Mach 5. Compact Design 72.6 mm 142.8 mm 8.7 mm Height WidthThickness.
CHILDREN'S HOSPITAL NOLAmplusmedtech.com/16001/pdf/1767.pdf · 2020. 5. 27. · d2310 storage d2311...
Transcript of CHILDREN'S HOSPITAL NOLAmplusmedtech.com/16001/pdf/1767.pdf · 2020. 5. 27. · d2310 storage d2311...
Rev # Date/Quote Description
I have read the appropriate requirements from the Skytron Pre-Installation Guide for Ergon booms and consulted with the individualtrades. I understand there are specific ceiling height, medical gas, electrical, video/communications and structural requirements that
must be supplied by the appropriate trade representatives to support this project. Please be aware that modification to the site specificdocument could result in additional Change Order/Drawing Change fees. These fees take place after the second Submittal Revision orthe first Fabrication Revision. Please speak with your Skytron Representative if you have any questions with regards to these fees. All
final tie-ins of electrical connections, plumbing and media must be made by a qualified and licensed individual. Skytron does not providefinal tie-in services due to local licensing regulations. Finish work (e.g., caulking and trim) is the responsibility of others. Installation of
standard product moldings or trim is included in the pricing provided.
PLEASE READ THE FOLLOWING CAREFULLY
EACH DRAWING MUST BE INITIALED AND DATED
Accepted by:(signature)
Accepted by:(print)
Requested Delivery Date
Date:
P.O. #:
New Preliminary Package
Drawing Package Revision Summary
0 11-14-17Q-18272
Accepted - with changes RejectedAccepted - as is
Equipment References DrawingIndex # Note that not all drawings will be required for each mount / drawings package
A (C-21554)B (C-21556)C (C-21558)D (C-21561)E (C-21562)F (C-21563)G (C-21564)H (C-21570)I (C-21572)
00a Room Layout - Contains overhead view of Skytron equipment
Integration Elevation Details - Contains elevation drawings of the Integration system
Carrier Details - Contains front, left and right side views of equipment carriers detailing accessories and outlet placement
Medical Gas Details - Contains medical gas details required for the riser plateinstallation
Electrical Wiring Detail - Contains detailed wiring diagram and circuit requirements for equipment booms and lights
Communication Details - Contains a breakdown of required communications cabling and connections
Light Fixture Details - Contains details of light wiring for fixture mounts and back box details
S1a
_2_3
_4
_5_6
Integration Mounting Details - Contains mounting details of the Integration systemS1b
Specification for the SKYTRON products found within this information package are specifically designated for your facility. Please ensure that all of your custom specifications have been included. Deviating from the depicted specific equipmentplacement could cause equipment conflicts in the room and must be approved by a Skytron Representative.
1
2
3
4
5
6
7
_1_1.1
Elevation Details - Contains elevation view drawings on equipment Mounting Structure Details - Contains mounting structure details of equipment
CHILDREN'S HOSPITAL NOLA
New Submittal Package11-16-17Q-18272
Added VAC to C & DUpdated Layouts
12-8-17Q-18272
Updated equipment schedulesUpdated gasses on mounts C & DUpdated VST lengths for mounts C & I
6-4-17Q-18272
Updated Item IDs6-18-17Q-18272
D2302
O.R.3
D2
PERFWOR
51" [1300mm]
35.25"/895mm
43"/1
090m
m
35.25"/895mm
3'-6"
3'-6"
5' 5'
ID 11021
ID 1767
ID 12461
ID 10966
DESC
RIPT
ION:
ROO
M LA
YOUT
00aSHEETINITIAL:
DATE:
CHILD
REN'
S HO
SPIT
ALNO
LAPR
OJEC
T #:
17-3
28SU
BMIT
TAL
PLOT
DAT
E:
ROOM
TYP
E: H
EART
OR
REV.
#: 0
6/20/2
018
*SITE SPECIFIC LAYOUT*
* IF SKYVISION IS APPLICABLE REFER TO THE LAST PORTION OF BOOM PACKAGE*
DIMENSION PROVIDED FROM WALLS ARE BASED ON CURRENTINFORMATION PROVIDED TO SKYTRON AT TIME OF DOCUMENT CREATION.
IN THE EVENT THAT FIXTURE LOCATIONS NEED TO CHANGE PLEASE CHECK WITH SKYTRON ON THE REVISED LAYOUT LOCATION
FINAL CONSTRUCTION DOCUMENTS SHOULD BE PROVIDED BY THE ARCHITECT.
EQUIPMENT SCHEDULE
ID DESCRIPTION
A ID 12461
C ID 1767
D ID 10966
H ID 11021
D2334
PERFUSIONWORKROOM
D2304
O.R.4
51" [1300mm]
35.25"/895mm 43"/1090mm
35.25"/895mm
3'-6"3'-6"
5'
5' ID 10966
ID 12461
ID 11021
ID 1767
DESC
RIPT
ION:
ROO
M LA
YOUT
01aSHEETINITIAL:
DATE:
CHILD
REN'
S HO
SPIT
ALNO
LARO
OM T
YPE:
GEN
OR
REV.
#: 0
6/20/2
018
*SITE SPECIFIC LAYOUT*
* IF SKYVISION IS APPLICABLE REFER TO THE LAST PORTION OF BOOM PACKAGE*
DIMENSION PROVIDED FROM WALLS ARE BASED ON CURRENTINFORMATION PROVIDED TO SKYTRON AT TIME OF DOCUMENT CREATION.
IN THE EVENT THAT FIXTURE LOCATIONS NEED TO CHANGE PLEASE CHECK WITH SKYTRON ON THE REVISED LAYOUT LOCATION
FINAL CONSTRUCTION DOCUMENTS SHOULD BE PROVIDED BY THE ARCHITECT.
PROJ
ECT
#: 17
-328
SUBM
ITTA
LPL
OT D
ATE:
EQUIPMENT SCHEDULE
ID DESCRIPTION
A ID 12461
C ID 1767
D ID 10966
H ID 11021
D2305
O.R.5
D2306
O.R.6
4 1 1 /
2 " [10
50mm ]
35.25"/895mm
35.25
"/895
mm
3'-6"
3'-6"
5'
4 1 1 /
2 " [10
50mm ]
35.25"/895mm
35.25
"/895
mm
3'-6"
3'-6"
5'
ID 10966
ID 11793
ID 1767
ID 11793
ID 10966
ID 1767
DESC
RIPT
ION:
ROO
M LA
YOUT
02aSHEETINITIAL:
DATE:
CHILD
REN'
S HO
SPIT
ALNO
LARO
OM T
YPE:
GEN
OR
REV.
#: 0
6/20/2
018
EQUIPMENT SCHEDULE
ID DESCRIPTION
B ID 11793
C ID 1767
D ID 10966
*SITE SPECIFIC LAYOUT*
* IF SKYVISION IS APPLICABLE REFER TO THE LAST PORTION OF BOOM PACKAGE*
DIMENSION PROVIDED FROM WALLS ARE BASED ON CURRENTINFORMATION PROVIDED TO SKYTRON AT TIME OF DOCUMENT CREATION.
IN THE EVENT THAT FIXTURE LOCATIONS NEED TO CHANGE PLEASE CHECK WITH SKYTRON ON THE REVISED LAYOUT LOCATION
FINAL CONSTRUCTION DOCUMENTS SHOULD BE PROVIDED BY THE ARCHITECT.
PROJ
ECT
#: 17
-328
SUBM
ITTA
LPL
OT D
ATE:
D2307
O.R.7
D2306
O.R.6
41 1/
2" [1
050m
m]
35.25"/895mm
35.25
"/895
mm
3'-6"
3'-6"
5'
ID 11793
ID 10966
ID 1767
DESC
RIPT
ION:
ROO
M LA
YOUT
03aSHEETINITIAL:
DATE:
CHILD
REN'
S HO
SPIT
ALNO
LARO
OM T
YPE:
GEN
OR
REV.
#: 0
6/20/2
018
*SITE SPECIFIC LAYOUT*
* IF SKYVISION IS APPLICABLE REFER TO THE LAST PORTION OF BOOM PACKAGE*
DIMENSION PROVIDED FROM WALLS ARE BASED ON CURRENTINFORMATION PROVIDED TO SKYTRON AT TIME OF DOCUMENT CREATION.
IN THE EVENT THAT FIXTURE LOCATIONS NEED TO CHANGE PLEASE CHECK WITH SKYTRON ON THE REVISED LAYOUT LOCATION
FINAL CONSTRUCTION DOCUMENTS SHOULD BE PROVIDED BY THE ARCHITECT.
EQUIPMENT SCHEDULE
ID DESCRIPTION
B ID 11793
C ID 1767
D ID 10966
PROJ
ECT
#: 17
-328
SUBM
ITTA
LPL
OT D
ATE:
D2308
(SMALL)O.R.
8
41 1/2" [1050mm]
35.25"/895mm
35.25"/895mm
3'-6" 3'-6"
5'
ID 10966
ID 11793
ID 1767
DESC
RIPT
ION:
ROO
M LA
YOUT
04aSHEETINITIAL:
DATE:
CHILD
REN'
S HO
SPIT
ALNO
LARO
OM T
YPE:
GEN
OR
REV.
#: 0
6/20/2
018
*SITE SPECIFIC LAYOUT*
* IF SKYVISION IS APPLICABLE REFER TO THE LAST PORTION OF BOOM PACKAGE*
DIMENSION PROVIDED FROM WALLS ARE BASED ON CURRENTINFORMATION PROVIDED TO SKYTRON AT TIME OF DOCUMENT CREATION.
IN THE EVENT THAT FIXTURE LOCATIONS NEED TO CHANGE PLEASE CHECK WITH SKYTRON ON THE REVISED LAYOUT LOCATION
FINAL CONSTRUCTION DOCUMENTS SHOULD BE PROVIDED BY THE ARCHITECT.
EQUIPMENT SCHEDULE
ID DESCRIPTION
B ID 11793
C ID 1767
D ID 10966
PROJ
ECT
#: 17
-328
SUBM
ITTA
LPL
OT D
ATE:
D2310
STORAGED2311
O.R.10
41 1/ 2" [1050mm]
35.25"/895mm
35.25"/895mm
3'-6" 3'-6"
5'
41 1/2" [1050mm]
35.25"/895mm
35.25"/895mm
3'-6"
3'-6"
5'
ID 10966
ID 11793
ID 11793
ID 1767
ID 10966ID 1767
DESC
RIPT
ION:
ROO
M LA
YOUT
05aSHEETINITIAL:
DATE:
CHILD
REN'
S HO
SPIT
ALNO
LARO
OM T
YPE:
GEN
OR
REV.
#: 0
6/20/2
018
*SITE SPECIFIC LAYOUT*
* IF SKYVISION IS APPLICABLE REFER TO THE LAST PORTION OF BOOM PACKAGE*
DIMENSION PROVIDED FROM WALLS ARE BASED ON CURRENTINFORMATION PROVIDED TO SKYTRON AT TIME OF DOCUMENT CREATION.
IN THE EVENT THAT FIXTURE LOCATIONS NEED TO CHANGE PLEASE CHECK WITH SKYTRON ON THE REVISED LAYOUT LOCATION
FINAL CONSTRUCTION DOCUMENTS SHOULD BE PROVIDED BY THE ARCHITECT.
EQUIPMENT SCHEDULE
ID DESCRIPTION
B ID 11793
C ID 1767
D ID 10966
PROJ
ECT
#: 17
-328
SUBM
ITTA
LPL
OT D
ATE:
D2312
O.R.11
41 1/2" [1050mm]
35.25"/895mm
35.25"/895mm
3'-6"
3'-6"
5'
41 1/2" [1050mm]
35.25"/895mm
35.25"/895mm
3'-6"
3'-6"
5'
ID 11793ID 11793
ID 10966
ID 1767
ID 10966
ID 1767
DESC
RIPT
ION:
ROO
M LA
YOUT
06aSHEETINITIAL:
DATE:
CHILD
REN'
S HO
SPIT
ALNO
LARO
OM T
YPE:
GEN
OR
REV.
#: 0
6/20/2
018
*SITE SPECIFIC LAYOUT*
* IF SKYVISION IS APPLICABLE REFER TO THE LAST PORTION OF BOOM PACKAGE*
DIMENSION PROVIDED FROM WALLS ARE BASED ON CURRENTINFORMATION PROVIDED TO SKYTRON AT TIME OF DOCUMENT CREATION.
IN THE EVENT THAT FIXTURE LOCATIONS NEED TO CHANGE PLEASE CHECK WITH SKYTRON ON THE REVISED LAYOUT LOCATION
FINAL CONSTRUCTION DOCUMENTS SHOULD BE PROVIDED BY THE ARCHITECT.
EQUIPMENT SCHEDULE
ID DESCRIPTION
B ID 11793
C ID 1767
D ID 10966
PROJ
ECT
#: 17
-328
SUBM
ITTA
LPL
OT D
ATE:
D2314
O.R.1
41 1/2" [1050mm]
35.25"/895mm
35.25"/895mm
3'-6"
3'-6"
5'
ID 11793
ID 10966
ID 1767
DESC
RIPT
ION:
ROO
M LA
YOUT
07aSHEETINITIAL:
DATE:
CHILD
REN'
S HO
SPIT
ALNO
LARO
OM T
YPE:
GEN
OR
REV.
#: 0
6/20/2
018
*SITE SPECIFIC LAYOUT*
* IF SKYVISION IS APPLICABLE REFER TO THE LAST PORTION OF BOOM PACKAGE*
DIMENSION PROVIDED FROM WALLS ARE BASED ON CURRENTINFORMATION PROVIDED TO SKYTRON AT TIME OF DOCUMENT CREATION.
IN THE EVENT THAT FIXTURE LOCATIONS NEED TO CHANGE PLEASE CHECK WITH SKYTRON ON THE REVISED LAYOUT LOCATION
FINAL CONSTRUCTION DOCUMENTS SHOULD BE PROVIDED BY THE ARCHITECT.
EQUIPMENT SCHEDULE
ID DESCRIPTION
B ID 11793
C ID 1767
D ID 10966
PROJ
ECT
#: 17
-328
SUBM
ITTA
LPL
OT D
ATE:
OR
D2301
(SMALL)O.R.
2
41 1/2" [1050mm]
35.2
5"/89
5mm
35.25"/895mm
3'-6"3'-6"
5'
ID 10966
ID 11793
ID 1767
DESC
RIPT
ION:
ROO
M LA
YOUT
08aSHEETINITIAL:
DATE:
CHILD
REN'
S HO
SPIT
ALNO
LARO
OM T
YPE:
GEN
OR
REV.
#: 0
6/20/2
018
*SITE SPECIFIC LAYOUT*
* IF SKYVISION IS APPLICABLE REFER TO THE LAST PORTION OF BOOM PACKAGE*
DIMENSION PROVIDED FROM WALLS ARE BASED ON CURRENTINFORMATION PROVIDED TO SKYTRON AT TIME OF DOCUMENT CREATION.
IN THE EVENT THAT FIXTURE LOCATIONS NEED TO CHANGE PLEASE CHECK WITH SKYTRON ON THE REVISED LAYOUT LOCATION
FINAL CONSTRUCTION DOCUMENTS SHOULD BE PROVIDED BY THE ARCHITECT.
EQUIPMENT SCHEDULE
ID DESCRIPTION
B ID 11793
C ID 1767
D ID 10966
PROJ
ECT
#: 17
-328
SUBM
ITTA
LPL
OT D
ATE:
B1144A
B1144
ORTHO
35.25
"/895
mm
27.5"/700mm
5'
CAUTIONTHIS BOOM HAS
ROTATIONALCONFLICTS
ID 4903 ID 12173
DESC
RIPT
ION:
ROO
M LA
YOUT
09aSHEETINITIAL:
DATE:
CHILD
REN'
S HO
SPIT
ALNO
LARO
OM T
YPE:
ORT
HORE
V. #:
06/2
0/201
8
EQUIPMENT SCHEDULE
ID DESCRIPTION
G ID 4903
I ID 12173
*SITE SPECIFIC LAYOUT*
* IF SKYVISION IS APPLICABLE REFER TO THE LAST PORTION OF BOOM PACKAGE*
DIMENSION PROVIDED FROM WALLS ARE BASED ON CURRENTINFORMATION PROVIDED TO SKYTRON AT TIME OF DOCUMENT CREATION.
IN THE EVENT THAT FIXTURE LOCATIONS NEED TO CHANGE PLEASE CHECK WITH SKYTRON ON THE REVISED LAYOUT LOCATION
FINAL CONSTRUCTION DOCUMENTS SHOULD BE PROVIDED BY THE ARCHITECT.
PROJ
ECT
#: 17
-328
SUBM
ITTA
LPL
OT D
ATE:
1C5
B1145BB1C
B1145
RESUSCITATION 1
CAUTIONTHIS BOOM HAS
ROTATIONALCONFLICTS
35.25"/895mm ID 4903ID 1441
DESC
RIPT
ION:
ROO
M LA
YOUT
10aSHEETINITIAL:
DATE:
CHILD
REN'
S HO
SPIT
ALNO
LARO
OM T
YPE:
RES
USCI
TATI
ONRE
V. #:
06/2
0/201
8
EQUIPMENT SCHEDULE
ID DESCRIPTION
F ID 1441
G ID 4903
*SITE SPECIFIC LAYOUT*
* IF SKYVISION IS APPLICABLE REFER TO THE LAST PORTION OF BOOM PACKAGE*
DIMENSION PROVIDED FROM WALLS ARE BASED ON CURRENTINFORMATION PROVIDED TO SKYTRON AT TIME OF DOCUMENT CREATION.
IN THE EVENT THAT FIXTURE LOCATIONS NEED TO CHANGE PLEASE CHECK WITH SKYTRON ON THE REVISED LAYOUT LOCATION
FINAL CONSTRUCTION DOCUMENTS SHOULD BE PROVIDED BY THE ARCHITECT.
PROJ
ECT
#: 17
-328
SUBM
ITTA
LPL
OT D
ATE:
1C5
B1145BB1C
B1146
RES 2
35.25"/895mm ID 4903ID 1441
DESC
RIPT
ION:
ROO
M LA
YOUT
11aSHEETINITIAL:
DATE:
CHILD
REN'
S HO
SPIT
ALNO
LA6/2
0/201
8
*SITE SPECIFIC LAYOUT*
* IF SKYVISION IS APPLICABLE REFER TO THE LAST PORTION OF BOOM PACKAGE*
DIMENSION PROVIDED FROM WALLS ARE BASED ON CURRENTINFORMATION PROVIDED TO SKYTRON AT TIME OF DOCUMENT CREATION.
IN THE EVENT THAT FIXTURE LOCATIONS NEED TO CHANGE PLEASE CHECK WITH SKYTRON ON THE REVISED LAYOUT LOCATION
FINAL CONSTRUCTION DOCUMENTS SHOULD BE PROVIDED BY THE ARCHITECT.
ROOM
TYP
E: R
ESUS
CITA
TION
REV.
#: 0
EQUIPMENT SCHEDULE
ID DESCRIPTION
F ID 1441
G ID 4903 PROJ
ECT
#: 17
-328
SUBM
ITTA
LPL
OT D
ATE:
E2542AA E2542AB
E2543
ENDO E2542A
DECONTAM.
E2542
ENDO
E2542B
E2542AC
41 1/2" [1050mm]
41 1/2" [1050mm]
ID 1768ID 1768
DESC
RIPT
ION:
ROO
M LA
YOUT
12aSHEETINITIAL:
DATE:
CHILD
REN'
S HO
SPIT
ALNO
LA6/2
0/201
8
EQUIPMENT SCHEDULE
ID DESCRIPTION
E ID 1768
*SITE SPECIFIC LAYOUT*
* IF SKYVISION IS APPLICABLE REFER TO THE LAST PORTION OF BOOM PACKAGE*
DIMENSION PROVIDED FROM WALLS ARE BASED ON CURRENTINFORMATION PROVIDED TO SKYTRON AT TIME OF DOCUMENT CREATION.
