districts Landscape: The intent of the Special Districts contracts is to provide a high level of landscape management with maintenance services provided on a weekly basis for all areas of each district.Maintenance District 2Trade Zone-Lundy-Ringwood-ConcourseMaintenance District 5 O r c h a r d Parkway-PlumeriaMaintenance District 11Brokaw-Murphy-Old OaklandMaintenance District 13Karina-O’NelMaintenance District 18The MeadowlandsMaintenance District 21Airport Pkwy-Gateway-Metro-Skyport Communities Facility District 14Hitachi

STREET LIGHT POLE DELAMINATION REPAIRPLAN #: 209002 Bid Date: 11/9/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Sacramento Online and PlanroomOWNER: City of Sacramento DESCR: Contact, Norm Colby, 916-808-6635 ([email protected]). Street Light Pole Delamination Repairs

RFP - PROFESSIONAL ENGINEERING SERVICES - FOUR BRIDGESPLAN #: 242080 Bid Date: 11/9/2012 Bid Time: 4:00 PM PLANS AT: Roseville Office Location: Sacramento Online and PlanroomOWNER: County of Sacramento DESCR: Contact, County of Sacramento, Project Manager, John Jaeger, 916-874-7507. Provide professional engineering services for the Alta Mesa Road, New Hope Road, Rio Linda Blvd & Winding Way Bridges in Sacramento County

CITY AUDITORIUM BOILERSPLAN #: 244092 Bid Date: 11/9/2012 Bid Time: 3:00 PM PLANS AT: Roseville Office Location: Richmond Online and PlanroomPREBID: MAND 10/19 @ 11am OWNER: City of Richmond FAX: 510-307-8116DESCR: Contact, City of Richmond (510) 620-6699. In general, the work consists of Installing two triad Series 1600 Low Pressure Boilers 996,000 BTU/HR or an equivalent boiler, and the concerned piping and ductwork at the CITY AUDITORIUM.

SEWER MAIN MANHOLE REHABILITATION PROJECTPLAN #: 249058 Bid Date: 11/9/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Woodland Online and PlanroomOWNER: City of Woodland DESCR: Contact, Linda Morello, 530-661-5836. City of Woodland is seeking proposals for the Sewer Main Manhole Rehabilitation Project.

MAIN LIBRARY EMERGENCY GENERATORPLAN #: 261050 Bid Date: 11/9/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Richmond Online and PlanroomPREBID: MAND 10/19 @ 10am OWNER: City of Richmond FAX: 510-307-8116DESCR: Contact, City of Richmond, City of Richmond (510) 620-6699. In general, the work consists of Installing one (1) new 45kW Kohler Power systems generator, model# 5OREOZJB or an equivalent emergency generator, and the concerned electrical wiring and conduits at the Richmond Main Library.BIDDERS LIST:General Contractor: Era Construction, Inc. 510-830-5955 510-743-4153

RFQ - INTEREST FOR AIRPORT CONSULTINGSERVICES AT EL DORADO COUNTY AIRPORTSPLAN #: 264043 Bid Date: 11/9/2012 Bid Time: 3:00 PM PLANS AT: Roseville Office Location: Placerville/Geo Online and PlanroomOWNER: County of El Dorado, Dept of Trans DESCR: Contact, Bonnie Rich, 530-621-5940 or email ([email protected]) The El Dorado County Transportation Dept., is soliciting a Request for Qualifications and Statement of Interest for professional services from qualified airport

Continued from last page

Plans On File

Page 49: Construction e_zone

Contractor’s ZoneContractor’s Zone

consulting firms for two El Dorado County Airports (Placerville/Georgetown)

DOLLAR GENERAL STOREPLAN #: 271045 Bid Date: 11/9/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Los Banos Plans on DiskG.C.: The Hatch Group Ph: 714-257-4600 FAX: 714-000-0000DESCR: Contact, The Hatch Group, Stacey Frame, 530-676-9200. The Hatch Group is accepting bids for the Dollar General Los Banos located at 485 N. Mercy Springs Road - Los Banos, CA 93635. Project description: New construction of a 20,695 SF Doll General Market with onsite and offsite improvements. BIDDERS LIST:General Contractor: The Hatch Group 714-257-4600 714-000-0000 Tilton Pacific Const 916-630-7200 916-630-4982

Monday, November 12, 2012

DOLLAR GENERAL SACRAMENTO TI- AND NEW CONSTRUCTIONPLAN #: 137061 Bid Date: 11/12/2012

Bid Time: 2:00 PM PLANS AT: Roseville Office Location: SacramentoG.C.: The Hatch Group Ph: (530) 676-9200 DESCR: Contact, Hatch Group, Dawn Modena (dawn.modena@thehatchgroup,net). or Andrew Lee, LEED AP, Assistant Project Manager, (530) 676-9200. Construct tenant improvements for a 29,000 SF market.

Tuesday, November 13, 2012

HILLTOP AREA STRENGTHEN AND REPLACE WATER SYSTEMPLAN #: 11013 Bid Date: 11/13/2012 Bid Time: 11:00 AM PLANS AT: Roseville Office Location: Modesto Online & Print On Est Cost: $1,162,500.00 DemandPREBID: 10/23 @ 11am OWNER: City of Modesto, Public Works Dept. DESCR: Contact, City of Modesto, 209-577-5462. Replace & upgrade deficient water mains in the outlying areas southwest of Modesto generally bounded by Paradise Rd, Ohio Ave, Robertson Rd and Carpenter Rd. The project will maintain & provide an increase in service reliability of the City of Modesto’s water system. The project will include replacement of associates water valves and fire hydrants and installation of water meters and service lines.BIDDERS LIST:

General Contractor: Herback General Engin 775-267-6800 775-786-7595Supplier: Groeniger & Company 916-455-3333 916-455-3402

TUOLUMNE RIVER REGIONAL PARK GATEWAY PHASE 1.3 TRAILSPLAN #: 18023 Bid Date: 11/13/2012 Bid Time: 11:00 AM PLANS AT: Roseville Office Location: Modesto Est Cost: $391,533.00PREBID: 10/25 @ 10am & site visit 10/25 @ 11am OWNER: City of Modesto, Public Works Dept. DESCR: Contact, Loren Holt, 209-571-5573. The West Basin is a large detention basin that captures stormwater runoff. The basin has heavy erosion along the banks that has deteriorated the walls and requires constant maintenance. This project will mitigate the issues by using engineered landscaping materials and methods to dissipate the concentrated flows that cause the erosion.

MODESTO WEST BASIN IMPROVEMENTSPLAN #: 19023 Bid Date: 11/13/2012 Bid Time: 11:00 AM PLANS AT: Roseville Office Location: Modesto Est Cost: $391,533.85PREBID: 10/29 @ 11am OWNER: City of Modesto, Public Works Dept. DESCR: Contact, Pete Kambel, 209-577-5444. The West Basin is a large detention basin that captures stormwater runoff. The basin has heavy erosion along the banks that has deteriorated the walls and requires constant maintenance. This project will mitigate the issues by using engineered landscaping materials and methods to dissipate the concentrated flows that cause the erosion. The Payment of Prevailing Wages is Required on this Project.

CITY COUNTCIL CHAMBERS A/V RENOVATIONPLAN #: 35011 Bid Date: 11/13/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Fairfield Online and Planroom# OF ADDENDA: 1PREBID: MAND 10-16 or 10/31 @ 10am OWNER: City of Fairfield DESCR: Contact, City of Fairfield, (707) 428-7485. Relocate existing audio/video equipment and operator for the broadcasting of public meetings from one room to another room in the City of Fairfield Council

Continued on next page

To Run Your Legal Ad, Please Visitwww.thedailyreporter.net

Or Give Us A Call 916-729-5432

Page 50: Construction e_zone

November 5, 2012Page 48 Contractor’s Zone• .Contractor’s Zone

Tuesday, November 13, 2012

HANS MILLER DEMOLITION PROJECTPLAN #: 48007 Bid Date: 11/13/2012Bid Time: 3:00 PM PLANS AT: Roseville Office Location: Yuba City Online and PlanroomPREBID: 11/1/2012 @ 10AM OWNER: Regional Housing Authority of Sutter & Nevada County DESCR: Contact, John Guanzon, Regional Housing Authority of Sutter & Nevada Co. (530) 671-0220. Work consists of the demolishing the existing structure on site and remove/properly dispose of all materials.

CO ROAD SAFETY IMPROVEMENT PROJECT AT COUNTY ROAD 98 AND COUNTY ROAD 29PLAN #: 49010 Bid Date: 11/13/2012

Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Yolo Co. Online & Print On Demand OWNER: County of Yolo DESCR: Contact, County of Yolo (530) 666-8852. Work consists of excavating two trenches for reinforced concrete pipe (RCP), furnishing and installing Class III (min.) RCP, and backfilling and compacting road base material.

PUBLIC STORAGEPLAN #: 52009 Bid Date: 11/13/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: San Jose Online & Print On Demand # OF ADDENDA: 1G.C.: Shames Construction Ph: 925-606-3000 FAX: 925-606-6656DESCR: Contact, Shames Construction, 925-606-6656. This project consists of a 3 story build-out (57,521sf 1st floor and 51,967sf for each 2nd and 3rd floors) in an existing Public Storage warehouse building. Trades Needed: Demolition, Paving/Striping, Slurry Seal, Underground Utilities, Landscape, Site Concrete, Bldg Concrete, Masonry, Structural Steel, Plaster/stucco, Waterproofing, Singleply Roofing, Sheet Metal, Auto-Door/Storefront Glazing, DFH, Insulation, Toilet Accessories, Caulking/Sealants, MetalStud/Drywall, Flooring, FRP, Painting, Thyseen-Krupp Elevators, HVAC, Fire Sprinkler, Plumbing, Electrical, Fire Alarm.

AGRICULTURAL COMMISSIONER’S MAIN OFFICE EXPANSIONPLAN #: 59003 Bid Date: 11/13/2012

Bid Time: 10:00 AM PLANS AT: Roseville Office Location: Yuba City Online & Print On Est Cost: $300,000.00 DemandPREBID: 11/1 @ 9am OWNER: County of Sutter DESCR: Contact, County of Sutter, (530) 822-7450. 1,000 square foot office space building addition along with approximately 1,400 square feet in tenant improvements to include electrical, mechanical and structural modifications.BIDDERS LIST:General Contractor: Bullard Construction 916-485-4370 916-485-4388 Sierra Valley Constructio 916-772-0800 916-772-0825 Broward Builders Inc. 530-666-5635 530-666-5723 Bobo Construction, Inc. 916-685-2285 916-714-4850 S W Allen Construction 916-344-2098 916-344-0307 Treehenge 530-269-2816 530-269-0289 Peterson Development 916-961-4756 916-966-0943 Younger General Cont 916-631-8000 916-631-8293 Hilbers, Inc. 530-673-2947 530-674-9578 Donald F. Gallino, Inc. 530-246-7671 530-246-8714

JEFFERSON STREET GRADE CONTROL STRUCTURE AND SEWER PIPELINE IMPROVEMENTSPLAN #: 124073 Bid Date: 11/13/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Coachella Online & Print On DemandOWNER: Coachella Valley Water District Ph: 760-398-2651 FAX: 760-391-9637DESCR: Contact, Coachella Valley Water District, David Wilson, 760-398-2651. Jefferson Street Grade Control Structure and Sewer Pipeline Improvements: The work to be performed includes a grade control structure, concrete slope lining extensions, sewer pipeline abandonment and installation, sewer by-pass during construction, connection to an existing wet well, well site perimeter wall removal and replacement, concrete block revetment over Mid-Valley Pipeline and proposed sewer, and all related concrete and material appurtenances.BIDDERS LIST:General Contractor: Herback General Engine 775-267-6800 775-786-7595

AUHSD DISTRICT OFFICE ALTERATIONS MEASURE E IMPROVEMENTSPLAN #: 151062 Bid Date: 11/13/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Lafayette Online & Print On Est Cost: $2,400,000.00 # OF ADDENDA: 2Demand PREBID: MAND 10/5

Continued from last page

Plans On File

Page 51: Construction e_zone

Contractor’s ZoneContractor’s Zone

OWNER: Acalanes Union High School District DESCR: Contact, LCA Architect (925) 944-1626. Project consists of demolition, tree preservation & pruning, site preparation & demolition, tree removal, site clearing, stripping & grubbing, earhwork & grading, trenching, backfilling & compacting, water systems, sanitary sewer, storm drainage, paving & surfacing, pavement marking, irrigation system, ornamental fences & gates, site furnishings & accessories, landscape planting, restoration of surfaces, concrete, reinforced masonry assemblies, structural steel, steel studs. metal fabrication, expansion joint cover assemblies, rough & finish carpentry, custom casework, insulation, roof & deck insulation, water emission control system, firestopping, built-up bituminous roofing, sheet metal flasing, gutters & downspouts, self-adhered membrane flashing, reglet & flashing systems, roof hatches, sealants & caulking, metal doors & frames, pre-finished steel door frames, wood doors, access doors & panels, aluminum entrance & storefront, aluminum windows, finish hardware, gate hardware, glazing, mirrors, lath & plaster/stucco, gypsum board, ceramic tile floor finish, ceramic tile wall finish, suspended acoustical celings, resilient floor coverings, resilient base, carpet-glue down, fiberglass reinforced plastic paneling, painting, markerboards, bulletin board cabinet, tackable wall panels, toilet compartment partitions, wall louvers, louvered roof screens, protective wallcovering, signage, fire extinguishers & cabinets, toilet accessories, projection screens;, horizontal blinds, motorized window shades, plumbing, HVAC, communications, fire alarm, CATV system, lighting & electrical. BIDDERS LIST: Pre-bid Online 530-889-3953 530-889-3956General Contractor: Cal Pacific Construction 415-824-8871 415-824-8867 S W Allen Construction 916-344-2098 916-344-0307

HELMS MIDDLE SCHOOL SPORTS FIELDS AND LANDSCAPINGPLAN #: 152058 Bid Date: 11/13/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: San Pablo Online & Print On Est Cost: $6,900,000.00 # OF ADDENDA: 2Demand PREBID: MAND 10/25 @ 1pm OWNER: West Contra Costa Unified School District Ph: 510-412-5657 FAX: 510-236-0464DESCR: Contact, Hector DeLeon, 510-364-2647. Rough and finish grading of a building pad for a new community building, demolition and construction of a new toilet building and a new storage building; rough and finish grading for landscaping, fencing, paving and walks and installation of artificial turf sports fields, play courts, playground BIDDERS LIST:General Contractor: Landmark Construction 916-663-1953 916-663-1867

Taber Construction 925-682-6133 925-682-6122 F & H Construction 209-931-3738 209-931-4427 Oc Jones And Sons 510-526-3424 510-526-0990Sub Contractor: Bennett Fencing 530-852-2618 000-000-0000 Mission City Rebar, Inc 925-449-6999 925-447-8797 R.l. Ziegenbein Const 925-820-9245 925-831-3093 Kck Builders 415-559-9312 415-453-9250

RFP - DESIGN OF DMF PERFORMANCEPLAN #: 176006 Bid Date: 11/13/2012Bid Time: 3:00 PM PLANS AT: Roseville Office Location: Palo Alto Online and PlanroomPREBID: 10/30 @ 10:30 OWNER: City of Palo Alto DESCR: Contact, City of Palo Alto, John Montenero, ([email protected]) City of Palo Alto is seeking proposals from qualified firms to provide professional services for providing engineering services for design, control programming, construction support, startup and testing of a dual media filtration airwash system, blowers, electrical and control/automation equipment,

LIGHTING CONTROL RETROFIT - PAUL BONDERSON BUILDING NO. 16PLAN #: 230090 Bid Date: 11/13/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Sacramento Online and Planroom Est Cost: $298,760.00 # OF ADDENDA: 5PREBID: MAND 10/9 @ 10am OWNER: State of CA - Dept of General Services DESCR: Contact, Jennifer Maier, 916-376-1754. Provide & install a wireless lighting control system which will replace the existing lighting control system and will utilize zone or room based occupancy sensing, day light sensing, auto-scheduling and local switching to control all new fixtures.

