BENE-CARE meeting, November 14, 2006
Collector work in Strasbourg
2 contributions :
• preparation of horn tests and definition of supplies and infrastructure
• study of target integration and cooling
local team : M. Dracos (group leader), F. Osswald* (technical coordinator) and collaborators : T. Adam, G. Gaudiot, T. Goeltzenlichter, M. Krauth, C. Ruescas, J. Schuler, J. Wurtz * spokesman
BENE-CARE meeting, November 14, 2006
horn, supplies and infrastructure
• SB-SPL (νFact)* horn model to be considered, CERN’s horn prototype can be used to start
• goals : fatigue tests of horn AND power supply at 50 Hz and progressive current up grade without beam. Numerical model validation in parallel for simulations and time&cost saving
• financing : LOI sent for FP7, 1.35 Meuros for target and collector costs, available 2009 ? (target R&D, horn, target integration i.e. BENE WP3 and 4)
* SuperBeam-Super Proton Linac for a neutrino factory
BENE-CARE meeting, November 14, 2006
SB-SPL horn (CERN’s Prototype)
BENE-CARE meeting, November 14, 2006
simulations
Comsol (ex Femlab) software evaluation :
compliance with the specific need of cross-disciplines = coupled PDE = multiphysics task of the EM horn submitted to electrical pulse, thermal and structural stresses temperature map for a simplified horn model
BENE-CARE meeting, November 14, 2006
then...
• fit model to experiment
• design a new horn : 2→10 GeV (tbc) proton incident energy, define combined stresses and requested beam cooling (no garanty with actual CERN prototype)
BENE-CARE meeting, November 14, 2006
pulsed power supply
• status : design a 2MW system delivering 300 kA, 100 μs long pulses @ 50 Hz, identification of suppliers, no call for tender but discussions to evaluate feasability, delivery delay and cost
• hybride and unique system composed of a capacitor charger, capacitive energy bank, pulsing system, electronic control, regulation interlocks and interfaces (connectors, bus bars, feedtroughs, impedance matching, protections)
BENE-CARE meeting, November 14, 2006
capacitor charger 1/3
• switch mode power supply composed of a
rectifier, a direct current link and a resonant circuit• main specifications (abstract) :
power 1.7 MW aver. / 3.4 MW peak, charging
current 500 A, energetic efficiency > 90 %, modular
system (10-40 racks) is recommanded but compact
charger (1-2 modules) not without interest, water
cooling (200 kW)
BENE-CARE meeting, November 14, 2006
capacitor charger 2/3
• miscellaneous :short and long term current and voltage stabilities (load andline voltage regulation, output voltage ripple, etc. ~ 0.1 %),charging time (≤ 19 ms), temperature coefficient < 0.02 %/°C,24 H/day operation, 200 days/year, 8 108 pulses, EMcompatibility, remote control
→ all these specs have a strong impact on cost, need to be confirmed with users !
BENE-CARE meeting, November 14, 2006
capacitor charger 3/3
cost < 500 k€ (with ER, specs dependent), delivery + testdelay ~ 1 year, but additional delay due to financing ! energy recovery option necessary due to electricity cost :80 €/MWh (~ 100 k€/month without ER) !In that case, 60 % initial voltage recovered, power and costreduced by a factor ~ 4, charging current 130 A, but higherpulsing system cost (150→500 k€) rental option, « system as it is », @ 1 kV (immediate andcheap) or up graded (delay) : 40 k€ + 10 k€ /year, Uni. ofGelsenkirchen (G)
BENE-CARE meeting, November 14, 2006
capacitive energy bank
• main specifications (abstract) : stored energy 35 kJ, charging voltage ± 7 kV,capacitance 1.5 mF, repetition rate 50 Hz,discharge current 15 kA RMS, operation time24H/day, life time > 104 H, low resistance-inductance value units, self-healing techno.• cost 100 k€, delivery delay 6 months+assembling&wiring
BENE-CARE meeting, November 14, 2006
pulsing system 1/2
• based on discharge solid state switches, mainly
thyristors, ABB contacted and R&D needed to
confirm the design of a 50 Hz system (ref. Power
electronics department, Lenzburg, CH)
• main specifications (abstract) :
300 kA to be switched at 50 Hz, 8 108 * 100 μs long
pulses, under 7 kV, low inductance system
BENE-CARE meeting, November 14, 2006
pulsing system 2/2
• Switching delay ~ 1 μs• di/dt ≥ 10 kA/μs• power constraints 300 kA, 4 MW, 1,5 MA².s• voltage on capacitor +/- 7 kV• endurance 50 p/s ≡ 4,3 106 p/day ≡ 1,3 108 p/month• optical triggering• water cooling ~ 10 kW• reliability of energy recovery option to be demonstrated• cost < 500 k€ (with energy recovery system)
BENE-CARE meeting, November 14, 2006
intermediate conclusion
• no major problem but R&D needed for pulsing system and feasibility demonstration @ 300 kA &
50 Hz → thyristors cooling & integration• pulsed power supply cost : < 1100 k€, tolerance
mainly due to thyristor R&D and charger specs• possible cost reduction : specs, international call for
tender, (energy recovery option, already included)• delivery delay ≤ 1 year but financing delay to
consider and R&D work → not too early to start now
BENE-CARE meeting, November 14, 2006
supplies and infrastructure 1/2
• set up infrastructure, cost estimation, andorganization of local team : 2 MW pulsedpower converter housing, electrical network,250 kW cooling and ventilation, safety,regulation, etc.
