CHANGING PARADIGMS - Evolve mining€¦ · SAFEST JAW CRUSHER IN THE WORLD HS105E Performance Kit...

5
CHANGING PARADIGMS New mining concept developed around the lowest sustainable cost per tonne philosophy. Truly unlocking Africa’s human potential through it’s mineral wealth

Transcript of CHANGING PARADIGMS - Evolve mining€¦ · SAFEST JAW CRUSHER IN THE WORLD HS105E Performance Kit...

Page 1: CHANGING PARADIGMS - Evolve mining€¦ · SAFEST JAW CRUSHER IN THE WORLD HS105E Performance Kit (Electric) ... from 2 tonne per hour in gold to over 3500 tonne per hour in iron

CHANGING PARADIGMS

New mining concept developed

around the lowest sustainable

cost per tonne philosophy.

Truly unlocking Africa’s human

potential through it’s mineral wealth

Page 2: CHANGING PARADIGMS - Evolve mining€¦ · SAFEST JAW CRUSHER IN THE WORLD HS105E Performance Kit (Electric) ... from 2 tonne per hour in gold to over 3500 tonne per hour in iron

SAFEST JAW CRUSHER IN THE WORLD

HS105E Performance Kit (Electric)

Weight 9,200 kg

Max load 5,500 kg

Max Reach - mm 2,800

Max reach height - mm 4,490

Dimensions L/W/H - mm 5,500/2,300/2,550

Electrics- V/A/Hz/Ph 380-400/262/50/5

Electric hydraulic drive motor 37kW/59A

Power usage 37KW running (up to 90 kW on start up)

Hydraulic pump 62cc

Hydraulic flow 0-250 lpm @ 250 bar

HBC950E Crusher (Electric)

Jaw Opening - mm 950 x 550

Load Volume m3 1,00

Jaw Setting Min - mm 12

Jaw Setting Max - mm 120

Dimensions L/W/H mm 2,350/1,450/ 1,390

Weight 3,950 kg

Electrics- V/A/Hz/Ph 380-400/262/50/5

Electric hydraulic drive motor 2x 25 kW

Power usage 50 KW – 100 kW running (no peak start up)

50%

Designed to safely unblock jaw crusher remotely

Designed to safely and remotely unblock oversize rocks out of the jaw

Ability to unblock the jaw crusher without slings / excavators / cranes

50% less power needed to do the same work

Up thrust toggle = better shape for entry into cone and stock pile

2 Venter AvenueBainsvlei, BloemfonteinSouth Africa

+27 82 809 1007+27 82 940 0672

[email protected]@[email protected]@evolvemining.com evolvemining.com

Page 3: CHANGING PARADIGMS - Evolve mining€¦ · SAFEST JAW CRUSHER IN THE WORLD HS105E Performance Kit (Electric) ... from 2 tonne per hour in gold to over 3500 tonne per hour in iron

OUR VISION AND MISSION

2 Venter AvenueBainsvlei, BloemfonteinSouth Africa

+27 82 809 1007+27 82 940 0672

[email protected]@[email protected]@evolvemining.com evolvemining.com

OUR VISIONSafe, Innovative mining solutions NOW!

OUR MISSIONTo develop a partnership of like-minded people and organizations with aligned cultures working together to…

design, build, operate and evolve, safe, highly innovative and competitive cost per tonne systems that….

produce the highest sustainable profits per ton for all stakeholders in the moving and processing of construction and mined minerals.

Begin With The End In Mind

OUR PURPOSE IS TO:Unlock the value of Africa through it’s PEOPLE, make a difference and

have adventures!

THE EVOLVE CULTURE

Our culture drives sustainable results for all clients and stakeholders. Our approach centres around the client and our people are key in turning vision into reality.

We EVOLVE, nurture and develop through a shared value system.

We value:

- Safety. We design and work with safety in mind, including looking after the environment.

- Honesty and integrity. The core values that form the foundation of our success.

- Respect. We value and hold our clients and stakeholders in the highest regard.

- Authenticity. EVOLVE remains well- grounded in its systems and approach.

- Discipline. Continuous and improved measurement ensures optimised operations.

- Innovation. At EVOLVE, we think outside the box of convention, but within safety guidelines.

