46 Westgate Structural Design
![Page 2: Ck21 presentation team 4](https://reader033.fdocuments.in/reader033/viewer/2022060116/557db9c5d8b42a11428b5182/html5/thumbnails/2.jpg)
46 Westgate RoadProject Introduction
Brief:
To design a new building tailored to the Arts, both visual and auditory. An exploration of vertical space must be incorporated.
Shedule of accommodation:
• Performance Space• Exhibition Space• Dressing Rooms• Studios• Cafe and Bar
![Page 3: Ck21 presentation team 4](https://reader033.fdocuments.in/reader033/viewer/2022060116/557db9c5d8b42a11428b5182/html5/thumbnails/3.jpg)
46 Westgate RoadSite Location
The proposed site is located at 46 Westgate Rd Newcastle upon Tyne NE1 1TSIt is a brownfield site situated between two buildings on the north side of the road.The site is 36m x 18m in size (648m sq)
![Page 4: Ck21 presentation team 4](https://reader033.fdocuments.in/reader033/viewer/2022060116/557db9c5d8b42a11428b5182/html5/thumbnails/4.jpg)
46 Westgate RoadSite Constraints
• Fronts onto busy Westgate road (one way system)• Buildings on either side• Windows on office building• Overlooked by residential accommodation to the North• Listed buildings and office area• Access for construction traffic to north (rear) or site.
![Page 5: Ck21 presentation team 4](https://reader033.fdocuments.in/reader033/viewer/2022060116/557db9c5d8b42a11428b5182/html5/thumbnails/5.jpg)
46 Westgate RoadSite Constraints
Rail noise Road Noise
![Page 6: Ck21 presentation team 4](https://reader033.fdocuments.in/reader033/viewer/2022060116/557db9c5d8b42a11428b5182/html5/thumbnails/6.jpg)
46 Westgate RoadLaser Scanning
• Paul Burrows from Leica GeoSystems visited to give a tutorial on to use the Leica P20 Laser Scanner.• Scans were taken from three different locations• Scans were registered in the office using Leica Cyclone software
![Page 7: Ck21 presentation team 4](https://reader033.fdocuments.in/reader033/viewer/2022060116/557db9c5d8b42a11428b5182/html5/thumbnails/7.jpg)
46 Westgate RoadPoint Cloud Data
• Three separate sets of point cloud data were synced together to form one set for the site and surrounding context• This data was imported into Revit where the point cloud was aligned to the existing city model• Once aligned the data could be used to accurately model the adjacent buildings to the site
![Page 8: Ck21 presentation team 4](https://reader033.fdocuments.in/reader033/viewer/2022060116/557db9c5d8b42a11428b5182/html5/thumbnails/8.jpg)
46 Westgate RoadPrecedent
![Page 9: Ck21 presentation team 4](https://reader033.fdocuments.in/reader033/viewer/2022060116/557db9c5d8b42a11428b5182/html5/thumbnails/9.jpg)
46 Westgate RoadDesign Development
Main approach perspective Sectional Perspective Suspended Staircase
![Page 10: Ck21 presentation team 4](https://reader033.fdocuments.in/reader033/viewer/2022060116/557db9c5d8b42a11428b5182/html5/thumbnails/10.jpg)
46 Westgate RoadDesign Development
Ground Floor Axonometric First Floor Axonometric
![Page 11: Ck21 presentation team 4](https://reader033.fdocuments.in/reader033/viewer/2022060116/557db9c5d8b42a11428b5182/html5/thumbnails/11.jpg)
46 Westgate RoadDesign Development
Exhibition Space with pitched glazed roof and sunscreen Cafe/Bar with exposed steel frame
![Page 12: Ck21 presentation team 4](https://reader033.fdocuments.in/reader033/viewer/2022060116/557db9c5d8b42a11428b5182/html5/thumbnails/12.jpg)
46 Westgate RoadSouth Elevation
![Page 13: Ck21 presentation team 4](https://reader033.fdocuments.in/reader033/viewer/2022060116/557db9c5d8b42a11428b5182/html5/thumbnails/13.jpg)
46 Westgate RoadNorth Elevation
![Page 14: Ck21 presentation team 4](https://reader033.fdocuments.in/reader033/viewer/2022060116/557db9c5d8b42a11428b5182/html5/thumbnails/14.jpg)
46 Westgate RoadBasement Plan
![Page 15: Ck21 presentation team 4](https://reader033.fdocuments.in/reader033/viewer/2022060116/557db9c5d8b42a11428b5182/html5/thumbnails/15.jpg)
