ZEYNUB SHAIKH
بسم الله الرحمن الرحيم We begin in the Name of Allah The Most Gracious, The Most Merciful

04/18/2023 2

To Design a High Voltage Transformer-less Solar Inverter with Input High Voltage Regulator

ZEYNUB SHAIKH
Our project's purpose will be: To Design a High Voltage Transformer-less Solar Inverter with Input High Voltage Regulator

04/18/2023 3

Project Members

Luqman Ahmed (EE-804)Syed Usama Hassan (EE-803)Chaudry Asad ur Rehman (EE-788)

Project AdvisorA/P Muhammad Farhan Khan 

ZEYNUB SHAIKH
Our group consists of 3 members: Luqman Ahmed (gesture towards him), Syed Usama Hassan - myself, and Chaudry Asad ur Rehman (gesture towards him). And we are honored to have A/P Muhammad Farhan Khan as our Project Advisor.

04/18/2023 4

Agenda:

•General Idea •Goals• Impact•Block Diagram• Solar Panel•Buck-Boost Converter• Inverter

ZEYNUB SHAIKH
Our Agenda consists of 7 parts: The general idea - which is exactly that - the general idea; Our Goals, which consist of ....; The Impact, Block Diagram, and Solar Panel be elaborated by Luqman; While the Buck-Booster Converter as well as the Inverter will be elaborated by Asad.

04/18/2023 5

1. General IdeaTo design a battery-less systemHigh voltage and transformer

less solar inverterCost effectiveEfficientContinuous supply of power

without any interruption(day-time)

04/18/2023 6

Problem StatementConventional Solar Systems

Low input voltage Transformer problems Battery System Sizes Maintenance Price

04/18/2023 7

Conventional Systems (1KW)Battery bank may cost 15,000 PKR.

Most of the price in an inverter is covered by its transformer. A transformer in each system takes approximately 5,500 PKR to make 1K W system.

04/18/2023 8

Motivation / AimUsage of high input voltageTo overcome the Battery issue Transformer-less inverterLess maintenance To minimize the price Energy Efficient System

04/18/2023 9

Our System (1KW)

No cost of batteries (saves 15,000 PKR)

No cost of Transformers (saves 5,500 PKR)Less heavier, easily portable

Buck-Boost converter for regulation

Transformer-less inverter due to high input voltage

04/18/2023 10

5. Block Diagram

04/18/2023 11

4. ImpactEnhancement in power Engineering:Enlargement and application of our planned project would not only give the investigators and students a chance to go in depth about the study and visualization of the modern concepts of power engineeringLarge scale:It will let the Engineers all across Pakistan to think about same sort of idea on a larger scale. Renewal energyThese phases, would provide us a path on walk on for the further development of renewal energy sources with least environment damage

04/18/2023 12

6. Solar Panels

Solar Panel can be designed by 4 types of solar cells1- Mono crystalline solar cell 2- Poly crystalline solar cell 3- All black and 4- HybridIn our project we are using that solar panels which consists of mono crystalline solar cells

04/18/2023 13

Benefits of Mono crystalline Solar Panels over others

Some solat websites suggest that single crystalline solar panels can last up to 50 years.

They have high efficiency. Greater Heat Resistance.

04/18/2023 14

Comparison chartMonocrystalline Polycrystalline

Typical module efficiency 15-20% 13-16%

Best research cell efficiency 25.0% 20.4%

Area required for 1 kWp 6-9 m2 8-9 m2

Typical length of warranty 25 years 25 years

Lowest price 0.75 $/W 0.62 $/W

Temperature resistance

Performance drops 10-15% at high temperatures

Less temperature resistant than monocrystalline

Additional detailsOldest cell technology and most widely used

Less silicon waste in the production process

04/18/2023 15

Buck-boost Regulator:A Buck-Boost converter is a type

of switched mode power supply that combines the principles of the Buck Converter and the Boost Converter in a single circuit. It provides a regulated DC output voltage from either an AC or a DC input.

04/18/2023 16

Operation as a Buck Converter:

04/18/2023 17

Operation as a Boost Converter

04/18/2023 18

Combined Operation

04/18/2023 19

Inverters

Input voltage

• 12 VDC, for smaller consumer and commercial inverters that typically run from a rechargeable 12V lead acid battery.• 24 and 48 VDC, which are common standards for home energy systems.• 200 to 400 VDC, when high power output is required

04/18/2023 20

General Diagram

04/18/2023 21

Approximate CostCost of the Project: 75,500 PKR

Cost of Solar Panels: 1,10,000 PKR

04/18/2023 22

Conclusion