Catfish Pond Construction
Gary Burtle
Animal & Dairy Science, UGA
Tifton, GA
![Page 2: Catfish Pond Construction Gary Burtle Animal & Dairy Science, UGA Tifton, GA.](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649cd55503460f9499c9fa/html5/thumbnails/2.jpg)
Catfish Ponds on Level Land
![Page 3: Catfish Pond Construction Gary Burtle Animal & Dairy Science, UGA Tifton, GA.](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649cd55503460f9499c9fa/html5/thumbnails/3.jpg)
Catfish Pond Dimensions
• Approximately 10 acres, 600 ft wide
• Average 4 ft deep
• Smooth bottom, 1% slope or less
• Levees at least 10 ft wide at top
• Levee slopes 3:1 or best 5:1
• Drain dimensions at least 12 inch diameter
![Page 4: Catfish Pond Construction Gary Burtle Animal & Dairy Science, UGA Tifton, GA.](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649cd55503460f9499c9fa/html5/thumbnails/4.jpg)
A Well Constructed Levee
![Page 5: Catfish Pond Construction Gary Burtle Animal & Dairy Science, UGA Tifton, GA.](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649cd55503460f9499c9fa/html5/thumbnails/5.jpg)
A Finished Levee
![Page 6: Catfish Pond Construction Gary Burtle Animal & Dairy Science, UGA Tifton, GA.](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649cd55503460f9499c9fa/html5/thumbnails/6.jpg)
Pond Soils Must Have Clay
• A minimum of 25% clay is required to slow the rate of seepage from ponds
• Construction requires that clay be compacted after each 12 inch layer
• Clay content over 60% should be mixed with soil of a lesser clay content
• Top soil layers must be disrupted with a trench and filled back with clay
![Page 7: Catfish Pond Construction Gary Burtle Animal & Dairy Science, UGA Tifton, GA.](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649cd55503460f9499c9fa/html5/thumbnails/7.jpg)
Rubber Tire Dirt Scrapers
![Page 8: Catfish Pond Construction Gary Burtle Animal & Dairy Science, UGA Tifton, GA.](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649cd55503460f9499c9fa/html5/thumbnails/8.jpg)
Catfish Pond Equipment
• Three phase power is essential
• Hook ups for three aerators each with 10 HP electric motors is common
• Bulk feed storage for at least 16 tons of catfish feed should be near the ponds
• Remote sensors, monitors and transmitters need power supplies
![Page 9: Catfish Pond Construction Gary Burtle Animal & Dairy Science, UGA Tifton, GA.](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649cd55503460f9499c9fa/html5/thumbnails/9.jpg)
Three Phase Electric Power
![Page 10: Catfish Pond Construction Gary Burtle Animal & Dairy Science, UGA Tifton, GA.](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649cd55503460f9499c9fa/html5/thumbnails/10.jpg)
Pond Construction Work Plan
• Survey
• Soils
• Water Supply
• General– Permits– Contracts and Estimates– Financing
![Page 11: Catfish Pond Construction Gary Burtle Animal & Dairy Science, UGA Tifton, GA.](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649cd55503460f9499c9fa/html5/thumbnails/11.jpg)
Survey the Grade
![Page 12: Catfish Pond Construction Gary Burtle Animal & Dairy Science, UGA Tifton, GA.](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649cd55503460f9499c9fa/html5/thumbnails/12.jpg)
Use Laser Leveling
![Page 13: Catfish Pond Construction Gary Burtle Animal & Dairy Science, UGA Tifton, GA.](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649cd55503460f9499c9fa/html5/thumbnails/13.jpg)
Pick an Experienced Contractor
![Page 14: Catfish Pond Construction Gary Burtle Animal & Dairy Science, UGA Tifton, GA.](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649cd55503460f9499c9fa/html5/thumbnails/14.jpg)
Identify the Soil Types
} Top Soil
} B & CHorizons
![Page 15: Catfish Pond Construction Gary Burtle Animal & Dairy Science, UGA Tifton, GA.](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649cd55503460f9499c9fa/html5/thumbnails/15.jpg)
Check the Soil Texture
![Page 16: Catfish Pond Construction Gary Burtle Animal & Dairy Science, UGA Tifton, GA.](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649cd55503460f9499c9fa/html5/thumbnails/16.jpg)
Pond Design Options
0.2% slope falls 1.2 ft over 600 ft
![Page 17: Catfish Pond Construction Gary Burtle Animal & Dairy Science, UGA Tifton, GA.](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649cd55503460f9499c9fa/html5/thumbnails/17.jpg)
Levee Pond LayoutLevee Pond Layout
General
Direction
Of
SlopeWell
Drains
10 A
![Page 18: Catfish Pond Construction Gary Burtle Animal & Dairy Science, UGA Tifton, GA.](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649cd55503460f9499c9fa/html5/thumbnails/18.jpg)
Volume of a Levee
Assume 16 ft Top Width.
