COMMUNITY BASED - PEP-NETbeneficiaries of health ... Mariculture Project (Bangus Production) 3....

33

Transcript of COMMUNITY BASED - PEP-NETbeneficiaries of health ... Mariculture Project (Bangus Production) 3....

COMMUNITY BASEDCOMMUNITY BASEDMONITORING SYSTEMMONITORING SYSTEM

SAN JULIAN, EASTERN SAMARSAN JULIAN, EASTERN SAMAR

SAN JULIAN MUNICIPAL SAN JULIAN MUNICIPAL MAPMAP

DEMOGRAPHYDEMOGRAPHY

8041804197579757117911792440244095695617961796285028501295412954TOTALTOTAL20320325125128286868181824247272313313LunangLunang

33733743043051511511516868123123129129638638San MiguelSan Miguel

81881899399312312326826810910921221229029013591359San IsidroSan Isidro

47547560560596961831837777139139163163848848PutongPutong

81081010021002129129257257919117317327627613511351PagbabangnaPagbabangnann

144514451717171718618640040015515529229252652622342234NenaNena

84184110041004129129219219828217917930630613081308LibasLibas

56556568368382821721727575145145216216931931CasoroyCasoroy

493493631631868618818857578989175175818818CampidhanCampidhan

14414418918927277272464678786262310310BunacanBunacan

41241249949968681181185252969615115166266266

2782783283283232565630305353888840440455

23523528328330307575772828818135835844

48648657457456561211215454959516216273373333

2752753133133131515119193636828237437422

2242242552552525414116163434717131331311

Members Members 15 15 y/oy/o

& & aboveabove

Members Members 10 10 y/oy/o

& & aboveabove

Members Members 1313--16 16 y/oy/o

Members Members 66--12 12 y/oy/o

Children Children 33--5 5 y/oy/o

Children Children 00--5 5 y/oy/o

HOUSEHOLDSHOUSEHOLDSPOPULATIONPOPULATIONBARANGAYBARANGAY

BY IMPLEMENTING BY IMPLEMENTING CBMSCBMS IN IN SAN JULIAN,EASTERN SAMAR, SAN JULIAN,EASTERN SAMAR, WE WERE ABLE TO:WE WERE ABLE TO:

Gather firstGather first--hand information for diagnosing hand information for diagnosing the extent of poverty in the areathe extent of poverty in the area

Determine Determine BarangayBarangay--specific or even specific or even householdhousehold--specific causes of povertyspecific causes of poverty

Design effective and efficient programs to Design effective and efficient programs to eradicate poverty among the constituentseradicate poverty among the constituents

Identify eligible beneficiariesIdentify eligible beneficiaries

Assess impact of policies and programsAssess impact of policies and programs

Strengthen mechanisms for the convergence Strengthen mechanisms for the convergence of poverty alleviation efforts at the of poverty alleviation efforts at the barangaybarangaylevel.level.

IDENTIFYINGIDENTIFYING SOCIAL NEEDS/CONCERN SOCIAL NEEDS/CONCERN OF EVERY HOUSEHOLDOF EVERY HOUSEHOLD

Thru CBMS we were able to:Thru CBMS we were able to:Know the concerns of our householdKnow the concerns of our householdFind out the aspects where they are mostly in need of Find out the aspects where they are mostly in need of assistance and problems or issues where they are so assistance and problems or issues where they are so pressedpressedImmerse to their personal lives, thus, coming out with Immerse to their personal lives, thus, coming out with the most specific concerns of our constituentsthe most specific concerns of our constituents

ACQUIRE EASY ACCESS TO INFORMATION ACQUIRE EASY ACCESS TO INFORMATION ON ECONOMIC, SOCIAL AND POLITICAL ON ECONOMIC, SOCIAL AND POLITICAL PROFILE OF THE BARANGAY.PROFILE OF THE BARANGAY.

Thru CBMS, we are already able to access Thru CBMS, we are already able to access information about our constituents, our information about our constituents, our respective barangay and our municipality as a respective barangay and our municipality as a whole.whole.

IDENTIFYING MEASURES AND PROVIDE A IDENTIFYING MEASURES AND PROVIDE A BASIS FOR POLICYBASIS FOR POLICY--MAKING, MAKING, IMPLEMENTATION AND REFORMSIMPLEMENTATION AND REFORMS

We already have an idea on how our people are We already have an idea on how our people are doing for a living and that how the government doing for a living and that how the government responds to them or take part with them. From responds to them or take part with them. From this light, the LGU can now determine the this light, the LGU can now determine the factors and the appropriate measures to respond factors and the appropriate measures to respond effectively for our people.effectively for our people.

