CENTUM VP Turbomachinery Control Solutions Bulletin 33L30A01-40E Author Yokogawa Electric...

Bulletin 33L30A01-40E www.yokogawa.com/pwr/pwr-top-001en.htm True integration of turbomachinery control in the state-of-the-art CENTUM VP Turbomachinery Control Solutions CENTUM VP Turbomachinery Control Solutions

Transcript of CENTUM VP Turbomachinery Control Solutions Bulletin 33L30A01-40E Author Yokogawa Electric...

Page 1: CENTUM VP Turbomachinery Control Solutions Bulletin 33L30A01-40E Author Yokogawa Electric Corporation Subject CENTUM VP Turbomachinery Control Solutions Keywords 4th Edition : May

Bulletin 33L30A01-40ETrademarksCENTUM, Vnet/IP, Vigilance and VigilantPlant are either trademarks or registered trademarks of Yokogawa Electric Corporation.All other company brand or product names in this bulletin are trademarks or registered trademarks of their respective holders. www.yokogawa.com/pwr/pwr-top-001en.htm

Subject to change without noticeAll Rights Reserved. Copyright © 2008, Yokogawa Electric Corporation

[Ed:04/b] Printed in Japan, 305(KP)

Represented by:

True integration of turbomachinery control in the state-of-the-art CENTUM VP

Turbomachinery Control Solutions

CENTUM VP Turbomachinery Control Solutions

Italy 400 MWcombined cycle

Romania180 MWcombined cycle

Turkey130 MWcombined cycle

China2 x 300 MWcoal �red

China 6 x 300 MW coal �red

India 2 x 600 MW 2 x 500 MW coal �red

India3 x 660 MWsupercriticalcoal �red

Algeria369 MWIWPP

Nigeria 530 MW & 2 x 450 MW simple cycle

Taiwan2 x 550 MWcoal �red

Korea9 x 100 MWcoal �red

Brazil 2 x 75 MW, oil & gas �red

Peru 650 MWcombined cycle

Venezuela 460 MW combined cycle

Bulgaria8 x 200 t/h�ue gas desulphurization

Korea800 MW supercriticaltraining simulator

Japan2 x 1,050 MW�ue gas desulfurization

U.S480 MW, combined cycle

U.S100 MW, combined cycle

Canada120 MW, cogeneration

U.S3 x 70 MW, gas & oil �red

Brazil 460 MW, combined cycle

Vietnam2 x 300 MW, coal �redsimulator & training

Japan 375 MW & 350 MW gas �red

Brunei110 MWcombined cycleThailand

2 x 110 MWcombined cycleSaudi Arabia

360 MWIWPP Australia

4 x 500 MWcoal �red revamping

Indonesia110 MW & 95 MWgeo-thermal

Singapore2 x 600 MWoil �redsimulator & training

Australia4 x 660 MWcoal �red revampingsimulator & training

Australia 4 x 550 MW brown coal �red revamping simulator & training

Mongolia8 x 420 t/hcoal �redrevamping & simulator

Spain800 MWcombined cyclew/ LNG terminal

Fossil fired power plants

Gas turbine power plants

Plant services and/or plant simulators

Yokogawa service offices

YOKOGAWA MIDDLE EAST & AFRICA B.S.C.(c)

Page 2: CENTUM VP Turbomachinery Control Solutions Bulletin 33L30A01-40E Author Yokogawa Electric Corporation Subject CENTUM VP Turbomachinery Control Solutions Keywords 4th Edition : May
Page 3: CENTUM VP Turbomachinery Control Solutions Bulletin 33L30A01-40E Author Yokogawa Electric Corporation Subject CENTUM VP Turbomachinery Control Solutions Keywords 4th Edition : May

Bulletin 33L30A01-40ETrademarksCENTUM, Vnet/IP, Vigilance and VigilantPlant are either trademarks or registered trademarks of Yokogawa Electric Corporation.All other company brand or product names in this bulletin are trademarks or registered trademarks of their respective holders. www.yokogawa.com/pwr/pwr-top-001en.htm

Subject to change without noticeAll Rights Reserved. Copyright © 2008, Yokogawa Electric Corporation

[Ed:04/b] Printed in Japan, 305(KP)

Represented by:

True integration of turbomachinery control in the state-of-the-art CENTUM VP

Turbomachinery Control Solutions

CENTUM VP Turbomachinery Control Solutions

Italy 400 MWcombined cycle

Romania180 MWcombined cycle

Turkey130 MWcombined cycle

China2 x 300 MWcoal �red

China 6 x 300 MW coal �red

India 2 x 600 MW 2 x 500 MW coal �red

India3 x 660 MWsupercriticalcoal �red

Algeria369 MWIWPP

Nigeria 530 MW & 2 x 450 MW simple cycle

Taiwan2 x 550 MWcoal �red

Korea9 x 100 MWcoal �red

Brazil 2 x 75 MW, oil & gas �red

Peru 650 MWcombined cycle

Venezuela 460 MW combined cycle

Bulgaria8 x 200 t/h�ue gas desulphurization

Korea800 MW supercriticaltraining simulator

Japan2 x 1,050 MW�ue gas desulfurization

U.S480 MW, combined cycle

U.S100 MW, combined cycle

Canada120 MW, cogeneration

U.S3 x 70 MW, gas & oil �red

Brazil 460 MW, combined cycle

Vietnam2 x 300 MW, coal �redsimulator & training

Japan 375 MW & 350 MW gas �red

Brunei110 MWcombined cycleThailand

2 x 110 MWcombined cycleSaudi Arabia

360 MWIWPP Australia

4 x 500 MWcoal �red revamping

Indonesia110 MW & 95 MWgeo-thermal

Singapore2 x 600 MWoil �redsimulator & training

Australia4 x 660 MWcoal �red revampingsimulator & training

Australia 4 x 550 MW brown coal �red revamping simulator & training

Mongolia8 x 420 t/hcoal �redrevamping & simulator

Spain800 MWcombined cyclew/ LNG terminal

Fossil fired power plants

Gas turbine power plants

Plant services and/or plant simulators

Yokogawa service offices

YOKOGAWA MIDDLE EAST & AFRICA B.S.C.(c)