Case Study Design Build Line
Transcript of Case Study Design Build Line
Case StudyCase StudyDesignDesign –– Build LineBuild Line
The ClientThe Client
Facilities have stagnated and not kept pace withFacilities have stagnated and not kept pace withthe industrythe industry
New manufacturing upgrades were needed toNew manufacturing upgrades were needed toupdate technology and build a competitiveupdate technology and build a competitivemanufacturing advantagemanufacturing advantage
Need toNeed to ““start from scratchstart from scratch”” to upgrade existingto upgrade existingplantsplants
The ProjectThe Project
$20+ million manufacturing line expansion$20+ million manufacturing line expansion
Covered all engineering disciplinesCovered all engineering disciplines
PackagingPackaging
Utility InfrastructureUtility Infrastructure
Electrical and controlsElectrical and controls
Building modificationsBuilding modifications
Contracting MethodologyContracting Methodology
DesignDesign –– BuildBuild Owner purchased packaging equipmentOwner purchased packaging equipment
W&C purchased/installation/commissioning utilityW&C purchased/installation/commissioning utilityequipmentequipment
W&C line installation and commissioningW&C line installation and commissioning
Shared Risk ModelShared Risk Model Guaranteed line performance with bonus/penaltyGuaranteed line performance with bonus/penalty
Cost plus with shared savingsCost plus with shared savings
Guaranteed maximum price with owner heldGuaranteed maximum price with owner heldcontingencycontingency
Phase 1Phase 1 -- Design Basis and CostDesign Basis and CostEstimationEstimation
Preliminary engineeringPreliminary engineeringstudystudy
Developed scope,Developed scope,
schedule and budget inschedule and budget inconjunction with clientconjunction with client
Worked with a variety ofWorked with a variety ofresources includingresources includingsuppliers, client andsuppliers, client andprevious experienceprevious experience
Phase 2Phase 2 -- Packaging EquipmentPackaging EquipmentSelectionSelection
Developed packaging specificationsDeveloped packaging specifications Blow moldingBlow molding
Filler/Capper/LabelerFiller/Capper/Labeler
Case PackingCase Packing
PalletizingPalletizing
Bid to equipment suppliersBid to equipment suppliers
Evaluated supplier bids and provided clientEvaluated supplier bids and provided clientrecommendationsrecommendations
Lead final negotiations in partnership with clientLead final negotiations in partnership with client
Phase 3Phase 3 –– Line LayoutLine Layout
Needed to make sureNeeded to make sureclient desired equipmentclient desired equipmentfit in the space providedfit in the space provided
Design considerations:Design considerations:
Decoupling of equipmentDecoupling of equipmentzoneszones
Material flow and storageMaterial flow and storage
ManningManning
Future expansionFuture expansion
Phase 4Phase 4 –– Support InfrastructureSupport InfrastructureDesign and ProcurementDesign and Procurement
Review and upgradeReview and upgradesystemssystems
Compressed airCompressed air
Cooling waterCooling water
Chill waterChill water
Electrical PowerElectrical Power
Control SystemsControl Systems
Procured all equipmentProcured all equipment
Phase 5Phase 5 –– Packaging EquipmentPackaging EquipmentReviewsReviews
Review equipment being provided by suppliersReview equipment being provided by suppliers
30 % review (order acknowledgement and30 % review (order acknowledgement andspecifications conformance)specifications conformance)
60% review detailed review of subsystems60% review detailed review of subsystems
Factory acceptance testingFactory acceptance testing
Phase 6Phase 6 –– Contractor SelectionContractor Selection
PrePre--qualify contractors based uponqualify contractors based upon
Safety recordSafety record
Financial StabilityFinancial Stability
F&B ExperienceF&B Experience
Develop bid packages for contractorsDevelop bid packages for contractors
Obtain and analyze bidsObtain and analyze bids
Finalize contractor selectionFinalize contractor selection
Phase 7Phase 7 –– InstallationInstallation
W&C was responsible for allW&C was responsible for allconstruction management onconstruction management on--sitesite OnOn--site construction managersite construction manager
Fiscal responsibility for allFiscal responsibility for allcontractorscontractors
Initial safety trainingInitial safety training
Daily coordination meetingDaily coordination meeting
Maintained a project file systemMaintained a project file system(Buzzsaw)(Buzzsaw)
Monthly clientMonthly client--W&C teamW&C teammeetingmeeting
Managed overall constructionManaged overall constructionscheduleschedule
Safety audits by corporate safetySafety audits by corporate safetymanagermanager
Phase 8Phase 8 –– CommissioningCommissioning
Responsible for allResponsible for allequipment commissioningequipment commissioning
Managed and fiscallyManaged and fiscallyresponsible for equipmentresponsible for equipmentvendorsvendors
Managed equipment cleaningManaged equipment cleaningprocesses prior to startupprocesses prior to startup
W&C engineers onW&C engineers on--site testingsite testingand documenting startupand documenting startup
Equipment centers testedEquipment centers testedindividually and as systemindividually and as system
Completed punch listsCompleted punch lists
Phase 9Phase 9 -- CloseoutCloseout
W&C Completed a Project CloseoutW&C Completed a Project Closeout
Compiled all equipment manualsCompiled all equipment manuals
Coordinated vendor trainingCoordinated vendor training
Completed packaging vendor closeoutsCompleted packaging vendor closeouts
Provided client a detailed asset cost basis summaryProvided client a detailed asset cost basis summary
Completed a lessons learned presentationCompleted a lessons learned presentation
The ResultsThe Results
All equipment centers passed 95% or moreAll equipment centers passed 95% or moreefficiencyefficiency
Overall line achieved greater than 98%Overall line achieved greater than 98%efficiencyefficiency –– achieved line performance bonusachieved line performance bonus
Completed within budget (included some ownerCompleted within budget (included some ownerheld contingency)held contingency)
Completed on scheduleCompleted on schedule
Celebrated successful line startup with a ribbonCelebrated successful line startup with a ribboncutting ceremony including W&C CEO.cutting ceremony including W&C CEO.