Challenges of Simulation Model Validation for Renewable Resources Presented at MIPSYCON 2018 by: Daniel Durbak and Dinemayer Silva usa.siemens.com/digitalgrid Unrestricted © Siemens Industry, Inc. 2018

Transcript of Challenges of Simulation Model Validation for Renewable ... · Power Loss Analysis. Power Factor &...

Page 1: Challenges of Simulation Model Validation for Renewable ... · Power Loss Analysis. Power Factor & Power Flow Analysis. ... • ISOs and bankers request accurate models for power

Challenges of Simulation Model Validation for Renewable ResourcesPresented at MIPSYCON 2018 by:Daniel Durbak and Dinemayer Silva

usa.siemens.com/digitalgridUnrestricted © Siemens Industry, Inc. 2018

Page 2: Challenges of Simulation Model Validation for Renewable ... · Power Loss Analysis. Power Factor & Power Flow Analysis. ... • ISOs and bankers request accurate models for power

Unrestricted © Siemens Industry, Inc. 2018

November 7, 2018Page 2 usa.siemens.com/digitalgrid

Overview

1

2

3

4

5

Introduction

Plant Configurations

Power Loss Analysis

Power Factor & Power Flow Analysis

Dynamic Simulations – Stability Analysis

Electro-magnetic Transient Simulations

Summary & Discussion

6

7

Page 3: Challenges of Simulation Model Validation for Renewable ... · Power Loss Analysis. Power Factor & Power Flow Analysis. ... • ISOs and bankers request accurate models for power

Unrestricted © Siemens Industry, Inc. 2018

November 7, 2018Page 3 usa.siemens.com/digitalgrid

Introduction

Who we are:

• Dinemayer Silva: Manager Consulting ~ Stability Analysis

• Daniel Durbak: Principal Consultant & Senior Key Expert ~ Insulation Coordination Studies

• Siemens PTI: the house of simulation software tools and network consulting

We have experienced the challenges of validating the simulation models for many plants with renewable resources.

1

Page 4: Challenges of Simulation Model Validation for Renewable ... · Power Loss Analysis. Power Factor & Power Flow Analysis. ... • ISOs and bankers request accurate models for power

Unrestricted © Siemens Industry, Inc. 2018

November 7, 2018Page 4 usa.siemens.com/digitalgrid

Introduction

Key software tools discussed today:

• PSS®E- positive sequence power flow analysis & dynamic simulations for stability analysis• Siemens PTI

• PYTHON – programming language for custom automation tools

• E-TRAN: creates PSCAD transmission system models from PSS®E power flow models• Electranix Corporation

• PSCADTM/EMTDCTM - Electro-magnetic transient simulations in three phase• Manitoba HVDC Research Centre a division of Manitoba Hydro International Ltd.

The software tools continue to evolve with new models for renewables

Page 5: Challenges of Simulation Model Validation for Renewable ... · Power Loss Analysis. Power Factor & Power Flow Analysis. ... • ISOs and bankers request accurate models for power

Unrestricted © Siemens Industry, Inc. 2018

November 7, 2018Page 5 usa.siemens.com/digitalgrid

Introduction

Key drivers:

• ISOs and bankers request accurate models for power flow analysis in the early stages of project development to determine plant feasibility with the transmission system.

• Design and equipment changes can result in delays for approval

• Requirement for PSS®E results to be reasonably consistent with PSCAD

• PSCAD models that survive events in a weak system

The industry is clamoring for more accurate simulation models and data for plants with renewable resources.

Page 6: Challenges of Simulation Model Validation for Renewable ... · Power Loss Analysis. Power Factor & Power Flow Analysis. ... • ISOs and bankers request accurate models for power

Unrestricted © Siemens Industry, Inc. 2018

November 7, 2018Page 6 usa.siemens.com/digitalgrid

Plant Configurations

Solar Farm Single Line Diagram from EPCHV Gen-tie line

Main step-up power transformerN invertors

N Padmount distribution transformers Each collector section length & cable type specified

2

Page 7: Challenges of Simulation Model Validation for Renewable ... · Power Loss Analysis. Power Factor & Power Flow Analysis. ... • ISOs and bankers request accurate models for power

Unrestricted © Siemens Industry, Inc. 2018

November 7, 2018Page 7 usa.siemens.com/digitalgrid

Power Loss Analysis

Wind Farm PSS®E Slider Diagram1 Gen-tie line1 Main step-up transformer N generatorsN padmount transformers Every collector cable sectionDetailed Representation derived from EPC design

