CHHATARPUR SSA WELCOMES SH N K YADAV
CGMT M P TELECOM CIRCLE
BHOPAL
Chhatarpur
SSA’s
Presentation
Chhatarpur SSA at a Glance
SL.SL. DescriptionDescription FiguresFigures
1 Area (in Sq. Km.) 13,665
2 Population 27,83,584
3 District 02
4 Total Tahsil 19
5 Blocks 19
6 Total Villages 2156
7 Panchayat 1917
8 Populated Villages 1950
Geographical detail (census-2011)
Chhatarpur SSA
Technical Details
SL. SL. Description Description FiguresFigures
1 Total no SDCA 12 (CPU-8,TKG-4)
2 Number of Exchanges 70
3 Total Switching Capacity 37880
4 No. of MBM 4
5 No. of SBM/RSU 26
6 AN-RAX 44
7 Land Line connection 15842
8 ISDN connection 49 (CPU-39,TKG-10)
9 Number of Exchanges having broadband facility 70
10 Internet connection 2827(BB-2176)
11 One PCO 1194
12 VPT (Covered/Total villages) 2045/2156
13 VPT (OH+UG) Land Line 227
14 VPT on WLL 1760
Chhatarpur SSA
SL. SL. Description Description FIGURES FIGURES
15 GSM BTS 192 (CPU-119, TKG-74)
16 Mobile GSM connection 55871
17 Prepaid Mobile connection 53666
18 Post-paid Mobile connection 2205
19 WLL BTS 34 (CPU-21, TKG-13)
20 WLL connections 8102
21 FWT 7001
22 LMT 1101
23 TAX Exchange (EWSD) 01 (6K)
24 TAX Loading(EWSD) 69%
25 OFC Route Km. 1281.92
26 C- III Internet Node 2
Technical Details continued…………
Chhatarpur SSA
Development Plan for Mobile and WLL
SL. SL. Description Description FiguresFigures
1
Mobile:
2G BTS:
In Chhatarpur Distt. 21
In Tikamgarh Distt. 25
3G BTS:
In Chhatarpur Distt. 3
In Tikamgarh Distt. 3
2
WLL / WiMax
WiMax BTS:
In Chhatarpur Distt. 19
In Tikamgarh Distt. 14
Chhatarpur SSA
AGENDA POINTS
Chhatarpur SSA
1. Minimizing the down time of GSM BTS.
• SSA is continuously trying hard to minimize the downtime of GSM BTS. However following points needs attention…..
• In last 2 years 126 new GSM BTS were added in the network. Staff and vehicle have not increased accordingly. Rather they have decreased.
• Shortage of manpower.
• Shortage of diesel: appropriate fund for diesel is not available. In April 3.32 lakhs and in May 3.31 lakhs were allotted.
• Shortage of Vehicle.
• Transportation of diesel is a big issue due to widespread geographical area.
Chhatarpur SSA
• Even after daily pursuance the performance of USO sites is not improving.
• Worst USO BTS for the month of April11.
• Alcatel and ITI are not attending faults timely even after many reminders.
• Due to widespread road widening work, there is frequent interruption in OFC media.
To minimize the downtime SSA needs…..
• At least 4 more vehicle.
• Site wise AMC tender should be finalized at the earliest.
Chhatarpur SSA
2. O&M issues of GSM Services.
ALCATEL Issues:-
List of pending Alcatel faults.
ITI Issues:-
List of pending ITI faults.
ELECTRICAL Wing Issues:-
As on date 4 GSM BTS are working without DG
At 25 USO sites 3 phase is either pending or faulty.
At 31 Non USO sites 3 phase is pending.
Other miscellaneous issues.
Chhatarpur SSA
3. O&M issues of Landline, Broadband and other Services.
LANDLINE:-
• Due to Road widening, Water pipe line and other municipal works, UG cable network had damaged and 5Pr / 10Pr UG cable is required.
• Since start of CDR system telephone bills have not been issued timely.
• In CDR system L2 dockets are not being resolved timely.
• Exchange code on telephone bills is required for sorting.
• New EPBT instruments are not available for replacement.
• The development work of UG cable in new developed colonies is pending.
• 4000 AH Battery set at Chatrasal Chowk urgently needs to be replaced due to life expired and 2000 AH Battery set is required in BSNL Bhavan for up gradation.
Chhatarpur SSA
BROADBAND:- In rural areas, provisioning and maintenance of
broadband connections is being very difficult due to non availability of skilled staff.
OTHER SERVICES:- One more EVDO BTS is required in Chhatarpur City
because at present there is only one BTS and subscriber base in around 90, which is already conveyed to Circle office.
Chhatarpur SSA
4. Measures to increase revenue.
• Vacant buildings / colony may be rent out to state/central govt. staff.
• Rent free landline connection may be provided in rural areas.
• Marketing activities must be intensified.• Cash reward must be given to outstanding staff.• IPMS may be implemented and performance based
incentives should be given.• BSNL should diversify its services in DTH and Real
estate.• Bill payment and recharge option should be available in
ATMs.
Chhatarpur SSA
5. Measures to control expenditure.
• Network optimization work must be finished immediately.• Handover should be properly defined. • Temporary electric connection may be regularized on
priority by electric wing to save revenue.• Curtailment on salary expenditure by VRS / Reduction in
retirement age from 60 to 58. Staff should be inducted on contract basis.
• Some provision may be done for redeployment of non performing group C & D staff.
• Expenditure incurred on DGR security may be minimized with the deployment of local registered security escorts.
• Paper less working may be started using Intranet.