COMPANY
REFERENCE LIST
YEAR COUNTRY PLANT / FINAL CLIENT CONTRACTOR CLIENT SUBJECT
2019 SPAIN REPSOL ‐ JOHN ZINK Pre‐Commissioning of VRU
2019 COLOMBIA PROQUINAL ‐ FIVES ITAS Commissioning and Start‐Up of RTO
2019 INDIA ITT UOP CALLIDUS Supervision For Burners Modification
2019 OMAN LIWA PLASTIC INDUSTRIES COMPLEX ORPIC ORPIC JOHN ZINK Flare AWL Assistance
2019 CAMERUN SONARA ‐ LIMBE CAMERUNAmec Foster Wheeler
CameroonKIRCHNER
Commissioning & Start‐Up & Dry Out For Fired Heather
2019 UK GRANGEMOUTHPetroineos Manufacturing
Scotland LtdUOP CALLIDUS Buners Start‐Up & Commissioning
2019 IRAN ‐ ‐ KIRCHNER Assistance & Meeting for Technical
Documentation
2019 OMAN OMAN METHANOL CO. ‐ UOP CALLIDUS Burner Maintenance
2019 ITALY SANNAZZARO ENI KIRCHNER Burners Supervision
2019 IRAN ‐ ‐ KIRCHNERAssistance & Meeting for Technical
Documentation
Reference List - SITE SERVICES 2012/2019
Page 1 of 26
YEAR COUNTRY PLANT / FINAL CLIENT CONTRACTOR CLIENT SUBJECT
Reference List - SITE SERVICES 2012/2019
2019 ITALY SANNAZZARO ENI KIRCHNER Burners Supervision
2019 IRAN NARGAN ‐ KIRCHNER Assistance & Meeting for Technical
Documentation
2019 IRAN ‐ ‐ KIRCHNERPre Comm.Comm. & Start‐Up Waste
Recovery Boiler
2019 OMAN OMAN METHANOL CO. OMAN METHANOL CO. UOP CALLIDUS Process Burners maintenance
2019 KSA PETROKEMYA ‐ TECNICAS REUNIDAS S.AProcess and Mechanical Inspection and
Start‐Up of RTO and Incinerator
2019 BAHRAIN ALBA BAHREIN FIVES SOLIOS FIVES ITAS Commissioning and Start‐Up of Incenerator
2019 EGYPT EGYPTIAN REFINING COMPANY (TAKRIR) S.A.E.GS ENGINEERING AND
CONSTRUCTIONICE
Commissioning & Start‐Up of Thermal Oxidizer's Burner
2019 IRAN QESHM HEAVY CRUDE OIL REFINERY PROJECT ‐ KIRCHNERSupervision during unboxing of N.2 Fired
Heaters
2019 INDIA RFCL Site Heurtey India UOP CALLIDUS Assistance at Installation of Burners
2019 BAHRAIN 2501121 ‐ NAG LTFD Phase 1 Project to Install 500 MMSCFD GDU PETROFAC FIVES ITASTroubleshooting ‐ Commissioning of a
