From “Field” to “Integration”As the world top runner, the CC-Link Partner Association (CLPA) takes lead to further open up industrial network.First from Asia, the field network CC-Link has been opening up ever further as CLPA takes the lead to develop and diffuse it globally. As a result of enthusiastic promotional activities ever since the establishment and the certification to the ISO and IEC, the CC-Link has grown into a global standard network.Now, as a solution to the needs for total system optimization that integrates various functions not only control but also device management (setting, monitoring), device maintenance (monitoring and failure detection) and data collection (operating condition), CLPA brings about an Ethernet-based industrial network vision and is making it come to being.It is the integrated network “CC-Link IE” that enables seamless data transfer from the information network layer to the field device layer. Backed up by the technology and proven services accumulated through the development of the CC-Link, CLPA is promoting to open it up further to meet your expectations.
In these globalized times, the manufacturing industry is facing harsh competition while at the same time welcoming opportunities for new development. Advances in information processing technology have given us a clearer image of the future manufacturing industry. In addition to flexibly restructuring the factory's manufacturing process or location according to the market situation and changes in technology, we are also able precisely manage the supplier chain in a broad sense from procurement of materials and parts, product sales and collection. It is said that promotion of this technology is a way to maintain and develop the manufacturing industry in technically advanced countries having a high infrastructure cost. On the other hand, this technology will be the foundation of industrial development especially in areas such as Asia. We expect major developments in the future.The industrial-use network plays a central role in this industrial development, functioning as a nervous system connecting nuclear functions that manage the system terminal actuators and sensors to the general system. This nervous system is not limited to business sites, but instead is incorporated into global activities and will continue to change as it transforms for major system optimization.We hope that the application range of CC-Link, originating in Japan, will continue to increase as an open network. We anticipate further development and diffusion so CC-Link may become backbone technology for future production system structuring.
Message
The Chairman of CLPAFumihiko KimuraFaculty of Science and Engineering, Department of Mechanical EngineeringProfessor emeritus of Tokyo University, Doctor of Engineering
CLPA, the organization promoting open network as well as your business partner.
Marketing Task Force
Technical Task Force
■Organization Chart for CC-Link Partner Association
Board of Directors
Chairman of the Association
Overseas Branches
Technical Task Force Marketing Task Force
Headquarters / Management Office
CC-Link Association partners (CLPA partners)
Distributing information
CC-Link IEspecification
Free distribution of CC-Link specifications
Conducting conformance tests
Technical support
Boardof
Directorfirms
Through the diffusion activities of the CC-Link and CC-Link IE on a global level, we support vendors and users.Under the motto “CC-Link, the open field network, will become world’s de facto stan-dard”, CLPA was established in November 2000. Ever since, the Board of directors, Marketing Task Force and Technical Task Force have joined forces to help the ven-dors to develop compatible products and the users to build up FA systems.
The Board of Directors consisting of nine firms operates CLPA and decides on major association issues.
Focuses on increasing the number of CLPA members, enhancing the world recognition and expanding the use of CC-Link.
Energetically exhibit at various trade shows and conferences, conduct educational and development seminars, plan and implement advertising pro-grams including enhancement of the home page.
Initiate and develop new specifications including the safety network “CC-Link Safety” and the in-tegrated network “CC-Link IE” that is attracting world attention. Produce needed technical ma-terials such as “Cable Installation Guide”. Eval-uate and develop new specifications for confor-mance testing. Engage in various technical issues. These activities have turned out remark-able achievements.
Focuses on management of related technology and coordinates provision of information to members and outside standard-setting organizations.
Get the membership to CLPA. The members can develop business opportunities and possibilities by receiving services such as support for developing compatible products.The member firms are entitled to obtaining the most up-to-date technological informa-tion and CC-Link specifications for free. In addition, promised support for conformance tests that are essential to establishing reli-ability assurance is available at various sta-ges of developing compatible products.
■CLPA membership categories (price excluding tax)
Annual dues
Initiation fee
Acquisition of product specification
License to use CC-Link technology
License to use CC-Link technology Other than SLMP*
Provided for free upon membership registration
Included in the annual membershipfee
Use of CC-Link logo
Technical support
Posting of products on web site and product catalog (no charge)
Exhibition at shows
Distribution of CC-Link News and product catalogsInformation about events
Posting of corporate name on CLPA web site
Master, local and intelligent device stations of CC-LinkManagement station and normal station of CC-Link IE ControlMaster and local stations, intelligent device stations of CC-Link IE Field
Remote device and I/O stations, cables and miscellaneous products of CC-LinkMaster and slave stations, cables and miscellaneous products of CC-Link/LT
Recommended network wiring parts for CC-Link IE Control and
CC-Link IE Field
*SLMP: Seamless Message Protocol
Approved software products
SLMP* connectable products
Registeredmember
Regularmember
JPY100,000
JPY300,000
JPY200,000
JPY200,000
JPY100,000
JPY50,000
JPY20,000
CC-Link IE Field Basic JPY50,000
JPY20,000
JPY100,000
JPY50,000
JPY200,000
JPY1,000,000
JPY1,000,000
Executivemember
Boardmember
Conformance test fee (per device)
Recommended product test fees (per model)
Consolidating the forces of partner firms around the world, CC-Link will take another giant step forward.CC-Link···making the next leap foward with CLPA Partners!
ARKUS Inc.
International Laboratory Corporation
IAI Corporation
IKsystem
ICBIZ Japan,Inc.
IDEC Corporation
IDEC DATALOGIC CO., LTD.
Ailes Electronic Industry CO., LTD
ASAHI KASEI ENGINEERING CORPORATION
ASAHI SANGYO CO.,LTD.
ASKA CORPORATION
Advanet lnc.
Analog Devices
ARGO CO.,LTD.
Altima Corp.
igus k.k.
IWAI KIKAI-KOGYO CO., LTD.
InterBridge, Inc.
WITTENSTEIN ternary Co.,Ltd.
Wind River KK
Wellintech Japan Co.,Ltd.
HMS INDUSTIRAL NETWORKS
A&D Co., Ltd.
ABB K.K.
SRT Co.Ltd
SMC CORPORATION
ESTIC CORPORATION
ESPEC TECHNO CORP.
ANYWIRE CORPORATION
NSD CO., LTD.
NSD Corp.
NF Corporation
NKE CORPORATION
M-System Co., Ltd.
MTT COMPANY, LTD
ELSENA,Inc.
ENDO KOGYO Co.,Ltd.
OI ELECTRIC CO., LTD
Ono Sokki Co., Ltd.
Office FA.com Co.,Ltd
OMRON Corporation
Omega Systems Incorporation
ORIENTAL MOTOR Co. , Ltd.
KANADEN CORPORATION
KANETSU CO., LTD
KAMACHO SCALE CO., LTD
Kawasaki Heavy Industries, LTD.
KEYENCE Corporation
GIKEN INDUSTRIAL CO., LTD.
KITAZAWA ELECTRIC WORKS CO., LTD.
CANON ANELVA CORPORATION
KYOEI ELECTRIC CO.,LTD
Kubota Corporation
KURAMO ELECTRIC CO., LTD
Graytechnos Co., Ltd.
KURODA Pneumatics Ltd.
K.T.MFG.CO., LTD.
K. MECS CO., LTD
KODENSHA Co.,Ltd.
KOBE CHUZAI CORP. MIHARA BRANCH
KOYO ELECTRONICS INDUSTRIES CO.,LTD.
CORRENS CORPORATION
KOGANEI CORPORATION
COGNEX K.K.
COCORESEARCH INC.
Cosmo Technical Co.,Ltd.
KOJIMA INSTRUMENTS INC.
CONTEC CO.,LTD
SATO PARTS CO.,LTD
Sartorius Mechatronics Japan K.K.
SANKO-KIGYO Inc.
SANSHA ELECTRIC MFG. CO.,LTD.