DETERMINING THE TYPES OF DETERMINING THE TYPES OF INTERVENTIONS FOR THE PROGRESS INTERVENTIONS FOR THE PROGRESS AND IMPROVEMENT OF THE LIVES OF AND IMPROVEMENT OF THE LIVES OF THE POOR CONSTITUENTS AND THE THE POOR CONSTITUENTS AND THE LOCALITY AS A WHOLE.LOCALITY AS A WHOLE.

ENCOURAGE GREATER COMMUNITYENCOURAGE GREATER COMMUNITY--PARTICIPATION IN DIAGNOSING, PARTICIPATION IN DIAGNOSING, ADDRESSING AND MONITORING ADDRESSING AND MONITORING DEVELOPMENT CONCERNS OF THE DEVELOPMENT CONCERNS OF THE COMMUNITYCOMMUNITY

PROMOTE THE SPIRIT OF PROMOTE THE SPIRIT OF VOLUNTEERISM AMONG THE LOCAL VOLUNTEERISM AMONG THE LOCAL PEOPLEPEOPLE

DETAILS OFDETAILS OFUSE AND IMPLEMENTATIONUSE AND IMPLEMENTATION

RegularRegularprogram ofprogram ofDOH/LGUDOH/LGUMHSMHS

1. Integrated Health 1. Integrated Health ServicesServices

ProgramProgram1.1 Maternal Health care1.1 Maternal Health care1.2 Child Health care1.2 Child Health care•• EPIEPI•• GPGP1.3 General Medical 1.3 General Medical

ServicesServices1.4 Mothers Classes1.4 Mothers Classes1.5 Family Planning 1.5 Family Planning

ProgramProgram

1. 218 children 01. 218 children 0--5 5 years old or 12.14% years old or 12.14% of 1796 are of 1796 are malnourished.malnourished.

•• 175 or 9.74% are 175 or 9.74% are moderately moderately malnourished.malnourished.

•• 43 or 2.39% are 43 or 2.39% are severely severely malnourished.malnourished.

•• TOP BARANGAYS:TOP BARANGAYS:1. Bunacan 1. Bunacan –– 32 (41%)32 (41%)2. Putong 2. Putong –– 36 (25.9%)36 (25.9%)3. Libas 3. Libas –– 36 (20.1%)36 (20.1%)

A. HEALTH & A. HEALTH & NUTRITIONNUTRITION

REMARKSREMARKSINTERVENTIONSINTERVENTIONSISSUES/CONCERNSISSUES/CONCERNSINDICATORINDICATOR

Accredited onAccredited onDecember 2005December 2005

IncreasedIncreasedmembership bymembership by20072007((20972097 as of as of

today)today)

2. Supplemental Feeding 2. Supplemental Feeding Program at Barangay Program at Barangay Casoroy.Casoroy.

3. Deworming Program3. Deworming Program•• SchoolSchool--agedaged•• Below 6 yrs. OldBelow 6 yrs. Old

4. Operation Timbang4. Operation Timbang

5. Sentrong Sigla Plus and 5. Sentrong Sigla Plus and PHILHEALTH PHILHEALTH AccreditationAccreditation

6. Health Insurance 6. Health Insurance Program/ PHILHEALTHProgram/ PHILHEALTHTree for a Healthy Life Tree for a Healthy Life ProgramProgram

2.2. 499 or 22.18% out of 499 or 22.18% out of 2250 couples are 2250 couples are practicing family practicing family planning.planning.

3.3. Of the total 1151 Of the total 1151 households with children households with children 00--5 years old, 1.74% or 5 years old, 1.74% or 20 of them have received 20 of them have received supplemental feeding supplemental feeding program.program.

4. 1332 or 46.74% of the 4. 1332 or 46.74% of the total number of total number of households are households are beneficiaries of health beneficiaries of health assistance programs.assistance programs.

•• 877 or 30.77% are 877 or 30.77% are beneficiaries of beneficiaries of PhilHealth.PhilHealth.