IN THE EVENT THAT FIXTURE LOCATIONS NEED TO CHANGE PLEASE CHECK WITH SKYTRON ON THE REVISED LAYOUT LOCATION
FINAL CONSTRUCTION DOCUMENTS SHOULD BE PROVIDED BY THE ARCHITECT.
ROOM
TYP
E: E
NDO
REV.
#: 0
PROJ
ECT
#: 17
-328
SUBM
ITTA
LPL
OT D
ATE:
E2547
DENTALPROCEDURE
B113
P
35.25"/895mm
CAUTIONTHIS BOOM HAS
ROTATIONALCONFLICTS
2'-1"
5'-11"
ID 10966
ID 1441
DESC
RIPT
ION:
ROO
M LA
YOUT
13aSHEETINITIAL:
DATE:
CHILD
REN'
S HO
SPIT
ALNO
LA6/2
0/201
8
EQUIPMENT SCHEDULE
ID DESCRIPTION
D ID 10966
F ID 1441
*SITE SPECIFIC LAYOUT*
* IF SKYVISION IS APPLICABLE REFER TO THE LAST PORTION OF BOOM PACKAGE*
DIMENSION PROVIDED FROM WALLS ARE BASED ON CURRENTINFORMATION PROVIDED TO SKYTRON AT TIME OF DOCUMENT CREATION.
IN THE EVENT THAT FIXTURE LOCATIONS NEED TO CHANGE PLEASE CHECK WITH SKYTRON ON THE REVISED LAYOUT LOCATION
FINAL CONSTRUCTION DOCUMENTS SHOULD BE PROVIDED BY THE ARCHITECT.
ROOM
TYP
E: D
ENTA
LRE
V. #:
0PR
OJEC
T #:
17-3
28SU
BMIT
TAL
PLOT
DAT
E:
B1135A
B1180A B1185AE2548 E2549
MINORPROCEDURE MINOR
PROCEDURE
35.25"/895mm
35.25"/895mm
ID 1441 ID 1441
DESC
RIPT
ION:
ROO
M LA
YOUT
14aSHEETINITIAL:
DATE:
CHILD
REN'
S HO
SPIT
ALNO
LA6/2
0/201
8
EQUIPMENT SCHEDULE
ID DESCRIPTION
F ID 1441
*SITE SPECIFIC LAYOUT*
* IF SKYVISION IS APPLICABLE REFER TO THE LAST PORTION OF BOOM PACKAGE*
DIMENSION PROVIDED FROM WALLS ARE BASED ON CURRENTINFORMATION PROVIDED TO SKYTRON AT TIME OF DOCUMENT CREATION.
IN THE EVENT THAT FIXTURE LOCATIONS NEED TO CHANGE PLEASE CHECK WITH SKYTRON ON THE REVISED LAYOUT LOCATION
FINAL CONSTRUCTION DOCUMENTS SHOULD BE PROVIDED BY THE ARCHITECT.
ROOM
TYP
E: M
INOR
PRO
CEDU
RERE
V. #:
0PR
OJEC
T #:
17-3
28SU
BMIT
TAL
PLOT
DAT
E:
6'-6"
6'-8" 2'10'-10"
41 1/2" [1050mm]
35.25
"/895
mm
35.25
"/895
mm
CAUTIONSURGICAL LIGHT PROVIDEDPER RFP092217 WILL NOT
REACH THE INTENDEDTARGET AREA
CAUTIONSURGICAL LIGHT PROVIDEDPER RFP092217 WILL NOT
REACH THE INTENDEDTARGET AREA
ID 1767
ID 10966ID 11793
DESC
RIPT
ION:
ROO
M LA
YOUT
15aSHEETINITIAL:
DATE:
CHILD
REN'
S HO
SPIT
ALNO
LA6/2
0/201
8
EQUIPMENT SCHEDULE
ID DESCRIPTION
B ID 11793
C ID 1767
D ID 10966
*SITE SPECIFIC LAYOUT*
* IF SKYVISION IS APPLICABLE REFER TO THE LAST PORTION OF BOOM PACKAGE*
DIMENSION PROVIDED FROM WALLS ARE BASED ON CURRENTINFORMATION PROVIDED TO SKYTRON AT TIME OF DOCUMENT CREATION.
IN THE EVENT THAT FIXTURE LOCATIONS NEED TO CHANGE PLEASE CHECK WITH SKYTRON ON THE REVISED LAYOUT LOCATION
FINAL CONSTRUCTION DOCUMENTS SHOULD BE PROVIDED BY THE ARCHITECT.
ROOM
TYP
E: H
YBRI
D OR
REV.
#: 0
PROJ
ECT
#: 17
-328
SUBM
ITTA
LPL
OT D
ATE:
Nx6 3
T
3
T4
35.25"/895mm
35.25"
/895m
m
CAUTIONSURGICAL LIGHT PROVIDEDPER RFP092217 WILL NOT
REACH THE INTENDEDTARGET AREA
7'
3'-3"
9'-9"
6'
CAUTIONSURGICAL LIGHT PROVIDEDPER RFP092217 WILL NOT
REACH THE INTENDEDTARGET AREA
ID 10966
ID 1441
ID 1767
DESC
RIPT
ION:
ROO
M LA
YOUT
16aSHEETINITIAL:
DATE:
CHILD
REN'
S HO
SPIT
ALNO
LA6/2
0/201
8
*SITE SPECIFIC LAYOUT*
* IF SKYVISION IS APPLICABLE REFER TO THE LAST PORTION OF BOOM PACKAGE*
DIMENSION PROVIDED FROM WALLS ARE BASED ON CURRENTINFORMATION PROVIDED TO SKYTRON AT TIME OF DOCUMENT CREATION.
IN THE EVENT THAT FIXTURE LOCATIONS NEED TO CHANGE PLEASE CHECK WITH SKYTRON ON THE REVISED LAYOUT LOCATION
FINAL CONSTRUCTION DOCUMENTS SHOULD BE PROVIDED BY THE ARCHITECT.
ROOM
TYP
E: C
ATH
LAB
REV.
#: 0
EQUIPMENT SCHEDULE
ID DESCRIPTION
C ID 1767
D ID 10966
F ID 1441
PROJ
ECT
#: 17
-328
SUBM
ITTA
LPL
OT D
ATE:
72"
120" CEILING HEIGHT
0" FLOOR
10"
712"
3912" 3Q1-L
3112" 32S
11"
11"
3UBM-W
82"
ITEM ID: 12461
MDL:
200 S
ERIE
SQT
Y.: 2
RE
V. #:
0
A1SHEETINITIAL:
DATE:
DESC
RIPT
ION:
ELE
VATI
ON D
ETAI
LS
CHILD
REN'
S HO
SPIT
ALNO
LA
*SITE SPECIFIC ELEVATION DETAILS*
PROJ
ECT
#: 17
-323
SUBM
ITTA
LPL
OT D
ATE:
6/20/2
018PLEASE REFER TO MOUNTING
STRUCTURE DETAIL PAGE FORMOUNTING STRUCTURE EXAMPLE
SCALE: 34" = 1'MAX. FIXTURE WEIGHT: MAX. MOMENT LOAD: EQUIPMENT CAPACITY:597 LBS. 2310 FT. LBS. 3UBMW - 108 LBS.
STRUCTURAL REQUIREMENTS - Architect and Structural Engineer
Mounting Structure ComponentsThe fabrication of each mounting structure may be slightly different but they each require the same basic components to ensurestability.
Sway Bracing (by others)Sway bracing is designed to rigidly affix the mounting plate to the structural ceiling. The primary purpose of sway bracing is toeliminate sway, or lateral twisting and flexing of the mounting structure as it "reacts" to dynamic load changes caused by moving thefixture radial arms. The sway bracing should be welded to the mounting plate and extend away from the center of the mount. Aminimum of four sway braces placed 90° apart and positioned at a 45° and 60° angle is recommended.
Minimum recommended material for sway bracing is 3" x 3" x 1/4" angle iron. It is recommended that in all applications thesway bracing be fastened to the structural ceiling.
Structural Ceiling Plate (by others)The structural ceiling plate rigidly attaches the mount to the structural ceiling using structural anchors appropriate for the ceilingconstruction. The structural ceiling plate should be a minimum of, 1" ASTM A36 steel plate, 17" diameter with (6) 5/8" diameterholes for structural anchors and is fabricated by others.
Expansion Anchors (by others)Test 50% of the anchors at 2,000 pounds (907 kg) tension, or 50 ft. lb. (68 N●m) torque per CBC 1925A.3.5. Installed anchors must meet the following criteria:1. Hydraulic Ram Method: The anchor should have no observable movement at the applicable test load. For wedge and sleevetype anchors, a practical way to determine observable movement is that the washer under the nut becomes loose.2. Torque Wrench Method (Wedge or Sleeve Type): The applicable test torque must be reached within one-half (1/2) turn of the nut.Testing should occur no sooner than 24 hours after installation of anchors. If any anchor fails testing, test all anchors until 20 consecutive anchors pass, then resume the initial testing frequency. Test equipment is to be calibrated by an approved testinglaboratory in accordance with standard recognized procedures.
Support Tube (by others)The support tube required to attach the mounting plate to the structural ceiling plate should be ASTM 500 Grade B, 6" diameter tube.Support tube is to be welded to structural ceiling plate and mounting plate. A minimum of 6 gussets placed 60° apart should bewelded to support tube at the structural ceiling plate and the mounting plate.
Mounting Plate (SKYTRON supplied)The 17.5" x 17.5" x 1" ASTM A36 steel mounting plate is a SKYTRON supplied item. The Support tube and sway bracing are welded to the mounting plate. The mounting plate contains the corresponding bolt pattern for attaching the fixture and provides themounting areas for the junction box and gas riser plates.
Mounting Structure DesignSeismic structural applications differ. Please contact your local SKYTRON representative for specific calculations. Themounting structure must be designed and fabricated to position the bottom of the SKYTRON mounting plate as shown on sitespecific elevation page. This is a critical dimension in order to accommodate proper clearance required for ceiling cover function. The mounting plate must be perfectly level (+/- 0.1°) and allow no more than two-tenths of a degree (0.2°) of rotation atthe mounting plate when the specified load is applied. The mounting structure must be tested for strength and stiffness prior toinstallation of the fixture. Please contact your SKYTRON representative to schedule testing.
Please consult your SKYTRON representative during early stages of construction to facilitate this process. The testingprocess is a required, documented function prior to closing of the finished ceiling.
Ceiling RequirementsA 24" x 24" access door must be mounted adjacent to the mounting structure for entry by service personnel for serviceaccess.
SKYTRON provides a 24" ceiling cover designed to cover 20" diameter ceiling hole cutout.
Additional Items(SKYTRON supplied)In addition to the pre-installation kit. SKYTRON provides the following items:
(6) 1-1/4" x 10" threaded rods. (24) 1-1/4" hex nuts, pump enclosure (if applicable)
STRUCTURALCEILING
STRUCTURALCEILING
STRUCTURAL CONCRETE SLABNORMAL WEIGHTfc=3,000 PSI (20,684 kPa)
SWAY BRACING3" x 3" x 1/4" (4)
GUSSET 6" DIA.SUPPORT
TUBE
FINISHED CEILING
20"DIAMETER OPENING
REQUIRED(CENTERED UNDER MOUNT)
12" MIN. / 60" MAX.
REFER TO JOB SPECIFIC ELEVATION PAGE (-0/+1)
MOUNTING PLATE(SKYTRON SUPPLIED)
45°- 60°
FIXTURE HUBTYP. 1/4"
PJP
ACCESS DOOR24" x 24"
(REQUIRED)
TYP. 1/4"TOP & BOTTOM
STRUCTURALCEILING PLATE
17" DIA. x 1"
EXPANSION ANCHORS:HILTI KB-III (ICBO 4627)
CARBON STEEL
NOTES:• This illustration depicts recommended mounting structure design and its components. Always consult
specific structural criteria defined by a structural engineer.• Do not cover or block any holes with sway bracing, gussets, weld or weld slag.• Typical dimensions shown. Refer to specific structural drawings and/or Seismic drawings for each
application.• *Critical Dimension
12" HIGH CLEAR SPACEABOVE MOUNTING PLATE
REQUIRED ON 3 SIDES FORGAS AND ELECTRICAL
COMPONENT INSTALLATION
*TYPICAL BOOM MOUNTING STRUCTURE DETAILS**ALWAYS CONSULT SPECIFIC STRUCTURAL CRITERIA DEFINED BY A STRUCTURAL ENGINEER*
NOTES:• This illustration depicts a generic mounting structure design and its components. Always consult
specific structural criteria defined by a structural engineer.• 1 14" Mounting bolts and nuts shipped with fixture.
JUNCTION BOX(SKYTRON SUPPLIED)
BRACKET(SKYTRON SUPPLIED)
PLATE(SKYTRON SUPPLIED)
INLET TUBE(SKYTRON SUPPLIED)
RISER PLATE(SKYTRON SUPPLIED)
CHECK VALVEREMOVAL TOOL(SKYTRON SUPPLIED)
A1.1SHEETINITIAL:
DATE:
DESC
RIPT
ION:
ELE
VATI
ON D
ETAI
LS11
/16/20
17
CHILD
REN'
S HO
SPIT
ALNO
LAMD
L: 20
0 SER
IES
QTY.
: 2
REV.
#: 0
PROJ
ECT
#: 17
-328
SU
BMIT
TAL
PLOT
DAT
E:
DIMENSIONS:INITIAL:
ELECTRICAL:GAS OUTLETS: A2
PLO
T DA
TE: 1
1/16
/201
7
CHIL
DREN
'S H
OSP
ITAL
NOLA
PRO
JECT
#: 1
7-32
8
DESC
RIPT
ION:
CAR
RIER
DET
AILS
SHEET
SUBM
ITTA
LQ
TY: 2
REV
#: 0
DATE:
MDL
: 200
SER
IES
CARRIER
*SITE SPECIFIC CARRIER DETAILS*
DISS (8) 125V, 20A DUPLEX - RED8 1/2"H x 26"W x 16 1/2"D
ACCESSORY LISTNONE
QTY GASES
1 CARBON DIOXIDE
0 HELIOX
2 MEDICAL AIR
0 NITROGEN
1 NITROUS OXIDE
2 OXYGEN
2 VACUUM
2 WAGD
ONLY PLACESCOMMUNICATIONS
CAN BE ADDED
VACUUM
VACUUM
NITROUS OXIDEMEDICAL AIR
CARBON DIOXIDE
WAGDOXYGEN
SEPARATOR PLATE
A3SHEET
MEDICAL GAS REQUIREMENTS - Medical Gas / Piping EngineerNotes:
• Beacon Medaes manufactured gas outlets supplied unless otherwise specified. Pricing and lead time could vary if another Mfgr. is chosen.• Medical gas risers comply with NFPA 9999-2012 OR CAN-CSA Z 73961-12 Edition Cleanliness of gas outlets must be maintained through
installation.• Purge gas lines and test at least 24 hrs. prior to installation.• Test results must be made available to SKYTRON representative for verification & comparison.• Check valve must be removed during installation to prevent damage to o-rings, refer to Ergon pre-installation guide for removal
instructions.** Caution - Check valves have 2 different sizes, please keep Instrument Air and Oxygen separate from the others **
Each boom fixture is fabricated in accordance to the specifications required by the customer. The configuration drawings supplied bySKYTRON will indicate the type and quantity of gas supply lines required. D.I.S.S. connection medical grade hoses connect the fixture tothe riser plate connectors. The customer is responsible to deliver the appropriate medical gas from the facility supply to the riser plateconnectors and for the design of a medical gas system with adequate flow capacity capable of compensating for the accumulative flowrestrictions associated with conventional construction methods i.e. flex gas hoses. SKYTRON provides medical gas riser plate(s) and theappropriate connectors for attachment to the Mounting Plate. The riser plates attach to the mounting plate and will accommodate up to 12gas connectors. The connectors are D.I.S.S. type medical gas connectors with removable single check valves and provide a 1/2" coppertube for attachment to facility supply lines. Caps are provided with Vacuum & WAGD gas connectors to facilitate testing procedures.
All connection and testing of medical gas piping to be performed in accordance with NFPA 99-2012 OR CAN-CSA Z 73961-12requirements.
Recommended Gas Riser PlacementA 6" clearance must be maintained between the finished ceiling and the gas inlet tubes. If this clearance cannot be accomplished atthe mounting plate, then horizontal or remote mounting of the riser plate will be required.When mount is in center of room, riser plate should face head end of room, when mount is near walls, riser plate should be adjacentto wall. If more than one riser plate is required they should be placed next to each other.
GAS CONNECTOR ASSEMBLY (w/ SECONDARY CHECK)*SUPPLIED w/FIXTURE*
9"
DISS CONNECTOR(w/ REMOVABLE PRIMARY
CHECK. PASSIVE EVAC,VACUUM & WAGD DO NOT
HAVE PRIMARY CHECK.)*SUPPLIED w/PRE-INSTALL KIT*
D I S SCHEMETRON
CGA ColorStandard
Note #1 - Any room (Critical Care Area) designed for a permanently located respiratory ventilator or anesthesia machine shall have an outlet capable of a transient flow rate of:170 LPM (6 SCFM) for 3 seconds at the station outlet.
Note #2 - For testing and certification purposes, individual station inlets shall be capable of delivering a flow rate of: 3 SCFM, while maintaining a system pressure of not lessthan 12" (300mm) at the nearest adjacent vacuum inlet. Facility supply must be 115 LPM MINIMUM. (Vacuum D.I.S.S. connectors omit primary check valves for optimal flow). 12in/HG.
Note #3 - WAGD (Waste Anesthetic Gas Disposal) systems employing a design where the WAGD lines are "tied in" to MedVac lines must produce the same flow rates as theMedVac inlets.
Note #4 - Nitrogen system requires nitrogen supplied directly from facility supply line rated at 185psi MIN to 200psi MAX. Avoid designs which feature multiple-in-line Nitrogencontrol systems in order to avoid loss of flow capability.
Note #5 - Pipe sizing: piping systems shall be designed and sized to deliver the required flow rates at the utilization pressures while accounting for natural flow losses throughvarious components including flexible hoses and terminal outlets. The Skytron medical gas and vacuum outlets meet and exceed these standards at the time of manufacture. However piping source capacity, sizing, and restrictions may prevent outlets from attaining required valves.
Additional references: Health Care Facilities code 2012 edition, Section 5.1.12.3.10.2, 5.1.12.3.10.3, 5.1.12.3.10.4, 5.1.12.3.10.5
• TYPE K COPPERTUBING
• 1/2" O.D. EXCEPTPASSIVE EVAC
• 3/4" O.D. FOR PASSIVEEVAC
Medical Air(Yellow)
Test GasISO ColorStandardMedical Air
(Black)
AbbreviatedName
MedAir
StandardPressure
50 - 55 psig
MaximumPressure
55 psig
AllowablePressure Drop
5 psig
Minimum Flow Rates
3.5 SCFM per outlet (100NL/min)N2NF see note #1, 5Carbon Dioxide
(Gray)Carbon Dioxide
(Gray) CO2 50 - 55 psig 55 psig 5 psig 3.5 SCFM per outlet (100NL/min)N2NFHeliox
(Brown)Heliox
(Brown) Heliox 50 - 55 psig 55 psig 5 psig 3.5 SCFM per outlet (100NL/min)N2NFNitrogen(Black)
Nitrogen(Black) N2 or HPN2 160 - 185 psig 200 psig 5 psig
5 SCFM per outlet (140NL/min)free air per outletN2NF see note #4, 5
Nitrous Oxide(Blue)
Nitrous Oxide(Blue) N2O 50 - 55 psig 55 psig 5 psig 3.5 SCFM per outlet (100NL/min)N2NF
Oxygen(Green)
Oxygen(White) O2 50 - 55 psig 55 psig 5 psig 3.5 SCFM per outlet (100NL/min)N2NF see note #1
Vacuum(White)
Vacuum(Yellow) MedVac 12in/Hg (300mm) N/A 3 SCFM per outlet (85NL/min) see note #2
Waste AnestheticGas Disposal
(Purple) WAGDVaries withsystem type
At a minimum, each inlet must be able todraw a continuous 50 lpm (1.8 SCFM)
through the interface
Waste AnestheticGas Disposal
(Purple) see note #3
PURITANOHMEDA
DESC
RIPT
ION:
MED
ICAL
GAS
DET
AILS
*SITE SPECIFIC GAS DETAILS* 11/16
/2017
CHILD
REN'
S HO
SPIT
ALNO
LAPR
OJEC
T #:
17-3
28SU
BMIT
TAL
PLOT
DAT
E:
MDL:
200 S
ERIE
SQT
Y.: 2
REV.