46 Westgate RoadGround Floor Plan
![Page 16: Ck21 presentation team 4](https://reader033.fdocuments.in/reader033/viewer/2022060116/557db9c5d8b42a11428b5182/html5/thumbnails/16.jpg)
46 Westgate RoadFirst Floor Plan
![Page 17: Ck21 presentation team 4](https://reader033.fdocuments.in/reader033/viewer/2022060116/557db9c5d8b42a11428b5182/html5/thumbnails/17.jpg)
46 Westgate RoadSecond Floor Plan
![Page 18: Ck21 presentation team 4](https://reader033.fdocuments.in/reader033/viewer/2022060116/557db9c5d8b42a11428b5182/html5/thumbnails/18.jpg)
46 Westgate RoadRoof Plan
![Page 19: Ck21 presentation team 4](https://reader033.fdocuments.in/reader033/viewer/2022060116/557db9c5d8b42a11428b5182/html5/thumbnails/19.jpg)
46 Westgate RoadStructural Foundations
Displacement piles are driven into the site
![Page 20: Ck21 presentation team 4](https://reader033.fdocuments.in/reader033/viewer/2022060116/557db9c5d8b42a11428b5182/html5/thumbnails/20.jpg)
46 Westgate RoadBasement Construction
In Situ Concrete is poured to form basement floor slab and retaining walls
![Page 21: Ck21 presentation team 4](https://reader033.fdocuments.in/reader033/viewer/2022060116/557db9c5d8b42a11428b5182/html5/thumbnails/21.jpg)
46 Westgate RoadStructural Columns
203x203x46 universal steel columns are erected on the pile caps
![Page 22: Ck21 presentation team 4](https://reader033.fdocuments.in/reader033/viewer/2022060116/557db9c5d8b42a11428b5182/html5/thumbnails/22.jpg)
46 Westgate RoadStructural Beams
Universal Beams 533x210x82 are added to the columns
![Page 23: Ck21 presentation team 4](https://reader033.fdocuments.in/reader033/viewer/2022060116/557db9c5d8b42a11428b5182/html5/thumbnails/23.jpg)
Universal Beams 356x171x51 are added to the columns
46 Westgate RoadStructural Beams
![Page 24: Ck21 presentation team 4](https://reader033.fdocuments.in/reader033/viewer/2022060116/557db9c5d8b42a11428b5182/html5/thumbnails/24.jpg)
Universal Beams 254x146x31 are added to the columns
46 Westgate RoadStructural Beams
![Page 25: Ck21 presentation team 4](https://reader033.fdocuments.in/reader033/viewer/2022060116/557db9c5d8b42a11428b5182/html5/thumbnails/25.jpg)
Universal Beams 178x102x19 are added to the columns
46 Westgate RoadStructural Beams
![Page 26: Ck21 presentation team 4](https://reader033.fdocuments.in/reader033/viewer/2022060116/557db9c5d8b42a11428b5182/html5/thumbnails/26.jpg)
C channels 152x89 are added to the columns for the lift shafts
46 Westgate RoadStructural Beams
![Page 27: Ck21 presentation team 4](https://reader033.fdocuments.in/reader033/viewer/2022060116/557db9c5d8b42a11428b5182/html5/thumbnails/27.jpg)
Bracing is added to the structure to provide additional rigidity
46 Westgate RoadStructural Bracing
![Page 28: Ck21 presentation team 4](https://reader033.fdocuments.in/reader033/viewer/2022060116/557db9c5d8b42a11428b5182/html5/thumbnails/28.jpg)
Insitu concrete is poured to form protected fire stair well
46 Westgate RoadFire Shaft
![Page 29: Ck21 presentation team 4](https://reader033.fdocuments.in/reader033/viewer/2022060116/557db9c5d8b42a11428b5182/html5/thumbnails/29.jpg)
In Situ Concrete Floors are poured to finish the primary structure
46 Westgate RoadConcrete Floors
![Page 30: Ck21 presentation team 4](https://reader033.fdocuments.in/reader033/viewer/2022060116/557db9c5d8b42a11428b5182/html5/thumbnails/30.jpg)
46 Westgate RoadConstruction Access
![Page 31: Ck21 presentation team 4](https://reader033.fdocuments.in/reader033/viewer/2022060116/557db9c5d8b42a11428b5182/html5/thumbnails/31.jpg)
46 Westgate RoadNavisworks - Clash Detection
We ran a clash detection on Navisworks between the structural columns and the walls, doors and curtain walling. Several clashes occurred where the columns and beams meet the internal walls and the openings have not been modelled.