COMPANY PROFILE - wiedemann-middleeast.comwiedemann-middleeast.com/assets/cms/uploads/files/Company...

27
0| Page COMPANY PROFILE WIEDEMANN Environment services Co. 6 th Floor , Al-Anjari buildingAli Al-Salem Street, Kuwait | Tel: +965 22490590 | Fax: +965 22490599 E-mail : [email protected]

Transcript of COMPANY PROFILE - wiedemann-middleeast.comwiedemann-middleeast.com/assets/cms/uploads/files/Company...

Page 1: COMPANY PROFILE - wiedemann-middleeast.comwiedemann-middleeast.com/assets/cms/uploads/files/Company Profile... · COMPANY PROFILE WIEDEMANN Environment services Co. 6th Floor , Al-Anjari

0 | P a g e

COMPANY PROFILE

WIEDEMANN Environment services Co.6th Floor , Al-Anjari buildingAli Al-Salem Street, Kuwait

| Tel: +965 22490590 | Fax: +965 22490599

E-mail : [email protected]

Page 2: COMPANY PROFILE - wiedemann-middleeast.comwiedemann-middleeast.com/assets/cms/uploads/files/Company Profile... · COMPANY PROFILE WIEDEMANN Environment services Co. 6th Floor , Al-Anjari

1 | P a g e

1. Business, Administrative & Contact Information

a. Business name: WIEDEMANN Environmet Services L.L.Cb. Business type: Sewerage Network maintenance, Sewer Cleaning

works& . CCTV pipe inspectionc. Tel:

a. Kuwait : Tel: +965 22490590 | Fax: +965 22490599b. UAE: Tel: +971 44548657 | Fax: +971 44548607

d. E-mail: [email protected]. Physical address:

a. Kuwait City: 6th Floor , Al-Anjari buildingAli Al-Salem Street, Kuwaitb. UAE: ASPECT Tower-D, 1702 Dubai, UAE

f. Postal Address:a. UAE 31261

2. Wiedeman vertreib address and contact in Germany

a. Buisness name: Wiedemann & Reichhardt mechanical and automotive .GmbH

b. Business Type Sale & Services of Wiedemann 7 reichhardt Sewer .vehicles world wide excluding Middle East.

c. Physical adress: Registered office 86 450 Altenmünster, Freiweg four

d. Tel: +49 (0) 82 95/96 93-0

e. Fax: +49 (0) 82 95/96 93-30

f. E-mail: [email protected]

Page 3: COMPANY PROFILE - wiedemann-middleeast.comwiedemann-middleeast.com/assets/cms/uploads/files/Company Profile... · COMPANY PROFILE WIEDEMANN Environment services Co. 6th Floor , Al-Anjari

2 | P a g e

2. Introduction History

Wiedemann & Reichhardt was founded in February 1976; the company with advancedpioneering technology concepts in the environmental engineering field from 1976 to 2012Wiedemann & Reichhardt have launched more than 30 new developments, all of whichdeclared suitable for patent protection. Since the demand for qualified manufacturers &contractors increased through the recently formed UAE, Wiedemann & Reichhardt expandedits business operations & developed a strong reputation in sewerage systems.

Wiedemann Vertriebs GmbHWas founded in 1980 is a partner of Wiedemann &Reichhardt, the company is responsible forsales & services including Europe and other continents excluding middle east. WiedemannVertriebs works in the region with sister companies as Wiedemann Environmental servicesand partners M/s Industrial Group for Control systems (IGCS).

WIEDEMANN Environment Service company, partners of Wiedemann Vertriebs GmbHCompany established in October 2010 and has built-up one branch in Dubai. We represent assale & service partners of Wiedemann Vertriebs Company in Middle East region. We arespecialized in all sewer cleaning & maintenance which include the following:o Sewer Pipe cleaningo CCTV inspection for sewer pipes, pump stations & pressure line.o Sewer equipment installation in wet wells & pipes (flow meters, sensors so on.)o

WIEDEMANN &REICHHARDT

Wiedemann VertriebsGmbH

WIEDEMANN EnvironmentService company

DUBAI

Other SisterCompanies

WIEDEMANN EnvironmentService company KUWAIT

Page 4: COMPANY PROFILE - wiedemann-middleeast.comwiedemann-middleeast.com/assets/cms/uploads/files/Company Profile... · COMPANY PROFILE WIEDEMANN Environment services Co. 6th Floor , Al-Anjari

3 | P a g e

Wiedemann Environmental Services Co. :

We have a strong leadership from Wiedemann Vertriebs GmbH, their attention to detail & deliver anassurance of expertise & quality in our works, playing a significant role in the development ofsewerage systems, operation & maintenance thereof.

