S.No. Scheme No. Division Scheme Description Capitalized Cost in Rs. Lac FY Category 1 BYDMS0910 BYPL DMS BYPL DMS FY 07-08 (DMS Project) 154.89 FY 10-11 Others 2 EC04IF3543 EHV Central Laying of 2 Nos. 33 kV 3x400 sqmm XLPE cable from Kashmiri Gate to Lahori Gate. 310.07 FY 10-11 EHV 3 EC04IF3561 EHV Central Laying of 2 Nos. 33 kV 3x400sqmm XLPE cable from RPH bay no 18 to Motia Khan. 643.62 FY 10-11 EHV 4 EC04SW3550 EHV Central Replacement of 33kV indoor switchgear at 33kV Town Hall grid s/stn. 186.62 FY 10-11 EHV 5 EC05IF3008 EHV Central Provision of alternate source of supply to B. G.Road by laying 2 Nos. 33 KV 3Cx400 sqmm XLPE cables from Faiz Road. 161.55 FY 10-11 EHV 6 EC05SW3011 EHV Central Replacement of 17 no. of 11KV , panel with new 11kv panels at BG Road grid. 129.58 FY 10-11 EHV 7 EE07FA3529 EHV East Erection of 5 no. towers for LILO of 66KV D/CKT tower line 66kv MVR-I-MVR II at Dallupura 103.91 FY 10-11 EHV 8 EE07GS4517 EHV East Addition of 4 Nos. 11KV HT 500 MVA Panel (2-Nos ) in 66KV Yamuna Vihar Grid and 2 Nos. 11 kV HT 500 MVA Panels in 33 KV Karawal Nagar Grid. 11.22 FY 10-11 EHV 9 EE08IF1025 EHV East Laying of 66 KV S/C 1CX630sqmm XLPE cable from Pragati Power Project ( Gas Turbine) to the proposed 66KV grid near Akshardham Temple. 491.82 FY 10-11 EHV 10 EE08IF1026 EHV East Laying of 66 KV S/C 1CX630sqmm XLPE cable from PPG Grid to the proposed 66KV grid near Akshardham Temple. 361.48 FY 10-11 EHV 11 EE09FA4015 EHV East Laying of inter connector with 2 nos 33 kv 3x400 sq. mm XLPE Cable fro KKD Grid to CBD -1 Grid. 49.76 FY 10-11 EHV 12 EE10SH4014 EHV East Replacement/Erection of 6 no. of new Towers for 66 kV D/C Tower Lines between Mayur Vihar 1 Grid and Mayur Vihar 2 Grid ( On Akashardham-Noida Road) 121.82 FY 10-11 EHV 13 EE09SH4017 EHV East Shifting of Tower line on account of construction of new Gajipur Drain (Hidden Cut) by U.P.Canal department 34.13 FY 10-11 EHV 14 EC08AT4016 EHV Central Addition of one no.(old) 33/11, 16MVA power transformer with all associated equipment at Anand Parvat Grid substation. 9.74 FY 10-11 EHV 15 EC08UT4018 EHV Central Augmentation of 1x10 MVA, 33/11 KV Power transformer to 1x16MVA at Shankar Road Grid. 6.65 FY 10-11 EHV 16 EE07UT4528 EHV East Estimate for up gradation of 1no. 66/33kV Pr. Tr. at Bhagarti Grid from 20MVA to 50MVA 7.07 FY 10-11 EHV 17 EE08AT4021 EHV East Addition of 33/11kv 20MVA power transformer at Karawal Nagar 93.98 FY 10-11 EHV

Transcript of Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed...

Page 1: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

S.No. Scheme No. Division Scheme DescriptionCapitalized Cost

in Rs. LacFY Category

1 BYDMS0910 BYPL DMS BYPL DMS FY 07-08 (DMS

Project) 154.89 FY 10-11 Others

2 EC04IF3543 EHV Central

Laying of 2 Nos. 33 kV 3x400

sqmm XLPE cable from Kashmiri

Gate to Lahori Gate.

310.07 FY 10-11 EHV

3 EC04IF3561 EHV Central

Laying of 2 Nos. 33 kV

3x400sqmm XLPE cable from

RPH bay no 18 to Motia Khan.

643.62 FY 10-11 EHV

4 EC04SW3550 EHV Central

Replacement of 33kV indoor

switchgear at 33kV Town Hall grid

s/stn.

186.62 FY 10-11 EHV

5 EC05IF3008 EHV Central

Provision of alternate source of

supply to B. G.Road by laying 2

Nos. 33 KV 3Cx400 sqmm XLPE

cables from Faiz Road.

161.55 FY 10-11 EHV

6 EC05SW3011 EHV Central

Replacement of 17 no. of 11KV ,

panel with new 11kv panels at BG

Road grid.

129.58 FY 10-11 EHV

7 EE07FA3529 EHV East

Erection of 5 no. towers for LILO

of 66KV D/CKT tower line 66kv

MVR-I-MVR II at Dallupura

103.91 FY 10-11 EHV

8 EE07GS4517 EHV East

Addition of 4 Nos. 11KV HT 500

MVA Panel (2-Nos ) in 66KV

Yamuna Vihar Grid and 2 Nos. 11

kV HT 500 MVA Panels in 33 KV

Karawal Nagar Grid.

11.22 FY 10-11 EHV

9 EE08IF1025 EHV East

Laying of 66 KV S/C

1CX630sqmm XLPE cable from

Pragati Power Project ( Gas

Turbine) to the proposed 66KV

grid near Akshardham Temple.

491.82 FY 10-11 EHV

10 EE08IF1026 EHV East

Laying of 66 KV S/C

1CX630sqmm XLPE cable from

PPG Grid to the proposed 66KV

grid near Akshardham Temple.

361.48 FY 10-11 EHV

11 EE09FA4015 EHV East

Laying of inter connector with 2

nos 33 kv 3x400 sq. mm XLPE

Cable fro KKD Grid to CBD -1

Grid.

49.76 FY 10-11 EHV

12 EE10SH4014 EHV East

Replacement/Erection of 6 no. of

new Towers for 66 kV D/C Tower

Lines between Mayur Vihar 1 Grid

and Mayur Vihar 2 Grid ( On

Akashardham-Noida Road)

121.82 FY 10-11 EHV

13 EE09SH4017 EHV East

Shifting of Tower line on account

of construction of new Gajipur

Drain (Hidden Cut) by U.P.Canal

department

34.13 FY 10-11 EHV

14 EC08AT4016 EHV Central

Addition of one no.(old) 33/11,

16MVA power transformer with all

associated equipment at Anand

Parvat Grid substation.

9.74 FY 10-11 EHV

15 EC08UT4018 EHV Central

Augmentation of 1x10 MVA, 33/11

KV Power transformer to

1x16MVA at Shankar Road Grid.

6.65 FY 10-11 EHV

16 EE07UT4528 EHV East

Estimate for up gradation of 1no.

66/33kV Pr. Tr. at Bhagarti Grid

from 20MVA to 50MVA

7.07 FY 10-11 EHV

17 EE08AT4021 EHV East Addition of 33/11kv 20MVA power

transformer at Karawal Nagar93.98 FY 10-11 EHV

Page 2: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

18 EE08GS1024 EHV East

Establishment of 66KV grid Sub

station with 2X25 MVA Power

Transformers at Commonwealth

Games Village at Akshardham

Temple.

1179.72 FY 10-11 EHV

19 EE09GS4012 EHV East

Augmentation of 33/11kv,12.5/16

MVA power transformer to 25

MVA from at Guru Angad Nagar

grid .

169.91 FY 10-11 EHV

20 EC09GS1008 EHV Central

Installation of 2 Nos of 33KV

Circuit Breaker for CPWD at IG

Stadium

4.05 FY 10-11 EHV

21 EC09SH1001 EHV Central

Shifting of 33KV U/G 3X400sq

MM XLPE cable on Velodram road

and Ring Road due to construction

on Ring road Bypass from

Salimgarh Fort to Velodrom road

IG stadium.

283.47 FY 10-11 EHV

22 EE08SH1027 EHV East

The shifting of 66KV double

circuit tower line ( Gazipur-Vivek

VIhar) near ISBT- Anand Vihar at

Road No. 56 due to construction

of flyover by PWD.

346.18 FY 10-11 EHV

23 EE08SH1028 EHV East

The shifting of 66KV double

circuit tower line (Gazipur-Vivek

VIhar& Patparganj- Vivek Vihar)

near ISBT- Anand Vihar at Road

No. 56 due to construction of

flyover by PWD.

790.97 FY 10-11 EHV

24 EE09SH1011 EHV East

Part shifting of 33K Preet Vihar –

Vivek Vihar O/H feeder by laying 2

nos. 33Kv 3x400sq.mm. XLPE

cable due to street scapping work

around Yamuna Sports Complex

by PWD. Road No.71A & 75B.

114.22 FY 10-11 EHV

25 EE09SH1016 EHV East

Shifting of 33kv Shakarpur –

Kailash Nagar O/H feeder from

Shamshan Ghat, Geeta Colony to

Mother Diary, Kailash Nagar due

to construction of Footover Bridge

by PWD on Marginal Bund Road

near Gandhi Nagar.

67.19 FY 10-11 EHV

26 EE10SH1003 EHV East

Balance part of work for I.

Shifting of 66 KV 3Nos cables

from V Vihar to D.Garden II.

Shifting of 33 KV existing

U/Gcircuits at road No. 56, apsara

Border, road intersection due to

construction of grade Separator by

PWD

9.90 FY 10-11 EHV

27 EE10SH1016 EHV East

Shifting of 33kV 'Karkardooma-

Kanti Ngr' U/G feeder by laying

2nos. 33kV 3x400sq.mm. XLPE

cable near Swarn Cinema due to

construction of footover Bridge by

PWD .

2.35 FY 10-11 EHV

28 EC09CB4002 EHV Central

Installation of 11KV, 5.4MVAR

Capacitor Bank at 33KV Faiz road

Grid Sub-station

16.04 FY 10-11 EHV

29 EE09CB4008 EHV East Installation of Capacitor Bank at

Dwarkapuri Grid Sub-station.16.82 FY 10-11 EHV

30 JM08MS4107 Karkardooma

Installation of LT APFC Panels In

Div KKD.(Servariya Mkt, Halkara

Kuan,Commercial Blk, Tikona

Park,28-29 Blk Etc.)

25.16 FY 10-11 LT

31 MV08MS4148Mayur Vihar Ph-

1&2

LT APFC Panel Scheme for Div

MVR 1 17.16 FY 10-11 LT

Page 3: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

32 CC07LT1539 Chandni Chowk

Conversion of O/H LT System in

to U/G at Gali Gulyan through

Hon'ble MP Sh. Kapil Sibel fund.

7.76 FY 10-11 LT

33 CC08LT4056 Chandni Chowk

Laying of 1 No. LT feeder from

Nichalson road package

substation Chowkramiya in

division Chandni Chowk.

1.82 FY 10-11 LT

34 CC08LT4058 Chandni Chowk

Laying of one LT feeder from

Ganda Nala to Ram Bazar in

division Chandni chowk.

1.95 FY 10-11 LT

35 CC08LT4062 Chandni Chowk

Laying of 4 No LT Fdr from Cloth

Mkt S/Stn to Ganesh

Bzr,Laxmibzr,Dak Bazar,Ganes

Bzr In D-CCK

5.25 FY 10-11 LT

36 CC09FA4001 Chandni Chowk

Replacement of HT 11 KV 3*300

Cable from Mother Dairy

Substation Alla Shaganj.

12.02 FY 10-11 HT

37 CC09FA4002 Chandni Chowk

Replacement of HT 11KV

3CX300 Sqmm cable from

Gaddodia Market Package Sub-

station to S.P.M Marg Package

Substation. Chandni chowk.

24.49 FY 10-11 HT

38 CC09LT4026 Chandni Chowk Laying 2 LT feeder From Town

Hall Pkg- Ktdhulyia /Naya Kat 12.00 FY 10-11 LT

39 CC09LT4027 Chandni Chowk Laying of 1 U/G LT Jubli Cinema

Tr To Chahindara 1.76 FY 10-11 LT

40 CC09LT4033 Chandni Chowk Stringing of 2 LT Feeder KT

Baryan- Batashan/Kndly Kasan. 2.60 FY 10-11 LT

41 CC09LT4036 Chandni Chowk Laying of 1 LT feeder Haveli

Haidar Quli To Union Bank 1.39 FY 10-11 LT

42 CC09LT4051 Chandni Chowk

Conversion of old conductor and

into LTAB cable at different places

in Lahori gate in division Chandni

Chowk.

130.84 FY 10-11 LT

43 CC09MS4045 Chandni Chowk Providing earthing at various

Substation, in Chandni chowk. 12.87 FY 10-11 LT

44 CC09MS4055 Chandni Chowk LT Clean up in Lahori gate Sub

division in chandni chowk. 97.05 FY 10-11 LT

45 CC09MS4056 Chandni Chowk LT Clean up in LR Market in sub

division of chandni chowk. 95.11 FY 10-11 LT

46 CC09MS4118 Chandni Chowk

Conversion of Overhead Service

Cable into underground cable at

various Road of MCD in division.

Chandni Chowk.

31.14 FY 10-11 LT

47 CC09MS4119 Chandni Chowk

Conversion of Overhead Service

Cable into underground Service

Cable at various Road of PWD in

division. Chandni Chowk.

1.86 FY 10-11 LT

48 CC09RM4004 Chandni Chowk Installation of 3 way O/D RMU at

Maliwara. Chandni chowk. 4.11 FY 10-11 HT

49 CC09SH1058 Chandni Chowk

Shifting of electric Services due to

Construction of Ring Road

Byepass from Salimghar Fort to

Velodrome Road, Package 2 From

Geeta Colony Bridge to Hanuman

Mandir Flyover.

16.16 FY 10-11 HT

50 DG09FA4020 Daryaganj

Replacement of Part PILCA

Portion of HT feeder from Minto

Road to New H.Q into XLPE cable

from Gate of Kamla Market to N.

HQ S/Stn in division Daryaganj.

36.08 FY 10-11 HT

51 DG09FA4021 Daryaganj

Replacement of old PILCA cable

into XLPE cable from Mahavir

vatia to 10 no Daryaganj Via

saraswati school S/stn in division

daryaganj.

18.68 FY 10-11 HT

Page 4: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

52 DG09FA4022 Daryaganj

Replacement of old PILCA Cable

into 3CX300MM2 XLPE cable

from I.P Grid to Gulab Bhawan

Substation in division Daryaganj.

43.74 FY 10-11 HT

53 DG09FA4024 Daryaganj

Replacement of old PILCA cable

into 3CX300MM2 XLPE cable

from Daryaganj to 8 No.

Daryaganj Substation in division

Daryaganj.

19.15 FY 10-11 HT

54 DG09LT4025 Daryaganj

T/O Of New LT U/G Feeder Of

Size 4Cx300mm2 From Dag II

(630 Kvatx.) S/Stn To MCD Car

Paking In Div Darya Ganj.

7.94 FY 10-11 LT

55 DG09LT4026 Daryaganj

T/O Of New LT U/G Feeder Of

Size 4Cx300Mm2 From Pant Qtr

S/Stn To Gurdwara In Div Darya

Ganj.

2.27 FY 10-11 LT

56 DG09LT4035 Daryaganj

T/O Of New LT U/G Feeder Of

Size 4Cx300Mm2 From Cng S/Stn

To Petrol Pump at Ring Road In

Div Darya Ganj.

3.58 FY 10-11 LT

57 DG09LT4037 Daryaganj

Replacement Of Old LT Feeder

From Delhi Gate(K) S/Stn To N S

Marg In Div Darya Ganj.

8.52 FY 10-11 LT

58 DG09LT4050 Daryaganj

Conversion of old conductor & old

leads into LTAB cable at different

places in division Daryaganj.

84.08 FY 10-11 LT

59 DG09MS4051 Daryaganj

Replacement of old damaged

poles, burnt/ deffective ACBs &

distribution boxes in division

Daryaganj.

14.95 FY 10-11 LT

60 DG09MS4052 Daryaganj Replacement of old service line in

division Daryaganj.(PART-4) 25.33 FY 10-11 LT

61 DG09MS4096 Daryaganj

Conversion of Overhead Service

Cable into underground cable at

various Road of MCD in division

Daryaganj.

