Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 ....

71
Blackrod SAGD Pilot Project Athabasca Oil Sands Area Scheme Approval No. 11522E Annual Performance Presentation Alberta Energy Regulator December 9, 2013

Transcript of Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 ....

Page 1: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

Blackrod SAGD Pilot Project Athabasca Oil Sands Area Scheme Approval No. 11522E Annual Performance Presentation Alberta Energy Regulator

December 9, 2013

Page 2: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

Company Overview

2

Page 3: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

Corporate Profile

3

• VP Operations Chris Hogue

• VP Exploration Ed Sobel

• Area Manager Heath Williamson

• Project Geologist Ari Babaganov

• Exploitation Engineer Mike Carteri

Page 4: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

4

Subsurface Agenda

4

1. Background

2. Geology / Geoscience

3. Drilling & Completions

4. Artificial Lift

5. Well Instrumentation

6. Scheme Performance

Page 5: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

Blackrod Subsurface

5

1. Background

Page 6: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

Blackrod Subsurface

6

Approved Development Area as per ERCB Scheme Approval No. 11522E

BLACKPEARL OIL SANDS LEASE HOLDINGS

CORED WELLS

Well Pair 1 13-25-076-18W4

10-36-076-18W4 Well Pair 2

Page 7: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

Project Summary

7

• AER Scheme Approval No. 11522E

• Two(2) SAGD Pilot Well Pairs

• Portage area on Oil Sands Lease 7407060158

• Pilot site located in 02-36-076-18W4

• Target formation is the Lower Grand Rapids Unit 1 (L.GR1)

• Traditional SAGD recovery process

• BlackPearl is the 100% W.I. Owner

Page 8: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

Blackrod Pilot Site

8

Page 9: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

Traditional SAGD Process

9

Page 10: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

Project Milestones – 13-25 WP1

10

• Oct 2010 AER Scheme Approval No. 11522

• Dec 2010 Drill 13-25 WP1

• May 2011 Commission Pilot Facility

• Jun 2011 Commence Circulation Phase

• Sep 2011 Convert to SAGD Production Phase

• Apr 2012 Achieve Commercial Production Monthly Rate of 400 bbl/d

• Mar 2013 Perforate Producer Well

• Jun 2013 Achieve Peak Production Monthly Rate of 600 bbl/d

• Dec 2013 Produce 200,000 Cumulative Barrels

Page 11: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

Project Milestones – 10-36 WP2

11

• Feb 2012 AER Approval No. 11522C for 10-36 WP2 and facility expansion

• Feb 2013 Drill 10-36 WP2

• Oct 2013 Commission Phase 2 Pilot Facility Expansion

• Nov 2013 Commence Circulation Phase

• Q1 2014 Convert to SAGD Production Phase

Page 12: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

Blackrod Subsurface

12

2. Geology / Geoscience

Page 13: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

Original Bitumen in Place

13

• OBIPWP1 = A1 * h1 * So1 * Ø1 * Bo = (100 m * 800 m) * 22 m * 0.63 * 0.35 * 1.0 = 388,080 m3

• OBIPWP2 = A2 * h2 * So2 * Ø2 * Bo = (100 m * 1050 m) * 25 m * 0.63 * 0.34 * 1.0 = 562,275 m3

Where: OBIP = Original Bitumen In Place A = Drainage Area h = Thickness So = Oil Saturation Ø = Average Porosity Bo = Expansion Factor WP1= 1st Pilot Well Pair drilled at 13-25-076-18W4 WP2= 2nd Pilot Well Pair drilled at 10-36-076-18W4

Page 14: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

Net Pay Map

14

LOG CUTOFFS • Gamma Ray < 75 API • Resistivity > 20 Ohm.m • Porosity > 33%

Total L.GR1 SAGD Net Oil Pay

• Existing lease and access selected for Pilot surface location

• Bottom hole locations for both Pilot Well Pairs selected based on offsetting well control