SANTEST CO., LTD
Sanyo Machine Works. Ltd.
SANRITU Co.,LTD.
CKD Corporation
Cisco Systems G.K.
JEL SYSTEM CO., LTD
SHIZUKI ELECTRIC CO., INC.
Shinano Kenshi Co.,Ltd.
SPC ELECTRONICS CORPORATION
SHIMADZU CORPORATION
SHIMADEN CO., LTD.
SHOEI Electric Co., Ltd.
Johokobo, Inc.
SWCC SHOWA CABLE SYSTEMS CO., LTD.
SINKA JAPAN CO.,LTD.
SHINKO TECHNOS CO.,LTD
New Cosmos Electric Co., Ltd.
Symphony M Corporation
Shinwa Co., Ltd
Sumitomo Heavy Industries,Ltd.
3M Japan Limited
Seiwa-electronics.co.ltd.
Dyadic Systems Co.,Ltd.
DAIICHI ELECTRONICS CO., LTD
DAI-ICHI DENTSU, LTD.
Tyco Electronics Japan G.K.
TAISEI COMPANY LIMITED
DYDEN CORPORATION
Diatrend Corporation
TAIYO,LTD.
TAIYO CABLETEC CORPORATION
TAIYO ELECTRIC CO.,LTD.
TAKENAKA ELECTRONIC INDUSTRIAL CO., LTD.
TAKEBISHI CORPORATION
TAKEMOTO DENKI CORPORATION
TACHIBANA ELETECH CO., LTD.
TAZMO CO., LTD.
Tateno Dennou, Inc.
Danaher Industrial Controls Japan Co., Ltd
TAMAGAWA SEIKI CO., LTD.
CHINO CORPORATION
CHUO KIKI Co.Ltd.
CHUO SEISAKUSHO, LTD.
TSUBAKIMOTO CHAIN CO.
Technical & Try CO., LTD
THK CO.,LTD.
TEXCELL CORPORATION
DIGITAL ELECTRONICS CORPORATION
DEPRO CO., LTD.
Tem-Tech Lab. Co. Ltd
TELI ENGINEERING CO,LTD
DENSO WAVE INCORPORATED
Tokyo Electron Device Ltd
TOHKEN CO., LTD.
TOSHIBA CORPORATION
TOSHIBA MACHINE CO., LTD.
Toshiba Schneider Inverter Corporation
Toho Technology Corp.
TOYOGIKEN CO., LTD.
TOYO ELECTRIC CORPORATION
TOYO ELECTRIC MFG.CO.,LTD
TOGAMI ELECTRIC MFG. CO., LTD
NADEX Co., Ltd.
NADA ELECTRONICS, LTD
Nikon Corporation
NIKKI DENSO CO., LTD.
NIKKE Machine Mfg. Co.,Ltd.
ALTERA JAPAN, LTD.
Nippoin Instrument Technology Company
JAPAN CONTROL ENGINEERING CO., LTD.
NSK Ltd.
Japan Telegartner Ltd.
NEC Corporation
NIPPON DENKI KENKYUSHO CO., LTD.
NIDEC-SHIMPO CORPORATION
Nihon denshi oh yoh system
NIHON ELECTRIC WIRE & CABLE CO., LTD.
Molex Japan G.K.
NETWELL CORPORATION
Harmonic Drive Systems, Inc
Hitwo System Corporation
HI-P Tech Corporation
Hakuto Co., Ltd.
HAKKO AUTOMATION CO., LTD.
Hakko Electronics Co., Ltd
PATLITE Corporation
Panasonic Electric Works, Co.,Ltd.
Panasonic Electric Works SUNX Co., Ltd.
Balluff Co.,Ltd.
PALgiken.co.Ltd
BANDO LIMITED
PEPPERL+FUCHS K.K.
B & PLUS K.K.
BCC Corporation
PMAC JAPAN CO., LTD.
Hitachi Industrial Equipment Systems Co., Ltd.
Hitachi Cable, Ltd.
BITS CO., LTD
Hirata Corporation
Hilscher GmbH
HIROCON CORPORATION
FANUC LTD
FESTO K.K.
Phoenix Contact K.K
FOREST ELECTRIC CO.LTD
FUKUDEN INCORPORATED
NACHI-FUJIKOSHI CORP.
FUJISOFT INCORPORATED.
Fuji Electric Co., Ltd.
Fujielectric Co., Ltd.
FUTABA KIKOU CO., LTD.
Bridge Technology Inc.
BellChild Co.,Ltd
HOKUYO AUTOMATIC CO., LTD.
HORIBA STEC Co., Ltd.
Honda Motor Co., Ltd.
Micronet. Co.
MYCOM, INC
Magnescale Co., Ltd.
Matsushita System Development Inc.
Matsutame Co., Ltd.
MISUMI
MITSUBISHI HEAVY INDUSTRIES PRINTING & PACKING MACHINERY, LTD.
MITSUBISHI HEAVY INDUSTRIES, LTD.
MITSUBISHI ELECTRIC CORPORATION
MITSUBISHI ELECTRIC CORPORATION
MITSUBISHI ELECTRIC CORPORATION
MITSUBISHI ELECTRIC CORPORATION
MITSUBISHI ELECTRIC CORPORATION
MITSUBISHI ELECTRIC CORPORATION
MITSUBISHI ELECTRIC CORPORATION
MITSUBISHI ELECTRIC CORPORATION NAGOYA WORKS Robot Development Section Drive System Dept
MITSUBISHI ELECTRIC CORPORATION
MITSUBISHI ELECTRIC CORPORATION
MITSUBISHI ELECTRIC CORPORATION
Mitsubishi Electric Information Systems Corporation
Mitsubishi Electric FA Industrial Products Corporation
MITSUBISHI ELECTRIC ENGINEERING COMPANY LIMITED
MITSUBISHI ELECTRIC SYSTEM & SERVICE CO., LTD.
MITSUBISHI ELECTRIC MECHATRONICS SOFTWARE CORPORATION
MINEBEA CO., LTD.
MURATA MACHINERY, LTD.
MEIDENSHA CORPORATION
Yaskawa Siemens Automation Drives Corporation
YASKAWA ELECTRIC CORPORATION
Yamatake Corporation
YAMATO SCALE CO., LTD.
YAMAHA MOTOR CO., LTD.
UNION DENSHI WORKS CO., LTD.
UNITEC Corp.
UNIPULSE Corporation
Yokogawa Electric Corporation
YOSIO ELECTRONIC COMPANY
YOSHIDA ELECTRIC INDUSTRY CO., LTD
YOSHINOGAWA ELECTRICWIRE&CABLE
RKC INSTRUMENT INC.
RIKEN KEIKI CO., LTD.
Risoh Keisoku, K.K.
Ryoden Trading Co., Ltd
LINTEC CO.,LTD
Renesas Electronics Corporation
LEM Japan K.K.
Wago Company of Japan, Ltd.
WATANABE ELECTRIC INDUSTRY CO., LTD.
PDL Electronics Ltd.
HILSCHER INDIA PUT, LTD.
Messung Systems Pvt. Ltd.
SMC PNEUMATICS PVT. LTD.
