Construction Estimate

2
Page 1 of 2 Renovation Budget Instructions: Enter data in cells shaded gray. All other cells are calculated Line Item Item Estimate Unit Cost Units 1 Demolition $ - $ - 1 - 2 Environmental / Abatement $ - $ - 1 - 3 Concrete $ - $ - 1 - 4 Masonry $ - $ - 1 - 5 Structural Remediation $ - $ - 1 - 6 Metals $ - $ - 1 - 7 Carpentry - Rough Framing $ - $ - 1 - 8 Carpentry - Finish $ - $ - 1 - 9 Plumbing and Hot Water $ - $ - 1 - 10 Plumbing Fixtures $ - $ - 1 - 11 HVAC $ - $ - 1 - 12 Electrical Wiring $ - $ - 1 - 13 Electric Fixtures $ - $ - 1 - 14 Insulation $ - $ - 1 - 15 Roofing $ - $ - 1 - 16 Sheet Metal and Gutter $ - $ - 1 - 17 Doors $ - $ - 1 - 18 Windows $ - $ - 1 - 19 Glass and Mirror $ - $ - 1 - 20 Exterior Finish (eg. Siding) $ - $ - 1 - 21 Gyp. Bd. / Taping $ - $ - 1 - 22 Flooring, Wood $ - $ - 1 - 23 Flooring, Resilient $ - $ - 1 - 24 Flooring, Ceramic Tile $ - $ - 1 - 25 Flooring Carpet $ - $ - 1 - 26 Priming and Painting $ - $ - 1 - 27 Specialties $ - $ - 1 - 28 Special Equipment Rental $ - $ - 1 - 29 Cabinets $ - $ - 1 - 30 Appliances $ - $ - 1 - 31 Blinds and Shades $ - $ - 1 - 32 Other, Common Labor $ - $ - 1 - 33 Other, Final Cleaning $ - $ - 1 - 34 [Additional] $ - $ - 1 - 35 [Additional] $ - $ - 1 - 36 [Additional] $ - $ - 1 - 37 [Additional] $ - $ - 1 - 38 [Additional] $ - $ - 1 - 39 [Additional] $ - $ - 1 - 40 Subtotal (Sticks and Bricks) $ - 0.0% Cost as % of Total

description

estimate

Transcript of Construction Estimate

Construction Estimate WorksheetRenovation BudgetInstructions: Enter data in cells shaded gray. All other cells are calculated automatically.Line ItemItem EstimateUnit CostUnitsCost as % of Total1Demolition0.00.01-2Environmental / Abatement0.00.01-3Concrete0.00.01-4Masonry0.00.01-5Structural Remediation0.00.01-6Metals0.00.01-7Carpentry - Rough Framing0.00.01-8Carpentry - Finish0.00.01-9Plumbing and Hot Water0.00.01-10Plumbing Fixtures0.00.01-11HVAC0.00.01-12Electrical Wiring0.00.01-13Electric Fixtures0.00.01-14Insulation0.00.01-15Roofing0.00.01-16Sheet Metal and Gutter0.00.01-17Doors0.00.01-18Windows0.00.01-19Glass and Mirror0.00.01-20Exterior Finish (eg. Siding)0.00.01-21Gyp. Bd. / Taping0.00.01-22Flooring, Wood0.00.01-23Flooring, Resilient0.00.01-24Flooring, Ceramic Tile0.00.01-25Flooring Carpet0.00.01-26Priming and Painting0.00.01-27Specialties0.00.01-28Special Equipment Rental0.00.01-29Cabinets0.00.01-30Appliances0.00.01-31Blinds and Shades0.00.01-32Other, Common Labor0.00.01-33Other, Final Cleaning0.00.01-34[Additional]0.00.01-35[Additional]0.00.01-36[Additional]0.00.01-37[Additional]0.00.01-38[Additional]0.00.01-39[Additional]0.00.01-40Subtotal (Sticks and Bricks)0.00.0%41Earth Work0.00.01-42Site Utilities0.00.01-43Garage and Parking0.00.01-44Roads and Walks0.00.01-45Site Improvements0.00.01-46Fencing0.00.01-44Lawns and Planting0.00.01-45Unusual Site Conditions0.00.01-46Subtotal (Site)0.00.0%47Architectural0.00.01-48Engineering0.00.01-49Accounting0.00.01-50Construction Permits0.00.01-51Consulting / Lawyer0.00.01-52Subtotal (Soft Costs)0.00.0%53Subtotal (Structure+Site)0.00.0%54Estimated Construction Cost0.00.0%55Property Acquisition0.00.056Property Inspections0.00.057Misc. Closing Costs0.00.058Real Estate Taxes0.00.059Insurance0.00.060Sales Commission(s)0.00.061Contingency0.00.062Property and Development0.063Gap or Subsidy0.064Total Cost (Incl. Subsidy)0.0Visit http://RenovateDSM.com for more information on renovating a home in Des Moines!

Page &P of &NFill in the Unit Cost or total estimate (Units=1) for each construction line item.Fill in the number of units for each construction line item. Leave at 1 to enter the full contract cost in the Unit Cost column.If the total project cost is over $250,000 and you are using Historic Tax Credits, you may be required to have the project audited.