We instituted in focusing and catering to the requirements of Infrastructure needs in different sectorsand activities utilizing latest and most advanced techniques among our competitors. With ourpartners, we are the only company in Gulf proficient in installing Fiber Cable inside LIVE sewer pipesand hence advanced the thought of febricity in Abu Dhabi, as our sister company have already laid

workers to maintain and all assets inside live sewer by using our vehicles. Our operators are welltrained to operate all sewer cleaning vehicles and are certified for all sewers cleaning & maintenanceworks.

We have facilitated Abu Dhabi Sewerage Services Company (ADSSC) our services and by way ofusing our techniques and advanced blockage removal methods we have accomplished & lower therate of blockages drastically into almost blockage free environment. Our wide range of sewer

with zero accidents.

We always keep safety first and due to our high quality and professional employees we have workedmore than 1,000,000 man hours inside sewer lines without a single accident. We encourage all staffand third parties to work together to create a healthy and safe working environment. The process is afundamental part of health and Safety at Work Act as It manages potential dangers in the workplace.Traffic Management is the first step to protect the site from any sudden incident. Our mission is toapply very high standard in Personal Protective Equipment PPE.

Wiedemann Environment Service takes pride in the introduction and application of innovativeengineering methods in its Contracts where our clients approve such methods, including the followingexamples:

Supply, Service & Management of all Wiedemann & Reichhardt Vehicles.Operation and maintenance of sewer networks.Installation of Fiber Optic Cable & other assets inside live sewer lines and pump stations.CCTV Sewer pipe inspections with HD & Panoramic camera surveys.Pipe re-blocking systems

In keeping with our drive for innovation we encourage and fund our staff to undertake trainings,attend seminars and study to keep abreast of new methods of management, accounting andengineering technologies, whether that is in the UAE, or overseas.

In support of project delivery & execution we have an extensive asset portfolio of Vehicles andMachines along with a well-stocked materials and parts store, to ensure all projects can proceedwithout delays.

Page 5: COMPANY PROFILE - wiedemann-middleeast.comwiedemann-middleeast.com/assets/cms/uploads/files/Company Profile... · COMPANY PROFILE WIEDEMANN Environment services Co. 6th Floor , Al-Anjari

4 | P a g e

Wiedemann & Reichhardt have over 30 years of successful equipment engineering experiencefor the sewer cleaning.

The company was founded in 06 July 1978, the new company initially started as a supply companyfor the local authority vehicle construction division ofyears both owners had build up an excellent range of knowledge and skills whilst working for KUKAUmwelttechnik.

to

was invented.

launched at the first Environment exibition in Berlin in October 1977. It was presented by the press asa new product for the exibition and stood apart from the rest due to its unusual design (dual tanksystem) and its unique technical idea (e.g the water recycling system, the suction hose reel, thecombined high pressure reel fitted to the boom and much more), which means that this vehicle is stilla pioneer due to the effeciency of its performance combined with the simplicity of its function.

As a result of the growing demand it become necessary to expand the company in all contenients.Since the demand for Wiedemann & Reichhardt sewer cleaning vehicles with recycling system risesprogressively now in Gulf regions, Wiedemann & Reichhardt decided to open a sublink for whole gulfregion in Dubai & Kuwait in profile of WIEDEMANN ENVIRONMENTAL Services. Established inOctober 2010 for the purpose to provide easy and nearby services to all the clients in gulf withdetermined effeciency and devotion.

Our aim is to provide only the best equipment and ensure the highest level of service support. Andwe have adhered to these commitments unfailingly when other companies have moved in and out ofthe region on the tides of economics and politics. Our company have excellence in customerrelationships, consultation and customer service.