TATA CONSULTANCY SERVICES JAPAN LIMITED
株式会社ARKUS
株式会社 アイ・エル・シー
株式会社 アイエイアイ
株式会社 アイケーシステム
株式会社アイシ-ビズジャパン
IDEC 株式会社
IDEC DATALOGIC 株式会社
アイレス電子工業 株式会社
旭化成エンジニアリング株式会社
旭産業株式会社
アスカ 株式会社
株式会社 アドバネット
アナログ・デバイセズ株式会社
株式会社アルゴ
株式会社アルス・リサーチ・システム
株式会社 アルティマ
イグス 株式会社
岩井機械工業 株式会社
インターブリッジ株式会社
ヴィッテンシュタイン・ターナリー株式会社
ウィンドリバー 株式会社
ウェリンテック・ジャパン株式会社
エイチエムエス・インダストリアルネットワークス株式会社
株式会社 エー・アンド・デイ
ABB 株式会社
有限会社SRT
SMC 株式会社
株式会社 エスティック
エスペックテクノ株式会社
株式会社 エニイワイヤ
株式会社 NSD
エヌエスディ 株式会社
株式会社エヌエフ回路設計ブロック
NKE 株式会社
株式会社 エム・システム技研
エムティティ 株式会社
株式会社エルセナ
遠藤工業株式会社
大井電気 株式会社
株式会社大崎電業社
株式会社 小野測器
株式会社オフィスエフエイ・コム
オムロン株式会社
株式会社オメガシステムズ
オリエンタルモーター 株式会社
株式会社 カナデン
鐘通株式会社
鎌長製衡 株式会社
川崎重工業 株式会社
株式会社 キーエンス
技研工業株式会社
株式会社 北澤電機製作所
キヤノンアネルバ 株式会社
協栄電機 株式会社
株式会社 クボタ
倉茂電工 株式会社
グレイテクノス株式会社
クロダニューマティクス株式会社
株式会社 ケーテー製作所
株式会社 ケーメックス
株式会社光電舎
神戸鋳材株式会社 三原支店
光洋電子工業株式会社
株式会社 コーレンス
株式会社 コガネイ
コグネックス 株式会社
ココリサーチ 株式会社
株式会社コスモテクニカル
コフロック 株式会社
株式会社コンテック
サトーパーツ 株式会社
ザルトリウス・メカトロニクス・ジャパン株式会社
三交企業株式会社
株式会社 三社電機製作所
サンテスト 株式会社
三洋機工 株式会社
株式会社サンリツ
CKD 株式会社
シスコシステムズ合同会社
株式会社 ジェルシステム
株式会社 指月電機製作所
シナノケンシ株式会社
島田理化工業 株式会社
株式会社 島津製作所
株式会社 シマデン
昌栄電機 株式会社
株式会社 情報工房
昭和電線ケーブルシステム株式会社
信華株式会社
神港テクノス 株式会社
新コスモス電機 株式会社
株式会社シンフォニーエム
株式会社 進和
瑞菱電機株式会社
住友重機械工業株式会社
スリーエムジャパン株式会社
住友電気工業株式会社
聖和電子工業株式会社
株式会社ダイアディックシステムズ
株式会社 第一エレクトロニクス
第一電通 株式会社
タイコエレクトロニクスジャパン合同会社
株式会社 タイセイ
大電 株式会社
ダイヤトレンド 株式会社
株式会社TAIYO
太陽ケーブルテック 株式会社
大洋電機株式会社
竹中電子工業 株式会社
株式会社たけびし
タケモトデンキ 株式会社
株式会社 立花エレテック
タツモ株式会社
立野電脳 株式会社
ダナハーICGジャパン 株式会社
多摩川精機 株式会社
株式会社 チノー 藤岡事業所
中央機器 株式会社
株式会社 中央製作所
株式会社 椿本チエイン 京都工場
株式会社 ティアンドティ
THK株式会社
テクセル株式会社
株式会社 デジタル
株式会社 デプロ
株式会社 テムテック研究所
テリーエンジニアリング株式会社
株式会社 デンソーウェーブ
東京エレクトロンデバイス株式会社
株式会社 東研
株式会社 東芝
東芝機械 株式会社
東芝シュネーデル・インバータ株式会社
東日京三電線株式会社
東朋テクノロジー株式会社
東洋技研 株式会社
東洋電機 株式会社
東洋電機製造株式会社
株式会社 戸上電機製作所
株式会社 ナ・デックス
ナダ電子 株式会社
株式会社ニコン
日機電装 株式会社
株式会社ニッケ機械製作所
日本アルテラ株式会社
日本計装技研 株式会社
日本制禦機器 株式会社
日本精工 株式会社
日本テレガートナー株式会社
日本電気 株式会社
株式会社 日本電機研究所
日本電産シンポ 株式会社
日本電子応用システム
日本電線工業 株式会社
日本モレックス 合同会社
株式会社ネットウエル
株式会社 ハーモニックドライブシステムズ
有限会社ハイツーシステム
株式会社ハイピーテック
伯東株式会社
八光オートメーション 株式会社
発紘電機 株式会社
株式会社 パトライト
パナソニック電工 株式会社
パナソニック電工SUNX 株式会社
バルーフ株式会社
株式会社 パル技研
坂東電線 株式会社
株式会社 ピーアンドエフ
株式会社ビー・アンド・プラス
株式会社 ビーシーシー
株式会社 ピーマック・ジャパン
株式会社 日立産機システム
日立電線株式会社
株式会社 ビッツ
平田機工 株式会社
ヒルシャー・ジャパン株式会社
ヒロコン株式会社
ファナック 株式会社
フエスト 株式会社
フエニックス・コンタクト株式会社
フォレスト電機 株式会社
株式会社福電
株式会社 不二越
富士ソフト株式会社
富士電機株式会社
富士電機株式会社
富士電建株式会社
株式会社 双葉機工
ブリッジテクノロジー株式会社
株式会社ベルチャイルド
株式会社HO・FACTORY
北陽電機 株式会社
株式会社 堀場エステック
本田技研工業株式会社鈴鹿製作所
株式会社マイクロネット
マイコム 株式会社
株式会社 マグネスケール
有限会社 松下システム開発
マツタメ 株式会社
株式会社 ミスミワイヤリング事業チーム
三菱重工印刷紙工機械株式会社
三菱重工業 株式会社 神戸造船所
三菱電機株式会社 系統変電システム製作所
三菱電機(株)受配電システム事業所
三菱電機(株)電力・産業システム事業所(神戸)
三菱電機(株)名古屋製作所 FAシステム部
三菱電機(株)名古屋製作所 インバータシステム部
三菱電機(株)名古屋製作所 NCシステム部
三菱電機(株)名古屋製作所 ドライブシステム部
三菱電機(株)名古屋製作所 ドライブシステム部ロボット開発課
三菱電機(株)姫路製作所
三菱電機(株)福山製作所 計測制御製造部
三菱電機(株)福山製作所 遮断器製造部
三菱電機インフォメーションシステムズ株式会社 中部支社
三菱電機FA産業機器株式会社
三菱電機エンジニアリング 株式会社
三菱電機システムサービス 株式会社
三菱電機メカトロニクスソフトウエア 株式会社
ミネベア 株式会社
村田機械 株式会社
株式会社 明電舎
安川シーメンスオートメーションドライブ 株式会社
株式会社 安川電機
株式会社 山武
大和製衡 株式会社
ヤマハ発動機 株式会社
株式会社 ユニオン電子工業
株式会社 ユニテック
ユニパルス 株式会社
横河電機 株式会社
ヨシオ電子 株式会社
吉田電機工業 株式会社
吉野川電線 株式会社
理化工業 株式会社
理研計器 株式会社
理想計測 株式会社
菱電商事株式会社
株式会社 リンテック
ルネサスエレクトロニクス 株式会社
レムジャパン株式会社
ワゴジャパン 株式会社
渡辺電機工業 株式会社
PDL Electronics Ltd.
HILSCHER INDIA PUT, LTD.
Messung Systems Pvt. Ltd.
SMC PNEUMATICS PVT. LTD.
(2015年7月現在)
CC-Link goes further for the better
to the manufacturing sites in the world.
CLPA keeps it advancing.These figures are self-explanatory about the development and growth on the global level.Many member firms come crossing the boarders to join CLPA.
A line of diversified CC-Link compatible products, as many as the number of user voices.
Recognized in the world market, the number of shipped nodes has exceeded 16.92 million.
