Citizens Information MeetingKirby Road Sidewalks
Chesterbrook Elementary School to Halsey Road &Halsey Road to Franklin Avenue
Preliminary Design
November 9, 2016Fairfax County
Dranesville District
County of Fairfax, Virginia
3Department of Transportation
Contacts• Supervisor Foust’s Office• Fairfax County Department of Transportation
(FCDOT)– Transportation Design (TDD)– Capital Projects (CPTED)
• Fairfax County Department of Public Works & Environmental Services (DPWES)– Construction (UDCD)– Land Acquisition (LAD)
• Design Consultant (WRA)
County of Fairfax, Virginia
4
Meeting Agenda• Context and Background• Summary of Preliminary Design Options• Schedule• Q & A• “Open House”
Department of Transportation
County of Fairfax, Virginia
5
Context• County’s 2012 Dialogue on Transportation• Included in 2014 Bond Issue
Department of Transportation
County of Fairfax, Virginia
6Department of Transportation
N
Project Limits
Limits of New Sidewalk
Kirby RoadHalsey Road
Franklin Ave
County of Fairfax, Virginia
7
Existing Conditions
Existing Crosswalk at Chesterbrook Elementary School
Department of Transportation
County of Fairfax, Virginia
8
Existing Conditions
Looking west towards Halsey Road
Department of Transportation
County of Fairfax, Virginia
9
Existing Conditions
Looking west towards Franklin Avenue
Department of Transportation
County of Fairfax, Virginia
10
Existing Conditions
Crosswalk at Franklin Avenue
Department of Transportation
County of Fairfax, Virginia
11
Improvements Will Include• New Concrete Curb & Gutter on Existing Edge of
Pavement• New 5’-6’ Wide Sidewalk and
Curb Ramps• New Concrete Driveway Entrances• New Storm Drain Inlets and Pipes• New Road Pavement and Striping• Design to VDOT Criteria
Department of Transportation
County of Fairfax, Virginia
12
Potential Impacts• Relocation or upgrade of existing utilities
(underground and/or overhead)• Tree Impacts
– In right-of-way and on private property
• Fences • Grading back slopes
Department of Transportation
County of Fairfax, Virginia
13
Sidewalk Options – ‘Alternative 1’• 5’ Sidewalk, 4’ Buffer & 6’ Sidewalk (No Buffer) –
Requires VDOT Waiver
Department of Transportation
NEW CURB & GUTTER
4’ GRASS BUFFER STRIP
NEW 5’ WIDE SIDEWALK
County of Fairfax, Virginia
14
Sidewalk Options – ‘Alternative 1’• 5’ Sidewalk, 4’ Buffer & 6’ Sidewalk (No Buffer) –
Requires VDOT Waiver
Department of Transportation
NEW CURB & GUTTER
NEW 6’ WIDE SIDEWALK
County of Fairfax, Virginia
15
Sidewalk Options – ‘Alternative 1’• 5’ Sidewalk, 4’ Buffer & 6’ Sidewalk (No Buffer) –
Requires VDOT Waiver
Department of Transportation
SIDEWALKCURB RAMPDRIVEWAY REPLACEMENTLIMITS OF DISTRUBANCEGRADING/CONSTRUCTION EASEMENTPROPOSED RIGHT OF WAYDRAINAGE EASEMENTPROPOSED TREE REMOVAL X
County of Fairfax, Virginia
16
Sidewalk Options – ‘Alternative 2’• 5’ Sidewalk, 4’ Buffer – VDOT Standard
Department of Transportation
NEW CURB & GUTTER
4’ GRASS BUFFER STRIP
NEW 5’ WIDE SIDEWALK
County of Fairfax, Virginia
17
Sidewalk Options – ‘Alternative 2’• 5’ Sidewalk, 4’ Buffer – VDOT Standard
Department of Transportation
SIDEWALKCURB RAMPDRIVEWAY REPLACEMENTLIMITS OF DISTRUBANCEGRADING/CONSTRUCTION EASEMENTPROPOSED RIGHT OF WAYDRAINAGE EASEMENTPROPOSED TREE REMOVAL X
County of Fairfax, Virginia
18
• Limits of Disturbance show the approximate area affected by construction.
• Driveways, fences, andtrees may be impactedon properties adjacentto the project.
• If private property is to be impacted during construction, we will obtain an easement or right-of-way before work begins.
Will the Project Impact My Property?
Department of Transportation
LIMITS OF DISTURBANCE
County of Fairfax, Virginia
19
Land Acquisition Process• Will occur after pre-final design complete.• Plats will be prepared showing easements
and/or right-of-way needed.• Land Acquisition Agent will contact
property owners to negotiate.
Department of Transportation
County of Fairfax, Virginia
20
Construction • We will coordinate with
property owners well in advance.
• Fences may be temporarily removed & replaced. Relocation to private property may be necessary, if within the right-of-way.
• Work hours are set by VDOT.
Department of Transportation
County of Fairfax, Virginia
21
Preliminary Schedule
• Intermediate Design – Early 2017• Pre-Final Design – Fall 2017• Land Acquisition – Mid to Late 2018• Final Design – Late 2018/Early 2019• Construction – 2019
Department of Transportation
County of Fairfax, Virginia
23
http://www.fairfaxcounty.gov/fcdot/pedestrian/kirbyroad.htm
Submit Comments on Project Website