Continued on next page

Talk to us!Do you have a legal ad that needs to be run?

Want to advertise? Questions about the new format?

Give us a call. We will be happy to help you!

916-729-5432

Page 52: Construction e_zone

November 5, 2012Page 50 Contractor’s Zone• .Contractor’s Zone

Tuesday, November 13, 2012

PEACOCK GAP GOLF CLUBPLAN #: 273035 Bid Date: 11/13/2012

Bid Time: 2:00 PM PLANS AT: Roseville Office Location: San Rafael Online and PlanroomPREBID: 11/1 @ 11:30am G.C.: SD Deacon Corp. Ph: 916-969-0900 FAX: 916-735-0800DESCR: Contact, S D Deacon, Brandon Nelson, [email protected]. Description: Demo existing clubhouse and building new building work to include: surveying, concrete sawing, selective demolition, earthwork, erosion control, site utilities, dry utilities, asphalt paving, pavement markings, unit pavers, fences & gates, retaining walls, landscaping, concrete, masonry, steel, rough carpentry, finish carpentry/millwork, solid surfacing, FRP, insulation, roofing, sheet metal, doors & hardware, storefront, drywall, ceramic tile, acoustical ceiling, wood flooring, resilient flooring, painting, fireplaces, toilet partitions & accessories, fire protection, plumbing, HVAC, electrical, fire alarm BIDDERS LIST:General Contractor: C. Overaa And Co. 510-234-0926 510-237-2435

Wednesday, November 14, 2012

CAMPUS SIGNAGE RESTORATION (REBID)PLAN #: 15016 Bid Date: 11/14/2012 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Hayward Online & Print On Est Cost: $50,000.00 # OF ADDENDA: 3Demand PREBID: MAND 10/30 @ 9am OWNER: California State University East Bay Ph: 510-885-3607 DESCR: Contact, Chuck Copus, P.M., 510-885-4259. Remove existing exterior site signage to contractor’s shop, repair & restore aliminum sign boxes to new condition, including removal of dents & scratches & replacing damaged panels as required; repaint the signs per the University specs & install new vinyl lettering & logos per sign schedule; replace the signs to their existing locations or relocate to new locations, including new footings & frames as required & shown in the contract

SANITARY SEWER PUMP STATION 10 IMPROVEMENTS PROJECTPLAN #: 21017 Bid Date: 11/14/2012

Bid Time: 3:00 PM PLANS AT: Roseville Office Location: Redwood City Plans on Disk Est Cost: $300,000.00 PREBID: 11/05 @ 10am OWNER: City of Redwood City DESCR: Contact, Jimmy Tan, 650-780-7397. Replacing the existing motor controllers with new variable frequency drive equipment, replacing and upgrading field instrumentation, and replacing the existing facility telemetry quipment with new devices that match present City standards.

POLICE BUILDING REMODEL PROJECTPLAN #: 36005 Bid Date: 11/14/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Wheatland Online and Planroom Est Cost: $80,000.00 # OF ADDENDA: 2PREBID: MAND 10/29 @ 2pm OWNER: City of Wheatland DESCR: Contact, City of Wheatland, 530.633.2761. Work consists of the improvements to an existing unoccupied 3,808 SF building including: interior demolition, parition walls, cover and add exterior openings, electrical, plumbing, HVAC, interior finishes, painting and various other items of work. BIDDERS LIST:General Contractor: B & B General Engin 530-277-7305 530-237-1798 Hometown 916-991-2486 916-991-2881 Joe Miller Construction 916-452-6108 916-452-1153 Owens Construction 530-878-3905 530-878-3906 Treehenge 530-269-2816 530-269-0289 Peterson Development 916-961-4756 916-966-0943 Sturgeon Construction, Inc. 916-452-6108 916-452-1153Supplier: Cavolt & Sons Inc 916-624-8222 916-624-0878

ORCHARD SUBSTATION LANDSCAPEPLAN #: 45097 Bid Date: 11/14/2012Bid Time: 2:00 PM Location: Ukiah PLANS AT: Auburn & Roseville Office Online and Planroom Est Cost: $30,000.00 # OF ADDENDA: 1 PREBID: MAND 11/1 @ 11am OWNER: City of Ukiah

Continued from last page

Plans On File

To Run Your Legal Ad, Please Visitwww.thedai l yrepor ter.netOr Give Us A Call 916-729-5432

Page 53: Construction e_zone

Contractor’s ZoneContractor’s Zone

DESCR: Contact, Mary Horger ([email protected]) (707) 463-6233. Includes earthwork, subgrade preparation and base material, irrigation system, decomposed granite, fieldstone boulders, flagstone, metal edging, stepping stones, landscape plantings, site concrete work,

INTERIOR RENOVATION/IHTA @ MT DIABLO HIG SCHOOLPLAN #: 120071 Bid Date: 11/14/2012Bid Time: 10:00 AM PLANS AT: Roseville Office Location: Concord Online & Print On Est Cost: $410,000.00 DemandPREBID: MAND 10/17 @ 10am OWNER: Mt. Diablo Unified School District Ph: 925-825-7440 FAX: 925-825-2505DESCR: Contact, Tim Cody, Proj Mgr, @ 925-682-8000, ext 85615 NOTE:Volume 1 spec book is not available yet. We will post when it becomes available.Complete renovation of existing classroom to facilitate use by International Hospitality Training Academy.Selective demolition, protection, new interior finishes, roofing, framing, mechanical, electrical and specialty work necessary to provide a complete renovation of existing room. BIDDERS LIST:General Contractor: Miller Paneling Specia 530-662-0860 530-662-0864

JUVENILE SERVICES BUILDING WINDOW REPLACEMENT & SUPPLEMENTAL HVACPLAN #: 108086 Bid Date: 11/14/2012

Bid Time: 2:00 PM PLANS AT: Roseville Office Location: San Rafael Online and Planroom Est Cost: $210,000.00 PREBID: 11/5 @ 2pm OWNER: County of Marin DESCR: Contact, County of Marin, 415-473-7877. Installation of roof top pre-heat units, ductwork and replacement of 43 office windows, stucco abatement and patchwork at windows.BIDDERS LIST:General Contractor: Cf Contracting 415-721-7160 415-296-6437

INTERIOR RENOVATION/IHTA @ MT DIABLO HIGH SCHOOLPLAN #: 120071 Bid Date: 11/14/2012Bid Time: 10:00 AM PLANS AT: Roseville Office Location: Concord Online & Print On Est Cost: $410,000.00 DemandPREBID: MAND 10/17 @ 10am OWNER: Mt. Diablo Unified School District Ph: 925-825-7440 FAX: 925-825-2505DESCR: Contact, Tim Cody, Proj Mgr, @ 925-682-8000, ext 85615 NOTE:Volume 1 spec book is not available yet. We will post when it becomes available.Complete renovation of

existing classroom to facilitate use by International Hospitality Training Academy.Selective demolition, protection, new interior finishes, roofing, framing, mechanical, electrical and specialty work necessary to provide a complete renovation of existing room. BIDDERS LIST:General Contractor: Miller Paneling Special 530-662-0860 530-662-0864Sub Contractor: Coast Casework Inc. 530-889-2859 530-889-2851

ARSENIC TREATMENT PROJECTPLAN #: 122077 Bid Date: 11/14/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Rio Vista Online & Print On Demand PREBID: 11/7 @ 10am OWNER: City of Rio Vista ENGINEER: Dillon & Murphy Engineers Ph: 209-334-6613 DESCR: Contact, Dillon & Murphy (209) 334-6613. The project consists of installation of the arsenic treatment project. BIDDERS LIST:General Contractor: Suulutaaq, Inc. Unit 2 707-427-3209 707-419-4851 Auburn Constructors, 916-924-0344 916-924-1800 Swank Construction 707-446-8808 707-446-8303Sub Contractor: Bockmon & Woody 209-993-2633 209-464-2615 Mission City Rebar, Inc 925-449-6999 925-447-8797

CURTIS PARK AND OAK PARK WATER METER RETROFIT PROJECTPLAN #: 206090 Bid Date: 11/14/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Sacramento Online and Planroom Est Cost: $3,650,000.00OWNER: City of Sacramento - Dept of Utilities DESCR: Contact, Inthira Mendoza, 916-808-1473. Work consists of installing meter setters, meter boxes, lids, meter valves and water meters at various commercial and residential properties, excavation, backfill, surface restoration, retrofitting water meters on existing water services.

Continued on next page

Page 54: Construction e_zone

November 5, 2012Page 52 Contractor’s Zone• .Contractor’s Zone

Wednesday, November 14, 2012

640 CAPITOLA ROAD PARKING LOT IMPROVEMENT PROJECTPLAN #: 276044 Bid Date: 11/14/2012 Bid Time: 2:30 PM PLANS AT: Roseville Office Location: Santa Cruz Online and Planroom Est Cost: $20,000.00 # OF ADDENDA: 1PREBID: 9/26 @ 10AM OWNER: County of Santa Cruz FAX: 831-454-2710DESCR: Contact, County of Santa Cruz (831) 454-2210. Grinding, cleaning, slurry seal coating and re·striping of an existing approximately 14,040 s.f. parking lot, and re”use and reinstallation of existing wheel stops. Installing new asphalt and miping, installing new 4” eoncrete slab l’lT new accessible van loading area and striping. Installing new accessible parking striping and new wheel stop on existing concrete surface, Installing new accessiblc parking signage on building exterior wall, installing new motorcycle parking striping on repaved surface with new signage installed on existing sign post. Installing new bicycle parking are” with 5 ncw bikc loop posts. Installing new Christy box U21 S water treatment unit with new asphalt paving, installing new 6’ high asphalt concrete curbs, installing new pedestrian walkway striping and lenering on repaved surface.

RFQ - ERECTION OF 2 METAL BUILDINGS S.A.R. BUILDING PROJECTPLAN #: 282054 Bid Date: 11/14/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Dublin Online and Planroom # OF ADDENDA: 1 PREBID: MAND 11/1 @ 2pm OWNER: County of Alameda DESCR: Contact, Roger Power, Captain, 510-208-9830 ([email protected]) The Alameda County Sherriff’s Office has purchased two S-type steel bui8ldings, 40’ wide by 64’ long. They are requesting informal quotes for the erection of these 2 buildings.

FIRE ALARM UPGRADE/STEELE LANE COMMUNITY CENTERPLAN #: 288043 Bid Date: 11/14/2012 Bid Time: 5:00 PM PLANS AT: Roseville Office Location: Santa Rosa Online & Print On Demand PREBID: MAND 10/30 @ 10am

OWNER: City of Santa Rosa DESCR: Contact, Jennifer Myles, 707-543-3709. Fire Alarm Upgrade/Steele Lane Community CenterBIDDERS LIST:Sub Contractor: Slembrouck-many Corp., 707-778-0170 707-778-0177

Thursday, November 15, 2012

CLAYBANK ROAD PAVEMENT REHABILITATION AND SSWA TOLENAS LATERAL REPLACEMENTPLAN #: 6031 Bid Date: 11/15/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Fairfield Plans on DiskPREBID: MAND 11/1 @ 9am OWNER: City of Fairfield DESCR: Contact, Thanh Vuong, 707-428-7017. Furnishing and installing a new SSWA 24inch underground water main using AWWA C905 DR18 Polyvinyl Chloride PVC pipe including a new water line blow-off valve. Once the new waterline is in service Contractor shall remove and dispose of a large portion of the old existing SSWA 24-inch water main that is within the portion of Claybank Rd., to be reconstructed and shall backfill the old trench with Class 2 Aggregate Base up to the new road subgrade and then reconstruct the pavement section for the entire road width including pavement 5removal and replacement of asphalt concrete BIDDERS LIST:General Contractor: Ghilotti Construction Co 707-585-1221 707-585-1601 Ghilotti Brothers Inc 415-454-7011 415-454-8376Supplier: Groeniger & Company 916-455-3333 916-455-3402

SEWER AND WATERLINE REPLACEMENT IN ALLEY’S CANAL TO BERKELEYPLAN #: 10016 Bid Date: 11/15/2012Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Turlock Online & Print On # OF ADDENDA: 3 DemandPREBID: MAND 10/2 @ 10am OWNER: City of Turlock DESCR: Contact, City of Turlock, 209-668-5520. Install new waterline, replace sewerline, install new manholes, demo and earthwork, cold plane operations, hot mix asphalt, pavement reinforcing fabric and furnishing all necessary labor, materials, tools, equipment and incidentals needed to perform the improvements as shown on the contract plans complete and in place.

Continued from last page

Plans On File

Page 55: Construction e_zone

Contractor’s ZoneContractor’s Zone

BIDDERS LIST:General Contractor: Taylor Backhoe Service, 209-384-8424 209-384-7629

EAST REDDING BIKE LANES - PHASE IIPLAN #: 13018 Bid Date: 11/15/2012 Bid Time: 11:00 AM PLANS AT: Roseville Office Location: Redding Online & Print On Demand OWNER: County of Shasta FAX: 530-225-5667DESCR: Contact, Mark Ciancio ([email protected]) (fax #) (530) 225-5667. Includes clearing and grubbing, excavation and embankment, removing existing asphalt, placing aggregate base material, placing new hot mix asphalt and widening existing roadway, cold planning asphalt concrete, removing existing metal beam guardrail, adjusting utility boxes, extending existing culverts, replacing culverts, reconstructing driveways, constructing a section of new 12” PVC water main, constructing paved ditch and HMA dike, new wire mesh fence, slurry seal, shoulder backing, removing striping and pavement markings, installing new thermoplastic striping and pavement markings, installing new signs, and removing and

MONTEZUMA ELEMENTARY SIDEWALK GAP CLOSUREPLAN #: 27017 Bid Date: 11/15/2012 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Stockton Online & Print On Est Cost: $350,000.00 DemandPREBID: MAND 11/5 @ 10am OWNER: City of Stockton DESCR: Contact, Jodi Almassy, 209-937-8299. The project includesconstructing improvements on Eighth Street between Mariposa Road and Nightingale Avenue. Improvements include: roadway frontage (curb, gutter andBIDDERS LIST:General Contractor: Diede Construction 209-369-8255 209-368-0600 Bc Construction 209-531-1252 209-531-1254

CITY-WIDE STREET AND MEDIAN LANDSCAPE MAINTENANCE AND WEED CONTROL-REBIDPLAN #: 29010 Bid Date: 11/15/2012 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Stockton Online & Print On Est Cost: $449,000.00 DemandPREBID: MAND 11/6 @ 9am OWNER: City of Stockton DESCR: Contact, David Kroll, 209-937-8676. City-Wide Street and Median Landscape Maintenance and Weed Control at various locations in the City of Stockton.