Though starting with only 134 member firms when CLPA was established, it is expected to reach more than 2595 member firms in year 2015 (as of the end of March). The overseas firms ac-count for as much as 70 % of the memberships, providing a solid evidence that the world has rec-ognized that the field network CC-Link, first from Japan, is to the true global standard.
With the increasing number of vendor firms joining CLPA, the accumulated CC-Link com-patible products is expected to soon reach 1529 in kinds. For the excellent features of these member products to be known and un-derstood, CLPA prepares “CC-Link Product Catalog” and “CC-Link Family Demonstration Panel”.
Centered on the automobile, semi-conductor and liquid crystal indus-tries, the number of shipped nodes of CC-Link compatible products keeps growing. It is expected to reach 16.92 million nodes in year 2015 and is picking up speed even more.
CC-Link, CC-Link Safety and CC-Link IE, ... The world keeps an eye with surprise on the industrial net work first from Japan.As a key measure of our promotion and the best opportunities to exchange more information with more vendors and users, CLPA has participated in trade shows and exhibitions in Japan and overseas. We are going to actively participate in more trade shows and exhibitions of diversified industries to promote the technological understand-ing and propose our future concept that is well-represented by the CC-Link IE.
In Japan
System Control Fair
In Europe and North America
SPS/IPC/DRIVES Show
In Korea
Automation World
In China
Roadshow
Overseas members
Members in Japan
Accum
ulated number of C
LPA m
embers
20142002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 201320142002 2003 2004 2005 2006 2007 2008 2009 2010 2012 20132011 20142002 2003 2004 2005 2006 2007 2008 2009 2010 20122011 2013
Accumulated number of CC-Link compatible products
Accumulated num
ber of CC
-Link compatible products
Accumulated number of nodes
Accum
ulated number of shipped nodes
◎Growing CLPA members ◎Increase of number of shipped nodes◎Increase of number of CC-Link compatible products
170016001500 1450 1400 1350 1300 1250 12001150110010501000950900850800 750 700 650 600 550 500 450 400 350 300 250 200 150 100 50 0
1475
705
615
528
420
337274
216157
850
950
1100
1260
2600
2500
2400
2300
2200
2100
2000
1900
1800
1700
1600
1500
1400
1300
1200
1100
1000
900
800
700
600
500
400
300
200
100
0
2328
1667
661
551
283
649
345
853
470
745
391469
230
1016
580
810
1331
1182
699
1481
935
546
1632
1062
570
1875
1271
604
2097
1465
632
1441
474
569
653
838
740
905961
1047
1139
12191290
1356
2595
1905
690
152916921600
1500
1400
1300
1200
1100
1000
900
800
700
600
500
400
300
200
100
0
2015 2015 2015
With expansion of promotion offices established in
Asia and in 11 regions of the world, CLPA develops
potential of the CC-Link across the globe.
6th ,FL.,No.105,WU KUNG 3rd.Rd.WU-KU HSIANG,Taipei,Taiwan,TEL.+886-2-89901573 FAX.+886-2-89901572 E-mail:[email protected]
RM. 711, 7F GANGSEO HANGANG XI-TOWER A, 401 Yangcheon-ro, Gangseo-gu, Seoul 07528 KoreaTEL.+82-2-3663-6178 FAX.+82-2-6224-0158E-mail:[email protected]
500Corporate Woods Parkway,Vernon Hills,IL,60061,USATEL.+1-847-478-2647 FAX.+1-847-876-6611 E-mail:[email protected]
Mitsubishi-Electric-Platz 1, 40882 Ratingen, GermanyTEL.+49-2102-486-1750 FAX.+49-2102-532-9740E-mail:[email protected]
307Alexandra Road#05-01/02 Mitsubishi Electric Building Singapore159943TEL.+656-470-2480 FAX.+656-476-7439 E-mail:[email protected]
CC-Link has been certified to conform to the internation-al standards, IEC Standards and SEMI Standards for the semiconductor and FPD industries, JIS, Chinese Nation-al Standards, ISO Standards, Korean National Standards and Taiwanese Standards. Although it was a de facto standard in Japan, now it is recognized as a global stan-dard in name and reality. It meets the conventional re-quirements for open networks, communication compati-bility and diverse lineup of connectable products, and, in addition, can drastically improve the production efficiency in establishment of systems and applications. Its high technological level and ease of use are internationally appreciated.
Headquarters (Tongji University): School of Electronics andInformation Engineering, Jiading Campus, Tongji University, Shanghai,P.R.ChinaHead Office: 4F, Intelligence Fortune Leisure Plaza,No.80 Xin Chang Road, Huang Pu district, Shanghai, P.R.ChinaTEL.021-64940523 FAX.021-64940525E-mail:[email protected]
2nd Floor, Tower A & B, Cyber Greens, DLF Cyber City,DLF Phase-III, Gurgaon-122002 Haryana, IndiaTEL.+91-124-4630300E-mail:[email protected]
From a Japanese defacto standard to a Global Standard!!
CLPA has established 11 offices across the globe. They are located in Japan, Korea, Taiwan, North America, Europe, China, ASEAN, India, Turkey, Mexico and Thailand. In near future, we plan to establish new offices located in Thailand and Mexico for further global expansion. These offices promote CC-Link/CC-Link IE technology and provide a wide range of services for CLPA members.
8 CLPA-Turkey(Turkey)
Serifali Mahallesi Nutuk Sokak.No:5 34775 Umraniye-istanbul /TurkeyTEL.+90-216-526-39-90E-mail:[email protected]
Mariano Escobedo 69, Zona Industrial - Tlalnepantla, 54030, Estado de Mexico, MexicoTEL.+52-55-3067-7517E-mail:[email protected]
9 CLPA-Mexico
7
8
109
9th Floor, SV City Building, Office Tower1, 896/19 and 20, Rama3 Rd., Bangpongpang, Yanawa, Bangkok 10120 ThailandTEL.+66-2-682-6522 FAX.+66-2-682-9750 E-mail:[email protected]
●CC-Link Promotion Center Thailand10
ISO15745-5: CC-Link approved in January 2007.IEC61158: CC-Link approved in December 2007.IEC61784: CC-Link approved in December 2007.IEC61158: CC-Link IE Field approved in August 2014.IEC61784: CC-Link IE Field approved in August 2014.IEC: CC-Link IE Safety to be approved in 2017.SEMI E54.12: CC-Link approved in 2001.SEMI E54.23-0513: CC-Link IE Field approved in May 2013.GB/Z 19760-2005: CC-Link approved in December 2005.GB/T 20229.4-6 Chinese BA (Building Automation) standard: CC-Link appeared in December 2006.GB/T 19760-2008 Chinese highest standard for industrial networks: CC-Link approved in June 2009.GB/Z 29496.1.2.3-2013: CC-Link Safety approved in June 2013.GB/T CC-Link IE to be approved in 2016.JIS TR B0031: CC-Link approved in May 2013.KSB ISO 15745-5: CC-Link approved in March 2008.KSC IEC 61158/61784: [CC-Link] Certified in December 2011.KSC IEC 61784-5-8: [CC-Link/CC-Link IE] Certified in December 2014.KS: CC-Link IE Safety to be approved in 2017.CNS 15252X6068: CC-Link approved in May 2009.
International Standard: ISO
International Standard: IEC
SEMI Standard
Chinese National Standard: GB
Japan Industrial Standard: JIS
Korean National Standard: KS
Taiwan Standard: CNS
For developing compatible products that attract world’s attention, come to CLPA. We will back you up in various scenes and stages.
To facilitate timely development of your products fitting in with market needs and compatible with the
CC-Link and other specifications, CLPA offers you needed support on various scenes and stages.
Coordinating various seminars for technical training, supporting conformance testing essential to
developing compatible products of high reliability and promotion of your products for timely introduction
into the market are among other examples of our well-programmed services.
Design hardware and
software in detail based
on the products and
network configurations.