#: 0
MEDI
CAL G
AS
MAX OF 12 INLET TUBES PER MOUNTING PLATE. IF MORE ARE REQUIREDTHEY WILL NEED REMOTE MOUNTING.
CHECK VALVE REPLACEMENTTOOL
VALVES
Use above for:Medical AirCarbon DioxideHelioxNitrous OxideNitrogen
Use above for:Instrument AirOxygen
1.18"1.10"
see note #5
see note #5
see note #5
CGA ColorStandard
Nitrogen(Black)
Test GasISO ColorStandard
Nitrogen(Black)
AbbreviatedName
AllowablePressure Drop Minimum Flow Rates
Vacuum(White)
Vacuum(Yellow)
N2 or HPN2
MedVac
(10 psi) 70kpa 400L/min (14.1scfm)@1,250kpa
30L/min (1.1scfm)@54kpa
N2NF
N2NF
INITIAL:DATE:
VERIFY AND INITIAL GAS FACEPLATE STYLE REQUESTED
(4 inhg) 13kpa
CAN-CSA section 7.3.2. Z 7396.1-12
N2NF Other Gas Various MedVac 120L/min (4.2scfm)@345kpa(4 psi) 28kpa
INITIAL:DATE: INITIAL:
DESC
RIPT
ION:
ELE
CTRI
CAL W
IRIN
G DE
TAILS
A4SHEET
11/16
/2017
REQUIRED FOR FABRICATIONVERIFY AND INITIAL
POWER TYPE INITIAL:
4 INP
UT LE
ADS
120 V
AC, 2
0 AMP
120 V
AC, 2
0 AMP
120 V
AC, 2
0 AMP
CIRC
UIT
2
CIRC
UIT
3
CIRC
UIT
4
(8) 1
25V,
20A,
DUP
LEX
OUTL
ETS
- RED
*SITE SPECIFIC WIRING DETAILS* INTERNAL FIXTURE WIRING TYPICAL, EXTRA FLEX STEEL CONDUIT
TYPE: 12AWG, 600V, XHHW-2, 90°C - UNLESS NOTED
MOUN
TING
HUB
T B T B T B T B
ELECTRICAL REQUIREMENTS - Electrical Engineer
Each boom fixture is fabricated in accordance to the specifications required by the customer. The Configuration drawings supplied by SKYTRONwill indicate the type and quantity of circuits required. SKYTRON provides all wiring and electrical materials for connection from fixture to junctionbox or pump enclosure (if applicable). SKYTRON supplies an electrical junction box (8-5/8" x 4-5/8" x 1-3/4") to facilitate field wiring for up to sixcircuits that is mounted on the mounting plate in the correct position and if applicable, a hydraulic pump enclosure/junction box (18"L x 6"W x 12"H) that is to be remote mounted within 24" of the mounting structure (by contractor). The pump enclosure can be shipped with the installationkit upon request. Typical wire type is 12AWG, 600V, XHHW-2. Each circuit requires a separate, properly circuit protected, 120VAC, 60Hz powersupply line enclosed in rigid metal conduit. All electrical materials for connection to SKYTRON supplied junction box or pump enclosure and installation labor for such materials to be provided by customer. All wiring and materials to be in accordance with federal, state and local codes.It is the customer's responsibility to meet conformity to NFPA and NEC standards with respect to the number of receptacles provided in a patientcare area.
Specific conductor colors and/or wiring for isolated applications are available upon request.
ARM COVERARM COVER
ARM COVERARM COVER
GROUND(FOR ELECTRICAL)
PROTECTED EARTH(FOR CHASSIS)
NORMALDUPLEX
CRITICALDUPLEX
CRITICALDUPLEX
ULTRAFLEXTYPE USL CONDUIT
ULTRAFLEXTYPE USL CONDUIT
TB
TERMINALBLOCKDETAIL
120VAC, 20ASUPPLY
TB
ISOLATED POWERBROWN W/YELLOW STRIPE, ORANGE W/BLUE STRIPE,
GREEN W/YELLOW STRIPE
NON-ISOLATED POWERBLACK, WHITE, GREEN
Internally LocatedElectrical Terminal
Block Detail
120VAC, 20ASUPPLY
carrier contains aninternally located
Terminal Blockthat provides
interconnectivitybetween the
outlets and theinternal conductors
CARR
IER
UTILI
TIES
PAN
EL
TB
TB
CIRC
UIT
112
0 VAC
, 20 A
MP
GENERIC BOOM ELECTRICAL WIRING DIAGRAM FOR FIXED ARMS
CHILD
REN'
S HO
SPIT
ALNO
LAPR
OJEC
T #:
17-3
28SU
BMIT
TAL
PLOT
DAT
E:
MDL:
200 S
ERIE
SQT
Y.: 2
REV.
#: 0
72"
120" CEILING HEIGHT
0" FLOOR
4112" 3T2-C
10"
36" 3AFC
18"
12"35"
REFER TO AUA3 DATA SHEETFOR SURGICAL LIGHT
SPECIFICATIONS
21"
3FLM-32
86 12"
80 12"
ITEM ID: 11793
B1SHEETINITIAL:
DATE:
DESC
RIPT
ION:
ELE
VATI
ON D
ETAI
LS
*SITE SPECIFIC ELEVATION DETAILS*
6/20/2
018PLEASE REFER TO MOUNTING
STRUCTURE DETAIL PAGE FORMOUNTING STRUCTURE EXAMPLE
MDL:
110 S
ERIE
SQT
Y.: 1
1RE
V. #:
0
SCALE: 34" = 1'MAX. FIXTURE WEIGHT: MAX. MOMENT LOAD: EQUIPMENT CAPACITY:484 LBS. 2207 FT. LBS. 3FLM1-32 - 64.5 LBS.
CHILD
REN'
S HO
SPIT
ALNO
LAPR
OJEC
T #:
17-3
23SU
BMIT
TAL
PLOT
DAT
E:
STRUCTURAL REQUIREMENTS - Architect and Structural Engineer
Mounting Structure ComponentsThe fabrication of each mounting structure may be slightly different but they each require the same basic components to ensurestability.
Sway Bracing (by others)Sway bracing is designed to rigidly affix the mounting plate to the structural ceiling. The primary purpose of sway bracing is toeliminate sway, or lateral twisting and flexing of the mounting structure as it "reacts" to dynamic load changes caused by moving thefixture radial arms. The sway bracing should be welded to the mounting plate and extend away from the center of the mount. Aminimum of four sway braces placed 90° apart and positioned at a 45° and 60° angle is recommended.
Minimum recommended material for sway bracing is 3" x 3" x 1/4" angle iron. It is recommended that in all applications thesway bracing be fastened to the structural ceiling.
Structural Ceiling Plate (by others)The structural ceiling plate rigidly attaches the mount to the structural ceiling using structural anchors appropriate for the ceilingconstruction. The structural ceiling plate should be a minimum of, 1" ASTM A36 steel plate, 17" diameter with (6) 5/8" diameterholes for structural anchors and is fabricated by others.
Expansion Anchors (by others)Test 50% of the anchors at 2,000 pounds (907 kg) tension, or 50 ft. lb. (68 N●m) torque per CBC 1925A.3.5. Installed anchors must meet the following criteria:1. Hydraulic Ram Method: The anchor should have no observable movement at the applicable test load. For wedge and sleevetype anchors, a practical way to determine observable movement is that the washer under the nut becomes loose.2. Torque Wrench Method (Wedge or Sleeve Type): The applicable test torque must be reached within one-half (1/2) turn of the nut.Testing should occur no sooner than 24 hours after installation of anchors. If any anchor fails testing, test all anchors until 20 consecutive anchors pass, then resume the initial testing frequency. Test equipment is to be calibrated by an approved testinglaboratory in accordance with standard recognized procedures.
Support Tube (by others)The support tube required to attach the mounting plate to the structural ceiling plate should be ASTM 500 Grade B, 6" diameter tube.Support tube is to be welded to structural ceiling plate and mounting plate. A minimum of 6 gussets placed 60° apart should bewelded to support tube at the structural ceiling plate and the mounting plate.
Mounting Plate (SKYTRON supplied)The 17.5" x 17.5" x 1" ASTM A36 steel mounting plate is a SKYTRON supplied item. The Support tube and sway bracing are welded to the mounting plate. The mounting plate contains the corresponding bolt pattern for attaching the fixture and provides themounting areas for the junction box and gas riser plates.
Mounting Structure DesignSeismic structural applications differ. Please contact your local SKYTRON representative for specific calculations. Themounting structure must be designed and fabricated to position the bottom of the SKYTRON mounting plate as shown on sitespecific elevation page. This is a critical dimension in order to accommodate proper clearance required for ceiling cover function. The mounting plate must be perfectly level (+/- 0.1°) and allow no more than two-tenths of a degree (0.2°) of rotation atthe mounting plate when the specified load is applied. The mounting structure must be tested for strength and stiffness prior toinstallation of the fixture. Please contact your SKYTRON representative to schedule testing.
Please consult your SKYTRON representative during early stages of construction to facilitate this process. The testingprocess is a required, documented function prior to closing of the finished ceiling.
Ceiling RequirementsA 24" x 24" access door must be mounted adjacent to the mounting structure for entry by service personnel for serviceaccess.
SKYTRON provides a 24" ceiling cover designed to cover 20" diameter ceiling hole cutout.
Additional Items(SKYTRON supplied)In addition to the pre-installation kit. SKYTRON provides the following items:
(6) 1-1/4" x 10" threaded rods. (24) 1-1/4" hex nuts, pump enclosure (if applicable)
STRUCTURALCEILING
STRUCTURALCEILING
STRUCTURAL CONCRETE SLABNORMAL WEIGHTfc=3,000 PSI (20,684 kPa)
SWAY BRACING3" x 3" x 1/4" (4)
GUSSET 6" DIA.SUPPORT
TUBE
FINISHED CEILING
20"DIAMETER OPENING
REQUIRED(CENTERED UNDER MOUNT)
12" MIN. / 60" MAX.
REFER TO JOB SPECIFIC ELEVATION PAGE (-0/+1)
MOUNTING PLATE(SKYTRON SUPPLIED)
45°- 60°
FIXTURE HUBTYP. 1/4"
PJP
ACCESS DOOR24" x 24"
(REQUIRED)
TYP. 1/4"TOP & BOTTOM
STRUCTURALCEILING PLATE
17" DIA. x 1"
EXPANSION ANCHORS:HILTI KB-III (ICBO 4627)
CARBON STEEL
NOTES:• This illustration depicts recommended mounting structure design and its components. Always consult
specific structural criteria defined by a structural engineer.• Do not cover or block any holes with sway bracing, gussets, weld or weld slag.• Typical dimensions shown. Refer to specific structural drawings and/or Seismic drawings for each
application.• *Critical Dimension
12" HIGH CLEAR SPACEABOVE MOUNTING PLATE
REQUIRED ON 3 SIDES FORGAS AND ELECTRICAL
COMPONENT INSTALLATION
*TYPICAL BOOM MOUNTING STRUCTURE DETAILS**ALWAYS CONSULT SPECIFIC STRUCTURAL CRITERIA DEFINED BY A STRUCTURAL ENGINEER*
NOTES:• This illustration depicts a generic mounting structure design and its components. Always consult
specific structural criteria defined by a structural engineer.• 1 14" Mounting bolts and nuts shipped with fixture.
JUNCTION BOX(SKYTRON SUPPLIED)
BRACKET(SKYTRON SUPPLIED)
PLATE(SKYTRON SUPPLIED)
INLET TUBE(SKYTRON SUPPLIED)
RISER PLATE(SKYTRON SUPPLIED)
CHECK VALVEREMOVAL TOOL(SKYTRON SUPPLIED)
B1.1SHEETINITIAL:
DATE:
DESC
RIPT
ION:
ELE
VATI
ON D
ETAI
LS11
/16/20
17
CHILD
REN'
S HO
SPIT
ALNO
LAMD
L: 11
0 SER
IES
QTY.
: 11
REV.
#: 0
PROJ
ECT
#: 17
-328
SU
BMIT
TAL
PLOT
DAT
E:
TYPE USL CONDUITBY SKYTRON
SPECIAL GROUNDING REQUIREMENTS - Electrical Engineer
1. Use of approved metal conduit shall be employed throughout the fixture's wiring circuit where applicable. Facility supplied, circuit breaker protected, 100-240VAC 50/60 Hz power source wiring.
2. Grounding - Proper performance and safety of this fixture can only achieved by an adequate grounding system. Fixture ground must be a dedicated ground point ultimately bonded to the facilities grounding system to prevent the migration of electricalinterference generated by other devices.
Protective Means - To avoid the risk of electric shock, this equipment must only be connected to a supply mains with protective earth ground. This fixture requires a properly circuit protected, appropriately sized, dedicated circuit. An isolated powersupply circuit must be protected by an appropriately sized double pole, single throw circuit breaker
BY SKYTRON
BY OTHERS
See note 1 See note 2
THIS DIAGRAM IS FOR INFORMATIONAL PURPOSES ONLY. THIS WILL NOT MATCH YOUR EXACT MODEL.
JUNCTION BOX BY OTHERWITHIN 12" OF MOUNT 3/4" METAL CONDUIT
100-240VAC INPUT DEDICATED
3/4" METAL CONDUIT 12AWG, 3 WIRES PERLIGHTHEAD PLUS FIXTURE GROUNDRED, GREEN/YELLOW, BLUE 24VDC OUTPUT
POWER SUPPLY JUNCTION BOXWITHIN 3' OF MOUNT(SUPPLIED BY SKYTRON)
B6SHEETINITIAL:
DATE:
DESC
RIPT
ION:
LIGH
T FI
XTUR
E DE
TAILS
11/16
/2017
MDL:
110 S
ERIE
SQT
Y.: 1
1RE
V. #:
0CH
ILDRE
N'S
HOSP
ITAL
NOLA
PROJ
ECT
#: 17
-328
SUBM
ITTA
LPL
OT D
ATE:
72"
120" CEILING HEIGHT
0" FLOOR
10"
312"
51" 3EC
3912" 32F-L
28"
3VBM48 67"
20"
35"
REFER TO AUA3 DATA SHEETFOR SURGICAL LIGHT
SPECIFICATIONS
21"
80 12"
ITEM ID: 1767
C1SHEETINITIAL:
DATE:
DESC
RIPT
ION:
ELE
VATI
ON D
ETAI
LS
*SITE SPECIFIC ELEVATION DETAILS*
6/20/2
018PLEASE REFER TO MOUNTING
STRUCTURE DETAIL PAGE FORMOUNTING STRUCTURE EXAMPLE
MDL:
310 S
ERIE
SQT
Y.: 1
4RE
V. #:
1
SCALE: 34" = 1'MAX. FIXTURE WEIGHT: MAX. MOMENT LOAD: EQUIPMENT CAPACITY:877 LBS. 4758 FT. LBS. 3VBM48 - 218 LBS.
CHILD
REN'
S HO
SPIT
ALNO
LAPR
OJEC
T #:
17-3
23SU
BMIT
TAL
PLOT
DAT
E:
STRUCTURAL REQUIREMENTS - Architect and Structural Engineer
Mounting Structure ComponentsThe fabrication of each mounting structure may be slightly different but they each require the same basic components to ensurestability.
Sway Bracing (by others)Sway bracing is designed to rigidly affix the mounting plate to the structural ceiling. The primary purpose of sway bracing is toeliminate sway, or lateral twisting and flexing of the mounting structure as it "reacts" to dynamic load changes caused by moving thefixture radial arms. The sway bracing should be welded to the mounting plate and extend away from the center of the mount. Aminimum of four sway braces placed 90° apart and positioned at a 45° and 60° angle is recommended.
Minimum recommended material for sway bracing is 3" x 3" x 1/4" angle iron. It is recommended that in all applications thesway bracing be fastened to the structural ceiling.
Structural Ceiling Plate (by others)The structural ceiling plate rigidly attaches the mount to the structural ceiling using structural anchors appropriate for the ceilingconstruction. The structural ceiling plate should be a minimum of, 1" ASTM A36 steel plate, 17" diameter with (6) 5/8" diameterholes for structural anchors and is fabricated by others.
Expansion Anchors (by others)Test 50% of the anchors at 2,000 pounds (907 kg) tension, or 50 ft. lb. (68 N●m) torque per CBC 1925A.3.5. Installed anchors must meet the following criteria:1. Hydraulic Ram Method: The anchor should have no observable movement at the applicable test load. For wedge and sleevetype anchors, a practical way to determine observable movement is that the washer under the nut becomes loose.2. Torque Wrench Method (Wedge or Sleeve Type): The applicable test torque must be reached within one-half (1/2) turn of the nut.Testing should occur no sooner than 24 hours after installation of anchors. If any anchor fails testing, test all anchors until 20 consecutive anchors pass, then resume the initial testing frequency. Test equipment is to be calibrated by an approved testinglaboratory in accordance with standard recognized procedures.
Support Tube (by others)The support tube required to attach the mounting plate to the structural ceiling plate should be ASTM 500 Grade B, 6" diameter tube.Support tube is to be welded to structural ceiling plate and mounting plate. A minimum of 6 gussets placed 60° apart should bewelded to support tube at the structural ceiling plate and the mounting plate.
Mounting Plate (SKYTRON supplied)The 17.5" x 17.5" x 1" ASTM A36 steel mounting plate is a SKYTRON supplied item. The Support tube and sway bracing are welded to the mounting plate. The mounting plate contains the corresponding bolt pattern for attaching the fixture and provides themounting areas for the junction box and gas riser plates.
Mounting Structure DesignSeismic structural applications differ. Please contact your local SKYTRON representative for specific calculations. Themounting structure must be designed and fabricated to position the bottom of the SKYTRON mounting plate as shown on sitespecific elevation page. This is a critical dimension in order to accommodate proper clearance required for ceiling cover function. The mounting plate must be perfectly level (+/- 0.1°) and allow no more than two-tenths of a degree (0.2°) of rotation atthe mounting plate when the specified load is applied. The mounting structure must be tested for strength and stiffness prior toinstallation of the fixture. Please contact your SKYTRON representative to schedule testing.
Please consult your SKYTRON representative during early stages of construction to facilitate this process. The testingprocess is a required, documented function prior to closing of the finished ceiling.
Ceiling RequirementsA 24" x 24" access door must be mounted adjacent to the mounting structure for entry by service personnel for serviceaccess.
SKYTRON provides a 24" ceiling cover designed to cover 20" diameter ceiling hole cutout.
Additional Items(SKYTRON supplied)In addition to the pre-installation kit. SKYTRON provides the following items:
(6) 1-1/4" x 10" threaded rods. (24) 1-1/4" hex nuts, pump enclosure (if applicable)
STRUCTURALCEILING
STRUCTURALCEILING
STRUCTURAL CONCRETE SLABNORMAL WEIGHTfc=3,000 PSI (20,684 kPa)
SWAY BRACING3" x 3" x 1/4" (4)
GUSSET 6" DIA.SUPPORT
TUBE
FINISHED CEILING
20"DIAMETER OPENING
REQUIRED(CENTERED UNDER MOUNT)
12" MIN. / 60" MAX.