31.35 FY 10-11 LT

62 DG09RM4011 Daryaganj

Installation of 3 Way O/D(Sf-6) at

Kundey Walan S/Stn Bldg. in

Div.Daryaganj

3.05 FY 10-11 HT

63 DG09RM4014 Daryaganj

Installation of 3 Way O/D(Sf-6) at

New Amar S/Stn In Div. Darya

Ganj

3.25 FY 10-11 HT

64 DG09SH1045 Daryaganj

Shifting of electric Services due to

Construction of Ring Road from

Shalimar Fort to Velodrome Road,

Package I

25.86 FY 10-11 LT

65 DG09SH1111 Daryaganj

Shifting of LT O/H Line due to

construction of All India Congress

Committee (AICC) headquarter at

9A, Kotal Road in Div Darya Ganj.

4.27 FY 10-11 LT

66 DG09SL1043 Daryaganj

Installation of Street Light points

in the Constituency of Hon'ble

MLA Shri Shoaib Iqbal.

2.63 FY 10-11 LT

67 DG09SL1103 Daryaganj

Installation of Street Light Point in

the Constituency of Hon'ble MLA

Shri Tarvinder Singh Marwah in

Div Darya Ganj

3.02 FY 10-11 LT

68 DG09SL2112 Daryaganj

Providing street light network at

ring Road Byepas from Salimgarh

Fort to Velodrome Road Package

– 1 Flyover Stitled Portion &

Package- 11

66.45 FY 10-11 LT

69 DG09SS2092 Daryaganj

Installation of 100 KVA

Transformer for providing street

light connection to PWD near

Sachivalaya in Div. Darya Ganj

7.55 FY 10-11 HT

Page 5: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

70 DG09UT4083 Daryaganj

Augmentation of 400KVA

Transformer into 630KVA at

Ansari Road no-1 substation in

division Daryaganj.

0.48 FY 10-11 HT

71 DL08FA4001 Dilshad Garden

Replacement of HT Cable

3CX150 PILCA to 3CX300 XLPE

between complain centre GT Road

to Police station Shahdara

10.58 FY 10-11 HT

72 DL08NF4038 Dilshad Garden

Midfeed 11 KV Police Station

Shahdara to K-Blk Mandir Wala

Naveen Shahdara

2.93 FY 10-11 HT

73 DL08NF4040 Dilshad Garden

T/O new 11KV feeder from Nand

Nagri Grid to F Block Dilshad

Colony Via B Blk Dilshad Colony

54.64 FY 10-11 HT

74 DL08RM4015 Dilshad Garden Installation of 4 Way at Peer Wala 6.22 FY 10-11 HT

75 DL08RM4045 Dilshad Garden Inst.of 3 Way RMU at Shivaji

Park Navin Shahdra 3.69 FY 10-11 HT

76 DL08RM4060 Dilshad Garden Replacement of 4-Panel Board at

C-Blk.New Seemapuri S/Stn. 8.84 FY 10-11 HT

77 DL08SH1082 Dilshad Garden

Shifting of Electrical Services due

to construction of Grade Separator

and Road No. 56 Near Apsara

Border.

45.62 FY 10-11 HT

78 DL08UT4083 Dilshad Garden

LT 5291 LA of 67 KW making

total load of 75 KW on SIP

category in f/o Sh Lakshmi &

Silicate Works 1/439 , Gali No.6

FCIA GT Road

15.69 FY 10-11 HT

79 DL08UT4085 Dilshad Garden

LT 5261 Augmentation of

transformer from 630 KVA to 990

KVA+2 NO feeders in f/o Sh

Rakesh Kumar Plot No-32,

Dilshad Garden Industrial Area

15.10 FY 10-11 HT

80 DL09AT4066 Dilshad Garden

Installation of New 630 KVA

Transformer at between B-Blk.

and G Block Dilshad Colony.

11.77 FY 10-11 HT

81 DL09AT4083 Dilshad Garden

Inst. of 630 KVA

Add.Transformer at S/Stn No. 4

Dilshad Garden

11.92 FY 10-11 HT

82 DL09EL1090 Dilshad Garden

Electrification of Police quarter

and Police building at Zafrabad

(Service connection).

1.11 FY 10-11 LT

83 DL09EL2089 Dilshad Garden Electrification of Police Station

Zafrabad Delhi & Flats. 25.47 FY 10-11 HT

84 DL09FA4032 Dilshad Garden

Replacement of 11 KV HT Cable

PILCA to 3CX300 XLPE from

Motiram Road to Railway Station.

48.55 FY 10-11 HT

85 DL09FA4037 Dilshad Garden

Repl.of HT 11 KV 3X300 Sq.mm.

Cable from GT Road Grid to B-

Blk.JLM-I

22.35 FY 10-11 HT

86 DL09FA4038 Dilshad Garden

Partly repl.of HT 11 Kv 3X300

Sq.mm. Cable from Shyamlal

College to Kabool Nagar

Substation

65.37 FY 10-11 HT

87 DL09LT4081 Dilshad Garden

Conversion of O/H LV Mains into

LTAB Cable at C Block R Block

and Laxmi Narayan Mandir

industrial area Dilshad Garden.

70.37 FY 10-11 LT

88 DL09NF4033 Dilshad Garden

New 11 KV 3CX300 Sqmm HT

Feeder from east of loni road Grid

to Motiram Road.

131.79 FY 10-11 HT

89 DL09RM4002 Dilshad Garden Installation of RMU at Ram Nagar

Sewage Pumping Station. 3.50 FY 10-11 HT

90 DL09RM4003 Dilshad Garden Repl.of Old Panel Board at

Shahadara Pumping station. 6.19 FY 10-11 HT

Page 6: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

91 DL09RM4004 Dilshad Garden Inst.of RMU at Water Works S/S

GT Road 3.88 FY 10-11 HT

92 DL09RM4006 Dilshad Garden

Installation of RMU at

Bhagwanpur Khera Substation No.-

1.

3.62 FY 10-11 HT

93 DL09RM4007 Dilshad Garden

Installation of RMU at

Bhagwanpur Khera Substation No.-

2

3.61 FY 10-11 HT

94 DL09RM4008 Dilshad Garden

Installation of 1X3 Way AND

1X1Way at Nova Substation Loni

Road.

5.79 FY 10-11 HT

95 DL09RM4009 Dilshad Garden Repl.of Old Panel Board at Police

Station DDA Flat MS Park S/S 10.21 FY 10-11 HT

96 DL09RM4010 Dilshad Garden Repl.of 4-Panel Board at MS Park

Masjid Wala S/S 5.45 FY 10-11 HT

97 DL09RM4011 Dilshad Garden Repl.of 4-Panel Board at MS Park

Shiv Mandir Wala S/S 5.96 FY 10-11 HT

98 DL09RM4012 Dilshad Garden Repl.of 4-Panel Board at Ms Park

Piau Wala S/S 5.48 FY 10-11 HT

99 DL09RM4013 Dilshad Garden

Repl. of 4-Paned Board at Loni

Road Sewage Pumping Station

S/S

3.71 FY 10-11 HT

100 DL09RM4014 Dilshad Garden Repl. of old Panel at B&E

Pkt.Dilshad Garden. 3.63 FY 10-11 HT

101 DL09RM4015 Dilshad Garden Repl.of old Panel at Bhartiya Tar

Udyog S/S B-Bl Dilshad Garden 3.52 FY 10-11 HT

102 DL09RM4019 Dilshad Garden Replacement of 4-Panel Board

Substation No.-4, Dilshad Garden. 4.50 FY 10-11 HT

103 DL09RM4020 Dilshad Garden Repl.of 5-Panel Board S/S

No.5,Dilshad Garden 5.53 FY 10-11 HT

104 DL09RM4024 Dilshad Garden Repl.of Old Panel at B-

Pkt.Dilshad Garden 9.25 FY 10-11 HT

105 DL09RM4025 Dilshad Garden Repl.of 5-Panel Board at R-

Pkt.Dilshad Garden 7.85 FY 10-11 HT

106 DL09RM4026 Dilshad Garden Repl.of 5-Panel Board at S/S

No.2 A-Bl JLM Indl Area. 8.66 FY 10-11 HT

107 DL09RM4028 Dilshad Garden

Installation /Addition of 1 No.

Single Way Panel of CG-Lucy

make at Ice factory Subhash

2.21 FY 10-11 HT

108 DL09RM4029 Dilshad Garden

Installation/Addition of 2 No. 1-

way Panel ABB make at Gorakh

Park KIOSK substation.

4.95 FY 10-11 HT

109 DL09SH1055 Dilshad Garden

Shifting of electrical services due

to construction of Road No. 58&

64 Across Part 1( from Road no.

71 to Railway Line) part 2 ( from

Railway line to below Flyover

Shahdara, Gali No. 2 Friends

Colony.)

16.00 FY 10-11 HT

110 DL09SH1085 Dilshad Garden

Shifting of Transformers / LT

Panels & S/Stn. Room due to

construction of Grade Separator at

Intersection of G.T. Road & Road

No. 56 near Apsara Border.

13.22 FY 10-11 HT

111 DL09UT4071 Dilshad Garden

Augmentation of 400KVA

Transformer into 990KVA at

Verma Castle Substation friends

colony industrial Area.

1.30 FY 10-11 HT

112 DL10EL2003 Dilshad Garden

Electrification of Police Station

Building and Staff Quarters at

Mansarover Park.

30.52 FY 10-11 HT

113 JM08FA4006 Karkardooma

Rep. of HT U/G PILCA Cable

from 18 Qtr O/H Feeder to

Transformer installed at Kunti

Marg at Ram Gali,Shastri

Gali,Karan Gali Etc

5.37 FY 10-11 HT

Page 7: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

114 JM08RM4068 Karkardooma Installation of RMU at Gali No 16

Vishwas Nagar 6.21 FY 10-11 HT

115 JM08RM4070 Karkardooma

Installation of O/D RMU at

Bhikam Singh Cly Schoolwala Sub

Station

3.95 FY 10-11 HT

116 JM08RM4071 Karkardooma Installation of O/D RMU at E Blk.

Jhilmil Cly J.J. Sub Station 5.81 FY 10-11 HT

117 JM08RM4073 Karkardooma Installation of O/D RMU at Indra

Park Sub Station 5.76 FY 10-11 HT

118 JM08RM4074 Karkardooma

Installation of Single Panel

Breaker at Saini Enclave Sub

Station

2.44 FY 10-11 HT

119 JM08RM4075 Karkardooma

Installation of O/D RMU at

Ramlila Gnd Mukesh Nagar Sub

Station

5.96 FY 10-11 HT

120 JM08RM4081 Karkardooma Installation of 3 Nos O/D Single

Panel at 28-29 Block Substation. 7.29 FY 10-11 HT

121 JM09AT4070 Karkardooma

Providing additional Transformer

of 400 KVA at C-Blk Surajmal

Vihar

2.98 FY 10-11 HT

122 JM09AT4122 Karkardooma Additional Transformer of 400

KVA at Hargovind Enclave S/Stn 2.98 FY 10-11 HT

123 JM09AT4123 Karkardooma

Additional Transformer of 400

KVA at C-Block Anand Vihar

S/Stn

2.87 FY 10-11 HT

124 JM09AT4133 Karkardooma

Installation of 400 KVA

Transformer at Sai Baba D/P

S/Stn.

2.29 FY 10-11 HT

125 JM09FA4018 Karkardooma

Rep/Aug of HT Cable from

Surajmal Vihar D/P to East End

Club S/Stn

7.27 FY 10-11 HT

126 JM09FA4019 Karkardooma Rep/Aug of HT Cable from 928

Qtr DDA S/Stn-1 to S/Stn-2 4.09 FY 10-11 HT

127 JM09FA4020 Karkardooma Rep/Aug of HT Cable from DDA

Shivam-1 to Shivam-2 S/Stn 6.73 FY 10-11 HT

128 JM09FA4021 Karkardooma

Rep/Aug of HT Cable from 18 Qtr

O/H to Transformer behaind

Shivam Enclave S/Stn

5.94 FY 10-11 HT

129 JM09FA4082 Karkardooma

Replacement of HT Cable from

Commercial Block S/S to Tash

Factory S/S.

4.24 FY 10-11 HT

130 JM09LT4024 Karkardooma

Taking out 3 Nos of LT feeder at

Bahubali enclave Extension

substation.

7.73 FY 10-11 LT

131 JM09LT4025 Karkardooma

T/O 3 No'S Of LT Feeders at

Sharad Vihar S/Stn No-1(Bahubali

Enclave)

15.66 FY 10-11 LT

132 JM09LT4035 Karkardooma T/O 3 No'S Of LT Feeders at

Jagriti Enclave S/Stn 20.50 FY 10-11 LT

133 JM09LT4046 Karkardooma T/O 3 No'S LT Feeders From

Vigyan Vihar S/Stn. 16.14 FY 10-11 LT

134 JM09LT4068 Karkardooma

Replacement of Feeder Pillers

and Service Pillers in Div

Karkardooma.

75.55 FY 10-11 LT

135 JM09LT4073 Karkardooma T/O 3 Nos LT Feeders From D-

Blk Surajmal Vihar Tr-2 16.88 FY 10-11 LT

136 JM09LT4075 Karkardooma

T/O 3 Nos LT Feeders From E-

Blk J J Cluster Jhilmil Colony

S/Stn.

8.84 FY 10-11 LT

137 JM09LT4084 Karkardooma T/O 3 No'S LT Feeders at

Mukesh Nagar S/Stn. 10.22 FY 10-11 LT

138 JM09LT4085 Karkardooma T/O 3 No'S LT Feeders at

Commercial Block S/Stn. 7.06 FY 10-11 LT

139 JM09MS4064 Karkardooma Providing earthing to various sub-

station in division Karkardooma. 47.37 FY 10-11 LT

Page 8: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

140 JM09MS4169 Karkardooma

Conversion of Overhead lines into

underground crossing main Roads

belongs to PWD in division

Karkardooma.

10.85 FY 10-11 LT

141 JM09RM4002 Karkardooma

Installation of 3-Way O/D RMU at

D- Block at Vivek Vihar Park

Substation.

3.17 FY 10-11 HT

142 JM09RM4003 Karkardooma Installation of 3-Way O/D RMU at

C- block Yojna Viahr Substation. 3.49 FY 10-11 HT

143 JM09RM4008 Karkardooma Installtion of 3 way O/D RMU at

Abudana Vivek Vihar Substation. 3.55 FY 10-11 HT

144 JM09RM4009 Karkardooma

Installation of 3-Way O/D RMU at

Gali No.-2 Vishwas Nagar Nala

Side Substation.

3.62 FY 10-11 HT

145 JM09RM4016 Karkardooma

Ins. of 3-Way O/D RMU at Karan

Gali(Schoolwala)Vishwas Nagar

Nala Sides/S

3.97 FY 10-11 HT

146 JM09RM4036 Karkardooma Replacement of Panel at Vivek

Apparment. 4.73 FY 10-11 HT

147 JM09RM4037 Karkardooma Replacement of Panel at

Gharonda Appartment. 4.61 FY 10-11 HT

148 JM09RM4038 Karkardooma Replacement of Panel at Law

Appartment. 4.36 FY 10-11 HT

149 JM09RM4040 Karkardooma Replacement of Panel at

Geetanjali Appartment. 4.59 FY 10-11 HT

150 JM09RM4041 Karkardooma

Installation of RMU at

Transformer Behind Shivam

Enclave.

3.70 FY 10-11 HT

151 JM09RM4042 Karkardooma Installation of RMU at Shivam

Enclave S/Stn No-2. 5.01 FY 10-11 HT

152 JM09RM4045 Karkardooma Providing single Panel at C- Block

Surajmal Vihar Substation. 2.67 FY 10-11 HT

153 JM09RM4078 Karkardooma

Providing Single Panel at

Institutional area Karkardooma

behind Deepak memorial hospital.

2.42 FY 10-11 HT

154 JM09RM4087 Karkardooma Installation of RMU at Subhash

Gali Nala Side S/Stn. 3.91 FY 10-11 HT

155 JM09RM4091 Karkardooma

Replacement 4 Way Panel Board

with 4 way RMU at District Court

Shadara Division Karkardooma.

4.27 FY 10-11 HT

156 JM09SH1176 Karkardooma

Shifting of electric line and pole

coming in the alignment of Road

No. 58, 58A, 71 & 75B Ext. to

facilitate ―Streetscaping &

Beautification of PWD roads

around Yamuna Sports Complex

for Common Wealth Games‖.

57.29 FY 10-11 HT

157 JM09UT4022 Karkardooma

Augmentation of Transformer

from 630KVA to 990KVA at Arya

Nagar Substation.

11.42 FY 10-11 HT

158 JM09UT4023 Karkardooma

Augmentation of Transformer 630

KVA to 990 KVA at Bhaubali

enclave.

11.63 FY 10-11 HT

159 JM09UT4081 Karkardooma

Augmentation of Transformer

400kVA to 630kVA at E- Block JJ

cluster Jhilmil Colony.

1.88 FY 10-11 HT

160 JM09UT4118 Karkardooma

Augmentation of transformer from

400KVA to 630KVA at Saini

Enclave Sub station.