Wiedemann & Reichhardt GmbH provides a wide range of machinery. Their most advancedmachines are :

SUPER 1000 One tank system with water recycling, operated by one man and emptyingsludge tank by tipping. Include Directional Nozzle with built-in Camera toinspect the pipe at same time of cleaning.

SUPER 2000 Two tank system with water recycling, separate water & sludge tank &emptying sludge tank by tipping, Include Directional Nozzle with built-inCamera

SUPER 3000 Two tank system with water recycling and with separation of sludge material,inorganic material & mineral substances. Mineral substances emptied by ascrew conveyer to a normal container at site operation. Also Include DirectionalNozzle with built-in Camera

Page 6: COMPANY PROFILE - wiedemann-middleeast.comwiedemann-middleeast.com/assets/cms/uploads/files/Company Profile... · COMPANY PROFILE WIEDEMANN Environment services Co. 6th Floor , Al-Anjari

5 | P a g e

GULLEY-Cleaner Cleaning gullies, Driving & operating from the working platform only with oneoperator.

Suction Vehicles Pressure tank vehicles& trailer in accordance with GGVS/ADR

Combination Trucks on 2 4 Axles-Chassis

Combination high-pressure and suction unit in a van type GULLY-LUX

High Pressure flushing Vehicles

With equipment storage installed in a box-van or a van

Page 7: COMPANY PROFILE - wiedemann-middleeast.comwiedemann-middleeast.com/assets/cms/uploads/files/Company Profile... · COMPANY PROFILE WIEDEMANN Environment services Co. 6th Floor , Al-Anjari

6 | P a g e

Theme of Wiedemann Sewer cleaning Vehicles with water recycling system:

The concept & aim of WIEDEMANN water recycling machines is to save the natural water resources& save time to keep our sewer lines clean.

Water recycling system diagram

WIEDEMANN Water-recycling vehicles

This machine utilizes the existing sewer or any contaminated water, recycle/filter it and use the samefor cleaning, flushing or blockage removal purposes.

Thecontaminated wateris suckedthrough thesuction tubeand transported to thesludge tank. Thecontaminated water level is automatically adjusted in each tank and the first process for cleaning thiswater begins.

From tanks the water passes througha centrifugalpump to the other section of machine and afterthefirstcleaningagainpumped intothe reservoir.From thereservoirthe water of thehigh pressurepumpissupplied, andpasses through thehigh pressurehosefor cleaningandfor other purposesinthe channel.

The system is based on the principle of physical Water Cleaning. It consists of 7 treatment phase andthe subsequent three main components:

Sedimentation (physical gravity separation)self-cleaning water flow with closing bellFine Sand SeparationCyclone separator (centrifugal)Control PanelCleaning

Page 8: COMPANY PROFILE - wiedemann-middleeast.comwiedemann-middleeast.com/assets/cms/uploads/files/Company Profile... · COMPANY PROFILE WIEDEMANN Environment services Co. 6th Floor , Al-Anjari

7 | P a g e

Description of the 7 stages of cleaning:

First Level: Coarse Separation stageseparates coarse material (stones, cans, etc.) and keeps them in the sludge compartment (rear) back

Second Level: SEDIMENTATIONafter passing through the Coarse Separation stage and the contaminated water enter into a settlingzone. Here, sludge, solids and sand particles separated by physical gravity separation and sink to thebottom (front area of the sludge tank)

Third Level: SELF-CLEANING WATER FLOW WITH CLOSING BELL-sandseparation stage and serves as a further introduction to the water in the main chamber of thewater tank and from there to further purification steps.The self-cleaning of the water flow is always opposite to the direction of flow. The cleaning water iscontinuously provided by the centrifugal pump water from the recycling loop.Water tankconsisting of two enclosed chambers, the main chamber and the pumping chamber:

Main chamberas through the chamber during water treatment and to receive excess waterfrom the pump chamber.Pump chamberas a storehouse for the cleaned and prepared for the high-pressure flushing

water pump and water for the operation of the water ring pump. Excess water is returned tofull fill the pump chamber into the main chamber.

