CITY OF PHOENIX REQUEST FOR QUALIFICATIONS PHOENIX ... · System programming, testing procedures,...
Transcript of CITY OF PHOENIX REQUEST FOR QUALIFICATIONS PHOENIX ... · System programming, testing procedures,...
![Page 1: CITY OF PHOENIX REQUEST FOR QUALIFICATIONS PHOENIX ... · System programming, testing procedures, operator training, system commissioning, system documentation, technical oversight](https://reader033.fdocuments.in/reader033/viewer/2022042017/5e75a058cdda886ba0239952/html5/thumbnails/1.jpg)
1
CITY OF PHOENIX
REQUEST FOR QUALIFICATIONS
PHOENIX CONVENTION CENTER
AUDIO VISUAL INFRASTRUCTURE REPLACEMENT
PROJECT
DESIGN-BUILD
PROJECT NO. CP10400026-1
January 9, 2017
Pre-Submittal Meeting
![Page 2: CITY OF PHOENIX REQUEST FOR QUALIFICATIONS PHOENIX ... · System programming, testing procedures, operator training, system commissioning, system documentation, technical oversight](https://reader033.fdocuments.in/reader033/viewer/2022042017/5e75a058cdda886ba0239952/html5/thumbnails/2.jpg)
2
Debra Russell, Contracts Specialist – Team Lead
Point of Contact for Submittals and RFB Questions
Office of the City Engineer [email protected] (602) 256-3444
Melissa McCann, Vertical Project Manager
Street Transportation Department
Larry Kraft, Facility Maintenance and Planning Manager
Phoenix Convention Center
J. Matt Bouchard, Production Services Manager
Phoenix Convention Center
Michael Montgomery, Project Manager
Phoenix Convention Center
Bill Brown, Production Coordinator
Phoenix Convention Center
Joanne McLaughlin, Business Relations Programs Assistant
Point of Contact for SBE Questions
Equal Opportunity Department [email protected] (602) 534-1279
Welcome and Introductions
![Page 3: CITY OF PHOENIX REQUEST FOR QUALIFICATIONS PHOENIX ... · System programming, testing procedures, operator training, system commissioning, system documentation, technical oversight](https://reader033.fdocuments.in/reader033/viewer/2022042017/5e75a058cdda886ba0239952/html5/thumbnails/3.jpg)
3
Sign-in please
Sign-in sheet and PowerPoint will be posted on
Procurement’s website:
http://phoenix.gov/streets/procurement/current-opportunities
Click on respective project, then click on:
■ Planholder List ■ RFQ ■ Addendum / Notifications (if applicable)
Please hold questions until Q&A period
This is the ONLY opportunity to discuss this project
with City staff
Meeting Overview
![Page 4: CITY OF PHOENIX REQUEST FOR QUALIFICATIONS PHOENIX ... · System programming, testing procedures, operator training, system commissioning, system documentation, technical oversight](https://reader033.fdocuments.in/reader033/viewer/2022042017/5e75a058cdda886ba0239952/html5/thumbnails/4.jpg)
4
What is Design-Build
SBE Program Requirements
Project Description and Scope of Work
Statement of Qualifications Evaluation Criteria
Submittal Requirements
Selection Process
Questions?
Agenda
![Page 5: CITY OF PHOENIX REQUEST FOR QUALIFICATIONS PHOENIX ... · System programming, testing procedures, operator training, system commissioning, system documentation, technical oversight](https://reader033.fdocuments.in/reader033/viewer/2022042017/5e75a058cdda886ba0239952/html5/thumbnails/5.jpg)
5
This Design-Build RFQ is a 1-Step Qualifications-
Based Selection Process based on the criteria in the
RFQ and an Interview Process
Not a Bid
Uses a single contract for Design and Construction
Advantages; Time savings, Team approach, common
goals and objectives, single responsibility
Design Fee is negotiated as fixed price or lump sum
What is Design-Build
![Page 6: CITY OF PHOENIX REQUEST FOR QUALIFICATIONS PHOENIX ... · System programming, testing procedures, operator training, system commissioning, system documentation, technical oversight](https://reader033.fdocuments.in/reader033/viewer/2022042017/5e75a058cdda886ba0239952/html5/thumbnails/6.jpg)
6
An SBE goal will be established during the Design Phase of
this project.