0.68 FY 10-11 HT

161 JM10EL2001 Karkardooma Electrification of Community

Centre Vivek Vihar. 30.96 FY 10-11 HT

Page 9: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

162 JM10SH1057 Karkardooma

Shifting of HT / LT Line at 60 ‗

Road Vishwas Nagar from Road

No. 57 to Ambedkar Park in Ward

No 226.

7.03 FY 10-11 LT

163 KN06LT4073 Krishna Nagar

Replacement of Old damaged,

undersized existing conductor with

AB cable at C Blk, F Blk Krishna

Nagar in division Krishna Nagar.

190.92 FY 10-11 LT

164 KN06LT4074 Krishna Nagar

Replacement of Old damaged,

undersized existing conductor with

AB cable at J Blk, H Blk Krishna

Nagar

176.74 FY 10-11 LT

165 KN07EL1587 Krishna Nagar Electrification of Mayurdhawaj

CGHS at Geeta Colony. 2.67 FY 10-11 HT

166 KN08EL2178 Krishna Nagar Electrification of Mayurdhawaj

CGHS at Geeta Colony. 54.54 FY 10-11 HT

167 KN08EL2179 Krishna Nagar Electrification of Mayurdhawaj

CGHS at Geeta Colony. 9.27 FY 10-11 LT

168 KN08FA4117 Krishna Nagar

Repl of HT 3X150MM2 Pilca

Cable into 3X300 XLPE in Kanti

Ngr Area D-KRN

21.13 FY 10-11 HT

169 KN08LT4107 Krishna Nagar

Replacement of LT cable at

Dundela Chowk in division Krishna

Nagar.

3.86 FY 10-11 LT

170 KN08LT4122 Krishna Nagar Scheme for LT Clean Up in

division Krishna Nagar. 6.23 FY 10-11 LT

171 KN08LT4174 Krishna Nagar

Providing/ replacment of LT

feeders from Substation Police

station Geeta Colony in division

Krishna Nagar.

7.44 FY 10-11 LT

172 KN08MS4115 Krishna Nagar

Repl of old service line &

providing PVC glands in meters in

D-KRN.

50.53 FY 10-11 LT

173 KN08RM4024 Krishna Nagar Installation of (1X3Way) O/D

RMU at Pandit Park 3.79 FY 10-11 HT

174 KN08UT4052 Krishna Nagar Augmentation of transformer at

Gagan Vihar Ext-1 1.87 FY 10-11 HT

175 KN08UT4128 Krishna Nagar

Augmentation of Transformer 400

kVA to 630kVA at 2 block Geeta

Colony Substation.

1.02 FY 10-11 HT

176 KN09AT4069 Krishna Nagar Pdg Addl Trf of 400KVA at K Blk

Krishn (Ghondli Village) 1.19 FY 10-11 HT

177 KN09LT4004 Krishna Nagar Replacement of LT Feeder frpm

Janta Park to kapoor basti. 1.68 FY 10-11 LT

178 KN09LT4005 Krishna Nagar

Replacement of LT feeder from

Primary school old seelampur to

Gali No.-3 old seelampur.

1.76 FY 10-11 LT

179 KN09LT4006 Krishna Nagar

Replacement of LT feeder

Kaushik puri Gali No.-4 Nala to

Gali No. 4D.

1.63 FY 10-11 LT

180 KN09LT4030 Krishna Nagar

Replacement of LT feeder from

Jitar Nagar Substation in division

Krishna Nagar.

3.96 FY 10-11 LT

181 KN09LT4031 Krishna Nagar

Replacement of LT Feeder from

Baldev Park Musical Fountain

Substation.

2.68 FY 10-11 LT

182 KN09LT4034 Krishna Nagar

Replacement and Taking out of

LT Feeder from Beedi Market

S/Stn in D-Krishna nagar.

3.62 FY 10-11 LT

183 KN09LT4046 Krishna Nagar Pdg 2 Nos LT Fdrs at Shastri

Nagar Nala In D-KRN 9.82 FY 10-11 LT

184 KN09LT4047 Krishna Nagar Pdg 2 Nos LT Fdrs at 7Blk Geeta

Colony in D-KRN 5.00 FY 10-11 LT

185 KN09LT4049 Krishna Nagar Pdg One LT Feeders from Rani

Garden Park In D-KRN. 4.05 FY 10-11 LT

186 KN09NF4037 Krishna Nagar

Providing duplicate source at new

pulia old seelampur from Primary

school old seelampur.

6.80 FY 10-11 HT

Page 10: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

187 KN09RM4018 Krishna Nagar Providing O/D 3 Way RMU at Old

Seelampur New Pulia 3.42 FY 10-11 HT

188 KN09SH1129 Krishna Nagar

Conversion of 11KV O/H Line into

U/G at Road No. 57 due to

construction of Foot Over Bridge

near Vishwas Nagar.

5.58 FY 10-11 HT

189 KN09SH1130 Krishna Nagar

Conversion of 11KV O/H Line into

U/G at Road No. 57 due to

construction of Foot Over Bridge

near Bhikam Singh Colony.

2.99 FY 10-11 HT

190 KN09SS4145 Krishna Nagar

Shifting of 990 KVA Transformer

from gali No.6 Shankar Nagar

extension to newly proposed site

near community center Shankar

road extension.

20.42 FY 10-11 HT

191 KN09UT4016 Krishna Nagar

Augmentation of Transformer

from 630 KVA to 990 KVA at

Tagore Gali Substation.

9.19 FY 10-11 HT

192 KN09UT4039 Krishna Nagar

Augmentation of Transformer

from 630 KVA to 990KVA at E

block park Krishna Nagar.

10.29 FY 10-11 HT

193 KN09UT4040 Krishna Nagar

Augmentation of transformer from

630KVA to 990KVA at Radheypuri-

II In division Krishnanagar.

10.38 FY 10-11 HT

194 KN09UT4041 Krishna Nagar

Aug of Trf 630KVA to 990KVA at

gali no 9 kanti nagar Exten in

division Krishna Nagar.

10.33 FY 10-11 HT

195 KN09UT4043 Krishna Nagar Aug of Trf 630 KVA to 990 KVA

at D Block krishna Nagar. 11.00 FY 10-11 HT

196 KN09UT4089 Krishna Nagar

Augmentation of Transformer

400KVA into 630KVA at Jitar

Nagar in division Krishna Nagar.

2.73 FY 10-11 HT

197 KW08FA4011 Karawal Nagar

Replacement of existing 3X150

PILCA to 3X300 XLPE Cable from

Gujar Mohlla to Tuna Nagar

2.52 FY 10-11 HT

198 KW08LT4170 Karawal Nagar Rep.Of Feeder Pillar at Ganga

Vihar Div KWR 13.19 FY 10-11 LT

199 KW08MS4074 Karawal Nagar Replacement of Meter Gland &

Flexible Pipe in Div. KWR 53.49 FY 10-11 LT

200 KW08MS4154 Karawal Nagar Providing int. b/w 11 kV Chawla

Farm to Sabha Pur O/H Cond. 13.49 FY 10-11 HT

201 KW08NF4002 Karawal Nagar

Providing interconnector 11 kV

3X300 XLPE between Sher Pur

Chowk to Tukhmir Pur Vill.

5.09 FY 10-11 HT

202 KW08NF4007 Karawal Nagar

Providing interconnector 11 kV

3X300 Sq. mm XLPE cable

between Tharmas factory to

Tunda Nagar (Chakki Wala)

4.81 FY 10-11 HT

203 KW08NF4008 Karawal Nagar

Providing interconnector and

replacement of O/H Line from

No.2 Ganga Vihar to E Blk.

Bhagirathi Vihar Via H Blk. Ganga

Vihar,Johri Pur Ext

17.34 FY 10-11 HT

204 KW09AT4132 Karawal Nagar

Installation of 400 Kva Trf. at

Sherpur Chowk in Div-Karawal

Nagar

1.89 FY 10-11 HT

205 KW09AT4187 Karawal Nagar Ins. of 400KVA Tr. at Ganga

Vihar No-1 S/Stn in Div-KWR 2.00 FY 10-11 HT

206 KW09EL4013 Karawal Nagar

Electrification left out pocket of

extended area in karawal nagar

division.

65.22 FY 10-11 LT

207 KW09EL4203 Karawal Nagar Electrification Badarpur Khadar

village in Karawal nagar division. 183.22 FY 10-11 LT

208 KW09FA4044 Karawal Nagar

Replacment of existing 11KV

3X240 XLPE into 3X300 sqmm

XLPE from C-1 Block. Nehru

Vihar to B-1 Nehru Vihar in

division Karawal nagar.

7.96 FY 10-11 HT

Page 11: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

209 KW09FA4045 Karawal Nagar

Replacement of existing 11 KV

3X240 XLPE into 3CX300 Sqmm

from M C-1 block Nehru Vihar to

B-3 Nehru Vihar in division

Karawal nagar.

4.60 FY 10-11 HT

210 KW09FA4046 Karawal Nagar

Replacment of existing 11 KV

3X240 XLPE into 3CX300 sqmm

from D-3 Nehru Vihar to E-1

Nehru Vihar in division Karawal

nagar.

11.95 FY 10-11 HT

211 KW09FA4052 Karawal Nagar

Rep. of O/H Line into 11 KV

3X300 Sq. mm U/G Cable from

Jeewan Jyoti School to Shambhu

Ka Gher in Div. KWR

7.75 FY 10-11 HT

212 KW09LT4001 Karawal Nagar T/O 4 Nos. LT Fdrs. from Dall Mill

S/Stn Div. Karawal Nagar 3.85 FY 10-11 LT

213 KW09LT4003 Karawal Nagar T/O 3 Nos. LT Fdrs. from S/Stn.

No. 5 Bank Wala Karawal Nagar 4.61 FY 10-11 LT

214 KW09LT4004 Karawal Nagar

Taking out 2 Nos. LT Feeders

from Mahalaxmi Enclave Karawal

Nagar.

2.30 FY 10-11 LT

215 KW09LT4006 Karawal Nagar T/O 2 Nos. LT Fdrs. From

Jeewan Jyoti School Div. KWR 2.65 FY 10-11 LT

216 KW09LT4009 Karawal Nagar T/O 2 Nos. LT Fdrs. from E Blk.

Chand Bagh Div. KWR 3.14 FY 10-11 LT

217 KW09LT4011 Karawal Nagar T/O 2 Nos. LT Fdrs. From C Blk.

Brij Puri Div. Kwr 3.12 FY 10-11 LT

218 KW09LT4012 Karawal Nagar T/O 2 Nos. LT Fdrs. From Gujar

Mohlla Div. KWR 2.56 FY 10-11 LT

219 KW09LT4054 Karawal Nagar T/O 2 Nos. LT Fdr. From H Blk.

Ganga Vihar In Div. KWR 3.10 FY 10-11 LT

220 KW09LT4055 Karawal Nagar T/O 2 Nos. LT Fdr. From F Blk.

Dayal Pur In Div. KWR 3.30 FY 10-11 LT

221 KW09MS2199 Karawal Nagar

Providing 100 KVA Transformer

for PWD Street light at wazirabad

road No. 59 im division Karawal

nagar.

3.07 FY 10-11 HT

222 KW09MS4057 Karawal Nagar Replacement of HTAB Cable in

Karawal Nagar Area. 96.70 FY 10-11 HT

223 KW09MS4180 Karawal Nagar

Electrification left out pocket area

in Karawal Nagar with LTAB

Cable.

34.47 FY 10-11 LT

224 KW09MS4197 Karawal Nagar

Conversion of Overhead Service

lines into underground in division

Karawal Nagar.

1.09 FY 10-11 LT

225 KW09RM4016 Karawal Nagar Rep. of Exist. 3 Into 3 Way B-2

Nehru Vihar In Div. KWR 3.01 FY 10-11 HT

226 KW09RM4038 Karawal Nagar Inst. of 3 Way RMU at D-1

Khajoori In Div. KWR 3.47 FY 10-11 HT

227 KW09SH1202 Karawal Nagar

Shifting of HT 11KV O/H feeder

and RMU on PWD Road no 59

Near Petrol Pump Bhajan Pura

due to construction of Cycle Track

11.40 FY 10-11 HT

228 KW09SH1221 Karawal Nagar

Shifting of electric S/Stns. and HT

Line from River side of M.B. Road

from Khajuri chowk to Sabha pur

Village..

51.37 FY 10-11 HT

229 KW09SL1194 Karawal Nagar

Providing street light point from

Nanak Sir Red Light to Chauhan

Patti Village in division Karawal

Nagar.

29.04 FY 10-11 LT

230 KW09UT4123 Karawal Nagar

Augmentation of 400KVA

Transformer into 630KVA at Raju

Chakki Wala in division Karawal

Nagar.

1.18 FY 10-11 HT

Page 12: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

231 KW09UT4133 Karawal Nagar

Augementation of 100KVA into

400KVA at Jila singh kothi

Sherpur in division -Karawal

nagar.

1.26 FY 10-11 HT

232 KW09UT4182 Karawal Nagar

Augmentation of 400KVA

Transformer in to 630KVA

Transformer at Milan Garden

Sabhapur Village in division

Karawal Nagar.

1.60 FY 10-11 HT

233 KW09UT4183 Karawal Nagar

Augmentation of 100KVA into

400KVA Trf at Chawla farm

Sabhapur in division Karawal

Nagar.

0.97 FY 10-11 HT

234 KY08LA2036 KCC Schemes

Providing addl. load of 850KW

making total load of 1137KW on

HT System of supply under MLHT

category at Yamuna Sports

Complex Training Venue F/o DDA.

13.70 FY 10-11 HT

235 KY08NC1040 KCC Schemes Training hall ( at CWG Village)

HT connection of 3.3MVA 18.70 FY 10-11 HT

236 KY08NC1041 KCC Schemes Dinning Hall ( at CWG Village) HT

connection of 3MVA. 32.05 FY 10-11 HT

237 KY09LA2016 KCC Schemes

Providing addl. load of 1127KW

making total 1800KW ohn HT

system of supply in f/o DDCA,

Ferozshah Kotla Stadium, New

Delhi.

53.78 FY 10-11 HT

238 KY09LA2021 KCC Schemes

Providing addl. load of 427KW

making total 500KW under

MLHT(HT) category f/o Sate Bank

Of India, 1494-95, Chandni

Chowk, Delhi.

11.52 FY 10-11 HT

239 KY09LA2026 KCC Schemes

Providing addl. load of 86KW

making total 139KW under

MLHT(HT) category on HT system

of supply in f/o Salwan Public

School, New Delhi.

23.69 FY 10-11 HT

240 KY09NC2009 KCC Schemes

BS 7063 Providing New Load of

1150 KW on HT System of supply

under MLHT Category for

UsmanPur Booster Pumping

Station,Shastri Park,Delhi.

16.21 FY 10-11 HT

241 KY09NC2014 KCC Schemes

Providing New load of 535KW

under MLHT category on HT

system of supply F/o Ex.

Engg.(E&M) WC-II/TYR, DJB,

water treatment plant at common

wealth games village, near

Akshardham temple, Delhi

9.94 FY 10-11 HT

242 KY09NC2017 KCC Schemes

(BS-7079) Providing new load of

350KW on HT system of supply

under MLHT category for Sewage

Treatment Plant at Akashardham

for Common Wealth Games,

Delhi.

11.73 FY 10-11 HT

243 KY09NC2025 KCC Schemes

Providing new load 156KW

making total load 156KW under

MLHT(HT) category f/o Ex.

Engg.(E) PWD, ITO Chungi

Crossing, Laxmi Nagar, Delhi.

8.27 FY 10-11 HT

244 KY10NC2001 KCC Schemes

(BS-7070)Providing New load of

400KW making total 400KW

under MLHT(HT) category f/o M/s

Oriole Dr. Fresh Hotels Pvt Ltd.,

Plot No-6, Sector-A, Community

Centre, Kondli, Delhi.

5.45 FY 10-11 HT

Page 13: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

245 KY10NC2003 KCC Schemes

(BS-8048)Providing New load of

1500KW making total 1500KW

under MLHT(HT) category f/o

Medical Suprident, EDP Cell, G B

Pant Hospital, Delhi.

19.96 FY 10-11 HT

246 LN07EL2647 Laxmi Nagar Electrification of Games Village at

Akshardham Complex.—HT part. 96.83 FY 10-11 HT

247 LN08EL1348 Laxmi Nagar

Electrification of Games Village at

Akshardham Complex.—S/Stn

part .