6900 - LOS ESTEROS ROAD-ZANKER ROAD SERVICE LATERALPLAN #: 34007 Bid Date: 11/15/2012 Bid Time: 3:00 PM PLANS AT: Roseville Office Location: San Jose Online & Print On Est Cost: $780,550.00 DemandOWNER: City of San Jose DESCR: Contact, City of San Jose, Darwin Lasat, ([email protected]). 6900 -Los Esteros Road - Zanker Road Service Lateral

FLEET SERVICES BUILDINGPLAN #: 37010 Bid Date: 11/15/2012

Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Sonora Online and PlanroomPREBID: MAND 11/8 @ 10am OWNER: County of Tuolumne DESCR: Contact, County of Tuolumne, phone 209-533-5660. Contractor to furnish all labor, materials, equipment, transportation, sitework, and services for the completion of the Fleet Services Building.

RODGERS THEATER PHASE II IMPROVEMENTSPLAN #: 41012 Bid Date: 11/15/2012 Bid Time: 10:00 AM PLANS AT: Print On Demand Location: Corning Online & Print On Demand PREBID: 11/6 @ 10am OWNER: City of Corning DESCR: Contact, City of Corning (530) 824-7029. Work consists of providing concrete foundation construction, demolition, wood framing, plumbing, electrical, mechanical and finish work.

BUTTERFIELD WAY AND FOLSOM BOULEVARD INTERSECTION IMPROVEMENT PROJECTPLAN #: 46091 Bid Date: 11/15/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Sacramento Online and PlanroomEst Cost: $180,000.00 # OF ADDENDA: 1OWNER: County of Sacramento - Municipal Services Agency Ph: 916-875-6789 DESCR: Contact, County of Sacramento Municipal Services (916) 874-6544. Work consists of proving pavement, striping, median works, ADA ramp upgrades, slurry seals, and signal modification work. BIDDERS LIST:General Contractor: B & M Builders, Inc. 916-862-0095 866-903-3437Sub Contractor: Studebaker Brown Electr 530-333-3423 530-823-1341Supplier: Blain Stumpf Sand & Gr 916-933-1555 916-933-2925

Continued from last page

Page 56: Construction e_zone

November 5, 2012Page 54 Contractor’s Zone• .Contractor’s Zone

Thursday, November 15, 2012

FOLSOM HALL REMODEL - PHYSICAL THERAPY DEPARTMENTPLAN #: 100076 Bid Date: 11/15/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Sacramento Est Cost: $1,400,000.00PREBID: 10/23 @ 10am OWNER: California State University, Sacramento Ph: 916-278-4895 DESCR: Contact, Diede Construction, 209-369-8255. Construction of tenant improvements within an office building and associated site improvements. BIDDERS LIST:General Contractor: Pnp Construction, Inc. 530-885-9360 530-885-9365 Bullard Construction 916-485-4370 916-485-4388 Miller Paneling Specialt 530-662-0860 530-662-0864 Hometown 916-991-2486 916-991-2881 Landmark Construction 916-663-1953 916-663-1867 S W Allen Construction 916-344-2098 916-344-0307 Bobo Construction 916-685-2285 916-714-4850 Peterson Development 916-961-4756 916-966-0943 Younger General Contr 916-631-8000 916-631-8293 American River Const 530-621-1785 530-621-0360 Diede Construction 209-369-8255 209-371-8942 Dg Granade 530-677-7484 530-677-7550Sub Contractor: Bob-leon Plastics, Inc. 916-452-4063 916-452-3759

2010 PAVEMENT PRESERVATION PROGRAMPLAN #: 118072 Bid Date: 11/15/2012

Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Sonoma Co. Planroom # OF ADDENDA: 1OWNER: County of Sonoma-Dept. of Transportation & Public DESCR: Contact, County of Sonoma, Department of Transportaion, Kevin Howze, 707-565-2620. Placement of a Bonded Wearing Course on various County Roads together with associated flagging, traffic control and preparation required to construct the work, along with delineation of the new pavement surface.

UKIAH VALLEY MEDICAL CENTER (NO GCPLAN #: 121076 Bid Date: 11/15/2012 Bid Time: 12:00 PM PLANS AT: Auburn & Roseville Location: Ukiah Online & Print On

DemandG.C.: Hospital Building Equipment Company Ph: 314-567-9000 DESCR: Contact, Hospital Building & Equipment Co. (HBE Corp.) #283655 (314) 567-9000 Fax:(314) 567-6994 Negotiated GC. Construct a new 25,260 SF one-story steel-framed addition to the existing hospital, including a 2,367 SF mechanical / electrical penthouse and helicopter landing pad on the roof; trades needed are selective demolition, excavation, grading, site preparation, site utilities, asphaltic concrete paving, concrete, steel reinforcement, metal decking, miscellaneous metal, carpentry, millwork, dampproofing, split-slab waterproofing system, helistop deck coating, TPO roofing system, sheet metal and equipment screens, spray-on fireproofing, firestopping, sealants, metal doors / frames, wood doors, integrated fire door assemblies, elevator door smoke containment system, aluminum entrances / storefront, finish hardware, automatic door operators / doors, glazing, exterior stucco, gypsum drywall systems, ceramic tile, acoustical ceiling, resilient flooring, carpeting, painting, miscellaneous specialties, toilet accessories, modular lavatory / toilet unit, undercounter refrigerator, patient service modules, medical gas security modules, steel cabinets, radiation protection, hydraulic elevators, medical gases, fire protection, plumbing, HVAC, automatic control systems, test / balance, electrical, fire BIDDERS LIST:Sub Contractor: Presidential Fire Prot 916-379-9199 916-379-9099

SAN ANTONIO BACKUP PIPELINEPLAN #: 126070 Bid Date: 11/15/2012Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Alameda Co. Plans on Disk# OF ADDENDA: 1 PREBID: 10/16 @ 9:30am OWNER: San Francisco Public Utilities Commission DESCR: Contact, Pauline Lam, SFPUC, 415-551-4603. Install approx., 6,600 feet of 66-inch diameter of welded steel pipe located along the west side of Calaveras Rd from the Alameda Siphons on the south to the edge of the SMP-24 quarry pit on the north etc..BIDDERS LIST:Sub Contractor: Mission City Rebar, Inc 925-449-6999 925-447-8797 Ferguson Welding 510-487-5906 510-487-5909

SITE WIDE LOW VOLTAGE MODERNIZATION - W. CHURCHILL MIDDLE SCHOOLPLAN #: 139062 Bid Date: 11/15/2012 Bid Time: 2:30 PM PLANS AT: Roseville Office

Continued from last page

Plans On File

Page 57: Construction e_zone

Contractor’s ZoneContractor’s Zone

Location: Carmichael Online & Print On # OF ADDENDA: 1 DemandPREBID: MAND 10/11 @ 2pm OWNER: San Juan Unified School District ENGINEER: KMM Services, Inc. Ph: 916-825-3625 DESCR: Contact, KMM Services, Inc., Ronny Kagstrom, 916-825-3625. Site Wide Low Voltage Modernization at W. Churchill Middle School in

JOINT WATER POLLUTION CONTROL PLANT AND SAN JOSE CREEK WATER RECLAMATION PLANT WEST SKIMMER MODIFICATIONSPLAN #: 147059 Bid Date: 11/15/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Carson Planroom# OF ADDENDA: 1 PREBID: MAND10/23 @ 9:30am OWNER: Sanitation Districts of Los Angeles County DESCR: Contact, Steve Krai, 562-908-4288, ext 5255. Removal and replacement of existing skimmer equipment in JWPCP and San Jose Creek West WRP with new skimmers made of stainless steel and non-metallic components; inspection and repair of concrete and concrete protective lining as necessary.

AUSTIN SWING SPACEPLAN #: 148060 Bid Date: 11/15/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Kentfield Online and PlanroomPREBID: 10/30 @ 10AM at 700 College Ave, Bldg PE-8, OWNER: Marin Community College District Ph: 415-457-8811 FAX:DESCR: Contact: Marin Community College District (415) 883-2211.Div_02-selective bldg demolition; Div_03-concrete; Div_05-metal support assemblies, metal fabrications; Div_06-wood treatment, rough & finish carpentry, custom casework; Div_07-waterproofing, polyutherane foam roof repairs, sheet metal flashing & trim, firestopping, joint sealants; Div_08-steel frames, flush wood doors, access doors & frames, door hardware, glazing; Div_09-gypsum board, acoustical ceilings, resilient flooring, tile carpeting, access flooring, painting & coating, vapor emission treatment systems, coating systems for steel; Div_10-visual display surface, signage, fire protection specialties; Div_11-audio-visual equipment; Div_23-plumbing, HVAC: Div_26-electrical syste; Div_27-communicationsBIDDERS LIST:General Contractor: Bobo Construction, Inc. 916-685-2285 916-714-4850 A.e. Nelson Construction 707-636-1750 707-636-1755

DESIGN BUILD OF THE SAN JOAQUIN REGIONAL TRANSIT DISTRICT REGIONA TRANSPORTATIONPLAN #: 155062 Bid Date: 11/15/2012

Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Stockton PREBID: 10-17 @ 10am OWNER: San Joaquin RTD Ph: 209-948-5566 FAX: 209-948-8516DESCR: Contact, San Joaquin Regional Transit District (209) 948-5566. Design Build of the San Joaquin Regional Transit District Regional Transportation Center**Documents are not available at this time.

RECOATING AND REPAIR OF DELAVEAGA TANK NO.1PLAN #: 162058 Bid Date: 11/15/2012 Bid Time: 4:00 PM PLANS AT: Roseville Office Location: Santa Cruz Online & Print On DemandPREBID: MAND 10/20 @ 1:30pm OWNER: City of Santa Cruz DESCR: Contact, City of Santa Cruz, Matt Zeman, 831-420-5211 ([email protected]) Repairs, surface preparation, lead paint removal, and repainting of the interior and exterior surfaces of DeLaveaga Tank No. 1, a one million gallon riveted and welded steel water storage tank; removal of surface preparation debris and materials; disinfection and filling; and all appurtenant work.

JANITORIAL SERVICESPLAN #: 180099 Bid Date: 11/15/2012

Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Sacramento Online and PlanroomPREBID: 11/7 @ 10am OWNER: Sacramento Housing & Redevelopment Agency FAX: 916-927-6963DESCR: Contact, Wayne Whitley 916-442-6736 ([email protected]) Sacramento Housing & Redevelopement - Procurement (916) 440-1331. Requesting Janitorial Services. NORTH BAY REGIONAL WATER TREATMENT PLANT - VALVE REPLACEMENT IN FILTER 7PLAN #: 189014 Bid Date: 11/15/2012Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Fairfield Online & Print On Demand PREBID: 11/1 @ 10am OWNER: City of Fairfield DESCR: Contact, City of Fairfield, (707) 428-7485. Remove and replace filter to waste valve (16”), modulating effluent valve (24”), and individual filter backwash valve (30”) in Filter No. 7 at the North Bay Regional Water Treatment Plant.

Continued on next page

Click on the blue underline to go to the Online Planroom

Page 58: Construction e_zone

November 5, 2012Page 56 Contractor’s Zone• .Contractor’s Zone

Thursday, November 15, 2012

NORTH BAY REGIONAL WATER TREATMENT PLANT - REPLACEMENT OF MEDIA IN FILTER 7PLAN #: 194093 Bid Date: 11/15/2012Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Fairfield Online & Print On Demand PREBID: MAND 11/1 @ 10am OWNER: City of Fairfield DESCR: Contact, City of Fairfield, (707) 428-7485. Removal and replacement of the sand and granular activated carbon media in a two-bay filter at the North Bay Regional Water Treatment Plant, 5110 Water Works Lane, Fairfield, Solano County, California. The Contractor is responsible for disposing of the existing media at Contractor’s cost. The Contractor is to remove and dispose of the existing nozzles at Contractor’s cost, and Contractor installs new City-provided nozzles.

!!!CANCELLED!!!RFQ- AS-NEEDED ARCHITECTURAL SERVICESPLAN #: 204099 Bid Date: 11/15/2012Bid Time: 2:30 PM PLANS AT: Roseville Office Location: San Francisco Online and Planroom# OF ADDENDA: 1 PREBID: 10/11 @ 3:30pm OWNER: City & County of San Francisco DESCR: Contact, Robert Nist, ([email protected]) City & Cunty of San Francisco is requesting qualifications from Architectural services on an as-needed basis for public building projects.

PARKING LOT SWEEP/STEAM ROSEVILLE DMV - REBIDPLAN #: 214089 Bid Date: 11/15/2012 Bid Time: 1:30 PM PLANS AT: Roseville Office Location: Roseville PlanroomOWNER: Department of Motor Vehicles Ph: 916-657-7822 DESCR: Contact, Melanie Pilliard, ([email protected].) Parking lot sweep/steam Roseville DMV.

COLUMBIA STATE HISTORIC PARK - INSTALLATION OF AUTOMATIC DOORSPLAN #: 222076 Bid Date: 11/15/2012Bid Time: 4:00 PM PLANS AT: Roseville Office Location: Columbia PREBID: MAND 10/30 @ 11am OWNER: California State Parks DESCR: Contact, Kristi Darby ([email protected]) Install automatic door operators at fifteen (15) exterior doorways and wood doors throughout Columbia State Historic Park.

RFQ - BUTTE HALL ELEVATORS AND FIREPLAN #: 240089 Bid Date: 11/15/2012

Bid Time: 3:00 PM PLANS AT: Roseville Office Location: Chico Planroom Est Cost: $1,200,000.00OWNER: California State University, Chico DESCR: Contact, Michael McNairn, 530-898-5134. Submit your statement of qualification to provide design / build services for the rehabilitation of Butte Hall and a new fire suppression system, which will include rehabilitation of three elevator cabs, including new controls, pulleys, doors and related components and design / installation of a waterless fire suppression system for seven existing server rooms in Butte Hall and Meriam Library.

ABOVE GROUND SEWER PIPE REPLACEMENT

PLAN #: 245050 Bid Date: 11/15/2012Bid Time: 3:00 PM PLANS AT: Roseville Office Location: Byron Online & Print On DemandPREBID: MAND 11-1-12 @ 10AM OWNER: County of Contra Costa FAX: 925-313-2333DESCR: Contact, Contra Costa County, Maintenance Division (925) 313-7000. Contra Costa County is requesting qualified persons or firms to submit proposals for a Sewer Pipe Replacement Project. The purpose of the Project is to remove and replace 1,260 linear feet of above ground plastic sewer pipe with welded steel pipe, while minimizing the impact on the surrounding habitat. The selected contractor will work the County’s Project Manager to determine the best system for providing the required functionality, and minimizing the impact on the surrounding habitat. The existing sewer piping on the northern end runs underground between a pumping station that is located inside a compound within the grounds of the Orin Allen Youth Rehabilitation Center, approximately 225 feet to where the piping daylights to above ground. The block that is located at the northern most end of the above ground piping, where the pipe daylights, is leaking and will need to be removed. Several of the pillars throughout the path of the pipe appear to be sinking. Prior to the installation of the new pipe, the sinking pillars will need to be raised in order to obtain fall. The assumption by the County is that the new piping can be welded to the existing steel pipe.