Page 15: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

Structure Map

15

L.GR1 TOP L.GR1 BASE

Page 16: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

Type Log

16

LOG CUTOFFS • Gamma Ray < 75 API • Resistivity > 20 Ohm.m • Porosity > 33%

Page 17: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

Representative Core

17

100/15-25-076-18W4/00

304.0m

307.7m

307.7m

313.1m

CAPPING SHALE

L.GR1

L.GR1* Core Characteristics: • Oil saturation: 0.60 • Bitumen weight: 11% • Net pay thickness: 26 m • Porosity: 36% • Vertical permeability: 3024 mD • Horizontal permeability: 3450 mD • Kv/Kh: 0.88 • API Gravity: 9.8 (at 15.6 ᵒC)

L.GR2 L.GR3

* Based on 10 cores within Pilot Project Area

Page 18: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

Cross Section Through 10-36 WP2

18

• To maximize oil recoveries, 10-36 WP2 placed deeper and drilled longer than 13-25 WP1

Page 19: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

Seismic

19

W E

3D X-Line along 13-25 WP1 3D Seismic Area Coverage

Page 20: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

Primary Cap Rock

20

• MFS (Maximum Flooding Shale)

• Directly overlays Lower Grand Rapids formation

• Regionally extensive

• 3 m average thickness

• Mini Frac Analysis:

‒ Performed on the 13-25-076-18W4 OSE Core Hole

‒ Initial Breakdown Pressure = 8500 kPa

‒ Closure Pressure Gradient = 13.7 kPa/m

Page 21: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

MFS Cap Rock Isopach Map

21

Page 22: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

MFS Cap Rock Base Structure Map

22

Page 23: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

MFS Cap Rock Base Depth Map

23

Page 24: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

Secondary Cap Rock

24

• Joli Fou formation

• 45 m above Lower Grand Rapids formation

• Regionally extensive

• 20 m average thickness

• Mini Frac Analysis:

‒ Performed on the 01-36-076-18W4 OSE Core Hole

‒ Initial Breakdown Pressure = 12,750 kPa

‒ Closure Pressure Gradient Range = 19.4 kPa/m*

* As per AER approved Application No. 1741982

Page 25: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

Joli Fou Cap Rock Isopach Map

25

Page 26: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

Joli Fou Cap Rock Base Structure Map

26

Page 27: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

Joli Fou Cap Rock Base Depth Map

27

Page 28: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

Blackrod Subsurface

28

3. Drilling and Completions

Page 29: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

Blackrod Pilot Well Network

29

Page 30: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

13-25 WP1 – Injector

30

Page 31: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

13-25 WP1 – Producer (SAGD Phase)

31

Page 32: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

13-25 WP1 – Downhole Modifications

32

• Injector Well:

‒ No modifications

• Producer Well:

‒ Downhole modifications required due to climbing differential pressure and reduced inflow starting in Q3 2012

‒ Two (2) acid stimulations performed in Dec 2012 and Feb 2013 both with marginal and short-lived improvement

‒ Perf job completed in Mar 2013 with significant and lasting improvement

‒ New “Ultra Temp” ESP installed in Sep 2013

Page 33: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

10-36 WP2 – Injector

33

Page 34: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

10-36 WP2 – Producer (Circ. Phase)

34

Page 35: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

Blackrod Subsurface

35

4. Artificial Lift

Page 36: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

Electrical Submersible Pump

36

• Fluid production via high temperature Electrical Submersible Pump (ESP) on 13-25 WP1 and plans to run ESP on 10-36 WP2 following circ. phase

• ESP advantages:

‒ Operate and lift fluids at controlled downhole pressures

‒ Maintain continuous fluid production

• Variable Flow Drive (VFD) utilized to control pump speed and production rates

• No issues with previous or current ESP

Page 37: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

Blackrod Subsurface

37

5. Well Instrumentation

Page 38: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

13-25 WP1 – Instrumentation Overview

38

Page 39: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

13-25 WP1 – Obs Wells

39

• Toe Obs Well:

‒ 103/13-25-076-18W4

‒ 8.5 m North of WP1

‒ RTD gauges to monitor temperature above, below, and within L.GR1

‒ Evidence of steam chamber front detected in Mar 2012

• Heel Obs Well:

‒ 102/14-25-076-18W4

‒ 17.7 m South WP1

‒ RTD gauges to monitor temperature above, below, and within L.GR1

‒ P/T gauge to monitor pressure & temperature within L.GR3 aquifer

‒ Evidence of steam chamber front detected in Aug 2012

Page 40: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

10-36 WP2 – Instrumentation Overview

40

Page 41: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

10-36 WP2 – Obs Wells

41

• Toe Obs Well:

‒ 100/07-36-076-18W4

‒ 17.5 m West of WP2

‒ Thermocouples to monitor temperature above, below, and within L.GR1

‒ P/T gauge to monitor pressure & temperature within L.GR3 aquifer

• Heel Obs Well:

‒ 100/02-36-076-18W4

‒ 16.1 m East of WP2

‒ RTD gauges to monitor temperature above, below, and within L.GR1

‒ P/T gauge to monitor pressure & temperature within L.GR3 aquifer

Page 42: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

Groundwater Monitoring Wells

42

• 100/03-36-076-18W4 GWM:

‒ Directionally drilled from 14-25 lease

‒ PCP to sample/analyze non-saline L.GR3 H2O as per AENV requirements

‒ P/T gauge to monitor pressure & temperature within L.GR3 aquifer

• 100/14-25-076-18W4 GWM:

‒ Directionally drilled from 14-25 lease

‒ PCP to sample/analyze non-saline L.GR3 H2O as per AENV requirements

‒ P/T gauge to monitor pressure & temperature within L.GR3 aquifer

• 100/15-25-076-18W4 GWM:

‒ PCP to sample/analyze non-saline Viking H2O as per AENV requirements

‒ P/T gauge to monitor pressure & temperature within Viking aquifer

Page 43: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

Blackrod Subsurface

43

6. Scheme Performance

Page 44: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

13-25 WP1 Performance as of Oct 31, 2013

44

• Two (2) years of SAGD Production Phase

• Observation Wells indicate growing steam chamber

• Current performance is favourable and in line with internal simulated SAGD models

• Oil production currently averaging 55 m3/d

• Ongoing assessment of operating parameters to optimize crude bitumen recovery from the L.GR1 reservoir

Page 45: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

13-25 WP1 Oil Production as of Oct 31, 2013

45

• Cumulative Production = 30,500 m3

• Recovery = 7.8% of OBIP

• CSOR including Circ. Phase = 4.6

• CSOR during Prod. Phase only = 4.2

• ISOR = 3.6

• Average Rate during Prod. Phase = 39 m3/day

• Max Rate during Prod. Phase = 96 m3/day

Page 46: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

13-25 WP1 Steam Injection as of Oct 31, 2013

46

• Average Steam Chamber Pressure = 2650 kPa

• Average Surface Steam Temperature = 240 ᵒC

• Wellhead Steam Quality = 95 – 100%

• Instantaneous steam chamber pressures well below max steam chamber pressure of 3900 kPa*

• Operational flexibility required to optimize SAGD Pilot efficiencies and crude oil production

* As per AER approved Application No. 1741982

Page 47: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

13-25 WP1 Performance Plot

47

Page 48: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

10-36 WP2 Performance

48

• Circulation Phase commenced Nov 4, 2013

• AER will be kept notified of 10-36 WP2 progress

Page 49: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

49

Surface Operations Agenda

49

1. Facilities

2. Measurement & Reporting

3. Water Source

4. Disposal

5. Environmental

6. Compliance Statement

Page 50: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

Blackrod Surface Operations

50

1. Facilities

Page 51: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

Pilot Facility Overview

51

Page 52: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

Pilot Facility Plot Plan

52

Page 53: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

Pilot Facility Plot Plan (cont.)