The City of Phoenix strives to advance the economic growth
of local businesses through its Small Business Enterprise
(SBE) Program.
Subject to City of Phoenix Code, Chapter 18, Article Vl,
pertaining to the participation of Small Business Enterprise
(SBE) firms.
Prime Contractor is required to meet or exceed the Required
SBE Goal.
Prime Contractor is required to demonstrate good faith
efforts to utilize certified SBE firms to achieve the SBE goal.
SBE Program
![Page 7: CITY OF PHOENIX REQUEST FOR QUALIFICATIONS PHOENIX ... · System programming, testing procedures, operator training, system commissioning, system documentation, technical oversight](https://reader033.fdocuments.in/reader033/viewer/2022042017/5e75a058cdda886ba0239952/html5/thumbnails/7.jpg)
NO SBE DOCUMENTS ARE DUE AT TIME
OF THIS SUBMITTAL
SBE Bid Submittal Requirements
![Page 8: CITY OF PHOENIX REQUEST FOR QUALIFICATIONS PHOENIX ... · System programming, testing procedures, operator training, system commissioning, system documentation, technical oversight](https://reader033.fdocuments.in/reader033/viewer/2022042017/5e75a058cdda886ba0239952/html5/thumbnails/8.jpg)
8
Eligible SBEs can be found at:
https://phoenix.diversitycompliance.com
Certified SBE Firms
![Page 9: CITY OF PHOENIX REQUEST FOR QUALIFICATIONS PHOENIX ... · System programming, testing procedures, operator training, system commissioning, system documentation, technical oversight](https://reader033.fdocuments.in/reader033/viewer/2022042017/5e75a058cdda886ba0239952/html5/thumbnails/9.jpg)
9
Equal Opportunity Department
For more information please contact:
Joanne McLaughlinBusiness Relations Programs Assistant
602-534-1279
![Page 10: CITY OF PHOENIX REQUEST FOR QUALIFICATIONS PHOENIX ... · System programming, testing procedures, operator training, system commissioning, system documentation, technical oversight](https://reader033.fdocuments.in/reader033/viewer/2022042017/5e75a058cdda886ba0239952/html5/thumbnails/10.jpg)
10
City of Phoenix is seeking a qualified Design-Build Team(DB Team) to provide 1-Step Design-Build services fordesign, permitting and construction for replacement ofAudio Visual (AV) infrastructure in Symphony Hall as wellas the North, West, and possibly the South Building.
Project site is generally located within the PhoenixConvention Center Complex centered at 100 N. ThirdStreet.
Estimated total cost for design and construction:
$4.3 million over 3 fiscal years
Project Summary
![Page 11: CITY OF PHOENIX REQUEST FOR QUALIFICATIONS PHOENIX ... · System programming, testing procedures, operator training, system commissioning, system documentation, technical oversight](https://reader033.fdocuments.in/reader033/viewer/2022042017/5e75a058cdda886ba0239952/html5/thumbnails/11.jpg)
11
Purpose of project is to assess, design, and replace the existing Audio Visual (AV) systems, Audio Visual (AV) control systems, and Audio Visual (AV) network systems with compatible leading edge technology that can be sustained and supported for a minimum of ten (10) years concurrent with maintaining an active Phoenix Convention Center and Venues environment.
During all phases of work (design and construction), the Convention Center Complex to remain in full operation and open at all times.
All design and construction to be in compliance with ANSI / InfoCOMM International Design and Construction Standards, as well in accordance with City of Phoenix MAG, state and federal codes and regulations.
Project will begin with existing equipment evaluation and assessment, planning and preliminary design, and cost estimating.
After preliminary phase, City of Phoenix will evaluate project and determine if it’s within the best interest of the City of Phoenix to proceed to final design and construction services.
Project Description
![Page 12: CITY OF PHOENIX REQUEST FOR QUALIFICATIONS PHOENIX ... · System programming, testing procedures, operator training, system commissioning, system documentation, technical oversight](https://reader033.fdocuments.in/reader033/viewer/2022042017/5e75a058cdda886ba0239952/html5/thumbnails/12.jpg)
12
Design-Build team will be responsible for all design andconstruction services for the Replacement Audio Visual(AV) Infrastructure for this project.