REFER TO JOB SPECIFIC ELEVATION PAGE (-0/+1)
MOUNTING PLATE(SKYTRON SUPPLIED)
45°- 60°
FIXTURE HUBTYP. 1/4"
PJP
ACCESS DOOR24" x 24"
(REQUIRED)
TYP. 1/4"TOP & BOTTOM
STRUCTURALCEILING PLATE
17" DIA. x 1"
EXPANSION ANCHORS:HILTI KB-III (ICBO 4627)
CARBON STEEL
NOTES:• This illustration depicts recommended mounting structure design and its components. Always consult
specific structural criteria defined by a structural engineer.• Do not cover or block any holes with sway bracing, gussets, weld or weld slag.• Typical dimensions shown. Refer to specific structural drawings and/or Seismic drawings for each
application.• *Critical Dimension
12" HIGH CLEAR SPACEABOVE MOUNTING PLATE
REQUIRED ON 3 SIDES FORGAS AND ELECTRICAL
COMPONENT INSTALLATION
*TYPICAL BOOM MOUNTING STRUCTURE DETAILS**ALWAYS CONSULT SPECIFIC STRUCTURAL CRITERIA DEFINED BY A STRUCTURAL ENGINEER*
NOTES:• This illustration depicts a generic mounting structure design and its components. Always consult
specific structural criteria defined by a structural engineer.• 1 14" Mounting bolts and nuts shipped with fixture.
JUNCTION BOX(SKYTRON SUPPLIED)
BRACKET(SKYTRON SUPPLIED)
PLATE(SKYTRON SUPPLIED)
INLET TUBE(SKYTRON SUPPLIED)
RISER PLATE(SKYTRON SUPPLIED)
CHECK VALVEREMOVAL TOOL(SKYTRON SUPPLIED)
C1.1SHEETINITIAL:
DATE:
DESC
RIPT
ION:
ELE
VATI
ON D
ETAI
LS11
/16/20
17
CHILD
REN'
S HO
SPIT
ALNO
LAMD
L: 31
0 SER
IES
QTY.
: 14
REV.
#: 0
PROJ
ECT
#: 17
-328
SU
BMIT
TAL
PLOT
DAT
E:
DISS (8) 125V, 20A DUPLEX - RED48 1/2"H x 22"W x 30"D
ACCESSORY LIST(1) MOUNTING BLOCK FOR VST MONITOR MOUNT(1) FRONT EQUIPMENT RAIL(2) PMSH SHELF(1) PMSH-H SHELF(1) CORD WRAP - RAIL MOUNTED(1) 22" x 19.5" x 7" DRAWER(1) REAR EQUIPMENT RAIL(1) GLOVE BOX HOLDER - RAIL MOUNTED
QTY GASES
1 CARBON DIOXIDE
0 HELIOX
1 MEDICAL AIR
1 NITROGEN
0 NITROUS OXIDE
1 OXYGEN
2 VACUUM
0 WAGD
*COMMUNICATION CANONLY BE ADDED ABOVETHE SEPARATOR PLATE
GAS OUTLETS:DIMENSIONS:
NOLA
CHIL
DREN
'S H
OSP
ITAL
INITIAL:
PLO
T DA
TE: 6
/4/2
018
SUBM
ITTA
LPR
OJE
CT #
: 17-
328
DESC
RIPT
ION:
CAR
RIER
DET
AILS
SHEETC2
QTY
: 14
REV
#: 1
DATE: ELECTRICAL:
MDL
: 310
SER
IES
CARRIER
*SITE SPECIFIC CARRIER DETAILS*
SEPARATOR PLATE
NITROGEN
OXYGEN
MEDICAL AIR
VACUUM
CARBON DIOXIDE
C3SHEET
MEDICAL GAS REQUIREMENTS - Medical Gas / Piping EngineerNotes:
• Beacon Medaes manufactured gas outlets supplied unless otherwise specified. Pricing and lead time could vary if another Mfgr. is chosen.• Medical gas risers comply with NFPA 9999-2012 OR CAN-CSA Z 73961-12 Edition Cleanliness of gas outlets must be maintained through
installation.• Purge gas lines and test at least 24 hrs. prior to installation.• Test results must be made available to SKYTRON representative for verification & comparison.• Check valve must be removed during installation to prevent damage to o-rings, refer to Ergon pre-installation guide for removal
instructions.** Caution - Check valves have 2 different sizes, please keep Instrument Air and Oxygen separate from the others **
Each boom fixture is fabricated in accordance to the specifications required by the customer. The configuration drawings supplied bySKYTRON will indicate the type and quantity of gas supply lines required. D.I.S.S. connection medical grade hoses connect the fixture tothe riser plate connectors. The customer is responsible to deliver the appropriate medical gas from the facility supply to the riser plateconnectors and for the design of a medical gas system with adequate flow capacity capable of compensating for the accumulative flowrestrictions associated with conventional construction methods i.e. flex gas hoses. SKYTRON provides medical gas riser plate(s) and theappropriate connectors for attachment to the Mounting Plate. The riser plates attach to the mounting plate and will accommodate up to 12gas connectors. The connectors are D.I.S.S. type medical gas connectors with removable single check valves and provide a 1/2" coppertube for attachment to facility supply lines. Caps are provided with Vacuum & WAGD gas connectors to facilitate testing procedures.
All connection and testing of medical gas piping to be performed in accordance with NFPA 99-2012 OR CAN-CSA Z 73961-12requirements.
Recommended Gas Riser PlacementA 6" clearance must be maintained between the finished ceiling and the gas inlet tubes. If this clearance cannot be accomplished atthe mounting plate, then horizontal or remote mounting of the riser plate will be required.When mount is in center of room, riser plate should face head end of room, when mount is near walls, riser plate should be adjacentto wall. If more than one riser plate is required they should be placed next to each other.
GAS CONNECTOR ASSEMBLY (w/ SECONDARY CHECK)*SUPPLIED w/FIXTURE*
9"
DISS CONNECTOR(w/ REMOVABLE PRIMARY
CHECK. PASSIVE EVAC,VACUUM & WAGD DO NOT
HAVE PRIMARY CHECK.)*SUPPLIED w/PRE-INSTALL KIT*
D I S SCHEMETRON
CGA ColorStandard
Note #1 - Any room (Critical Care Area) designed for a permanently located respiratory ventilator or anesthesia machine shall have an outlet capable of a transient flow rate of:170 LPM (6 SCFM) for 3 seconds at the station outlet.
Note #2 - For testing and certification purposes, individual station inlets shall be capable of delivering a flow rate of: 3 SCFM, while maintaining a system pressure of not lessthan 12" (300mm) at the nearest adjacent vacuum inlet. Facility supply must be 115 LPM MINIMUM. (Vacuum D.I.S.S. connectors omit primary check valves for optimal flow). 12in/HG.
Note #3 - WAGD (Waste Anesthetic Gas Disposal) systems employing a design where the WAGD lines are "tied in" to MedVac lines must produce the same flow rates as theMedVac inlets.
Note #4 - Nitrogen system requires nitrogen supplied directly from facility supply line rated at 185psi MIN to 200psi MAX. Avoid designs which feature multiple-in-line Nitrogencontrol systems in order to avoid loss of flow capability.
Note #5 - Pipe sizing: piping systems shall be designed and sized to deliver the required flow rates at the utilization pressures while accounting for natural flow losses throughvarious components including flexible hoses and terminal outlets. The Skytron medical gas and vacuum outlets meet and exceed these standards at the time of manufacture. However piping source capacity, sizing, and restrictions may prevent outlets from attaining required valves.
Additional references: Health Care Facilities code 2012 edition, Section 5.1.12.3.10.2, 5.1.12.3.10.3, 5.1.12.3.10.4, 5.1.12.3.10.5
• TYPE K COPPERTUBING
• 1/2" O.D. EXCEPTPASSIVE EVAC
• 3/4" O.D. FOR PASSIVEEVAC
Medical Air(Yellow)
Test GasISO ColorStandardMedical Air
(Black)
AbbreviatedName
MedAir
StandardPressure
50 - 55 psig
MaximumPressure
55 psig
AllowablePressure Drop
5 psig
Minimum Flow Rates
3.5 SCFM per outlet (100NL/min)N2NF see note #1, 5Carbon Dioxide
(Gray)Carbon Dioxide
(Gray) CO2 50 - 55 psig 55 psig 5 psig 3.5 SCFM per outlet (100NL/min)N2NFHeliox
(Brown)Heliox
(Brown) Heliox 50 - 55 psig 55 psig 5 psig 3.5 SCFM per outlet (100NL/min)N2NFNitrogen(Black)
Nitrogen(Black) N2 or HPN2 160 - 185 psig 200 psig 5 psig
5 SCFM per outlet (140NL/min)free air per outletN2NF see note #4, 5
Nitrous Oxide(Blue)
Nitrous Oxide(Blue) N2O 50 - 55 psig 55 psig 5 psig 3.5 SCFM per outlet (100NL/min)N2NF
Oxygen(Green)
Oxygen(White) O2 50 - 55 psig 55 psig 5 psig 3.5 SCFM per outlet (100NL/min)N2NF see note #1
Vacuum(White)
Vacuum(Yellow) MedVac 12in/Hg (300mm) N/A 3 SCFM per outlet (85NL/min) see note #2
Waste AnestheticGas Disposal
(Purple) WAGDVaries withsystem type
At a minimum, each inlet must be able todraw a continuous 50 lpm (1.8 SCFM)
through the interface
Waste AnestheticGas Disposal
(Purple) see note #3
PURITANOHMEDA
DESC
RIPT
ION:
MED
ICAL
GAS
DET
AILS
*SITE SPECIFIC GAS DETAILS* 11/16
/2017
CHILD
REN'
S HO
SPIT
ALNO
LAPR
OJEC
T #:
17-3
28SU
BMIT
TAL
PLOT
DAT
E:
MEDI
CAL G
AS
MAX OF 12 INLET TUBES PER MOUNTING PLATE. IF MORE ARE REQUIREDTHEY WILL NEED REMOTE MOUNTING.
CHECK VALVE REPLACEMENTTOOL
VALVES
Use above for:Medical AirCarbon DioxideHelioxNitrous OxideNitrogen
Use above for:Instrument AirOxygen
1.18"1.10"
see note #5
see note #5
see note #5
CGA ColorStandard
Nitrogen(Black)
Test GasISO ColorStandard
Nitrogen(Black)
AbbreviatedName
AllowablePressure Drop Minimum Flow Rates
Vacuum(White)
Vacuum(Yellow)
N2 or HPN2
MedVac
(10 psi) 70kpa 400L/min (14.1scfm)@1,250kpa
30L/min (1.1scfm)@54kpa
N2NF
N2NF
INITIAL:DATE:
VERIFY AND INITIAL GAS FACEPLATE STYLE REQUESTED
(4 inhg) 13kpa
CAN-CSA section 7.3.2. Z 7396.1-12
N2NF Other Gas Various MedVac 120L/min (4.2scfm)@345kpa(4 psi) 28kpa
MDL:
310 S
ERIE
SQT
Y.: 1
4RE
V. #:
0
INITIAL:DATE: INITIAL:
DESC
RIPT
ION:
ELE
CTRI
CAL W
IRIN
G DE
TAILS
C4SHEET
11/16
/2017
REQUIRED FOR FABRICATIONVERIFY AND INITIAL
POWER TYPE INITIAL:
5 INP
UT LE
ADS
120 V
AC, 2
0 AMP
120 V
AC, 2
0 AMP
120 V
AC, 2
0 AMP
CIRC
UIT
2
CIRC
UIT
3
CIRC
UIT
4
(8) 1
25V,
20A,
DUP
LEX
OUTL
ETS
- RED
*SITE SPECIFIC WIRING DETAILS* INTERNAL FIXTURE WIRING TYPICAL, EXTRA FLEX STEEL CONDUIT
TYPE: 12AWG, 600V, XHHW-2, 90°C - UNLESS NOTED
MOUN
TING
HUB
T B T B T B T B
ELECTRICAL REQUIREMENTS - Electrical Engineer
Each boom fixture is fabricated in accordance to the specifications required by the customer. The Configuration drawings supplied by SKYTRONwill indicate the type and quantity of circuits required. SKYTRON provides all wiring and electrical materials for connection from fixture to junctionbox or pump enclosure (if applicable). SKYTRON supplies an electrical junction box (8-5/8" x 4-5/8" x 1-3/4") to facilitate field wiring for up to sixcircuits that is mounted on the mounting plate in the correct position and if applicable, a hydraulic pump enclosure/junction box (18"L x 6"W x 12"H) that is to be remote mounted within 24" of the mounting structure (by contractor). The pump enclosure can be shipped with the installationkit upon request. Typical wire type is 12AWG, 600V, XHHW-2. Each circuit requires a separate, properly circuit protected, 120VAC, 60Hz powersupply line enclosed in rigid metal conduit. All electrical materials for connection to SKYTRON supplied junction box or pump enclosure and installation labor for such materials to be provided by customer. All wiring and materials to be in accordance with federal, state and local codes.It is the customer's responsibility to meet conformity to NFPA and NEC standards with respect to the number of receptacles provided in a patientcare area.
Specific conductor colors and/or wiring for isolated applications are available upon request.
ARM COVERARM COVER
ARM COVERARM COVER
GROUND(FOR ELECTRICAL)
PROTECTED EARTH(FOR CHASSIS)
NORMALDUPLEX
CRITICALDUPLEX
CRITICALDUPLEX
ULTRAFLEXTYPE USL CONDUIT
ULTRAFLEXTYPE USL CONDUIT
TB
TERMINALBLOCKDETAIL
120VAC, 20ASUPPLY
TB
ISOLATED POWERBROWN W/YELLOW STRIPE, ORANGE W/BLUE STRIPE,
GREEN W/YELLOW STRIPE
NON-ISOLATED POWERBLACK, WHITE, GREEN
Internally LocatedElectrical Terminal
Block Detail
120VAC, 20ASUPPLY
carrier contains aninternally located
Terminal Blockthat provides
interconnectivitybetween the
outlets and theinternal conductors
CARR
IER
UTILI
TIES
PAN
EL
TB
TB
CIRC
UIT
112
0 VAC
, 20 A
MP
GENERIC BOOM ELECTRICAL WIRING DIAGRAM FOR FIXED ARMS
120 V
AC, 1
5 AMP
ASTR
O LI
GHT
LIGH
T CI
RCUI
T TO
POW
ER S
UPPL
Y BO
XSE
E PA
GE 6
CIRC
UIT
5
CHILD
REN'
S HO
SPIT
ALNO
LAPR
OJEC
T #:
17-3
28SU
BMIT
TAL
PLOT
DAT
E:
MDL:
310 S
ERIE
SQT
Y.: 1
4RE
V. #:
0
TYPE USL CONDUITBY SKYTRON
SPECIAL GROUNDING REQUIREMENTS - Electrical Engineer
1. Use of approved metal conduit shall be employed throughout the fixture's wiring circuit where applicable. Facility supplied, circuit breaker protected, 100-240VAC 50/60 Hz power source wiring.
2. Grounding - Proper performance and safety of this fixture can only achieved by an adequate grounding system. Fixture ground must be a dedicated ground point ultimately bonded to the facilities grounding system to prevent the migration of electricalinterference generated by other devices.
Protective Means - To avoid the risk of electric shock, this equipment must only be connected to a supply mains with protective earth ground. This fixture requires a properly circuit protected, appropriately sized, dedicated circuit. An isolated powersupply circuit must be protected by an appropriately sized double pole, single throw circuit breaker
BY SKYTRON
BY OTHERS
See note 1 See note 2
THIS DIAGRAM IS FOR INFORMATIONAL PURPOSES ONLY. THIS WILL NOT MATCH YOUR EXACT MODEL.
JUNCTION BOX BY OTHERWITHIN 12" OF MOUNT 3/4" METAL CONDUIT
100-240VAC INPUT DEDICATED
3/4" METAL CONDUIT 12AWG, 3 WIRES PERLIGHTHEAD PLUS FIXTURE GROUNDRED, GREEN/YELLOW, BLUE 24VDC OUTPUT
POWER SUPPLY JUNCTION BOXWITHIN 3' OF MOUNT(SUPPLIED BY SKYTRON)
C6SHEETINITIAL:
DATE:
DESC
RIPT
ION:
LIGH
T FI
XTUR
E DE
TAILS
11/16
/2017
MDL:
310 S
ERIE
SQT
Y.: 1
4RE
V. #:
0CH
ILDRE
N'S
HOSP
ITAL
NOLA
PROJ
ECT
#: 17
-328
SUBM
ITTA
LPL
OT D
ATE:
72"
120" CEILING HEIGHT
0" FLOOR
10"
712"
3912" 3Q1-L
3112" 32F
25"
3VBM36 67 12"
30"
ITEM ID: 10966
D1SHEETINITIAL:
DATE:
DESC
RIPT
ION:
ELE
VATI
ON D
ETAI
LS
*SITE SPECIFIC ELEVATION DETAILS*
6/20/2
018PLEASE REFER TO MOUNTING
STRUCTURE DETAIL PAGE FORMOUNTING STRUCTURE EXAMPLE
MDL:
200 S
ERIE
SQT
Y.: 1
5RE
V. #:
0
SCALE: 34" = 1'MAX. FIXTURE WEIGHT: MAX. MOMENT LOAD: EQUIPMENT CAPACITY:597 LBS. 2310 FT. LBS. 3VBM36 - 219 LBS.
CHILD
REN'
S HO
SPIT
ALNO
LAPR
OJEC
T #:
17-3
23SU
BMIT
TAL
PLOT
DAT
E:
STRUCTURAL REQUIREMENTS - Architect and Structural Engineer
Mounting Structure ComponentsThe fabrication of each mounting structure may be slightly different but they each require the same basic components to ensurestability.
Sway Bracing (by others)Sway bracing is designed to rigidly affix the mounting plate to the structural ceiling. The primary purpose of sway bracing is toeliminate sway, or lateral twisting and flexing of the mounting structure as it "reacts" to dynamic load changes caused by moving thefixture radial arms. The sway bracing should be welded to the mounting plate and extend away from the center of the mount. Aminimum of four sway braces placed 90° apart and positioned at a 45° and 60° angle is recommended.
Minimum recommended material for sway bracing is 3" x 3" x 1/4" angle iron. It is recommended that in all applications thesway bracing be fastened to the structural ceiling.
Structural Ceiling Plate (by others)The structural ceiling plate rigidly attaches the mount to the structural ceiling using structural anchors appropriate for the ceilingconstruction. The structural ceiling plate should be a minimum of, 1" ASTM A36 steel plate, 17" diameter with (6) 5/8" diameterholes for structural anchors and is fabricated by others.
Expansion Anchors (by others)Test 50% of the anchors at 2,000 pounds (907 kg) tension, or 50 ft. lb. (68 N●m) torque per CBC 1925A.3.5. Installed anchors must meet the following criteria:1. Hydraulic Ram Method: The anchor should have no observable movement at the applicable test load. For wedge and sleevetype anchors, a practical way to determine observable movement is that the washer under the nut becomes loose.2. Torque Wrench Method (Wedge or Sleeve Type): The applicable test torque must be reached within one-half (1/2) turn of the nut.Testing should occur no sooner than 24 hours after installation of anchors. If any anchor fails testing, test all anchors until 20 consecutive anchors pass, then resume the initial testing frequency. Test equipment is to be calibrated by an approved testinglaboratory in accordance with standard recognized procedures.
Support Tube (by others)The support tube required to attach the mounting plate to the structural ceiling plate should be ASTM 500 Grade B, 6" diameter tube.Support tube is to be welded to structural ceiling plate and mounting plate. A minimum of 6 gussets placed 60° apart should bewelded to support tube at the structural ceiling plate and the mounting plate.