thermal oxydizer in Barhain
Page 2 of 26
YEAR COUNTRY PLANT / FINAL CLIENT CONTRACTOR CLIENT SUBJECT
Reference List - SITE SERVICES 2012/2019
2019 EGYPT RAS SUKHEIR GUPCO JOHN ZINK Commissioning & Start‐Up of Flare Stack
2019 MALAYSIA RAPID PROJECT PACKAGE PUNJ LLOYD SDN. BHD. JOHN ZINK Commissioning & Start‐Up of Flare Stack
2018 ARGENTINA PROSERNAT CAMPANA HEURTEY PETROCHEM UOP CALLIDUS Mechanical Installation of Thermal Oxidizer
2018 EGYPT ZOHR DEVELOPMENT PROJECT, EGYPT SIIRTEC NIGI VERGAENGINEERINGCommissioning and Start‐Up of N.4 Fired
Heaters
2018 EGYPT ABU RUDEIS ENPPI VERGAENGINEERINGCommissioning and Start‐Up of N.6 Fired
Heaters
2018 KSA SONARA SONARA KIRCHNERMechanical troubleshooting Platformer
Heater
2018 MALAYSIA PETRONAS SINOPEC KIRCHNER Dry Out n°6 Heaters
2018 ITALY ESSO AUGUSTA ESSO JOHN ZINK Commissioning and Start‐Up of VRU
2018 KSAJubail bulk plant; Road 274; nearkhonaini petrol station no.50.
ARAMCO JOHN ZINK Commissioning and Start‐Up of VRU
2018 POLAND GDANSK ‐POLAND GRUPA LOTOS UOP CALLIDUS Commissioning and Start‐Up of Burners
Page 3 of 26
YEAR COUNTRY PLANT / FINAL CLIENT CONTRACTOR CLIENT SUBJECT
Reference List - SITE SERVICES 2012/2019
2018 ITALY RAFFINERIA DI MILAZZO ENI KIRCHNER Burners Supervision
2018 CINA XINFA GROUP – Chiping Xinyuan Carbon XINFA GROUP FIVES ITAS Commissioning and Start‐Up of Incinerator
2018 UAE ADNOC ABU DHABI UAE TECNIMONT FIVES ITASUAE ‐ COMMISSIONIG & START UP of
FLARE SYSTEM
2018 FRANCE MERIGNAC ‐SAFRAN CERAMIC SAFRAN CERAMIC FIVES ITAS Problem solving TOX
2018 POLAND PLOCK‐POLAND ELEKTROBUDOWA VERGAENGINEERINGCommissioning and Start‐Up for N.2 Fired
Heaters
2018 EGYPTEnppi ‐ Engineering Co. For The Petroleum & Process Industries,Alexandria
Governorate, Egypt,4V37+7W Alexandria, EgyptKIRCHNER
Commissioning and Start‐Up for N.2 Fired Heaters
2018 POLAND PLOCK‐POLAND ELEKTROBUDOWA VERGAENGINEERING INSTRUMENT LOOP CHECK
2018 IRAQ ZUBAIR ‐ HAMMAR MISHRIF ZUBAIR NORTH NEW DGS PROJECT ITT KIRCHNER PREI SRL TRAINING COURSE
2018 ITALY AREA PROVE CREMOSANO ICE ‐ KIRCHNER ASSISTANCE AND SUPERVISION ‐ BURNERS
FIRING TEST
2018 IRAN South Pars Gas Field Development Assaluyeh PETRO KARAN KIRCHNER DRY‐OUT OF FIRED HEATER
Page 4 of 26
YEAR COUNTRY PLANT / FINAL CLIENT CONTRACTOR CLIENT SUBJECT
Reference List - SITE SERVICES 2012/2019
2018 ITALY RAFFINERIA CREMONA ITALY NUOVA ABIBES SRLJOHN ZINK HAMWORTHY
COMBUSTIONFLARE ASSISTANCE
2018 KOREA OHAN SVERDRUP PROJECT AKERSOLUTIONSBOUSTEAD INTERNATIONAL
HEATERSCOMMISSIONING FIRED HEATER
2018 KSA ‐ ‐ KIRCHNERMECHANICAL ASSISTANCE & COMMISSIONING & START‐UP
2018 RUSSIA ‐ ‐ UOP CALLIDUS FLARE ASSISTANCE
2018 FRANCE TOTAL RAFFINAGE ‐RAFFINAGE DE DONGES TOTAL UOP CALLIDUS TILE REPAIR
2018 ITALY VIA BOVISASCA 15 ‐ NOVATE MILANESE KIRCHNERASSISTANCE AND SUPERVISION ‐ BURNERS
FIRING TEST
2018 ITALY ‐ ‐BOUSTEAD INTERNATIONAL
HEATERSFACTORY ACCEPTANCE TEST OF N.2 FIRED
HEATERS
2018 ITALY STAMBILIMENTO DI MANTOVA ‐ SAPIO srl BURNERS SUPERVISION
2018 KSA Cumene Plant – Rabigh Phase II ‐JOHN ZINK HAMWORTHY
COMBUSTIONKSA ‐ COMMISSIONING AND START‐UP TO
2018 BAHRAIN 2501121 ‐ NAG LTFD Phase 1 Project to Install 500 MMSCFD GDU PETROFAC FIVES ITASTroubleshooting ‐ Commissioning of a
thermal oxydizer in Barhain
Page 5 of 26
YEAR COUNTRY PLANT / FINAL CLIENT CONTRACTOR CLIENT SUBJECT
Reference List - SITE SERVICES 2012/2019
2018 ITALY GELA REFINERY ENI ICE BURNER MECHANICAL SUPERVISION
2018 ITALY VERSALIS ENI ‐ BRINDIS ENI KIRCHNER Site supervision
2018 CAMERUN SONARA ‐ LIMBE CAMERUN AMEC‐ FOSTER WHEELER KIRCHNER START‐UP OF FIRED HEATER
2018 EGYPT ZOHR DEVELOPMENT PROJECT, EGYPT SIIRTEC NIGI VERGAENGINEERING SITE SUPERVISION
2018 GERMANY EC ERDOELCHEMIE GMBH Dormagen ‐JOHN ZINK HAMWORTHY
COMBUSTIONSITE SUPERVISION
2018 KAZAKHSTAN PETRO KAZAKHSTAN OIL PRODUCTS LLP ‐ WELCRON Commissioning and start up
2018 KSA Rabigh II CP‐3/4 Package GSCA FIVES ITAS Commissioning and start up RTO
2018 ITALY AREOMECCANICA STRANICH ‐MILANO GREENS COMBUTION Test Run of Combustion Air Blower
2018 EGYPT BP WEST NILE DELTA GAS DEVELOPMENT PROJECT BECHTEL VERGAENGINEERING Fired Heater Mechanical Supervision
2018 ITALY ‐ ‐ KIRCHNER Technical Assistance
Page 6 of 26
YEAR COUNTRY PLANT / FINAL CLIENT CONTRACTOR CLIENT SUBJECT
Reference List - SITE SERVICES 2012/2019
2018 KSA SAUDI ARMCO arjan – GOSP 2 & Marjan – GOSP 3AMCO ITALGRU PROSERVICE OffShore Site Service
2018 ITALY 657 REFINERY, Falconara Marittima/API RAFFINERIA DI ANCONA TECHNIP KIRCHNERSite Service for Commissioning & Start‐Up
of Hydrocracker
2018 IRAQZUBAIR ‐ HAMMAR MISHRIF ZUBAIR NORTH NEW
DGS PROJECTITT KIRCHNER PREI SRL SITE SERVICE
2018 IRAN SOUTH PARS GAS FIELD DEVELOPMENT PHASE 19, Tombak/NIOC ‐ KIRCHNER Site Service for Commissioning & Start‐Up
2017 IRAN SOUTH PARS GAS FIELD DEVELOPMENT PHASES 13 AND 2224, Assaluyeh/NIOC PKSK KIRCHNERSite Service for Commissioning & Start‐Up N.1 Gas Dryers Regeneration Heaters
2017 KSA RABIGH PHASE 2 PETROCHEMICAL PROJECT, Rabigh/PETRORABIGH DAELIM UOP CALLIDUSTroubleshooting and Start‐Up of Catalytic
Incinerator
2017 KSA RABIGH CENTRE, Rabigh/PETRORABIGH DAELIM GREENWORKS Training Course on R.T.O.
2017 KUWAIT WASTE RECYCLING PLANT, Mina Abdullah/KNPC GS E&C, JGC, SK E&CJOHN ZINK HAMWORTHY
COMBUSTIONPilot Flare Start‐up
2017 CHINA XINYUAN COAL POWER PLANT, Chiping/XINFA GROUP FIVES SOLIOS FIVES ITAS Erection Supervision & Problem Solving on
Installation of n.2 R.T.O.