3

Page 8: Challenges of Simulation Model Validation for Renewable ... · Power Loss Analysis. Power Factor & Power Flow Analysis. ... • ISOs and bankers request accurate models for power

Unrestricted © Siemens Industry, Inc. 2018

November 7, 2018Page 8 usa.siemens.com/digitalgrid

Power Loss Analysis

Plant Gross P Production

P levels - 12 stair steps

Hours from estimated 8760-Hour Net Energy Time Series

Annual MWh energy production is same

0.000.050.100.150.200.250.300.350.400.450.500.550.600.650.700.750.800.850.900.951.00

0

730

1460

2190

2920

3650

4380

5110

5840

6570

7300

8030

8760

Pow

er G

ener

ated

(pu

)

Hours

Net.power.pad (pu)

Steps

Page 9: Challenges of Simulation Model Validation for Renewable ... · Power Loss Analysis. Power Factor & Power Flow Analysis. ... • ISOs and bankers request accurate models for power

Unrestricted © Siemens Industry, Inc. 2018

November 7, 2018Page 9 usa.siemens.com/digitalgrid

Power Loss Analysis

The power loss results from 12 power flow cases show the impact of the major component types.

Page 10: Challenges of Simulation Model Validation for Renewable ... · Power Loss Analysis. Power Factor & Power Flow Analysis. ... • ISOs and bankers request accurate models for power

Unrestricted © Siemens Industry, Inc. 2018

November 7, 2018Page 10 usa.siemens.com/digitalgrid

Power Factor and Power Flow Analysis

Typical Requirements:• Minimum 0.95 power factor at the POI (i.e., Q at least 33% of rated P)

• Performance comparable to an equivalent synchronous generation unit

Typical Equipment Needs to be Determined:• Switched Shunt Capacitors

• Switched Shunt Reactors

• DVAR

4

The detailed power flow model is used for the analysis.

Page 11: Challenges of Simulation Model Validation for Renewable ... · Power Loss Analysis. Power Factor & Power Flow Analysis. ... • ISOs and bankers request accurate models for power

Unrestricted © Siemens Industry, Inc. 2018

November 7, 2018Page 11 usa.siemens.com/digitalgrid

Power Factor and Power Flow Analysis

Typical Requirements:

• V & Q control objectives to be agreed upon by plant owner, transmission owner and ISO

Typical Equipment Needs to be Determined:

• Solar inverter or wind turbine generator controls

• PPC voltage control point and settings

• Fixed Taps or On-Load Tap Changer (OLTC) settings for transformers

Model must agree with requirements

Page 12: Challenges of Simulation Model Validation for Renewable ... · Power Loss Analysis. Power Factor & Power Flow Analysis. ... • ISOs and bankers request accurate models for power

Unrestricted © Siemens Industry, Inc. 2018

November 7, 2018Page 12 usa.siemens.com/digitalgrid

Power Factor and Power Flow Analysis

Equivalent RepresentationUsed for transmission system impact studies (SIS).• Gen-tie = same• Main step-up transformer = same• Equivalent generator = N x MVA, N x P, N x Q• Padmount transformer = N x MVA • Equivalent collector cable R + jX, B = Derived from EPC design

Page 13: Challenges of Simulation Model Validation for Renewable ... · Power Loss Analysis. Power Factor & Power Flow Analysis. ... • ISOs and bankers request accurate models for power

Unrestricted © Siemens Industry, Inc. 2018

November 7, 2018Page 13 usa.siemens.com/digitalgrid

Dynamic Simulations – Stability AnalysisPSS®E Dynamic Library Models for Renewable Resources:

5

Requirement: PSS®E results to be reasonably consistent with PSCAD

Page 14: Challenges of Simulation Model Validation for Renewable ... · Power Loss Analysis. Power Factor & Power Flow Analysis. ... • ISOs and bankers request accurate models for power

Unrestricted © Siemens Industry, Inc. 2018

November 7, 2018Page 14 usa.siemens.com/digitalgrid

Dynamic Simulations – Stability Analysis

Typical Tests to Perform to Validate Model:• Flat run (steady state without switching)

• Ring down (fault cleared without switching)

• Fault with all lines in (N-0 to N-1)

• Fault with one line out (N-1 to N-2)

• Low Voltage Ride Through (LVRT)

• Frequency Reference Step Response

• Power Reference Step Response

• Voltage Reference Step Response

• Shunt Capacitor Switching

The equivalent plant model is used for the analysis.

