5 Delivering More to a Large Steel Manufacturer The Challenge Optimize performance of conveyor system. CB Delivers More CB began with an inspection and detailed audit of each conveyor system in the plant using proprietary software to calculate the belt tension requirements and conveyor capacities. Our analysis determined that 52% of the systems were “over-belted” – the belting installed was bigger, thicker and heavier than was required to maximize system performance. With a full understanding of the system performance and capabilities, CB’s technician was able to recommend the right Value Fit belt solution to ensure the system was working at peak efficiency while delivering more than $95,000 in immediate cost savings and a lower overall projected operating cost year-after-year. Delivering More to a Global Soft Drink Manufacturer The Challenge A 10-week delivery time for a critical motor part would significantly impact production capacity and costs. Clearly an alternative solution was needed – and needed fast. CB Delivers More A CB technical service representative quickly went onsite to evaluate the application and take load and physical size ratings. His analysis identified an alternative motor and gearbox solution that could be installed in a matter of days – as opposed to 10 weeks. The CB solution not only had the manufacturer up and running again in a week, but also resulted in a 50% cost savings compared to using the part that was originally suggested. “CB delivered real value for money by recommending the right product to optimize the performance of our conveyor system. We will continue to save money for years to come.” “We were in urgent need of a critical part, but the lead time was 10 weeks. CB offered a solution that could not only be delivered within a week, but also resulted in cost savings of more than 50%.”

Transcript of CB VaLUE FiT pROdUCT SOLUTiOnS - Canadian...

4 5

CB VaLUE FiT pROdUCT SOLUTiOnS™

How we can help

Bearings and SealsLinear Bearings and ComponentsMechanical power TransmissionElectricalpneumatics and Lubrications Systems

industrial Mill SuppliesLubricants, MRO Chemicals, Coatings and paintsConveyor Components and BeltingSafety Supplies

We know that the right parts are critical to a successful plant operation. We also recognize that intelligent use of resources is now more important than ever. CB Value Fit Product Solutions deliver the perfect combination of value for money, fit to function and fit to environment, helping you minimize downtime and maximize efficiency. But don’t simply take our word for it. Read on to see how we’ve provided cost-effective, real-world solutions for our customers, big or small.

delivering More to a Large Steel Manufacturer

The ChallengeOptimize performance of conveyor system.

CB delivers MoreCB began with an inspection and detailed audit of each conveyor system in the plant using proprietary software to calculate the belt tension requirements and conveyor capacities. Our analysis determined that 52% of the systems were “over-belted” – the belting installed was bigger, thicker and heavier than was required to maximize system performance.

With a full understanding of the system performance and capabilities, CB’s technician was able to recommend the right Value Fit belt solution to ensure the system was working at peak efficiency while delivering more than $95,000 in immediate cost savings and a lower overall projected operating cost year-after-year.

delivering More to a Global Soft drink Manufacturer

The ChallengeA 10-week delivery time for a critical motor part would significantly impact production capacity and costs. Clearly an alternative solution was needed – and needed fast.

CB delivers MoreA CB technical service representative quickly went onsite to evaluate the application and take load and physical size ratings. His analysis identified an alternative motor and gearbox solution that could be installed in a matter of days – as opposed to 10 weeks. The CB solution not only had the manufacturer up and running again in a week, but also resulted in a 50% cost savings compared to using the part that was originally suggested.

“CB delivered real value for money by recommending the right product to optimize the performance of our conveyor system. We will continue to save money for years to come.”

“We were in urgent need of a critical part, but the lead time was 10 weeks. CB offered a solution that could not only be delivered within a week, but also resulted in cost savings of more than 50%.”