Closing bell of the water flowopens automatically when the water recycling closes the self-cleaningwater flow and thus the entire water recycling system is complets. Similar to the implementation ofpure suction work.

4th - 7 Level: Fine Sand Separation

Rotary pumptransports the pre-cleaned water from the main chamber into the Sand Separation tank.At the same time cleaning the water for the self-cleaning water flow is fed into the scavenging.

5th Stage - Cyclone separator (centrifugal)separates under pressure (centrifugal pump) by centrifugal force to physically fine and very fine gritfrom the water. The separated particles are discharged and returned automatically to the sludge tank.The purified water is four times after one pass through the cyclone separator main chamber andpump chamber finally provided the high pressure pump.

6th Stage - Control Panel:

The total water recycling plant operates continuously, without interruption during the suction andflushing. All processes are on the PLC CAN - BUS - Computer controlled fully automaticallycontrolled and monitored. A manual control capability of the system is also available.

7th Stage - Cleaning:

All are in the course of the recycling process of water separated particles transported back

Page 9: COMPANY PROFILE - wiedemann-middleeast.comwiedemann-middleeast.com/assets/cms/uploads/files/Company Profile... · COMPANY PROFILE WIEDEMANN Environment services Co. 6th Floor , Al-Anjari

8 | P a g e

automatically into the sludge tank. The water cycle is fully automatic continuous self-cleaning.Cleaning processes of the recycling facility are not required.

Ref: the sketch below

Page 10: COMPANY PROFILE - wiedemann-middleeast.comwiedemann-middleeast.com/assets/cms/uploads/files/Company Profile... · COMPANY PROFILE WIEDEMANN Environment services Co. 6th Floor , Al-Anjari

9 | P a g e

COMMERCIAL REGISTRATION

Wiedemann Environment Dubai

Page 11: COMPANY PROFILE - wiedemann-middleeast.comwiedemann-middleeast.com/assets/cms/uploads/files/Company Profile... · COMPANY PROFILE WIEDEMANN Environment services Co. 6th Floor , Al-Anjari

10 | P a g e

Page 12: COMPANY PROFILE - wiedemann-middleeast.comwiedemann-middleeast.com/assets/cms/uploads/files/Company Profile... · COMPANY PROFILE WIEDEMANN Environment services Co. 6th Floor , Al-Anjari

11 | P a g e

PROFESSIONAL LICENSE

Wiedemann Environment Dubai

Page 13: COMPANY PROFILE - wiedemann-middleeast.comwiedemann-middleeast.com/assets/cms/uploads/files/Company Profile... · COMPANY PROFILE WIEDEMANN Environment services Co. 6th Floor , Al-Anjari

12 | P a g e

Page 14: COMPANY PROFILE - wiedemann-middleeast.comwiedemann-middleeast.com/assets/cms/uploads/files/Company Profile... · COMPANY PROFILE WIEDEMANN Environment services Co. 6th Floor , Al-Anjari

13 | P a g e

LOCATION MAP OF WIEDEMANN ENVIRONEMT SERVICES CO. DUBAI,UAE.

Service Road

ASPECTTOWERS

SAFA PARK BRIDGE (EXIT 47) Wiedemann Environment Services LLC1702 Aspect Tower-D, Executive TowersBusiness Bay, Dubai, UAE.Tel: 04-4548657 Fax: 04-4548607

DANATA

EPPCO

WIEDEMANN EnvironmentServices Co.

Page 15: COMPANY PROFILE - wiedemann-middleeast.comwiedemann-middleeast.com/assets/cms/uploads/files/Company Profile... · COMPANY PROFILE WIEDEMANN Environment services Co. 6th Floor , Al-Anjari

14 | P a g e

WIEDEMANN & REICHHARDT Organization Chart :

