CAPITALIZING GREEN PAVEMENTA METHOD AND VALUATION
Xiaoyu Liu, David Choy (presenting), Qingbin Cui, Charles Schwartz
Pavement Life-Cycle Assessment Symposium
Champaign, IL; April 12-13
![Page 2: CAPITALIZING GREEN PAVEMENT A METHOD AND VALUATION](https://reader031.fdocuments.in/reader031/viewer/2022020622/61ec54477f88d844c965a80b/html5/thumbnails/2.jpg)
Presentation Overview
1. Problem2. Big Ideas3. Voluntary Carbon Markets4. Pavement Performance Benchmark5. Conclusion
April 13, 2017
Capitaliing Green Pavement
Slide 2
![Page 3: CAPITALIZING GREEN PAVEMENT A METHOD AND VALUATION](https://reader031.fdocuments.in/reader031/viewer/2022020622/61ec54477f88d844c965a80b/html5/thumbnails/3.jpg)
Hot-mixed vs foamed asphalt (HMA vs FSB)
1/5: PROBLEM
April 13, 2017
Capitaliing Green Pavement
Slide 3
![Page 4: CAPITALIZING GREEN PAVEMENT A METHOD AND VALUATION](https://reader031.fdocuments.in/reader031/viewer/2022020622/61ec54477f88d844c965a80b/html5/thumbnails/4.jpg)
April 13, 2017
Capitaliing Green Pavement
Slide 4
HMA
![Page 5: CAPITALIZING GREEN PAVEMENT A METHOD AND VALUATION](https://reader031.fdocuments.in/reader031/viewer/2022020622/61ec54477f88d844c965a80b/html5/thumbnails/5.jpg)
April 13, 2017
Capitaliing Green Pavement
Slide 5
HMA
317Mt produced each year in the U.S.NAPA 2015(in metric)
90%Paved roads in US, Canda, and EuropeMagnum 2006
3xMore GHG/$ spent than power and communication linesTruit 2009
+4Other pollutants: CO, NO2, SO2, various organic compoundsTruit 2009
![Page 6: CAPITALIZING GREEN PAVEMENT A METHOD AND VALUATION](https://reader031.fdocuments.in/reader031/viewer/2022020622/61ec54477f88d844c965a80b/html5/thumbnails/6.jpg)
April 13, 2017
Capitaliing Green Pavement
Slide 6
HMA
317Mt produced each year in the U.S.NAPA 2015(in metric)
90%Paved roads in US, Canda, and EuropeMagnum 2006
3xMore GHG/$ spent than power and communication linesTruit 2009
+4Other pollutants: CO, NO2, SO2, various organic compoundsTruit 2009
![Page 7: CAPITALIZING GREEN PAVEMENT A METHOD AND VALUATION](https://reader031.fdocuments.in/reader031/viewer/2022020622/61ec54477f88d844c965a80b/html5/thumbnails/7.jpg)
April 13, 2017
Capitaliing Green Pavement
Slide 7
HMA
317Mt produced each year in the U.S.NAPA 2015(in metric)
90%Paved roads in US, Canda, and EuropeMagnum 2006
3xMore GHG/$ spent than power and communication linesTruit 2009
+4Other pollutants: CO, NO2, SO2, various organic compoundsTruit 2009
![Page 8: CAPITALIZING GREEN PAVEMENT A METHOD AND VALUATION](https://reader031.fdocuments.in/reader031/viewer/2022020622/61ec54477f88d844c965a80b/html5/thumbnails/8.jpg)
317Mt produced each year in the U.S.NAPA 2015(in metric)
90%Paved roads in US, Canda, and EuropeMagnum 2006
3xMore GHG/$ spent than power and communication linesTruit 2009
+4Other pollutants: CO, NO2, SO2, various organic compoundsTruit 2009
April 13, 2017
Capitaliing Green Pavement
Slide 8
HMA
![Page 9: CAPITALIZING GREEN PAVEMENT A METHOD AND VALUATION](https://reader031.fdocuments.in/reader031/viewer/2022020622/61ec54477f88d844c965a80b/html5/thumbnails/9.jpg)
April 13, 2017
Capitaliing Green Pavement
Slide 9
Hot Mix vs Foam Stabilized Base (FSB)
HMA FSB
Aggregate Virgin & Recycled 100% Recycled
Cost $$ $
Mix temperature High Low (Ambient)
Hauling More Less
Use High Low