Design and/or construction elements include, but are notlimited to:
Design services for AV technology systems integration fromconcept to implementation complete with systems design,systems design options and alternatives;
Construction phase documentation, technical specifications,equipment lists, cost estimating;
System programming, testing procedures, operator training,system commissioning, system documentation, technicaloversight and;
Project management with milestone scheduling for the successfulinstallation of the upgraded Audio Visual (AV) systems.
Scope of Work
![Page 13: CITY OF PHOENIX REQUEST FOR QUALIFICATIONS PHOENIX ... · System programming, testing procedures, operator training, system commissioning, system documentation, technical oversight](https://reader033.fdocuments.in/reader033/viewer/2022042017/5e75a058cdda886ba0239952/html5/thumbnails/13.jpg)
13
Design services include a complete retrofit of new AudioVideo Lighting (AVL) systems into the existing PhoenixConvention Center Department (PCCD) infrastructure,which includes but is not limited to:
Equipment rooms, equipment racks;
electrical service, existing conduits and raceways;
existing IT infrastructure;
existing analog and digital audio visual (AV) wiring to all servicedareas;
speaker systems and other related areas with integratedtechnology systems.
Scope of Work
![Page 14: CITY OF PHOENIX REQUEST FOR QUALIFICATIONS PHOENIX ... · System programming, testing procedures, operator training, system commissioning, system documentation, technical oversight](https://reader033.fdocuments.in/reader033/viewer/2022042017/5e75a058cdda886ba0239952/html5/thumbnails/14.jpg)
14
Project Performance Dates include:
Design Phase complete by October 20, 2017 including Phase Iconstruction GMP.
Phase I construction complete by June 20, 2018 includingcommissioning, training, project close-out, and Phase II GMP.
Phase II construction complete by June 20, 2019 includingcommissioning, training and project close-out.
AVL systems required to be purchased, installed and operationalduring Phase I and Phase II construction without negatively impactingPhoenix Convention Center contracted event schedule.
DB Team expected to provide design and construction for completeproject requirements for replacement of PCC Audio Visual Systemsinfrastructure, and expected to stay within City’s estimated budget.
Overall project schedule not to exceed beyond June 20, 2019(inclusive of both design and construction phases).
Scope of Work
![Page 15: CITY OF PHOENIX REQUEST FOR QUALIFICATIONS PHOENIX ... · System programming, testing procedures, operator training, system commissioning, system documentation, technical oversight](https://reader033.fdocuments.in/reader033/viewer/2022042017/5e75a058cdda886ba0239952/html5/thumbnails/15.jpg)
15
DB Team will be responsible for design and constructionof complete project requirements for replacement of AVInfrastructure project including:
Supply of all materials, equipment, and labor forinstallation, acceptance testing, commissioning, andwarranty with record documents;
control costs and be responsible for project schedule;
may compete to self-perform certain work.
Design-Builder is required for self-performing a minimumof forty-five percent (45%) of the construction work asmeasured by total contract price for construction.
Scope of Work
![Page 16: CITY OF PHOENIX REQUEST FOR QUALIFICATIONS PHOENIX ... · System programming, testing procedures, operator training, system commissioning, system documentation, technical oversight](https://reader033.fdocuments.in/reader033/viewer/2022042017/5e75a058cdda886ba0239952/html5/thumbnails/16.jpg)
16
Convention Center
NORTH
BUILDING
SOUTH
BUILDING
WEST
BUILDING
SYMPHONY
HALL
N. 3
RD
S
TR
EE
T
N. 5
TH
S
TR
EE
T
N. 7
TH
S
TR
EE
T
N. 2
ND
S
TR
EE
T
N. 1
ST
S
TR
EE
T
MONROE STREET
WASHINGTON STREET
JEFFERSON STREET
CE
NT
RA
L A
VE
NU
E
N
![Page 17: CITY OF PHOENIX REQUEST FOR QUALIFICATIONS PHOENIX ... · System programming, testing procedures, operator training, system commissioning, system documentation, technical oversight](https://reader033.fdocuments.in/reader033/viewer/2022042017/5e75a058cdda886ba0239952/html5/thumbnails/17.jpg)
17
Convention Center
![Page 18: CITY OF PHOENIX REQUEST FOR QUALIFICATIONS PHOENIX ... · System programming, testing procedures, operator training, system commissioning, system documentation, technical oversight](https://reader033.fdocuments.in/reader033/viewer/2022042017/5e75a058cdda886ba0239952/html5/thumbnails/18.jpg)
2,312 Seat Venue
Symphony Hall
18
![Page 19: CITY OF PHOENIX REQUEST FOR QUALIFICATIONS PHOENIX ... · System programming, testing procedures, operator training, system commissioning, system documentation, technical oversight](https://reader033.fdocuments.in/reader033/viewer/2022042017/5e75a058cdda886ba0239952/html5/thumbnails/19.jpg)
19
North + West Buildings
Connected in the Lower Level Exhibit Hall and Via a Sky Bridge on the Upper Level.