2017 KSA RABIGH CENTRE, Rabigh/PETRORABIGH DAELIM GREENWORKS Training Course on R.T.O.
Page 7 of 26
YEAR COUNTRY PLANT / FINAL CLIENT CONTRACTOR CLIENT SUBJECT
Reference List - SITE SERVICES 2012/2019
2017 FRANCE LNG TANKER “EXCALIBUR”, Brest/EXMAR DAMEN SHIPREPAIR BREST GREENS POWER Renewal & Assembly of N.6 Burners
2017 EGYPT WEST NILE DELTA GAS DEVELOPMENT PROJECT RAVEN SITE, Idku/ BP BECHTEL JOHN ZINK HAMWORTHY
COMBUSTIONFlare Erection supervision
2017 SINGAPORE MOGAS COGEN PROJECT, Singapore/SINGAPORE REFINING COMPANY L.T.D. JGC CORPORATION KIRCHNER Start‐Up of N.2 Heater
2017 KSA RABIGH CENTRE, Rabigh/PETRORABIGH SAIPEM KIRCHNER Training Course on N.1 Fired Heater
2017 ITALY FERRARA SITE, Ferrara/YARA ITALIA S.p.A. and LYONDELLBASELL ‐JOHN ZINK HAMWORTHY
COMBUSTIONGround Flare Assistance
2017 EGYPT Alexandria/ABU QIR PETROLEUM ‐ VERGAENGINEERING Commissioning & Start Up of Fired Heater
2017 KSA SAMAC MMA‐PMMA PROJECT, Al‐Jubail/SAMAC CTCI CORPORATIONJOHN ZINK HAMWORTHY
COMBUSTIONDry‐Out of RTO
2017 KUWAIT KOC 1 PIPELINE PROJECT, Mina Al‐Ahmadi/KUWAIT OIL COMPANY HYUNDAY E&C Co.,LtdJOHN ZINK HAMWORTHY
COMBUSTIONAWL repair
2017 KSA SAMAC MMA‐PMMA PROJECT, Al‐Jubail/SAMAC CTCI CORPORATIONJOHN ZINK HAMWORTHY
COMBUSTIONStart Up of RTO
2017 KSA RABIGH PHASE 2 PETROCHEMICAL PROJECT, Rabigh/PETRORABIGH DAELIM FIVES ITAS Training Course on R.T.O.
Page 8 of 26
YEAR COUNTRY PLANT / FINAL CLIENT CONTRACTOR CLIENT SUBJECT
Reference List - SITE SERVICES 2012/2019
2017 KSA SADARA PETROCHEMICAL COMPLEX, Al‐Jubail/SADARA CHEMICAL COMPANY FLUORJOHN ZINK HAMWORTHY
COMBUSTIONMechanical Inspection on R.T.O.
2017 ITALY SAPIO MANTOVA SAPIO MANTOVA SAPIO Reformer Burner supervision
2017 KSA RABIGH PHASE 2 PETROCHEMICAL PROJECT, Rabigh/PETRORABIGH SAIPEM KIRCHNER Training Course on Heater
2017 EGYPT BP WEST NILE DELTA GAS DEVELOPMENT PROJECT, Giza‐Fayoum/BP BECHTEL VERGAENGINEERINGMechanical Inspection For Regeneration
Gas Heater H‐2521
2017 VIETNAMNSRP COMPLEX PROJECT, Thanh Hoa Province/VIETNAM OIL AND GAS GROUP,
KUWAIT PETROLEUM INTERNATIONAL, IDEMITSU KOSAN Co. Ltd, MITSUI CHEMICALS Inc.
JGCS CONSORTIUM KIRCHNERPlatforming Heater Commissioning and
Start Up
2017 IRAN SOUTH PARS GAS FIELD DEVELOPMENT PHASE 19, Tombak/NIOCNARGAN, TECNIMONT KT, TECHNIP KTI, SAZEH, PPI,
IOECSAMIA COMBUSTION
Incinerator's Burner Mechanical check & Start Up
2017 EGYPT FARASKOUR COMPRESSOR STATION, Faraskour/PETROMAINT & WASCO TECNICAS REUNIDAS TECNICAS REUNIDAS Commissioning and Start Up of Cold Flare
2017 VIETNAM BINH SON REFINERY, Dung Quat/BINH SON REFINING & PETROCHEMICAL Co. Ltd. TECHNIP KIRCHNER Heater Supervision during TurnAround
2017 KSA RABIGH PHASE 2 PRETROCHEMICAL PROJECT, Rabigh/PETRORABIGH PETROFACJOHN ZINK HAMWORTHY
COMBUSTIONCommissioning & Start‐Up of Liquid T.O.
2017 QATAR QATARGAS 2 DEVELOPMENT PROJECT, Ras Laffan/QATARGASCHIYODA‐TECHNIP JOINT
VENTURE (CTJV)KIRCHNER Site Supervision
Page 9 of 26
YEAR COUNTRY PLANT / FINAL CLIENT CONTRACTOR CLIENT SUBJECT
Reference List - SITE SERVICES 2012/2019
2017 KSA RABIGH PHASE 3 PRETROCHEMICAL PROJECT, Rabigh/PETRORABIGH DAELIM FIVES ITAS Commissioning & Start‐Up of R.T.O.
Phase III
2017 KSA RABIGH PHASE 1 & 2 PRETROCHEMICAL PROJECT, Rabigh/PETRORABIGH DAELIM FIVES ITAS Commissioning & Start‐Up of R.T.O.