WING A & WING B COOLING SYSTEM UPGRADEPLAN #: 254061 Bid Date: 11/15/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Vacaville Online and PlanroomPREBID: MAND 10/25 @ 10am

Continued from last page

Plans On File

Page 59: Construction e_zone

Contractor’s ZoneContractor’s Zone

OWNER: State of CA - Dept of General Services DESCR: Contact, Eric Waddell, 916-376-11768. Project comprises labor, material and services necessary for: Removal and demolition of existing cooling systems for wings A and B. Provide cooling system upgrade for wings A and B including electrical and structural work to support equipment. Remove and replace the chilled water coils at a number of existing units. Provide chillers including concrete pad, piping and electrical requirements. Provide structural strengthening required for mechanical equipment. Patch and repair roofing as required for mechanical changes and support system.BIDDERS LIST:General Contractor: Bell Products, Inc. 707-255-1811 707-255-1908 Bobo Construction, Inc. 916-685-2285 916-714-4850 Division 5-15, Inc. 916-638-1520 916-638-1521

HELICOPTER SERVICES - UPPER AMERICAN RIVER PROJECT

PLAN #: 263040 Bid Date: 11/15/2012 Bid Time: 5:00 PM PLANS AT: Roseville Office Location: Sacramento Online & Print On Est Cost: $300,000.00 DemandPREBID: 11/1 @ 9:30am OWNER: Sacramento Municipal Utility District Ph: 888-742-7683 DESCR: Contact, Paul Bagley, 916-732-6536. ([email protected]) The Contractor shall provide all transportation, labor, material, equipment, supervision, materials, and incidentals required by SMUD to provide helicopter service for transporting SMUD and other authorized personnel and/or equipment on SMUD’s Upper American River Project (Desolation Wilderness and surrounding areas) and associated SMUD transmission and sub-transmission facilities.

MOUNT TORO GROUNDINGPLAN #: 269080 Bid Date: 11/15/2012

Bid Time: 3:30 PM PLANS AT: Print On Demand Location: Monterey Co. Online & Print On Demand PREBID: MAND 11/1 @ 9am OWNER: Co of Monterey FAX: 831-755-4958DESCR: Contact, County of Monterey, 831-755-4990. Installation of a grounding ring around the building and tower, and connection of every metallic structure surrounding the site to the ring to maintain equal potential. A single point grounding scheme is required for the site to reduce circulating current, unwanted surges, and lighting from entering the building damaging the equipment.

RECLAMATION PUMP VFD REPLACEMENTPLAN #: 290043 Bid Date: 11/15/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office

Location: Marina Online and PlanroomPREBID: 11/6 @ 10am OWNER: Monterey Regional Water Pollution Control Agency DESCR: Contact, MRWPCA, 831-372-2385. Demolition of existing Reclamation Pump VFDs. Install new reclamation pump VFDs, including modifications to housekeeping pads and anchorage, mod and reconnection of existing power and control cables for the reclamation pump, modification of existing backwash pump VFDs and pump

Friday, November 16, 2012

EASTRIDGE TRANSIT CENTER AND BUSPLAN #: 117074 Bid Date: 11/16/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: San Jose Online and Planroom# OF ADDENDA: 3 PREBID: 8/10 @ 10 am. OWNER: Santa Clara Valley Transportation Authority Ph: 408-321-7189 FAX: 408-955-9729DESCR: Contact: VTA (408) 321-7189 .The work generally includes clearing and grubbing, demolition, excavation, street improvements, AC paving, addition of curb and gutter and sidewalk, multiuse path, street and pedestrian lighting, landscaping new utilities, conduits, service connections, signing and striping and misc other work. BIDDERS LIST:Sub Contractor: Mission City Rebar, Inc 925-449-6999 925-447-8797 R.l. Ziegenbein Const 925-820-9245 925-831-3093 Monterey Bay Rebar 831-724-3013 831-724-3151Supplier: Reed & Graham Inc 916-381-9900 916-388-1486

SJUSD HORACE MANN ELEMENTARY SCHOOL THIRD FLOOR RAIN SCREENSPLAN #: 130067 Bid Date: 11/16/2012

Bid Time: 10:00 AM PLANS AT: Roseville Office Location: San Jose PREBID: 11/1 @ 3PM (Highly Recommended OWNER: San Jose Unified School District Ph: 408-535-6071 DESCR: Contact, Kitchell, 408-280-7889. Kitchell CEM, as construction managers for SJUSD, is soliciting prices from several sources for the Third Floor Rain Screens Project

Continued on next page

To Run Your Legal Ad, Please Visitwww.thedailyreporter.net

Or Give Us A Call 916-729-5432

Page 60: Construction e_zone

November 5, 2012Page 58 Contractor’s Zone• .Contractor’s Zone

Continued from last page

Friday, November 16, 2012

RFQ - MINOR BUILDING CONSTRUCTION, PLUMBING, CARPETING, FLOORING & CEILING

PLAN #: 171093 Bid Date: 11/16/2012 Bid Time: 3:00 PM PLANS AT: Roseville Office Location: San Jose PlanroomOWNER: City of San Jose DESCR: Contact, Priscilla Louangrath, 408-535-7058. Contractor to provide maintenance repairs of the interior buildings on the site of the Water Pollution Control Plant and South Bay Water Remote Facilities1.Repair/replace various ceiling materials & installations (T-bar, sheetrock, acoustical, etc.)2.Provide service for minor plumbing repairs & installations (water, sewer & gas)3.Provide service for various floor repairs & installations (tile, vinyl & carpet)4.Provide minor construction repairs & installations (dividing wall, partitions, etc.)

WALKER COMMONS PAINTINGPLAN #: 219089 Bid Date: 11/16/2012

Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Chico Online and PlanroomPREBID: 11/6 @ 1pm OWNER: Butte County Housing Authority DESCR: Contact, Butte County Housing Authority, Sheri Bouvier ([email protected]) (x 237) (530) 895-4474. Paint gray exterior siding at Walker Commons, Units 1 through 56 and the community

RFQ - RUBBISH AND DEBRIS REMOVAL SERVICES

PLAN #: 225081 Bid Date: 11/16/2012 Bid Time: 3:00 PM PLANS AT: Roseville Office Location: San Jose PlanroomOWNER: City of San Jose DESCR: Contact, Priscilla Louangrath, 408-535-7058. City of San Jose is seeking Requests for Qualifications for Rubbish and Debris Removal Services from private properties on an as-needed basis.

TEMPORARY FENCING SERVICESPLAN #: 238089 Bid Date: 11/16/2012

Bid Time: 4:00 PM PLANS AT: Roseville Office

Plans On File

Location: Sacramento Online and Planroom # OF ADDENDA: 1 PREBID: 10/30 @ 10am OWNER: City of Sacramento DESCR: Contact, Elise Gumm ([email protected]) (916) 808-1927. Repair, maintain, install, reset, remove and replace fencing as directed by the City, which will include temporary and semi-permanent / permanent fencing.

ELEVATOR MODERNIZATIONPLAN #: 258047 Bid Date: 11/16/2012

Bid Time: 2:30 PM PLANS AT: Roseville Office Location: Modesto Online & Print On Demand PREBID: MAND 10/31 @ 9AM OWNER: County of Stanislaus DESCR: Contact, County Of Stanislaus (209) 525-6319. The County Of Stanislaus is seeking proposals from qualified & experienced organizations for the modernization of two elevators in the county-owned buildings.

Monday, November 19, 2012

NEWELL CREEK DAM PIPELINE INSPECTIONPLAN #: 170094 Bid Date: 11/19/2012 Bid Time: 4:00 PM PLANS AT: Roseville Office Location: Santa Cruz Online and PlanroomPREBID: MAND 10/31 @ 10am OWNER: City of Santa Cruz DESCR: Contact, Isidro Rivera, 831-420-5313 ([email protected]). The City of Santa Cruz Water Department is seeking qualified individuals or firms/consultants with expertise in remote pipeline inspection services to submit proposals to provide inspection services for Newell Creek Dam Outlet Pipeline. This request for proposal covers the inspection of a pipeline consisting of over 1600 lineal feet and four different pipe diameters ranging from 22-inch to 36-inch.

2012 SEWER/STORM TRENCH REPAIR PROJECTPLAN #: 181096 Bid Date: 11/19/2012 Bid Time: 11:30 AM PLANS AT: Roseville Office Location: Marysville PlanroomOWNER: City of Marysville DESCR: Contact, City of Marysville City Services (530) 749-3902. Repair settled sewer and storm drain trenches, including removal / replacement of the asphalt concrete over three settled sewer and storm drain trenched (pavement patching). BIDDERS LIST:

Page 61: Construction e_zone

Contractor’s ZoneContractor’s Zone

General Contractor: United Building Contrac 530-345-8455 530-345-8885 2012 PAVEMENT REPAIR PROJECTPLAN #: 203098 Bid Date: 11/19/2012 Bid Time: 11:00 AM PLANS AT: Roseville Office Location: Marysville PlanroomOWNER: City of Marysville DESCR: Contact, City of Marysville City Services (530) 749-3902. Repair damaged asphalt, including edge grinding, installation of pavement reinforcement fabric, 1-1/2” overlay with Type B 1/2” AC in two intersections and removal / replacement of problem sections of asphlat concrete (pavement patching).

JOB ORDER CONTRACTING - 13004PLAN #: 266042 Bid Date: 11/19/2012 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Alameda Online and PlanroomPREBID: MAND 11/1 @ 1PM at 1401 Lakeside Dr., Oakland & 11/2 @ 2PM at 100 Civic Plaza, Dublin OWNER: County of Alameda DESCR: Contact, Gary Russel, Proj Mgr, @ 510-208-9586. The scope of General JOC contracts are for for general construction, repair, remodel & other repetitive related work to be performed for the County of Alameda.

JOB ORDER CONTRACTING - 13005PLAN #: 270041 Bid Date: 11/19/2012 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Alameda Online and PlanroomPREBID: MAND 11/1 @ 1PM at 1401 Lakeside Dr., Oakland & 11/2 @ 2PM at 100 Civic Plaza, Dublin OWNER: County of Alameda DESCR: Contact, Gary Russel, Proj Mgr, @ 510-208-9586. The scope of General JOC contracts are for for general construction, repair, remodel & other repetitive related work to be performed for the County of Alameda.

JOB ORDER CONTRACTING - 13003PLAN #: 275045 Bid Date: 11/19/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Alameda Online and PlanroomPREBID: MAND 11/1 @ 1PM at 1401 Lakeside Dr., Oakland & 11/2 @ 2PM at 100 Civic Plaza, OWNER: County of Alameda DESCR: Contact, Gary Russel, Proj Mgr, @ 510-208-9586. The scope of General JOC contracts are for for general construction, repair, remodel & other repetitive related work to be performed for the County of Alameda.

Tuesday, November 20, 2012

EAST STOCKTON SOUND WALL RENOVATIONPLAN #: 5015 Bid Date: 11/20/2012

Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Elk Grove Online & Print On Est Cost: $1,053,000.00 DemandPREBID: MAND 11/13 @ 1pm OWNER: City of Elk Grove DESCR: Contact, Gary Grunwald, 916-478-2236 ([email protected]). Includes construction of a 10’-8” high sound wall +/- 1,750’ long (post tensioned wall is optional), roadway reconstruction, micro-surfacing, curb / gutter / sidewalk removal / replacement, LED retrofit lighting, pavement delineation and drainage

WEST CAPITAL COMMONSPLAN #: 25017 Bid Date: 11/20/2012Bid Time: 2:00 PM PLANS AT: Print On Demand Location: West Online & Print On DemandDESCR: Contact: INLAND WASHINGTON, LLC. (509) 891-5162.New construction of a 270 unit apartment complex consisting of (11) 3 story apartment buildings. This project includes a Clubhouse and Pool House that will be bid at a separate time. Building envelopes include asphalt composition roofs, fiber cement siding, and vinyl windows.

KRUSI PARK RENOVATIONSPLAN #: 38019 Bid Date: 11/20/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Alameda Online & Print On DemandPREBID: MAND 10/17 & 10/24 @ 10am OWNER: City of Alameda DESCR: Contact, City of Alameda, 510-747-7930. The work to be done consists of furnishing all labor, tools, equipment, materials, except as herein specified, and doing all work associated with The work for Renovations to Krosi Park. The site work at this park includes but is not limited to: dust and noise control, demolition, tree and plant protections, staking, clearing and grubbing, earthwork, trenching, site preparation, erosion control, subgrade preparation, water systems, storm drain system, sanitary sewer, asphaltic concrete pavement, concrete, paving, pavement marking, landscape grading, landscape drainage, signage, irrigation, site furnishings, metal work, electrical work, planting and planting maintenance. The building work at this park includes but is not limited to site work, site preparation, utility connections, foundation, concrete, masonry, metals, wood and plastic, thermal and moisture protection, doors and windows, finishes, specialties, equipment, furnishings, plumbing and electrical. BIDDERS LIST:General Contractor: Romkon Inc. 415-525-4432 415-529-2073Sub Contractor: National Electric Co. 510-475-9400 510-475-9411 Mission City Rebar, Inc 925-449-6999 925-447-8797

Continued on next page

Page 62: Construction e_zone

November 5, 2012Page 60 Contractor’s Zone• .Contractor’s Zone

Tuesday, November 20, 2012

POLE REPLACEMENT AND OTHER LINE WORKPLAN #: 88064 Bid Date: 11/20/2012 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Sacramento Online & Print On Demand PREBID: 11- 6, 2012@ 9am OWNER: Sacramento Municipal Utility District Ph: 888-742-7683 DESCR: Contact, Cheryl Brooks, 916-732-5607,[email protected]. This contract is for the replacement of existing wood poles on the District’s distribution system. Poles may have a variety of voltages (230kV to 120V), communication conductors, and associated equipment on them. The contractor shall furnish all labor, supervision, and equipment, necessary to complete the work assigned under this contract. The District will furnish all material necessary to install the pole and rebuild or reinstall the existing equipment based upon current District Construction Standards. The work consists of obtaining all necessary permits; hole drilling, digging, trenching; removal of existing pole, installation of new pole, transfer of existing equipment and conductors, rebuilding of cross-arms or other structures on the pole as directed, back-filling, temporary sidewalk & street repair with approved material (example: cold patch or cutback), debris removal; and as-built documentation. Work may also include other work as directed by the District. The work on this contract consists of numerous individual jobs, which will be assigned after award of the contract. This contract will terminate on or before December 31, 2014.