REMARKSREMARKSINTERVENTIONSINTERVENTIONSISSUES/CONCERNSISSUES/CONCERNSINDICATORINDICATOR

LGU YearlyLGU Yearlybudget allocation budget allocation is not enough tois not enough tocater the needscater the needsof theof theCommunityCommunity/need additional /need additional fundingfunding

PCSO assistancePCSO assistanceLOGOFINDLOGOFINDLGU fundedLGU funded--dodo--

LGU fundedLGU funded

LGU FundedLGU Funded

7. Procurement of drugs and 7. Procurement of drugs and medicinesmedicines

8. 8. BarangayBarangay Health FacilitiesHealth FacilitiesImprovement ProgramImprovement Program

8.1 Construction of MHC at8.1 Construction of MHC atPoblacionPoblacion

8.2 Construction of BHS at8.2 Construction of BHS atBrgyBrgy. . NenaNena

8.3 Provision of medical 8.3 Provision of medical equipment, furniture & equipment, furniture & apparatuses at MHC & apparatuses at MHC & BHS at BHS at NenaNena

8.4 Construction of BHS at 8.4 Construction of BHS at San IsidroSan Isidro

8.5 Construction/Repair of 8.5 Construction/Repair of BHSBHS

•• PutongPutong, , CasoroyCasoroy, , PagbabangnanPagbabangnan, , CampidhanCampidhan, San Miguel, San Miguel

8.6. Establishment of 8 8.6. Establishment of 8 BotikaBotika ngng BarangayBarangay

REMARKSREMARKSINTERVENTIONSINTERVENTIONSISSUES/CONCERNSISSUES/CONCERNSINDICATORINDICATOR

Regular activityRegular activityof the RSIof the RSI

LGU fundedLGU funded

LGU/ProvinceLGU/Province

LGU FundLGU Fund

LGU & GTZLGU & GTZfunded/ 80funded/ 80families availedfamilies availedof the projectof the project

1. Potable Water Supply 1. Potable Water Supply SourceSource

DisinfectionDisinfection

2. Improvement/repair of all2. Improvement/repair of alllevel I level I WatterWatter SystemSystem

3. 3. OperationalizeOperationalize Level II Level II BrgyBrgy. No. 1 to 4. No. 1 to 4

3. Level III Water System 3. Level III Water System for the 6 for the 6 BaranaysBaranays under under PoblacionPoblacion

4. Construction of 80 4. Construction of 80 sanitary toiletssanitary toilets

1. 469 or 16.46% 1. 469 or 16.46% households without households without access to safe wateraccess to safe water

•• TOP BARANGAYSTOP BARANGAYS1.1. LunangLunang2.2. PagbabangnanPagbabangnan3.3. San IsidroSan Isidro4.4. San MiguelSan Miguel5.5. CasoroyCasoroy6.6. BarangayBarangay 5 5 ––

92.05%92.05%7.7. BarangayBarangay 4 4 ––

72.84%72.84%2. 2066 or 72.49% 2. 2066 or 72.49%

households without households without sanitary toiletssanitary toilets

•• TOP BARANGAYSTOP BARANGAYS1.1. BunacanBunacan –– 85.5%85.5%2.2. PutongPutong –– 45.4%45.4%3.3. San Isidro San Isidro –– 45.2%45.2%

B. WATER & B. WATER & SANITATIONSANITATION

REMARKSREMARKSINTERVENTIONSINTERVENTIONSISSUES/CONCERNSISSUES/CONCERNSINDICATORINDICATOR

1. Summer Jobs for Poor and1. Summer Jobs for Poor andDeserving StudentsDeserving Students

2. Improvement of Public 2. Improvement of Public MarketMarket

3. Establishment of Flea Market3. Establishment of Flea Market

4. Conduct of Agro fair4. Conduct of Agro fair

5. Insuring Production of farm5. Insuring Production of farmproducts through farmproducts through farmcooperator scheme.cooperator scheme.