Managing DirectorCommercialManagement

Carla Wiedemann

QMSerena Eisele

Financial Accounting MangerAndrea Gottling Prokuristin

Monitoring of AcountsPayment Transactions

Serena Eisele

PurchasingImelda Dieminger

Conditions & priceMaintenancePetra Miller

Incoming / OutgoinggoodsWIKA

Julia Grybas

Member of ManagementMarco Dammer

QMSerena Eisele

Technical OperationsManager

Rainer Reichhardt

Technical OperationsManager

Planning for W&R / WIKA

Pre-paint AssemblyDrive & Help-frame, Assembly of

Devices, Hydraulics, PaintingWolfgang Kanefzky, Sohr

Final AssemblyManfred Bock

InstallationElectric-u-Pneumatic

Mariusz Kempny

Customer Service andRepairs

Josef Weigand

PaintingSohr

Merchandise Managementincomming / Outgoing goods

Joachim Knorr, M. Kaussner

Order ManagementDispatching of Goods

Josef Weigand, Manfred Bock,Wolfgang kanefzky, Mariusz Kempny

Research & Development : Karl WiedemannConstruction: Karl Wiedemann, J. BrandlDrawing: Anja Miller, Hoger SieglWork Preparation: Johann BrandlMaterial Disposition: Johann BrandlDocumentation: Rainer Reichhardt

Version 04:Created by : Carla Wiedemann 27.07.2009Changed by : M. Kaussner 29.07.2011Translation : C. Weimer 14.02.2012

Organizational ChartWiedemann and Reichhardt

text

Page 16: COMPANY PROFILE - wiedemann-middleeast.comwiedemann-middleeast.com/assets/cms/uploads/files/Company Profile... · COMPANY PROFILE WIEDEMANN Environment services Co. 6th Floor , Al-Anjari

15 | P a g e

WIEDEMANN & REICHHARDT Financials :

Page 17: COMPANY PROFILE - wiedemann-middleeast.comwiedemann-middleeast.com/assets/cms/uploads/files/Company Profile... · COMPANY PROFILE WIEDEMANN Environment services Co. 6th Floor , Al-Anjari

16 | P a g e

WIEDEMANN & REICHHARDT ISO :

Page 18: COMPANY PROFILE - wiedemann-middleeast.comwiedemann-middleeast.com/assets/cms/uploads/files/Company Profile... · COMPANY PROFILE WIEDEMANN Environment services Co. 6th Floor , Al-Anjari

17 | P a g e

WIEDEMANN & REICHHARDT Relationship with WIEDEMANNEnvironment Service Co. Official Statement :

Page 19: COMPANY PROFILE - wiedemann-middleeast.comwiedemann-middleeast.com/assets/cms/uploads/files/Company Profile... · COMPANY PROFILE WIEDEMANN Environment services Co. 6th Floor , Al-Anjari

18 | P a g e

Thank you for taking the time to go through this business profile.If there are any questions orcomments, please feel free to contact us.

WIEDEMANN ENVIRONMENT SERVICES Co.

ASPECT TOWER D,Flat 1702

Buisness Bay, Dubai UAE

P.O.Box 31261

WIEDEMANN ENVIRONMENT SERVICES Co.

6th Floor , Al-Anjari building

Ali Al-Salem Street, Kuwait City

Tel: +965 22490590

Fax: +965 22490599

Contact Support Engineer

Ehsan Ali

GSM :

Kuwait +965 66977925

UAE +971 552746910

Page 20: COMPANY PROFILE - wiedemann-middleeast.comwiedemann-middleeast.com/assets/cms/uploads/files/Company Profile... · COMPANY PROFILE WIEDEMANN Environment services Co. 6th Floor , Al-Anjari

19 | P a g e

REFERENCE PROJECTS

Page 21: COMPANY PROFILE - wiedemann-middleeast.comwiedemann-middleeast.com/assets/cms/uploads/files/Company Profile... · COMPANY PROFILE WIEDEMANN Environment services Co. 6th Floor , Al-Anjari

20 | P a g e

MIDDLE-EAST PROJECTS:

Design, Construction & Maintenance of an enterprise wide fiber optic data network inside livesewer lines at Abu Dhabi Island

Project No(G-5719)

Client: Abu Dhabi Water and Electricity Authority ADWEA

Project Concept: The concept of this project depend using sewerage network as duct toconnect ADWEA premises and stations together in one network.