Page 15: Challenges of Simulation Model Validation for Renewable ... · Power Loss Analysis. Power Factor & Power Flow Analysis. ... • ISOs and bankers request accurate models for power

Unrestricted © Siemens Industry, Inc. 2018

November 7, 2018Page 15 usa.siemens.com/digitalgrid

Electro-magnetic Transient Simulations

• The PSCAD/EMTDC model of the power system in the vicinity of the Plant is derived from the PSS®E positive sequence power flow model using the E-TRAN program.

• Substitute the manufacturer’s inverter model for the load flow generator.• Add PPC model (i.e. REPCAU1 equivalent)

T-LineE_119993_200_1E

PROJECT_

N200 34.5115.0

E

:1

PROJECT_

N300 T-LineE_300_400_1

E

PROJECT

N400

J

0.634.5

E

:1

PROJECT_

N500

VN500~

E20.04.112 E_500_0_1Inverter

Solar

12

REPCAU1Pref

IQ

Vt

Qref Qt

Vt

PPC%

6

Page 16: Challenges of Simulation Model Validation for Renewable ... · Power Loss Analysis. Power Factor & Power Flow Analysis. ... • ISOs and bankers request accurate models for power

Unrestricted © Siemens Industry, Inc. 2018

November 7, 2018Page 16 usa.siemens.com/digitalgrid

Solar Farm with Rapid Rebound

Three phase fault near the Plant with normal clearing

The P & Q outputs from the Plant rebounds rapidly to pre-fault levels

PSS®E results are compared with PSCAD/EMTDC - reasonably similar

Electro-magnetic Transient Simulations

Page 17: Challenges of Simulation Model Validation for Renewable ... · Power Loss Analysis. Power Factor & Power Flow Analysis. ... • ISOs and bankers request accurate models for power

Unrestricted © Siemens Industry, Inc. 2018

November 7, 2018Page 17 usa.siemens.com/digitalgrid

Solar Farm with Ramp Rebound

Three phase fault near the Plant with normal clearing

The P & Q outputs from the Plant rebounds to pre-fault levels with a definite ramp (about 1 s).

PSS®E results are compared with PSCAD/EMTDC - reasonably similar

Electro-magnetic Transient Simulations

Page 18: Challenges of Simulation Model Validation for Renewable ... · Power Loss Analysis. Power Factor & Power Flow Analysis. ... • ISOs and bankers request accurate models for power

Unrestricted © Siemens Industry, Inc. 2018

November 7, 2018Page 18 usa.siemens.com/digitalgrid

Summary

Many pitfalls regarding the validation of simulation models for plants with renewable resources.

Key Challenges:• PSS®E Power Flow: Plant model perfectly consistent with EPC design and specifications

• PSS®E Dynamic: Library model (data) reasonable consistent with PSCAD model.

• E-TRAN: Picking a set of busses and parameters for a reasonable transmission system model.

• PSCAD:• Merging renewable source model with E-TRAN derived system model

• Proper initializing to match PSS®E Power Flow

• Surviving events in a weak system

It takes team work to get all pieces of the simulation models to fit together.

This Photo by Unknown Author is licensed under CC BY-SA-NC

7

Page 19: Challenges of Simulation Model Validation for Renewable ... · Power Loss Analysis. Power Factor & Power Flow Analysis. ... • ISOs and bankers request accurate models for power

Unrestricted © Siemens Industry, Inc. 2018

November 7, 2018Page 19 usa.siemens.com/digitalgridAuthor / DepartmentYYYY-MM-DDRestricted © Siemens AG 20XX

Page 19

Discussion

Page 20: Challenges of Simulation Model Validation for Renewable ... · Power Loss Analysis. Power Factor & Power Flow Analysis. ... • ISOs and bankers request accurate models for power

Unrestricted © Siemens Industry, Inc. 2018

November 7, 2018Page 20 usa.siemens.com/digitalgrid

Contact Information

Siemens Industry, Inc.400 State StreetSchenectady, NY 12305, USA

Daniel DurbakPrincipal Consultant, Senior Key Expert+1 518 [email protected]

Dinemayer SilvaManager Consulting+1 518 [email protected]/digitalgrid