1. 1800 OR 63.16% households 1. 1800 OR 63.16% households with income below poverty with income below poverty thresholdthreshold

TOP BARANGAYS:TOP BARANGAYS:•• Bunacan Bunacan –– 91.9%91.9%•• San Isidro San Isidro –– 83.8%83.8%•• San Miguel San Miguel –– 80.86%80.86%•• Campidhan Campidhan –– 72.6%72.6%•• Putong Putong –– 72.4%72.4%2. 1466 or 51.44% of the total 2. 1466 or 51.44% of the total

number of households with number of households with income below food thresholdincome below food threshold

TOP BARANGAYS:TOP BARANGAYS:•• Bunacan Bunacan –– 87.1%87.1%•• San Isidro San Isidro –– 77.2%77.2%•• San Miguel San Miguel –– 69%69%•• Campidhan Campidhan –– 59.4%59.4%•• Putong Putong –– 58.3%58.3%

C. INCOMEC. INCOME

INTERVENTIONSINTERVENTIONSISSUES/CONCERNSISSUES/CONCERNSINDICATORINDICATOR

6. Establishing a marketing6. Establishing a marketingarm of LGUarm of LGU

7. Jobs Fair (Local & Abroad)7. Jobs Fair (Local & Abroad)

3. 749 or 26.28% households 3. 749 or 26.28% households experience food shortageexperience food shortageTOP BARANGAYS:TOP BARANGAYS:••BunacanBunacan –– 80.6%80.6%••PagbabangnanPagbabangnan –– 49.3%49.3%••BarangayBarangay 1 1 –– 45.07%45.07%••San Isidro San Isidro –– 39%39%••LunangLunang –– 36.1%36.1%

4. 838 or 17.55% are 4. 838 or 17.55% are unemployedunemployed

INTERVENTIONSINTERVENTIONSISSUES/CONCERNSISSUES/CONCERNSINDICATORINDICATOR

LGU FundLGU Fund

Target of Zero Target of Zero Literacy by Literacy by 20102010

LGU & LGU & Barangay FundBarangay Fund

LGU Fund tieLGU Fund tie--up with DepEdup with DepEd

1. Conduct of Education 1. Conduct of Education Summit.Summit.

2. Creation of Education 2. Creation of Education Council.Council.

(Scholarship, (Scholarship, assistance)assistance)

3. Establishment of 12 3. Establishment of 12 Day Care Centers to Day Care Centers to 12 barangays12 barangays

•• Construction of Construction of buildingsbuildings

•• Provision of Personal Provision of Personal servicesservices

4. Literacy Program 4. Literacy Program through: through:

•• Basic LiteracyBasic Literacy•• Functional Literacy Functional Literacy

NonNon--Formal Formal EducationEducation

1. 524 OR 21.48% are not 1. 524 OR 21.48% are not attending elementaryattending elementary

2. 438 or 37.15% are not 2. 438 or 37.15% are not attending high schoolattending high school

3. 831 children aged 33. 831 children aged 3--5 5 years old are not in years old are not in Day CareDay Care

4. 934 are not literate4. 934 are not literateTOP BARANGAYS:TOP BARANGAYS:

BunacanBunacanLayogLayogSan MiguelSan MiguelPutong (Caruyagon & Putong (Caruyagon & Palo 1)Palo 1)

D. BASIC D. BASIC EDUCATION EDUCATION & LITERACY& LITERACY

REMARKSREMARKSINTERVENTIONSINTERVENTIONSISSUES/CONCERNSISSUES/CONCERNSINDICATORINDICATOR

LGU procured LGU procured almost 2 has. almost 2 has. LotLot

LGU FundLGU Fund

LGU FundLGU Fund

OngoingOngoing

OngoingOngoing

1. Comprehensive1. ComprehensiveSolid Waste Solid Waste Management programManagement program

•• Procurement of lot Procurement of lot for controlled dump for controlled dump sitesite

•• Establishment of Establishment of Controlled Dump Controlled Dump site & MRFsite & MRF

•• Procurement of Procurement of garbage truck & pay garbage truck & pay loaderloader

•• Adoption of Adoption of CMSWM CMSWM OrdinanceOrdinance

•• Formulation of Formulation of MSWM PlanMSWM Plan

1. No household or 1. No household or barangay is barangay is practicing waste practicing waste managementmanagement

E. OTHER LGU E. OTHER LGU SPECIFIC SPECIFIC INDICATORS: INDICATORS: ••Environmental Environmental ManagementManagement

REMARKSREMARKSINTERVENTIONSINTERVENTIONSISSUES/CONCERNSISSUES/CONCERNSINDICATORINDICATOR

LGU fundedLGU funded

LGU fundedLGU funded

LGU/DALGU/DA

LGU/DALGU/DA

LGU/DARLGU/DAR--ADB funded/on ADB funded/on goinggoing

1. Provision of assorted 1. Provision of assorted vegetable seeds vegetable seeds (Organize farmer 5HH (Organize farmer 5HH cooperator per cooperator per barangaybarangay))