Thickness Standard A bit more
![Page 10: CAPITALIZING GREEN PAVEMENT A METHOD AND VALUATION](https://reader031.fdocuments.in/reader031/viewer/2022020622/61ec54477f88d844c965a80b/html5/thumbnails/10.jpg)
Interstate Highway Projects
Only eleven states use recycled materials on interstate highway projects
Image credit: Brian Diefenderfer, PhD, PE, Virginia Transportation Research Council (September 2016)
April 13, 2017
Capitaliing Green Pavement
Slide 10
![Page 11: CAPITALIZING GREEN PAVEMENT A METHOD AND VALUATION](https://reader031.fdocuments.in/reader031/viewer/2022020622/61ec54477f88d844c965a80b/html5/thumbnails/11.jpg)
Project
• $190 million
• Reconstruction of 7.08 miles (3,000+ trucks/day)
• Addition of a 12ft shoulder
Estimated Impact
• 30 to 50% cost savings
• 50% less greenhouse gasses*
• Fixes deterioration causes, not just symptoms
• Faster than full reconstruction
FSB Example:I-64 Highway: Restoration & Widening
April 13, 2017
Capitaliing Green Pavement
Slide 11
* initial estimate; I believe actual results will vary
![Page 12: CAPITALIZING GREEN PAVEMENT A METHOD AND VALUATION](https://reader031.fdocuments.in/reader031/viewer/2022020622/61ec54477f88d844c965a80b/html5/thumbnails/12.jpg)
Full Depth Reclamation (FDR)
Recycles materials on-site
1. Pulverize existing asphalt + underlying base (4 to 12 inches)
2. Treat reclaimed material with additives
3. Compact (drum or pneumatic tire roller)
4. Apply a surface layer
Image credit: Brian Diefenderfer, PhD, PE, Virginia Transportation Research Council (September 2016)
April 13, 2017
Capitaliing Green Pavement
Slide 12
![Page 13: CAPITALIZING GREEN PAVEMENT A METHOD AND VALUATION](https://reader031.fdocuments.in/reader031/viewer/2022020622/61ec54477f88d844c965a80b/html5/thumbnails/13.jpg)
Cold Central Plant Recycling (CCPR)
Recycles materials in a central place
• In urban areas, central plants can stockpile RAP from contractors that have excess amounts
• Normally requires hauling/fuel
• Mobile mix plants reduce hauling
Image courtesy of Global Resource Recyclers Engineering (2017)
April 13, 2017
Capitaliing Green Pavement
Slide 13
![Page 14: CAPITALIZING GREEN PAVEMENT A METHOD AND VALUATION](https://reader031.fdocuments.in/reader031/viewer/2022020622/61ec54477f88d844c965a80b/html5/thumbnails/14.jpg)
Barriers
• Business as usual in the U.S.
• Unregulated CO2 markets
• Equipment / re-tooling
• Training
• No consensus on use or structural performance
Drivers
• Low cost of recycled materials
• Environmental goodwill?
••
FSB Barriers and Drivers
April 13, 2017
Capitaliing Green Pavement
Slide 14
![Page 15: CAPITALIZING GREEN PAVEMENT A METHOD AND VALUATION](https://reader031.fdocuments.in/reader031/viewer/2022020622/61ec54477f88d844c965a80b/html5/thumbnails/15.jpg)
Voluntary Markets & App
2/5: THE BIG IDEAS
April 13, 2017
Capitaliing Green Pavement
Slide 15
![Page 16: CAPITALIZING GREEN PAVEMENT A METHOD AND VALUATION](https://reader031.fdocuments.in/reader031/viewer/2022020622/61ec54477f88d844c965a80b/html5/thumbnails/16.jpg)
April 13, 2017
Capitaliing Green Pavement
Slide 16
Two Ideas to Drive Adoption
1. Economic
2. Social
![Page 17: CAPITALIZING GREEN PAVEMENT A METHOD AND VALUATION](https://reader031.fdocuments.in/reader031/viewer/2022020622/61ec54477f88d844c965a80b/html5/thumbnails/17.jpg)