STATION AND TUNNEL EMERGENCY LIGHTINGPLAN #: 110082 Bid Date: 11/20/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: San Francisco Online and Planroom Est Cost: $2,000,000.00 # OF ADDENDA: 1PREBID: 10/03/12 @ 9:00 am OWNER: San Francisco Bay Area Rapid Transit District Ph: 510-464-6547 DESCR: Contact, San Francisco Bay Area Rapid Transit (510) 464-6088. The work includes, but is not limited to, the following work at Civic Center Station, San Francisco and 19th Street Station, Oakland. Work such as providing battery rooms, battery room ventilation system, eye wash stations, batteries and battery racks, UPS and UPS maintenance Bypass cabinets, 480 VAC circuit breakers, distribution panels, DC battery disconnect switches, junction boxes, pull boxes, conduits, wires, fittings, and accessories needed to complete the

Continued from last page

Plans On Fileinstallation. Work also includes disconnecting and recircuiting existing light fixtures from existing and new panels, start-up, commissioning and maintenance. BIDDERS LIST:General Contractor: Cf Contracting 415-721-7160 415-296-6437

STANDBY GENERATOR AND ELEVATED BUS DUCT REPLACEMENT PROJECTPLAN #: 127062 Bid Date: 11/20/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: So. San Online & Print On # OF ADDENDA: 1 DemandPREBID: MAND 10/16 @ 1:30pm OWNER: City of South San Francisco DESCR: Contact, CIty of South San Francisco, 650) 829-6652. Demolition of the existing Standby Generator Building No. 1 and the equipment inside, demoliton of the existing elevated bus duct, construction of the new Standby Generator Building No. 1 and including providing Standby Generator No. 1 and appurtenances, providing a new cable bus and rehabilitating the associated support structure and BIDDERS LIST:Sub Contractor: Mission City Rebar, Inc 925-449-6999 925-447-8797

SEISMIC IMPROVEMENTS FOR HOBPLAN #: 165076 Bid Date: 11/20/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Contra Costa Online & Print On Est Cost: $5,500,000.00 DemandPREBID: 10/24 @ 10am OWNER: Central Contra Costa Sanitary Dist. DESCR: Contact, Nathan Hodges, 925-335-7762. Seismic retrofit & building renovation of an existing four-story steel frame building designed in 1981, including carpet replacement, ADA improvements, asbestos abatement, network cable replacement & improvements to kitchen & restrooms & HVAC & electrical systems. BIDDERS LIST: Cooper Pugeda Manag 415-552-5511 415-543-6510General Contractor: C. Overaa And Co. 510-234-0926 510-237-2435 Bobo Construction, Inc. 916-685-2285 916-714-4850 Taber Construction 925-682-6133 925-682-6122 Swank Construction 707-446-8808 707-446-8303 Diede Construction 209-369-8255 209-368-0600 A-zcon Builders 916-786-8003 916-786-8046

Page 63: Construction e_zone

Contractor’s ZoneContractor’s Zone

HVAC MAINTENANCE SERVICESPLAN #: 227079 Bid Date: 11/20/2012 Bid Time: 3:00 PM PLANS AT: Roseville Office Location: San Jose Online and Planroom Est Cost: $224,000.00DESCR: Contact, City of San Jose, Priscilla Louangrath, 408-535-7058. The City of San José ( hereinafter “City”) is soliciting bids from qualified Contractors (hereinafter “Bidder”) to provide HVAC maintenance services including all labor, material, and equipment necessary to perform repairs, replacements, and support of such services as specified in the bid document scope of work, Attachment 1 at various City sites.The City intends to award two contracts as a result of this bid for a cumulative total of approximately $224,000.The City reserves the right to award the two contracts with a 60/40 split.The City reserves the option to renew the resulting Purchase Orders for four (4) additional terms of 1 year, for a total of five (5) years.Important Note: The quantities/hours specified herein are estimates and are not guaranteed. The estimated quantities/ hours may vary depending on the demands of the City. Any variations from these estimated quantities shall not entitle the bidder to an adjustment in the rates or to any additional compensation.

U2 MAINTENANCE TANK PROJECTPLAN #: 293043 Bid Date: 11/20/2012

Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Santa Cruz Online & Print On Demand PREBID: 11/6 @ 2pm OWNER: City of Santa Cruz DESCR: Contact, Matt Zeman ([email protected]) Construct a nominal 58,000 gallon bolted steel tank, plus associated facilities and utilities as illustrated on the plans and project specifications.

WATER MAIN SEISMIC IMPROVEMENT PROJECTPLAN #: 295028 Bid Date: 11/20/2012Bid Time: 3:00 PM PLANS AT: Roseville Office Location: Redwood City Online & Print On Demand OWNER: City of Redwood City DESCR: Contact, City of Redwood City (650) 780-7380. Install new piping & piping components, including pipes, flexible couplings, corrosion protection, pipe supports & pipe restraints & all associated firrings, dewatering, vehicular & pedestrian traffic control & safety & all other associated work.

MOSS LANDING MARINE LAB AQUACULTURE LAB PROJECTPLAN #: 305009 Bid Date: 11/20/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office

Location: San Jose Est Cost: $953,000.00 # OF ADDENDA: 4PREBID: 9/19 @ 10am (strongly recommended) OWNER: San Jose State University Ph: 408-924-2246 FAX: 408-924-7243DESCR: Contact, Sylvia Sosa ([email protected]). Construction of 1645 sq.ft. of new Aquaculture Lab building and tank slab to replace demolished Aquaculture Lab buildings and tanks.BIDDERS LIST:General Contractor: Legg, Inc. 925-605-4500 925-605-4510Sub Contractor: Mission City Rebar, Inc 925-449-6999 925-447-8797

Wednesday, November 21, 2012

BUCKEYE WATER TREATMENT PLANT STORAGE BUILDINGPLAN #: 73066 Bid Date: 11/21/2012 Bid Time: 3:00 PM PLANS AT: Print On Demand Location: Redding Online & Print On Est Cost: $165,000.00 DemandOWNER: City of Redding DESCR: Contact, City of Redding, Darren Langfield, 530-225-4469. Construct a 2,268 square-foot pre-engineered metal storage building; the building will have associated electrical, mechanical, and plumbing; sitework will include minor grading for the building pad and cutting / patching pavement for electrical and water trench. BIDDERS LIST:General Contractor: R.k. Ricks Construction 530-604-3102 530-241-4360 B & B General Engin 530-277-7305 530-237-1798 Donald F. Gallino, Inc. 530-246-7671 530-246-8714

FURNISH 5 KV SWITCHGEAR - CITRUS, CRAFTON HILLS AND CHERRY VALLEY PUMP STATIONS/EAST BRANCH EXTENSION-PHASE IIPLAN #: 158063 Bid Date: 11/21/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: San Planroom # OF ADDENDA: 1 PREBID: 10/3 @ 10am OWNER: State of California, Dept of Water Resources Ph: 916-653-5791 DESCR: Contact, Department of General Services, 916-375-4940, Jim Veres telephone (916) 653-4867, fax (916) 653-6166, or by e-mail at [email protected]. See specifications for details.

Continued on next page

Page 64: Construction e_zone

November 5, 2012Page 62 Contractor’s Zone• .Contractor’s Zone

Wednesday, November 21, 2012

ELMHURST HAZMAT ABATEMENT - JOB ORDERPLAN #: 204001 Bid Date: 11/21/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Alameda Co. Online and PlanroomOWNER: County of Alameda DESCR: Contact, Jason Garrison, 510-208-9520. Remove the obsolete HVAC, the ducts are covered with wood trim that is painted with lead-based paint. Beneath the wood trim is asbestos insulation that is between two layers of transite panels. Loose and peeling paint will need to be stabilized and some of the paint will need to be spot bated so that the County can cut the steel without disturbing the remaining lead-based

RFQ - EXECUTIVE PROGRAM ADVISOR FOR WATER POLLUTION CONTROL PLANT CAPITAL IMPROVEMENT PROGRAMPLAN #: 220076 Bid Date: 11/21/2012Bid Time: 3:00 PM PLANS AT: Roseville Office Location: San Jose Online and PlanroomOWNER: City of San Jose DESCR: Contact, Greg Card, 408-535-8304. City of San Jose is seeking Statement of Qualification from qualified consultants for the Executive Program Advisor for Water Pollution Control Plant Capital Improvement Program.

Monday, November 26, 2012

BUILD 3 OFFICES FOR USDI BUREAU OF LANDPLAN #: 160063 Bid Date: 11/26/2012

Bid Time: 12:00 PM PLANS AT: Print On Demand Location: Sacramento Online & Print On Est Cost: $42,000.00 DemandPREBID: MAND 11/7 @ 1pm OWNER: General Services Administration DESCR: Contact, General Services Admin. (916) 468-5366 Timothy Day ([email protected]) Work consists of constructing three offices in the existing Bureau of Land Management suites.

Tuesday, November 27, 2012

FIBER OPTIC CABLE INSTALLATION AT A-LINE, M- LINE, & CONCORD YARDPLAN #: 156084 Bid Date: 11/27/2012

Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Various Online and Planroom Est Cost: $900,000.00 PREBID: MAND 10/23/12 @ 9:00 am OWNER: San Francisco Bay Area Rapid Transit District Ph: 510-464-6547 DESCR: Contact, San Francisco Bay Area Rapid Transit (510) 464-6088. The work consists of providing all labor, materials, fiber optic cable, equipment, and services necessary to install fiber optic cables as indicated in the specifications, and to furnish and install 2” Galvanized Rigid Steel conduit, 2” flex conduit, conduit radius extenders, transition and pull boxes, conduit hubs, gaskets, and other ancillary equipment where required to make a complete and functional installation, as indicated. All mounting hardware and pull boxes shall be of stainless steel. Interested prospective Bidders are requrested to confirm their intention to attend by notifying the District’s Contract Administrator Sunni Gunawardena @ 510-464-6550 prior to the date of the scheduled pre-bid meeting and site tour. BIDDERS LIST:General Contractor: Cf Contracting 415-721-7160 415-296-6437

BUILDING 800 RENOVATIONPLAN #: 163072 Bid Date: 11/27/2012 Bid Time: 1:00 PM PLANS AT: Roseville Office Location: Aptos Online & Print On Est Cost: $3,354,000.00 # OF ADDENDA: 1DemandPREBID: MAND 10/25 @ 10am OWNER: Cabrillo College Ph: 831-479-6100 DESCR: Contact, Cabrillo Community College Dist (831) 477-5613. Renovation of the 800 Building brings together several related programs into a state-of-the-art learning facility in one building: Engineering, Physics, Computer Science, Computer and Information Systems, and MESA (Mathematics, Engineering, Science Achievement). The project is funded in part by a STEM Grant from the U.S. Department of Education, to facilitate broader participation in these disciplines by the County’s Latino community. The STEM Grant will provide $1,952,530 or 46% of the estimated $4,202,530 construction and soft costs. The balance of the estimated construction costs ($2,250,000) will be paid from the District’s Measure D Bond funds. BIDDERS LIST:General Contractor: Menghetti Construction 209-524-2465 209-524-2495 Garden City Construction 408-289-8807 408-289-8523 Strawn Construction, Inc 408-286-1299 408-286-1288 Tombleson Inc 831-422-9696 831-422-0566

Continued from last page

Plans On File

Page 65: Construction e_zone

Contractor’s ZoneContractor’s Zone

Bobo Construction, Inc. 916-685-2285 916-714-4850Sub Contractor: Culbert Installs Doors, 916-675-4050 916-992-0133

PARKING LOT SWEEPING AND STEAM CLEANING SERVICES FOR ARVIN DMV FIELD OFFICE

PLAN #: 195095 Bid Date: 11/27/2012 Bid Time: 1:30 PM PLANS AT: Roseville Office Location: Arvin PlanroomOWNER: Department of Motor Vehicles Ph: 916-657-7822 DESCR: Contact, Allison Stanek, DMV, 916-657-9810. Parking Lot Sweeping and Steam Cleaning Services for Arvin DMV Field Office.

UTILITY POTHOLING ON VARIOUS ROADWAYS IN UNINCORPORATED AREAS, ALAMEDA

PLAN #: 279040 Bid Date: 11/27/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Alameda PlanroomPREBID: MAND 11/7 @ 2PM at 951 Turner Ct., Rm 230, Hayward OWNER: County of Alameda DESCR: Contact: Tam Nguyen 510-670-5758.Locating both horizontally & bertically various underground utility lines by “non-destructive vacuum excavation;” providing traffic control; restoration of disturbed roadway pavement; cleaning site & miscellaneous work.

Wednesday, November 28, 2012

JPS EAST CAMPUS-OPERATION CENTER MOVEPLAN #: 53095 Bid Date: 11/28/2012

Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Sacramento Online & Print On Est Cost: $1,750,000.00 DemandPREBID: 11/7 @ 10am (strongly recommended) OWNER: Sacramento Municipal Utility District Ph: 888-742-7683 DESCR: Contact, John Slingerland, 916-732-6515, [email protected] The Move Contractor shall be responsible to provide all labor, including but not limited to, electrical, mechanical, plumbing, hazardous materials, riggers, specialty equipment subcontractors and provide all vehicles, equipment and materials required to safely and efficiently execute a “turnkey” solution when relocating SMUD’s existing operations to SMUD’s new East Campus-Operations Center. The Move Contractor shall pack, relocate, and unpack a wide range of

existing Yard equipment and materials (e.g., bins of parts, hand tools, batteries, tires, hazardous materials, pallets, inventory, specialty equipment, heavy transformers, etc.). In addition, Move Contractor shall relocate office contents for approximately 375staff which will be packed and unpacked by SMUD.

BUS STOP PAVEMENT IMPROVEMENTS FY12PLAN #: 79053 Bid Date: 11/28/2012

Bid Time: 1:00 PM PLANS AT: Roseville Office Location: San Jose, PlanroomPREBID: 11/8 @ 10AM at 3331 North First St., San Jose OWNER: Santa Clara Valley Transportation Authority Ph: 408-321-7189 FAX: 408-955-9729DESCR: Contact: VTA (408) 321-5743.Improvements at 19 bus stops in the cities of Palo Alto, Santa Clara & San Jose, including bus stop PCC pad restoration, various sidewalk & street improvements for ADA approved access.

BROADWAY STREETSCAPE IMPROVEMENTS PROJECT PHASE III

PLAN #: 101084 Bid Date: 11/28/2012 Bid Time: 2:30 PM PLANS AT: Roseville Office Location: San Francisco PREBID: 11/6 @ 2:30pm OWNER: City & County of San Francisco DESCR: Contact, Cristina Olea, 415-558-4004. Streetscape and pedestrian improvements, roadway rehabilitation, sewer work, streetlight and traffic signal work and traffic routing, striping and signage work.

HOSPITAL WIRELESS ACCESS POINT INSTALLATION CP NO. 8 - NORTH / SOUTH

WINGPLAN #: 103084 Bid Date: 11/28/2012 Bid Time: 10:00 AM PLANS AT: Roseville Office Location: Sacramento Online & Print On Est Cost: $359,000.00 DemandPREBID: MAND 11/7 @ 10 AM OWNER: University of California, Davis Health System DESCR: Contact, Facilities and Design Construction ([email protected]) (916) 734-7024. Relocate / install new and existing wireless access points (WAP), provide / install new surface wiremold raceway system for WAP cabling installation, terminate patch cords from each wireless access point device to a new or existing patch panel, install / connect patch cords between patch panel and switch, install switches, test system, protect existing equipment and system, patch / repair existing construction required for new work or relocate existing WAPs and relocate up to 5% of WAPs after system testing for signal coverage.

