June-September 2015 Concrete Protection Restoration, Inc. Volume 1, Issue 3 June-September 2015 We thank everybody that stopped by our booth at the 2015 ICRI Fall Convention in Fort Worth, Texas. Our Florida office enjoyed a beautiful day at the SE Florida ICRI Golf Tournament. 2811 Lord Baltimore Drive Baltimore, MD 21244 1755 East Hallandale Beach Blvd., Unit 1802 Hallandale Beach, FL 33009 www.concretecpr.com Toll Free: 800-452-3137 E-mail: [email protected] Concrete Protection & Restoration, Inc. Michael O’Malley, Kevin Kline, Don Caple, Frank Morabito, and David Karins, receiving the Award of Excellence for the Dolphin Towers Emergency Structural Repairs Upcoming Employees’ Training: OSHA 10 & OSHA 30 Scaffold Training First Aid Classes Defensive Driver Training The award winner of our 3 rd quarter drawing was Kelly Smulovitz who is very eager to go see the Ravens play. We hope you have a blast at the game Kelly and congratulations again! Good luck to the 4 th quarter drawing entrants!

Transcript of Concrete Protection Restoration, Inc. June-September 2015 · 2018. 12. 27. · Erick Sandoval...

Page 1: Concrete Protection Restoration, Inc. June-September 2015 · 2018. 12. 27. · Erick Sandoval Medina who is working at the Montgomery ounty Executive Office uilding and illy Rupert

June-September 2015

Concrete Protection Restoration, Inc. V

olu

me

1, I

ss

ue

3

Jun

e-S

ep

tem

be

r 2

015

We thank

everybody

that stopped

by our booth

at the 2015

ICRI Fall

Convention in

Fort Worth,

Texas.

Our Florida office enjoyed a

beautiful day at

the SE Florida

ICRI Golf

Tournament.

2811 Lord Baltimore Drive Baltimore, MD 21244 1755 East Hallandale Beach Blvd., Unit 1802 Hallandale Beach, FL 33009 www.concretecpr.com

Toll Free: 800-452-3137 E-mail: [email protected]

Concrete Protection & Restoration, Inc.

Michael O’Malley, Kevin Kline, Don Caple, Frank Morabito, and David Karins, receiving the Award of Excellence for the Dolphin Towers Emergency Structural Repairs

Upcoming Employees’ Training:

OSHA 10 & OSHA 30

Scaffold Training

First Aid Classes

Defensive Driver Training

The

award

winner of

our 3rd

quarter

drawing

was Kelly Smulovitz who is very eager

to go see the Ravens play. We hope you

have a blast at the game Kelly and

congratulations again!

Good luck to the 4th quarter drawing

entrants!

Page 2: Concrete Protection Restoration, Inc. June-September 2015 · 2018. 12. 27. · Erick Sandoval Medina who is working at the Montgomery ounty Executive Office uilding and illy Rupert

which is being converted to

luxury condominiums, consists

of non-structural slab repairs,

structural slab repairs, beam

repairs and concrete column

jackets.

CP&R was recently recognized

as HITT Contracting's 'Featured

Subcontractor'. We were

nominated for our teams'

dedication and attention to

detail on both the Southern

Towers and Wardman Tower

projects. According to Dave

Sommer and Ray Heverline,

both Senior Project Managers

with HITT, “CPR's attention to

safety, protection, and security

of the tenants has consistently

been above and beyond

requirements. Throughout both

projects CP&R has been professional

and responsive to the

many changes in

scope, fair in pricing,

and committed to

their agreed schedule.

A class act!"

CP&R is currently working on

the repair and coating of the

concrete balconies at the

Southern Towers in Alexandria,

VA and structural concrete

repairs at the “Landmark” 90

year old Wardman Tower in

Washington, D.C. Both the

Southern Towers and

Wardman Tower have been

occupied during the

restoration. The Southern

Towers Apartments project

involves structural concrete

repairs of cantilevered

balconies, acrylic soffit coating

and installation of a urethane

deck coating on the top surface

and edges of the balconies. The

work at the Wardman Tower,

Southern Towers and Wardman Tower Repairs Projects

Page 2 Ju

ne

-Se

pte

mb

er

20

15

Vo

lum

e 1

, Is

su

e 3

chipping hammers while also providing

masonry repairs and thermal and

moisture protection. Also, CP&R will be

replacing numerous wing and

compression expansion joints throughout

the 5 level structure as well as complete

painting of all concrete surfaces and color

coding piping. This work will take place in

multiple phases in order provide full

access for the public outside our work

zones.

We welcome you to visit our crew at the

Three Bethesda Metro Center!