Mounting Plate (SKYTRON supplied)The 17.5" x 17.5" x 1" ASTM A36 steel mounting plate is a SKYTRON supplied item. The Support tube and sway bracing are welded to the mounting plate. The mounting plate contains the corresponding bolt pattern for attaching the fixture and provides themounting areas for the junction box and gas riser plates.
Mounting Structure DesignSeismic structural applications differ. Please contact your local SKYTRON representative for specific calculations. Themounting structure must be designed and fabricated to position the bottom of the SKYTRON mounting plate as shown on sitespecific elevation page. This is a critical dimension in order to accommodate proper clearance required for ceiling cover function. The mounting plate must be perfectly level (+/- 0.1°) and allow no more than two-tenths of a degree (0.2°) of rotation atthe mounting plate when the specified load is applied. The mounting structure must be tested for strength and stiffness prior toinstallation of the fixture. Please contact your SKYTRON representative to schedule testing.
Please consult your SKYTRON representative during early stages of construction to facilitate this process. The testingprocess is a required, documented function prior to closing of the finished ceiling.
Ceiling RequirementsA 24" x 24" access door must be mounted adjacent to the mounting structure for entry by service personnel for serviceaccess.
SKYTRON provides a 24" ceiling cover designed to cover 20" diameter ceiling hole cutout.
Additional Items(SKYTRON supplied)In addition to the pre-installation kit. SKYTRON provides the following items:
(6) 1-1/4" x 10" threaded rods. (24) 1-1/4" hex nuts, pump enclosure (if applicable)
STRUCTURALCEILING
STRUCTURALCEILING
STRUCTURAL CONCRETE SLABNORMAL WEIGHTfc=3,000 PSI (20,684 kPa)
SWAY BRACING3" x 3" x 1/4" (4)
GUSSET 6" DIA.SUPPORT
TUBE
FINISHED CEILING
20"DIAMETER OPENING
REQUIRED(CENTERED UNDER MOUNT)
12" MIN. / 60" MAX.
REFER TO JOB SPECIFIC ELEVATION PAGE (-0/+1)
MOUNTING PLATE(SKYTRON SUPPLIED)
45°- 60°
FIXTURE HUBTYP. 1/4"
PJP
ACCESS DOOR24" x 24"
(REQUIRED)
TYP. 1/4"TOP & BOTTOM
STRUCTURALCEILING PLATE
17" DIA. x 1"
EXPANSION ANCHORS:HILTI KB-III (ICBO 4627)
CARBON STEEL
NOTES:• This illustration depicts recommended mounting structure design and its components. Always consult
specific structural criteria defined by a structural engineer.• Do not cover or block any holes with sway bracing, gussets, weld or weld slag.• Typical dimensions shown. Refer to specific structural drawings and/or Seismic drawings for each
application.• *Critical Dimension
12" HIGH CLEAR SPACEABOVE MOUNTING PLATE
REQUIRED ON 3 SIDES FORGAS AND ELECTRICAL
COMPONENT INSTALLATION
*TYPICAL BOOM MOUNTING STRUCTURE DETAILS**ALWAYS CONSULT SPECIFIC STRUCTURAL CRITERIA DEFINED BY A STRUCTURAL ENGINEER*
NOTES:• This illustration depicts a generic mounting structure design and its components. Always consult
specific structural criteria defined by a structural engineer.• 1 14" Mounting bolts and nuts shipped with fixture.
JUNCTION BOX(SKYTRON SUPPLIED)
BRACKET(SKYTRON SUPPLIED)
PLATE(SKYTRON SUPPLIED)
INLET TUBE(SKYTRON SUPPLIED)
RISER PLATE(SKYTRON SUPPLIED)
CHECK VALVEREMOVAL TOOL(SKYTRON SUPPLIED)
D1.1SHEETINITIAL:
DATE:
DESC
RIPT
ION:
ELE
VATI
ON D
ETAI
LS11
/16/20
17
CHILD
REN'
S HO
SPIT
ALNO
LAMD
L: 20
0 SER
IES
QTY.
: 15
REV.
#: 0
PROJ
ECT
#: 17
-328
SU
BMIT
TAL
PLOT
DAT
E:
DISS (8) 125V, 20A DUPLEX - RED39"H x 11"W x 8 1/2"D
ACCESSORY LIST(1) REAR EQUIPMENT RAIL(1) WINGBAR W/ 4 HOOK IV TREE
QTY GASES
0 CARBON DIOXIDE
0 HELIOX
1 MEDICAL AIR
0 NITROGEN
1 NITROUS OXIDE
2 OXYGEN
2 VACUUM
1 WAGD
*COMMUNICATION CANONLY BE ADDED ABOVETHE SEPARATOR PLATE
GAS OUTLETS:DIMENSIONS:
NOLA
CHIL
DREN
'S H
OSP
ITAL
INITIAL:
PLO
T DA
TE: 6
/4/2
018
SUBM
ITTA
LPR
OJE
CT #
: 17-
328
DESC
RIPT
ION:
CAR
RIER
DET
AILS
SHEETD2
QTY
: 15
REV
#: 2
DATE: ELECTRICAL:
MDL
: 200
SER
IES
CARRIER
*SITE SPECIFIC CARRIER DETAILS*
SEPARATOR PLATE
VACUUM
WAGDMEDICAL AIRNITROUS OXIDEOXYGENOXYGEN
VACUUM
D3SHEET
MEDICAL GAS REQUIREMENTS - Medical Gas / Piping EngineerNotes:
• Beacon Medaes manufactured gas outlets supplied unless otherwise specified. Pricing and lead time could vary if another Mfgr. is chosen.• Medical gas risers comply with NFPA 9999-2012 OR CAN-CSA Z 73961-12 Edition Cleanliness of gas outlets must be maintained through
installation.• Purge gas lines and test at least 24 hrs. prior to installation.• Test results must be made available to SKYTRON representative for verification & comparison.• Check valve must be removed during installation to prevent damage to o-rings, refer to Ergon pre-installation guide for removal
instructions.** Caution - Check valves have 2 different sizes, please keep Instrument Air and Oxygen separate from the others **
Each boom fixture is fabricated in accordance to the specifications required by the customer. The configuration drawings supplied bySKYTRON will indicate the type and quantity of gas supply lines required. D.I.S.S. connection medical grade hoses connect the fixture tothe riser plate connectors. The customer is responsible to deliver the appropriate medical gas from the facility supply to the riser plateconnectors and for the design of a medical gas system with adequate flow capacity capable of compensating for the accumulative flowrestrictions associated with conventional construction methods i.e. flex gas hoses. SKYTRON provides medical gas riser plate(s) and theappropriate connectors for attachment to the Mounting Plate. The riser plates attach to the mounting plate and will accommodate up to 12gas connectors. The connectors are D.I.S.S. type medical gas connectors with removable single check valves and provide a 1/2" coppertube for attachment to facility supply lines. Caps are provided with Vacuum & WAGD gas connectors to facilitate testing procedures.
All connection and testing of medical gas piping to be performed in accordance with NFPA 99-2012 OR CAN-CSA Z 73961-12requirements.
Recommended Gas Riser PlacementA 6" clearance must be maintained between the finished ceiling and the gas inlet tubes. If this clearance cannot be accomplished atthe mounting plate, then horizontal or remote mounting of the riser plate will be required.When mount is in center of room, riser plate should face head end of room, when mount is near walls, riser plate should be adjacentto wall. If more than one riser plate is required they should be placed next to each other.
GAS CONNECTOR ASSEMBLY (w/ SECONDARY CHECK)*SUPPLIED w/FIXTURE*
9"
DISS CONNECTOR(w/ REMOVABLE PRIMARY
CHECK. PASSIVE EVAC,VACUUM & WAGD DO NOT
HAVE PRIMARY CHECK.)*SUPPLIED w/PRE-INSTALL KIT*
D I S SCHEMETRON
CGA ColorStandard
Note #1 - Any room (Critical Care Area) designed for a permanently located respiratory ventilator or anesthesia machine shall have an outlet capable of a transient flow rate of:170 LPM (6 SCFM) for 3 seconds at the station outlet.
Note #2 - For testing and certification purposes, individual station inlets shall be capable of delivering a flow rate of: 3 SCFM, while maintaining a system pressure of not lessthan 12" (300mm) at the nearest adjacent vacuum inlet. Facility supply must be 115 LPM MINIMUM. (Vacuum D.I.S.S. connectors omit primary check valves for optimal flow). 12in/HG.
Note #3 - WAGD (Waste Anesthetic Gas Disposal) systems employing a design where the WAGD lines are "tied in" to MedVac lines must produce the same flow rates as theMedVac inlets.
Note #4 - Nitrogen system requires nitrogen supplied directly from facility supply line rated at 185psi MIN to 200psi MAX. Avoid designs which feature multiple-in-line Nitrogencontrol systems in order to avoid loss of flow capability.
Note #5 - Pipe sizing: piping systems shall be designed and sized to deliver the required flow rates at the utilization pressures while accounting for natural flow losses throughvarious components including flexible hoses and terminal outlets. The Skytron medical gas and vacuum outlets meet and exceed these standards at the time of manufacture. However piping source capacity, sizing, and restrictions may prevent outlets from attaining required valves.
Additional references: Health Care Facilities code 2012 edition, Section 5.1.12.3.10.2, 5.1.12.3.10.3, 5.1.12.3.10.4, 5.1.12.3.10.5
• TYPE K COPPERTUBING
• 1/2" O.D. EXCEPTPASSIVE EVAC
• 3/4" O.D. FOR PASSIVEEVAC
Medical Air(Yellow)
Test GasISO ColorStandardMedical Air
(Black)
AbbreviatedName
MedAir
StandardPressure
50 - 55 psig
MaximumPressure
55 psig
AllowablePressure Drop
5 psig
Minimum Flow Rates
3.5 SCFM per outlet (100NL/min)N2NF see note #1, 5Carbon Dioxide
(Gray)Carbon Dioxide
(Gray) CO2 50 - 55 psig 55 psig 5 psig 3.5 SCFM per outlet (100NL/min)N2NFHeliox
(Brown)Heliox
(Brown) Heliox 50 - 55 psig 55 psig 5 psig 3.5 SCFM per outlet (100NL/min)N2NFNitrogen(Black)
Nitrogen(Black) N2 or HPN2 160 - 185 psig 200 psig 5 psig
5 SCFM per outlet (140NL/min)free air per outletN2NF see note #4, 5
Nitrous Oxide(Blue)
Nitrous Oxide(Blue) N2O 50 - 55 psig 55 psig 5 psig 3.5 SCFM per outlet (100NL/min)N2NF
Oxygen(Green)
Oxygen(White) O2 50 - 55 psig 55 psig 5 psig 3.5 SCFM per outlet (100NL/min)N2NF see note #1
Vacuum(White)
Vacuum(Yellow) MedVac 12in/Hg (300mm) N/A 3 SCFM per outlet (85NL/min) see note #2
Waste AnestheticGas Disposal
(Purple) WAGDVaries withsystem type
At a minimum, each inlet must be able todraw a continuous 50 lpm (1.8 SCFM)
through the interface
Waste AnestheticGas Disposal
(Purple) see note #3
PURITANOHMEDA
DESC
RIPT
ION:
MED
ICAL
GAS
DET
AILS
*SITE SPECIFIC GAS DETAILS* 11/16
/2017
CHILD
REN'
S HO
SPIT
ALNO
LAPR
OJEC
T #:
17-3
28SU
BMIT
TAL
PLOT
DAT
E:
MEDI
CAL G
AS
MAX OF 12 INLET TUBES PER MOUNTING PLATE. IF MORE ARE REQUIREDTHEY WILL NEED REMOTE MOUNTING.
CHECK VALVE REPLACEMENTTOOL
VALVES
Use above for:Medical AirCarbon DioxideHelioxNitrous OxideNitrogen
Use above for:Instrument AirOxygen
1.18"1.10"
see note #5
see note #5
see note #5
CGA ColorStandard
Nitrogen(Black)
Test GasISO ColorStandard
Nitrogen(Black)
AbbreviatedName
AllowablePressure Drop Minimum Flow Rates
Vacuum(White)
Vacuum(Yellow)
N2 or HPN2
MedVac
(10 psi) 70kpa 400L/min (14.1scfm)@1,250kpa
30L/min (1.1scfm)@54kpa
N2NF
N2NF
INITIAL:DATE:
VERIFY AND INITIAL GAS FACEPLATE STYLE REQUESTED
(4 inhg) 13kpa
CAN-CSA section 7.3.2. Z 7396.1-12
N2NF Other Gas Various MedVac 120L/min (4.2scfm)@345kpa(4 psi) 28kpa
MDL:
200 S
ERIE
SQT
Y.: 1
5RE
V. #:
0
INITIAL:DATE: INITIAL:
DESC
RIPT
ION:
ELE
CTRI
CAL W
IRIN
G DE
TAILS
D4SHEET
11/16
/2017
REQUIRED FOR FABRICATIONVERIFY AND INITIAL
POWER TYPE INITIAL:
4 INP
UT LE
ADS
120 V
AC, 2
0 AMP
120 V
AC, 2
0 AMP
120 V
AC, 2
0 AMP
CIRC
UIT
2
CIRC
UIT
3
CIRC
UIT
4
(8) 1
25V,
20A,
DUP
LEX
OUTL
ETS
- RED
*SITE SPECIFIC WIRING DETAILS* INTERNAL FIXTURE WIRING TYPICAL, EXTRA FLEX STEEL CONDUIT
TYPE: 12AWG, 600V, XHHW-2, 90°C - UNLESS NOTED
MOUN
TING
HUB
T B T B T B T B
ELECTRICAL REQUIREMENTS - Electrical Engineer
Each boom fixture is fabricated in accordance to the specifications required by the customer. The Configuration drawings supplied by SKYTRONwill indicate the type and quantity of circuits required. SKYTRON provides all wiring and electrical materials for connection from fixture to junctionbox or pump enclosure (if applicable). SKYTRON supplies an electrical junction box (8-5/8" x 4-5/8" x 1-3/4") to facilitate field wiring for up to sixcircuits that is mounted on the mounting plate in the correct position and if applicable, a hydraulic pump enclosure/junction box (18"L x 6"W x 12"H) that is to be remote mounted within 24" of the mounting structure (by contractor). The pump enclosure can be shipped with the installationkit upon request. Typical wire type is 12AWG, 600V, XHHW-2. Each circuit requires a separate, properly circuit protected, 120VAC, 60Hz powersupply line enclosed in rigid metal conduit. All electrical materials for connection to SKYTRON supplied junction box or pump enclosure and installation labor for such materials to be provided by customer. All wiring and materials to be in accordance with federal, state and local codes.It is the customer's responsibility to meet conformity to NFPA and NEC standards with respect to the number of receptacles provided in a patientcare area.
Specific conductor colors and/or wiring for isolated applications are available upon request.
ARM COVERARM COVER
ARM COVERARM COVER
GROUND(FOR ELECTRICAL)
PROTECTED EARTH(FOR CHASSIS)
NORMALDUPLEX
CRITICALDUPLEX
CRITICALDUPLEX
ULTRAFLEXTYPE USL CONDUIT
ULTRAFLEXTYPE USL CONDUIT
TB
TERMINALBLOCKDETAIL
120VAC, 20ASUPPLY
TB
ISOLATED POWERBROWN W/YELLOW STRIPE, ORANGE W/BLUE STRIPE,
GREEN W/YELLOW STRIPE
NON-ISOLATED POWERBLACK, WHITE, GREEN
Internally LocatedElectrical Terminal
Block Detail
120VAC, 20ASUPPLY
carrier contains aninternally located
Terminal Blockthat provides
interconnectivitybetween the
outlets and theinternal conductors
CARR
IER
UTILI
TIES
PAN
EL
TB
TB
CIRC
UIT
112
0 VAC
, 20 A
MP
GENERIC BOOM ELECTRICAL WIRING DIAGRAM FOR FIXED ARMS
CHILD
REN'
S HO
SPIT
ALNO
LAPR
OJEC
T #:
17-3
28SU
BMIT
TAL
PLOT
DAT
E:
MDL:
200 S
ERIE
SQT
Y.: 1
5RE
V. #:
0
72"
120" CEILING HEIGHT
0" FLOOR
10"
312"
51" 3EC
4112" 3T2-C
36" 3AFC
12"
18"
3VBM48 67"
20"
3FLM-32
81"
3912" 32F-L
28"
ITEM ID: 1768
E1SHEETINITIAL:
DATE:
DESC
RIPT
ION:
ELE
VATI
ON D
ETAI
LS
*SITE SPECIFIC ELEVATION DETAILS*
6/20/2
018PLEASE REFER TO MOUNTING
STRUCTURE DETAIL PAGE FORMOUNTING STRUCTURE EXAMPLE
MDL:
320 S
ERIE
SQT
Y.: 2
REV.
#: 0
SCALE: 34" = 1'MAX. FIXTURE WEIGHT: MAX. MOMENT LOAD: EQUIPMENT CAPACITY:1029 LBS. 5754 FT. LBS.
3VBM48 - 218 LBS.3FLM1-32 - 64.5 LBS.
CHILD
REN'
S HO
SPIT
ALNO
LAPR
OJEC
T #:
17-3
23SU
BMIT
TAL
PLOT
DAT
E:
STRUCTURAL REQUIREMENTS - Architect and Structural Engineer
Mounting Structure ComponentsThe fabrication of each mounting structure may be slightly different but they each require the same basic components to ensurestability.
Sway Bracing (by others)Sway bracing is designed to rigidly affix the mounting plate to the structural ceiling. The primary purpose of sway bracing is toeliminate sway, or lateral twisting and flexing of the mounting structure as it "reacts" to dynamic load changes caused by moving thefixture radial arms. The sway bracing should be welded to the mounting plate and extend away from the center of the mount. Aminimum of four sway braces placed 90° apart and positioned at a 45° and 60° angle is recommended.
Minimum recommended material for sway bracing is 3" x 3" x 1/4" angle iron. It is recommended that in all applications thesway bracing be fastened to the structural ceiling.
Structural Ceiling Plate (by others)The structural ceiling plate rigidly attaches the mount to the structural ceiling using structural anchors appropriate for the ceilingconstruction. The structural ceiling plate should be a minimum of, 1" ASTM A36 steel plate, 17" diameter with (6) 5/8" diameterholes for structural anchors and is fabricated by others.
Expansion Anchors (by others)Test 50% of the anchors at 2,000 pounds (907 kg) tension, or 50 ft. lb. (68 N●m) torque per CBC 1925A.3.5. Installed anchors must meet the following criteria:1. Hydraulic Ram Method: The anchor should have no observable movement at the applicable test load. For wedge and sleevetype anchors, a practical way to determine observable movement is that the washer under the nut becomes loose.2. Torque Wrench Method (Wedge or Sleeve Type): The applicable test torque must be reached within one-half (1/2) turn of the nut.Testing should occur no sooner than 24 hours after installation of anchors. If any anchor fails testing, test all anchors until 20 consecutive anchors pass, then resume the initial testing frequency. Test equipment is to be calibrated by an approved testinglaboratory in accordance with standard recognized procedures.
Support Tube (by others)The support tube required to attach the mounting plate to the structural ceiling plate should be ASTM 500 Grade B, 6" diameter tube.Support tube is to be welded to structural ceiling plate and mounting plate. A minimum of 6 gussets placed 60° apart should bewelded to support tube at the structural ceiling plate and the mounting plate.
Mounting Plate (SKYTRON supplied)The 17.5" x 17.5" x 1" ASTM A36 steel mounting plate is a SKYTRON supplied item. The Support tube and sway bracing are welded to the mounting plate. The mounting plate contains the corresponding bolt pattern for attaching the fixture and provides themounting areas for the junction box and gas riser plates.