Continued on next page

Page 66: Construction e_zone

November 5, 2012Page 64 Contractor’s Zone• .Contractor’s Zone

Wednesday, November 28, 2012

SICKLES AVENUE AND ALEMANY BOULEVARD- PAVEMENT RENOVATION AND SEWER

PLAN #: 104084 Bid Date: 11/28/2012 Bid Time: 2:30 PM PLANS AT: Roseville Office Location: San Francisco PREBID: 11/6 @ 1:30pm OWNER: City & County of San Francisco DESCR: Contact, Ramon Kong, 415-554-8280. The Work is located on Sickles Avenue from Mission Street to Alemany Boulevard and on Alemany Boulevard from San Jose Avenue to Seneca Avenue and consists of pavement renovation, curb ramps, traffic routing, sewer replacement and all other related work.

REPLACEMENT OF TOILET PARTITIONS AND BATHROOM ACCESSORIESPLAN #: 233071 Bid Date: 11/28/2012

Bid Time: 2:30 PM PLANS AT: Roseville Office Location: Long Beach Online and PlanroomPREBID: MAND 11/8 @ 8am OWNER: Department of Motor Vehicles Ph: 916-657-7822 DESCR: Contact, Loretta Vaquez, 916-657-8697. Replacement of Toilet Partitions and Bathroom Accessories

MULTI-USE PATHWAY MAINTENANCE PROJECT

PLAN #: 278040 Bid Date: 11/28/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Marin Co. Planroom Est Cost: $250,000.00OWNER: County of Marin DESCR: Contact, County of Marin, 415-473-7877. Asphalt concrete resurfacing, pavement repairs, asphalt concrete grinding, concrete sidewalk, concrete curbs, vegetation removal.

Thursday, November 29, 2012

2012 SOUNDWALL REPAIR & REPLACEMENT PROJECT

PLAN #: 0 Bid Date: 11/29/2012

Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Santa Clara Online & Print On Demand PREBID: 11/14 @ 10am OWNER: County of Santa Clara DESCR: Contact, Herbert Naraval, Proj Engr, @ 408-494-1308. Removal & replacement of soundwall panels & posts along various expressways.

GOLD RUN SITE DEVELOPMENT PROJECTPLAN #: 2015 Bid Date: 11/29/2012

Bid Time: 3:30 PM PLANS AT: Roseville Office Location: Placer Co. Plans on Disk Est Cost: $225,000.00 PREBID: 11/8 @ 10am OWNER: County of Placer Procurement Dept DESCR: Contact, County of Placer Procurement Services (530) 889-4255. Work consists of developing a public safety radio site to support the Countywide Interoperable Radio Communications Project. Site development includes: installation of an owner-provided 12’ x 20’ shelter; construction of an owner-provided 180 foot tower; construction of pads to support the shelter, generator, and propane tank; installation of owner-provided backup generator, transfer switch and propane tank; grading as required for the site; and all site work associated with the public safety radio site including foundation, trenching, electrical, grounding and

HAGAN PICNIC PAVILION IMPROVEMENTSPLAN #: 198095 Bid Date: 11/29/2012 Bid Time: 1:00 PM PLANS AT: Roseville Office Location: Rancho Planroom Est Cost: $118,300.00OWNER: Cordova Recreation & Park District Ph: 916-362-1841 FAX: 916-362-9602DESCR: Contact, Cordova Recreation and Park District, Jerry Fox, (916) 947-6794. Construction fence, construction sign, demolition, grading, postconstructionturf seeding, erosion control, approx. 6000 sq. feet of concrete installation, minor electrical (per plan), irrigation head relocation, ADA lot striping and signage installation, 2 Group BBQ’s and installation, picnic and prep table installation, shelter installation with stone column cladding, as detailed in the plans and specifications.

VETERANS MEMORIAL BUILDINGPLAN #: 145062 Bid Date: 11/29/2012

Bid Time: 2:30 PM PLANS AT: Roseville Office Location: Santa Cruz Online & Print On Demand PREBID: MAND 11/7 @ 10am OWNER: County of Santa Cruz

Continued from last page

Plans On File

Page 67: Construction e_zone

Contractor’s ZoneContractor’s Zone

FAX: 831-454-2710DESCR: Contact, Vanir Construction Management, Dolores Montenegro, Senior Project Manager via email at [email protected], with copy to Domenic Zigant @ [email protected] bidder must submit a bid proposal for the project for which they intend to bid to the General Services. Project consists of the Phase 2 interior renovation and modifications to the SANTA CRUZ VETERANS MEMORIAL BUILDING. The Work specifically includes all the work as represented by the Drawings and Specifications issued for construction and subsequent approved revisions and includes but is not limited to: hazardous material abatement in areas where demolition is shown, modifications to electrical, mechanical HVAC systems, new menand women’s toilets, improvements for compliance with Americans with Disabilities, and seismic upgrade of the building.

HAGAN PICNIC PAVILION IMPROVEMENTSPLAN #: 198095 Bid Date: 11/29/2012 Bid Time: 1:00 PM PLANS AT: Roseville Office Location: Rancho Online and Planroom Est Cost: $118,300.00OWNER: Cordova Recreation & Park District Ph: 916-362-1841 FAX: 916-362-9602DESCR: Contact, Cordova Recreation and Park District, Jerry Fox, (916) 947-6794. Construction fence, construction sign, demolition, grading, postconstructionturf seeding, erosion control, approx. 6000 sq. feet of concrete installation, minor electrical (per plan), irrigation head relocation, ADA lot striping and signage installation, 2 Group BBQ’s and installation, picnic and prep table installation, shelter installation with stone column cladding, as detailed in the plans and specifications.BIDDERS LIST:General Contractor: C & C Construction 916-434-5280 916-434-5288

REQUIREMENTS CONTRACT FOR AUTOMATIC FAREBOX COLLECTION SYSTEMPLAN #: 201089 Bid Date: 11/29/2012 Bid Time: 3:00 PM PLANS AT: Roseville Office Location: Fresno PREBID: 11/7 @ 10am OWNER: City of Fresno DESCR: Contact, Jean Runnels, Phone: (559) 621-1163 OR 621-1332. New AFC system that is based on open system architecture, modular, and flexible to adapt to and accept any commonly used fare media, such as paper-based or limited-use ticket, magnetic stripe card, or smart card, over the service life of the system. The AFC system should conform to technological and environmental Open Standards and Guidelines, including, but not limited to the following applicable industry standards, as required to provide the levels of service required by this bid:. This request is for a one -year contract with one (1) one-year extensions.

RESEAL AND RESTRIPE PARKING LOTPLAN #: 221094 Bid Date: 11/29/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Fresno Online and PlanroomPREBID: MAND 11/15 @ 10am OWNER: State of CA - Dept of General Services DESCR: Contact, Peter Flores, 916-322-8883Contractor shall provide all labor, equipment, and materials necessary to provide Parking Lot Repairs, Sealing and Striping at the Water Resources Office Building.

GOLDEN HILL TANK NO. 1 AND MERRY HILL TANK REHABILITATIONPLAN #: 232083 Bid Date: 11/29/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: El Paso de Online and PlanroomPREBID:10/26@ 1:30pm OWNER: City of El Paso de Robles DESCR: Contact, City of El Paso de Robles, 805-237-3861. Repairs to Golden hill Tank No. 1 and Merry Hill Tank, removal and repair of corroded rafter ends, removal of clips attached to the dollar plate and repair of coatings on dollar plate. A curved beam assembly with clips will be installed to support the rafters. Select interior coating repairs will be performed at direction of Owner. Merry Hill Tank will undergo seismic improvements including installation of a concrete ringwall and attachment of the tank to ringwall with seismic restraints. Piping modifications are required to facilitate the new footing. The interior of the tank will be recoated and exterior surfaces will be coated.

JOB ORDER CONTRACT PHASE 19 AND 20PLAN #: 262036 Bid Date: 11/29/2012

Bid Time: 2:00 PM PLANS AT: Roseville Office Location: San Jose Online and PlanroomPREBID: MAND 11/6 @ 10am OWNER: San Jose State University Ph: 408-924-2246 FAX: 408-924-7243DESCR: Contact, San Jose State University, Sylvia Sosa-Galindo [[email protected]] JOC is a competitively bid, firm fixed priced, indefinite quantity contract. The scope of work includes a collection of detailed repair and construction tasks and specifications that have established unit prices. It is placed with the “Contractor” for the accomplishment of repair, alteration, modernization, maintenance, rehabilitation, demolition and construction of infrastructure, buildings, structures, or other real property. Work is accomplished by means of issuance of a purchase order against the JOC. Under the JOC concept, the Contractor furnishes all management, documentation, labor, materials, and equipment needed to perform the work. The JOC contract awarded under this solicitation will each have a minimum value of work of $50,000.00 and a maximum value of work of $1,000,000.00. The JOC Contracts will have the option to extend the maximum value up to $3,000,000.00. The term of the contract will be for 365 calendar days. Continued on next page

Page 68: Construction e_zone

November 5, 2012Page 66 Contractor’s Zone• .Contractor’s Zone

Thursday, November 29, 2012

RFP - ON-CALL GENERAL ENGINEERING CONSULTANT DESIGN SERVICESPLAN #: 267041 Bid Date: 11/29/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: San Carlos Online and PlanroomPREBID: 10/26 @ 9:00am OWNER: San Mateo Co. Transit District DESCR: Contact, Samtrans, Patric May, ([email protected]). General Engineering Consultant Design Services for San Mateo Co

Friday, November 30, 2012

MISSION 12” WATER MAINPLAN #: 39016 Bid Date: 11/30/2012

Bid Time: 3:00 PM PLANS AT: Roseville Office Location: Santa Clara Plans on DiskPREBID: 11/14 @ 9:30am OWNER: City of Santa Clara DESCR: Contact, Rocco Colicchia, 925-348-1098. Installation of a 12” water main on Mission College Blcd., trench & excavation safety, aggregate base, asphaltic concrete pavement, resurfacing and berms, furnishing and installing pipe.

ON-CALL ENGINEERING AND TECHNICAL SUPPORT SERVICES FOR COUNTY AIRPORTSPLAN #: 185095 Bid Date: 11/30/2012

Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Siskiyou Co. Online and PlanroomOWNER: County of Siskiyou FAX: 530-842-8288DESCR: Contact, Mellissa Cummins, 530-842-8295. County of Siskiyou is soliciting bids for On Call Engineering andTechnical Support Services for County Airports

LANDSCAPE MAINTENANCE AT VARIOUS WATER WELLS AND WATER DIVISION PROPERTIES IN FRESNOPLAN #: 298026 Bid Date: 11/30/2012Bid Time: 3:00 PM PLANS AT: Roseville Office Location: Fresno Online and Planroom # OF ADDENDA: 2 PREBID: 11/8 @ 10am OWNER: City of Fresno DESCR: Contact, City of Fresno, 559-621-1332. City of Fresno is soliciting proposals for a requirements contract for landscape maintenance at various water wells and water division properties ( 1 yr Contract ) with two one-year extensions.

Tuesday, December 04, 2012

IMPROVEMENTS TO THE OTTER EXPRESS FOOD SERVICE BUILDINGPLAN #: 285043 Bid Date: 12/4/2012Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Monterey Online & Print On Est Cost: $1,450,000.00 DemandPREBID: 11/13 @ 10am OWNER: California State University Monterey Bay Ph: 831-582-4169 FAX: 831-582-4436DESCR: Contact, Reyola H Carlisle, 831-582-3506. ***** Plans and specificaitons may be seen on the BIDSYNC Website after 10/29. ***** Renovations to an existing facility to expand the food service area and increase the dining capacity. The scope includes, but is not necessarily limited to: selective demolition; foundation and structural steel reinforcement; existing roof re-coating; preformed metal roofing installations; new windows and skylights; interior construction and all new finishes including, suspended acoustical ceiling, ceramic tile, carpet and painting; custom casework and countertops; new food service equipment; new furnishings including manufactured booths and banquettes; restroom renovations; HVAC and plumbing improvements; electrical system improvements; new lighting; and new fire alarm system. California Contractor License Requirement: Class B. A voluntary Pre-bid Conference Walkthrough is scheduled for Tuesday, November 13, 2012 at 10:00 A.M. Interested bidders should assemble at: California State University Monterey Bay, University Center (Campus Building 29), Room 115, 4314 Sixth Avenue, Seaside, CA 93955. BIDDERS LIST:General Contractor Tombleson Inc 831-422-9696 831-422-0566 Wysong Construction 805-466-1038 805-466-5176

Wednesday, December 05, 2012

BICENTENNIAL WAY AND MENDOCINO AVENUE TRAFFIC SIGNAL MODIFICATIONPLAN #: 289041 Bid Date: 12/5/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Santa Rosa PREBID: 11/14 @ 10am OWNER: City of Santa Rosa DESCR: Contact, City of Santa Rosa, Stephen Dittmer, 707-543-3847. Bicentennial Way and Mendocino Avenue Traffic Signal Modification Project will be available on website on 10/29BIDDERS LIST:General Contractor:

Continued from last page

Plans On File

Page 69: Construction e_zone

Contractor’s ZoneContractor’s Zone

Ghilotti Construction C 707-585-1221 707-585-1601 Ghilotti Brothers Inc 415-454-7011 415-454-8376

STEVENS CREEK PIPELINE REHABILITATION PROJECTPLAN #: 299043 Bid Date: 12/5/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Santa Clara Online & Print On Est Cost: $600,000.00 DemandPREBID: MAND 11/14/12 AT 9 AM OWNER: Santa Clara Valley Water District Ph: 408-265-2607 DESCR: Contact, Contact Thomas Lau, Project Manager, at (408) 265-2607, ext 2587. Project consists of work on the Stevens Creek Pipeline at 51 sites in multiple cities within Santa Clara County. Work includes conducting internal pipeline inspections using remote video equipment on the entire Stevens Creek pipeline, complete interior pipeline repair work as needed, should damaged areas be indentified during the internal pipeline inspections, prepare & paint/coat all in-utility box, in-vault & exposed pipeline, appurtenances & piping assembly components, restore all impacted work sites to a condition equal to or better than that existing prior to construction.

Thursday, December 06, 2012

9-INCH DUCTILE IRON MAIN INSTALLATION IN 23RD STREET FROM CHURCH STREET TO HOFFMAN

PLAN #: 112084 Bid Date: 12/6/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: San Francisco Plans on DiskPREBID: 11/13 @ 10am OWNER: City & County of San Francisco DESCR: Contact, City & County of San Francisco (415) 551-4603. Install approximately 4,100 linear feet of 4, 6 & 8 inch ductile iron pipe & 2,700 linear feet of copper services in 23rd St from Church St to Hoffman Dt.

Tuesday, December 11, 2012

UNION CITY INTERMODAL STATION PHASE 2 - BART STATION IMPROVEMENTSPLAN #: 109082 Bid Date: 12/11/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Union City PlanroomPREBID: 11/8 @ 9am OWNER: San Francisco Bay Area Rapid Transit District Ph: 510-464-6547 DESCR: Contact, Sunni Gunawardena, 510-464-6550. Construction of a 2000 SF concourse addition on the east side of the Union City Station and a re-configuration of the existing

station concourse, including finish surface upgrades to provide a free passage through the station for future connection to 11th St..etcBIDDERS LIST:Supplier: Lane-aire Manufacturing 916-732-2224 916-732-2227

Thursday, December 13, 2012

21ST STREET IMPROVEMENTSPLAN #: 84080 Bid Date: 12/13/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: El Paso de Online and PlanroomPREBID: 11/20 @ 2pm OWNER: City of El Paso de Robles DESCR: Contact, City of El Paso de Robles, 805-237-3861. Remove existing & install new road, curb, gutter, drain lines, sewer, water, streetlights, underground utilities, striping, landscaping, & minor grading.

