CERN P186 Magnet cryogenic system update

7
CERN P186 Magnet cryogenic system update Yury Ivanyushenkov RAL December 7, 2004

description

CERN P186 Magnet cryogenic system update. Yury Ivanyushenkov RAL December 7, 2004. Liquid nitrogen cooling system: Diagram. Drawn by Peter Titus. Cold vent line. Fill line. Flexible transfer lines available at CERN. Flow in. Flow return. CERN flexible transfer line as a fill line. - PowerPoint PPT Presentation

Transcript of CERN P186 Magnet cryogenic system update

Page 1: CERN P186 Magnet cryogenic system update

CERN P186Magnet cryogenic system update

Yury IvanyushenkovRAL

December 7, 2004

Page 2: CERN P186 Magnet cryogenic system update

Liquid nitrogen cooling system: Diagram

Drawn by Peter Titus

Fill line

Cold vent line

Page 3: CERN P186 Magnet cryogenic system update

Flexible transfer lines available at CERN

Flow in

Flow return

Page 4: CERN P186 Magnet cryogenic system update

CERN flexible transfer line as a fill line

Transfer line pressure drop vs. Fill time

0

2

4

6

8

10

12

14

16

18

0 5 10 15 20 25

Fill time, min

Pre

ssur

e dr

op, b

ar

Internal pipe only

Return pipe only

Both pipes

Fill volume = 300 l of LN

Geometry:40 m of horizontal flexible transfer linewith 4 bends

Conclusion: this line is OK as a fill line if both pipes are in use

Page 5: CERN P186 Magnet cryogenic system update

CERN flexible transfer line as a cold vent line

Geometry:40 m of horizontal flexible transfer linewith 4 bends

Note:formula for compressible flow is used

Conclusion: this line can not be used as a cold line at high mass flow rate.

Cold line pressure drop vs. Cold nitrogen gas flow rate

0

10

20

30

40

50

60

0 20 40 60 80 100 120

M ass flow, g/s

Pre

ss

ure

dro

p,

ba

r

Internal pipe only

Return pipe only

Both pipes

Page 6: CERN P186 Magnet cryogenic system update

Cold vent line diameter calculation

Question: what is the optimal diameter for the cold vent line ?

Pressure drop vs. Transfer line diameter

0

5

10

15

20

25

30

35

40

45

50

0 10 20 30 40 50 60 70 80

Int diameter, mm

Pre

ssu

re d

rop

, b

ar 100 g/s

200 g/s

300 g/s

400 g/s

500 g/s

Geometry:40 m of horizontal flexible transfer linewith 4 bends

Note:formula for compressible flow is used

Line int diameter 70 mm

Pressure drop of 1.34 bar for 500 g/s

Page 7: CERN P186 Magnet cryogenic system update

Cryogenic system cost estimate (Preliminary and not official !)

Item Supplier Cost Quantity Total cost, k£

Fill transfer line AS Scientific, UK £200 /m 40 8

Vent line AS Scientific £200 /m 40 8

Valves Industry £5000 7 35

Cold box AS Scientific ? £10000 1 10

Additional lines AS Scientific £100 /m 40 4

LN2 Dewar CERN 1 2

Equipment installation

CERN + RAL £200 / day 20 4

Instrumentation Industry + MIT+ CERN + RAL

5

Control system Industry + MIT + CERN + RAL

10

Total: 86

Contingency (30 %) 26

Total + Contingency 112