ConEdison & PG&E/Marin – InteroperabilityJames McCray – COO/CMONovember 13 Grid-Interop T&D Session
Today’s Discussion
• Current Projects• Network Designs• What our Utility Partners are saying• Integration and Interoperability• Expectations• Field Experiences
– ConEdison– PG&E
• Future Vision
Infotility – Current Projects
PG&E / Marin Renewables – Mixed Use ConEdison/Innoventive – Verizon Data Centers
Boulder – Eco-Community ConEdison – Urban Microgrid
Marin County Civic Center
• Collaborating with the Marin County Sustainability Office on using the Civic Center Campus, and near-by municipal facilities for early stage demonstrations.
– PV already installed– Access to EMS systems with
capabilities to embed GA intelligence.
– Potential DR with lights and HVAC– Nearby schools, water district, and
theater appear to be on the same PG&E feeder
– Politically attractive site for Marin in illustrate what they are doing in this area.
Spot Networks and Radial Feeders
Radial Feeder - MarinSpot Network - NYC
Expectations
• Everything Magically Links Together– Smart Metering/AMI– Renewables Availability and Performance– Storage– SCADA Transformer Loading and Temperature– Other Grid Conditions– Demand Response– Local Contingencies and Emergencies– Market Pricing– Market and Local Curtailment Signals
The Reality - The Interoperability Void
SCADA SCADA
AMI AMI
DR DR
DER DER
VOIDVOID
Preliminary Metering Plan
Field Experiences – Growing Pains
• ConEdison – 3G System of the Future– Recently Installed Transformer Monitoring – System Wide– Demand Response – Totally Manual– AMI – Initial Pilots and Meter Testing
• PG&E – Distribution Operators and Demand Response– Web-based Transformer and Network Loading – Most Substations– Demand Response – Siloed Systems– AMI – Initial Installations, New Systems
• Marin – Sustainable Community– Massive Influx of Renewables – No Performance Visibility– Major Storm Reliability Issues – Renegade Islanding– Community Based Management of Energy Supply – No Systems
Future Vision – Customer Experience
• Interoperability is an evolutionary process.• Start out small, with custom interfaces.• Build and implement software applications with
– Open interfaces with limited or no proprietary constraints.– Consistent with current understanding of UCA, IEC 61850, etc.
• Longer-term evolution of field test and production implementations as standards are completed and accepted.– IEC 61850 – Substations and Renewables Management– National Standards - NIST, GridWise, et.al. Configurations