Mounting Structure DesignSeismic structural applications differ. Please contact your local SKYTRON representative for specific calculations. Themounting structure must be designed and fabricated to position the bottom of the SKYTRON mounting plate as shown on sitespecific elevation page. This is a critical dimension in order to accommodate proper clearance required for ceiling cover function. The mounting plate must be perfectly level (+/- 0.1°) and allow no more than two-tenths of a degree (0.2°) of rotation atthe mounting plate when the specified load is applied. The mounting structure must be tested for strength and stiffness prior toinstallation of the fixture. Please contact your SKYTRON representative to schedule testing.
Please consult your SKYTRON representative during early stages of construction to facilitate this process. The testingprocess is a required, documented function prior to closing of the finished ceiling.
Ceiling RequirementsA 24" x 24" access door must be mounted adjacent to the mounting structure for entry by service personnel for serviceaccess.
SKYTRON provides a 24" ceiling cover designed to cover 20" diameter ceiling hole cutout.
Additional Items(SKYTRON supplied)In addition to the pre-installation kit. SKYTRON provides the following items:
(6) 1-1/4" x 10" threaded rods. (24) 1-1/4" hex nuts, pump enclosure (if applicable)
STRUCTURALCEILING
STRUCTURALCEILING
STRUCTURAL CONCRETE SLABNORMAL WEIGHTfc=3,000 PSI (20,684 kPa)
SWAY BRACING3" x 3" x 1/4" (4)
GUSSET 6" DIA.SUPPORT
TUBE
FINISHED CEILING
20"DIAMETER OPENING
REQUIRED(CENTERED UNDER MOUNT)
12" MIN. / 60" MAX.
REFER TO JOB SPECIFIC ELEVATION PAGE (-0/+1)
MOUNTING PLATE(SKYTRON SUPPLIED)
45°- 60°
FIXTURE HUBTYP. 1/4"
PJP
ACCESS DOOR24" x 24"
(REQUIRED)
TYP. 1/4"TOP & BOTTOM
STRUCTURALCEILING PLATE
17" DIA. x 1"
EXPANSION ANCHORS:HILTI KB-III (ICBO 4627)
CARBON STEEL
NOTES:• This illustration depicts recommended mounting structure design and its components. Always consult
specific structural criteria defined by a structural engineer.• Do not cover or block any holes with sway bracing, gussets, weld or weld slag.• Typical dimensions shown. Refer to specific structural drawings and/or Seismic drawings for each
application.• *Critical Dimension
12" HIGH CLEAR SPACEABOVE MOUNTING PLATE
REQUIRED ON 3 SIDES FORGAS AND ELECTRICAL
COMPONENT INSTALLATION
*TYPICAL BOOM MOUNTING STRUCTURE DETAILS**ALWAYS CONSULT SPECIFIC STRUCTURAL CRITERIA DEFINED BY A STRUCTURAL ENGINEER*
NOTES:• This illustration depicts a generic mounting structure design and its components. Always consult
specific structural criteria defined by a structural engineer.• 1 14" Mounting bolts and nuts shipped with fixture.
JUNCTION BOX(SKYTRON SUPPLIED)
BRACKET(SKYTRON SUPPLIED)
PLATE(SKYTRON SUPPLIED)
INLET TUBE(SKYTRON SUPPLIED)
RISER PLATE(SKYTRON SUPPLIED)
CHECK VALVEREMOVAL TOOL(SKYTRON SUPPLIED)
E1.1SHEETINITIAL:
DATE:
DESC
RIPT
ION:
ELE
VATI
ON D
ETAI
LS11
/16/20
17
CHILD
REN'
S HO
SPIT
ALNO
LAMD
L: 32
0 SER
IES
QTY.
: 2RE
V. #:
0PR
OJEC
T #:
17-3
28
SUBM
ITTA
LPL
OT D
ATE:
VACUUM
OXYGENMEDICAL AIR
NITROGEN
VACUUM
SEPARATOR PLATE
DISS (8) 125V, 20A DUPLEX - RED48 1/2"H x 22"W x 30"D
ACCESSORY LIST(1) MOUNTING BLOCK FOR VST MONITOR MOUNT(1) FRONT EQUIPMENT RAIL(1) 3PMSH-H SHELF(2) 3PMSH SHELF(2) CORD WRAP - RAIL MOUNTED(1) GLOVE BOX HOLDER - RAIL MOUNTED(1) REAR EQUIPMENT RAIL(1) 22" x 19.5" x 7" PLASTIC DRAWER
QTY GASES
0 CARBON DIOXIDE
0 HELIOX
1 MEDICAL AIR
1 NITROGEN
0 NITROUS OXIDE
1 OXYGEN
2 VACUUM
0 WAGD*COMMUNICATION CANONLY BE ADDED ABOVETHE SEPARATOR PLATE
GAS OUTLETS:DIMENSIONS:
NOLA
CHIL
DREN
'S H
OSP
ITAL
INITIAL:
PLO
T DA
TE: 1
2/8/
2017
SUBM
ITTA
LPR
OJE
CT #
: 17-
328
DESC
RIPT
ION:
CAR
RIER
DET
AILS
SHEETE2
QTY
: 2
R
EV #
: 1
DATE: ELECTRICAL:
MDL
: 320
SER
IES
CARRIER
*SITE SPECIFIC CARRIER DETAILS*
E3SHEET
MEDICAL GAS REQUIREMENTS - Medical Gas / Piping EngineerNotes:
• Beacon Medaes manufactured gas outlets supplied unless otherwise specified. Pricing and lead time could vary if another Mfgr. is chosen.• Medical gas risers comply with NFPA 9999-2012 OR CAN-CSA Z 73961-12 Edition Cleanliness of gas outlets must be maintained through
installation.• Purge gas lines and test at least 24 hrs. prior to installation.• Test results must be made available to SKYTRON representative for verification & comparison.• Check valve must be removed during installation to prevent damage to o-rings, refer to Ergon pre-installation guide for removal
instructions.** Caution - Check valves have 2 different sizes, please keep Instrument Air and Oxygen separate from the others **
Each boom fixture is fabricated in accordance to the specifications required by the customer. The configuration drawings supplied bySKYTRON will indicate the type and quantity of gas supply lines required. D.I.S.S. connection medical grade hoses connect the fixture tothe riser plate connectors. The customer is responsible to deliver the appropriate medical gas from the facility supply to the riser plateconnectors and for the design of a medical gas system with adequate flow capacity capable of compensating for the accumulative flowrestrictions associated with conventional construction methods i.e. flex gas hoses. SKYTRON provides medical gas riser plate(s) and theappropriate connectors for attachment to the Mounting Plate. The riser plates attach to the mounting plate and will accommodate up to 12gas connectors. The connectors are D.I.S.S. type medical gas connectors with removable single check valves and provide a 1/2" coppertube for attachment to facility supply lines. Caps are provided with Vacuum & WAGD gas connectors to facilitate testing procedures.
All connection and testing of medical gas piping to be performed in accordance with NFPA 99-2012 OR CAN-CSA Z 73961-12requirements.
Recommended Gas Riser PlacementA 6" clearance must be maintained between the finished ceiling and the gas inlet tubes. If this clearance cannot be accomplished atthe mounting plate, then horizontal or remote mounting of the riser plate will be required.When mount is in center of room, riser plate should face head end of room, when mount is near walls, riser plate should be adjacentto wall. If more than one riser plate is required they should be placed next to each other.
GAS CONNECTOR ASSEMBLY (w/ SECONDARY CHECK)*SUPPLIED w/FIXTURE*
9"
DISS CONNECTOR(w/ REMOVABLE PRIMARY
CHECK. PASSIVE EVAC,VACUUM & WAGD DO NOT
HAVE PRIMARY CHECK.)*SUPPLIED w/PRE-INSTALL KIT*
D I S SCHEMETRON
CGA ColorStandard
Note #1 - Any room (Critical Care Area) designed for a permanently located respiratory ventilator or anesthesia machine shall have an outlet capable of a transient flow rate of:170 LPM (6 SCFM) for 3 seconds at the station outlet.
Note #2 - For testing and certification purposes, individual station inlets shall be capable of delivering a flow rate of: 3 SCFM, while maintaining a system pressure of not lessthan 12" (300mm) at the nearest adjacent vacuum inlet. Facility supply must be 115 LPM MINIMUM. (Vacuum D.I.S.S. connectors omit primary check valves for optimal flow). 12in/HG.
Note #3 - WAGD (Waste Anesthetic Gas Disposal) systems employing a design where the WAGD lines are "tied in" to MedVac lines must produce the same flow rates as theMedVac inlets.
Note #4 - Nitrogen system requires nitrogen supplied directly from facility supply line rated at 185psi MIN to 200psi MAX. Avoid designs which feature multiple-in-line Nitrogencontrol systems in order to avoid loss of flow capability.
Note #5 - Pipe sizing: piping systems shall be designed and sized to deliver the required flow rates at the utilization pressures while accounting for natural flow losses throughvarious components including flexible hoses and terminal outlets. The Skytron medical gas and vacuum outlets meet and exceed these standards at the time of manufacture. However piping source capacity, sizing, and restrictions may prevent outlets from attaining required valves.
Additional references: Health Care Facilities code 2012 edition, Section 5.1.12.3.10.2, 5.1.12.3.10.3, 5.1.12.3.10.4, 5.1.12.3.10.5
• TYPE K COPPERTUBING
• 1/2" O.D. EXCEPTPASSIVE EVAC
• 3/4" O.D. FOR PASSIVEEVAC
Medical Air(Yellow)
Test GasISO ColorStandardMedical Air
(Black)
AbbreviatedName
MedAir
StandardPressure
50 - 55 psig
MaximumPressure
55 psig
AllowablePressure Drop
5 psig
Minimum Flow Rates
3.5 SCFM per outlet (100NL/min)N2NF see note #1, 5Carbon Dioxide
(Gray)Carbon Dioxide
(Gray) CO2 50 - 55 psig 55 psig 5 psig 3.5 SCFM per outlet (100NL/min)N2NFHeliox
(Brown)Heliox
(Brown) Heliox 50 - 55 psig 55 psig 5 psig 3.5 SCFM per outlet (100NL/min)N2NFNitrogen(Black)
Nitrogen(Black) N2 or HPN2 160 - 185 psig 200 psig 5 psig
5 SCFM per outlet (140NL/min)free air per outletN2NF see note #4, 5
Nitrous Oxide(Blue)
Nitrous Oxide(Blue) N2O 50 - 55 psig 55 psig 5 psig 3.5 SCFM per outlet (100NL/min)N2NF
Oxygen(Green)
Oxygen(White) O2 50 - 55 psig 55 psig 5 psig 3.5 SCFM per outlet (100NL/min)N2NF see note #1
Vacuum(White)
Vacuum(Yellow) MedVac 12in/Hg (300mm) N/A 3 SCFM per outlet (85NL/min) see note #2
Waste AnestheticGas Disposal
(Purple) WAGDVaries withsystem type
At a minimum, each inlet must be able todraw a continuous 50 lpm (1.8 SCFM)
through the interface
Waste AnestheticGas Disposal
(Purple) see note #3
PURITANOHMEDA
DESC
RIPT
ION:
MED
ICAL
GAS
DET
AILS
*SITE SPECIFIC GAS DETAILS* 11/16
/2017
CHILD
REN'
S HO
SPIT
ALNO
LAPR
OJEC
T #:
17-3
28SU
BMIT
TAL
PLOT
DAT
E:
MEDI
CAL G
AS
MAX OF 12 INLET TUBES PER MOUNTING PLATE. IF MORE ARE REQUIREDTHEY WILL NEED REMOTE MOUNTING.
CHECK VALVE REPLACEMENTTOOL
VALVES
Use above for:Medical AirCarbon DioxideHelioxNitrous OxideNitrogen
Use above for:Instrument AirOxygen
1.18"1.10"
see note #5
see note #5
see note #5
CGA ColorStandard
Nitrogen(Black)
Test GasISO ColorStandard
Nitrogen(Black)
AbbreviatedName
AllowablePressure Drop Minimum Flow Rates
Vacuum(White)
Vacuum(Yellow)
N2 or HPN2
MedVac
(10 psi) 70kpa 400L/min (14.1scfm)@1,250kpa
30L/min (1.1scfm)@54kpa
N2NF
N2NF
INITIAL:DATE:
VERIFY AND INITIAL GAS FACEPLATE STYLE REQUESTED
(4 inhg) 13kpa
CAN-CSA section 7.3.2. Z 7396.1-12
N2NF Other Gas Various MedVac 120L/min (4.2scfm)@345kpa(4 psi) 28kpa
MDL:
320 S
ERIE
SQT
Y.: 2
RE
V. #:
0
INITIAL:DATE: INITIAL:
DESC
RIPT
ION:
ELE
CTRI
CAL W
IRIN
G DE
TAILS
E4SHEET
11/16
/2017
REQUIRED FOR FABRICATIONVERIFY AND INITIAL
POWER TYPE INITIAL:
4 INP
UT LE
ADS
120 V
AC, 2
0 AMP
120 V
AC, 2
0 AMP
120 V
AC, 2
0 AMP
CIRC
UIT
2
CIRC
UIT
3
CIRC
UIT
4
(8) 1
25V,
20A,
DUP
LEX
OUTL
ETS
- RED
*SITE SPECIFIC WIRING DETAILS* INTERNAL FIXTURE WIRING TYPICAL, EXTRA FLEX STEEL CONDUIT
TYPE: 12AWG, 600V, XHHW-2, 90°C - UNLESS NOTED
MOUN
TING
HUB
T B T B T B T B
ELECTRICAL REQUIREMENTS - Electrical Engineer
Each boom fixture is fabricated in accordance to the specifications required by the customer. The Configuration drawings supplied by SKYTRONwill indicate the type and quantity of circuits required. SKYTRON provides all wiring and electrical materials for connection from fixture to junctionbox or pump enclosure (if applicable). SKYTRON supplies an electrical junction box (8-5/8" x 4-5/8" x 1-3/4") to facilitate field wiring for up to sixcircuits that is mounted on the mounting plate in the correct position and if applicable, a hydraulic pump enclosure/junction box (18"L x 6"W x 12"H) that is to be remote mounted within 24" of the mounting structure (by contractor). The pump enclosure can be shipped with the installationkit upon request. Typical wire type is 12AWG, 600V, XHHW-2. Each circuit requires a separate, properly circuit protected, 120VAC, 60Hz powersupply line enclosed in rigid metal conduit. All electrical materials for connection to SKYTRON supplied junction box or pump enclosure and installation labor for such materials to be provided by customer. All wiring and materials to be in accordance with federal, state and local codes.It is the customer's responsibility to meet conformity to NFPA and NEC standards with respect to the number of receptacles provided in a patientcare area.
Specific conductor colors and/or wiring for isolated applications are available upon request.
ARM COVERARM COVER
ARM COVERARM COVER
GROUND(FOR ELECTRICAL)
PROTECTED EARTH(FOR CHASSIS)
NORMALDUPLEX
CRITICALDUPLEX
CRITICALDUPLEX
ULTRAFLEXTYPE USL CONDUIT
ULTRAFLEXTYPE USL CONDUIT
TB
TERMINALBLOCKDETAIL
120VAC, 20ASUPPLY
TB
ISOLATED POWERBROWN W/YELLOW STRIPE, ORANGE W/BLUE STRIPE,
GREEN W/YELLOW STRIPE
NON-ISOLATED POWERBLACK, WHITE, GREEN
Internally LocatedElectrical Terminal
Block Detail
120VAC, 20ASUPPLY
carrier contains aninternally located
Terminal Blockthat provides
interconnectivitybetween the
outlets and theinternal conductors
CARR
IER
UTILI
TIES
PAN
EL
TB
TB
CIRC
UIT
112
0 VAC
, 20 A
MP
GENERIC BOOM ELECTRICAL WIRING DIAGRAM FOR FIXED ARMS
CHILD
REN'
S HO
SPIT
ALNO
LAPR
OJEC
T #:
17-3
28SU
BMIT
TAL
PLOT
DAT
E:
MDL:
320 S
ERIE
SQT
Y.: 2
RE
V. #:
0
FLAT
SCRE
EN B
RACK
ETMO
UNTI
NG H
UB
72"
120" CEILING HEIGHT
0" FLOOR
6"
35"
80"
REFER TO AUA3 DATA SHEETFOR SURGICAL LIGHT
SPECIFICATIONS
29"
ITEM ID: 1441
F1SHEETINITIAL:
DATE:
DESC
RIPT
ION:
ELE
VATI
ON D
ETAI
LS
*SITE SPECIFIC ELEVATION DETAILS*
6/20/2
018PLEASE REFER TO MOUNTING
STRUCTURE DETAIL PAGE FORMOUNTING STRUCTURE EXAMPLE
MDL:
AUA3
-895
QTY.
: 6RE
V. #:
0
SCALE: 34" = 1'MAX. FIXTURE WEIGHT: MAX. MOMENT LOAD: EQUIPMENT CAPACITY:93 LBS. 305 FT. LBS. N/A
CHILD
REN'
S HO
SPIT
ALNO
LAPR
OJEC
T #:
17-3
23SU
BMIT
TAL
PLOT
DAT
E:
CEILING COVER(SKYTRON SUPPLIED)
FINISHED CEILING
STRUCTURAL CEILING
16-1/2" DIA. ACCESS HOLE20 1/2" DIA. CEILING COVER
15" DIA. MOUNTING. PLATE
2.2"1.1"
FIXTUREJUNCTION
BOX
5.9" MAX3.9" MIN.
3/4" METAL FLEXCONDUIT (see note 3)
45° 45°
STRUCTURAL CEILING
11.8" x 11.8" x .4"STIFFENER PLATE
3/4" ALL THREAD ROD(see note 1)
(4) 2" x 2" ANGLE SWAY BRACING(see note 2)
STRUCTURAL REQUIREMENTS - Architect and Structural Engineer
Notes1. 3/4” support rods located for total support of light, all labor and materials for fabrication are supplied by General Contractor. 3/4” nuts
and washers for support of SKYTRON mounting plate supplied by contractor (8 each required).
2. The mounting structure must be attached to structural ceiling and BRACED TO ALLOW NO TWISTING OR LATERAL MOTION andshall be designed not to provide a degree of deflection greater than two-tenths of a degree at the mounting plate.
3. 3/4” metal conduit and minimum 12AWG wire size (3 wires per lighthead plus fixture ground) required between fixture and the powersource. All metal conduit, wiring, and other electrical materials as well as installation labor for such materials associated with theinstallation of the SKYTRON surgical light to be provided by Electrical Contractor. All installations of SKYTRON procedural lightsshould be under the direct supervision of a SKYTRON representative. All wiring to be in accordance with local codes and by a certifiedelectrician.
This is a GENERAL GUIDELINE ONLY.
NOTES:• This illustration depicts a generic mounting structure design and its components. Always consult
specific structural criteria defined by a structural engineer.• Do not cover or block any holes with sway bracing, gussets, weld, weld slag or etcetera• Typical dimensions shown. Refer to specific structural drawings and/or Seismic drawings for each
application.
*TYPICAL LIGHT MOUNTING STRUCTURE DETAILS**ALWAYS CONSULT SPECIFIC STRUCTURAL CRITERIA DEFINED BY A STRUCTURAL ENGINEER*
Hole forAccess to
FixtureJunction
Box
TOP VIEWMOUNTING PLATE DETAIL
2" x 2"Angle Sway Bracing90° Apart - 4 Each(see note 2)
5.9"
Hole forAccess to
FixtureJunction
Box
TOP VIEWMOUNTING PLATE DETAIL
2" x 2"Angle Sway Bracing90° Apart - 4 Each(see note 2)
11.8"
9 - 1/2"
5.9"
11.8"9 - 1/2"
F1.1SHEETINITIAL:
DATE:
DESC
RIPT
ION:
ELE
VATI
ON D
ETAI
LS11
/17/20
17
CHILD
REN'
S HO
SPIT
ALNO
LAMD
L: AU
A3-8
95QT
Y.: 6
REV.