Produce a prototype
product to the design
drawings and eval-
uate it from various
aspects.
For developing and marketing
CC-Link compatible products,
you are requested to hold a
CLPA membership either as a
Regular member, Executive mem-
ber or Board member. Fill out the
application form and send it via
facsimile to the following:
The CLPA provides for free the specifica-tions corresponding to the developed prod-ucts compatible with the CC-Link. This how-ever requires the reci-pients to have a dedi-cated communications LSI or a built-in module. Refer to the respective partner products cata-logs for the specifica-tions.
Disclosing technicalspecifications
CLPA offers the mem-ber firms the “CC-Link Conformance Test” specifications for free applicable to the de-veloped compatible products.
As part of the development sup-port, the members can take part in various CLPA-coordinated sem-inars and those promoted by a Board member firm (Mitsubishi Electric Corporation). From mem-bers dealing with the CC-Link for the first time to those actually building up CC-Link, you have op-portunities to gain technical knowledge that suits your purpo-ses.
Development support
Development designand evaluation
Production of prototypeand its evaluationMembership registration
Developmentplanning
Providing the“CC-Link Conformance Test”
specifications
Mem
ber m
anu
facturers
C
L
P
A
Developing
products
compatible with
the following
specifications:
●CC-Link IE
●CC-Link
●CC-Link/LT
●CC-Link Safety CC-Link Partner Association, facsimileNo. +81(0)52-916-8655
The member firm implements the conformance test according to the
“CC-Link Conformance Test” specifications for each product model.
To facilitate the conformance testing, CLPA has test centers in Ja-
pan and overseas.
CLPA promotes and expand marketing of compatible
products with materials highlighting their innovative, ex-
cellent features.
A catalog in a printed and an electronic form (CD-ROM) is available, fully covering all the CC-Link compatible products that the member manufactur-ers have developed and put on market. CLPA provides users with diversified solutions.
Product promotion
CLPA web site pro-vides information on the CC-Link compat-ible products devel-oped and marketed by the member manu-facturers.
Information registered anddisclosed on web site
Implementing conformance tests Marketing
* The conformance test is to ensure that the product meets the common specification
of CC-Link. The conformance test is not intended to ensure the performance and
quality of the product itself.
What is Conformance Test?
· ensure the communication reliability of your product in CC-Link, andBy conducting the
conformance test, you can … · easily design system configuration where products of different manufacturers and models are connected.
Power supply noise test (AC/DC) Surging test with 64 stations
Brunch line noise test Interoperability test
Test example
Tested station Master station
Master station
Powercable
Communication line (CC-Link)
Tested station
(64 stations)Master station
Master stationTested station
Tested station
●Conformance test is to be conducted on each model to ensure high-ly reliable communication between CC-Link compatible products.
●Your products need to be tested in CC-Link communication to be certified if your products meet CC-Link communication specifications and can be connected to CC-Link networks.
●Automatic test tools are available for CC-Link IE Field Network Basic and SLMP.
The member firms use the conformance test facilities to test CC-Link compatible products from various aspects. The noise test, hard-ware test, software test and combined test among others enable to appropriately check whether for instance, CC-Link compatible products can communicate normally.
Laboratory testing
Laboratory
Mitsubishi Electric Engineering Co., Ltd.Nagoya Office CC-Link Test Center139, Aza-Shimoyashiki, Shimoyashiki-cho, Kasugai-shi, Aichi 486-0906Phone: 0568-36-3863 (Direct line) Fax: 0568-36-2045E-mail: [email protected]
Kanagawa Industrial Technology Center, Electronic Technology Division705-1, Shimoimaizumi, Ebina-shi, Kanagawa 243-0435, JapanPhone: +81-46-236-1500 (Main switchboard) Fax: +81-46-236-1525http://www.kanagawa-iri.go.jp/index.html
The Industrial Ethernet network that realizes high reliability by duplexing the transmission path. The core network that bundles each field or motion network and provides controller-level distributed control with Gigabit speed large data capacity. With the newly added safe communication function, safety data can be shared between controllers.
CC-Link is the existing fieldbus network for typical field control applications. CC-Link/LT is a cost saving network for small I/O applications. CC-Link Safety is specialized for use to meet demanding safety network requirements.
The new Industrial Ethernet field network for intelligent manufacturing systems. Provides real-time integrated distributed control of I/O while also linking numerous networks at Gigabit speed. The safe communication function and motion communication function have been newly added allowing systems to be configured simply.
F e a t u r e s
Continuously evolvingThe evolution will not stop!CC-Link IE concept of CLPA, raising to the higher state covering information system to production fields.Each new day brings greater expectation in regard to CC-Link IE and its potential as the next-generation, Ethernet-based in-tegrated network. CLPA’s CC-Link IE enables seamless data transmission from information systems to production fields, and greatly changes the concept of industrial networks.
Optimal network choice for complete manufaturing control up to the business information system level.
CC-Link IE is a vertically integrated and Ethernet-based network from IT layer to field layer.
Ultra high speed & ultra large capacity network with real-time performance
The SLMP (Seamless Message Protocol) is a common protocol for realizing system management and operation regardless of the differences between networks. The SLMP ensures direct transmission of information between production site and IT system and facilitates extensive information sharing.
3G networks cloud
Internet
SeamlessMessageProtocol
SLMP
Equipmentmaintenance
Productionorder terminal
LAN (Ethernet)
HMI
Man
ufu
cturin
g
PLC
MES (Manufacturing Execution System)
Equipmentmonitoring
PLC (Master)
SafetyPLC
BoardHMI
Hub
Servo
Safety remote I/O
PLC (Local)
Controller dispersion
Synchro-nization
Synchro-nization
Info
rmatio
n S
ystem
I/O Robot Inverter
I/O control
Realizing CC-Link IE communication using general-purpose Ethernet on field network applicable to small-scale equipment
HTTP/FTP etc.
User application (cyclic communication/transient communication/SLMP)
Application software
Ethernet protocol stack
Ethernet communication driver
TCP/UDP
IP
Ethernet EIA-485
※SLMP:Seamless Message Protocol
Robot Remote I/O HMI
Provision of sample programs for slaves
Seamless information sharing by SLMP compatible devices
Commercially available switching hub
Wi-Fi router
Cyclic communicationbetween master and
slave stations
Provision of sample programs for PLC and IPC (master station) masters
Barcodereader
Visionsensor
Inverter
Ex) Parameter setting and status monitor by WEB server with built-in slaves
Remote maintenance based on machine life diagnostic information and status information from devices compatible with CC-Link IE Field Basic
Data information from slaves
Standard Ethernet communication(HTTP,FTP, etc.)
Servo motors with built-in positionersOperation of
built-in positioners
Network
Cyclic communication on CC-Link IE field network is realized by software.The system can be developed easily, and a wide lineup of applicable devices can be provided earlier.
The communication can be done simultaneously with standard Ethernet TCP/IP communication (HTTP, FTP, etc.).
Wiring for control is not required, and the Ethernet network can be unified.
A field network system compatible with standard Ethernet communication can be constructed at low cost.
The master station can be easily realized on IPC or personal computer.The master station can be realized without a dedicated interface board.*Cyclic communication is implemented as application software on Ethernet based on sample source code.
CC-Link IE communication using general-purpose Ethernet technology which can be easily applied to small-scale equipment not requiring high-speed control and is easy to use and develop. Realizing cyclic communication on the CC-Link IE field network by software.