Phase I & Phase II
2017 ALGERIA GNL‐3Z PROJECT, Arzew/SONATRACHSNAMPROGETTI, CHIYODA, SAIPEM, CONTRACTING
ALGERIAKIRCHNER Commissioning & Start‐Up
2017 GERMANY OT ALTTROGLITZ, Elsterave/PARALUBE GMBH ‐JOHN ZINK HAMWORTHY
COMBUSTIONFlare's component installation assistance &
Start‐Up
2017 RUSSIA YAMAL LNG, Sabetta/YAMGAZ SNC TECHNIP GREENS COMBUSTION Commissioning & Start‐Up
2017 UAE Abu Dhabi/ADCO AMEC FOSTER WHEELER GREENS COMBUSTIONBath Heater's Pilots assembly assistance &
Start‐Up
2017 OMAN Yibal khuff project/PETROLEUM DEVELOPMENT OMAN (PDO) STS‐TEBODINJOHN ZINK HAMWORTHY
COMBUSTIONCommissioning & Start‐Up
2017 CZECH REPUBBLIC Lobecek/SYNTHOS KRALUPY TECNICAS REUNIDAS TECNICAS REUNIDAS Commissioning & Start‐Up of Flare Stack
2017 ITALY SASOL S.p.A. ‐JOHN ZINK HAMWORTHY
COMBUSTIONFlare troubleshooting
2017 UAE ADCO TECHNIP JOHN ZINK HAMWORTHY
COMBUSTIONBath Heater's Pilots assembly assistance &
Start‐Up
Page 10 of 26
YEAR COUNTRY PLANT / FINAL CLIENT CONTRACTOR CLIENT SUBJECT
Reference List - SITE SERVICES 2012/2019
2017 KSA Al‐Jubail/KEMYA DAELIMJOHN ZINK HAMWORTHY
COMBUSTIONFlare's KEP‐Cable troubleshooting
2017 SURINAME Sarroch/SARLUX GRUPPO SARAS ‐JOHN ZINK HAMWORTHY
COMBUSTIONDetailed Technical Report of the Heater
Efficency
2017 RUSSIA Solnechnogarsk/ROSSTRO PLAST LLC ‐ FIVES ITAS Start‐Up & Commissioning of an R.T.O.
2017 CHINARAPID PROJECT PACKAGE N.2, Ningbo/SINOPEC ENGINEERING GROUP AND
PETRONAS ‐ KIRCHNERErection Supervision n & Problem Solving
on Installation of n.52 Box Burners
2017 VIETNAMNSRP COMPLEX PROJECT, Thanh Hoa Province/VIETNAM OIL AND GAS GROUP,
KUWAIT PETROLEUM INTERNATIONAL, IDEMITSU KOSAN Co. Ltd, MITSUI CHEMICALS Inc.
JGCS CONSORTIUMJOHN ZINK HAMWORTHY
COMBUSTIONIgnition test supervision
2017 KSA MANIFA GAS FACILITIES PROJECT, Al Jubail/SAUDI ARABIAN OIL COMPANY GS E&CJOHN ZINK HAMWORTHY
COMBUSTIONRepair of A.W.L. light system MISSION N.2
2017 ITALY DUSLO COMPLEX TECHNIP KIRCHNER Training Course of N.1 Fired Heater
2017 EGYPT SCARAB SAFFRON DEVELOPMENT PROJECT, Alexandria/BURULLUS GAS COMPANYBECHTEL‐INTEC CONSORTIUM
VERGAENGINEERING Site Service Inspection on N.2 Fired Heater
2017 IRAN RABIGH PHASE 2 PRETROCHEMICAL PROJECT, Rabigh/PETRORABIGH DAELIM FIVES ITAS Software Problem Solving & BMS
Inspection
2017 SURINAME STAATSOLIE MAATSCHAPPIJ SURINAME N.V. SAIPEM KIRCHNERBurners Problem Solving & Heaters
Running Test
Page 11 of 26
YEAR COUNTRY PLANT / FINAL CLIENT CONTRACTOR CLIENT SUBJECT
Reference List - SITE SERVICES 2012/2019
2016 IRAN SOUTH PARS GAS FIELD DEVELOPMENT PHASE 19, Tombak/NIOCNARGAN, TECNIMONT KT, TECHNIP KTI, SAZEH, PPI,
IOECKIRCHNER
Site Service for Commissioning & Start‐Up Fired Heaters ‐ 104‐H‐201
2016 ITALY STABILIMENTO DI COLLEFERRO, Colleferro/AVIO S.p.A. ‐JOHN ZINK HAMWORTHY
COMBUSTIONGeneral Inspection of on‐shore Flare
system
2016 HUNGARY DANUBE REFINERY, Szazhalombatta/MOL PLC ‐ GREENS COMBUSTIONStart‐Up of Process Burners with OIL e UV
SCANNERS
2016 IRAN BANDAR ABBAS, Assaluyeh/PGSOC HANIL HEAVY INDUSTRIES ICE Burner Start‐Up
2016 KSA MANIFA GAS FACILITIES PROJECT, Al Jubail/SAUDI ARABIAN OIL COMPANY GS E&CJOHN ZINK HAMWORTHY
COMBUSTIONRepair of A.W.L. light system
2016 EGYPT ABU QUIR ‐ ANRPC ‐ BECHTEL ‐ GASCO ‐ PETROBEL ‐ UGDC ‐ E.STYRENICS ‐ VERGAENGINEERINGSite Inspection of N.15 Fired Heaters located in a number of Egyptian Sites
2016 ENGLAND TEESIDE, Middlesbrough/SABIC SAMSUNG C&T ECUK Ltd JOHN ZINK UK Flare Erection Final Check
2016 ITALY Cremosano/ANRPC ENPPI KIRCHNER Burner Firing Test
2016 SPAIN Burgos/ADISSEO ESPANA S.A. ‐JOHN ZINK HAMWORTHY
COMBUSTIONMecchanical Supervision & Start‐up of
Incinerator
2016 HUNGARY DANUBE REFINERY, Szazhalombatta/MOL PLC ‐ GREENS COMBUSTIONStart‐Up Oil Burner & UV scanners
troubleshooting
Page 12 of 26
YEAR COUNTRY PLANT / FINAL CLIENT CONTRACTOR CLIENT SUBJECT
Reference List - SITE SERVICES 2012/2019
2016 GHANA Tema/TOR ‐ VERGAENGINEERING Commissioning Fired Heater