The Three Bethesda Metro Center

office building in Bethesda, MD was

constructed in 1985 and consists of a

17-story cast-in-place concrete

structure that is part of a complex

that also includes a Hyatt Regency

Hotel and the WMATA Bethesda

Metro Station. On 2014, CP&R

completed the repairs of the plaza

beams located over the escalators

that provide access to the Metro

Station as well as waterproofing and

necessary concrete repairs at an

expansion joint in the plaza level. On

July, 2015 CP&R started the

continuation of its repair at the

5-story below-grade parking garage

of The Three Bethesda Metro Center.

Amongst different concrete repairs,

CP&R will perform full depth flat and

pan slab repairs via hydrodemo and

Bethesda Metro Garage Repairs

Page 3: Concrete Protection Restoration, Inc. June-September 2015 · 2018. 12. 27. · Erick Sandoval Medina who is working at the Montgomery ounty Executive Office uilding and illy Rupert

slab. In April 2014, after three

years of investigation, design, and

contract negotiation, a building

permit was issued and CP&R

crews were able to start the

required structural repairs. The

emergency repairs were

conducted through:

Structural reinforcement of

the Dolphin Tower’s

foundation

Column enlargements and

shear wall installations

Shoring and repair of the

fourth-floor transfer slab

Removal and replacement of

exterior CMU walls with

poured in place reinforced

concrete shear walls

Reinforcement of carbon

fiber & addition of

CP&R is proud to announce that

we were the recipient of the

Award of Excellence in the

High-Rise Category in the ICRI 2015

Project Awards Program with the

Emergency Structural Repairs

conducted at the Dolphin Towers

Condominium. The same project

has won the Outstanding Project

of the Year Award with NCSEA.

In late June 2010, the Dolphin

Tower was evacuated after the 4th

floor transfer slab, which supports

117 residential units in the tower

above, suffered major shear

cracking. Immediately, emergency

shoring was installed to carry the

loads of the tower columns

directly down to the building

foundation in order to supplement

and relieve the damaged transfer

Dolphin Towers Condominium: Emergency Structural Repairs

Page 3

post-tension beams

Repairs on the upper levels of the

tower to relieve some

overstressed slab locations and

increase the wind load capacity

based on the new building codes.

The structural repair portion of the

project was completed on schedule

and under budget.

2811 Lord Baltimore Drive Baltimore, MD 21244 1755 East Hallandale Beach Blvd., Unit 1802 Hallandale Beach, FL 33009 www.concretecpr.com

Toll Free: 800-452-3137 E-mail: [email protected]

Concrete Protection & Restoration, Inc.

Page 4: Concrete Protection Restoration, Inc. June-September 2015 · 2018. 12. 27. · Erick Sandoval Medina who is working at the Montgomery ounty Executive Office uilding and illy Rupert

The winner of the 3rd Quarter

Safety Award is Carlos Rivera

for his outstanding safety

performance at 1747

Pennsylvania Avenue. Carlos

had two entries into the 3rd

Quarter Safety Award

Nomination. One being for his

outstanding attention to all

safety matters at our project at

1747 Pennsylvania Ave and

another for our project at 2175 K

Street. Other nominations for the

Safety Award program were to

Erick Sandoval Medina who is

working at the Montgomery

County Executive Office Building

and Billy Rupert who is working at

the Allegheny Columns project. All

three entrants (Carlos, Erick and

Billy) are repeat entrants into the

Quarterly Safety Award program

Our August employee of the month

was Eduardo Rodriguez. Eduardo

has been working night shifts and is

always there when needed on

weekend jobs. He is always thinking

about how to increase productivity

and about completing the job in an

efficient manner, improving overall

quality and safety. He has a 'we can

do' attitude and that is exactly

what CP&R needs. Congratulations

Eduardo and thank you for always

having a positive attitude and being

willing to help.

Last, but not least, the nominated

employee for September was Jose

Flores. According to his nominator,

The employee nominated for the

month of July is Felipe Castro who

continually shows concern for

CP&R’s overall progress and image.

As pointed out by his nominator,

“Felipe consistently goes above and

beyond doing more than just what

is asked of him not only on the past

30 days, but at least in the last 7

years that I (the nominator) have

been with CP&R. He is my go to guy

with whatever job task we are faced

with. He is a man with pride in his

work. Whenever I get a new guy on

my job site I always put them with

Felipe so he can train and teach

them.”

Third Quarter Safety Award

Employee of the Month Nominations

Page 4

2811 Lord Baltimore Drive Baltimore, MD 21244 1755 East Hallandale Beach Blvd., Unit 1802 Hallandale Beach, FL 33009 www.concretecpr.com

Toll Free: 800-452-3137 E-mail: [email protected]

Concrete Protection & Restoration, Inc.

and have consistently shown

excellent attention to safety at

their job

sites.

“Jose has an excellent work ethics. He is always

willing to learn, he always puts quality first, he

works well

with others,

and he knows

how to

delegate

crewmembers.

Not only that,

but he also

knows how to

ask questions

if needed, he is

always concerned for

the safety of others,

and most of all he has

a great attitude.”