Temperature drops for leads Y2, Y4, Y5, Y8 Noise for Y1, Y3, Y6, Y7, Y2, Y4, Y12 (6/5 to 6/9), Y13 Time of occurrences: 6/05/08 6/10/08 10 am 6/10/08 4 pm 6/12/08 11 am These sensors were installed by Nicolas Vauthier 05/09/08 Questions: - What did happen to the new installed sensor TT983s ? - Wanted : Correlation to establish with the electrical activities around the DFBXG (ELQA, HV, ground, etc..). - Isolation problem? electrical cables stress during activities? - Proximity boxes under focus? - How to prevent such events? - Review TT893s cabling? Review ELQA and HC test procedure? - Confirm that the band heaters are working. Status: - The control valve, CV891, for these leads were forced closed. - Need to understand what happened in order to perform the qualification test for the final protocol (equipped all VC leads). CD - 06/12/08 oblem : Temperature sensors on the DFBXG 600A low current lead TT983

description

Problem : Temperature sensors on the DFBXG 600A low current lead TT983s. - PowerPoint PPT Presentation

Transcript of CD - 06/12/08

Page 1: CD - 06/12/08

Observations:Temperature drops for leads Y2, Y4, Y5, Y8Noise for Y1, Y3, Y6, Y7, Y2, Y4, Y12 (6/5 to 6/9), Y13

Time of occurrences:6/05/08 6/10/08 10 am6/10/08 4 pm6/12/08 11 am

These sensors were installed by Nicolas Vauthier 05/09/08

Questions:- What did happen to the new installed sensor TT983s ? - Wanted : Correlation to establish with the electrical activities around the DFBXG (ELQA, HV, ground, etc..).- Isolation problem? electrical cables stress during activities?- Proximity boxes under focus? - How to prevent such events?- Review TT893s cabling? Review ELQA and HC test procedure?- Confirm that the band heaters are working.

Status:- The control valve, CV891, for these leads were forced closed.- Need to understand what happened in order to perform the qualification test for the final protocol (equipped all VC leads).- The powering of L8 RQX and RTX2 is not compromise.

CD - 06/12/08

Problem : Temperature sensors on the DFBXG 600A low current lead TT983s

Page 2: CD - 06/12/08

Y1—8 : 10 days

Page 3: CD - 06/12/08

Y2-4-5-8: 10 days

Page 4: CD - 06/12/08

Y9--Y14 + X5+X6