71
Blackrod SAGD Pilot Project Athabasca Oil Sands Area Scheme Approval No. 11522E Annual Performance Presentation Alberta Energy Regulator December 9, 2013

Transcript of Company Overvie · • Gamma Ray < 75 API • Resistivity > 20 ... Instrumentation Overview . 38 ....

Blackrod SAGD Pilot Project Athabasca Oil Sands Area Scheme Approval No. 11522E Annual Performance Presentation Alberta Energy Regulator

December 9, 2013

Company Overview

2

Corporate Profile

3

• VP Operations Chris Hogue

• VP Exploration Ed Sobel

• Area Manager Heath Williamson

• Project Geologist Ari Babaganov

• Exploitation Engineer Mike Carteri

4

Subsurface Agenda

4

1. Background

2. Geology / Geoscience

3. Drilling & Completions

4. Artificial Lift

5. Well Instrumentation

6. Scheme Performance

Blackrod Subsurface

5

1. Background

Blackrod Subsurface

6

Approved Development Area as per ERCB Scheme Approval No. 11522E

BLACKPEARL OIL SANDS LEASE HOLDINGS

CORED WELLS

Well Pair 1 13-25-076-18W4

10-36-076-18W4 Well Pair 2

Project Summary

7

• AER Scheme Approval No. 11522E

• Two(2) SAGD Pilot Well Pairs

• Portage area on Oil Sands Lease 7407060158

• Pilot site located in 02-36-076-18W4

• Target formation is the Lower Grand Rapids Unit 1 (L.GR1)

• Traditional SAGD recovery process

• BlackPearl is the 100% W.I. Owner

Blackrod Pilot Site

8

Traditional SAGD Process

9

Project Milestones – 13-25 WP1

10

• Oct 2010 AER Scheme Approval No. 11522

• Dec 2010 Drill 13-25 WP1

• May 2011 Commission Pilot Facility

• Jun 2011 Commence Circulation Phase

• Sep 2011 Convert to SAGD Production Phase

• Apr 2012 Achieve Commercial Production Monthly Rate of 400 bbl/d

• Mar 2013 Perforate Producer Well

• Jun 2013 Achieve Peak Production Monthly Rate of 600 bbl/d

• Dec 2013 Produce 200,000 Cumulative Barrels

Project Milestones – 10-36 WP2

11

• Feb 2012 AER Approval No. 11522C for 10-36 WP2 and facility expansion

• Feb 2013 Drill 10-36 WP2

• Oct 2013 Commission Phase 2 Pilot Facility Expansion

• Nov 2013 Commence Circulation Phase

• Q1 2014 Convert to SAGD Production Phase

Blackrod Subsurface

12

2. Geology / Geoscience

Original Bitumen in Place

13

• OBIPWP1 = A1 * h1 * So1 * Ø1 * Bo = (100 m * 800 m) * 22 m * 0.63 * 0.35 * 1.0 = 388,080 m3

• OBIPWP2 = A2 * h2 * So2 * Ø2 * Bo = (100 m * 1050 m) * 25 m * 0.63 * 0.34 * 1.0 = 562,275 m3

Where: OBIP = Original Bitumen In Place A = Drainage Area h = Thickness So = Oil Saturation Ø = Average Porosity Bo = Expansion Factor WP1= 1st Pilot Well Pair drilled at 13-25-076-18W4 WP2= 2nd Pilot Well Pair drilled at 10-36-076-18W4

Net Pay Map

14

LOG CUTOFFS • Gamma Ray < 75 API • Resistivity > 20 Ohm.m • Porosity > 33%

Total L.GR1 SAGD Net Oil Pay

• Existing lease and access selected for Pilot surface location

• Bottom hole locations for both Pilot Well Pairs selected based on offsetting well control

Structure Map

15

L.GR1 TOP L.GR1 BASE

Type Log

16

LOG CUTOFFS • Gamma Ray < 75 API • Resistivity > 20 Ohm.m • Porosity > 33%

Representative Core

17

100/15-25-076-18W4/00

304.0m

307.7m

307.7m

313.1m

CAPPING SHALE

L.GR1

L.GR1* Core Characteristics: • Oil saturation: 0.60 • Bitumen weight: 11% • Net pay thickness: 26 m • Porosity: 36% • Vertical permeability: 3024 mD • Horizontal permeability: 3450 mD • Kv/Kh: 0.88 • API Gravity: 9.8 (at 15.6 ᵒC)

L.GR2 L.GR3

* Based on 10 cores within Pilot Project Area

Cross Section Through 10-36 WP2

18

• To maximize oil recoveries, 10-36 WP2 placed deeper and drilled longer than 13-25 WP1

Seismic

19

W E

3D X-Line along 13-25 WP1 3D Seismic Area Coverage

Primary Cap Rock

20

• MFS (Maximum Flooding Shale)

• Directly overlays Lower Grand Rapids formation

• Regionally extensive

• 3 m average thickness

• Mini Frac Analysis:

‒ Performed on the 13-25-076-18W4 OSE Core Hole

‒ Initial Breakdown Pressure = 8500 kPa

‒ Closure Pressure Gradient = 13.7 kPa/m

MFS Cap Rock Isopach Map

21

MFS Cap Rock Base Structure Map

22

MFS Cap Rock Base Depth Map

23

Secondary Cap Rock

24

• Joli Fou formation

• 45 m above Lower Grand Rapids formation

• Regionally extensive

• 20 m average thickness

• Mini Frac Analysis:

‒ Performed on the 01-36-076-18W4 OSE Core Hole

‒ Initial Breakdown Pressure = 12,750 kPa

‒ Closure Pressure Gradient Range = 19.4 kPa/m*

* As per AER approved Application No. 1741982

Joli Fou Cap Rock Isopach Map

25

Joli Fou Cap Rock Base Structure Map

26

Joli Fou Cap Rock Base Depth Map

27

Blackrod Subsurface

28

3. Drilling and Completions

Blackrod Pilot Well Network

29

13-25 WP1 – Injector

30

13-25 WP1 – Producer (SAGD Phase)

31

13-25 WP1 – Downhole Modifications

32

• Injector Well:

‒ No modifications

• Producer Well:

‒ Downhole modifications required due to climbing differential pressure and reduced inflow starting in Q3 2012

‒ Two (2) acid stimulations performed in Dec 2012 and Feb 2013 both with marginal and short-lived improvement

‒ Perf job completed in Mar 2013 with significant and lasting improvement

‒ New “Ultra Temp” ESP installed in Sep 2013

10-36 WP2 – Injector

33

10-36 WP2 – Producer (Circ. Phase)

34

Blackrod Subsurface

35

4. Artificial Lift

Electrical Submersible Pump

36

• Fluid production via high temperature Electrical Submersible Pump (ESP) on 13-25 WP1 and plans to run ESP on 10-36 WP2 following circ. phase

• ESP advantages:

‒ Operate and lift fluids at controlled downhole pressures

‒ Maintain continuous fluid production

• Variable Flow Drive (VFD) utilized to control pump speed and production rates

• No issues with previous or current ESP

Blackrod Subsurface

37

5. Well Instrumentation

13-25 WP1 – Instrumentation Overview

38

13-25 WP1 – Obs Wells

39

• Toe Obs Well:

‒ 103/13-25-076-18W4

‒ 8.5 m North of WP1

‒ RTD gauges to monitor temperature above, below, and within L.GR1

‒ Evidence of steam chamber front detected in Mar 2012

• Heel Obs Well:

‒ 102/14-25-076-18W4

‒ 17.7 m South WP1

‒ RTD gauges to monitor temperature above, below, and within L.GR1

‒ P/T gauge to monitor pressure & temperature within L.GR3 aquifer

‒ Evidence of steam chamber front detected in Aug 2012

10-36 WP2 – Instrumentation Overview

40

10-36 WP2 – Obs Wells

41

• Toe Obs Well:

‒ 100/07-36-076-18W4

‒ 17.5 m West of WP2

‒ Thermocouples to monitor temperature above, below, and within L.GR1

‒ P/T gauge to monitor pressure & temperature within L.GR3 aquifer

• Heel Obs Well:

‒ 100/02-36-076-18W4

‒ 16.1 m East of WP2

‒ RTD gauges to monitor temperature above, below, and within L.GR1

‒ P/T gauge to monitor pressure & temperature within L.GR3 aquifer

Groundwater Monitoring Wells

42

• 100/03-36-076-18W4 GWM:

‒ Directionally drilled from 14-25 lease

‒ PCP to sample/analyze non-saline L.GR3 H2O as per AENV requirements

‒ P/T gauge to monitor pressure & temperature within L.GR3 aquifer

• 100/14-25-076-18W4 GWM:

‒ Directionally drilled from 14-25 lease

‒ PCP to sample/analyze non-saline L.GR3 H2O as per AENV requirements

‒ P/T gauge to monitor pressure & temperature within L.GR3 aquifer

• 100/15-25-076-18W4 GWM:

‒ PCP to sample/analyze non-saline Viking H2O as per AENV requirements

‒ P/T gauge to monitor pressure & temperature within Viking aquifer

Blackrod Subsurface

43

6. Scheme Performance

13-25 WP1 Performance as of Oct 31, 2013

44

• Two (2) years of SAGD Production Phase

• Observation Wells indicate growing steam chamber

• Current performance is favourable and in line with internal simulated SAGD models

• Oil production currently averaging 55 m3/d

• Ongoing assessment of operating parameters to optimize crude bitumen recovery from the L.GR1 reservoir

13-25 WP1 Oil Production as of Oct 31, 2013

45

• Cumulative Production = 30,500 m3

• Recovery = 7.8% of OBIP

• CSOR including Circ. Phase = 4.6

• CSOR during Prod. Phase only = 4.2

• ISOR = 3.6

• Average Rate during Prod. Phase = 39 m3/day

• Max Rate during Prod. Phase = 96 m3/day

13-25 WP1 Steam Injection as of Oct 31, 2013

46

• Average Steam Chamber Pressure = 2650 kPa

• Average Surface Steam Temperature = 240 ᵒC

• Wellhead Steam Quality = 95 – 100%

• Instantaneous steam chamber pressures well below max steam chamber pressure of 3900 kPa*