April 13, 2017
Capitaliing Green Pavement
Slide 17
Two Ideas to Drive Adoption
1. Economic: Voluntary Carbon Market
2. Social: App
![Page 18: CAPITALIZING GREEN PAVEMENT A METHOD AND VALUATION](https://reader031.fdocuments.in/reader031/viewer/2022020622/61ec54477f88d844c965a80b/html5/thumbnails/18.jpg)
Baselines and Performance Benchmarks for
3/5: VOLUNTARY CARBON MARKETS
April 13, 2017
Capitaliing Green Pavement
Slide 18
![Page 19: CAPITALIZING GREEN PAVEMENT A METHOD AND VALUATION](https://reader031.fdocuments.in/reader031/viewer/2022020622/61ec54477f88d844c965a80b/html5/thumbnails/19.jpg)
April 13, 2017
Capitaliing Green Pavement
Slide 19
Voluntary Carbon Market Projects
1. Projects reduce CO2 emissions
2. Standard organizations verify reductionsand award carbon offset credits
3. Credits are sold at market prices
![Page 20: CAPITALIZING GREEN PAVEMENT A METHOD AND VALUATION](https://reader031.fdocuments.in/reader031/viewer/2022020622/61ec54477f88d844c965a80b/html5/thumbnails/20.jpg)
April 13, 2017
Capitaliing Green Pavement
Slide 20
Voluntary Carbon Market Projects
Two ways to verify emission reductions:
• Project Baselines
• Performance Benchmarks
![Page 21: CAPITALIZING GREEN PAVEMENT A METHOD AND VALUATION](https://reader031.fdocuments.in/reader031/viewer/2022020622/61ec54477f88d844c965a80b/html5/thumbnails/21.jpg)
Baseline
Emis
sion
s (C
O 2)
Offset
VoluntaryProject
BaselineProject
Voluntary Market
April 13, 2017
Capitaliing Green Pavement
Slide 21
Baseline Method
![Page 22: CAPITALIZING GREEN PAVEMENT A METHOD AND VALUATION](https://reader031.fdocuments.in/reader031/viewer/2022020622/61ec54477f88d844c965a80b/html5/thumbnails/22.jpg)
Baseline
Emis
sion
s (C
O 2)
Offset
VoluntaryProject
BaselineProject
Voluntary Market
April 13, 2017
Capitaliing Green Pavement
Slide 22
Baseline Method
![Page 23: CAPITALIZING GREEN PAVEMENT A METHOD AND VALUATION](https://reader031.fdocuments.in/reader031/viewer/2022020622/61ec54477f88d844c965a80b/html5/thumbnails/23.jpg)
Baseline
Cap
Emis
sion
s (C
O 2)
ForSale
VoluntaryProject
NormalProject
BaselineProject
Voluntary Market Organizations with Emission Cap Goals
Actual Emissions
April 13, 2017
Capitaliing Green Pavement
Slide 23
Baseline Method
![Page 24: CAPITALIZING GREEN PAVEMENT A METHOD AND VALUATION](https://reader031.fdocuments.in/reader031/viewer/2022020622/61ec54477f88d844c965a80b/html5/thumbnails/24.jpg)
April 13, 2017
Capitaliing Green Pavement
Slide 24
Baseline Method
![Page 25: CAPITALIZING GREEN PAVEMENT A METHOD AND VALUATION](https://reader031.fdocuments.in/reader031/viewer/2022020622/61ec54477f88d844c965a80b/html5/thumbnails/25.jpg)
April 13, 2017
Capitaliing Green Pavement
Slide 25
Baseline Method
![Page 26: CAPITALIZING GREEN PAVEMENT A METHOD AND VALUATION](https://reader031.fdocuments.in/reader031/viewer/2022020622/61ec54477f88d844c965a80b/html5/thumbnails/26.jpg)
April 13, 2017
Capitaliing Green Pavement
Slide 26
Many projectsare different sizesbut technically similar.
![Page 27: CAPITALIZING GREEN PAVEMENT A METHOD AND VALUATION](https://reader031.fdocuments.in/reader031/viewer/2022020622/61ec54477f88d844c965a80b/html5/thumbnails/27.jpg)
April 13, 2017
Capitaliing Green Pavement
Slide 27
How can wecapitalize on theirsimilarities?