Project Length : 485 Km of exisiting sewer lines from dia 150mm to 2000mm

Our Scope of Work:CCTV Pipeline Inspection for Cable route in the sewerageNetwork.Pipeline Cleaning by using full automatic water recycling system from dia 150mm to2000mm.

Our sister Company IGCS carried out the installation of Fiber Optic cable inside the live sewernetwork and we as wiedemann environment services were maintaining the whole sewer networkfor healthy installation of the fiber cable.

The Project was challenging as the Abu Dhbai Sewer network in year 2009 to 2011 wassurcharged as most of the lines were under rehabilitation works. We did through physical surveysfor the lines and prepared an effective schedule by switchng related pump stations to empty thelines to be in use for our scope.

After the installation of Fiber cable we maintain the lines and minimise the exisiting 100 blockagesper month to almost zero per month. Our cleaning methodology is effective for all sizes of sewerlines from 100mm to 2200mm. We also maintain and clean the pump station wel wells (inlet &outlet manoles), we have installed sewer equipmenets too (flowmeters, sensors so on.) for Abudhabi sewerage services.

During the above all process we were inspecting the lines by CCTV camera inspection to checkthe FOC installation and the sewer lines status. We have reported Abu Dhabi Sewerage servicesa major numbers of defects in existing sewer lines. Our CCTV inspection is high defnition andprovide a clear scan of all types of sewer pipes.

Page 22: COMPANY PROFILE - wiedemann-middleeast.comwiedemann-middleeast.com/assets/cms/uploads/files/Company Profile... · COMPANY PROFILE WIEDEMANN Environment services Co. 6th Floor , Al-Anjari

21 | P a g e

KUWAIT :

Cleaning Flushing & CCTV inspection Works for Interceptor line of Mishrif PumpingStationfrom MH#02 to MH04 at KUWAIT

Municipal Sector / Area : MISHRIF, Kuwait

Scope of Work : CCTV & Sewer jetting from Manhole #02 to #04 Sewer

Line Dia : 2000 mm

Total Line Length : 1.5 Km

Client : Ministry of Public Works Kuwait

Consultant : CH2M HILL

Main Contractor : KHARAFI International Co.

This project is one of our most challenging projects, where the cleint has requeted us to help inremoving hundreds tons of soft sand that was dumped into the mega sewer line to stop the flow dueto a major shutdown in the downstream pumping station. We had to send our crews 32 m deep inside90cm manholes to clear the problem. Our super3000 machine was used to jet and clean the 2200mmpipes with up to 250m manholes apart. Mobilization of our huge equipment in very short time andworking against extremely risky environment was a major chalenge.

Page 23: COMPANY PROFILE - wiedemann-middleeast.comwiedemann-middleeast.com/assets/cms/uploads/files/Company Profile... · COMPANY PROFILE WIEDEMANN Environment services Co. 6th Floor , Al-Anjari

22 | P a g e

QATAR :

Cleaning & CCTV inspection Works for Sewer & Surface ground water lines in Qatar.

Municipal Sector / Area : Doha, Qatar

Scope of Work : CCTV inspection & Cleaning of Sewer lines & Surfacegroud water lines

Line Dia : 100 to 2000 mm

Total Project Length : 430 Km + remeasureable

Client : ASHGHAL Qatar

Main Contractor : M/s Buzwair Engineering & Contracting Company.

Brief Scope of Work:

Travel to initial cleaning, site setting up, Sewer cleaning equipment and preparatory work:

clean the manhole and vacate site on completion of work

Preparation for CCTV survey (safety precautions, i.e.; Traffic Management, fixing & removing

stopper, etc.)

Opening Manholes.

Cleaning front side for job.

Cleaning sewer including removing all silt, sand, debris, stones, roots, timber and other

foreign materials to be disposed of at a site approved by the Engineer

Carry out special Panoramic CCTV survey in Sewer line and SGW lines. (gravity Lines and/or

none pressurized lines)

Carry out special Panoramic CCTV survey with job upon request and release related report as

per the request. (regardless of length of the job and size of the pipe and/or days of services)

Closing and cleaning the working area.

