CAYDEN CAMPAIGN DOUBLE VANITY CRATE STORAGE · 2020-07-01 · CAYDEN CAMPAIGN DOUBLE VANITY CRATE...
Transcript of CAYDEN CAMPAIGN DOUBLE VANITY CRATE STORAGE · 2020-07-01 · CAYDEN CAMPAIGN DOUBLE VANITY CRATE...
C A Y D E N C A M P A I G N D O U B L E V A N I T Y
C R A T E S T O R A G E
• K e e p S t o n e T o p i n i t ' s c r a t e u n t i l i n s t a l l a t i o n
• S t o r e c r a t e v e r t i c a l l y i n a s a f e l o c a t i o n
• D o n o t s t a c k a n y t h i n g o n t o p o f c r a t e
1 O F 8
TOOL AND MATERIAL REQUIREMENTS
e
PARTS LIST
E. Mounting Bracket (x8)
F. Lock Washer (x8)
C. Basin (x2) (Oval or Rectangular)G. Threaded Rod (x8)
H. Wing Nut (x8)
2 O F 8
D. Vanity Base
B. Backsplash (Sold Separately)
A. Stone Top (Oval or Rectangular)
C A Y D E N C A M P A I G N D O U B L E V A N I T Y
Remove metal bands, unscrew the slats or lid,and lift the Stone Top [ A ] out of the crate.
Carefully, without allowing any freefall,rotate the crate from vertical to flat.
STONE TOP INSPECTION
Inspect the Stone Top [ A ] for cracks or defects.If defects are detected, do not install and please call 877-777-7059. If no defects are detected; clean Stone Top [ A ] with a soft cloth.
Always carry Stone Top [ A ] vertically
Do not carry Stone Top [ A ] horizontally as itincreases the risk of breakage or cracking.
CLEANING AND MAINTENANACE INSTRUCTIONS• Avoid abrasive and harsh chemical cleaners.• RH Stone Tops [A] have a honed finish, hand polished edges, and are
sealed twice with inert silicone sealant• Stone Tops [A] should be re-sealed annually
S T O N E T O P U N - P A C K I N G A N D T R A N S P O R T
W H E N M O V I N G S T O N E T O P , A L W A Y S U S E A T W O - M A N C R E W
3 O F 8
C A Y D E N C A M P A I G N D O U B L E V A N I T Y
STONE TOP INSTALLATION
4 O F 8
C A Y D E N C A M P A I G N D O U B L E V A N I T Y
PRIMARY INSTALLATION REQUIREMENTS:
• Professional two-man crew.• Water supply and drain piping installed according to local plumbing and building codes (sold seperately).
• Wall and floor are square and plumb at installation site.• Vanity Base [ D] installed square and plumb with wall and floor. Vanity Base [ D] also needs to be level.• Ensure Stone Top [A] is the correct size to match the Vanity Base [ D ].
BASIN INSTALLATION STEPS:
1. Apply a continuous bead of silicone sealant to the top surface of lavatory basin rim where it comes incontact with underside of Stone Top [A] (see illustration below).
2. Position basin [C] in it's final location and secure Mounting Bracket under the basin [C] lip. Make sureoverflow of basin [C] is located on the same side as the pre-drilled faucet holes in Stone Top [A].
3. Align Threaded Rod G], Lock Washer [F] and Wing Nut [H] with pre-installed Stone Top threaded insertand secure on all (4) points with mounting bracket [E].
( x 4 ) B a s i n [C ]Mounting Points
5 O F 8
M o u n t i n gB r a c k e t [E ]
L o c k i n gW a s h e r [F ]
W i n g N u t [H ]
AssembledView
T o p S u r f a c e o f B a s i n [ A ]
S t o n e T o p U n d e r s i d e
T h r e a d e d
R o d [ G ]
C A Y D E N C A M P A I G N D O U B L E V A N I T Y
6 O F 8
C A Y D E N C A M P A I G N D O U B L E V A N I T Y
7 O F 8
R E C T A N G U L A R S T O N E T O P
O V A L S T O N E T O P
C A Y D E N C A M P A I G N D O U B L E V A N I T Y
8 O F 8
C A Y D E N C A M P A I G N D O U B L E V A N I T Y
OVAL B A S I N
RECTANGULAR B A S I N