CCISD Bond 2014

18
 NEW ELEMENTARY SCHOOL SITES BOND 2014 February 9 th  2015

description

Architects in February updated Corpus Christi school board members on potential locations for elementary campus construction.

Transcript of CCISD Bond 2014

  • NEW ELEMENTARY SCHOOL SITES

    BOND 2014

    February 9th 2015

  • NEW CCISD ELEMENTARY SCHOOLS BOND 2014

    1 LIST OF SCHOOLS / SITES OPTIONS

    LOS ENCINOS ELEMENTARY SCHOOL

    NEW FACILITY AT EXISTING SITE

    CALK & WILSON ELEMENTARY SCHOOL

    OPTION 1: EXISTING HAMLIN MIDDLE SCHOOL SITE

    OPTION 2: EXISTING WILSON ELEMENTARY SITE

    OPTION 3: SOUTH POPE PARK SITE

    WINDSOR PARK ELEMENTARY SCHOOL

    OPTION 1 LEXINGTON/SOUTH PARK SITE

    OPTION 2 - EXISTING WINDSOR PARK SITE

    PLEASE NOTE: The following drawings are not meant to represent a complete or final site plan for each site. Layouts are meant to demonstrate the ability of site to accommodate elementary school and support areas. Layout, orientation, and parking are shown to demonstrate adjacencies and access/egress and will be designed and optimized in the future.

  • 2 LOS ENCINOS ELEMENTARY SCHOOL ELEMENTARY SCHOOL SITE

    NEW CCISD ELEMENTARY SCHOOLS BOND 2014

    FRIO ST.

    HAC

    ALA ST.

    DORADO ST.

    EXISTING ELEMENTARY SCHOOL SITE

  • 3 LOS ENCINOS ELEMENTARY SCHOOL EXISTING ELEMENTARY SCHOOL SITE

    NEW CCISD ELEMENTARY SCHOOLS BOND 2014

    FRIO ST. HACALA ST.

    MISSIO

    N D

    R.

  • 4 LOS ENCINOS ELEMENTARY SCHOOL EXISTING ELEMENTARY SCHOOL SITE

    NEW CCISD ELEMENTARY SCHOOLS BOND 2014

    PROS: PROTOTYPE FACILITY FITS SITE PREVIOUSLY DEVELOPED SITE

    (ADDS LEED POINTS) POSSIBLE RE-USE OF EXISTING

    DRIVEWAYS

    CONS: MUST RELOCATE STUDENTS

    DURING CONSTRUCTION DEMOLITION AHEAD OF

    CONSTRUCTION = EXTENDED SCHEDULE

    STREET FRONTAGE CURRENTLY ON ONE SIDE ONLY

    EXISTING ELEMENTARY SCHOOL SITE

  • CALK - WILSON ELEMENTARY SCHOOL SITE OPTIONS

    NEW CCISD ELEMENTARY SCHOOLS BOND 2014

    5

    SITE OPTION 1

    EXISTING HAMLIN MIDDLE SCHOOL SITE

    SITE OPTION 2

    EXISTING WILSON ELEMENTARY SCHOOL SITE

    SITE OPTION 3

    SOUTH POPE PARK SITE

  • CALK - WILSON ELEMENTARY SCHOOL SITE OPTION 1 : EXISTING HAMLIN MIDDLE SCHOOL SITE

    NEW CCISD ELEMENTARY SCHOOLS BOND 2014

    6

    HAM

    LIN

    DR

    IVE.

    HAMLIN MIDDLE SCHOOL

    SOUTH STAPLES ST.

  • CALK - WILSON ELEMENTARY SCHOOL SITE OPTION 1 : EXISTING HAMLIN MIDDLE SCHOOL SITE

    NEW CCISD ELEMENTARY SCHOOLS BOND 2014

    7

    HAMLIN MIDDLE SCHOOL SITE

    WILSON ELEMENTARY SCHOOL SITE

  • CALK - WILSON ELEMENTARY SCHOOL SITE OPTION 2 : EXISTING WILSON SITE

    NEW CCISD ELEMENTARY SCHOOLS BOND 2014

    8

    FORT WORTH ST.