Assume 5:1 Slope on both sides.
Assume 5 ft average Levee Height.
(16 x 5) + (5 x 5 x 5/2) + (5 x 5 x 5/2) = 205 sq ft
205 sq ft x 100 ft = 20,500 cu ft per 100 ft length
20,500 cu ft / 27 cu ft per cu yd = 759 cu yd/ 100 ft
![Page 19: Catfish Pond Construction Gary Burtle Animal & Dairy Science, UGA Tifton, GA.](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649cd55503460f9499c9fa/html5/thumbnails/19.jpg)
Multiple Pond Sizes for Hatchery
![Page 20: Catfish Pond Construction Gary Burtle Animal & Dairy Science, UGA Tifton, GA.](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649cd55503460f9499c9fa/html5/thumbnails/20.jpg)
Size Ponds According to Your Need
• Generally 10 Acres for loading 20,000 lb of catfish per harvest.
• Size ponds according to market FIRST.• Consider topographical and soils
characteristics of your property.• Avoid long and narrow ponds or odd
shaped ponds.• Use the slope of your land.
![Page 21: Catfish Pond Construction Gary Burtle Animal & Dairy Science, UGA Tifton, GA.](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649cd55503460f9499c9fa/html5/thumbnails/21.jpg)
Water Control Structures
Pond Drains
Water Supply Lines
![Page 22: Catfish Pond Construction Gary Burtle Animal & Dairy Science, UGA Tifton, GA.](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649cd55503460f9499c9fa/html5/thumbnails/22.jpg)
Drains on Outside of Levee
![Page 23: Catfish Pond Construction Gary Burtle Animal & Dairy Science, UGA Tifton, GA.](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649cd55503460f9499c9fa/html5/thumbnails/23.jpg)
Swivel Drains
![Page 24: Catfish Pond Construction Gary Burtle Animal & Dairy Science, UGA Tifton, GA.](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649cd55503460f9499c9fa/html5/thumbnails/24.jpg)
Drain Through Core
![Page 25: Catfish Pond Construction Gary Burtle Animal & Dairy Science, UGA Tifton, GA.](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649cd55503460f9499c9fa/html5/thumbnails/25.jpg)
Antiseep Collar
![Page 26: Catfish Pond Construction Gary Burtle Animal & Dairy Science, UGA Tifton, GA.](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649cd55503460f9499c9fa/html5/thumbnails/26.jpg)
Seal the Collar
![Page 27: Catfish Pond Construction Gary Burtle Animal & Dairy Science, UGA Tifton, GA.](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649cd55503460f9499c9fa/html5/thumbnails/27.jpg)
In Levee Drain Lines
Clean-outs every 400 ft
Concrete bearing masses at junctions
Junctions at 45 degrees
![Page 28: Catfish Pond Construction Gary Burtle Animal & Dairy Science, UGA Tifton, GA.](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649cd55503460f9499c9fa/html5/thumbnails/28.jpg)
Drain too High
![Page 29: Catfish Pond Construction Gary Burtle Animal & Dairy Science, UGA Tifton, GA.](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649cd55503460f9499c9fa/html5/thumbnails/29.jpg)
Weighted Drain
![Page 30: Catfish Pond Construction Gary Burtle Animal & Dairy Science, UGA Tifton, GA.](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649cd55503460f9499c9fa/html5/thumbnails/30.jpg)
Improperly Weighted Drain
![Page 31: Catfish Pond Construction Gary Burtle Animal & Dairy Science, UGA Tifton, GA.](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649cd55503460f9499c9fa/html5/thumbnails/31.jpg)
Water Supply Line
![Page 32: Catfish Pond Construction Gary Burtle Animal & Dairy Science, UGA Tifton, GA.](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649cd55503460f9499c9fa/html5/thumbnails/32.jpg)
Supported Supply Line
![Page 33: Catfish Pond Construction Gary Burtle Animal & Dairy Science, UGA Tifton, GA.](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649cd55503460f9499c9fa/html5/thumbnails/33.jpg)
Alfalfa Valve
![Page 34: Catfish Pond Construction Gary Burtle Animal & Dairy Science, UGA Tifton, GA.](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649cd55503460f9499c9fa/html5/thumbnails/34.jpg)