Page 24: COMPANY PROFILE - wiedemann-middleeast.comwiedemann-middleeast.com/assets/cms/uploads/files/Company Profile... · COMPANY PROFILE WIEDEMANN Environment services Co. 6th Floor , Al-Anjari

23 | P a g e

WORLDWIDE PROJECTS DONE BY OUR PARTNERS

WIEDEMANN & VERTRIEBS GmbH:

PDF FILE ATTACHED

Page 25: COMPANY PROFILE - wiedemann-middleeast.comwiedemann-middleeast.com/assets/cms/uploads/files/Company Profile... · COMPANY PROFILE WIEDEMANN Environment services Co. 6th Floor , Al-Anjari

24 | P a g e

BRIEF CLEANING METHODOLOGY :

SKETCH

1.1. Cleaning/flushing or sewer blockage removal should be done in equal intervals of 5 to 10Mtrsdistance or as illustrated below:

1.1.1. Drive the Jetting hose into the pipe upto 5 to 10Mtrs (depend on level of blockage) andwrench jetting hose back very slowly.

1.1.2. Jetting hose should not be wrenched backwards speedily as the water push createdby nozzle which carries the sludge/debris with it will be reduced which in turn reducescleaning efficiency by 50%.

1.1.3. Keep adding 5 to 10 Mtr distance more to previous distance cleaned after every driveand repeat the same procedure up to desired length or manhole to manhole distance.

1.1.4. The cleaning/flushing or blockage removal of any sewer line should be through onlybetween two manholes.

Page 26: COMPANY PROFILE - wiedemann-middleeast.comwiedemann-middleeast.com/assets/cms/uploads/files/Company Profile... · COMPANY PROFILE WIEDEMANN Environment services Co. 6th Floor , Al-Anjari

25 | P a g e

1.1.5. To collect non-suckable debris, a screen of same dia as of sewer pipe to be cleanedshould be placed at the downstream outlet of manhole in operation as shown illustratedin sketch-

1.1.6. While pulling the Hose back the heap of the slush gathered at screen in beneath ofthe manhole in operation should be removed or sucked out by means of Suction unitRefer picture below.

SKETCH

1.2. Avoid pushing the slush to next manhole through swear line as it is the key reason for poorcleaning which can lead to major blockages, damage the pumping mains or even cancollapse the sewer line.

1.3. Utmost safety precautions should be followed while inflating the stoppers. Proper ventilationshould be provided to avoid concentration of hazardous gases developed while disturbingsewer water during cleaning process.

1.4. If the sewer line contains hard solid debris, tree roots so on, rotating type nozzles should beused with standard jet pressure to avoid any line damage.

1.5. If the sewer lines are surcharged above 40% of line dia with sewer flow or have high remainsmore than 40% e.g remains of sand, mud, concrete reside etc. the following proceduresshould be followed:

1.5.1. Over pumping and by pass method should be adopted if the above mentionedsituation (2.10) is observed.

Page 27: COMPANY PROFILE - wiedemann-middleeast.comwiedemann-middleeast.com/assets/cms/uploads/files/Company Profile... · COMPANY PROFILE WIEDEMANN Environment services Co. 6th Floor , Al-Anjari

26 | P a g e

1.5.2. The simple method of bypassing as shown in sketch- below is followed as :

SKETCH C

1.5.3. Inflate the stopper inside the upstream manhole outlet to avoid waste water to flowthrough pipe to be cleaned and as mentioned in item 2.8.

1.5.4. Submerge the suction inlet hose of suction pump into the upstream manhole.

1.5.5. Extend the outlet hose as per desired pipe length to be cleaned and drain off thesewer water in the downstream manhole by skipping no. of manholes to be cleaned(maximum 2 in no.)

1.5.6. The same arrangement can be followed from upstream to downstream basis.

1.5.7. Do not use submergible pumps as it collects and blocks the manhole benching,disturbs the cleaning process & increase threats.

1.5.8. Start cleaning at MH#2 upstream and downstream, collect & suck all theremaining/debris at manhole benching at same interval and repeat the process at MH#3.

1.5.9. If the depth of manhole is more than 15 mtrs additional or isolated suction units shouldbe used at the process of cleaning.

1.5.10. The cleaning should be done is same pattern as explained in item 2.6

2. Advantages in using Waterrecycling system