2016 ITALY Milazzo/MILAZZO REFINERY ‐ KIRCHNER Burner's Problem solving
2016 IRAN SOUTH PARS GAS FIELD DEVELOPMENT PHASES 20 AND 21, Assaluyeh/NIOC OIEC PREI Start‐Up of N.1 Heater
2016 HUNGARY DANUBE REFINERY, Szazhalombatta/MOL PLC ‐ GREENS COMBUSTION Start‐Up of Process Burners
2016 CZECH REPUBBLIC Lobecek/SYNTHOS KRALUPY TECNICAS REUNIDAS TECNICAS REUNIDAS Start‐Up of Flare Stack
2016 ITALY PRIOLO SAIPEM GEV Assistance on the Engeneering of package
2016 KSA SADARA PROJECT/JGC GULF INTERNATIONAL Ltd FLUORJOHN ZINK HAMWORTHY
COMBUSTIONCommissioning & Start‐up Incinerator
2016 SLOVAKIA Bratislava/SLOVNAFT TECNIMONT FIVES ITAS Commissioning & Start‐Up of Regenerative
Thermal Oxidizer
2016 IRAN SOUTH PARS GAS FIELD DEVELOPMENT PHASE 19, Tombak/NIOC PPI CEBA Burners PreCommissioning
Page 13 of 26
YEAR COUNTRY PLANT / FINAL CLIENT CONTRACTOR CLIENT SUBJECT
Reference List - SITE SERVICES 2012/2019
2016 BAHREIN KUWAIT OIL TANKER COMPANY ‐ GREENS POWER Start‐up of N.1 Marine Boiler
2016 ITALY Val D’Agri Field, Viggiano/ENI BONATTIJOHN ZINK HAMWORTHY
COMBUSTIONStart‐Up of N.2 Thermal Oxidizers
2016 ITALY Milazzo/MILAZZO REFINERY ‐ KIRCHNERProblem solving and Technical Survey on
Ultra Low‐NOx Burners
2016 USA AMERICAN PACKAGING CORPORATION BOBST ITALIA S.p.A. FIVES ITAS Site service limit switch equipment
installation
2016 GERMANY NYNAS HARBURG REFINERY, Hamburg/SHELL ‐ GREENS COMBUSTIONCommissioning and Start‐Up for N.50 Low
NOx Process Burners
2016 IRAN Assaluyeh/NIOC PPI KIRCHNERCommissioning & Start‐Up Fired Heaters
104‐H‐101&301 Train 2, Train 3
2016 CUBA HERMANOS DIAZ REFINERY,Santiago de Cuba/CUPET ‐ INFOPROSite Service for Commissioning & Start‐Up
N.1 Fired Heater
2016 EGYPT BP WEST NILE DELTA GAS DEVELOPMENT PROJECT, Giza‐Fayoum/BP ‐ VERGAENGINEERINGSite Service for Asset Refurbishment and
Preservation Work PHASE 4
2016 ITALY Cremosano/BUSHEHR PETROCHEMICAL COMPANY EIED KIRCHNER Burner's Firing Test Supervision
Page 14 of 26
YEAR COUNTRY PLANT / FINAL CLIENT CONTRACTOR CLIENT SUBJECT
Reference List - SITE SERVICES 2012/2019
2016 ITALY Sarroch/SARLUX GRUPPO SARAS ‐ GREENS COMBUSTION Burners Start‐Up
2016 ITALY Sarroch/SARLUX GRUPPO SARAS ‐ GREENS COMBUSTION Burners check
2016 KSA AMMONIA AND UREA PLANT, Dammam/SAFCO ‐ KIRCHNERMecchanical assistance for Heater
assembly
2016 GERMANY NYNAS HARBURG REFINERY, Hamburg/SHELL GREENS COMBUSTION SHELL Burner supervision
2016 ALGERIA GNL‐3Z PROJECT, Arzew/SONATRACHSNAMPROGETTI, CHIYODA, SAIPEM, CONTRACTING
ALGERIAKIRCHNER Supervision at Start‐Up of Process Burners
2016 MEXICO ETILENO XXI PROJECT, Nanchital/BRASKEM IDESA TECHNIPJOHN ZINK HAMWORTHY
COMBUSTIONSite Service for Start‐Up of N.1 Thermal
Oxidizer Package
2016 QATAR QATARGAS 3 & 4 LNG PROJECT, Ras Laffan/QATARGASCHIYODA‐TECHNIP JOINT
VENTURE (CTJV)KIRCHNER
Site Service for Commissioning & Start‐Up N.1 Fired Heater
2016 EGYPT BP WEST NILE DELTA GAS DEVELOPMENT PROJECT, Giza‐Fayoum/BP ‐ VERGAENGINEERINGSite Service for Asset Refurbishment and
Preservation Work
2016 ITALY Sarroch/SARLUX GRUPPO SARAS ‐ KIRCHNER Site Service for N.1 Fired Heater
Page 15 of 26
YEAR COUNTRY PLANT / FINAL CLIENT CONTRACTOR CLIENT SUBJECT
Reference List - SITE SERVICES 2012/2019
2016 IRAN SOUTH PARS GAS FIELD DEVELOPMENT PHASE 19, Tombak/MISAGH SANAT ITAS ITAS Burner supervision
2016 IRAN SOUTH PARS GAS FIELD DEVELOPMENT PHASE 20 AND 21, Tombak/NIOC ITT PREI Site Service for Commissioning & Start‐Up
2016 IRAQ ZUBAIR OIL FIELD, Hammar MishrifPROGETTI EUROPA & GLOBAL
S.p.A.KIRCHNER
Site Service for Commissioning & Start‐Up N.1 Fired Heater
2016 UAE Abu Dhabi/ABU DHABI GAS DEVELOPMENT COMPANY SAIPEM ICESite Service for Problem Solving on Process
Burners
2016 IRAN SOUTH PARS GAS FIELD DEVELOPMENT PHASE 19, Tombak/NIOC PPI KIRCHNERCommissioning & Start‐Up Fired Heater
104‐H‐101 Train 1
2015 ITALY VAL D'AGRI FIELD, Viggiano/ENI BONATTI QUINTO TRENO Incinerator Commissioning and Start Up ‐