485.48 FY 10-11 HT

248 LN08EL1350 Laxmi Nagar

Electrification of Games Village at

Akshardham Complex.—Service

connection partt

121.19 FY 10-11 LT

249 LN08EL2333 Laxmi Nagar

Provision of separate Transformer

for RSU Takshila Telephone

Exchange I.P. Extension

Patparganj.

6.41 FY 10-11 HT

250 LN08FA3109 Laxmi Nagar

Augmentation of 3*300 Pilca to

3*300 XLPE cable at 220 KV PPG

Grid to DDA Flat Nirman Vihar

19.52 FY 10-11 HT

251 LN08FA4111 Laxmi Nagar

Augmentation of HT Cbl

3*300Pilca Cbl to 3*300 XLPE

cable at East Guru Angad Ngr

Grid to B- Blk Preet Vihar in Div

LNR

30.19 FY 10-11 HT

252 LN08LT4130 Laxmi Nagar

Laying of 2 Fdrs from proposed

Transformer at Kishan Kunj and 2

Nos Fdrs on Existing Transformer

6.98 FY 10-11 LT

253 LN08LT4135 Laxmi Nagar

Laying 2 Nos LT Fdrs from

Proposed DTR to Walia Nursing

Home S/Stn

2.30 FY 10-11 LT

254 LN08LT4153 Laxmi Nagar

Conversion of O/H Conductor into

LT cable at Mandawali, Pandav

Nagar, Hasanpur,Gazipur etc in

Div LNR

214.03 FY 10-11 LT

255 LN08LT4243 Laxmi Nagar Laying Of LT Fdr 3.5X300 Sqmm

Xlpe from Police Booth S/Stn. 8.76 FY 10-11 LT

256 LN08LT4299 Laxmi Nagar Rep of damaged LT ACB'S & FP

in Divn LNR 45.16 FY 10-11 LT

257 LN08MS4139 Laxmi Nagar Rep of Service Lines in Divn.

LNR. 467.14 FY 10-11 LT

258 LN08MS4353 Laxmi Nagar

Replacement of 1 No. 630 KVA oil

filled Trs. with Dry Type Trs.at

Mitra Deep CGHS PPG D-LNR.

15.88 FY 10-11 HT

259 LN08RM4058 Laxmi Nagar

Replacement of damaged 7 PB at

Bank Enclave LNR with

2X4WAY+1X1WAY RMU

17.00 FY 10-11 HT

260 LN08RM4223 Laxmi Nagar Rep of old damaged 4PB at S/Stn

13 FIE Patparganj 6.32 FY 10-11 HT

261 LN08RM4231 Laxmi Nagar

Rep of old damaged 4 Panel

Board at S/Stn 4 FIE with 1X4 way

RMU

9.84 FY 10-11 HT

262 LN08RM4300 Laxmi Nagar

Replacement of D.P at ARA

Machine Shakar Pur with 1X3

Way O/D RMU.

4.02 FY 10-11 HT

263 LN08SH1332 Laxmi Nagar

Shifting of Electric Services due

to construction of Grade Separator

at ISBT Anand Vihar Crossing

and T Junction of Road No.56-57.

30.99 FY 10-11 HT

264 LN09AT4141 Laxmi Nagar

Providing additional Distribution

Transformer 630KVA at

Substation-2 FIE.

3.09 FY 10-11 HT

Page 14: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

265 LN09AT4142 Laxmi Nagar

Providing additional Transformer

of 630kVA at Substation 20 FIE

Patparganj.

4.01 FY 10-11 HT

266 LN09AT4143 Laxmi Nagar Prov. Addl Dtr 630 KVA at S/S

24 FIE Patparganj 2.87 FY 10-11 HT

267 LN09AT4261 Laxmi Nagar Providing Addl Dtr 630 KVA at

Chander Vihar Sub Station No 2 3.88 FY 10-11 HT

268 LN09AT4293 Laxmi Nagar Providing Additional Dtr 630 KVA

at G Block Shakar Pur 4.89 FY 10-11 HT

269 LN09AT4294 Laxmi Nagar Providing Additional Dtr 630 KVA

at Budh Vihar Kiosk SS LNR 4.71 FY 10-11 HT

270 LN09AT4297 Laxmi Nagar

Providing additional DTR 630

KVA at Jagat Ram Park Laxmi

Nagar SS

5.88 FY 10-11 HT

271 LN09AT4298 Laxmi Nagar Providing additional DTR 630

KVA at WB Block Shakar Pur SS 1.72 FY 10-11 HT

272 LN09AT4306 Laxmi Nagar

Providing additional DTR 630

KVA at Chander Vihar Sub Station

No 1

4.30 FY 10-11 HT

273 LN09FA4090 Laxmi Nagar

Replacement of HT 11KV 3X300

Sqmm PILCA Cable to 3X300

XLPE Cable from D Block Khatta

To PWD.

10.01 FY 10-11 HT

274 LN09LT4128 Laxmi Nagar

Replacement Of U/G LT Cable

3.50X300 From PNB S/Stn To 34

Bank Enclave.

2.68 FY 10-11 LT

275 LN09LT4129 Laxmi Nagar

Laying Of One No LT Feeder

4X300Mmsq Xlpe Cable From

Mangal Bazar To F-144/D Mangal

Bazar LNR

3.31 FY 10-11 LT

276 LN09LT4130 Laxmi Nagar

Laying Of One No LT Feeder

4X300Mmsq Xlpe Cable From Ara

Machine Shakarpur S/St To B-70

Old Post Office Shakar Pur

6.34 FY 10-11 LT

277 LN09LT4133 Laxmi Nagar

Laying Of Two No LT Feeder

4X300Mmsq Xlpe Cable From

Chetan Jain Marg S/St To S-524

School Blk and Chetan Jain Marg

To S-406 School B

6.78 FY 10-11 LT

278 LN09LT4134 Laxmi Nagar

Laying Of One No LT Feeder

4X300Mmsq Xlpe Cable From

Nehru Enclave S/Stn To S-380

School Blk Shakar Pur.

4.33 FY 10-11 LT

279 LN09LT4137 Laxmi Nagar

Laying Of One No LT Feeder

4X300Mmsq Xlpe Cable From

Shakar Pur Kiosk SS To 88/8A

Shakar Pur Khas

9.50 FY 10-11 LT

280 LN09LT4139 Laxmi Nagar

Layin Of Two No LT Feeder

4X300Mmsq Xlpe Cable From

Dda Park S.Blk SS To S-481

School Blk Skp and DDA Park SS

To S-508 School Blk

11.84 FY 10-11 LT

281 LN09LT4140 Laxmi Nagar

Laying Of One No LT Feeder

4X300Mmsq Xlpe Cable From

Rita Block Shakar Pur SS to B-62

Main Market Shakar Pur.

10.23 FY 10-11 LT

282 LN09MS1360 Laxmi Nagar Shifting of feeder pillar at 171 FIE

Patparganj. 0.74 FY 10-11 LT

283 LN09MS4368 Laxmi Nagar Street light connection at MB

Road Akshardham Chungi. 12.45 FY 10-11 LT

284 LN09MS4370 Laxmi Nagar

Conversion Of O/H Lines in to

U/G Passing through Main Roads

Belonging to PWD in Divn LNR

17.11 FY 10-11 LT

285 LN09NF4362 Laxmi Nagar

Providing direct 11 KV Feed to

Akshardham Mandir from

Commonwealth Games Grid.

9.98 FY 10-11 HT

Page 15: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

286 LN09RM4001 Laxmi Nagar

Replacement of Old & Damaged

11 Kv Panels at S/Stn No 19 Fie

Patpar Ganj.

5.54 FY 10-11 HT

287 LN09RM4004 Laxmi Nagar

Replacement Of Old & Damaged

11 Kv Panels at S/Stn No 10 Fie

Patpar Ganj

3.31 FY 10-11 HT

288 LN09RM4006 Laxmi Nagar

Replacement Of Old & Damaged

11 Kv Panels at S/Stn No 7 Fie

Patpar Ganj

9.16 FY 10-11 HT

289 LN09RM4007 Laxmi Nagar

Replacement of Old & Damaged

11 Kv Panels at Telco No 2 S/Stn

Gazi Pur.

4.61 FY 10-11 HT

290 LN09RM4009 Laxmi Nagar

Replacement of Old & Damaged

11 Kv Panels at S/Stn No 16

CGHS

5.78 FY 10-11 HT

291 LN09RM4013 Laxmi Nagar

Replacement of Old & Damaged

11 Kv Panels at Sagar CGHS

S/Stn

4.76 FY 10-11 HT

292 LN09RM4014 Laxmi Nagar

Replacement of Old & Damaged

11 Kv Panels at Silver Oak CGHS

S/Stn

4.38 FY 10-11 HT

293 LN09RM4015 Laxmi Nagar

Replacement of Old & Damaged

11 Kv Panels at Vrindavan CGHS

S/Stn

4.66 FY 10-11 HT

294 LN09RM4018 Laxmi Nagar

Replacement of Old & Damaged

11 Kv Panels at Srm CGHS

S/Stn.

3.05 FY 10-11 HT

295 LN09RM4019 Laxmi Nagar

Replacement of Old & Damaged

11 Kv Panels atjai Santoshi Maa

CGHS S/Stn.

5.67 FY 10-11 HT

296 LN09RM4020 Laxmi Nagar

Replacement of Old & Damaged

11 Kv Panels at Sita Ram CGHS

S/Stn

5.70 FY 10-11 HT

297 LN09RM4023 Laxmi Nagar

Replacement of Old & Damaged

11 Kv Panels at Sivalik CGHS

S/Stn

5.11 FY 10-11 HT

298 LN09RM4024 Laxmi Nagar

Replacement of Old & Damaged

11 Kv Panels at Agrasen CGHS

S/St No-1

5.73 FY 10-11 HT

299 LN09RM4025 Laxmi Nagar

Replacement of Old & Damaged

11 Kv Panels at Agrasen CGHS

S/St No 2

4.69 FY 10-11 HT

300 LN09RM4028 Laxmi Nagar

Replacement of Old & Damaged

11 Kv Panels at Sriganesh CGHS

S/St

6.01 FY 10-11 HT

301 LN09RM4030 Laxmi Nagar

Replacement Of Old & Damaged

11 Kv Panels at Himalya CGHS

S/St

5.33 FY 10-11 HT

302 LN09RM4031 Laxmi Nagar

Replacement of Old & Damaged

11 Kv Panels at Unesco CGHS

S/St No 1

6.17 FY 10-11 HT

303 LN09RM4032 Laxmi Nagar

Replacement of Old & Damaged

11 Kv Panels at Unesco CGHS

S/St-2

6.11 FY 10-11 HT

304 LN09RM4033 Laxmi Nagar

Replacement of Old & Damaged

11 Kv Panels at Shikha CGHS

S/St

5.38 FY 10-11 HT

305 LN09RM4034 Laxmi Nagar

Replacement Of Old & Damaged

11 Kv Panels at Sukh Sagar

CGHS S/St

4.46 FY 10-11 HT

306 LN09RM4035 Laxmi Nagar

Replacement of Old & Damaged

11Kv Panels at Prince CGHS S/St

No -1

5.53 FY 10-11 HT

307 LN09RM4036 Laxmi Nagar

Replacement of Old & Damaged

11Kv Panels at Prince CGHS

S/Stn No -2

5.82 FY 10-11 HT

308 LN09RM4037 Laxmi Nagar

Replacement of Old & Damaged

11 Kv Panels at Vardhan CGHS

S/Stn

5.85 FY 10-11 HT

Page 16: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

309 LN09RM4038 Laxmi Nagar

Replacement Of Old & Damaged

11 Kv Panels at Delhi Rajdhani

CGHS S/St

4.48 FY 10-11 HT

310 LN09RM4040 Laxmi Nagar Replacement Of Old & Damaged

11 Kv Panels at Nithi CGHS S/St 3.52 FY 10-11 HT

311 LN09RM4043 Laxmi Nagar

Replacement of Old & Damaged

11 Kv Panels at Poojha CGHS

S/St

5.64 FY 10-11 HT

312 LN09RM4044 Laxmi Nagar

Replacement Of Old & Damaged

11 Kv Panels at Meena CGHS

S/St

3.64 FY 10-11 HT

313 LN09RM4045 Laxmi Nagar

Replacement of Old & Damaged

11 Kv Panels at Sahvikas CGHS

S/St

5.11 FY 10-11 HT

314 LN09RM4047 Laxmi Nagar

Replacement of Old & Damaged

11 Kv Panels at Ashirwad CGHS

S/St No -1

5.39 FY 10-11 HT

315 LN09RM4048 Laxmi Nagar

Replacement of Old & Damaged

11 Kv Panels at Narwana CGHS

S/St-1

5.58 FY 10-11 HT

316 LN09RM4050 Laxmi Nagar

Replacement of Old & Damaged

11 Kv Panels at Narwana CGHS

S/St-2

5.20 FY 10-11 HT

317 LN09RM4051 Laxmi Nagar

Replacement of Old & Damaged

11 Kv Panels at Pharma CGHS

S/St-1

4.70 FY 10-11 HT

318 LN09RM4052 Laxmi Nagar

Replacement of Old & Damaged

11 Kv Panels at Pharma CGHS

S/St-2

4.60 FY 10-11 HT

319 LN09RM4053 Laxmi Nagar

Replacement of Old & Damaged

11 Kv Panels at Pharma CGHS

S/St 3

4.77 FY 10-11 HT

320 LN09RM4057 Laxmi Nagar

Replacement of Old & Damaged

11 Kv Panels at Mayfair CGHS

S/St

4.91 FY 10-11 HT

321 LN09RM4058 Laxmi Nagar

Replacement Of Old & Damaged

11 Kv Panels at Navkranti CGHS

S/St

3.60 FY 10-11 HT

322 LN09RM4059 Laxmi Nagar Replacement of Old & Damaged

11 Kv Panels at Vikalp CGHS S/St 5.34 FY 10-11 HT

323 LN09RM4060 Laxmi Nagar

Replacement of Old & Damaged

11 Kv Panels at Anamika CGHS

S/St

5.48 FY 10-11 HT

324 LN09RM4062 Laxmi Nagar

Replacement of Old & Damaged

11 Kv Panels at Rajdhani Nikunj

Cghs S/St-1

5.76 FY 10-11 HT

325 LN09RM4068 Laxmi Nagar

Replacement Of Old & Damaged

11 Kv Panels at Takshila CGHS

S/St No -1

5.05 FY 10-11 HT

326 LN09RM4069 Laxmi Nagar

Replacement of Old & Damaged

11 Kv Panels at Takshila Cghs

S/St No -2

6.19 FY 10-11 HT

327 LN09RM4071 Laxmi Nagar

Replacement Of Old & Damaged

11 Kv Panels at G-2 Preet Vihar

S/Stn.

4.78 FY 10-11 HT

328 LN09RM4074 Laxmi Nagar

Replacement of Old & Damaged

11 Kv Panels at Shiromani School

Block Shakar Pur S/Stn

8.32 FY 10-11 HT

329 LN09RM4075 Laxmi Nagar

Replacement of Old & Damaged

11 Kv Panels at Chetan Jain Marg

School Block Shakar Pur.

6.77 FY 10-11 HT

330 LN09SH1555 Laxmi Nagar Shifting of 11KV S/Stn. at

Vishawakarma Park. 8.16 FY 10-11 HT

Page 17: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

331 LN09SL1182 Laxmi Nagar

Providing Street Lights at

Unauthorised Colonies Mandawali

(85,695,158,907),Pandav

Nagar(75,1199,545),School Block

Shakar Pur ( 824,130),South

Ganesh Nagar ( 691), West Vinod

Nagar ( 922,610) Ganesh Nagar II

Shakar Pur LOP ( 522)

13.03 FY 10-11 LT

332 LN09SS4163 Laxmi Nagar

Providing additional DTR 400KVA

at Tikona Park Substation Laxmi

Nagar with 3 nos. LT feeder of

size 4CX300sqmm.

0.87 FY 10-11 HT

333 LN09SS4191 Laxmi Nagar Establishment of New Substation

at D- Block Pandav Nagar. 41.57 FY 10-11 HT

334 LN09SS4221 Laxmi Nagar

Establishment of New Substation

at F Block Preet Vihar with 400

KVA Distribution transformer.

18.63 FY 10-11 HT

335 LN09SS4222 Laxmi Nagar

Establishment of New substation

at GNPN Complex Pandav Nagar

with 630KVA distribution

Transformer.

18.79 FY 10-11 HT

336 LN09SS4343 Laxmi Nagar

Establishment of New substation

at Nehru enclave School block

Shakarpur.

28.10 FY 10-11 HT

337 LN09UT4119 Laxmi Nagar

Augmentation of DTR 630 KVA

into 990 KVA at G block shakar

pur sub station

3.83 FY 10-11 HT

338 LN09UT4165 Laxmi Nagar

Augmentation of 630 kVA DTR to

990 KVA DTRat WB block sub

station shakar pur.