53

Page 54: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

Pilot Facility Performance

54

• No issues with bitumen treatment, water treatment, or steam generation

• Pilot Facility downtime associated with scheduled shut-downs & Well Pair work-overs

• Generated steam, produced bitumen, produced water, and produced gas volumes reported to Petrinex

• Purchased gas volumes reported to Petrinex

• Flared gas volumes reported to AENV and Petrinex

• SO2 & Nox emissions and ambient air quality data submitted to AENV both monthly and annually as per terms of EPEA Approval 00264736-00-00

• GHG emissions reporting not required for Blackrod Pilot Facility as per terms of EPEA Approval 00264736-00-00

Page 55: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

Pilot Facility Modifications

55

• Phase 2 Pilot Facility Expansion* constructed in Q2/Q3 2013 and commissioned in Oct 2013

• Circulation Phase on 10-36 WP2 commenced on Nov 4, 2013 with no facility related issues

* As per AER approved Application No’s. 1718974, 1754889

Page 56: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

Blackrod Surface Operations

56

2. Measurement & Reporting

Page 57: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

Blackrod MARP

57

• BlackPearl remains compliant with AER Directive 017 as well as Directive 042 as per the terms of our approved MARP (Measurement, Accounting, and Reporting Plan)

• In Jul 2013, BlackPearl received AER Approval for a wholly new Blackrod Pilot MARP Application which incorporates the 10-36 Well Pair

• Annual MARP update to be submitted on Feb 28, 2014

Page 58: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

Process & Flow Diagram

58

Page 59: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

Process & Flow Diagram (cont.)

59

Page 60: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

Blackrod Surface Operations

60

3. Water Source

Page 61: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

Blackrod Water Source(s)

61

• 1F1/14-24-076-18W4 L.GR3 WSW:

‒ Non-saline (~3700 TDS)

‒ AENV Water Act Licence No. 00308617-00-01

‒ Approved for 350 m3/day

‒ Production volumes reported to AENV and Petrinex

‒ 100/14-24-076-18W4 monitoring well 20 m North of 1F1/14-24 WSW

‒ No issues with soft water treatment process

• 1F1/15-25-076-18W4 Grosmont Member D WSW

‒ Saline (~12,800 TDS)

‒ Supplemental softening equipment incorporated and commissioned in Q4, 2012

‒ No issues with supplemental saline water softening process

Page 62: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

Blackrod Surface Operations

62

4. Disposal

Page 63: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

Blackrod Disposal

63

• Produced Water:

‒ 100/02-25-076-18W4 Class 1b Disposal Well

‒ AER Scheme Approval No. 11703A

‒ Disposal into Grosmont Members B, A

‒ Maximum wellhead injection pressure of 6300 kPa

‒ This well continues to operate on vacuum with no pressure at the wellhead

‒ Disposal volumes reported to Petrinex

• Waste:

‒ Waste fluids (i.e. sewage, sludge, etc.) trucked out to third party disposal facilities

Page 64: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

Blackrod Disposal

64

Page 65: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

Blackrod Surface Operations

65

5. Environmental Issues

Page 66: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

Blackrod Environmental

66

• No environmental issues to date

• BlackPearl remains compliant with the terms of AENV Approval No. 264736-00-00:

‒ CPP (Caribou Protection Plan)

‒ Air Monitoring

‒ Groundwater Monitoring

‒ Soil Monitoring

‒ Etc.

Page 67: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

Blackrod Surface Operations

67

6. Compliance

Page 68: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

Blackrod Compliance

68

• To the best of BlackPearl’s knowledge, the Blackrod SAGD Pilot Project is currently in full compliance with all conditions and regulatory requirements related to AER Scheme Approval No. 11522E

Page 69: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

Blackrod Future Plans

69

1. SAGD Commercial Development

Page 70: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

SAGD Commercial Development

70

• 80,000 bbl/d (12,720 m3/d) to be developed in phases, with the first phase planned for 20,000 bbl/d; two additional phases of 30,000 bbl/d each to follow

• Commercial SAGD Application No. 1728831 submitted in Q2 2012 currently under AER review

• SIR2 Responses are currently under AER review

• BlackPearl is expecting that the Blackrod SAGD Commercial Project will receive AER approval in late Q1 2014

Page 71: Company Overview · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 . 13-25 WP1 – Obs ... • Commercial SAGD Application No. 1728831 submitted

Appendices

71

1. Pressure & Temperature Data • SAGD Producer Well • SAGD Injector Well • Heel & Toe Observation Wells