![Page 28: CAPITALIZING GREEN PAVEMENT A METHOD AND VALUATION](https://reader031.fdocuments.in/reader031/viewer/2022020622/61ec54477f88d844c965a80b/html5/thumbnails/28.jpg)
April 13, 2017
Capitaliing Green Pavement
Slide 28
We can compare different size projects with arate – a performance benchmark:CO2 / Project Factor
![Page 29: CAPITALIZING GREEN PAVEMENT A METHOD AND VALUATION](https://reader031.fdocuments.in/reader031/viewer/2022020622/61ec54477f88d844c965a80b/html5/thumbnails/29.jpg)
April 13, 2017
Capitaliing Green Pavement
Slide 29
Project Baseline vs Performance Benchmark
ProjectBaseline
Emis
sion
s (C
O 2)
PerformanceBenchmark
Emis
sion
s (C
O 2) /
Pro
ject
Fac
tor
![Page 30: CAPITALIZING GREEN PAVEMENT A METHOD AND VALUATION](https://reader031.fdocuments.in/reader031/viewer/2022020622/61ec54477f88d844c965a80b/html5/thumbnails/30.jpg)
Project Baseline
Calculate CO2 emissions for twoscenarios and their difference
Performance Benchmark
Calculate CO2 for one scenario, and compare it to a benchmark rate: CO2
/ project factor
Project Baseline vs Performance Benchmark
April 13, 2017
Capitaliing Green Pavement
Slide 30
![Page 31: CAPITALIZING GREEN PAVEMENT A METHOD AND VALUATION](https://reader031.fdocuments.in/reader031/viewer/2022020622/61ec54477f88d844c965a80b/html5/thumbnails/31.jpg)
Project Baseline
• For unique projects
• Not scalable
• Expensive to justify the business as usual case
Performance Benchmark
• For similar projects
• Scalable
• Predefined business as usual case: CO2 / project factor
Project Baseline vs Performance Benchmark
April 13, 2017
Capitaliing Green Pavement
Slide 31
![Page 32: CAPITALIZING GREEN PAVEMENT A METHOD AND VALUATION](https://reader031.fdocuments.in/reader031/viewer/2022020622/61ec54477f88d844c965a80b/html5/thumbnails/32.jpg)
4/5: PAVEMENT PERFORMANCE BENCHMARK
April 13, 2017
Capitaliing Green Pavement
Slide 32
![Page 33: CAPITALIZING GREEN PAVEMENT A METHOD AND VALUATION](https://reader031.fdocuments.in/reader031/viewer/2022020622/61ec54477f88d844c965a80b/html5/thumbnails/33.jpg)
16HMA Plants
(Maryland)
HMA Study
16Placement Projects(Maryland and Virginia)
April 13, 2017
Capitaliing Green Pavement
Slide 33
![Page 34: CAPITALIZING GREEN PAVEMENT A METHOD AND VALUATION](https://reader031.fdocuments.in/reader031/viewer/2022020622/61ec54477f88d844c965a80b/html5/thumbnails/34.jpg)
April 13, 2017
Capitaliing Green Pavement
Slide 34
HMA Emission Categories
Raw Materials
Mix Plant
Hauling
+ Installation
Project Emissions
![Page 35: CAPITALIZING GREEN PAVEMENT A METHOD AND VALUATION](https://reader031.fdocuments.in/reader031/viewer/2022020622/61ec54477f88d844c965a80b/html5/thumbnails/35.jpg)
Raw Materials36%
Mix Plant11%Hauling
10%
Installation43%
HMA Emission Categories
April 13, 2017
Capitaliing Green Pavement
Slide 35
CategoryEmissions(kg-CO2e/t)
Raw Materials 54
Mix Plant 17
Hauling 15
Installation 64
![Page 36: CAPITALIZING GREEN PAVEMENT A METHOD AND VALUATION](https://reader031.fdocuments.in/reader031/viewer/2022020622/61ec54477f88d844c965a80b/html5/thumbnails/36.jpg)
0
5
10
15
20
25
30
35
<110 110-125 125-140 140-155 >155
Fre
qu
en
cy
Emissions (kg-CO2e / t)
HMA Emission Distribution
April 13, 2017
Capitaliing Green Pavement
Slide 36
![Page 37: CAPITALIZING GREEN PAVEMENT A METHOD AND VALUATION](https://reader031.fdocuments.in/reader031/viewer/2022020622/61ec54477f88d844c965a80b/html5/thumbnails/37.jpg)
April 13, 2017
Capitaliing Green Pavement
Slide 37
HMA Performance Benchmark
ProjectType
Hauling Distance(miles)
Benchmark(kg-CO2e/t)
Parking Lot ≤ 40 121.9
Parking Lot > 40 142.4
Road Any 102.9
![Page 38: CAPITALIZING GREEN PAVEMENT A METHOD AND VALUATION](https://reader031.fdocuments.in/reader031/viewer/2022020622/61ec54477f88d844c965a80b/html5/thumbnails/38.jpg)
Traditional Project Offset Project
Same Sub-Base
Same Granular Base
Directly replacing HMA withall FSB lowers structuralperformance and provides apoor surface layer.
