Coastal Protection and Restoration Authority August 22, 2012 Deepwater Horizon.
-
Upload
ross-mason -
Category
Documents
-
view
213 -
download
0
Transcript of Coastal Protection and Restoration Authority August 22, 2012 Deepwater Horizon.
Lake Hermitage Marsh Creation
• Lake Hermitage Marsh Creation– 104 acres marsh– Dredging for
the CWPPRA portion has begun
Louisiana Oyster Cultch Project
• Oyster Cultch Placements– Spring 2012
• Hackberry Bay• Sister Lake
– Fall 2012• Lake Fortuna• South Black Bay
– Spring 2013 • 3-Mile Bay• Drum Bay
Louisiana Oyster Cultch Project - Hatchery
• Oyster Hatchery Facility– Expansion of existing
Louisiana Sea Grant Facility– At LDWF Marine Fisheries Lab
– Projected Timeline• Designer selected – Sept.
2012• Construction begins – Jan.
2013• Facility completion – Spring
2014
– Operations• Broodstock maintenance• Algal cultivation• Larvae production• Nursery system
Oyster Re-establishment Program (Louisiana Oyster Cultch Project)
Cheniere Ronquille Barrier Island Restoration
Lake Hermitage Additional Increment (NRDA Early Restoration Project)
Bay Side Segmented Breakwater at Grand Isle
Saltwater Hatchery West Grand Terre Beach Nourishment
Shell Island Restoration West Grand Terre Stabilization
Chandeleur Islands Restoration Barataria Basin Barrier Shoreline Restoration - Caminada Headland
Biloxi Marsh Shoreline Protection Caillou Lake
Grand Liard Marsh & Ridge Restoration
Coastal Restoration Projects“Louisiana Plan” Projects
Photo Credit: NOAA
Assessment Update
• Work plans continue to be developed and implemented to assess injuries to natural resources across the Gulf.
• Finalized work plans are available to the public:
http://losco-dwh.com
• Assessment will continue while Early Restoration planning is under way.
• Unilateral removal of segments from active response
• Lack of long-term and proactive oil patrol and removal
• Submerged oil
• Lack of opportunities for parish involvement
• Orphaned anchors
• Premature exit from response
Outstanding Response Issues