2. Pest monitoring on 2. Pest monitoring on various crops andvarious crops andprocurement of procurement of pesticides and disease pesticides and disease controlcontrol

3. HYV Rice Seed 3. HYV Rice Seed ProductionProduction

4. Soft loan for hybrid4. Soft loan for hybridricerice

5. Rehab. of San Isidro5. Rehab. of San IsidroSan Miguel FMR & 1San Miguel FMR & 1span bridge (Organize 2span bridge (Organize 2Coops under DAR)Coops under DAR)

1. 1701 or 59.68% are 1. 1701 or 59.68% are farming householdsfarming households

2. 929 or 32.6% 2. 929 or 32.6% households are households are engaged in fishingengaged in fishing

E. OTHER LGU E. OTHER LGU SPECIFIC SPECIFIC INDICATORS: INDICATORS: ••LivelihoodLivelihood

REMARKSREMARKSINTERVENTIONSINTERVENTIONSISSUES/CONCERNSISSUES/CONCERNSINDICATORINDICATOR

LGU FundedLGU Funded

LGU FundedLGU Funded

LGU/ProvinceLGU/Province

LGU/DSWDLGU/DSWD

LGU FundedLGU Funded

LGU FundedLGU Funded

LGU FundedLGU Funded

1. 1. BantayBantay Dagat ProgramDagat Program

2. Establishment of 2. Establishment of MaricultureMariculture ProjectProject((BangusBangus Production)Production)

3. Organize 3. Organize fisherfolkfisherfolk(Crab Fattening)(Crab Fattening)

4. Organize 4. Organize FisherfolkFisherfolk

1. Animal & poultry 1. Animal & poultry disease surveillance & disease surveillance & control programcontrol program

2. Swine dispersal2. Swine dispersal

3. Native chicken 3. Native chicken dispersaldispersal

3. 1151 or 40.39% 3. 1151 or 40.39% households are households are engaged in poultry engaged in poultry or livestock raisingor livestock raising

4. 25 or 0.88% of 4. 25 or 0.88% of the total households the total households availed livelihood availed livelihood training programstraining programs

E. OTHER LGU E. OTHER LGU SPECIFIC SPECIFIC INDICATORS: INDICATORS: ••LivelihoodLivelihood

REMARKSREMARKSINTERVENTIONSINTERVENTIONSISSUES/CONCERNSISSUES/CONCERNSINDICATORINDICATOR

FINDINGS AND RECOMMENDATIONS FINDINGS AND RECOMMENDATIONS BASED ON CBMS USEBASED ON CBMS USE

PROBLEMS ENCOUNTEREDPROBLEMS ENCOUNTEREDAt present the CBMS program can no longer be At present the CBMS program can no longer be

open due to computer virus. LGU technical staff has open due to computer virus. LGU technical staff has no capability to restore the program.no capability to restore the program.

BEST PRACTICESBEST PRACTICESCBMS of San Julian thru Mayor George N. Erroba has CBMS of San Julian thru Mayor George N. Erroba has help a lot in advocating for the adoption of CBMS at the help a lot in advocating for the adoption of CBMS at the provincial and regional level by sharing the learning provincial and regional level by sharing the learning experience of San Julian CBMS implementation.experience of San Julian CBMS implementation.

Trained technical CBMS staffs of San Julian have Trained technical CBMS staffs of San Julian have been tapped as a resource persons in other LGUbeen tapped as a resource persons in other LGU’’s s during the training of enumerators on CBMS during the training of enumerators on CBMS Implementation in their areaImplementation in their area

APPLICATIONAPPLICATIONPreparation of Barangay & Municipal SocioPreparation of Barangay & Municipal Socio--Economic ProfileEconomic ProfileUpdating of Municipal Development Investment Updating of Municipal Development Investment PlanPlanResource MobilizationResource MobilizationPreparation of project proposal & feasibility Preparation of project proposal & feasibility studiesstudiesLocalizing the Millennium Development Goals Localizing the Millennium Development Goals (MDGS)(MDGS)

Mayor GEORGE N. ERROBAMayor GEORGE N. ERROBA

LGU of LGU of San Julian,San Julian,Eastern Eastern SamarSamar