Supply too Close to Levee Toe
![Page 35: Catfish Pond Construction Gary Burtle Animal & Dairy Science, UGA Tifton, GA.](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649cd55503460f9499c9fa/html5/thumbnails/35.jpg)
Well and Power Unit
![Page 36: Catfish Pond Construction Gary Burtle Animal & Dairy Science, UGA Tifton, GA.](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649cd55503460f9499c9fa/html5/thumbnails/36.jpg)
Filling Ponds from Natural Water
![Page 37: Catfish Pond Construction Gary Burtle Animal & Dairy Science, UGA Tifton, GA.](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649cd55503460f9499c9fa/html5/thumbnails/37.jpg)
13 Million Gallons in a 10 A Pond
![Page 38: Catfish Pond Construction Gary Burtle Animal & Dairy Science, UGA Tifton, GA.](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649cd55503460f9499c9fa/html5/thumbnails/38.jpg)
Water Budget
(Evaporation + Seepage) – Rainfall =
Water that must be Pumped
![Page 39: Catfish Pond Construction Gary Burtle Animal & Dairy Science, UGA Tifton, GA.](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649cd55503460f9499c9fa/html5/thumbnails/39.jpg)
Water Budget
• 45 inches/year Average in Georgia
• Evaporation from ponds 0 to 1 inch per day– Accounts for about 36 inches per year
• Seepage varies according to compaction– 0.05 to 0.5 inch per hour– Accounts for about 12 to 120 inches per year
![Page 40: Catfish Pond Construction Gary Burtle Animal & Dairy Science, UGA Tifton, GA.](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649cd55503460f9499c9fa/html5/thumbnails/40.jpg)
Water Needed
• 48 to 60 inches to fill the pond
• If pond is full:
– 3 to 12 inches for well built ponds
– 48 to 120 inches for seeping ponds
![Page 41: Catfish Pond Construction Gary Burtle Animal & Dairy Science, UGA Tifton, GA.](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649cd55503460f9499c9fa/html5/thumbnails/41.jpg)
Estimating Water Flow
D
12 in.
Area of pipe = A
Q = “A” X “D”
![Page 42: Catfish Pond Construction Gary Burtle Animal & Dairy Science, UGA Tifton, GA.](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649cd55503460f9499c9fa/html5/thumbnails/42.jpg)
Flow Problem
Assume an 8” diameter pipe.
Assume “D” is 12 inches.
“A” = 3.14 x 6 2 = 113 sq inches
Q = 12 x 113 = 1,356 GPM
![Page 43: Catfish Pond Construction Gary Burtle Animal & Dairy Science, UGA Tifton, GA.](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649cd55503460f9499c9fa/html5/thumbnails/43.jpg)
How Long to Fill a Pond?
Assume a 10 acre pond.
Assume a 400 GPM well capacity.
Assume very short distance between well and pond.
10 A X 4 ft X 325,000 gal/A-ft / 400 GPM =
32,500 minutes or 541 hr or 22.5 days
Recommend 50 GPM per Acre of Pond
![Page 44: Catfish Pond Construction Gary Burtle Animal & Dairy Science, UGA Tifton, GA.](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649cd55503460f9499c9fa/html5/thumbnails/44.jpg)
Options to Fill Ponds
• Seek sites with adequate ground or surface water.
• Drill several wells and pump into linked water lines. (3 x 400 GPM = 1,200 GPM)
• Pump from adjacent ponds that are to be drained using a high volume-low head pump.
![Page 45: Catfish Pond Construction Gary Burtle Animal & Dairy Science, UGA Tifton, GA.](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649cd55503460f9499c9fa/html5/thumbnails/45.jpg)
This Could Be You!
![Page 46: Catfish Pond Construction Gary Burtle Animal & Dairy Science, UGA Tifton, GA.](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649cd55503460f9499c9fa/html5/thumbnails/46.jpg)
Bins Require Extra Land
![Page 47: Catfish Pond Construction Gary Burtle Animal & Dairy Science, UGA Tifton, GA.](https://reader035.fdocuments.in/reader035/viewer/2022062713/56649cd55503460f9499c9fa/html5/thumbnails/47.jpg)
Don’t Forget Storage