2.55 FY 10-11 HT

339 LN09UT4167 Laxmi Nagar

Augmentation of 2 no 630 KVA

DTR to 990 KVA DTR at sanjay

park sub station shakar pur

5.94 FY 10-11 HT

340 LN09UT4169 Laxmi Nagar

Augmentation of DTR 630 KVA to

990 KVA at kuldeep nursing home

s/stn laxmi nagar.

2.00 FY 10-11 HT

341 LN09UT4170 Laxmi Nagar

Augmentation of DTR 630KVA to

990 KVA at kundan nagar sub

station laxmi nagar.

9.72 FY 10-11 HT

342 LN10EL2002 Laxmi Nagar

Electrification of Police Station

Mandawali Fazalpul Delhi & Flats

(Madhu Vihar).

13.41 FY 10-11 HT

343 LN10SH1006 Laxmi Nagar

Shifting of electric services due to

Construction of three no clover

leaves at Noida More ( NH-24By

Pass )

1.80 FY 10-11 HT

344 M306RM4542 Mayur Vihar Ph-3 Prvdng 3 Way RMU at S/stn HB

vill Dallupura 3.55 FY 10-11 HT

345 M306RM4544 Mayur Vihar Ph-3 Providing new 3 way RMU at

S/stn vill Gharoli 3.40 FY 10-11 HT

346 M306RM4545 Mayur Vihar Ph-3 Providing 3 way RMU at S/stn C

Blk Mulla Cly 3.23 FY 10-11 HT

347 M308LT4035 Mayur Vihar Ph-3 Provision of LT AB cable at LOP

of B&C Blk New Ashok Nagar 20.50 FY 10-11 LT

348 M309FA4005 Mayur Vihar Ph-3

Replacement of 11 KV PILCA

Cable 3*300 Sqmm to XLPE

Cable 3*300 Sqmm from

Dallupura Grid to S/S No 9 VSE

36.82 FY 10-11 HT

349 M309RM4002 Mayur Vihar Ph-3

Replacement of 11 KV 4 Way

Panel Board at substation no.-5

East end appartment.

5.11 FY 10-11 HT

350 M309RM4003 Mayur Vihar Ph-3

Replacement of 11 KV 3 Way

Panel Board with 4 Way RMU at

C2 New Ashok Nagar.

5.08 FY 10-11 HT

Page 18: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

351 M309RM4006 Mayur Vihar Ph-3

Replacement of 11 KV 7 Way

Panel Board at 25 MCD Sewage

Treatment Plant Kondli.

9.66 FY 10-11 HT

352 M309RM4008 Mayur Vihar Ph-3

Replacment of 11 KV 4 Way

Panel Board at Allahabad Bank

CGHS.

5.00 FY 10-11 HT

353 M309RM4009 Mayur Vihar Ph-3

Provision of New 11KV 4 Way

O/D RMU at New Ashok Nagar

DP near Metro Substation.

5.38 FY 10-11 HT

354 M309RM4010 Mayur Vihar Ph-3

Replacement of 11KV 3Way

Panel Board at Durga Park

Dallupura.

3.51 FY 10-11 HT

355 M309RM4023 Mayur Vihar Ph-3

Replacment of 11 KV 4 Way

Panel Board at Pragatisheel

CGHS.

5.04 FY 10-11 HT

356 M309RM4031 Mayur Vihar Ph-3

Replacement of 11 KV 4 Way

Panel Board at Substation -1 East

End Appartment.

4.79 FY 10-11 HT

357 M309RM4032 Mayur Vihar Ph-3 Replacement of 11KV 4 Way

Panel at Anupam CGHS 5.09 FY 10-11 HT

358 M309RM4033 Mayur Vihar Ph-3 Replacment of 11 KV 4 Way

Panel Board at Triveni CGHS. 5.01 FY 10-11 HT

359 M309RM4034 Mayur Vihar Ph-3 Replacement 11 KV 4 Way Panel

Board at Aniket CGHS. 5.01 FY 10-11 HT

360 M309SS2115 Mayur Vihar Ph-3 Providing the supply to PWD

Deptt. For Street light points. 7.52 FY 10-11 HT

361 M310EL2001 Mayur Vihar Ph-3 Electrification of Kondli

Community Centre. 126.62 FY 10-11 HT

362 MV09AT4072Mayur Vihar Ph-

1&2

Prov of 400KVA Add. Tr. at D Blk

Gazi Pur 1.98 FY 10-11 HT

363 MV09AT4098Mayur Vihar Ph-

1&2

Provision of Add.400KVA Tr at

S/Stn No-1,Khichari Pur Cly,Mvr-II 2.09 FY 10-11 HT

364 MV09MS4130Mayur Vihar Ph-

1&2

Estimate for Overhead to

underground conversion at PWD

Roads in Mayur Vihar Phase-I & II.

6.10 FY 10-11 LT

365 MV09MS4131Mayur Vihar Ph-

1&2

Estimate for Overhead to

underground conversion at MCD

Roads in Mayur Vihar Phase-I & II.

1.55 FY 10-11 LT

366 MV09RM4005Mayur Vihar Ph-

1&2

Replacement of 11 Kv 4 Way

Panel Board at Lsc 1 Pkt1 MVR-1 3.29 FY 10-11 HT

367 MV09RM4006Mayur Vihar Ph-

1&2

Replacement of 11 Kv 4 Way

Panel Board at Mavila CGHS 5.35 FY 10-11 HT

368 MV09RM4007Mayur Vihar Ph-

1&2

Replacement of 11 Kv 4 Way

Panel Board at Ocf Near Club

Chilla MVR-I

3.34 FY 10-11 HT

369 MV09RM4008Mayur Vihar Ph-

1&2

Replacement of 11 Kv 4 Way

Panel Board at S/S 5 Pkt 4 MVR-I 8.97 FY 10-11 HT

370 MV09RM4009Mayur Vihar Ph-

1&2

Replacement of 11KV 4 Way

Panel board at Sardar CGHS. 4.94 FY 10-11 HT

371 MV09RM4010Mayur Vihar Ph-

1&2

Replacement of 11 Kv 4 Way

Panel Board at Shekhar CGHS

S/S 2

4.55 FY 10-11 HT

372 MV09RM4012Mayur Vihar Ph-

1&2

Replacement of 11 Kv 4 Way

Panel Board at Una CGHS S/S 1 4.63 FY 10-11 HT

373 MV09RM4013Mayur Vihar Ph-

1&2

Replacement of 11 Kv 4 Way

Panel Board at Una CGHS S/S No

2

4.73 FY 10-11 HT

374 MV09RM4014Mayur Vihar Ph-

1&2

Replacement of 11 KV 4 Way

Panel Board at United CGHS

substation No.-1.

4.98 FY 10-11 HT

375 MV09RM4015Mayur Vihar Ph-

1&2

Replacement of 11 KV 4 Way

Panel Board at Upkar CGHS. 4.49 FY 10-11 HT

376 MV09RM4016Mayur Vihar Ph-

1&2

Replacement of 11KV 4 Way

Panel Board at Vardhman CGHS. 4.96 FY 10-11 HT

Page 19: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

377 MV09SH1163Mayur Vihar Ph-

1&2

Shifting of electric services due to

widenning of road at Gajipur drain

in between kondli to chilla Grid

division Mayur Vihar Ph-I & II.

8.51 FY 10-11 HT

378 MV09UT4086Mayur Vihar Ph-

1&2

Augmentation of 400KVA

Transformer into 630KVA

Transformer at Substation -2

CGHS Mayur Vihar -Ph-I.

1.65 FY 10-11 HT

379 MV09UT4094Mayur Vihar Ph-

1&2

Augmentation of 400KVA

Transformer into 630KVA at

Substation-3 Pkt -1 Mauyr Vihar-I.

1.67 FY 10-11 HT

380 NN09AT4101 Nand Nagri

Installation of 990 kVA

Transformer at Substation Weaver

Complex (SDM Compound in

division Nand Nagri.

6.48 FY 10-11 HT

381 NN09AT4202 Nand Nagri

Installation of New DP With 400

KVA DTR I/F of Ashok Kumar

Near Pole X-109 in D-NNG in

Rajeev Nagar Ind area.

3.05 FY 10-11 HT

382 NN09FA4072 Nand Nagri

Laying of HT cable in Place of

O/H AT Primary School to Shanti

Lal Via Ratan wala, Mandoli (DP)

and Primary School to Mandoli

Kiosk.

14.22 FY 10-11 HT

383 NN09LT4056 Nand Nagri Laying LT Cable , at Balbir Nagar

S/Stn, Distt.-Nand Nagri. 11.18 FY 10-11 LT

384 NN09LT4058 Nand Nagri Laying LT Cable , at C-Block,

Kabir Nagar, Distt.-Nand Nagri. 5.35 FY 10-11 LT

385 NN09LT4059 Nand Nagri Laying of LT cable at Babarpur

Village division Nand Nagri. 9.06 FY 10-11 LT

386 NN09MS4100 Nand Nagri

New DP to be installed at site to

provide 11KW connection in F/O

Suresh Gupta, H.NO-64865,Milan

Garden Mandoli.

0.97 FY 10-11 HT

387 NN09MS4138 Nand Nagri

Installation of New D.P With 100

KVA Transformer I/O Smt Kumud

Gupta Kh. No- 15/12, Om

Dharam Kanta, New Mandoli Ind

Area in D-NNG

3.25 FY 10-11 HT

388 NN09MS4193 Nand Nagri

Additional Transformer at

D.O.No.2254-2255 in Favour of

SS Plastech Ind-NNG

2.18 FY 10-11 HT

389 NN09MS4195 Nand Nagri

Create New D.P. With 100 Kva

Dtr I/F of Sh Ajay Goel Near RMU

1 Mandoli Ind Area in D-NNG

2.63 FY 10-11 HT

390 NN09MS4206 Nand Nagri

Conversion of LT overhead cables

to underground of MCD Roads at

different places in division

Nandnagri.

5.88 FY 10-11 LT

391 NN09MS4207 Nand Nagri

Conversion of LT overhead cables

to underground of PWD Roads at

different places in division

Nandnagri.

5.38 FY 10-11 LT

392 NN09MS4210 Nand Nagri

Inst. of New D.P. With 25 KVA

DTR I/F MTNL Harsh Vihar at C

Block RMU in D-NNG

1.02 FY 10-11 HT

393 NN09MS4211 Nand Nagri

Inst of New 25 KVA 3 Ph

Transformer at D.P.No. 2233-

2234 in Rajeev Ngrind Area in D-

NNG

0.79 FY 10-11 HT

394 NN09RM4003 Nand Nagri Inst. of RMU at Sudamapuri S/S

No-2 Zone-2903 Distt.--NNG 3.40 FY 10-11 HT

395 NN09RM4004 Nand Nagri

Installation of 3 way O/D RMU at

Ambedkar Park Babarpur Zone-

2903, division-Nandnagri.

3.53 FY 10-11 HT

Page 20: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

396 NN09RM4006 Nand Nagri

Installation of 2 Nos 3-Way I/D

RMU Aat Uttri Chhajjupur Zone-

2903-division Nandnagri.

8.62 FY 10-11 HT

397 NN09RM4009 Nand Nagri Installation of 3 Way O/D RMU at

Dp No-2033-2034 Seva Dham 3.49 FY 10-11 HT

398 NN09RM4013 Nand Nagri

Installation of 2 Nos,4-Way I/D

RMU at A-4 NNG Zone-2901

Distt.-NNG

9.21 FY 10-11 HT

399 NN09RM4016 Nand Nagri Installation of 3-Way I/D RMU at

ITI NNG, Zone-2901, Distt.NNG 3.12 FY 10-11 HT

400 NN09RM4020 Nand Nagri

Installation of4-Way I/D RMU at

LIG S/St-4,Pkt-E,Gtb, Zone-2901,

Distt.-NNG

4.52 FY 10-11 HT

401 NN09RM4022 Nand Nagri

Installation of4-Way I/D RMU -at,

F-Pocket S/S No-2 GTB, Zone-

2901, Distt.- NNG

4.66 FY 10-11 HT

402 NN09RM4028 Nand Nagri

Installation of 2-Nos, 4-Way, I/D

RMU at MIG Substation No.-2,

Zone-2902, division- Nandnagri.

8.72 FY 10-11 HT

403 NN09RM4032 Nand Nagri

Installation of 2 nos, 4 Way , I/D

RMU East Jyoti nagar, Zone-

2902, Division Nandnagri.

8.71 FY 10-11 HT

404 NN09SL1228 Nand Nagri Providing street light at Nehar

Road in Village Gokalpur. 1.65 FY 10-11 LT

405 NN09UT4149 Nand Nagri

Augmentation of 100KVA DTR in

industrial area 1891-1892 in

mandoli division Nandnagri.

1.23 FY 10-11 HT

406 NN09UT4160 Nand Nagri

Augmentation of 400 KVA

Transformer into 630KVA at Balbir

Nagar Extension Substation.

1.46 FY 10-11 HT

407 NN09UT4191 Nand Nagri

Augmentation of 25KVA

Transformer at D.P No. 2319-

2320 I/F of Shanti Devi in rajeev

nagar industrial area in division

Nand Nagri.

1.97 FY 10-11 HT

408 NN09UT4196 Nand Nagri

Augmentation of 100KVA to 400

KVA Transformer I/F of Kundan

Lal Petrol Pump at Loni Road in

Division Nanad Nagri.

1.57 FY 10-11 HT

409 NN09UT4224 Nand Nagri

Augmentattion of 100KVA DTR

I/F of Sh. Mahesh Chand Goel at

pole No. 1971-72 Mandoli

industrial area.

1.10 FY 10-11 HT

410 PG09AT4103 Paharganj Addl. Installation of 990KVA Trf.

at Chuna Mandi S/S 11.98 FY 10-11 HT

411 PG09FA4001 Paharganj

Rep. of HT from MCD Park to

Arakasha Rd Via Gali Tel

Mill,Laxman Puri

37.49 FY 10-11 HT

412 PG09FA4002 Paharganj

Rep.of HT Cable from Neem

Wala Chowk (Nabi Karim ) to

Quilakadam Sarif

7.95 FY 10-11 HT

413 PG09FA4004 Paharganj

Rep.of HT Cable from Ram Ngr

to Ashoka Basti Via AB Patrika

and Amerpuri

51.77 FY 10-11 HT

414 PG09FA4005 Paharganj

Rep. of HT Cable from. M Khan

Grid to P.G Dis. (Partly Cable Fr

Loha Mandito C-Blk Mkhan

12.29 FY 10-11 HT

415 PG09FA4007 Paharganj Rep. of HT Cable from. B.G.Road

to Azad Mkt 14.78 FY 10-11 HT

416 PG09FA4009 Paharganj Rep. of HT Cable From. Library

Road to Gali Zameer Wali 8.77 FY 10-11 HT

417 PG09FA4013 Paharganj Rep. of HT Cable from.Prem

Nagar Yogmaya S/S 8.71 FY 10-11 HT

418 PG09LT4044 Paharganj

Taking out 2 NOS. U\G LT

Feeders from existing 400KVA

Transformer -1 at Sarai Khalil -2

substation.

14.65 FY 10-11 LT

Page 21: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

419 PG09LT4045 Paharganj

Taking out 2 Nos. U\G LT

Feeders from existing 400KVA

Transformer No-2 at Sarai Khalil -

2 substation.

8.42 FY 10-11 LT

420 PG09LT4065 Paharganj

Replacement of Feeder Piller A

&B Type at Aram Bagh flat in

division Paharganj.

13.56 FY 10-11 LT

421 PG09MS4123 Paharganj

Conversion of Overhead Service

Cable into underground cable at

various Road of MCD in division

Paharganj.

119.48 FY 10-11 LT

422 PG09NF4008 Paharganj

Newly installation of HT Cable

from Narayan market to Sadar

cloth Market.

21.72 FY 10-11 HT

423 PG09RM4022 Paharganj

Add. of 1 No. Single Way O\D

(Cglucy Make) at Deputy Ganj

Pl\Ms\S In Zone Bg. Road (D)

PHG

2.30 FY 10-11 HT

424 PG09RM4024 Paharganj Rep. of 3 Way I\D RMU at Gali

/Neem Wali In Div. PHG 3.13 FY 10-11 HT

425 PG09RM4026 Paharganj

Add. of 1 No. Single Way I\D

(ABB Make) at Sadar Thana Rd.

In Zone PP Qtr (D)PHG

2.32 FY 10-11 HT

426 PG09RM4030 Paharganj

Replacement of Panel with 4 Way

I\D RMU at DaribaPan Substation

in division Paharganj.