Inspection and Coordination
2015 ITALY VAL D'AGRI / ENI BONATTIJOHN ZINK HAMWORTHY
COMBUSTIONIncinerator Commissioning and Start Up
2015 THAILAND NRSP COMPLEX PROJECT JGCS CONSORTIUM KIRCHNERMechanical Supervision & Problem Solving
of an Heater Stack assembly
2015 ITALY FERRARA / YARA ITALIA SpA KIRCHNER KIRCHNER Dryout of Reformer Heater
Page 16 of 26
YEAR COUNTRY PLANT / FINAL CLIENT CONTRACTOR CLIENT SUBJECT
Reference List - SITE SERVICES 2012/2019
2015 BELGIUM GEEL PLANT / BP BPJOHN ZINK HAMWORTHY
COMBUSTIONFlare Tip Repair
2015 VIETNAM NGHI SON REFINERY AND PETROLCHEMICAL JGCS CONSORTIUM KIRCHNERCCR Platforming Fired Heater Assembly
supervision
2015 KSAPETROKEMYA ABS PROJECT, Al Jubail/ARABIAN PETROCHEMICAL COMPANY
(PETROKEMYA)TECNICAS REUNIDAS PREI
Incinerator and RTO Commissioning and Start Up
2015 KSAPETROKEMYA ABS PROJECT, Al Jubail/ARABIAN PETROCHEMICAL COMPANY
(PETROKEMYA) PETROKEMYA
JOHN ZINK HAMWORTHY COMBUSTION
A.W.L. repair Thermal Incinerators
2015 ITALY SANNAZZARO ENI ENI KIRCHNERHeater repair / modification & site
supervision
2015 KSAPETROKEMYA ABS PROJECT, Al Jubail/ARABIAN PETROCHEMICAL COMPANY
(PETROKEMYA)DAELIM
JOHN ZINK HAMWORTHY COMBUSTION
Flare Commissioning
2015 TURKMENISTAN CENTRAL DIYARBEKIR PLATFORMS/PETRONAS CALIGARI ‐ VERGAENGINEERING OFFSHORE ‐ Fired Heater Start Up
2015 AZERBAIJAN OFFSHORE PLATFORM/AIOC BPJOHN ZINK HAMWORTHY
COMBUSTIONOFFSHORE ‐ Flare Tip Changin assistance
2015 AUSTRALIA GLADSTONE LNG PROJECT, Curtis island/TOTAL BECHTELJOHN ZINK HAMWORTHY
COMBUSTIONFlare commissioning and Start Up
Page 17 of 26
YEAR COUNTRY PLANT / FINAL CLIENT CONTRACTOR CLIENT SUBJECT
Reference List - SITE SERVICES 2012/2019
2015 RUSSIA Chita JSC KHIAGDA DESMET‐BALLESTRA Start Up Burner Heaters
2015 TUNISIA HASDRUBAL GAS PROCESSING PLANT, Gulf of Gabes/BGT AND ETAP ‐ VERGAENGINEERING Site supervision for Mecchanical cheks
2015 SURINAME STAATSOLIE MAATSCHAPPIJ SURINAME N.V. SAIPEM KIRCHNER Hydrocracker Start‐Up
2015 IRAN SOUTH PARS GAS FIELD DEVELOPMENT PHASES 15 AND 16, Assaluyeh/NIOC PPI KIRCHNERSite Service for Commissioning & Start‐Up Regeneration Heaters ‐ 116‐H‐101/201
2015 U.A.E. SHAH GAS PLANT, Abu Dhabi/ABU DHABI GAS DEVELOPMENT COMPANY LIMITED SAIPEM SAIPEM Thermal Incinerators Assistance
2015 AUSTRALIA GLADSTONE LNG PROJECT, Curtis island/TOTAL BECHTEL JOHN ZINK HAMWORTHY
COMBUSTIONFlare Stack ‐ Aviation Warning Lights
Installation
2015 KSAPETROKEMYA ABS PROJECT, Al Jubail/ARABIAN PETROCHEMICAL COMPANY
(PETROKEMYA)DAELIM
JOHN ZINK HAMWORTHY COMBUSTION
Flare commissioning
2015 VIETNAM NGHI SON, VIETNAM JGCS CONSORTIUM KIRCHNERCCR Platforming Fired Heater Assembly
supervision
2015 EGYPT OBAYIED FIELD DEVELOPMENT, Obayied/BAPETCO ENPPIJOHN ZINK HAMWORTHY
COMBUSTIONFlare Tip replacement
Page 18 of 26
YEAR COUNTRY PLANT / FINAL CLIENT CONTRACTOR CLIENT SUBJECT
Reference List - SITE SERVICES 2012/2019
2015 ITALY LA CERRATA BD Supervision BIO GAS flare
2015 KSA JUBAIL INDUSTIAL CITY KSA / AL JUBAIL PETROCHEMICAL COMPANY (KEMYA) DAELIMJOHN ZINK HAMWORTHY
COMBUSTIONFlare Stack ‐ Aviation Warning Lights
Installation
2015 SURINAME STAATSOLIE MAATSCHAPPIJ SURINAME N.V. SAIPEM KIRCHNER Reformer Heater Dryout
2015 BRUNEI BRUNEI METHANOL COMPANY MITSUBISHIJOHN ZINK HAMWORTHY
COMBUSTIONThermal Oxidizer ‐ Technical Assistance
2015 BULGARIA LUKOIL NEFTTOCHIM BOURGAS AD TECNIMONT KT ICE Thermal Reactor Start‐Up
2015 KUWAIT KUWAIT OIL COMPANY SIIRTEC NIGI ICE Problem Solving: vibration on bath heaters
2015 NORWAY STATOIL STATOILJOHN ZINK HAMWORTHY
COMBUSTIONMechanical consultancy supply for Flare
Tip repair in site workshop
2015 JORDAN JORDAN PETROLEUM REFINERY CO LTD LE GAS INTEGRAL ICE Incinerator Start‐Up
2015 KUWAIT MAA REFINERY HYUNDAI HEAVY INDUSTRIESJOHN ZINK HAMWORTHY
COMBUSTIONFlare Stack ‐ commisioning and startr up
operation
Page 19 of 26
YEAR COUNTRY PLANT / FINAL CLIENT CONTRACTOR CLIENT SUBJECT