April 13, 2017
Capitaliing Green Pavement
Slide 38
Structural Performance Adjustment
![Page 39: CAPITALIZING GREEN PAVEMENT A METHOD AND VALUATION](https://reader031.fdocuments.in/reader031/viewer/2022020622/61ec54477f88d844c965a80b/html5/thumbnails/39.jpg)
Traditional Project Offset Project
Same Sub-Base
Same Granular Base
Replacing HMA with an FSBlayer and a small HMAsurface layer yields an equalstructural performace that is2% heavier and 25% thicker.
April 13, 2017
Capitaliing Green Pavement
Slide 39
Structural Performance Adjustment
![Page 40: CAPITALIZING GREEN PAVEMENT A METHOD AND VALUATION](https://reader031.fdocuments.in/reader031/viewer/2022020622/61ec54477f88d844c965a80b/html5/thumbnails/40.jpg)
FSB Emission Reductions
With the 2% structural performance adjustment:
HMA benchmark
121.9 kg-CO2e/t:
Cold Central Plant Recycling (CPPR)
78.4 kg-CO2e/t
36% Reduction
Cold In-Place Recycling (CIR)
23.3 kg-CO2e/t
81% Reduction
April 13, 2017
Capitaliing Green Pavement
Slide 40
0
20
40
60
80
100
120
140
HMA Benchmark CCPR CIR
Em
issi
on
s (k
g-C
O2e
/t)
2% Performance Adjustment
![Page 41: CAPITALIZING GREEN PAVEMENT A METHOD AND VALUATION](https://reader031.fdocuments.in/reader031/viewer/2022020622/61ec54477f88d844c965a80b/html5/thumbnails/41.jpg)
April 13, 2017
Capitaliing Green Pavement
Slide 41
CCPR Total Savings
material savings
+ offset savings
= total ($/t-material)
![Page 42: CAPITALIZING GREEN PAVEMENT A METHOD AND VALUATION](https://reader031.fdocuments.in/reader031/viewer/2022020622/61ec54477f88d844c965a80b/html5/thumbnails/42.jpg)
April 13, 2017
Capitaliing Green Pavement
Slide 42
CCPR Material Savings (Installed)
HMA 110
FSB 90
Savings 20 ($/t-material)
![Page 43: CAPITALIZING GREEN PAVEMENT A METHOD AND VALUATION](https://reader031.fdocuments.in/reader031/viewer/2022020622/61ec54477f88d844c965a80b/html5/thumbnails/43.jpg)
April 13, 2017
Capitaliing Green Pavement
Slide 43
CCPR Offset Savings
HMA Benchmark 121.9
Adjusted FSB 78.4
Savings 43.5 kg-CO2e/t-material
At a market rate of $9.30 / 1,000 kg-CO2e:
Savings: 0.4 ($/t-material)
![Page 44: CAPITALIZING GREEN PAVEMENT A METHOD AND VALUATION](https://reader031.fdocuments.in/reader031/viewer/2022020622/61ec54477f88d844c965a80b/html5/thumbnails/44.jpg)
April 13, 2017
Capitaliing Green Pavement
Slide 44
CCPR Total Savings
material savings
+ offset savings
= total ($/t-material)
![Page 45: CAPITALIZING GREEN PAVEMENT A METHOD AND VALUATION](https://reader031.fdocuments.in/reader031/viewer/2022020622/61ec54477f88d844c965a80b/html5/thumbnails/45.jpg)
April 13, 2017
Capitaliing Green Pavement
Slide 45
CCPR Total Savings
$20/t material savings
+ $0.4/t offset savings
= $20.4/t ($/t material)
![Page 46: CAPITALIZING GREEN PAVEMENT A METHOD AND VALUATION](https://reader031.fdocuments.in/reader031/viewer/2022020622/61ec54477f88d844c965a80b/html5/thumbnails/46.jpg)
April 13, 2017
Capitaliing Green Pavement
Slide 46
CCPR Contractor Profits
$0.4 offset savings < $20 material savings
![Page 47: CAPITALIZING GREEN PAVEMENT A METHOD AND VALUATION](https://reader031.fdocuments.in/reader031/viewer/2022020622/61ec54477f88d844c965a80b/html5/thumbnails/47.jpg)
April 13, 2017