2 Large Ballrooms
81 Meeting Rooms
502,500 SF of Exhibit Space.
![Page 20: CITY OF PHOENIX REQUEST FOR QUALIFICATIONS PHOENIX ... · System programming, testing procedures, operator training, system commissioning, system documentation, technical oversight](https://reader033.fdocuments.in/reader033/viewer/2022042017/5e75a058cdda886ba0239952/html5/thumbnails/20.jpg)
20
North + West Buildings
![Page 21: CITY OF PHOENIX REQUEST FOR QUALIFICATIONS PHOENIX ... · System programming, testing procedures, operator training, system commissioning, system documentation, technical oversight](https://reader033.fdocuments.in/reader033/viewer/2022042017/5e75a058cdda886ba0239952/html5/thumbnails/21.jpg)
21
North + West Buildings
![Page 22: CITY OF PHOENIX REQUEST FOR QUALIFICATIONS PHOENIX ... · System programming, testing procedures, operator training, system commissioning, system documentation, technical oversight](https://reader033.fdocuments.in/reader033/viewer/2022042017/5e75a058cdda886ba0239952/html5/thumbnails/22.jpg)
22
18 Meeting Rooms
28,000 SF Ballroom
2 Exhibit Halls - 82,000 SF Total
Total of 143,400 SF Event Space
South Building
![Page 23: CITY OF PHOENIX REQUEST FOR QUALIFICATIONS PHOENIX ... · System programming, testing procedures, operator training, system commissioning, system documentation, technical oversight](https://reader033.fdocuments.in/reader033/viewer/2022042017/5e75a058cdda886ba0239952/html5/thumbnails/23.jpg)
23
South Building
![Page 24: CITY OF PHOENIX REQUEST FOR QUALIFICATIONS PHOENIX ... · System programming, testing procedures, operator training, system commissioning, system documentation, technical oversight](https://reader033.fdocuments.in/reader033/viewer/2022042017/5e75a058cdda886ba0239952/html5/thumbnails/24.jpg)
24
A. General Information – 15 points
B. Experience and Qualifications of the Firm – 25 points
C. Experience of Key Personnel to be Assigned – 20 points
D. Approach to Performing the Required Services – 30 points
E. Overall Evaluation of the Firm and its Ability to Provide
the Required Services (no response is required, panel
evaluation) – 10 points
Provide responses in the order listed in Section IV of the RFQ
Be complete, be concise
Statement of Qualifications Criteria
![Page 25: CITY OF PHOENIX REQUEST FOR QUALIFICATIONS PHOENIX ... · System programming, testing procedures, operator training, system commissioning, system documentation, technical oversight](https://reader033.fdocuments.in/reader033/viewer/2022042017/5e75a058cdda886ba0239952/html5/thumbnails/25.jpg)
25
A. General Information – 15 points
B. Experience and Qualifications of the Team – 20 points
C. Experience of Key Personnel to be Assigned – 25 points
D. Approach to Performing the Required Services – 30 points
E. Overall Evaluation of the Firm and its Ability to Provide
the Required Services (no response is required, panel
evaluation) – 10 points
Provide responses in the order listed in Section IV of the RFQ
Be complete, be concise
Statement of Qualifications Criteria
![Page 26: CITY OF PHOENIX REQUEST FOR QUALIFICATIONS PHOENIX ... · System programming, testing procedures, operator training, system commissioning, system documentation, technical oversight](https://reader033.fdocuments.in/reader033/viewer/2022042017/5e75a058cdda886ba0239952/html5/thumbnails/26.jpg)
26
Cover Letter – 1 page, company name, address and contact
information (include email)
Evaluation Criteria, including project organizational chart
Additional Content, may include resumes or other information
Bonding Statement will not be counted towards the maximum
pages permitted
MAXIMUM pages permitted is 12 pages:
+ Evaluation Criteria (including organizational chart)
+ Additional Content (resumes or other information)
+ Photos, charts / graphs or other evaluation content
= 12 MAXIMUM pages permitted
Submittal Requirements
![Page 27: CITY OF PHOENIX REQUEST FOR QUALIFICATIONS PHOENIX ... · System programming, testing procedures, operator training, system commissioning, system documentation, technical oversight](https://reader033.fdocuments.in/reader033/viewer/2022042017/5e75a058cdda886ba0239952/html5/thumbnails/27.jpg)
27
Each page side with criteria information will be counted
Pages that have photos, charts, and graphs will be counted toward maximum number of pages
Cover letter, Front and back covers, Table of Contents, and tab dividers will NOT be counted toward the maximum page limit, UNLESS they include information that may be considered by the selection panel
Submittal Requirements (continued)
![Page 28: CITY OF PHOENIX REQUEST FOR QUALIFICATIONS PHOENIX ... · System programming, testing procedures, operator training, system commissioning, system documentation, technical oversight](https://reader033.fdocuments.in/reader033/viewer/2022042017/5e75a058cdda886ba0239952/html5/thumbnails/28.jpg)
28
Submit 8 copies of the SOQ.