CONSTRUCTION, DEVELOPMENT AND TESTING OF THE SULLIVAN AVENUE WELLPLAN #: 182097 Bid Date: 12/13/2012

Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Daly City Online & Print On Demand OWNER: City of Daly City DESCR: Contact, City of Daly City, (650) 991-8200. Construction, Development and Testing of the Sullivan Avenue Well.

CHP OCEANSIDE AREA OFFICE REPLACEMENTPLAN #: 307010 Bid Date: 12/13/2012

Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Vista Online & Print On Demand PREBID: MAND 11/5 @ 11am OWNER: State of CA - Dept of General Services DESCR: Contact, Department of General Services, (916) 376-1629. BIDDERS LIST:General Contractor: Augustine Company, The 619-670-4466 619-670-4411

Continued on next page

Page 70: Construction e_zone

November 5, 2012Page 68 Contractor’s Zone• .Contractor’s Zone

Tuesday, December 18, 2012

RWQCP ADMIN. BLDG. SYSTEMS UPGRADEPLAN #: 169086 Bid Date: 12/18/2012 Bid Time: 3:00 PM PLANS AT: Rosevil le Office Location: Palo Alto Plans on DiskPREBID: MAND 11/16 @ 10am OWNER: City of Palo Alto DESCR: Contact, Daisy Stark, 650-444-6352. Upgrades of Wastewater Treatment electrical facilities in the Administration. Building including construction of medium (15 KV), and low voltage electrical connections to existing wastewater treatment plant power grid, and construction of miscellaneous systems and accessories at the Regional Water Quality Control Plant, 2501 Embarcadero Way in Palo Alto.BIDDERS LIST:General Contractor: Cf Contracting 415-721-7160 415-296-6437Sub Contractor: Mission City Rebar, Inc 925-449-6999 925-447-8797

Thursday, December 20, 2012

FIRE ALARM CONTROL UNIT REPLACEMENT, SOS BUILDINGPLAN #: 188090 Bid Date: 12/20/2012

Bid Time: 2:00 PM PLANS AT: Rosevil le Office Location: Sacramento Online and PlanroomPREBID: MAND 12/4 @ 9:30am OWNER: State of CA - Dept of General Services DESCR: Contact, Department of General Services (916) 376-1754 Work consists of the replacement of a complete operational fire alarm system including calibration, testing and engineering.

Monday, December 31, 2012

PLACER COUNTY OFFICE OF EDUCATION - LIST OF QUALIFIED CONTRACTORSPLAN #: 173079 Bid Date: 12/31/2012Bid Time: 12:00 PM PLANS AT: Auburn & RosevilleLocation: Placer County Online and PlanroomOWNER: Placer County Office of Education Ph: 916-415-4424 DESCR: The Placer County Office of Education (PCOE) is

inviting all interested licensed contractors to submit their company for inclusion on the PCOE list of qualified bidders for the calendar year 2012. You must resubmit to be included on the 2012 list even if your company has submitted an application in prior years. Per California Public Contract Code 22032, any Public Works Project that is estimated to be below $175,000 is subject to the Informal Bidding Procedures set forth by the State of California Uniform Construction Cost Accounting Commission. All trade categories are subject to Informal Bidding Procedures. Contactors that are interested in being on the 2012 Informal Bidding Contractor List are required to have a current license and are subject to verification through the Contractors State License Board. Phone: 530-889-8020BIDDERS LIST:General Contractor: Steeltech Roofing 530-845-5681 530-367-5310Sub Contractor: Presidential Fire Prot 916-379-9199 916-379-9099 Brandon Thorp Electric 916-740-0479 916-000-0000

ARDEN PARK RECREATION AND PARK DISTRICT - QUALIFIED BIDDER LISTPLAN #: 179092 Bid Date: 12/31/2012 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Sacramento Online and PlanroomOWNER: Arden Park Recreation and Park District Ph: 916-483-6069 DESCR: Contact, Colin Miller, 916-483-6069 ([email protected]). The Arden Park Recreation and Park District recently adopted an ordinance to participate in the Uniform Public Construction Cost Accounting Act. (Contractors seeking to be included on qualified bidder lists)BIDDERS LIST:Sub Contractor: Presidential Fire Prot 916-379-9199 916-379-9099

RFQ COUNTY OF SACRAMENTO SMALL PROJECTSPLAN #: 187073 Bid Date: 12/31/2012 Bid Time: 5:00 PM PLANS AT: Roseville Office Location: Sacramento Planroom Est Cost: $100,000.00 OWNER: County of Sacto DESCR: Co of Sacramento, [email protected]. If you would like to have your firm added to a mailing list to receive our Notice to Contractors for projects $100,000 or less being bid under CUPCCAA, please provide the following information: 1. Name and address of the firm 2. Name of contact person 3. Firm’s telephone number (and fax number if available)

Continued from last page

Plans On File

Page 71: Construction e_zone

Contractor’s ZoneContractor’s Zone

Continued on next page

Click on any blue underline because it’s an active link!

4. The type(s) of work (e.g. earthwork, pipelines, electrical, painting, general building, etc) in which you are interested and currently licensed to do 5. Class of California contractor’s license(s) held by firm 6. Contractors license number(s) 7. Other California State certifications held by firm (e.g. ASB, HAZ, etc) 8. Any Federal, State, DBE certifications SEND THIS INFORMATION TO: County of Sacramento CUPCCAA Project / Contract Services 827 7th Street, Room 101 Sacramento, CA 95814 Or email to: [email protected] THERE IS NO SUBMITTAL DEADLINE, NAMES WILL BE ADDED TO THE MAILING LIST AS THEY ARE RECEIVED. For this invitation, names will be retained on the list through December 31, 2012.

SIERRA COLLEGE QUALIFIED CONTRACTORS LISTPLAN #: 191080 Bid Date: 12/31/2012Bid Time: 5:00 PM PLANS AT: Roseville Office Location: Rocklin Online and PlanroomOWNER: Sierra Joint Community College District DESCR: Contact: Purchasing Dept. 916-660-7626.Sierra Joint Community College District Informal Bidding for projects less than $125,000 For more information, contact Facilities Development & Construction at 916-660-7658. BIDDERS LIST:Sub Contractor: Presidential Fire Prot 916-379-9199 916-379-9099Supplier: Sunbelt Rentals 916-789-1234 916-789-7077 Jms Industries 916-348-1502 916-408-6609

2012 BUTTE COUNTY QUALIFIED BIDDERS LISTPLAN #: 213071 Bid Date: 12/31/2012 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Oroville Online and PlanroomOWNER: County of Butte FAX: 530-538-7171DESCR: Janet Woods, ([email protected]). All licensed contractors are invited to submit the name of their firm to the County of Butte list of qualified bidders for calendar year 2012.BIDDERS LIST:Sub Contractor: Advanced Synthetic Wall 916-740-3693 916-740-2693

NOTICE INVITING QUALIFIED CONTRACTORS - TAHOE TRUCKEE USDPLAN #: 252041 Bid Date: 12/31/2012Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Truckee/Tahoe Online and PlanroomOWNER: Tahoe Truckee Unified School District

DESCR: Contact, Todd Rivera, 530-582-2541 ([email protected]). The Tahoe Truckee Unified School District invites all interested contractors to be included on the District’s List of Qualified Contractors for the 2012BIDDERS LIST:Sub Contractor: Advanced Synthetic Wall 916-740-3693 916-740-2693

FOLSOM CORDOVA UNIFIED SCHOOL DISTRICT - LIST OF CONTRACTORS 2012PLAN #: 251038 Bid Date: 12/31/2012 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Folsom/Cordo Online and PlanroomOWNER: Folsom Cordova Unified School District Ph: 916-355-1111 DESCR: Contact: Peggy Beller 916-355-1111 ext. 139. All licensed contractors are invited to submit the name of their firm to the District for inclusion in the District’s list of qualified bidders for the Calendar Year 2012. BIDDERS LIST:Sub Contractor: Advanced Synthetic Wall 916-740-3693 916-740-2693

NOTICE INVITING QUALIFIED CONTRACTORS - TAHOE TRUCKEE USDPLAN #: 252041 Bid Date: 12/31/2012 Bid Time: 12:00 PM PLANS AT: Roseville OfficeLocation: Truckee/Tahoe Online and PlanroomOWNER: Tahoe Truckee USD DESCR: Contact, Todd Rivera, 530-582-2541 ([email protected]). The Tahoe Truckee Unified School District invites all interested contractors to be included on the District’s List of Qualified Contractors for the 2012

OHLONE COMMUNITY COLLEGE DISTRICT- INCLUSION OF QUALIFIED CONTRACTORSPLAN #: 257065 Bid Date: 12/31/2012 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Alameda Co. Online and PlanroomOWNER: Ohlone Community College District Ph: 510-659-6000 DESCR: Send Information to ([email protected]) The Ohlone Community College District is inviting all licensed contractors to submit the information requested to the District for inclusion on the District’s list of qualified bidders for informal bidding for calendar year 2012.

Page 72: Construction e_zone

November 5, 2012Page 70 Contractor’s Zone• .Contractor’s Zone

Monday, December 31, 2012

NOTICE INVITING LICENSED CONTRACTORS - CITY OF GALTPLAN #: 265036 Bid Date: 12/31/2012Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Galt Online and PlanroomOWNER: City of Galt DESCR: Contact, City of Galt, 209-366-7130. City of Galt is inviting all licensed contractors to submit the name of their firm to the City for inclusion on the City’s list of qualified bidders for the current calendarBIDDERS LIST:Sub Contractor: Presidential Fire Prote 916-379-9199 916-379-9099

NOTICE INVITING QUALIFIED CONTRACTORS/TAHOE TRUCKEE UNIFIED SCHOOL DISTRICT

PLAN #: 283052 Bid Date: 12/31/2012Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Tahoe/Truckee Online and PlanroomOWNER: Tahoe Truckee Unified School District DESCR: Contact, Becca McGough, Facilities Department, 530-582-2540. Tahoe Truckee Unified School District invites all interested contractors to be included on the District’s List of Qualified Contractors for the 2013 calendar year.

DIXON UNIFIED SCHOOL DISTRICT - LIST OF CONTRACTORSPLAN #: 297033 Bid Date: 12/31/2012 Bid Time: 12:00 PM PLANS AT: Roseville OfficeLocation: Dixon PlanroomOWNER: City of Dixon DESCR: Contact, Cecile L. Nunley, ([email protected]) Inviting interested contractors in performing public works projects for the Dixon Unified School District.

COUNTY OF EL DORADO - AGENCY BIDDERS LISTPLAN #: 300025 Bid Date: 12/31/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: El Dorado Co. Online and PlanroomOWNER: County of El Dorado DESCR: Bonnie Rich, 530-621-5940 or by email at ([email protected])Register your firms information even if you have been previously listed or have recently bid on a public works project.

BIDDERS LIST:Sub Contractor: Presidential Fire Prote 916-379-9199 916-379-9099

QUALIFIED CONTRACTORS LIST - TUOLUMNE COUNTYPLAN #: 319005 Bid Date: 12/31/2012Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Tuolumne PlanroomOWNER: County of Tuolumne DESCR: Contact, County of Tuolumne Facilites Management, Jenny Watts, 209-533-5660. County of Tuolumne are inviting all licensed Contractors interested in bidding on projects submit the information for inclusion on the Qualified Contractor’s list for the upcoming year.

Friday, January 04, 2013

DESIGN-BUILD OF OUTER HARBOR INTERMODAL TERMINAL RAILYARD, PHASE 1, AT THE FORMER OAKLAND ARMY BASEPLAN #: 293041 Bid Date: 1/4/2013 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Oakland Planroom Est Cost: $60,000,000.00 OWNER: Port Of Oakland DESCR: Contact, Bill Russell, ([email protected]) The Port will select a qualified Design-Build entity (Design-Builder) to design and construct the Outer Harbor Intermodal Terminal (OHIT) Railyard, Phase 1 along the eastern half of the Port’s portion of the former Oakland Army Base (OAB) (the Project). BIDDERS LIST:Supplier: Modern Building System 916-985-9852 916-985-9865

Monday, January 14, 2013

DESIGN BUILD OF OUTER HARBOR INTERMODAL TERMINAL RAILYARD, PHASE 1 AT FORMER OAKLAND ARMY BASEPLAN #: 157068 Bid Date: 1/14/2013 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Oakland PREBID: MAND 11/27 @ 9am OWNER: Port Of Oakland DESCR: Contact, Barry Mac Donnell, 510-627-1383. Port of Oakland is inviting design build Proposals from qualified Bidders for the design and construction of Phase 1 of its Outer Harbor Intermodal Terminal Railyard project.

Continued from last page

Plans On File

Page 73: Construction e_zone

Contractor’s ZoneContractor’s Zone

Friday, February 01, 2013

RFP - CROWS LANDING AIR FACILITPLAN #: 231087 Bid Date: 2/1/2013

Bid Time: 2:30 PM PLANS AT: Roseville Office Location: Stanislaus Co. Online and Planroom

PREBID: 11/16 @ 2pm OWNER: County of Stanislaus DESCR: Contact, City of Modesto, General Service Agency/Purchasing Division, 209-525-6319. Stanislaus County is seeking a Master Developer partner for a 1,531 acre former air facility development project.

Page 74: Construction e_zone

November 5, 2012Page 72 Contractor’s Zone• .Contractor’s Zone

ADVERTISEMENT FOR BIDS

Please refer to additional requirements contained in the complete Advertisement for Bids published on-line at http://dcm.ucdavis.edu.

Subject to conditions prescribed by the University of California, Davis, sealed bids for a lump-sum contract are invited for the following Work: LANDSCAPE IMPROVEMENTS, RMI WEST, Project No.: Q-214065 9571300/6623113/9570551.

DESCRIPTION OF WORK: Provide all labor, materials, equipment, tools, transportation, insurance, and services for landscape improvements in the Robert Mondavi Institute courtyard area. Work to include, but is not limited to, the following: demolish existing concrete and asphalt, clean up existing debris, break up compaction in landscape areas, grade the site, and install new concrete sidewalk and bands, drainage improvements, irrigation improvements, planting improvements (including sod meadow and sod lawn), and metal benches, as noted on Drawings.

Estimated Construction Cost of this project is $90,200.00 (Base Bid)

A MANDATORY Pre-Bid Conference and MANDATORY Pre-Bid Job Walk will be conducted on TUESDAY, NOVEMBER 13, 2012 beginning promptly at 10:00 AM. Participants shall meet at the DESIGN AND CONSTRUCTION MANAGEMENT MAIN CONFERENCE ROOM. Bidders must be present at the Pre-Bid Conference no later than the scheduled start time. Only bidders who participate in both the Conference and the Job Walk in their entirety will be allowed to bid on the Project as prime contractors. For further information, contact HEATHER ECKELS at (530) 752-6115. The Job Walk will last approximately 2 hours. Transportation will be provided to the Job Walk.

THERE WILL BE NO EXCEPTIONS FOR LATE ENTRY INTO PRE-BID CONFERENCE AND DEADLINE FOR SUBMITTING A BID.