    NORTH POPE PARK

    SOUTH POPE PARK

  • CALK - WILSON ELEMENTARY SCHOOL SITE OPTION 3 : SOUTH POPE PARK SITE

    NEW CCISD ELEMENTARY SCHOOLS BOND 2014

    9

    SOUTH POPE PARK

    NORTH POPE PARK

    ROBERT WILSON ELEMENTARY SCHOOL

    SITE

    HAMLIN MIDDLE SCHOOL

    CONTIGUOUS POPE PARK

    PROPOSED NEW ELEMENTARY SCHOOL SITE

    HAMLIN MIDDLE SCHOOL

  • CALK - WILSON ELEMENTARY SCHOOL SITE OPTION 3 : SOUTH POPE PARK SITE

    NEW CCISD ELEMENTARY SCHOOLS BOND 2014

    10

    HAMLIN MIDDLE SCHOOL

    HAMLIN MIDDLE SCHOOL

    HAMLIN MIDDLE SCHOOL

    EXISTING ROBERT WILSON

    ELEMENTARY SCHOOL

    EXISTING ROBERT WILSON

    ELEMENTARY SCHOOL

    EXISTING ROBERT WILSON

    ELEMENTARY SCHOOL

  • CALK - WILSON ELEMENTARY SCHOOL SITE OPTION 1 VS SITE OPTION 2 VS SITE OPTION 3

    NEW CCISD ELEMENTARY SCHOOLS BOND 2014

    11

    PROS: PROTOTYPE SCHOOL FITS SITE NO RELOCATION OF STUDENTS REQUIRED PREVIOUSLY DEVELOPED SITE ( ADDS LEED

    POINTS)

    CONS: REQUIRED RELOCATION OF HAMLIN

    MS ATHLETIC FIELDS OFF SITE DIFFICULTY FITTING ALL PROTOTYPE

    SCHOOL AMENITIES STREET FRONTAGE ON ONE SIDE ONLY CLOSE PROXIMITY TO CCISD HAMLIN

    MS

    PROS: PROTOTYPE SCHOOL FITS SITE STREET FRONTAGE ON TWO SIDES FOR BETTER ACCESS PREVIOUSLY DEVELOPED SITE (ADDS LEED POINTS) POSSIBLE RE-USE OF EXISTING DRIVEWAYS

    CONS: MUST RELOCATE STUDENTS DURING

    CONSTRUCTION DEMOLITION AHEAD OF CONSTRUCTION

    = EXTENDED SCHEDULE

    EXISTING HAMLIN MIDDLE SCHOOL SITE

    EXISTING WILSON ELEMENTARY SCHOOL SITE SOUTH POPE PARK SITE

  • WINDSOR PARK ELEMENTARY SCHOOL SITE OPTIONS

    NEW CCISD ELEMENTARY SCHOOLS BOND 2014

    12

    SITE OPTION 1 SITE OPTION 2

    EXISTING LEXINGTON ELEMENTARY SCHOOL SITE (+ PART OF SOUTH PARK MS PROPERTY)

    EXISTING WINDSOR PARK ELEMENTARY SCHOOL SITE

  • WINDSOR PARK ELEMENTARY SCHOOL SITE OPTION 1 : LEXINGTON ELEMENTARY SCHOOL SITE (+ SOUTH PARK)

    NEW CCISD ELEMENTARY SCHOOLS BOND 2014

    13

    McARDLE RD

    SOUTH PARK MIDDLE SCHOOL

  • WINDSOR PARK ELEMENTARY SCHOOL SITE OPTION 2A : EXISTING WINDSOR PARK SITE

    NEW CCISD ELEMENTARY SCHOOLS BOND 2014

    14

    SHERIDAN DR.

    S. ALAM

    EDA ST.

  • WINDSOR PARK ELEMENTARY SCHOOL SITE OPTION 2B : EXISTING WINDSOR PARK SITE

    NEW CCISD ELEMENTARY SCHOOLS BOND 2014

    15

    S. ALAM

    EDA ST.

    SHERIDAN DR.

  • WINDSOR PARK ELEMENTARY SCHOOL SITE OPTION 1 VS SITE OPTION 2

    NEW CCISD ELEMENTARY SCHOOLS BOND 2014

    16

    PROS: PROTOTYPE SCHOOL FITS SITE CORNER SITE FOR BETTER VEHICULAR ACCESS PREVIOUSLY DEVELOPED SITE (ADDS LEED POINTS) POSSIBLE RE-USE OF EXISTING DRIVEWAYS

    CONS: MUST RELOCATE STUDENTS DURING CONSTRUCTION DEMOLITION AHEAD OF CONSTRUCTION = EXTENDED SCHEDULE

    PROS: NO RELOCATION OF STUDENTS REQUIRED PREVIOUSLY DEVELOPED SITE ( ADDS LEED

    POINTS)

    CONS: ENCROACHES SLIGHLTY ONTO SOUTH PARK

    MS PROPERTY SLIGHTLY LONGER DRIVES INCREASE COST

    EXISTING LEXINGTON ELEMENTARY SCHOOL SITE EXISTING WINDSOR PARK ELEMENTARY SCHOOL SITE

  • THANK YOU !