4.27 FY 10-11 HT

427 PG09RM4031 Paharganj

Addition of 1 no 3 Way O\D at

Kabir Basti Pl/M substation in

Zone Ram Nagar division

Paharganj.

3.25 FY 10-11 HT

428 PG09RM4032 Paharganj

Replacement of Panel with 4 Way

I\D RMU at Fire Station in Division

Paharganj.

4.32 FY 10-11 HT

429 PG09UT4102 Paharganj

Augmentation ug.of existing Ttrf

no-1 from 630 to 990 KVA at

khanna cinema s/s

10.30 FY 10-11 HT

430 PN08AT4017 Patel Nagar Addition of 630 KVA D/Tr at 30

Blk West Patel Nagar 2.59 FY 10-11 HT

431 PN08FA4093 Patel Nagar

Replacement of 3X150MM2

PILCA H.T. Cable to XLPE Cable

Size 3X300MM2 from leading S/S

New Rohtak Road to Pappuwala

Gali No-8 Anand Parvat

5.42 FY 10-11 HT

432 PN08FA4094 Patel Nagar

Replacement of 3X150MM2

PILCA H.T. Cable to XLPE Cable

Size 3X300MM2 from Dunggarmal

(K) S/S to Pappuwala S/S Gali No-

8 Anand Parvat

3.45 FY 10-11 HT

433 PN08FA4136 Patel Nagar

Replacement of PILCA Cable

3*300 Sqmm to 11KV Cable

3*300 Sqmm XLPE from Prem

Nagar Phatak to Nehru Nagar DP

18.16 FY 10-11 HT

434 PN08FA4139 Patel Nagar

Replacement of 11 KV 3*150

Sqmm PILCA to 3*300 Sqmm

XLPE Prem Nagar Gurudwara to

Phatak Prem Nagar in Div PNR.

18.17 FY 10-11 HT

435 PN08LT4002 Patel Nagar Laying Add 2 Nos LT Feeder at

Pappuwala 1.62 FY 10-11 LT

436 PN08LT4004 Patel Nagar

Laying 4 Nos LT Cable 4*300 Sq

mm at Local D/Tr No 1 ,11 B

,A.S.Road Devnagar

2.71 FY 10-11 LT

437 PN08LT4081 Patel Nagar

Laying Of U/G Additional 2Nos

L.T.Feeder Frome S/Stn 13 B.Dev

Nager

1.01 FY 10-11 LT

Page 22: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

438 PN08LT4082 Patel Nagar

Laying Of U/G Additional

L.T.Feeder Frome S/Stn H.S.Road

Kiosk To Budha Andir Road

1.91 FY 10-11 LT

439 PN08LT4083 Patel Nagar

Laying Of U/G Additional

L.T.Feeder Frome S/Stn H.S.

Road To Gali No.2Block No.9(

Near H.No.6561) Dev Nager

1.88 FY 10-11 LT

440 PN08LT4085 Patel Nagar

Laying Of Additional U/G Of One

No LT Feeder Size 3X300Mm2

From Militory Road S/S To Gali No-

1 Than Singh Nagar.

1.41 FY 10-11 LT

441 PN08LT4086 Patel Nagar

Laying Of Additional U/G Of One

No Lt Feeder Size 3X300Mm2

From Kamal(K) S/S To Gadodia

Road.

1.41 FY 10-11 LT

442 PN08LT4087 Patel Nagar

Laying Of Additional U/G Of One

No Lt Feeder Size 3X300Mm2

From Tikonapark S/S Gadodia

Road To Gali No-17 Nai Basti.

2.37 FY 10-11 LT

443 PN08LT4088 Patel Nagar

Laying Of Additional U/G Of 2

Nos Lt Feeder Size 3X300Mm2

From Nagarwala S/S To Gali No-1

Than Singh Nagar.

2.08 FY 10-11 LT

444 PN08LT4095 Patel Nagar

Laying Of U/G Additional 2 Nos.

L.T.Feeder Frome S/Stn Vijay

Chock To Milatry Road

Opp.H.No.16/653-I Gali No.20

Bapa Nager

1.91 FY 10-11 LT

445 PN08LT4096 Patel Nagar

Laying Of U/G Additional

L.T.Feeder Frome S/Stnt Tank

Road Khatta To Road No.5 Shiv

Mandir Opp.H.No.6188/3 Block 1

Dev Nager

3.82 FY 10-11 LT

446 PN08LT4097 Patel Nagar

Laying of U/G additional LT feeder

from substation punjabi basti

Military Road 16/476-I M.Road

Bapa nagar.

0.93 FY 10-11 LT

447 PN08LT4098 Patel Nagar

Laying of U/G additional LT feeder

from S/STN Gurudwara Govt

quarter Dev Nagar to 26B/9 D.B

Gupta Road near (Pakodewala)

1.38 FY 10-11 LT

448 PN08LT4100 Patel Nagar

Laying Of U/G Additional

L.T.Feeder Frome S/Stn

M.C.D.Office Dev Nagerto 17B/26

Dev Nager .

1.37 FY 10-11 LT

449 PN08LT4116 Patel Nagar

Laying Additional Two No LT

Cable 4*300 Sq Mm At Krishna

Tirath

2.07 FY 10-11 LT

450 PN08MS4130 Patel Nagar

Convert O/H 11 KV feeder DMS

grid to DMS No.-3 in division Patel

Nagar.

7.11 FY 10-11 HT

451 PN08SS4107 Patel Nagar

Establishment of New substation

of 400 KVA at Rajasthani colony

west patel nagar.

9.21 FY 10-11 HT

452 PN09AT4053 Patel Nagar Add 630 KVA Tr at Regar Pura

S/S in D-PNR. 2.71 FY 10-11 HT

453 PN09FA4022 Patel Nagar

Rep of HT PILCA Cable 3*150

Sqmm from Hog Mkt to Deep

Shikha S/S and Deep Shikha S/S

to Gagandeep

2.23 FY 10-11 HT

454 PN09FA4023 Patel Nagar Rep of PILCA 3*150 Sqmm

Prabhat Kiran to Hog Mkt 2.15 FY 10-11 HT

455 PN09FA4024 Patel Nagar

Rep of HT PILCA 3*150 Sqmm

from 10 B Rajender Place to

Gagan Deep by Prem Sadan

4.45 FY 10-11 HT

Page 23: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

456 PN09FA4026 Patel Nagar

Rep of HT PILCA 3*300 Sqmm to

3*300 Sqmm XLPE from 10 B

Rajinder Place to Hog Mkt

9.74 FY 10-11 HT

457 PN09LT4028 Patel Nagar Laying 4 No LT Cable from

Super bazar Div Patel Nagar 44.27 FY 10-11 LT

458 PN09LT4029 Patel Nagar Laying 3 No LT Cable from B

Block West Patel Nagar 35.19 FY 10-11 LT

459 PN09LT4030 Patel Nagar Laying 3 No LT Cable from 30

Block West Patel Nagar 24.71 FY 10-11 LT

460 PN09LT4031 Patel Nagar Installation of LT ACB 400A /1250

A at Different S/Stn. in Div PNR 31.01 FY 10-11 LT

461 PN09LT4041 Patel Nagar

Replacement of Old off size bare

conductor to LTAB cable at Anand

Parbat in division Patel Nagar.

52.42 FY 10-11 LT

462 PN09LT4042 Patel Nagar

Replacement of Old off size bare

conductor to LTAB cable at West

Patel nagar in division Patel

Nagar.

50.89 FY 10-11 LT

463 PN09MS4021 Patel Nagar

Rep Of HT O/H Bare Conductor

to HTAB Coductor from Near

Nagarwala S/S to Cash Office Gali

No 8 Anad Parbat

7.53 FY 10-11 LT

464 PN09MS4038 Patel Nagar

Replacement of service cable at

Rameshwari nagar, Dev Nagar,

double story dev nagar, Bappa

nagar in sub division Kaikarwala

Patel Nagar.

105.42 FY 10-11 LT

465 PN09MS4039 Patel Nagar

Replacement of Service cable at

Baljeet nagar Prem nagar Nehru

nagar in division Patel nagar.

133.36 FY 10-11 LT

466 PN09MS4040 Patel Nagar

Replacment of Service Cable at

Anand Parbat in division Patel

Nagar.

75.20 FY 10-11 LT

467 PN09MS4107 Patel Nagar

Conversion of O/H network into

U/G on MCD Roads in division

Patel nagar.

38.34 FY 10-11 LT

468 PN09RM4009 Patel Nagar

Installation of 3 Way SF6 O/D

RMU at New Market (Police Post)

East Patel Nagar.

3.42 FY 10-11 HT

469 PN09RM4011 Patel Nagar

Replacement of Panel at Nalla (K)

26 Block West Patel nagar

division Patel Nagar.

3.49 FY 10-11 HT

470 PN09RM4015 Patel Nagar Replacement of Panel at 29 Block

West Patel Nagar. 11.40 FY 10-11 HT

471 PN09RM4035 Patel Nagar

Rep of 11 Kv Ht Panel at Rachna

Building Rajindra Place In Div

PNR

4.78 FY 10-11 HT

472 PN09SS4032 Patel Nagar

Installation of new substation with

one 630KVA transformer ,HT, LT

Cable and one RMU at Ramjas

day boarding School in division

Patel Nagar.

17.51 FY 10-11 HT

473 PN09UT4004 Patel Nagar Aug of 630 to 990 kva at militory

road panjabi basti div patel nagar 10.48 FY 10-11 HT

474 SR08LT4011 Shankar Road

Laying of 5 no LT feeders from

existing 2X 990 KVA & 1X630

KVA Transformer at 2E

Jhandewalan PL/M Substation.

12.85 FY 10-11 LT

475 SR08LT4015 Shankar Road

Laying of 3 nos new LT feeder

from 4E(K) Jhandewalan in

division Shankar Road.

13.66 FY 10-11 LT

476 SR08LT4017 Shankar Road

Laying of 1 No new LT feeder

from existing 2X990 KVA

Transformer at Bhoothnath

Substation.

8.56 FY 10-11 LT

Page 24: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

477 SR08RM4043 Shankar Road Installation of one single panel

O/D at Police Qtr S/Stn in D-SRD 4.86 FY 10-11 HT

478 SR09AT4010 Shankar Road

Installation of Additional 630 KVA

Transformer at Jhandewalan No 1

S/Stn.

1.65 FY 10-11 HT

479 SR09LT4043 Shankar Road

Laying of 2 Nos new LT feeders

from Proposed 990KVA DT at 2E

PL/MS/Station Jhandewalan.

4.41 FY 10-11 LT

480 SR09LT4044 Shankar Road

Laying of 2 nos new LT feeders

from proposed 630KVA DT at

Jhandewalan substation No.-1

2.82 FY 10-11 LT

481 SR09LT4047 Shankar Road

Laying of 2 nos. LT feeder from

proposed 990KVA DT at 2E(K)

Jhandewalan.

2.64 FY 10-11 LT

482 SR09LT4049 Shankar Road

Replacement of old and damaged

feeder pillar & LT ACBs in division

Shankar Road.

36.27 FY 10-11 LT

483 SR09LT4062 Shankar Road

LT-6522 New Connection of

80KW in favour Mr Rajnish

Sharma ,16-B, FF Bazar Marg old

Rajinder Nagar.New Delhi-60

6.48 FY 10-11 LT

484 SR09MS4052 Shankar Road Replacement of service line in

Pusa Road Zone. 85.65 FY 10-11 LT

485 SR09MS4053 Shankar Road Replacement of service lines in

Old & New Rajinder Nagar Area. 101.69 FY 10-11 LT

486 SR09MS4111 Shankar Road

Conversion of Overhead network

into underground at various Road

of MCD in division. Shankar Road.

19.15 FY 10-11 LT

487 SR09RM4004 Shankar Road

Installtion of 3 WAY RMU at 17-

B Bazar marg old Rajinder Nagar

Substation Shankar Road.

3.88 FY 10-11 HT

488 SR09RM4007 Shankar Road Replacement of 3 Way Panel at

NPL Multi storey Substation. 3.41 FY 10-11 HT

489 SR09RM4059 Shankar Road

Replacement of 5 Panel board at

A block Flatted Factory in Division-

shankar Road.

6.75 FY 10-11 HT

490 SR09SH1106 Shankar Road

Conversion of LT O/H System to

U/G system to at Jhandewalan

Mandir.

15.03 FY 10-11 LT

491 SR09SL1109 Shankar Road

Providing of new100 nos St Ltg

fittings of 150 Watt HPSV in Arya

Samaj Road WEA Karol Bagh

New & Old Rajender Nagar Area

Requested by Hon'ble MLA SH

Ramakant Goswami Div Sanker

Road (MLA Schemes)

2.49 FY 10-11 LT

492 SR09UT4086 Shankar Road

Augmentation of 400KVA

Transformer into 630kVA at 12

WEA Karolbagh.

0.66 FY 10-11 HT

493 SR09UT4099 Shankar Road

Augmentation of DTR 630 KVA to

990 KVA DTR at old salwan

substation.

1.96 FY 10-11 HT

494 SR09UT4100 Shankar Road

Augmentation of 400KVA

Transformer in to 630KVA at New

Salwan CGHS Substation.

0.80 FY 10-11 HT

495 YV05SH2155 Yamuna Vihar

Shifting of Electric Service due to

widening of Cilvart at Brahmpuri

Road in Distt YVR

4.59 FY 10-11 HT

496 YV07SH1538 Yamuna Vihar

Shifting of Electric Services due

to Intersection of G.T. Road No.

57/65 (Keshav Chowk) for

preparing the Grade Separator

Near Shyam Lal College

54.02 FY 10-11 HT

Page 25: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

497 YV09FA4030 Yamuna Vihar

Replacement of HT cable at E

Block shastri Park to C Block

Shastri Park to C Block Shastri

park. Nand Nagri.

3.40 FY 10-11 HT

498 YV09FA4072 Yamuna Vihar Rep of HT Cable Moni Baba

Mandir to Brahmpuri S/Stn No-1 11.54 FY 10-11 HT

499 YV09LT4006 Yamuna Vihar New LT Cable at Chauhan

Banagar Gali No.-10. 3.43 FY 10-11 LT

500 YV09LT4009 Yamuna Vihar Replacement of 3 and 1 New LT

Cable at B-2 PSS Yamuna vihar 3.35 FY 10-11 LT

501 YV09LT4034 Yamuna Vihar

Rep Of 3 No LT Cable at Chet

Ram/Moujpur S/Stn No-2 (D)

Yamuna Vihar

1.07 FY 10-11 LT

502 YV09LT4036 Yamuna Vihar Rep Of 3 No LT Cables at B-4

S/Stn Yamuna Vihar 2.36 FY 10-11 LT

503 YV09LT4037 Yamuna Vihar Replacement Of 3 Nos LT Cable

at C-7 S/Stn Yamuna Vihar 3.66 FY 10-11 LT

504 YV09LT4040 Yamuna Vihar Replacement Of 3 Nos LT Cables

at C-10 Yamuna Vihar 3.40 FY 10-11 LT

505 YV09LT4041 Yamuna Vihar Replacement Of 2 No Of LT

Cables at C-11 Yamuna vihar 3.86 FY 10-11 LT

506 YV09LT4050 Yamuna Vihar Replacement Of LT Feeder From

5Th Pusta To Tikona Park 2.90 FY 10-11 LT

507 YV09LT4051 Yamuna Vihar Replacement Of LT Feeder from

Tikona Park To Gamari 5.14 FY 10-11 LT

508 YV09LT4052 Yamuna Vihar Replacement Of LT Feeder at

Daiwala S/Stn 5.65 FY 10-11 LT

509 YV09LT4053 Yamuna Vihar Replacement of LT cable at Moni

Baba Mandir Substation. 4.21 FY 10-11 LT

510 YV09LT4056 Yamuna Vihar Replacement Of LT Cable at

Bhisam Wala Brahampuri 1.59 FY 10-11 LT

511 YV09LT4057 Yamuna Vihar Replacement Of LT Cable at

Brahampuri Gali No 1 2.47 FY 10-11 LT

512 YV09LT4140 Yamuna Vihar

Providing additional LTAB cable

as well as 100 PCC poles in

division Yamuna Vihar.

25.34 FY 10-11 LT

513 YV09LT4153 Yamuna Vihar

Replacement of Old Conductor

with LT AB Cable at C block

Yamuna Vihar.

43.98 FY 10-11 LT

514 YV09MS4076 Yamuna Vihar

Replacement of 2X10,4X50 and

4X25mm2 service cable from

Service Pillar/F.Pillar to House(D)

YVR

193.79 FY 10-11 LT

515 YV09MS4143 Yamuna Vihar Providing single and three phase

DB in division Yamuna Vihar. 20.07 FY 10-11 LT

516 YV09MS4158 Yamuna Vihar

Provide 80 Nos.earthing on leftout

Substation in division Yamuna

Vihar.