Data (Robot)Station down(Error station)
Cable Broken
Broken
Down
Communication speed / data link control
Network topology
Data transmission reliability method
Data transmission control method
Size of network shared memory
Communication medium
Connector
Maximum Number of stations
Station-to-station distance (When multi mode optical fiber is used)
Overall distance (When multi mode optical fiber is used)
1Gbps / based on Ethernet standard
Loop
Double loop
Token passing
MAX. 256Kbytes
IEEE 802.3z multimode optical fiber cable (GI)
IEC 61754-20 LC connector
Twisted pair cable with shield (category 5e)
RJ45 connector, M12 X-code connector (duplex connector)
120 stations
MAX. 550 m
MAX. 66,000 m
Basic communication functionNetwork shared memory communication (Cyclic communication: real time communication)
Message communication (Transient communication: non real time communication)
CC-Link IE Controller network Specifications
A new, in-factory backbone network, utilizing Gigabit Ethernet technology.
Network shared memory for cyclic communication with ultra high speed & ultra large capacity
CC-Link IE is designed to ensure a highly reliable network through the use of full duplex fiber optic
transmission paths, delivering high-speed, large-capacity distributed control.
It’s the new backbone network that provides assured control of each field network.
To achieve stable communication independent of transmission
delay CC-Link IE adopts a token passing protocol for data trans-
mission control.
Each controller passes data to the network shared memory only
when it has the token, ensuring fully deterministic and high
speed real-time comunication.
High speed & reliability by redundant fiber optic loop technology
By adoption of redundant loop topology, each station continues
communication by looping back upon detection of a broken
cable or station error.
This integrated redundancy is provided without additional equip-
ment and without increasing network cost.
Data (PC)
Data (PLC)
Data (PLC)
Additional controllers
Cable adapters can be installed within 550 m
LC Connector Adapter
IEC061508 SIL3 IEC61784-3 (2010) Compliant Safety Communication FunctionThe safety communication function has been added to the CC-Link IE controller network allowing safe communication to be shared between controllers.
PLC
Safety PLC (Safety control)
CC-Link IE Control
Safety PLC (Safety control)
Standardinput
Safetyinput
Safetyinput Safety output
Standardoutput
E-stop switch Warning light
Light curtainRestart switch
Adoption of Ethernet-compliant cables, connectors and adapters
Easy and world-wide purchasing of standard Ethernet cabling
parts by using Ethernet technology.
By using cable adapters, wiring debugging and installation can
be started even if all the equipment in the line has not been fully
installed.
IEEE802.3z (1000BASE-SX)LC connector (IEC61754-20)
Ultra High Speed
CC-Link IE Field is ultra high speed & ultra large capacity network , which provides both deterministic (cyclic) communication and on-demand messaging (transient) communication Controller dispersion, I/O control, motion control and safety functions can be set seamlessly.
Easy network trouble shooting
STATION NO.X10 X1
5
0 1
46
23
5
0 1
46
9237
8
0 1
4
23
0
PW
1 2 3 4 5 6 7 8 9 A B C D E F
L RUN SD RD L ERR.
DA DG
DB SLD
(FG)
1 3 5 7 9 11 13 15 17 19 21 23 25 27
2 4 6 8 10 12 14 16 18 20 22 24 26
+24V 24G
B RATE
STATION NO.X10 X1
5
0 1
46
23
5
0 1
46
9237
8
0 1
4
23
0
PW
1 2 3 4 5 6 7 8 9 A B C D E F
L RUN SD RD L ERR.
DA DG
DB SLD
(FG)
1 3 5 7 9 11 13 15 17 19 21 23 25 27
2 4 6 8 10 12 14 16 18 20 22 24 26
+24V 24G
B RATE
STATION NO.X10 X1
5
0 1
46
23
5
0 1
46
9237
8
0 1
4
23
0
PW
1 2 3 4 5 6 7 8 9 A B C D E F
L RUN SD RD L ERR.
DA DG
DB SLD
(FG)
1 3 5 7 9 11 13 15 17 19 21 23 25 27
2 4 6 8 10 12 14 16 18 20 22 24 26
+24V 24G
B RATE
STATION NO.X10 X1
5
0 1
46
23
5
0 1
46
9237
8
0 1
4
23
0
PW
1 2 3 4 5 6 7 8 9 A B C D E F
L RUN SD RD L ERR.
DA DG
DB SLD
(FG)
1 3 5 7 9 11 13 15 17 19 21 23 25 27
2 4 6 8 10 12 14 16 18 20 22 24 26
+24V 24G
B RATE
PULL
POWER
Master Slave Slave HubSlave
Slave
Slave
PCHub
Ultra-high-speed ... supremely useable ... seamless ... and fully compatible with the Ethernet standardsWe’re bringing the benefits of “Gigabit & Ethernet” to the field level!
Gigabit transmission and real-time protocol enables easy and reliable data communication and remote I/O communication independent of transmission delay.
High-speed communication for the management information of the devices and trace information as well as the transmission of control data.
Flexible network topology (ring, line and star are all possible)
The network shared memory allows communication among controllers and field devices.
Easy configuration and network diagnosis enables a total engineering cost reduction from system start-up to maintenance.
Easy Networking
Bandwidth for cyclic communications
Bandwidth for transient communications1Gbps
(broad bandwidth)
DETERMINISTIC
Reserves dedicated bandwidthfor cyclic communication andtransient communication. Thisrealizes stable high speedcommunication anddeterministic communication
Disconnected
Unstable
Display the network
structure same as
actual system
When the trouble occurs, the cause can be found. Then system down time can be minimized.
Ethernet cable RJ-45 Connector Ethernet Hub
Since the physical layer and data link of CC-Link IE Field Network apply Ethernet technology, commercial Ethernet cables, adapters and hubs can be used.The availability of materials and selectivity of equipment for the network installation and adjustment are enhanced.
Ethernet Cable and Connector
STATION NO.X10 X1
5
0 1
46
23
5
0 1
46
9237
8
0 1
4
23
0
PW
1 2 3 4 5 6 7 8 9 A B C D E F
L RUN SD RD L ERR.
DA DG
DB SLD
(FG)
1 3 5 7 9 11 13 15 17 19 21 23 25 27
2 4 6 8 10 12 14 16 18 20 22 24 26
+24V 24G
B RATE
STATION NO.X10 X1
5
0 1
46
23
5
0 1
46
9237
8
0 1
4
23
0
PW
1 2 3 4 5 6 7 8 9 A B C D E F
L RUN SD RD L ERR.
DA DG
DB SLD
(FG)
1 3 5 7 9 11 13 15 17 19 21 23 25 27
2 4 6 8 10 12 14 16 18 20 22 24 26
+24V 24G
B RATE
STATION NO.X10 X1
5
0 1
46
23
5
0 1
46
9237
8
0 1
4
23
0
PW
1 2 3 4 5 6 7 8 9 A B C D E F
L RUN SD RD L ERR.
DA DG
DB SLD
(FG)
1 3 5 7 9 11 13 15 17 19 21 23 25 27
2 4 6 8 10 12 14 16 18 20 22 24 26
+24V 24G
B RATE
STATION NO.X10 X1
5
0 1
46
23
5
0 1
46
9237
8
0 1
4
23
0
PW
1 2 3 4 5 6 7 8 9 A B C D E F
L RUN SD RD L ERR.
DA DG
DB SLD
(FG)
1 3 5 7 9 11 13 15 17 19 21 23 25 27
2 4 6 8 10 12 14 16 18 20 22 24 26
+24V 24G
B RATE
STATION NO.X10 X1
5
0 1
46
23
5
0 1
46
9237
8
0 1
4
23
0
PW
1 2 3 4 5 6 7 8 9 A B C D E F
L RUN SD RD L ERR.
DA DG
DB SLD
(FG)
1 3 5 7 9 11 13 15 17 19 21 23 25 27
2 4 6 8 10 12 14 16 18 20 22 24 26
+24V 24G
B RATE
STATION NO.X10 X1
5
0 1
46
23
5
0 1
46
9237
8
0 1
4
23
0
PW
1 2 3 4 5 6 7 8 9 A B C D E F
L RUN SD RD L ERR.