Reference List - SITE SERVICES 2012/2019
2015 JORDAN JPRC ZARKA / REFINERY LE GAZ INTEGRAL ICE SRLPre‐Commissioning, Commissioning & Start‐Up of Incinerator Package and Thermal
Reactor Burner
2015 UAE Abu Dhabi/TAKREER DEAWOOJOHN ZINK HAMWORTHY
COMBUSTIONFlare Stack ‐ Pre commisioning / commissioning and start up
2015 KSA JUBAIL INDUSTIAL CITY KSA / AL JUBAIL PETROCHEMICAL COMPANY (KEMYA) DAELIMJOHN ZINK HAMWORTHY
COMBUSTIONFlare Stack (180meters) Supervision at
erection
2015 SURINAME STAATSOLIE MAATSCHAPPIJ SURINAME N.V. SAIPEM KIRCHNERProblem Solving: Ignition issues ‐ Process Burners for Vacuum Heater and start up
operation
2015 THAILAND Map Ta Phut/PTT PUBLIC COMPANY LIMITED ‐ KIRCHNERTraining Course and Supervision at Start‐
Up for Waste Heat Recovery Unit
2015 KUWAIT MAA REFINERY, Mina Al‐Ahmadi/KNPC HYUNDAI HEAVY INDUSTRIESJOHN ZINK HAMWORTHY
COMBUSTIONFlare Stack ‐ Pre commisioning operation
2014 TUNISIA HASDRUBAL GAS PROCESSING PLANT, Gulf of Gabes/BGT AND ETAP ‐JOHN ZINK HAMWORTHY
COMBUSTIONStack Aviation Warning Lights
2014 U.A.E. RUWAIS ABU DHABI TAKREERJOHN ZINK HAMWORTHY
COMBUSTIONAir Pre Heater supervision and start up
2014 INDONESIA SENORO GAS DEVELOPMENT PROJECTSAMSUNG‐TRIPATRA
CONSORTIUMJOHN ZINK HAMWORTHY
COMBUSTIONRefractory repair and dampers valve check
Page 20 of 26
YEAR COUNTRY PLANT / FINAL CLIENT CONTRACTOR CLIENT SUBJECT
Reference List - SITE SERVICES 2012/2019
2014 IRAN SOUTH PARS GAS FIELD DEVELOPMENT PHASES 15 AND 16, Assaluyeh/NIOC PPI KIRCHNERSite Service for Commissioning & Start‐Up N.6 Gas Dryers Regeneration Heaters ‐
Train 4
2014 QATAR QATARGAS 3&4 ONSHORE LNG PROJECTS CHIYODA / TECHNIP KIRCHNER
Technical Assistance for Heaters Tr4 24‐F0301, Tr5 25‐F0301, Tr6 52‐F0301, Tr7 53‐
F0301
2014 EGYPT BAPETCO SHELL /GPS JOHN ZINK USA CO Burner Startup
2014 MALAYSIA ARKEMA LYCHEE PROJECT, Kerteh/DESMET BALLESTRA ‐ JOHN ZINK USASupervision at Commissioning and Start‐Up
of Icninerator Burner for SRU
2014 EGYPT REFORMING PLANT/SUEZ OIL PROCESSING COMPANY ‐ KIRCHNER Supervision at Burner firing test
2014 KUWAIT MAA REFINERY, Mina Al‐Ahmadi/KNPC DAELIMJOHN ZINK HAMWORTHY
COMBUSTIONFlare Stack ‐ Aviation Warning Lights
Installation
2014 KUWAIT MAA REFINERY, Mina Al‐Ahmadi/KNPC HYUNDAI HEAVY INDUSTRIESJOHN ZINK HAMWORTHY
COMBUSTIONFlare Stack ‐ Aviation Warning Lights
Replacement
2014 CUBA HERMANOS DIAZ REFINERY,Santiago de Cuba/CUPET ‐ INFOPRO Study for Revamping Heater H‐101
2014 IRAN SOUTH PARS GAS FIELD DEVELOPMENT PHASES 15 AND 16, Assaluyeh/NIOC PPI KIRCHNERSite Service for Commissioning & Start‐Up N.6 Gas Dryers Regeneration Heaters ‐
Train 3
Page 21 of 26
YEAR COUNTRY PLANT / FINAL CLIENT CONTRACTOR CLIENT SUBJECT
Reference List - SITE SERVICES 2012/2019
2014 VENEZUELA JOSE PETROCHEMICAL COMPLEX,Anzoategui/FERTINITRO ‐ KIRCHNERSupervision and problem solving of Heater
installation
2014 GREECE Corinth/MOTOR OIL HELLAS CORINTH REFINERIES S.A. ‐ VERGAENGINEERINGSite Service for Commissioning & Start‐Up
N.1 Visbreaker Heater H‐151
2014 ITALY Sannazzaro de Burgundi/SANNAZZARO DE BURGUNDI REFINERY ENI KIRCHNERTechnical Study on Process Burners ‐
Heater B‐1011 Topping 2
2014 OMAN SALALAHSALALAH METHANOL
COMPANYJOHN ZINK HAMWORTHY
COMBUSTIONThermocouples replacement
2014 TUNISIA HASDRUBAL GAS PROCESSING PLANT, Gulf of Gabes/BGT AND ETAP ‐JOHN ZINK HAMWORTHY
COMBUSTIONAviation Warning Lights Replacement
2014 IRANBANDAR ABBAS GAS CONDENSATE REFINERY, Bandar Abbas/PERSIAN GULF STAR OIL
COMPANYHANIL HEAVY INDUSTRIES HANIL HEAVY INDUSTRIES
Support and assistance for Thermal Incinerator
2014 ITALY SARROCH / SASOL SASOL KIRCHNERBurners verification & Material
Requirsition compilation for Burners
2014 EGYPT Western Desert ENPPI ITPCommissioning and Start up for water bath
heater
2014 RUSSIA KHABAROVSH / UTE KHABAROVSH SPE ENGINEERING ICESurvey for Burners Commissioning & Start‐
Up
Page 22 of 26
YEAR COUNTRY PLANT / FINAL CLIENT CONTRACTOR CLIENT SUBJECT