SOQ due: 12:00 P.M. Noon – Arizona local time
Friday, January 20, 2017
Phoenix City Hall
200 West Washington Street, 6th Floor
6th Floor Submittal Box
Include firm name and procurement title on submittal
envelope
Submittal Requirements (continued)
![Page 29: CITY OF PHOENIX REQUEST FOR QUALIFICATIONS PHOENIX ... · System programming, testing procedures, operator training, system commissioning, system documentation, technical oversight](https://reader033.fdocuments.in/reader033/viewer/2022042017/5e75a058cdda886ba0239952/html5/thumbnails/29.jpg)
29
Receipt of SOQ after the specified cut-off date and time
Too few copies of the submittal
Deposit of SOQ in the wrong location
Violating the “Contact with City Employees” policy
Failure to provide Bonding Statement
Grounds for Disqualifications
![Page 30: CITY OF PHOENIX REQUEST FOR QUALIFICATIONS PHOENIX ... · System programming, testing procedures, operator training, system commissioning, system documentation, technical oversight](https://reader033.fdocuments.in/reader033/viewer/2022042017/5e75a058cdda886ba0239952/html5/thumbnails/30.jpg)
30
Each SOQ will be evaluated according to the evaluation
criteria in the RFQ.
Interviews will be conducted following SOQ evaluations.
One Design-Build team will be selected.
A contract will be executed upon completion of
negotiations of contract terms and City Council approval.
Selection Process
![Page 31: CITY OF PHOENIX REQUEST FOR QUALIFICATIONS PHOENIX ... · System programming, testing procedures, operator training, system commissioning, system documentation, technical oversight](https://reader033.fdocuments.in/reader033/viewer/2022042017/5e75a058cdda886ba0239952/html5/thumbnails/31.jpg)
31
Friday, January 20, 2017
12:00 P.M. Noon, Arizona local time
City Hall, 200 W. Washington Street
6th Floor, Submittal Box
SOQ Due Date
![Page 32: CITY OF PHOENIX REQUEST FOR QUALIFICATIONS PHOENIX ... · System programming, testing procedures, operator training, system commissioning, system documentation, technical oversight](https://reader033.fdocuments.in/reader033/viewer/2022042017/5e75a058cdda886ba0239952/html5/thumbnails/32.jpg)
32
https://www.phoenix.gov/streets/procurement/current-opportunities
Notifications / Addendum (if any)
Plan Holder List
Award
Pre-submittal Power Point Presentation
Pre-submittal Sign-in sheet
Request for Qualifications
Street Transportation Department
Procurement Section WEBPAGE
![Page 33: CITY OF PHOENIX REQUEST FOR QUALIFICATIONS PHOENIX ... · System programming, testing procedures, operator training, system commissioning, system documentation, technical oversight](https://reader033.fdocuments.in/reader033/viewer/2022042017/5e75a058cdda886ba0239952/html5/thumbnails/33.jpg)
33
E-mail your questions to:
Debra Russell
Contract Specialist – Team Lead
(602) 256-3444
OPEN FOR QUESTIONS
&
Thank You for Attending!!!
Questions After Today