19.72 FY 10-11 LT

517 YV09MS4162 Yamuna Vihar

Conversion of Overhead electrical

services into underground at

different places in Yamuna vihar.

17.76 FY 10-11 LT

518 YV09RM4020 Yamuna Vihar Rep of 3 Way RMU at Mcd S/Stn

No 1 3.03 FY 10-11 HT

519 YV09RM4024 Yamuna Vihar Installation of 4 Way RMU at

Pahari Wala at Chauhan Banger 4.98 FY 10-11 HT

520 YV09RM4027 Yamuna Vihar Replacement of 4Way RMU at

Engneering College Gautam Puri 5.27 FY 10-11 HT

521 YV09RM4063 Yamuna Vihar Replacement of HT Panel at B-4

Yamuna Vihar. 4.61 FY 10-11 HT

522 YV09RM4064 Yamuna Vihar Installation of new RMU at Veer

Abdul Hameed marg. 3.14 FY 10-11 HT

523 YV09RM4067 Yamuna Vihar Replacement of 5 Panel board at

Delhi Jal Board Bhajanpura. 6.48 FY 10-11 HT

Page 26: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

524 YV09RM4068 Yamuna Vihar

Installation of new HT single way

Panel at K Block West Ghonda

Gali No. 20.

2.25 FY 10-11 HT

525 YV09RM4078 Yamuna Vihar

Installation of new RMU at H

Block Seelampur under O/G

Jagjeet Nagar Feeder.

3.53 FY 10-11 HT

526 YV09UT4092 Yamuna Vihar

Augmentation of 400KVA

Transformer into 630KVA at

DSIDC Seelampur.

1.07 FY 10-11 HT

527 DG09LT4034 Daryaganj

Taking out new LT feeder from

Madina Library Substation to

Pyare Lal Bhawan in division

Daryaganj.

2.63 FY 10-11 LT

528 DG09SS4087 Daryaganj

Conversion of 630KVA oil type

transformer into 630 KVA

Package Substation at DDU Marg

substation in division daryganj.

24.02 FY 10-11 HT

529 DG09SS4088 Daryaganj

Conversion of 630KVA oil type

Transformer into 630KVA package

Sub-station at Girdhari Lal P/M

Sub-station in division Daryaganj.

21.97 FY 10-11 HT

530 DG09SS4089 Daryaganj

Conversion of 990KVA

Transformer into 990KVA

Package Substation at

Kanchanpuri Substation in division

Daryaganj.

23.64 FY 10-11 HT

531 DG09SS4091 Daryaganj

Conversion of 990 KVA oil type

transformer into 990KVA Package

Substation at Vikam Nagar

Substation in division Daryaganj.

27.10 FY 10-11 HT

532 DG10AT4027 Daryaganj Installation of additional 400KVA

Transformer at Hans Bhawan. 4.85 FY 10-11 HT

533 DG10MS4026 Daryaganj

Replacement of old Service cable

of subdivision daryaganj & Minto

Road in division daryaganj.

17.06 FY 10-11 LT

534 DG10SH1035 Daryaganj

Conversion of LT O/H System

into U/G system at ANSARI

ROAD from Delhi Gate to foot

Over Bridge in Distt: Darya Ganj

339.25 FY 10-11 LT

535 DG10SH1038 Daryaganj Shifting of PCC pole near EDP

cell at G.B. Pant Hospital 1.50 FY 10-11 LT

536 DG10SH1039 Daryaganj

Shifting/Dismentalling of LT pole

with cable running adjacent/almost

touching Turkman Gate in Div

Darya Ganj

0.61 FY 10-11 LT

537 DL09MS2128 Dilshad Garden

Shifting of poles coming in drain

at DDA Housing Complex R block

Dilshad garden.

0.54 FY 10-11 LT

538 DL09MS4061 Dilshad Garden Replacement of Service Line in

division G.T Road. 51.33 FY 10-11 LT

539 DL09RM4023 Dilshad Garden

Replacement of 4-Panel Board

S/stn No.-1 A-Block .Jhilmil

industrial area Dilshad garden.

5.61 FY 10-11 HT

540 DL09UT4053 Dilshad Garden

Aug. of 630 KVA Trf. to 990 KVA

TRF at julfe bangaal s/stn no.1

dilshad garden

11.67 FY 10-11 HT

541 DL09UT4069 Dilshad Garden

Aug.of 630 kVA transformer into

990 KVA at DSIDC s/s no.2, b-

blk.Jhilmil Industrial area.

10.36 FY 10-11 HT

542 DL10EL1004 Dilshad Garden

Electrification of Police Station

Building and Staff Quarters at

Mansarover Park.

0.35 FY 10-11 LT

Page 27: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

543 DL10SH1069 Dilshad Garden

Shifting of electric services on

service road due to construction of

ROB on Shahdara Saharanpur

Railway Line & Flyover on G.T.

Road Shahdara ( Portion from

Railway Line to Telephone

Exchange Dilshad Gartden).

46.36 FY 10-11 HT

544 JM09RM4004 Karkardooma

Installation of 3 way O/D RMU at

Yojna Vihar Market D/P Sub-

station.

3.53 FY 10-11 HT

545 JM09RM4010 Karkardooma

Installation of 3-WAY O/D RMU

at Gali No. 3-4 Vishwas Nagar

Nala Side Sub-station.

3.94 FY 10-11 HT

546 JM09RM4015 Karkardooma

Installation of 3 Way O/D RMU at

Vishnu Gali Vishwas Nagar Nala

Side Sub-station.

5.93 FY 10-11 HT

547 JM09UT4120 Karkardooma

Aug of transformer 630 kVA to

990 kVA at rishabh vihar market

s/stn

11.36 FY 10-11 HT

548 JM10LT4017 Karkardooma

Providing additional circuit of

LTAB for dividing/Reducing the

load of LTAB of the area in

Bholanath nagar, Bihari Colony in

division DIV KKD.

36.49 FY 10-11 LT

549 JM10MS4022 Karkardooma

Replacement of O/H Service lines

in Bihari Colony, Bhola nath

Nagar, Vishwas Nagar, Kasrurba

Nagar etc in division

Karkardooma.

37.61 FY 10-11 LT

550 KN08LT4062 Krishna Nagar Replacement of LT cable at Silver

Park. 4.09 FY 10-11 LT

551 KN08RM4019 Krishna Nagar Installation of 3 way O/D RMU at

Kanti nagar Extension gali No.-5. 3.40 FY 10-11 HT

552 KN09LT4024 Krishna Nagar

Taking out 3 Nos, LT U/G feeder

from E Block Krishna Nagar Park

in District Krishna Nagar.

3.91 FY 10-11 LT

553 KN09LT4051 Krishna Nagar

Providing 4 Nos. LT Feeders from

Gagan Vihar Extension in division

Krishna Nagar.

5.42 FY 10-11 LT

554 KN09SS4140 Krishna Nagar

Installtion of Package Sub-station

990KVA+630KVA at Sarojani Park

Nale wala in Krishna Nagar.

(Master Plan Road)

24.14 FY 10-11 HT

555 KN09UT4093 Krishna Nagar

Augmentation of TRF 630KVA to

990KVA at Golden Park in division

Krishna Nagar

11.18 FY 10-11 HT

556 KN09UT4094 Krishna Nagar

Augmentation of Trf 630KVA to

990KVA at Baldev Park Musical

Fountain

11.15 FY 10-11 HT

557 KN10SH1044 Krishna Nagar Shifting of pole at H No 28 Govind

Park 0.06 FY 10-11 LT

558 KN10SH1045 Krishna Nagar Shifting of PCC pole at 26/1

Kureji Khas in D-KRN 0.06 FY 10-11 LT

559 KW09FA4049 Karawal Nagar

REP. OF EXISTING 11 KV

CABLE 3X240 XLPE INTO 3X300

XLPE FROM

MAHALAXMIENCLAVE TO

BHAGAT VIHAR IN DIV. KWR

12.39 FY 10-11 HT

560 KW09RM4086 Karawal Nagar

Installation of RMU at Khanni

Nagar DP in division Karawal

nagar.

5.67 FY 10-11 HT

561 KW09RM4091 Karawal Nagar

Installation of RMU at D-Block

Sonia Vihar 3rd Pusta in division

Karawal nagar.

3.86 FY 10-11 HT

Page 28: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

562 KW09RM4092 Karawal Nagar

Installation of RMU at E-2 block

Sonia Vihar near Gas godown

division Karawal nagar.

4.09 FY 10-11 HT

563 KW09RM4095 Karawal Nagar

Installation of Rmu at Gali No.-11

Sonia Vihar A-block Part-3 division-

Karawal nagar.

4.06 FY 10-11 HT

564 KW09RM4097 Karawal Nagar

Installation of RMU at A- Block

Shri Ram Colony in division

Karawal Nagar.

3.84 FY 10-11 HT

565 KW09UT4201 Karawal Nagar

Augementation of 100 KVA into

400 KVA Aat Nikka Factory

Tukmirpur Village in division

Karawal Nagar.

1.42 FY 10-11 HT

566 KY09LA2015 KCC Schemes

(BS-7071) Providing addl. Load of

150 KW making total load of 190

KW on HT system of supply under

MLHT category F/o IGL, CNG

Station Main Road, Geeta Colony,

Delhi

13.96 FY 10-11 HT

567 KY09LA2020 KCC Schemes

Providing addl. load of 80KW

making total 190KW under MLHT

category f/o IGL, CNG Station,

CBD Ground, Near Cross River

mall, Karkardooma, Delhi.

18.35 FY 10-11 HT

568 KY09LA2024 KCC Schemes

Amalgamation and addl. load of

219KW making total 300KW

under MLHT(HT) category in f/o

Shyam Lal Collage, Delhi

18.24 FY 10-11 HT

569 KY09NC2022 KCC Schemes

Providing new load of 155KW

making total 155KW under

MLHT(HT) category f/o

Ex.Engg.(E) PWD, Gazipur

Flyover Crossing, NH-24, Delhi.

6.17 FY 10-11 HT

570 KY09NC2027 KCC Schemes

Providing new load of 198KW

making total 198KW on MLHT

(HT) category f/o IGL, CNG

Station, Vivek Vihar, Delhi.

18.24 FY 10-11 HT

571 KY10EL2020 KCC Schemes

Electrification of Plot No-7-B and

providing new load of 70KW under

NDLT category in f/o Gulshan

Kumar Jolly, 3rd floor, Plot No-7-

B, Rajindra Palace, Pusa Road,

Delhi.

26.49 FY 10-11 HT

572 KY10LA2006 KCC Schemes

Providing addl. Load of 110KW

making total 200KW under

MLHT(HT) category f/o Principal,

Janki Devi Memorial College, Sir

Ganga Ram Hospital Marg, Delhi

25.16 FY 10-11 HT

573 KY10LA2008 KCC Schemes

(BS-7093) providing addl. load of

125KW making total 250KW

under MLHT (HT) category f/o

Babu Banarasi Dass Edu. Society,

Northern India Engg. Coll, FC-26,

Shastri Park, Delhi.

5.47 FY 10-11 HT

574 KY10NC2002 KCC Schemes

Providing New load of 200KW

making total 200KW under

MLHT(HT) category in f/o Lok

Kalyan Samiti, 11-A, Sucheta

Bhawan, Vishnu Digamber Marg,

Delhi.

18.34 FY 10-11 HT

575 KY10NC2004 KCC Schemes

Providing new load of 1000KW

under MLHT(HT) category f/o M/s

Spirit Hotels and Resorts Pvt. Ltd.,

6-A, Community Centre,

Mandawali Fazalpur, delhi

5.88 FY 10-11 HT

Page 29: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

576 KY10NC2009 KCC Schemes

New load of (200+280)KW

making total 480KW under

MLHT(HT) category in f/o M/s

Kunal Foods Pvt. Ltd., Plot No-C,

Community Centre, Vivek Vihar,

Delhi.

7.70 FY 10-11 HT

577 KY10NC2015 KCC Schemes

Providing new load of 444KW

under MLHT(HT) category in f/o

S.S Infrastructure, 6-B,

Community Centre, Mandawali,

Fazalpur, Delhi.

5.20 FY 10-11 HT

578 KY10NC2016 KCC Schemes

Providing new load of 444KW

making total 444KW under

MLHT(HT) category on HT system

of supply f/o Indo Green

international, 6-C, comm.. centre ,

mandawali, fazalpur, Delhi

5.37 FY 10-11 HT

579 KY10NC2017 KCC Schemes

Providing new load of 100KW

under MLHT(HT) category in f/o

M/s Singhal Industries, K-1-A,

Vishnu Gali, New Mandoli Ind

Area, Delhi.

4.13 FY 10-11 HT

580 KY10NC2019 KCC Schemes

Providing new load of 656KW

making total 656KW under MLHT

category in f/o Principal, Maharaja

Agersen College, Vashundra

Enclave, Delhi.

8.28 FY 10-11 HT

581 KY10NC2023 KCC Schemes

Providing new load of 1413KW

making total 1413KW f/o Paliwal

Developers Ltd., 1-B, Distt.

Centre, Mayur Vihar.

8.34 FY 10-11 HT

582 KY10NC2025 KCC Schemes

Providing new load of 400KW

making total 400KW under

MLHT(HT) category in f/o M/s

Basant Project Ltd., Plot No-23,

Commercial Building, Rajendra

Palace, Delhi.

5.98 FY 10-11 HT

583 LN08LT4127 Laxmi Nagar

Laying of 1 No LT feeder from

Substaion No.- 20 FIE and Taking

3 Nos additional feeder on existing

Distribution Transfoemer

3.97 FY 10-11 LT

584 LN08LT4128 Laxmi Nagar

Laying of 3 Nos LT Feeders at

Substation No. 2 FIE Distribution

Transformer.

3.70 FY 10-11 LT

585 LN08LT4240 Laxmi Nagar Laying of 2 Nos. LT feeder from

Tikona Park Sub-station. 3.92 FY 10-11 LT

586 LN09LT1526 Laxmi Nagar Shifting pole at 333-334 West

Guru Angad Nagar ,Laxmi Nagar 0.09 FY 10-11 LT

587 LN09MS4508 Laxmi Nagar

Conversion of LT O/H Conductor

with LT AB at L Block, F Block ,

and E Block Laxmi Nagar.

64.76 FY 10-11 LT

588 LN09RM4008 Laxmi Nagar

Replacement of old & damaged

11KV panels at sub-station No-13

CGHS.

3.36 FY 10-11 HT

589 LN09RM4016 Laxmi Nagar

Replacement of old & damaged

11KV panels at Azad CGHS

Substation.

4.62 FY 10-11 HT

590 LN09RM4022 Laxmi Nagar

Replacement of Old & damaged

11 Panels at Ashirwad Enclave

CGHS Sub-station.

4.34 FY 10-11 HT

591 LN09RM4029 Laxmi Nagar

Replacement of old & damaged

11KV Panels at Akiriti CGHS Sub-

station.

5.09 FY 10-11 HT

592 LN09RM4049 Laxmi Nagar

Replacement of old & damaged

11KV Panels at Narwana

CGHS.Substation-2

4.98 FY 10-11 HT

Page 30: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

593 LN09RM4061 Laxmi Nagar

Replacement of old & damaged

11KV Panels at friends at Friend

CGHS substation.

4.69 FY 10-11 HT

594 LN09RM4065 Laxmi Nagar

Replacement of old & damaged

11 KV Panels at Subji mandi

Gazipur Substation.

3.21 FY 10-11 HT

595 LN09RM4066 Laxmi Nagar

Replacement of old & damaged

11KV panels at Substation at

substation no.-12 CGHS.

9.66 FY 10-11 HT

596 LN09SS4160 Laxmi Nagar

Installtion of additional 630KVA

Distribution Transformer , 1X4

WAY RMU & 5 NOS LT feeders

at DDA Flat Nirman vihar Sub-

station.

4.30 FY 10-11 HT

597 LN09UT4157 Laxmi Nagar

Augmentation of Trf 630KVA to

990KVA at Tikona Park Laxmi

Nagar.

2.59 FY 10-11 HT

598 LN09UT4164 Laxmi Nagar

Agumentation of 630 kVA DTR to

990 KVA DTR at E block vikas

marg laxmi nagar

10.65 FY 10-11 HT

599 LN09UT4280 Laxmi Nagar

Augmentation of 400KVA DTR to

990 KVA DTR at Kishan Kunj

Extension Sub-station.

9.87 FY 10-11 HT

600 LN09UT4290 Laxmi Nagar

Augmentation of 400 KVA DTR

TO 990 KVA DTR at Bank

Enclave Substation.