Capitaliing Green Pavement
Slide 47
CCPR Contractor Profits
$0.4 offset savings < $20 material savings
If a contractor
1. Purchases FSB at $25/t (FOB, material only)
2. Sells it for a 10% profit margin ($2.5)
3. Carbon offset savings ($0.4/t) raise profits 16%
![Page 48: CAPITALIZING GREEN PAVEMENT A METHOD AND VALUATION](https://reader031.fdocuments.in/reader031/viewer/2022020622/61ec54477f88d844c965a80b/html5/thumbnails/48.jpg)
5/5: CONCLUSIONS
April 13, 2017
Capitaliing Green Pavement
Slide 48
![Page 49: CAPITALIZING GREEN PAVEMENT A METHOD AND VALUATION](https://reader031.fdocuments.in/reader031/viewer/2022020622/61ec54477f88d844c965a80b/html5/thumbnails/49.jpg)
• Performance benchmarks developed in this study may be used with or without FSB
• FSB projects generate ~43.5 kg-CO2e/t carbon offset credits
Conclusions
• Replacing HMA with FSB yields ~$20.4/t in savings
• $0.4/t in offset credits can increase contractor material profits (~16%)
April 13, 2017
Capitaliing Green Pavement
Slide 49
![Page 50: CAPITALIZING GREEN PAVEMENT A METHOD AND VALUATION](https://reader031.fdocuments.in/reader031/viewer/2022020622/61ec54477f88d844c965a80b/html5/thumbnails/50.jpg)
• Approve methods
• Launch app
What’s Next
April 13, 2017
Capitaliing Green Pavement
Slide 50
![Page 51: CAPITALIZING GREEN PAVEMENT A METHOD AND VALUATION](https://reader031.fdocuments.in/reader031/viewer/2022020622/61ec54477f88d844c965a80b/html5/thumbnails/51.jpg)
April 13, 2017
Capitaliing Green Pavement
Slide 51
![Page 52: CAPITALIZING GREEN PAVEMENT A METHOD AND VALUATION](https://reader031.fdocuments.in/reader031/viewer/2022020622/61ec54477f88d844c965a80b/html5/thumbnails/52.jpg)
QUESTIONS?
April 13, 2017
Capitaliing Green Pavement
Slide 52
![Page 53: CAPITALIZING GREEN PAVEMENT A METHOD AND VALUATION](https://reader031.fdocuments.in/reader031/viewer/2022020622/61ec54477f88d844c965a80b/html5/thumbnails/53.jpg)
These didn’t make my presentation, but might be helpful in answering your questions
BACK UP SLIDES
April 13, 2017
Capitaliing Green Pavement
Slide 53
![Page 54: CAPITALIZING GREEN PAVEMENT A METHOD AND VALUATION](https://reader031.fdocuments.in/reader031/viewer/2022020622/61ec54477f88d844c965a80b/html5/thumbnails/54.jpg)
Baseline
Emis
sion
s (C
O 2)
Offset
VoluntaryProject
BaselineProject
Voluntary Market
April 13, 2017
Capitaliing Green Pavement
Slide 54
Non-Additionality
![Page 55: CAPITALIZING GREEN PAVEMENT A METHOD AND VALUATION](https://reader031.fdocuments.in/reader031/viewer/2022020622/61ec54477f88d844c965a80b/html5/thumbnails/55.jpg)
Baseline
NewBaseline
Emis
sion
s (C
O 2)
“Non-Additional Offset”
Offset
VoluntaryProject
NewBaselineProject
Voluntary Market
April 13, 2017
Capitaliing Green Pavement
Slide 55
Non-Additionality
![Page 56: CAPITALIZING GREEN PAVEMENT A METHOD AND VALUATION](https://reader031.fdocuments.in/reader031/viewer/2022020622/61ec54477f88d844c965a80b/html5/thumbnails/56.jpg)
April 13, 2017
Capitaliing Green Pavement
Slide 56
HMA Greenhouse Gases and Air Pollutants
Carbon Dioxide (CO2)
Sulfur dioxide (SO2)
Nitrogen oxide (NOx)
Carbon monoxide (CO)
Volatile organic compounds (VOC)
Volatile hazardous air pollutant (HAP)EPA 2009