Carbon management plan
WM Energy Managers' Forum, Friday 7th December 2012
Balbir BassiRugby Borough [email protected]
![Page 2: Carbon management plan WM Energy Managers' Forum, Friday 7th December 2012](https://reader036.fdocuments.in/reader036/viewer/2022062322/56814321550346895daf8b6b/html5/thumbnails/2.jpg)
Introduction
• In the past years Rugby Borough Council has taken measures in cutting down on wasted energy.
• Meter readings were taken manually and given to the energy supplier. This contributed to bill validation and eliminated estimated billing.
• False billing has been eliminated by identifying redundant and non existent meters.
• New supplier contracts have been set up for suppliers to provide actual readings rather than estimated readings.
• Significant reduction in billing is seen in slides to follow
![Page 3: Carbon management plan WM Energy Managers' Forum, Friday 7th December 2012](https://reader036.fdocuments.in/reader036/viewer/2022062322/56814321550346895daf8b6b/html5/thumbnails/3.jpg)
Corporate Energy Costs
![Page 4: Carbon management plan WM Energy Managers' Forum, Friday 7th December 2012](https://reader036.fdocuments.in/reader036/viewer/2022062322/56814321550346895daf8b6b/html5/thumbnails/4.jpg)
Achievements & Progress to dateProjects already implemented
•Town hall voltage optimisation
•Closure of Redundant buildings
•Heating schedule checks (BEMS set points)
•Energy Management (Monitoring, Recording & Reporting)•Installation of LED lighting to John Barford car park
![Page 5: Carbon management plan WM Energy Managers' Forum, Friday 7th December 2012](https://reader036.fdocuments.in/reader036/viewer/2022062322/56814321550346895daf8b6b/html5/thumbnails/5.jpg)
Case studyThe secret :
•To show success with an initial project that demonstrates a strong financial return.
•Implement a project with a positive Environmental Impact.
That’s;
Replacement of T8 5ft fluorescent tubes and fitting with Lylux- 5ft LED and fittings with sensors
![Page 6: Carbon management plan WM Energy Managers' Forum, Friday 7th December 2012](https://reader036.fdocuments.in/reader036/viewer/2022062322/56814321550346895daf8b6b/html5/thumbnails/6.jpg)
Case Study
John Barford Multi-Storey Car Park
LED lighting to a Multi-storey Car Park
•Complete Lamp/Luminaires & Lighting controls(sensors) ,supply and fit to 389 fittings.
•Project Cost £49 950 including installation
![Page 7: Carbon management plan WM Energy Managers' Forum, Friday 7th December 2012](https://reader036.fdocuments.in/reader036/viewer/2022062322/56814321550346895daf8b6b/html5/thumbnails/7.jpg)
John Barford before installation of LED lighting
![Page 8: Carbon management plan WM Energy Managers' Forum, Friday 7th December 2012](https://reader036.fdocuments.in/reader036/viewer/2022062322/56814321550346895daf8b6b/html5/thumbnails/8.jpg)
John Barford after installation of LED lighting
![Page 9: Carbon management plan WM Energy Managers' Forum, Friday 7th December 2012](https://reader036.fdocuments.in/reader036/viewer/2022062322/56814321550346895daf8b6b/html5/thumbnails/9.jpg)
The link for before and after installation for a panoramas view of the car park.
• Location 1, before the installation:
http://www.ecolight-ltd.com/index.php/markets/our-customers/rugby-council-car-park/before-installation-1• Location 1, after the installation:
http://www.ecolight-ltd.com/index.php/markets/our-customers/rugby-council-car-park/after-installation-1
![Page 10: Carbon management plan WM Energy Managers' Forum, Friday 7th December 2012](https://reader036.fdocuments.in/reader036/viewer/2022062322/56814321550346895daf8b6b/html5/thumbnails/10.jpg)
Predicted ChangeJohn Barford Car Park
lightingPredicted Savings for the car park only
![Page 11: Carbon management plan WM Energy Managers' Forum, Friday 7th December 2012](https://reader036.fdocuments.in/reader036/viewer/2022062322/56814321550346895daf8b6b/html5/thumbnails/11.jpg)
Actual Evidence of ChangeJohn Barford Car Park lighting
Pay back less than 5 years: 4.8 years
From £5,274
down to £1,305
![Page 12: Carbon management plan WM Energy Managers' Forum, Friday 7th December 2012](https://reader036.fdocuments.in/reader036/viewer/2022062322/56814321550346895daf8b6b/html5/thumbnails/12.jpg)
Evidence of ChangeJohn Barford Car Park
lighting• Impact• Reduced electric energy consumption:75% saving In
one quarter .• Reduced annual running costs from £13,232 to £2,742• Improved Energy efficiency to the car Park• Improved Lighting Control• Improved Lighting levels hence Customer satisfaction.• Positive Environmental impact
![Page 13: Carbon management plan WM Energy Managers' Forum, Friday 7th December 2012](https://reader036.fdocuments.in/reader036/viewer/2022062322/56814321550346895daf8b6b/html5/thumbnails/13.jpg)
Challenges• To Believe in LED (new technology),as the
most cost effective solution for the car Park.
• To design for sensors and timers to maximise energy savings while providing adequate lighting where necessary.
• To manage the project during Christmas period and ensure minimum disruptions to the daily use of the car park.
![Page 14: Carbon management plan WM Energy Managers' Forum, Friday 7th December 2012](https://reader036.fdocuments.in/reader036/viewer/2022062322/56814321550346895daf8b6b/html5/thumbnails/14.jpg)
Summary
• LED with controls is the way forward. It cuts down on energy usage while producing a positive effect on budgets
• Final Thought…….Energy reduction
saves money