Gautrain Rapid Rail Link station platform TRAnSPoRTATIon SySTeMS COMMUTER SYSTEM Gautrain Rapid Rail Link SOUTH AFRICA Bombardier Transportation, as a member of the Bombela Consortium, provided the impressive 80 km rapid rail transit system that connects Johannesburg, Tshwane (Pretoria) and the OR Tambo International Airport in South Africa. In a contract awarded in 2006, Bombardier was responsible for the design and supply of the core electrical and mechanical systems, including a fleet of 96 BOMBARDIER* ELECTROSTAR* vehicles, and is now providing 15 years of maintenance services. The commuter system features the BOMBARDIER* CITYFLO* 250 train control technology, well proven on transportation systems in europe. The ELECTROSTAR vehicles, of which most underwent final assembly in South Africa, were designed for commuter operation and are capable of speeds of up to 160 km/h. The project was a Public Private Partnership, consisting of financing, designing, building and operations and maintenance of the Gautrain Rapid Rail Link.

Transcript of commuter SyStem - C.I.F.I

Page 1: commuter SyStem - C.I.F.I

Gautrain rapid rail Link station platform

TRAnSPoRTATIon SySTeMS

commuter SyStemGautrain Rapid Rail Link

© 2

014

, Bo

mb

ard

ier

Inc.

or

its

sub

sid

iari

es.

All

rig

hts

re

serv

ed

/114

59

/SY

S/1

2-2

014

/en

South AfricA

Bombardier transportation, as a member

of the Bombela consortium, provided the impressive 80 km rapid rail transit system

that connects Johannesburg, tshwane (Pretoria) and the or tambo

international Airport in South Africa.

In a contract awarded in 2006, Bombardier was

responsible for the design and supply of the core

electrical and mechanical systems, including a fleet of

96 BoMBarDIEr* ElEctrostar* vehicles, and is now

providing 15 years of maintenance services.

The commuter system features the BoMBarDIEr*

cItYFlo* 250 train control technology, well proven on

transportation systems in europe. The ElEctrostar

vehicles, of which most underwent final assembly in

South Africa, were designed for commuter operation

and are capable of speeds of up to 160 km/h.

The project was a Public Private Partnership, consisting

of financing, designing, building and operations and

maintenance of the Gautrain Rapid Rail Link.

Page 2: commuter SyStem - C.I.F.I

Project Schedulenotice to proceed (nTP) September 2006

Construction start September 2006

First vehicle delivery July 2008 (Derby)

December 2008 (on site)

Last vehicle delivery December 2010

In service June 2010

major SubsystemsVehicle ElEctrostar Electric

Multiple Unit

Signalling cItYFlo 250

Power supply 25 kV AC

Power collection overhead catenary

distribution system

(rigid conductor bar in tunnel)

Traction power substations 1 main substation and

5 auto paralleling transformer

substations

Communications Fibre-optic ring, SCADA, CCTV,

PA/PI, eTeL, PABX, Closed

Circuit Television (CCTV),

2 cameras per car, recording

to on-board system

System Description System type Intercity Rapid Rail Link

System length 80 km (dual track)

number of lines Two (one commuter service from

Hatfield-Pretoria to Johannesburg,

and one mixed commuter-airport

service from oR Tambo Airport

to Sandton)

Vehicle fleet 24 (4-car trains)

Train control cItYFlo 250 Signalling & ATP

System design capacity (@ year 15)

• Hatfield to Johannesburg 4,284 pphpd

• Rhodesfield to Sandton 2,757 pphpd

• Airport Service oR Tambo to Sandton 660 pphpd

Maximum grade 4%

Average line speed 160 km/h

Length underground tunnel 20 km

Length at grade 44 km

Length elevated 13 km

Intermodal connections Bus network

fixed facilitiesGuideway types Underground, at grade, elevated

Switches Mainline #12 and #18.5 with

moveable point depot #9 with

fixed point

number of stations 10

Average station spacing 8 km

Platform length 165 m

Station “accessibility” provisions Station elevators, ramps

Maintenance building location north of the intersection

between Midrand and Malboro

stations on the west side of the

alignment

Maintenance workshop building size 7001 m²

yard operation Manual with ATP protection

yard storage capacity Dual, electrified and shunter

3,774 mm

2,800 mm

Page 3: commuter SyStem - C.I.F.I

Vehicle DataType of vehicle ElEctrostar

Quantity ordered 96 vehicles

Train consist 4 vehicles

Dimensions and WeightTrain length (over body ends) 83,167 mm

overall width 2,800 mm

overall height (top of rail to top car) 3,774 mm

Top of rail to floor 1,148 mm

Doorway width (side doors) 1,300 mm

Doorway height (side doors) 1,900 mm

Floor to ceiling height 2,100 mm

Wheel diameter (new) 840 mm

Bogie wheelbase 2,600 mm

Train weight (tare) 177,700 kg

technical characteristicsPrimary power 25k Vac

Auxiliary power supply 400 Vac

Low-voltage power supply 110 Vdc

Propulsion traction Water cooled VVVF asynchronous

Service braking Friction disc brakes with blended

pneumatic and regenerative

braking

Carbody Semi-monocoque aluminium

Parking brakes Spring applied, air release park

brake units

Emergency brakes Pneumatic

Side windows Mechanically fixed double

glazed with hoppers for

emergency ventilation

Doors (per car) 2 pairs plug sliders, electrically

operated

Air-conditioning (per car) 2 roof mounted HVAC units

Performance and capacityMaximum acceleration rate (service) 1.0 m/s²

Maximum braking rate (service) 1.0 m/s²

Maximum braking rate (emergency) 1.3 m/s²

Maximum operating speed 160 km/h

Maximum passenger capacity

(a) Commuter trains

- seated 282

- total (seated and standing) 638

(b) Airport trains

- seated 240

- total (seated and standing) 590

21,593.5 mm

Page 4: commuter SyStem - C.I.F.I

© 2

014

, Bo

mb

ard

ier

Inc.

or

its

sub

sid

iari

es.

All

rig

hts

re

serv

ed

/114

59

/SY

S/1

2-2

014

/en

Project scopeIn addition to the manufacture and supply of

96 ElEctrostar vehicles, Bombardier, in conjunction

with its Broad Based Black Economic Empowerment

partners, has been responsible for:

• cItYFlo 250 automatic train control technology

• Power supply and distribution systems

• Communications systems

• Automatic fare collection

• Trackwork and maintenance equipment

• Project management

• Systems engineering and integration

• Testing and commissioning

• Workshop equipment

• Training and manuals

• 15 years of maintenance services

The Bombela Consortium shareholders comprise:

• Bombardier Transportation

• French civil contractor Bouygues Travaux Publics

• South African civil contractor Murray & Roberts

• J&J Group - South African broad-based investment

holding and management company

• Strategic Partners Group (SPG), which is a group of

several South African Broad Based Black Economic

Empowerment companies

The civil contractors were responsible for all of the civil

works, including tunnels, stations and the maintenance

depot. RATP Développement is responsible for providing

15 years of operations.

South AfricA

www.bombardier.com

Bombardier transportation

Schöneberger Ufer 1

10785 Berlin, Germany

Tel +49 30 98607 0

Fax +49 30 98607 2000

* Trademark(s) of Bombardier Inc. or its subsidiaries.

Hatfield

Rhodesfield

OR TamboInternationalAirport

Pretoria Station

Centurion

Midrand

Marlboro

Sandton

Rosebank

Park Station

TSHWANE

JOHANNESBURG

Depot