DA DG
DB SLD
(FG)
1 3 5 7 9 11 13 15 17 19 21 23 25 27
2 4 6 8 10 12 14 16 18 20 22 24 26
+24V 24G
B RATE
STATION NO.X10 X1
5
0 1
46
23
5
0 1
46
9237
8
0 1
4
23
0
PW
1 2 3 4 5 6 7 8 9 A B C D E F
L RUN SD RD L ERR.
DA DG
DB SLD
(FG)
1 3 5 7 9 11 13 15 17 19 21 23 25 27
2 4 6 8 10 12 14 16 18 20 22 24 26
+24V 24G
B RATE
STATION NO.X10 X1
5
0 1
46
23
5
0 1
46
9237
8
0 1
4
23
0
PW
1 2 3 4 5 6 7 8 9 A B C D E F
L RUN SD RD L ERR.
DA DG
DB SLD
(FG)
1 3 5 7 9 11 13 15 17 19 21 23 25 27
2 4 6 8 10 12 14 16 18 20 22 24 26
+24V 24G
B RATE
STATION NO.X10 X1
5
0 1
46
23
5
0 1
46
9237
8
0 1
4
23
0
PW
1 2 3 4 5 6 7 8 9 A B C D E F
L RUN SD RD L ERR.
DA DG
DB SLD
(FG)
1 3 5 7 9 11 13 15 17 19 21 23 25 27
2 4 6 8 10 12 14 16 18 20 22 24 26
+24V 24G
B RATE
0123456789ABCDEF
0123456789ABCDEF
STATION NO.
X10
X1
MODE
NC
DA
DB
DG
1
3
5
7
6
4
2
PULL
POWER
STATION NO.X10 X1
5
0 1
46
23
5
0 1
46
9237
8
0 1
4
23
0
PW
1 2 3 4 5 6 7 8 9 A B C D E F
L RUN SD RD L ERR.
DA DG
DB SLD
(FG)
1 3 5 7 9 11 13 15 17 19 21 23 25 27
2 4 6 8 10 12 14 16 18 20 22 24 26
+24V 24G
B RATE
STATION NO.X10 X1
5
0 1
46
23
5
0 1
46
9237
8
0 1
4
23
0
PW
1 2 3 4 5 6 7 8 9 A B C D E F
L RUN SD RD L ERR.
DA DG
DB SLD
(FG)
1 3 5 7 9 11 13 15 17 19 21 23 25 27
2 4 6 8 10 12 14 16 18 20 22 24 26
+24V 24G
B RATE
STATION NO.X10 X1
5
0 1
46
23
5
0 1
46
9237
8
0 1
4
23
0
PW
1 2 3 4 5 6 7 8 9 A B C D E F
L RUN SD RD L ERR.
DA DG
DB SLD
(FG)
1 3 5 7 9 11 13 15 17 19 21 23 25 27
2 4 6 8 10 12 14 16 18 20 22 24 26
+24V 24G
B RATE
0123456789ABCDEF
0123456789ABCDEF
STATION NO.
X10
X1
MODE
NC
DA
DB
DG
1
3
5
7
6
4
2
PULL
POWER
STATION NO.X10 X1
5
0 1
46
23
5
0 1
46
9237
8
0 1
4
23
0
PW
1 2 3 4 5 6 7 8 9 A B C D E F
L RUN SD RD L ERR.
DA DG
DB SLD
(FG)
1 3 5 7 9 11 13 15 17 19 21 23 25 27
2 4 6 8 10 12 14 16 18 20 22 24 26
+24V 24G
B RATE
STATION NO.X10 X1
5
0 1
46
23
5
0 1
46
9237
8
0 1
4
23
0
PW
1 2 3 4 5 6 7 8 9 A B C D E F
L RUN SD RD L ERR.
DA DG
DB SLD
(FG)
1 3 5 7 9 11 13 15 17 19 21 23 25 27
2 4 6 8 10 12 14 16 18 20 22 24 26
+24V 24G
B RATE
STATION NO.X10 X1
5
0 1
46
23
5
0 1
46
9237
8
0 1
4
23
0
PW
1 2 3 4 5 6 7 8 9 A B C D E F
L RUN SD RD L ERR.
DA DG
DB SLD
(FG)
1 3 5 7 9 11 13 15 17 19 21 23 25 27
2 4 6 8 10 12 14 16 18 20 22 24 26
+24V 24G
B RATE
Flexible network topology
Star topology
Star topology
Ring topology
Line topology
CC-Link IE Field can access field devices directly by remote engneering tools, across the network hierarchy.
Devices can be monitored or configured from anywhere in the network, which increases the engineering efficiency with remote management.
Seamless Networking
The safety communication function has been added to the CC-Link IE field network allowing safe communication at the field level.
Allows flexible arrangement matching the device layout by connecting the PLC and Safety PLC with a single network.
IEC061508 SIL3 IEC61784-3 (2010) Compliant Safety Communication Function
Highly accurate synchronization is possible by compensating the delay time in propagating data from the master station to the slave station.
Able to set up not only the synchronization required, but also the information of I/O and sensors which synchronization is not required, on the same CC-Link IE field network.
Motion communication function capable of highly accuracy synchronous communication
Ethernet Adapter
Ethernet equipment connection CC-Link connection
Controller distribution
In addition to data control, stress free information exchange of control, monitoring, and diagnosis data are possible.The network shared memory enables communication among controllers
Easily realize the management and configuration of increasing amounts of motion data
Easily realize a safe communication function at the field level
Ethernet equipment can connect easily
Seamless connection with existing CC-Link via gateway
Hub
I/O Control Motion control Safe communication function
Gateway
In addition to high speed 10 Mbps operation, CC-Link is extremely
deterministic. Being able to rely on a predictable, unvarying I/O re-
sponse allows system designers to provide reliable, real-time control.
CLPA provides a “memory mapped profile” that definesdata for
each product type. This definition includes the control signal
and data layout (addressing). Multiple vendors can develop
CC-Link compatible products to match this “profile”. Users are
then able to easily change from one product brand to another
without needing to change connections or control programs.
The maximum overall cable length is 100 meters when 10
Mbps is selected. This length can be extended to 1.2 km when
the network speed is 156 Kbps. The use of cable repeaters
and optical repeaters allows even greater distances to be cov-
ered. CC-Link supports large-scale applications and reduces
the work needed for wiring and device installation.CC-Link significantly reduces the amount of control and power wir-
ing needed in today’s complex production lines. It reduces wiring
and installation costs, minimizes the work needed to accomplish
the wiring and drastically improves maintenance operations.
■Link scan time
■Memory mapped Profile
■CC-Link transmission distance
0 20 40 60
0
1
2
3
4
5
6
RX0
RWr0
RX10
RWr10
CC-Link
0 2,000 4,000 6,000 8,000 10,000 12,000 14,000
156kbps
625kbps
2.5Mbps
5Mbps
10Mbps
[m]
The RAS (Reliability, Availability, Serviceability) function is another
of CC-Links features. Functions including stand-by master, detach-
ing slave station, automatic return and testing and monitoring pro-
vide high reliability net-work system and allow the system down time
to minimize.
M
R3R1 L1R2
This system automatically conveys metal molds according to in-
structions received from an upper level cell controller. It con-
trols AGV route switching and interfaces with an NC machine
through the CC-Link. The CC-Link network drastically reduced
wiring and the work period. A significant part of the wiring re-
duction was due to the high noise immunity of CC-Link, which
imposed very few constraints on the routing of wires.
This line assembles automobile body with spot-welding and
arc-welding robots. The line consists of 46 PLCs, installed 7 to
8 CC-Link master units in each, and the total 2000 to 3000 of
remote I/O units. The CC-Link reduced drastically wiring and
cost. Also the time needed to do field installation work and wir-
ing was drastically shortened because the easy connection of
CC-Link to each piece of equipment. The efficiency and speed
of the conveyor system was increased due to the high speed
communication to the remote I/O made possible by CC-Link.