Bids will be received only at: Design and Construction Management, University of California, 255 Cousteau Place, Davis, California 95618.

Bid Deadline: Sealed bids must be received on or before: 2:00 PM, THURSDAY NOVEMBER 29, 2012. Bids will be opened at: 2:01 P.M. or promptly thereafter.

The successful Bidder will be required to have the following California current and active contractor’s license at the time of submission of the Bid: C-27 – Landscaping Contractor.

Every effort will be made to ensure that all persons have equal access to contracts and other business opportunities with the University within the limits imposed by law or University policy. Each Bidder may be required to show evidence of its equal employment opportunity policy.

THE REGENTS OF THE UNIVERSITY OF CALIFORNIAUniversity of California, DavisOctober 31, 2012

Legal Ads

Page 75: Construction e_zone

Contractor’s ZoneContractor’s Zone

INVITATION FOR BID

The Housing Authority of the City of Sacramento is soliciting sealed bids for Invitation for Bid (IFB) No. 2012073-MPlg for Clauss Court Office 2012, 1 Clauss Court, Unit 5B, Sacramento, CA. Possible subcontracting trades are Asbestos Removal; Cabinet, Millwork & Finish Carpentry; Concrete; Construction Clean-up; Doors, Gates & Activating Devices; Drywall; Electrical; Flooring & Floor Covering; Framing & Rough Carpentry; Hydroseed Spraying; Lathing & Plastering; Lead Removal; Ornamental Metal; Painting & Decorating; Plumbing; and Warm-Air Heating, Ventilation & AC. The estimated bonding range is between $40,000 - $45,000.

Bids will be received at the Procurement Services Division, 801 12th Street, 2nd Floor, Sacramento, California until 2:00 p.m. on December 3, 2012 at which time and place all bids received will be publicly opened and read aloud.

Interested licensed “B” General Building Contractors should plan to attend the Pre-Bid Conference scheduled for 11/14/2012 at 9:00 AM, at 801 12th Street, 2nd Floor, Sacramento, California with a site visit following the Pre-Bid Conference. The site visit will only be conducted immediately following the Pre Bid Conference. All contractors are urged to attend the Pre-Bid Conference including the site inspection. Prime contractors are encouraged to bring any subcontractors interested in visiting the site to the Pre Bid Conference and site visit. Although attendance is not mandatory, contractors will be required to verify that they are aware of the existing site conditions.

A bid package, plan holders list, and other contract documents relating to the project may be obtained beginning November 9, 2012 through:

Signature Reprographics620 Sunbeam AvenueSacramento, CA 95814916-454-0800http://www.planroom.us/shra

A deposit of $100.00 check or money order only is required for the first set of plans and any additional plans may be purchased through Signature Reprographics. Deposits will be refunded if plans are returned in good condition, to Signature Reprographics, no later than three weeks after bid opening.

Please direct all general and contractual questions to Mike Peek, Buyer – Procurement Services, at 916-449-6277. For any technical questions regarding the Technical Plans and Specifications, please contact Mary L. Lyon, Program Manager, at 449-6263. For information on other construction projects, visit our website at http://www.shra.org.

This contract is subject to Federal labor standards, affirmative action requirements, Section 3 Requirements of the HUD Act of 1968, and Minority and Women Owned Business Enterprise standards. All bidders will be required to furnish and pay for a satisfactory Bid Bond in the amount of not less than 10% of the total bid price. The successful bidder will be required to furnish and pay for a satisfactory Performance Bond and Payment Bond in the amount of not less than 100% of the contract price. Pursuant to the California Public Contract Code Section 22300 the Contractor may request that the Agency substitute a security in the amount of the performance retention.

The Sacramento Housing and Redevelopment Agency reserves the right to reject any or all bids and waive any informalities in the bidding. The Agency is an Equal Opportunity Employment employer.

Page 76: Construction e_zone

November 5, 2012Page 74 Contractor’s Zone• .Contractor’s Zone

Legal AdsANNOUNCEMENT TO PREQUALIFIED PROPOSERS

Subject to conditions prescribed by the University of California, Davis, sealed proposals for a design build contract are invited from prequalified proposers for the following work: UC Davis Welcome Center, Project Number: 2829070.

Description of Work: The University is seeking a Design Build Team for an approximately 7500 SF tenant improvement project in an existing LEED Platinum building on Campus that has an innovative HVAC system. This project is to construct an Admissions Welcome Center for prospective undergraduate students. This new center is intended to serve as the headquarters for campus tours and information sessions, deliver advising and one-on-one counseling, as well as present information about student life and student services.

The Work shall include all design work, labor, material, tools, equipment, excavation, shoring, testing, inspection, commissioning and all necessary general conditions that may be reasonably inferred from the Contract Documents to provide all Design Work and Construction Work for UC Davis Welcome Center.

Target Contract Amount: $1,500,000.00Maximum Acceptance Cost: $1,700,000.00

Procedures: Procedures: NOTE: Credit card orders for documents are now accepted on our Reprographics website at http://reprographics.ucdavis.edu/store/ Downloadable Bidding Documents will be available to Bidders on Thursday, November 8, 2012. A non-refundable fee will be required in the amount of $50.00. If paying by check or money order, make payable to UC Regents. All payments must be received at UCD Reprographics before documents can be made available for download.

Prequalified contractors will be issued 1 set of documents at no charge.

The following design builders have been prequalified to submit proposals on this project:

PLEASE NOTE: Subcontractors wishing to bid on this project should contact the prequalified General Contractor directly at the numbers listed above.

A MANDATORY Pre-Bid Conference and MANDATORY Pre-Bid Job Walk will be conducted on Wednesday, November 14, 2012 beginning promptly at 9:30 a.m. Participants shall meet at Design and Construction Management, 255 Cousteau Place, Davis, CA 95618. Bidders must be present at the Pre-Bid Conference no later than the scheduled start time. Only bidders who participate in both the Conference and the Job Walk in their entirety, will be allowed to bid on the Project as prime contractors. For further information, contact Chris McGuire at (530) 754-1021 or (530) 754-1111. The Job Walk will last approximately 2 hours. Transportation will be provided to the Project Site Visit.

Proposals will be received only at: Design and Construction Management, University of California 255 Cousteau Place, Davis, California 95616 (530) 754-1111

Proposals must be received on or before: 2:00 P.M. Thursday, December 6, 2012.

FIRM: PHONE: FAX: EMAIL:Kitchell (916) 648-9700 (916) 648-6534 [email protected] Construction (916) 441-6870 (916) 441-6138 [email protected] Construction Inc. (916) 282-2900 (916) 282-2901 [email protected]

Page 77: Construction e_zone

Contractor’s ZoneContractor’s Zone

Proposals will be opened at: 2:01 p.m., or promptly thereafter.

Proposal Security in the amount of 10% of the Lump Sum Base Proposal, excluding alternates, shall accompany each bid. The surety issuing the Bid Bond shall be, on the bid deadline, an admitted surety insurer (as defined in the California Code of Civil Procedure Section 995.120)

All insurance policies required to be obtained by Design Builder shall be subject to approval by University for form and substance. All such policies shall be issued by a company rated by Best as A- or better with a financial classification of VIII or better, or have equivalent rating by Standard and Poor’s or Moody’s.

The successful proposer and its subcontractors will be required to follow the nondiscrimination requirements set forth in the proposal documents and to pay prevailing wage rates at the location of the work.

The successful proposer will be required to have the following California contractor’s license at the time of the proposal opening: General Building “B”.

Every effort will be made to ensure that all persons have equal access to contracts and other business opportunities with the University within the limits imposed by law or University policy. Each Bidder may be required to show evidence of its equal employment opportunity policy. The successful Bidder and its subcontractors will be required to follow the nondiscrimination requirements set forth in the Bidding Documents and to pay prevailing wage at the location of the work.

THE REGENTS OF THE UNIVERSITY OF CALIFORNIAUniversity of California, DavisNovember 6, 2012

Tuesday, October 16, 2012 GERARD AVENUE SEWER MAIN REPLACEMENT PHASE 2, Merced

Plan 90081 Number:

Rolfe Construction $1,389,867 Mid Cal Pipelines & Utilities, Inc. $1,517,233 Dawson-Mauldin Construction, Inc. $1,890,275 MAINTENANCE FACILITY/RESTROOM & ATHLETIC STORAGE BUILDING, St. Helena

Plan 199098 Number:

Northwest Engineering $388,131 Murray Building $389,000 Helmer & Sons, Inc. $408,000

Tuesday, October 23, 2012 2501 AND 2531 LAND AVENUE ROOF PROJECT REBID, Sacramento

Plan 159074 Number:

Pacific Builders $226,203 GENERAL EDUCATION BUILDINGS AND TECHNOLOGY CENTER PAINTING PROJECT, San

Plan 19022 Number:

Leo’s AC, Inc. $317,000 Wednesday, October 24, 2012 ROAD IMPROVEMENTS - (RAISED CENTER MEDIAN) NORTH BEALE ROAD (LINDHURST AVE. TO LINDA AVE), Yuba Co.

Plan 48006 Number:

Knife River Construction $1,345,847

Bid Results

Click on any blue underline because it’s an active link!

Page 78: Construction e_zone

November 5, 2012Page 76 Contractor’s Zone• .Contractor’s Zone

Bid Results Thursday, October 25, 2012 CHILLER REPLACEMENT AT THE MARTINEZ DETENTION FACILITY, Martinez

Plan 160062 Number:

Agbayani Construction $514,880

Tuesday, October 30, 2012 O’HARA AVENUE WIDENING - ROADWAY IMPROVEMENTS, Oakley

Plan 97065 Number:

Grade Tech Inc. $1,327,989.52 Bay Cities Paving & Grading $1,443,246.28 M C I Engineering, Inc. $1,452,905.55 UNIVERSE TIMELINE (SET IN CONCRETE SIDEWALK) @ BUTTE COMMUNITY COLLEGE,

Plan 24007 Number:

United Building Contractors $31,818 R & R Horn, Inc. $36,950 Franklin Construction $40,000

WASTEWATER TREATMENT FACILITY DIGEST ER 2 & 3 CLEANING, Santa Cruz

Plan 240088 Number:

Synagro $207,803 AIRPORT - LARKFIELD - WIKIUP SANITATION ZONE TREATMENT PLANT EMERGENCY GAS SCRUBBER SYSTEM, Santa Rosa

Plan 26088 Number:

Arnold Construction Company $236,176 BUENA VISTA AVENUE SANITARY SEWER AND STORM DRAIN IMPROVEMENTS, Vallejo

Plan 63091 Number:

Carone & Company, Inc $214,035

TUBBS ISLAND ROAD RECONSTRUCTION PROJ-ECT 2012, Vallejo

Plan 64089 Number:

Grade Tech Inc. $63,767

$684

billion

http://designcenters.paccoast.com

Page 79: Construction e_zone

Contractor’s ZoneContractor’s Zone

$684

billion

The Internet Accounts For 4.7%

of the U.S. Economy

Survey Says: 77% of Americans would be willing to give up chocolate for an entire year, rather than go without the Internet. Only 21% though would give up sex, and an even smaller 7% would go without a shower.

According to a recent survey conducted by CNN Money, the Internet contributes more to the American economy than the entire federal government, according to a new study by the Boston Consulting Group.

The Internet accounted for $684 billion, or 4.7% of all U.S. economic activity in 2010, Boston Consulting Group found. By way of comparison, the federal government, contributed $625 billion, or 4.3%, to the nation’s output. If it was considered its own separate industry, the Internet would also be larger than America’s education, construction or agricultural sectors.

In the retail sphere alone, e-commerce accounted for 5% of U.S. sales in 2010.

“All businesses are increasingly digital and need to think about how to take advantage of these opportunities,” said Dominic Field, a BCG partner and co-author of the report. Boston Consulting Group predicts the Internet will grow about 10% a year through 2016 in the Group of 20 nations.

Advertising HERE makes dollars, and sense!And this digital media will grow every year.

Call Steve today to get your powerfuldisplay ad started. 916.729.5432

Page 80: Construction e_zone

November 5, 2012Page 78 Contractor’s Zone• .Contractor’s Zone

PCCAPlacer County Contractors Association & Builders Exchange

Newspaper Rate Sheet

Ad Type Ad Size 1 run 6 runs 13 runs 26 runs 52 runs

Two Page Spread 17 1/4” wide by 11 1/4” tall $782 $639 $497 $355 $209

Full page (bleed) 8 5/8” wide by 11 1/4” tall $427 $355 $284 $213 $139

Full page (boxed) 8” wide by 9 3/4” tall $427 $355 $284 $213 $139

Half page 8” wide by 4 3/4” tall $229 $193 $158 $123 $87

One Third (V) 2 7/8” wide by 7 1/2” tall $171 $144 $118 $92 $63

One Third (H) 8” wide by 3 1/8” tall $171 $144 $118 $92 $63

Quarter Page 3 7/8” wide by 4 3/4” tall $97 $81 $64 $47

Contractor Yellow Pages (Business Card Sized Ad) $39 $32 $24 $19

Legal ads • 3 7/8” wide and up to 2 1/4” tall $50 • 3 7/8” wide and up to 3 1/2” tall $75

• 3 7/8” wide and up to 5” tall $95 • 3 7/8” wide and up to 6 1/2” tall $135

The Placer County Contractors Association (PCCA) weekly newspaper is published 52 times a year and distributed free of charge to building & construction firms in the greater Placer and Sacramento county area. PCCA reserves the right to determine position and placement of all advertising. Special positioning may be purchased for an additional 20% if space is available. The Inside Cover is our best position, and is available for an additional 20% on a long-term advertising ocntract only. 15% off these rates for PCCA members!

Upgraded format, larger ad sizes, lowered rates:

Rates above are for full color ads per insertion. Flash animation (.swf files), animations (.gif format) and video clips can be added to any ad. There is no extra charge for video clips or multi-media in ads unless “assembly” of the ad is required. Some file size limitations apply. For information call Steve Berlin, at 916-729-5432, or email him at: mailto:[email protected]. Email camera-ready ads in high resolution Adobe Acrobat (.pdf) format to: [email protected]. Ad creation and graphic design services are available through C&S Publishing at $75 an hour — FREE to PCCA members!

Reading the price chart: Each column shows the price per run based on the number of times the ad is run. For example, a 1/4 page ad, run 13 times (which is every week for 3 months or every other week for 6 months) is $81 per run. That same ad, run every week for a year, would only cost $47 per run. Ads are invoiced monthly after the last ad run of the month. Net 30 days is offered. Take 15% off the rates shown below if you are a member of the Placer County Contractors Asociation. Take another 3% off if you prepay your ad contract entirely. Multiple ads can be run on a rotation basis under one advertising contract.

For more information: Call Steve Berlin, at 916-729-5432, or email him at: mailto:[email protected] See the news-paper onlne at www.PCCAe-Zone.com

Publisher reserves the right to refuse any advertisement with or without reason or explaination including any ad that in the opinion of PCCA is unethical, makes extravagant claims, misrepresents, is unfair or harmful to other advertisers; violates postal, anti-trust or U.S. currency regulations; or is deemed inconsistent with the objectives of the Association.

Display Advertising Policy, Rates and InformationREVJULY2012

Our LOWEST rates