Reference List - SITE SERVICES 2012/2019
2014 KAZAKHSTAN DUNGA OIL FIELD/MAERSK OIL GATEWAY NOVARGI Technical Support for Gas Burner
2014 PAKISTAN PAKISTAN PETROLEUM LIMITED ‐ NOVARGI Technical Assistance for Diesel Oil Burner
2014 IRAN SOUTH PARS GAS FIELD DEVELOPMENT PHASES 15 AND 16, Assaluyeh/NIOC PPI KIRCHNERTraining Course and Site Service for
Commissioning & Start‐Up N.6 Gas Dryers Regeneration Heaters ‐ Train 2
2013 IRAN PGSOC TECNIMONT TECNIMONTTraining Course and Management All Fired
Equipment South Pars Phase 12
2013 ITALY Sannazzaro de Burgundi/SANNAZZARO DE BURGUNDI REFINERY ENI KIRCHNER Technical Assistance at Start‐Up
2013 THAILAND PTT TOYO‐THAI KIRCHNER Inspection N.4+N.1 Zeeco Burners
2013 IRANBANDAR ABBAS GAS CONDENSATE REFINERY, Bandar Abbas/LAVAN OIL REFINING
COMPANY‐ HANIL HEAVY INDUSTRIES Site supervision for Spare Parts definition
2013 KSA SAUDI ARABIA / RABIG II SAIPEM SAMIA COMBUSTIONBurner drawing review and check & Fired
Tests inspection
2013 KUWAIT MAA REFINERY, Mina Al‐Ahmadi/KNPC ‐ KIRCHNERBurner Data Sheet check & Material Requirsition for Burners H‐31/32/33
/001/002/003/004/005
Page 23 of 26
YEAR COUNTRY PLANT / FINAL CLIENT CONTRACTOR CLIENT SUBJECT
Reference List - SITE SERVICES 2012/2019
2013 CROATIA RIJEKA OIL REFINERY, Rijeka/INA ITT ICE Site survey
2013 IRAN PGSOC ‐ HANIL HEAVY INDUSTRIESAssistance for Incinerator Burner Bandar
Abbas Gas Condensate Refinery
2013 RUSSIA ‐ KT ICE Site Service Burners for reformer unit
2013 PAKISTAN SAWAN GAS FIELD PROJECT/OMV ‐ AIRPROTECHPre‐Commissioning, Commissioning & Start‐
Up of Sonic Flare System
2013 ITALY ‐ SPARK ENERGY AIRPROTECH Site Service for Bio Gas Start‐Up
2013 U.A.E. DAS ISLAND LNG TERMINAL, Abu Dhabi/ADGAS HYUNDAI HEAVY INDUSTRIESJOHN ZINK HAMWORTHY
COMBUSTIONFlare LP + Flare HP Offshore Technology /
Assistances for A.W.L. change
2013 ITALY Sannazzaro de Burgundi/SANNAZZARO DE BURGUNDI REFINERY ENI KIRCHNER Heater Plant EST B‐5370
2013 MAROCCO OCP ‐JOHN ZINK HAMWORTHY
COMBUSTIONAir Preheater supervision
2013 ISRAELE RAMAT OVAV ISRAEL CTU AIRPROTECHAssistances for Biogas Flare System
enclosure Type
Page 24 of 26
YEAR COUNTRY PLANT / FINAL CLIENT CONTRACTOR CLIENT SUBJECT
Reference List - SITE SERVICES 2012/2019
2013 UAE RUWAIS ABU DHABI SAMSUNG JOHN ZINK HAMWORTHYSupervision on Mechanical Activities for Flares RFCC and CDU (the world's tallest
flares)
2013 EGYPT SUEZ STEEL DANIELI AIRPROTECHTechnical Inspection to Flare PG 639‐U
FE21F10FLY
2013 ROMANIA ROMPETROL ELECTROTOTAL SAMIA COMBUSTIONTechnical Study and Site Service on of Fired
heaters 100‐H1, 100H‐2, 100H‐3
2013 CUBA HERMANOS DIAZ REFINERY,Santiago de Cuba/CUPET ‐ FORNITALIA MONTAGGITechnical Inspection to Crude Heater F‐101
aimed to revamping/replacement and Training Course
2013 IRAN SOUTH PARS GAS FIELD DEVELOPMENT PHASES 15 AND 16, Assaluyeh/NIOC PPI KIRCHNERTraining Course and Site Service for
Commissioning & Start‐Up N.6 Gas Dryers Regeneration Heaters ‐ Train 1
2013 ITALY SAFCO SAIPEM GENERAL EUROPE VACUUM Project Managing for Vacuum Pump
2013 ITALY GELA REFINERY, Gela/ENI ‐ KIRCHNERConsulting for Spare parts for Heaters F‐
102 and F‐103
2013 ITALY ‐ ‐ SAMIA COMBUSTIONSpecialized Technical Support for Fired Test Radiant Wall Burner Forced Drat & Fired
Test Low NOx Burners
2013 ITALY GELA / ENI ‐ KIRCHNERSite Assistance for N.42 Burners, Reformer
Heaters F‐102 F‐103
2012 IRANBANDAR ABBAS GAS CONDENSATE REFINERY, Bandar Abbas/PERSIAN GULF
STAR OIL COMPANYHANIL HEAVY INDUSTRIES HANIL HEAVY INDUSTRIES
BMS for N.30 Fired Heaters: H‐0201/5201/7201, H‐0202/5202/7202, H‐
0203/5203/7203, H‐1601/6601, H‐0401, H‐0251/2/3, H‐5251/2/3, H‐7251/2/3, H‐
Page 25 of 26
YEAR COUNTRY PLANT / FINAL CLIENT CONTRACTOR CLIENT SUBJECT
Reference List - SITE SERVICES 2012/2019
2012 GREECE Corinth/MOTOR OIL HELLAS CORINTH REFINERIES S.A. ‐ KIRCHNERTechnical study on N.10 Burners, Fired
Heater F‐7502
Page 26 of 26