This system monitors the automatic operation and alarm condi-
tions for machine rooms and electric equipment rooms. LAN
connections and phone lines enable remote monitoring and
maintenance. CC-Link I/O modules drastically reduce the wir-
ing to air-conditioning units and other electrical equipment.
The high-speed data link allows real-time display of the current
status and error condition of equipment being monitored.
CC-Link application stories
Overground I/F PLC
Remote for eachcontrol I/F
Remote for eachcontrol I/F
Remote I/O forroot switching
Information System
Information System
InformationSystem
Side-Mainline
Intranetconnection
Telephoneline
Remotemaintenance
TFTtouch panel
Color LCD (10.4 inch)
Touch paneloperation
Electricalequipment
Performs operation of each equipment device, and monitors equipment status and faults
Air-conditioningunit
Sanitaryequipment
Securityequipment
RR-FURline
Large NC machine fordie manufacture
Large NC machine fordie manufacture
CC-Link master x 4 50 connection modules
Repeater improves network flexibility
Auto-warehouse
System application: Combination of CC-Link and CC-Link/LT
A wide range of devices can be connected
Products from multiple manu-facturers can be connected
Easy connection of various types of sensors
Seamless communication with a CC-Link to CC-Link to CC-Link/LT bridge
Easy maintenance
DDCC
DDCC
DDCC
DDCC
CC-Link Specification
Difference between CC-Link Ver.1.10 and Ver.2.00 in the number of connected units
CC-Link Ver. 1.00 model (differences from Ver. 1.10)
CC-Link/LT specification
CC-Link Safety specification
CC-Link IE Controller Network specification
Communication medium
Connector
Distance between stations (max.)
CC-Link IE Controller Networks achieve the communication speed of 1 Gbps. Here, the token method is adopted as the data transfer control method. The token method does not cause any collision of frames in the transmission path, improving the throughput of communication. Therefore, it is optimal for networks where regular schedule communication is required.
Item Specification
Transmission line type
Optical cable
Twisted
pair cableCC-Link IE Field Network Specifications
Ethernet Standards
Communication speed
Communication media
Communication control method
Topology
Maximum number of connected units
Maximum station-to-station distance
IEEE802.3ab (1000BASE-T) compliant
1Gbps
Shielded twisted pair cable (Category 5e), RJ-45 connector
Token passing method
Line, star, ring
254 modules (total of master and slave stations)
100m
Cyclic communication(Master slave method)
Transient communication (message communication)
Message size: Max. 2048 bytes
Control signal (bit data): max. 32768 bits (4096 bytes)RX (slave → master): 16384 bitsRY (master → slave): 16384 bitsControl data (word data): Max. 16384 words (32768 bytes)RWr (slave → master): 8192 wordsRWw (master → slave): 8192 words
Outline specifications for CC-Link IE Field Network BasicCommunication speedImplementation methodConnection formCableMax. number of connected stations per network (open specification)Cyclic communication
Max. number of link points/network
Max. number of link points/station (More than one station can be occupied.)
Link scan time (16 stations connected)Transient transmissionMix of communication protocols, TCP and IP
100MbpsSoftwareStart (connection with switching hub)Ethernet category 5e or higher64Allowed512 bytes each (4K points)4K bytes each (2K points)8 bytes each (64 points) (fixed)64 bytes each (32 points) (fixed)10msPossible (max. 2K bytes)Allowed
RX,RYRWr,RWwRX,RYRWr,RWw
LB
LW
LX
LY
LB
LW
LX
LY
32768 bits
131072 words
8192 bits
8192 bits
16384 bits
16384 words
8192 bits
8192 bits
1 Gbps
Up to 120 stations
239
32
Optical fiber cable for 1000BASE-SX (MMF)
IEC60793-2-10 Types A1a.1(50/125 μm multimode)
3.5 (dB/km) or less (λ=850 nm)
500 (MHz・km) or more (λ=850 nm)
66 km (when 120 stations are connected)
550 m (core/clad = 50/125 (μm))
Duplex LC connector
IEC61754-20: LC type connector
0.3 (dB) or less
PC polishing
Dual loop
Shielded twisted pair cable (category 5e)
RJ45 connector, M12 X-Code connector
100m
Max. number of link points per network
Max. number of link points per station
Optical fiber specificationsStandard
Transmission loss (max.)
Transmission band (min.)
Standard
Connection loss
Polished surface
Communication speed
Number of connected stations per network
Max. number of networks
Max. number of groups
Total length (total length of optical cable)
Distance between stations (max.)
Connector specifications
CLPA Office LocationsCLPA – Japan (Head Office)6F Ozone-front Building,3-15-58, Ozone, Kita-ku,Nagoya 462-0825, JapanPhone: +81-52-919-1588 Fax: +81-52-916-8655E-mail: [email protected]: http://www.cc-link.org
CLPA – Americas500 Corporate Woods Parkway,Vernon Hills, IL, 60061, U.S.A.Phone: +1-847-478-2647 Fax: +1-847-876-6611E-mail: [email protected]: http://www.cclinkamerica.org
CLPA – Europe (Germany)Mitsubishi-Electric-Platz 1,40882 Ratingen, GermanyPhone: +49-2102-486-1750 Fax: +49-2102-532-9740E-mail: [email protected]: http://www.clpa-europe.com
CLPA – Europe (U.K. Office)Travellers Lane, Hatfield, Hertfordshire, AL10 8XB U.K.(P.O. Box 50, Hatfield, AL10 8XB U.K.)Phone: +44-1707-278953 Fax: +44-1707-282873E-mail: [email protected]: http://www.clpa-europe.com
CLPA – KoreaRM. 711, 7F GANGSEO HANGANG XI-TOWER A,401 Yangcheon-ro, Gangseo-gu, Seoul 07528 KoreaPhone: +82-2-3663-6178 Fax: +82-2-6224-0158E-mail: [email protected]: http://www.cc-link.or.kr/
CLPA – ChinaHeadquarters (Tongji University): School of Electronics andInformation Engineering, Jiading Campus, Tongji University, Shanghai,P.R.ChinaHead Office: 4F, Intelligence Fortune Leisure Plaza,No.80 Xin Chang Road, Huang Pu district, Shanghai, P.R.ChinaPhone: 021-64940523 Fax: 021-64940525E-mail: [email protected]
CLPA – Taiwan6th FI, No.105, Wu Kung 3 Rd., Wu-Ku Hsiang, Taipei, TaiwanPhone: +886-2-8990-1573 Fax: +886-2-8990-1572E-mail: [email protected]: http://www.cc-link.org.tw/
CLPC – ASEAN (Singapore)307 Alexandra Road #05-01/02,Mitsubishi Electric Bldg., Singapore 159943Phone: +656-470-2480 Fax: +656-476-7439E-mail: [email protected]
CLPA – India (India)2nd Floor, Tower A & B, Cyber Greens, DLF Cyber City,DLF Phase-III, Gurgaon-122002 Haryana, IndiaPhone: +91-124-4630300E-mail: [email protected]
CLPA – Turkey (Turkey)Serifali Mahallesi Nutuk Sokak.No:5 34775 Umraniye-istanbul /TurkeyPhone: +90-216-526-39-90E-mail: [email protected]
CLPA – MexicoMariano Escobedo 69, Zona Industrial - Tlalnepantla, 54030, Estado de Mexico, MexicoTEL.+52-55-3067-7517E-mail:[email protected]
CC-Link Promotion Center Thailand9th Floor, SV City Building, Office Tower1, 896/19 and 20, Rama3 Rd., Bangpongpang, Yanawa, Bangkok 10120 ThailandTEL.+66-2-682-6522 FAX.+66-2-682-9750E-mail:[email protected]
© 2008 CC-Link Partner Association. All rights reserved.
New publication, effective Dec. 2016Specifications subject to change without noticeCC1011-04-W