Petronas Project Oversight and Corporate Governance System Requirements

10
Current Practice Study Project Culture Project Standards System Requirement Study On site and Remote Assistance Local SME Representation End to End PETRONAS PROJECT GOVERNANCE REQUIREMENTS 1 Petronas requires a System Integrator dealing with various projects and armed with the latest technologies that can compliment most of the existing systems out in the market. ENGAGE ANALYSE DESIGN DEVELOP DEPLOY SUPPORT Stakeholders Identify Enterprise needs Suit Clients Requirements Customizable Simulation & Pilot Phase Gap Analysis Flexible Best Practice GOVERNANCE MONITORING COMMISSIONING Client Customization Network Architecture On-Site Training

Transcript of Petronas Project Oversight and Corporate Governance System Requirements

Current Practice Study • Project Culture • Project Standards

System Requirement Study

On site and Remote Assistance Local SME Representation End to End

PETRONAS PROJECT GOVERNANCE REQUIREMENTS

1

Petronas requires a System Integrator dealing with various projects and armed with the latest technologies that can compliment most of the existing systems out in the market.

ENGAGE

ANALYSE

DESIGN

DEVELOP

DEPLOY

SUPPORT

Stakeholders Identify Enterprise needs

Suit Clients Requirements Customizable

Simulation & Pilot Phase

Gap Analysis

Flexible Best Practice

GOVERNANCE MONITORING COMMISSIONING

Client Customization Network

Architecture On-Site Training

2

SUPPORT & GUIDE

REVIEW & BENCHMARK

STANDARDIZE

PLAN

IMPLEMENT

PARADIGM SHIFT APPROACH

Level 2: DATA ANALYSIS

LEVEL 1: OVERSIGHT & MONITORING

LEVEL 3 REPORTING

LEVEL 4 SCHEDULE & TASK MANAGEMENT

LEVEL 5 ON-SITE JOB COMPLETION

TRADITIONAL APPROACH

TRANSFORMATIONAL SHIFT

3

PRODUCT

SUITE

Safety Risk Management System

(SRMS)

Operability Development Management

System (ODMS)

Labour, Equipment & Materials

Management System (LEMS)

Project Governance

Management System

Single access point and database for all information ensuring standardization and consistency.

MASTER ASSET & TAG

MANAGER

Manage through standards and naming convention, approval, revocation, workflows and a structured MOC tailored to the Enterprise Client.

Assign and track the completion of preservation tasks simply by providing information on the equipment, tools and consumables.

ASSET PRESERVATION & WARRANTY

Identify steps, resources, tools and documents required to perform any job. Develop and maintain job and task libraries for both asset and work activities.

STANDARD JOB & TASK MODELLING

Manage project involvement, purchasing information and track scheduling for Vendors, Suppliers and Manufacturers.

RESOURCE MANAGER

MOC oversees the assigning, tracking, reporting and approval of action items required to implement changes in highly regulated industrial environments.

MANAGEMENT OF CHANGE

(MOC)

5 Product Suites

The System is a comprehensive enterprise level cloud software suite that enables an industrial enterprise to report and oversee multi-discipline

tasks being performed in real-time globally.

DOCUMENT & DRAWING

CORE MODULE

Commissioning & Completions Management

System (CCMS)

Core Modules

PROJECT GOVERNANCE SYSTEM REQUIREMENT

LEVEL 1 – DASHBOARDS & BUSINESS REPORTS

With Project Governance Management System (PGMS), it is simple.

View the right information, from the right groups, at the right time. Binding the entire suite of applications, comprising of the Completion & Commissioning (CCMS), Safety Risk (SRMS), Operability Development (ODMS) and Labour, Equipment & Material (LEMS) Management Systems. PGMS allows management to roll up Level 5 data for any phase or discipline of a project. Everything that is needed by the management team to plan, estimate, execute and control project outcomes are visible via:

Project Summary Dashboards

Project Performance Reporting

Real-time Data Report

Alerts & Intervention

Location Alerts

4

Business Unit / Projects Lifecycle Dashboard Monthly Executive Reports

Analysis Reports

LEVEL 1 – DASHBOARDS DESIGN

5

LEVEL 1 – ALERTS & INTERVENTION

6

User is able to drill down the information of each project by clicking on the alerts.

Under Control

Warning

Needs intervention

Performance Summaries Report Publication and Review

Phase Readiness Reviews / EVM Analysis Project Reviews & Definition Rating

Reports

LEVEL 2 – ARTIFICIAL INTELLIGENCE

Data analysis

7

Consolidated reporting Trending & Forecasting

LEVEL 3 – DATA ENTRY & REPORTING

Easy data-entry

8

Customized Reporting Customized Workflows and Approvals

WBS Setup Risks / Issues / Lessons Learned Collaboration – Contracts / RFIs

Management of Change Procurement Estimating & Costing

KEY TAKE-AWAYS

The System Integrator will enable Petronas to :

Gain ownership and control of all project information

Have stringent management and full auditable governance process

Track responsibilities and accountabilities of project’s stakeholders

Detailed and reliable data from top to bottom

9

PROJECT GOVERNANCE FRAMEWORK

10