• Operational flexibility required to optimize SAGD Pilot efficiencies and crude oil production

* As per AER approved Application No. 1741982

13-25 WP1 Performance Plot

47

10-36 WP2 Performance

48

• Circulation Phase commenced Nov 4, 2013

• AER will be kept notified of 10-36 WP2 progress

49

Surface Operations Agenda

49

1. Facilities

2. Measurement & Reporting

3. Water Source

4. Disposal

5. Environmental

6. Compliance Statement

Blackrod Surface Operations

50

1. Facilities

Pilot Facility Overview

51

Pilot Facility Plot Plan

52

Pilot Facility Plot Plan (cont.)

53

Pilot Facility Performance

54

• No issues with bitumen treatment, water treatment, or steam generation

• Pilot Facility downtime associated with scheduled shut-downs & Well Pair work-overs

• Generated steam, produced bitumen, produced water, and produced gas volumes reported to Petrinex

• Purchased gas volumes reported to Petrinex

• Flared gas volumes reported to AENV and Petrinex

• SO2 & Nox emissions and ambient air quality data submitted to AENV both monthly and annually as per terms of EPEA Approval 00264736-00-00

• GHG emissions reporting not required for Blackrod Pilot Facility as per terms of EPEA Approval 00264736-00-00

Pilot Facility Modifications

55

• Phase 2 Pilot Facility Expansion* constructed in Q2/Q3 2013 and commissioned in Oct 2013

• Circulation Phase on 10-36 WP2 commenced on Nov 4, 2013 with no facility related issues

* As per AER approved Application No’s. 1718974, 1754889

Blackrod Surface Operations

56

2. Measurement & Reporting

Blackrod MARP

57

• BlackPearl remains compliant with AER Directive 017 as well as Directive 042 as per the terms of our approved MARP (Measurement, Accounting, and Reporting Plan)

• In Jul 2013, BlackPearl received AER Approval for a wholly new Blackrod Pilot MARP Application which incorporates the 10-36 Well Pair

• Annual MARP update to be submitted on Feb 28, 2014

Process & Flow Diagram

58

Process & Flow Diagram (cont.)

59

Blackrod Surface Operations

60

3. Water Source

Blackrod Water Source(s)

61

• 1F1/14-24-076-18W4 L.GR3 WSW:

‒ Non-saline (~3700 TDS)

‒ AENV Water Act Licence No. 00308617-00-01

‒ Approved for 350 m3/day

‒ Production volumes reported to AENV and Petrinex

‒ 100/14-24-076-18W4 monitoring well 20 m North of 1F1/14-24 WSW

‒ No issues with soft water treatment process

• 1F1/15-25-076-18W4 Grosmont Member D WSW

‒ Saline (~12,800 TDS)

‒ Supplemental softening equipment incorporated and commissioned in Q4, 2012

‒ No issues with supplemental saline water softening process

Blackrod Surface Operations

62

4. Disposal

Blackrod Disposal

63

• Produced Water:

‒ 100/02-25-076-18W4 Class 1b Disposal Well

‒ AER Scheme Approval No. 11703A

‒ Disposal into Grosmont Members B, A

‒ Maximum wellhead injection pressure of 6300 kPa

‒ This well continues to operate on vacuum with no pressure at the wellhead

‒ Disposal volumes reported to Petrinex

• Waste:

‒ Waste fluids (i.e. sewage, sludge, etc.) trucked out to third party disposal facilities

Blackrod Disposal

64

Blackrod Surface Operations

65

5. Environmental Issues

Blackrod Environmental

66

• No environmental issues to date

• BlackPearl remains compliant with the terms of AENV Approval No. 264736-00-00:

‒ CPP (Caribou Protection Plan)

‒ Air Monitoring

‒ Groundwater Monitoring

‒ Soil Monitoring

‒ Etc.

Blackrod Surface Operations

67

6. Compliance

Blackrod Compliance

68

• To the best of BlackPearl’s knowledge, the Blackrod SAGD Pilot Project is currently in full compliance with all conditions and regulatory requirements related to AER Scheme Approval No. 11522E

Blackrod Future Plans

69

1. SAGD Commercial Development

SAGD Commercial Development

70

• 80,000 bbl/d (12,720 m3/d) to be developed in phases, with the first phase planned for 20,000 bbl/d; two additional phases of 30,000 bbl/d each to follow

• Commercial SAGD Application No. 1728831 submitted in Q2 2012 currently under AER review

• SIR2 Responses are currently under AER review

• BlackPearl is expecting that the Blackrod SAGD Commercial Project will receive AER approval in late Q1 2014

Appendices

71

1. Pressure & Temperature Data • SAGD Producer Well • SAGD Injector Well • Heel & Toe Observation Wells