#: 0
PROJ
ECT
#: 17
-328
SU
BMIT
TAL
PLOT
DAT
E:
SPECIAL GROUNDING REQUIREMENTS - Electrical Engineer
1. Use of approved metal conduit shall be employed throughout the fixture's wiring circuit where applicable. Facility supplied, circuit breaker protected, 100-240VAC 50/60 Hz power source wiring.
2. Grounding - Proper performance and safety of this fixture can only achieved by an adequate grounding system. Fixture ground must be a dedicated ground point ultimately bonded to the facilities grounding system to prevent the migration of electricalinterference generated by other devices.
Protective Means - To avoid the risk of electric shock, this equipment must only be connected to a supply mains with protective earth ground. This fixture requires a properly circuit protected, appropriately sized, dedicated circuit. An isolated powersupply circuit must be protected by an appropriately sized double pole, single throw circuit breaker
3. Mounting and anchorage: please refer to the ASTRO Installation Manual for mounting requirements. Seismic applications will differ in construction requirements. Please request seismic calculations and mounting requirements from your SKYTRONrepresentative.
BY SKYTRON
BY OTHERS
See note 3
THIS DIAGRAM IS FOR INFORMATIONAL PURPOSES ONLY. THIS WILL NOT MATCH YOUR EXACT MODEL.
3/4" METAL CONDUIT 12AWG, 3 WIRES PERLIGHTHEAD PLUS FIXTURE GROUNDRED, GREEN/YELLOW, BLUE 24VDC OUTPUT
See note 1 See note 2
JUNCTION BOX BY SKYTRON3/4" METAL CONDUIT100-240VAC INPUT DEDICATED
POWER SUPPLY JUNCTION BOXWITHIN 3' OF MOUNT(SUPPLIED BY SKYTRON)
MDL:
AUA3
-895
QTY.
: 6RE
V. #:
0
F6SHEETINITIAL:
DATE:
DESC
RIPT
ION:
LIGH
T FI
XTUR
E DE
TAILS
11/16
/2017
CHILD
REN'
S HO
SPIT
ALNO
LAPR
OJEC
T #:
17-3
28SU
BMIT
TAL
PLOT
DAT
E:
72"
108" CEILING HEIGHT
0" FLOOR
10"
712"
48" 3E1-L
3912" 32F-L
9"3VBM48 70"
23"
ITEM ID: 4903
G1SHEETINITIAL:
DATE:
DESC
RIPT
ION:
ELE
VATI
ON D
ETAI
LS
*SITE SPECIFIC ELEVATION DETAILS*
6/20/2
018PLEASE REFER TO MOUNTING
STRUCTURE DETAIL PAGE FORMOUNTING STRUCTURE EXAMPLE
MDL:
300 S
ERIE
SQT
Y.: 3
REV.
#: 0
SCALE: 34" = 1'MAX. FIXTURE WEIGHT: MAX. MOMENT LOAD: EQUIPMENT CAPACITY:657 LBS. 3968 FT. LBS. 3VBM48 - 235 LBS.
CHILD
REN'
S HO
SPIT
ALNO
LAPR
OJEC
T #:
17-3
23SU
BMIT
TAL
PLOT
DAT
E:
STRUCTURAL REQUIREMENTS - Architect and Structural Engineer
Mounting Structure ComponentsThe fabrication of each mounting structure may be slightly different but they each require the same basic components to ensurestability.
Sway Bracing (by others)Sway bracing is designed to rigidly affix the mounting plate to the structural ceiling. The primary purpose of sway bracing is toeliminate sway, or lateral twisting and flexing of the mounting structure as it "reacts" to dynamic load changes caused by moving thefixture radial arms. The sway bracing should be welded to the mounting plate and extend away from the center of the mount. Aminimum of four sway braces placed 90° apart and positioned at a 45° and 60° angle is recommended.
Minimum recommended material for sway bracing is 3" x 3" x 1/4" angle iron. It is recommended that in all applications thesway bracing be fastened to the structural ceiling.
Structural Ceiling Plate (by others)The structural ceiling plate rigidly attaches the mount to the structural ceiling using structural anchors appropriate for the ceilingconstruction. The structural ceiling plate should be a minimum of, 1" ASTM A36 steel plate, 17" diameter with (6) 5/8" diameterholes for structural anchors and is fabricated by others.
Expansion Anchors (by others)Test 50% of the anchors at 2,000 pounds (907 kg) tension, or 50 ft. lb. (68 N●m) torque per CBC 1925A.3.5. Installed anchors must meet the following criteria:1. Hydraulic Ram Method: The anchor should have no observable movement at the applicable test load. For wedge and sleevetype anchors, a practical way to determine observable movement is that the washer under the nut becomes loose.2. Torque Wrench Method (Wedge or Sleeve Type): The applicable test torque must be reached within one-half (1/2) turn of the nut.Testing should occur no sooner than 24 hours after installation of anchors. If any anchor fails testing, test all anchors until 20 consecutive anchors pass, then resume the initial testing frequency. Test equipment is to be calibrated by an approved testinglaboratory in accordance with standard recognized procedures.
Support Tube (by others)The support tube required to attach the mounting plate to the structural ceiling plate should be ASTM 500 Grade B, 6" diameter tube.Support tube is to be welded to structural ceiling plate and mounting plate. A minimum of 6 gussets placed 60° apart should bewelded to support tube at the structural ceiling plate and the mounting plate.
Mounting Plate (SKYTRON supplied)The 17.5" x 17.5" x 1" ASTM A36 steel mounting plate is a SKYTRON supplied item. The Support tube and sway bracing are welded to the mounting plate. The mounting plate contains the corresponding bolt pattern for attaching the fixture and provides themounting areas for the junction box and gas riser plates.
Mounting Structure DesignSeismic structural applications differ. Please contact your local SKYTRON representative for specific calculations. Themounting structure must be designed and fabricated to position the bottom of the SKYTRON mounting plate as shown on sitespecific elevation page. This is a critical dimension in order to accommodate proper clearance required for ceiling cover function. The mounting plate must be perfectly level (+/- 0.1°) and allow no more than two-tenths of a degree (0.2°) of rotation atthe mounting plate when the specified load is applied. The mounting structure must be tested for strength and stiffness prior toinstallation of the fixture. Please contact your SKYTRON representative to schedule testing.
Please consult your SKYTRON representative during early stages of construction to facilitate this process. The testingprocess is a required, documented function prior to closing of the finished ceiling.
Ceiling RequirementsA 24" x 24" access door must be mounted adjacent to the mounting structure for entry by service personnel for serviceaccess.
SKYTRON provides a 24" ceiling cover designed to cover 20" diameter ceiling hole cutout.
Additional Items(SKYTRON supplied)In addition to the pre-installation kit. SKYTRON provides the following items:
(6) 1-1/4" x 10" threaded rods. (24) 1-1/4" hex nuts, pump enclosure (if applicable)
STRUCTURALCEILING
STRUCTURALCEILING
STRUCTURAL CONCRETE SLABNORMAL WEIGHTfc=3,000 PSI (20,684 kPa)
SWAY BRACING3" x 3" x 1/4" (4)
GUSSET 6" DIA.SUPPORT
TUBE
FINISHED CEILING
20"DIAMETER OPENING
REQUIRED(CENTERED UNDER MOUNT)
12" MIN. / 60" MAX.
REFER TO JOB SPECIFIC ELEVATION PAGE (-0/+1)
MOUNTING PLATE(SKYTRON SUPPLIED)
45°- 60°
FIXTURE HUBTYP. 1/4"
PJP
ACCESS DOOR24" x 24"
(REQUIRED)
TYP. 1/4"TOP & BOTTOM
STRUCTURALCEILING PLATE
17" DIA. x 1"
EXPANSION ANCHORS:HILTI KB-III (ICBO 4627)
CARBON STEEL
NOTES:• This illustration depicts recommended mounting structure design and its components. Always consult
specific structural criteria defined by a structural engineer.• Do not cover or block any holes with sway bracing, gussets, weld or weld slag.• Typical dimensions shown. Refer to specific structural drawings and/or Seismic drawings for each
application.• *Critical Dimension
12" HIGH CLEAR SPACEABOVE MOUNTING PLATE
REQUIRED ON 3 SIDES FORGAS AND ELECTRICAL
COMPONENT INSTALLATION
*TYPICAL BOOM MOUNTING STRUCTURE DETAILS**ALWAYS CONSULT SPECIFIC STRUCTURAL CRITERIA DEFINED BY A STRUCTURAL ENGINEER*
NOTES:• This illustration depicts a generic mounting structure design and its components. Always consult
specific structural criteria defined by a structural engineer.• 1 14" Mounting bolts and nuts shipped with fixture.
JUNCTION BOX(SKYTRON SUPPLIED)
BRACKET(SKYTRON SUPPLIED)
PLATE(SKYTRON SUPPLIED)
INLET TUBE(SKYTRON SUPPLIED)
RISER PLATE(SKYTRON SUPPLIED)
CHECK VALVEREMOVAL TOOL(SKYTRON SUPPLIED)
G1.1SHEETINITIAL:
DATE:
DESC
RIPT
ION:
ELE
VATI
ON D
ETAI
LS11
/16/20
17
CHILD
REN'
S HO
SPIT
ALNO
LAMD
L: 30
0 SER
IES
QTY.
: 3RE
V. #:
0PR
OJEC
T #:
17-3
28
SUBM
ITTA
LPL
OT D
ATE:
DISS (8) 125V, 20A DUPLEX - RED48 1/2"H x 22"W x 30"D
ACCESSORY LIST(1) MOUNTING BLOCK FOR VST MONITOR MOUNT(1) FRONT EQUIPMENT RAIL(1) REAR EQUIPMENT RAIL(2) CORD WRAP - RAIL MOUNTED(1) PMSH SHELF(2) PREMIUM DRAWER
QTY GASES
0 CARBON DIOXIDE
0 HELIOX
1 MEDICAL AIR
0 NITROGEN
1 NITROUS OXIDE
2 OXYGEN
2 VACUUM
0 WAGD
ELECTRICAL:GAS OUTLETS:DIMENSIONS:INITIAL:
G2
PLO
T DA
TE: 1
1/16
/201
7
CHIL
DREN
'S H
OSP
ITAL
NOLA
PRO
JECT
#: 1
7-32
8
DESC
RIPT
ION:
CAR
RIER
DET
AILS
SHEET
SUBM
ITTA
LQ
TY: 3
REV
#: 0
DATE:
MDL
: 300
SER
IES
CARRIER
*SITE SPECIFIC CARRIER DETAILS*
MEDICAL AIR
NITROUS OXIDE
OXYGEN
OXYGEN
VACUUMVACUUM
SEPARATOR PLATE
*COMMUNICATION CANONLY BE ADDED ABOVETHE SEPARATOR PLATE
G3SHEET
MEDICAL GAS REQUIREMENTS - Medical Gas / Piping EngineerNotes:
• Beacon Medaes manufactured gas outlets supplied unless otherwise specified. Pricing and lead time could vary if another Mfgr. is chosen.• Medical gas risers comply with NFPA 9999-2012 OR CAN-CSA Z 73961-12 Edition Cleanliness of gas outlets must be maintained through
installation.• Purge gas lines and test at least 24 hrs. prior to installation.• Test results must be made available to SKYTRON representative for verification & comparison.• Check valve must be removed during installation to prevent damage to o-rings, refer to Ergon pre-installation guide for removal
instructions.** Caution - Check valves have 2 different sizes, please keep Instrument Air and Oxygen separate from the others **
Each boom fixture is fabricated in accordance to the specifications required by the customer. The configuration drawings supplied bySKYTRON will indicate the type and quantity of gas supply lines required. D.I.S.S. connection medical grade hoses connect the fixture tothe riser plate connectors. The customer is responsible to deliver the appropriate medical gas from the facility supply to the riser plateconnectors and for the design of a medical gas system with adequate flow capacity capable of compensating for the accumulative flowrestrictions associated with conventional construction methods i.e. flex gas hoses. SKYTRON provides medical gas riser plate(s) and theappropriate connectors for attachment to the Mounting Plate. The riser plates attach to the mounting plate and will accommodate up to 12gas connectors. The connectors are D.I.S.S. type medical gas connectors with removable single check valves and provide a 1/2" coppertube for attachment to facility supply lines. Caps are provided with Vacuum & WAGD gas connectors to facilitate testing procedures.
All connection and testing of medical gas piping to be performed in accordance with NFPA 99-2012 OR CAN-CSA Z 73961-12requirements.
Recommended Gas Riser PlacementA 6" clearance must be maintained between the finished ceiling and the gas inlet tubes. If this clearance cannot be accomplished atthe mounting plate, then horizontal or remote mounting of the riser plate will be required.When mount is in center of room, riser plate should face head end of room, when mount is near walls, riser plate should be adjacentto wall. If more than one riser plate is required they should be placed next to each other.
GAS CONNECTOR ASSEMBLY (w/ SECONDARY CHECK)*SUPPLIED w/FIXTURE*
9"
DISS CONNECTOR(w/ REMOVABLE PRIMARY
CHECK. PASSIVE EVAC,VACUUM & WAGD DO NOT
HAVE PRIMARY CHECK.)*SUPPLIED w/PRE-INSTALL KIT*
D I S SCHEMETRON
CGA ColorStandard
Note #1 - Any room (Critical Care Area) designed for a permanently located respiratory ventilator or anesthesia machine shall have an outlet capable of a transient flow rate of:170 LPM (6 SCFM) for 3 seconds at the station outlet.
Note #2 - For testing and certification purposes, individual station inlets shall be capable of delivering a flow rate of: 3 SCFM, while maintaining a system pressure of not lessthan 12" (300mm) at the nearest adjacent vacuum inlet. Facility supply must be 115 LPM MINIMUM. (Vacuum D.I.S.S. connectors omit primary check valves for optimal flow). 12in/HG.
Note #3 - WAGD (Waste Anesthetic Gas Disposal) systems employing a design where the WAGD lines are "tied in" to MedVac lines must produce the same flow rates as theMedVac inlets.
Note #4 - Nitrogen system requires nitrogen supplied directly from facility supply line rated at 185psi MIN to 200psi MAX. Avoid designs which feature multiple-in-line Nitrogencontrol systems in order to avoid loss of flow capability.
Note #5 - Pipe sizing: piping systems shall be designed and sized to deliver the required flow rates at the utilization pressures while accounting for natural flow losses throughvarious components including flexible hoses and terminal outlets. The Skytron medical gas and vacuum outlets meet and exceed these standards at the time of manufacture. However piping source capacity, sizing, and restrictions may prevent outlets from attaining required valves.
Additional references: Health Care Facilities code 2012 edition, Section 5.1.12.3.10.2, 5.1.12.3.10.3, 5.1.12.3.10.4, 5.1.12.3.10.5
• TYPE K COPPERTUBING
• 1/2" O.D. EXCEPTPASSIVE EVAC
• 3/4" O.D. FOR PASSIVEEVAC
Medical Air(Yellow)
Test GasISO ColorStandardMedical Air
(Black)
AbbreviatedName
MedAir
StandardPressure
50 - 55 psig
MaximumPressure
55 psig
AllowablePressure Drop
5 psig
Minimum Flow Rates
3.5 SCFM per outlet (100NL/min)N2NF see note #1, 5Carbon Dioxide
(Gray)Carbon Dioxide
(Gray) CO2 50 - 55 psig 55 psig 5 psig 3.5 SCFM per outlet (100NL/min)N2NFHeliox
(Brown)Heliox
(Brown) Heliox 50 - 55 psig 55 psig 5 psig 3.5 SCFM per outlet (100NL/min)N2NFNitrogen(Black)
Nitrogen(Black) N2 or HPN2 160 - 185 psig 200 psig 5 psig
5 SCFM per outlet (140NL/min)free air per outletN2NF see note #4, 5
Nitrous Oxide(Blue)
Nitrous Oxide(Blue) N2O 50 - 55 psig 55 psig 5 psig 3.5 SCFM per outlet (100NL/min)N2NF
Oxygen(Green)
Oxygen(White) O2 50 - 55 psig 55 psig 5 psig 3.5 SCFM per outlet (100NL/min)N2NF see note #1
Vacuum(White)
Vacuum(Yellow) MedVac 12in/Hg (300mm) N/A 3 SCFM per outlet (85NL/min) see note #2
Waste AnestheticGas Disposal
(Purple) WAGDVaries withsystem type
At a minimum, each inlet must be able todraw a continuous 50 lpm (1.8 SCFM)
through the interface
Waste AnestheticGas Disposal
(Purple) see note #3
PURITANOHMEDA
DESC
RIPT
ION:
MED
ICAL
GAS
DET
AILS
*SITE SPECIFIC GAS DETAILS* 11/16
/2017
CHILD
REN'
S HO
SPIT
ALNO
LAPR
OJEC
T #:
17-3
28SU
BMIT
TAL
PLOT
DAT
E:
MDL:
300 S
ERIE
SQT
Y.: 3
REV.
#: 0
MEDI
CAL G
AS
MAX OF 12 INLET TUBES PER MOUNTING PLATE. IF MORE ARE REQUIREDTHEY WILL NEED REMOTE MOUNTING.
CHECK VALVE REPLACEMENTTOOL
VALVES
Use above for:Medical AirCarbon DioxideHelioxNitrous OxideNitrogen
Use above for:Instrument AirOxygen
1.18"1.10"
see note #5
see note #5
see note #5
CGA ColorStandard
Nitrogen(Black)
Test GasISO ColorStandard
Nitrogen(Black)
AbbreviatedName
AllowablePressure Drop Minimum Flow Rates
Vacuum(White)
Vacuum(Yellow)
N2 or HPN2
MedVac
(10 psi) 70kpa 400L/min (14.1scfm)@1,250kpa
30L/min (1.1scfm)@54kpa
N2NF
N2NF
INITIAL:DATE:
VERIFY AND INITIAL GAS FACEPLATE STYLE REQUESTED
(4 inhg) 13kpa
CAN-CSA section 7.3.2. Z 7396.1-12
N2NF Other Gas Various MedVac 120L/min (4.2scfm)@345kpa(4 psi) 28kpa
INITIAL:DATE: INITIAL:
DESC
RIPT
ION:
ELE
CTRI
CAL W
IRIN
G DE
TAILS
G4SHEET
11/16
/2017
REQUIRED FOR FABRICATIONVERIFY AND INITIAL
POWER TYPE INITIAL:
4 INP
UT LE
ADS
120 V
AC, 2
0 AMP
120 V
AC, 2
0 AMP
120 V
AC, 2
0 AMP
CIRC
UIT
2
CIRC
UIT
3
CIRC
UIT
4
(8) 1
25V,
20A,
DUP
LEX
OUTL
ETS
- RED
*SITE SPECIFIC WIRING DETAILS* INTERNAL FIXTURE WIRING TYPICAL, EXTRA FLEX STEEL CONDUIT
TYPE: 12AWG, 600V, XHHW-2, 90°C - UNLESS NOTED
MOUN
TING
HUB
T B T B T B T B
ELECTRICAL REQUIREMENTS - Electrical Engineer
Each boom fixture is fabricated in accordance to the specifications required by the customer. The Configuration drawings supplied by SKYTRONwill indicate the type and quantity of circuits required. SKYTRON provides all wiring and electrical materials for connection from fixture to junctionbox or pump enclosure (if applicable). SKYTRON supplies an electrical junction box (8-5/8" x 4-5/8" x 1-3/4") to facilitate field wiring for up to sixcircuits that is mounted on the mounting plate in the correct position and if applicable, a hydraulic pump enclosure/junction box (18"L x 6"W x 12"H) that is to be remote mounted within 24" of the mounting structure (by contractor). The pump enclosure can be shipped with the installationkit upon request. Typical wire type is 12AWG, 600V, XHHW-2. Each circuit requires a separate, properly circuit protected, 120VAC, 60Hz powersupply line enclosed in rigid metal conduit. All electrical materials for connection to SKYTRON supplied junction box or pump enclosure and installation labor for such materials to be provided by customer. All wiring and materials to be in accordance with federal, state and local codes.It is the customer's responsibility to meet conformity to NFPA and NEC standards with respect to the number of receptacles provided in a patientcare area.