☻to be noticed : local scientific council(IPHC) agreement obtained last June
BENE-CARE meeting, November 14, 2006
suplies and infrastructure 2/2
• example of test area with supplies cran, etc.
• cost to up grade
the plant ~ 250 k€
• building to host a test bench @ Strasbourg
BENE-CARE meeting, November 14, 2006
target integration and cooling
goals :
•maintain the integrity of a solid target despite the heating / 2ndary particle energy deposition + Joule effect of pulsed current circulation in the horn
•integer the solid target into the horn
→ evaluate the feasibility of a BNL, CERN&IPHC experiment, adapt material and size of target and its container to the current intensity and the power
IPHC contributionto BNL&CERN experiment
BENE-CARE meeting, November 14, 2006
status
• preliminar specifications submitted by N. Simos (BNL) and I. Efthymiopoulos (CERN): limited items but broad range of test condition settings
• 1st order calculations and global dimensions set up, temporary options → to identify needs/studies and trigger discussions
BENE-CARE meeting, November 14, 2006
first specs (Nick’s)
•target material options : AlBeMet, IG-43, Gum metal
•test the target and container heat dissipation
•use helium and water as heat dissipators
•use DC currents to obtain the steady mean temperatures (target temp.
~ 1000 °C) and superpose pulsed currents to evaluate the dynamic effect
•define the dimensions of the target and container in order to reach the
test currents i.e. the dissipated powers ( ~ 100 kW ?)
•define secondary parameters as flow, pressure, temp. increase, etc.
•adapt the test bench to the CERN’s supplies
BENE-CARE meeting, November 14, 2006
target test bench
no use of electrical heater but direct heating through current feed to the target and its container to simulate beam and current heating of the inner conductor and target. Uniform heating, no exponential distribution/ energy deposition→ other alternative : charged particle or Laser heating ?
BENE-CARE meeting, November 14, 2006
first virtual prototype 1/2
the actual design is a compromise between target dimensions, materials, HV/high current design, and performances, in order to reduce cost of power distribution (electricity, bus bars, connectors)
BENE-CARE meeting, November 14, 2006
first virtual prototype 2/2
DC ampicity and 10’s kW heating
(tbc) lead to high resistivity materials,
long target (0.70 m, diam. 0.2 m) and
~ 10’s kA limited DC current (tbc)
BENE-CARE meeting, November 14, 2006
next step
actual missing data :
• fix the resistive power dissipated in the target
and its metallic container
•fix the acceptable temperature shifts
•define the interfaces / CERN’s equipments :
available power supply, distribution line,
helium circuitry, and connectors
BENE-CARE meeting, November 14, 2006
conclusion
goals can be achieved following preliminar schedule (see Marcos’ talk, BENE SG, July 2006)
design of Power Supply : 2006-2007horn R&D, tests and simulations : 2006-2008new horn prototype : 2009schedule of solid target test to be defined
... if financing and manpower available in time
BENE-CARE meeting, November 14, 2006
question time
BENE-CARE meeting, November 14, 2006
references
talks :
•BENE SG meeting at CERN, July 2006
•ISS meeting at Irvine, August 2006
papers :
•Study of particle production and capture for a neutrino factory, S. Gilardoni, CERN thesis, NuFact 141, July 2004 •Etude des faisceaux CNGS et identification des muons dans l’expérience OPERA. Optimisation de la ligne de faisceau du projet SPL-Fréjus, A. Cazes, Thèse LAL, December 2004•G. Graewer, Investigation of the possibility to build a 400 kA pulse current generator to drive a magnetic horn, NuFact 38, July 2000•IPHC test facility, F. Osswald & al., July 2006, to be published
BENE-CARE meeting, November 14, 2006
remaining horn issues
•multistress resistance
•reflector integration and test
•fatigue test
•radiologic hardness
•target integration
•power supply design and test
•energy recovery system
BENE-CARE meeting, November 14, 2006