- Balance. Healthy, steady growth without the burnout.

- Adventure. Business, as life, is an adventure undertaken by the brave.

Page 4: CHANGING PARADIGMS - Evolve mining€¦ · SAFEST JAW CRUSHER IN THE WORLD HS105E Performance Kit (Electric) ... from 2 tonne per hour in gold to over 3500 tonne per hour in iron

EVOLVE MINING

We are specialists in designing mines and

process plants that produce at the lowest,

sustainable, cost per tonne in the harshest

conditions in the world.

We have been involved in projects that vary

from 2 tonne per hour in gold to over 3500

tonne per hour in iron ore.

The intended consequence of our approach

and innovation is ‘Higher Sustainable Profits

for Our Customers’. It has been our experience

that the earlier we are involved in the mine the

more profits we can help our customers make.

From exploration through mine planning to

processing ore for the end customers we prefer

to be involved in every step of the way

- Our design centres 100% on our philosophy of ‘Lowest, Sustainable, Cost Per Tonne’.

- Our designs generate early cash flow for mines expanding or starting out.

- Our approach is designed to help de-risk the already high risks of mining.

- Our approach combines innovative and alternative mining solutions with traditional mining solutions to give our customers a competitive edge for their business:• In pit crushing and conveying• Surface mining and conveying• Innovative modular and scalable crushing, screening

and process plants

- We are prepared to run our solutions at a cost per tonne through our contracting company AMC http://africanminingandcrushing.com/

- We have partners in all commodities to be able to process ore and produce finished saleable commodities for our customers.

- We specialise in upgrading waste dumps, for most commodities, in some instances by 300% (eg from 0.4g/ton to 1,2g/ton in low grade gold dumps).

- Our new technology “New Mining” designs allow us to process old slag dumps and reclaim vast sums of previously un-reclaimable materials.

2 Venter AvenueBainsvlei, BloemfonteinSouth Africa

+27 82 809 1007+27 82 940 0672

[email protected]@[email protected]@evolvemining.com evolvemining.com

Page 5: CHANGING PARADIGMS - Evolve mining€¦ · SAFEST JAW CRUSHER IN THE WORLD HS105E Performance Kit (Electric) ... from 2 tonne per hour in gold to over 3500 tonne per hour in iron

2 Venter AvenueBainsvlei, BloemfonteinSouth Africa

+27 82 809 1007+27 82 940 0672

[email protected]@[email protected]@evolvemining.com

OUR NEW MINING CONCEPT

OUR NEW MINING CONCEPT IS - 90% designed and built in Africa

- a scalable solution that can produce of 50tph to 135 tph on construction materials

- is profitable - the second and third stages become self funding

- A system that is very safe and mobile

- is very robust and designed for the harsh African conditions

- Incorporating all capital costs

- Producing material at a competitive cost per ton price of a 150 to180tph plant

- Running at low R/t operating costs

ECONOMICS

50 t/h plant -> 2 Stage90 t/h plant -> 3 Stage

CAPITAL COSTS (%)Conventional 100Evolve 85

COST PER TONNE(%)Conventional 100Evolve 75

ENERGY COSTS(%)Conventional 100Evolve 50

Why will this work for construction

- Construction materials are the most used commodity globally, 2nd only to fresh water.

- Current traditional crushing and screening technology below 100-120tph does not make economic sense.

- Crushing and screening equipment has traditionally been designed outside Africa.

- Transport makes up the most substantial proportion of the rural infrastructure costs.

- The cost of putting services into rural areas is about 3 to 5 times compared to an urban environment.

- The potential is there to use our “New Mining” concept in one in 5 villages in Africa.

Why will this work for mining

- Community frustration - they do not actively participate in the benefits of Mining.

- The perception -by the countries in Africa that mining does not benefit enough people.

- European / American model does not fit small scale mining in 3rd world – no really commercially available solutions that are economically viable and accessible.

- Governments want to develop local entrepreneurs & help them develop businesses in mining and mining beneficiation but are finding it difficult to make it a reality.

- Large mining companies need the infrastructure round the mine to be in good condition to make their mines viable. Large mining need to be seen to be giving back.

evolvemining.com