Specific conductor colors and/or wiring for isolated applications are available upon request.
ARM COVERARM COVER
ARM COVERARM COVER
GROUND(FOR ELECTRICAL)
PROTECTED EARTH(FOR CHASSIS)
NORMALDUPLEX
CRITICALDUPLEX
CRITICALDUPLEX
ULTRAFLEXTYPE USL CONDUIT
ULTRAFLEXTYPE USL CONDUIT
TB
TERMINALBLOCKDETAIL
120VAC, 20ASUPPLY
TB
ISOLATED POWERBROWN W/YELLOW STRIPE, ORANGE W/BLUE STRIPE,
GREEN W/YELLOW STRIPE
NON-ISOLATED POWERBLACK, WHITE, GREEN
Internally LocatedElectrical Terminal
Block Detail
120VAC, 20ASUPPLY
carrier contains aninternally located
Terminal Blockthat provides
interconnectivitybetween the
outlets and theinternal conductors
CARR
IER
UTILI
TIES
PAN
EL
TB
TB
CIRC
UIT
112
0 VAC
, 20 A
MP
GENERIC BOOM ELECTRICAL WIRING DIAGRAM FOR FIXED ARMS
CHILD
REN'
S HO
SPIT
ALNO
LAPR
OJEC
T #:
17-3
28SU
BMIT
TAL
PLOT
DAT
E:
MDL:
300 S
ERIE
SQT
Y.: 3
REV.
#: 0
72"
0" FLOOR
120" CEILING HEIGHT10"
51" [1300mm]3T2
36" 3AFC
12"
18"
3FLM-32
86 12"
35"43"
80"
REFER TO AUA33 DATA SHEETFOR SURGICAL LIGHT
SPECIFICATIONS
81"
21" 15"
ITEM ID: 11021
H1SHEETINITIAL:
DATE:
DESC
RIPT
ION:
ELE
VATI
ON D
ETAI
LS
*SITE SPECIFIC ELEVATION DETAILS*
6/20/2
018PLEASE REFER TO MOUNTING
STRUCTURE DETAIL PAGE FORMOUNTING STRUCTURE EXAMPLE
SCALE: 34" = 1'MAX. FIXTURE WEIGHT: MAX. MOMENT LOAD: EQUIPMENT CAPACITY:
CHILD
REN'
S HO
SPIT
ALNO
LAMD
L: 11
0 SER
IES
QTY.
: 2RE
V. #:
0
484 LBS. 2207 FT. LBS. 3FLM1-32 - 64.5 LBS.
PROJ
ECT
#: 17
-323
SUBM
ITTA
LPL
OT D
ATE:
STRUCTURAL REQUIREMENTS - Architect and Structural Engineer
Mounting Structure ComponentsThe fabrication of each mounting structure may be slightly different but they each require the same basic components to ensurestability.
Sway Bracing (by others)Sway bracing is designed to rigidly affix the mounting plate to the structural ceiling. The primary purpose of sway bracing is toeliminate sway, or lateral twisting and flexing of the mounting structure as it "reacts" to dynamic load changes caused by moving thefixture radial arms. The sway bracing should be welded to the mounting plate and extend away from the center of the mount. Aminimum of four sway braces placed 90° apart and positioned at a 45° and 60° angle is recommended.
Minimum recommended material for sway bracing is 3" x 3" x 1/4" angle iron. It is recommended that in all applications thesway bracing be fastened to the structural ceiling.
Structural Ceiling Plate (by others)The structural ceiling plate rigidly attaches the mount to the structural ceiling using structural anchors appropriate for the ceilingconstruction. The structural ceiling plate should be a minimum of, 1" ASTM A36 steel plate, 17" diameter with (6) 5/8" diameterholes for structural anchors and is fabricated by others.
Expansion Anchors (by others)Test 50% of the anchors at 2,000 pounds (907 kg) tension, or 50 ft. lb. (68 N●m) torque per CBC 1925A.3.5. Installed anchors must meet the following criteria:1. Hydraulic Ram Method: The anchor should have no observable movement at the applicable test load. For wedge and sleevetype anchors, a practical way to determine observable movement is that the washer under the nut becomes loose.2. Torque Wrench Method (Wedge or Sleeve Type): The applicable test torque must be reached within one-half (1/2) turn of the nut.Testing should occur no sooner than 24 hours after installation of anchors. If any anchor fails testing, test all anchors until 20 consecutive anchors pass, then resume the initial testing frequency. Test equipment is to be calibrated by an approved testinglaboratory in accordance with standard recognized procedures.
Support Tube (by others)The support tube required to attach the mounting plate to the structural ceiling plate should be ASTM 500 Grade B, 6" diameter tube.Support tube is to be welded to structural ceiling plate and mounting plate. A minimum of 6 gussets placed 60° apart should bewelded to support tube at the structural ceiling plate and the mounting plate.
Mounting Plate (SKYTRON supplied)The 17.5" x 17.5" x 1" ASTM A36 steel mounting plate is a SKYTRON supplied item. The Support tube and sway bracing are welded to the mounting plate. The mounting plate contains the corresponding bolt pattern for attaching the fixture and provides themounting areas for the junction box and gas riser plates.
Mounting Structure DesignSeismic structural applications differ. Please contact your local SKYTRON representative for specific calculations. Themounting structure must be designed and fabricated to position the bottom of the SKYTRON mounting plate as shown on sitespecific elevation page. This is a critical dimension in order to accommodate proper clearance required for ceiling cover function. The mounting plate must be perfectly level (+/- 0.1°) and allow no more than two-tenths of a degree (0.2°) of rotation atthe mounting plate when the specified load is applied. The mounting structure must be tested for strength and stiffness prior toinstallation of the fixture. Please contact your SKYTRON representative to schedule testing.
Please consult your SKYTRON representative during early stages of construction to facilitate this process. The testingprocess is a required, documented function prior to closing of the finished ceiling.
Ceiling RequirementsA 24" x 24" access door must be mounted adjacent to the mounting structure for entry by service personnel for serviceaccess.
SKYTRON provides a 24" ceiling cover designed to cover 20" diameter ceiling hole cutout.
Additional Items(SKYTRON supplied)In addition to the pre-installation kit. SKYTRON provides the following items:
(6) 1-1/4" x 10" threaded rods. (24) 1-1/4" hex nuts, pump enclosure (if applicable)
STRUCTURALCEILING
STRUCTURALCEILING
STRUCTURAL CONCRETE SLABNORMAL WEIGHTfc=3,000 PSI (20,684 kPa)
SWAY BRACING3" x 3" x 1/4" (4)
GUSSET 6" DIA.SUPPORT
TUBE
FINISHED CEILING
20"DIAMETER OPENING
REQUIRED(CENTERED UNDER MOUNT)
12" MIN. / 60" MAX.
REFER TO JOB SPECIFIC ELEVATION PAGE (-0/+1)
MOUNTING PLATE(SKYTRON SUPPLIED)
45°- 60°
FIXTURE HUBTYP. 1/4"
PJP
ACCESS DOOR24" x 24"
(REQUIRED)
TYP. 1/4"TOP & BOTTOM
STRUCTURALCEILING PLATE
17" DIA. x 1"
EXPANSION ANCHORS:HILTI KB-III (ICBO 4627)
CARBON STEEL
NOTES:• This illustration depicts recommended mounting structure design and its components. Always consult
specific structural criteria defined by a structural engineer.• Do not cover or block any holes with sway bracing, gussets, weld or weld slag.• Typical dimensions shown. Refer to specific structural drawings and/or Seismic drawings for each
application.• *Critical Dimension
12" HIGH CLEAR SPACEABOVE MOUNTING PLATE
REQUIRED ON 3 SIDES FORGAS AND ELECTRICAL
COMPONENT INSTALLATION
*TYPICAL BOOM MOUNTING STRUCTURE DETAILS**ALWAYS CONSULT SPECIFIC STRUCTURAL CRITERIA DEFINED BY A STRUCTURAL ENGINEER*
NOTES:• This illustration depicts a generic mounting structure design and its components. Always consult
specific structural criteria defined by a structural engineer.• 1 14" Mounting bolts and nuts shipped with fixture.
JUNCTION BOX(SKYTRON SUPPLIED)
BRACKET(SKYTRON SUPPLIED)
PLATE(SKYTRON SUPPLIED)
INLET TUBE(SKYTRON SUPPLIED)
RISER PLATE(SKYTRON SUPPLIED)
CHECK VALVEREMOVAL TOOL(SKYTRON SUPPLIED)
H1.1SHEETINITIAL:
DATE:
DESC
RIPT
ION:
ELE
VATI
ON D
ETAI
LS11
/16/20
17
CHILD
REN'
S HO
SPIT
ALNO
LAMD
L: 11
0 SER
IES
QTY.
: 2RE
V. #:
0PR
OJEC
T #:
17-3
28
SUBM
ITTA
LPL
OT D
ATE:
TYPE USL CONDUITBY SKYTRON
SPECIAL GROUNDING REQUIREMENTS - Electrical Engineer
1. Use of approved metal conduit shall be employed throughout the fixture's wiring circuit where applicable. Facility supplied, circuit breaker protected, 100-240VAC 50/60 Hz power source wiring.
2. Grounding - Proper performance and safety of this fixture can only achieved by an adequate grounding system. Fixture ground must be a dedicated ground point ultimately bonded to the facilities grounding system to prevent the migration of electricalinterference generated by other devices.
Protective Means - To avoid the risk of electric shock, this equipment must only be connected to a supply mains with protective earth ground. This fixture requires a properly circuit protected, appropriately sized, dedicated circuit. An isolated powersupply circuit must be protected by an appropriately sized double pole, single throw circuit breaker
BY SKYTRON
BY OTHERS
See note 1 See note 2
THIS DIAGRAM IS FOR INFORMATIONAL PURPOSES ONLY. THIS WILL NOT MATCH YOUR EXACT MODEL.
JUNCTION BOX BY OTHERWITHIN 12" OF MOUNT 3/4" METAL CONDUIT
100-240VAC INPUT DEDICATED
3/4" METAL CONDUIT 12AWG, 3 WIRES PERLIGHTHEAD PLUS FIXTURE GROUNDRED, GREEN/YELLOW, BLUE 24VDC OUTPUT
POWER SUPPLY JUNCTION BOXWITHIN 3' OF MOUNT(SUPPLIED BY SKYTRON)
MDL:
110 S
ERIE
SQT
Y.: 1
REV.
#: 0
H6SHEETINITIAL:
DATE:
DESC
RIPT
ION:
LIGH
T FI
XTUR
E DE
TAILS
11/16
/2017
CHILD
REN'
S HO
SPIT
ALNO
LAPR
OJEC
T #:
17-3
28SU
BMIT
TAL
PLOT
DAT
E:
72"
0" FLOOR
108" CEILING HEIGHT6"
2712"
35"
80"
REFER TO AUA33 DATA SHEETFOR SURGICAL LIGHT
SPECIFICATIONS
81"
11"17"
ITEM ID: 12173
I1SHEETINITIAL:
DATE:
DESC
RIPT
ION:
ELE
VATI
ON D
ETAI
LS
*SITE SPECIFIC ELEVATION DETAILS*
6/20/2
018PLEASE REFER TO MOUNTING
STRUCTURE DETAIL PAGE FORMOUNTING STRUCTURE EXAMPLE
SCALE: 34" = 1'MAX. FIXTURE WEIGHT: MAX. MOMENT LOAD: EQUIPMENT CAPACITY:
CHILD
REN'
S HO
SPIT
ALNO
LAMD
L: AU
A33-
895/7
00QT
Y.: 1
REV.
#: 1
166 LBS. 539 FT. LBS. N/A
PROJ
ECT
#: 17
-323
SUBM
ITTA
LPL
OT D
ATE:
CEILING COVER(SKYTRON SUPPLIED)
FINISHED CEILING
STRUCTURAL CEILING
16-1/2" DIA. ACCESS HOLE20 1/2" DIA. CEILING COVER
15" DIA. MOUNTING. PLATE
2.2"1.1"
FIXTUREJUNCTION
BOX
5.9" MAX3.9" MIN.
3/4" METAL FLEXCONDUIT (see note 3)
45° 45°
STRUCTURAL CEILING
11.8" x 11.8" x .4"STIFFENER PLATE
3/4" ALL THREAD ROD(see note 1)
(4) 2" x 2" ANGLE SWAY BRACING(see note 2)
STRUCTURAL REQUIREMENTS - Architect and Structural Engineer
Notes1. 3/4” support rods located for total support of light, all labor and materials for fabrication are supplied by General Contractor. 3/4” nuts
and washers for support of SKYTRON mounting plate supplied by contractor (8 each required).
2. The mounting structure must be attached to structural ceiling and BRACED TO ALLOW NO TWISTING OR LATERAL MOTION andshall be designed not to provide a degree of deflection greater than two-tenths of a degree at the mounting plate.
3. 3/4” metal conduit and minimum 12AWG wire size (3 wires per lighthead plus fixture ground) required between fixture and the powersource. All metal conduit, wiring, and other electrical materials as well as installation labor for such materials associated with theinstallation of the SKYTRON surgical light to be provided by Electrical Contractor. All installations of SKYTRON procedural lightsshould be under the direct supervision of a SKYTRON representative. All wiring to be in accordance with local codes and by a certifiedelectrician.
This is a GENERAL GUIDELINE ONLY.
NOTES:• This illustration depicts a generic mounting structure design and its components. Always consult
specific structural criteria defined by a structural engineer.• Do not cover or block any holes with sway bracing, gussets, weld, weld slag or etcetera• Typical dimensions shown. Refer to specific structural drawings and/or Seismic drawings for each
application.
*TYPICAL LIGHT MOUNTING STRUCTURE DETAILS**ALWAYS CONSULT SPECIFIC STRUCTURAL CRITERIA DEFINED BY A STRUCTURAL ENGINEER*
Hole forAccess to
FixtureJunction
Box
TOP VIEWMOUNTING PLATE DETAIL
2" x 2"Angle Sway Bracing90° Apart - 4 Each(see note 2)
5.9"
Hole forAccess to
FixtureJunction
Box
TOP VIEWMOUNTING PLATE DETAIL
2" x 2"Angle Sway Bracing90° Apart - 4 Each(see note 2)
11.8"
9 - 1/2"
5.9"
11.8"9 - 1/2"
I1.1SHEETINITIAL:
DATE:
DESC
RIPT
ION:
ELE
VATI
ON D
ETAI
LS11
/17/20
17
CHILD
REN'
S HO
SPIT
ALNO
LAMD
L: AU
A33-
895/7
00QT
Y.: 1
REV.
#: 0
PROJ
ECT
#: 17
-328
SU
BMIT
TAL
PLOT
DAT
E:
SPECIAL GROUNDING REQUIREMENTS - Electrical Engineer
1. Use of approved metal conduit shall be employed throughout the fixture's wiring circuit where applicable. Facility supplied, circuit breaker protected, 100-240VAC 50/60 Hz power source wiring.
2. Grounding - Proper performance and safety of this fixture can only achieved by an adequate grounding system. Fixture ground must be a dedicated ground point ultimately bonded to the facilities grounding system to prevent the migration of electricalinterference generated by other devices.
Protective Means - To avoid the risk of electric shock, this equipment must only be connected to a supply mains with protective earth ground. This fixture requires a properly circuit protected, appropriately sized, dedicated circuit. An isolated powersupply circuit must be protected by an appropriately sized double pole, single throw circuit breaker
3. Mounting and anchorage: please refer to the ASTRO Installation Manual for mounting requirements. Seismic applications will differ in construction requirements. Please request seismic calculations and mounting requirements from your SKYTRONrepresentative.
BY SKYTRON
BY OTHERS
See note 3
THIS DIAGRAM IS FOR INFORMATIONAL PURPOSES ONLY. THIS WILL NOT MATCH YOUR EXACT MODEL.
3/4" METAL CONDUIT 12AWG, 3 WIRES PERLIGHTHEAD PLUS FIXTURE GROUNDRED, GREEN/YELLOW, BLUE 24VDC OUTPUT
See note 1 See note 2
JUNCTION BOX BY SKYTRON3/4" METAL CONDUIT100-240VAC INPUT DEDICATED
POWER SUPPLY JUNCTION BOXWITHIN 3' OF MOUNT(SUPPLIED BY SKYTRON)
MDL:
AUA3
3-89
5/700
QTY.
: 1RE
V. #:
0
I6SHEETINITIAL:
DATE:
DESC
RIPT
ION:
LIGH
T FI
XTUR
E DE
TAILS
11/16
/2017
CHILD
REN'
S HO
SPIT
ALNO
LAPR
OJEC
T #:
17-3
28SU
BMIT
TAL
PLOT
DAT
E:
INITIAL:DATE:
MOUNTING STRUCTURE TEST JIG
WEIGHT SUPPORT TUBE
1-1/4" NUTS
1-1/4" THREADED RODS (6)
MOUNTING HUBASSEMBLY
12mm NUT (6)
12mm x 30mm BOLT (4)
CHAIN
CHAIN FALL
LOWER RADIAL ARM
UPPER RADIAL ARM
5/8" NUT (2)
12mm NUT (2)
WEIGHTS (6)
TESTING - MOUNTING STRUCTURE
Each mounting structure must be tested by a Skytron representative to verify that there is no more than two-tenths of a degree of rotational movement at the mounting plate prior to installing a fixture. A mounting structure test jig is available from a Skytron representative to facilitate thisprocess. The mounting structure test jig is a fixture which simulates the weights and moment loads created by a Skytron fixture. It consists of ahub assembly, an upper and lower radial arm, a chain fall, weight support tube and six 100 lb. weights (refer to illustration).
The drawing package and the test jig instructions are required to perform an accurate test.
The test jig instructions include the load simulator weight chart, the test jig report form and complete instructions for performing the test.
fixture weight moment load * test weight
N/A200 lbs300 lbs
N/AN/A
N/AN/A
145 lbs 650 ft lbs
100110120200300310
330COLUMN (ALL)
(ALL) LFSLFS(ALL) EXTENDED LIGHT ARMS
SERIES NUMBER
200 lbs300 lbs
216 lbs 1011 ft lbs
400 lbs500 lbs
597 lbs 2310 ft lbs
1029 lbs6934 ft lbs
499 lbs657 lbs
657 lbs877 lbs
2207 ft lbs3213 ft lbs
3968 ft lbs4758 ft lbs
100 lbs
200 lbs
3201257 lbs
600 lbs5754 ft lbs600 lbs
WARNINGTesting the weight and moment load on Ergon 3can only be performed by a authorized Skytron
distributor ONLY.
WARNINGBecause testing the weight and moment load ofErgon 3 is hazardous work it is important to use
proper Personal Protection Equipment (PPE) and adhere toOSHA (Occupational Safety and Health Administration) for
materials handling and storage for the safe equipment used inhoists and with slings.
The Skytron weight and moment load simulator is a device which simulates the weight and moment load on an actual ceiling mounted articulating fixture in orderto test the weight bearing capacity and performance of the Ergon 3 mounting structure.
Skytron recommends using a 600 lb (272 kg) maximum load simulator to test all mounting structure systems for maximum load and weight capacity.
Load simulation is an essential part of readiness assessment and provides reassurance the mounting structure can accept larger more complex articulatingsystems if the need arises for equipment changes or future expansion.
In the event that the mounting structure system cannot deliver performance for the maximum load(600lbs), the weight matrix provided above provides lesserfixture weight and moment load as a means to ensure that the minimum criteria is met.
Refer to project specific drawings for exact weight capacity