11.50 FY 10-11 HT

601 LN09UT4291 Laxmi Nagar

Augmentation of 2x630 KVA DTR

to 2x990 KVA DTR at Ramesh

park ahkara ss

21.29 FY 10-11 HT

602 LN09UT4292 Laxmi Nagar

Augmentation of 400 KVA DTR to

990 KVA DTR at Ek Minar Masjid

substation.

7.88 FY 10-11 HT

603 LN10SH1035 Laxmi Nagar

Shifting of 100KVA DTR and 3

Way O/D RMU at PandavNagar

NH-24 division Laxmi Nagar.

7.32 FY 10-11 HT

604 LN10SH1036 Laxmi Nagar

Shifting of High Tension Lines of

11000 Volts for the stretch from

shop plot No. 1 to shop plot No.

14, Pandav Nagar, Delhi.

6.24 FY 10-11 HT

605 M309FA4013 Mayur Vihar Ph-3

Replacement of 11 KV PILCA

Cable of Size 3*300Sqmm to

XLPE Cable 3*300 Sqmm from

Dallupura Grid to S/S C3 New

Ashok Nagar

11.28 FY 10-11 HT

606 M309FA4028 Mayur Vihar Ph-3

Conversion of O/H into U/G HT

Cable 3CX300MM from Indal

Public School to Mulla

Colony.Mayur Vihar Ph-III

15.00 FY 10-11 HT

607 M309NF4019 Mayur Vihar Ph-3

Providing HT 11 KV new feeder

from Dallupura Grid to C4 new

ashok nagar.

11.06 FY 10-11 HT

608 M310MS4051 Mayur Vihar Ph-3

Replacement of old damaged

feeder pillars at new Ashok Nagar

and Vasundhara enclave Mayur

Vihar Phase-3.

20.46 FY 10-11 LT

609 MV09EL2165Mayur Vihar Ph-

1&2

Providing street lightening

network at NH-24 crossing NOIDA

more to Chilla Regulator.(UP LINK

ROAD) Mayur Vihar

11.39 FY 10-11 HT

610 MV10EL1050Mayur Vihar Ph-

1&2

Electrification of Puneet CGHS at

Chilla Dallupura. 2.34 FY 10-11 LT

611 MV10LT4035Mayur Vihar Ph-

1&2

Replacement of old 2CX10Sqmm

Service Cable at Mayur vihar Ph-

1.

37.88 FY 10-11 LT

612 NN09MS4197 Nand Nagri

Replacement of Burnt out 1-PH

and 3-PH DB's at different location

at division Nand Nagri.

20.70 FY 10-11 LT

Page 31: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

613 NN09RM4005 Nand Nagri Installation of 2 Nos. 4 Way I/D

RMU at Jyoti Colony. 9.15 FY 10-11 HT

614 NN09RM4024 Nand Nagri

Installation of 3-Way I/D RMU at

Durgapuri Gali No-10 zone-2902,

division Nand Nagri.

4.76 FY 10-11 HT

615 NN09RM4026 Nand Nagri

Installation of 4-Way, I/D RMU at

Jagatpuri Zone-2902, division-

Nand Nagri.

5.14 FY 10-11 HT

616 NN09UT4178 Nand Nagri

Aug of 630 KVA distribution trf.

to 990 KVA at sudamapuri sub

station no-3

10.80 FY 10-11 HT

617 PG09MS4083 Paharganj

Replacement of old service lines

in LOP area of Chuna Mandi

Zone.Paharganj.

54.82 FY 10-11 LT

618 PN09LT4113 Patel Nagar

Replacement of off size bare

conductor into LTAB conductor at

East Patel Nagar 1 to 23 Block.

86.68 FY 10-11 LT

619 PN09RM4010 Patel Nagar

Replacement of RMU 3 Way oil

Type to 3 Way SF-6 I/D Type at

MES Sub-station division Patel

Nagar.

3.54 FY 10-11 HT

620 PN09UT4050 Patel Nagar

Augmentation of 630kVA to 990

KVA Transformer at 35 Block East

patel nagar.

10.40 FY 10-11 HT

621 PN09UT4061 Patel Nagar

Augmentation of Trf from 630

KVA to 990 KVA Trf. At Tin

Market in division Patel Nagar.

11.17 FY 10-11 HT

622 PN09UT4064 Patel Nagar

Augmentation of 2X630 to 2X990

KVA DTR at 22 Block West patel

nagar.

20.86 FY 10-11 HT

623 PN09UT4065 Patel Nagar

Augmentation of Trf 630 KVA to

990 KVA Trf. At S-block West

Patel Nagar.

2.94 FY 10-11 HT

624 PN09UT4067 Patel Nagar

Augmentation of Trf. from

630KVA to 990 KVA Trf. At 35

block west Patel nagar in division

Patel nagar.

11.02 FY 10-11 HT

625 PN09UT4068 Patel Nagar

Augmentation of Trf from 630

KVA to 990 KVA Trf. At Shakti

Mandir in division Patel Nagar.

11.24 FY 10-11 HT

626 PN09UT4069 Patel Nagar Augmentation of Trf. from 2X630

to 2X990 KVA at Puja Park. 21.15 FY 10-11 HT

627 PN10LT4054 Patel Nagar

Replacement of off size bare

conductor into LTAB Cable at

Anand Parvat area in division Patel

Nagar.

73.24 FY 10-11 LT

628 SR08LT4023 Shankar Road

Replacement /new 1 no. LT

Feeders from existing 990KVA

Transformer at Joshi Road (K)

Substation.

6.55 FY 10-11 LT

629 SR09LT4045 Shankar Road

Laying of 2nos. LT feeders from

Newly proposed 400KVA DTR at

Kazoor Road (K).

8.32 FY 10-11 LT

630 SR09LT4083 Shankar Road

Replacement of old bare

conductor in to LTAB Cable in the

area of sub -division Puas Road

division Shankar Road.

48.48 FY 10-11 LT

631 SR09LT4084 Shankar Road

Replacement of off Size bare

conductor in to LTAB cable Iin the

area of Chaperwala Sub division

Shankar Road.

45.38 FY 10-11 LT

632 SR09MS4024 Shankar Road

Replacement of existing 11KV

O/H Khalsa College line by 11KV

HT AB Cable.

10.25 FY 10-11 HT

633 SR09MS4025 Shankar Road

Replacement of existing 11KV

O/H Ahata Kidara line by 11KV

HTAB Cable..

7.84 FY 10-11 HT

Page 32: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

634 SR09RM4006 Shankar Road Replacement of 7 Panel board at

A.S Nala (K) Substation. 4.71 FY 10-11 HT

635 DG09SL2124 Daryaganj

Providing street lighting network

for Park and Ride Project from

Geeta colony Bridge to Simplex

Office near Velodrome Road (

New Ring Road Bye Pass).

30.39 FY 10-11 LT

636 DG09SS2093 Daryaganj

Installtion of 100 KVA

Transformer at Yamuna Barrage

S/stn.for providing street light

connection to PWD in Div. Darya

Ganj.

8.87 FY 10-11 HT

637 DG10SH1019 Daryaganj

Conversion of LT O/H System

into U/G system at Netaji Subhash

Marg from Delhi Gate to Kabuter

Market in Distt: Darya Ganj

124.35 FY 10-11 LT

638 DL10MS4067 Dilshad Garden

Installation of a newly feeder Pillar

at 56 A Damodar Park for

Providing new connection against

TF M/s Tayal Engineering works.

1.60 FY 10-11 LT

639 JM10LT4088 Karkardooma

Providing U/G Cable of

4CX300Sqmm for new connection

of 160KW at CBD-III Grid.

3.81 FY 10-11 LT

640 JM10MS4025 Karkardooma

Replacement of Burnt/ Bypassed

DB's in Bihari Colony, Bhola Nath

Nagar, New Sanjay Amar colony

in division Karkardooma.

20.94 FY 10-11 LT

641 KN09LT4003 Krishna Nagar Replacement of LT feeders from

Nehru Gali to Nehru Gali Chowk. 2.24 FY 10-11 LT

642 KN09LT4056 Krishna Nagar Replacement of LT feeder from

Govind Park Sub-station. 1.74 FY 10-11 LT

643 KN09MS4143 Krishna Nagar

Conversion O/H network into U/G

network on MCD Road at Krishna

nagar

0.14 FY 10-11 LT

644 KN09MS4144 Krishna Nagar

Conversion O/H network into U/G

network on PWD Road at Krishna

nagar

5.18 FY 10-11 LT

645 KW09FA4042 Karawal Nagar

Rep. of existing 11 KV 3X240

Sqmm XLPE into 3X300 Sqmm

XLPE from Chandu Nagar to A

Blk. Nehru Vihar in Div. KWR.

9.15 FY 10-11 HT

646 KW09NF4053 Karawal Nagar

Providing interconnector between

substation no.-4 Karawal nagar to

C block Mukund Vihar in division

Karawal Nagar.

3.49 FY 10-11 HT

647 KW10UT4075 Karawal Nagar

Augmentation of 100KVA into 400

KVA Transformer at Delhi Police

Camp.

1.91 FY 10-11 HT

648 KY10NC2007 KCC Schemes

Providing new load of 765KW

making total 765KW under

MLHT(HT) category in f/o

Ex.Engg.(SDW) XIII, DJB, 90

MGD EPS, Wazirabad Road,

Yamuna Vihar, Delhi.

6.33 FY 10-11 HT

649 KY10NC2010 KCC Schemes

providing new load of 2452KW

under MLHT category in F/O M/s

Eros Resorts & Hotels Pvt. Ltd.,

Plot No-13A, Distt. Centre, Mayur

Vihar-I, Delhi

8.87 FY 10-11 HT

650 KY10NC2011 KCC Schemes

providing new load of 2281KW

under MLHT category in F/O M/s

Eros Resorts & Hotels Pvt. Ltd.,

Plot No-13B, Distt. Centre, Mayur

Vihar-I, Delhi.

13.35 FY 10-11 HT

Page 33: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

651 KY10NC2012 KCC Schemes

Providing new load of 2000KW

under MLHT(HT) category in f/o

IFCI Ltd. (Novman Ahmed), Plot

No-4A, Distt. Centre, mayor vihar,

phase-I, delhi.

5.77 FY 10-11 HT

652 KY10NC2022 KCC Schemes

Providing new load of 200KW

under MLHT category in f/o DTC,

Park & Ride, Behind Rajghat

Power House, Delhi.

8.36 FY 10-11 HT

653 LN08LT4255 Laxmi Nagar

Laying of 2 Nos. LT feeder from

Kuldeep Nursingh Home Sub-

station.

4.47 FY 10-11 LT

654 LN09LT4135 Laxmi Nagar

Laying of one No. LT feeder

4CX300sq mm XLPE Cable from

Ramesh Park Akahara Sub-station

to R-51 Ramesh Park Laxmi

nagar.

3.35 FY 10-11 LT

655 LN09MS1517 Laxmi Nagar Shifting of pole at D-65 at Laxmi

Nagar. 0.14 FY 10-11 LT

656 LN09MS1527 Laxmi Nagar Shifting of pole at B-120 Pandav

Nagar. 0.11 FY 10-11 LT

657 LN09RM4055 Laxmi Nagar

Replacement of old & damaged

11KV Panels of old & Damaged

11KV Panels at Ramakrishna

CGHS Substation-1.

4.23 FY 10-11 HT

658 LN09RM4056 Laxmi Nagar

Replacement of Old & damaged

11KV Panels at Ramakrishna

CGHS Sub-station-2.

4.21 FY 10-11 HT

659 LN09SH1528 Laxmi Nagar

Providing of street lightening

network at Akshardham Temple

flyover near NOIDA More NH-24.

8.32 FY 10-11 LT

660 LN10EL1003 Laxmi Nagar

Electrification of Police station and

staff quarter at Madhu Vihar

division Laxmi nagar.

0.51 FY 10-11 LT

661 LN10EL1042 Laxmi Nagar

Electrification of Plot No. 2 LSC

Mandawali Fazalpur (Near Prince

& Kothari CGHS), Delhi.

0.10 FY 10-11 LT

662 M309MS4116 Mayur Vihar Ph-3

Estimate for conversion of O/H

lines to U/G at PWD Roads in

Mayur Vihar Phase-III.

1.73 FY 10-11 LT

663 M309MS4117 Mayur Vihar Ph-3

Estimate for conversion O/H lines

into U/G at MCD Roads in Mayur

Vihar Phase -III.

2.19 FY 10-11 LT

664 M309RM4007 Mayur Vihar Ph-3

Replacement of 11 KV 3 Way

Panel Board at 10 MGD STP

Kondli.

3.43 FY 10-11 HT

665 MV09AT4071Mayur Vihar Ph-

1&2

Prov. of 400KVA

Add.Transformer at J Blk East

Vinod Nagar

2.14 FY 10-11 HT

666 MV09AT4087Mayur Vihar Ph-

1&2

Provision of Add.630 KVA Tr. at

S/Stn No-7,Pkt-1,MVR-I 2.09 FY 10-11 HT

667 MV10EL1001Mayur Vihar Ph-

1&2

Electrification of commercial

building at Plot No. 3, LSC B-

Block Mayur Vihar Ph-2 Delhi.

0.14 FY 10-11 HT

668 NN09RM4027 Nand Nagri

Installation of 4-Way I/D RMU at

Gokulpur Naharwala zone-2902,

division Nand Nagari.

4.17 FY 10-11 HT

669 NN09RM4033 Nand Nagri

Installation of 4-Way I/D RMU at

Meet nagar B- block Zone -2902,

division- Nanad Nagri.

4.16 FY 10-11 HT

670 PN08LT4003 Patel Nagar Addition of 20Nos. LT feeder from

PS Road sub-station. 2.13 FY 10-11 LT

671 SR09AT4011 Shankar Road

Installation of Additional 400 Kva

Transformer At Khajoor Road (K)

S/Stn.

2.93 FY 10-11 HT

672 SR09AT4017 Shankar Road Installation of Additional 400 KVA

DTR at Janta Market in D-SRD. 2.78 FY 10-11 HT

Page 34: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

673 SR09LT4030 Shankar Road

Laying of 2 Nos. new LT feeders

from old Salwan to 34 Block, Old

Rajinder Nagar. Shankar Road.

3.76 FY 10-11 LT

674 SR09RM4056 Shankar Road Installation of 3 way RMU at

Hathiwala chowk Substation. 3.23 FY 10-11 HT

675 YV09LT4003 Yamuna Vihar

Replacement of LT Cable at

Rajuwala sub-station. Yamuna

vihar.

3.16 FY 10-11 LT

676 DL09FA4034 Dilshad Garden

REPLACEMENT OF 11 KV HT

CABLE PILCA TO 3X300 XLPE

FROM MOTIRAM ROAD TO

RADH

10.05 FY 10-11 HT

677 DL09FA4039 Dilshad Garden

REPLACEMENT OF HT 11 KV

CABLE INTO 3X300 SQ.MM.

FROM 4-POLE DP TO

BHARTIYA

7.55 FY 10-11 HT

678 DL09LT4043 Dilshad Garden T/O 2 Nos. LT Feeder from

Existing 2X990KVA Transformer 3.72 FY 10-11 LT

679 DL09RM4016 Dilshad Garden

Replacement of RMU at D-

Pocket Sub-station (Inside)

Dilshad garden.

3.29 FY 10-11 HT

680 DL09RM4018 Dilshad Garden Installation of RMU at Khera

Village substation. 4.57 FY 10-11 HT

681 DL10SH1097 Dilshad Garden

(BS-3741) Dismantling & Shifting

of Sub-station in F/O Rajiv Gupta

& Ajay Gupta, B-8, Jhilmil

Industrial area, Delhi.

0.20 FY 10-11 HT

682 KW09NF4153 Karawal Nagar

PROVIDING NEW FDR. FROM

KARAWAL NAGAR GRID TO

KAMAL VIHAR VIA MTNL DP IN

DIV-KWR

11.63 FY 10-11 HT

683 KW09NF4207 Karawal Nagar

PROV. NEW FEEDER

KARAWAL NAGAR GRID TO

DEVI NAGAR SHIV VIHAR IN

DIV-KWR

15.98 FY 10-11 HT

684 KW09NF4208 Karawal Nagar

PROV. NEW FEEDER

KARAWAL NAGAR GRID TO SBI

KARAWAL NAGAR IN DIV-KWR

4.46 FY 10-11 HT

685 KW09NF4247 Karawal Nagar

PROV. NEW FEEDER

KARAWAL NAGAR GRID TO

CHAMAN PARK IN DIV. KWR

10.77 FY 10-11 HT

686 KW09RM4076 Karawal Nagar Instalation of RMU at Devi Nagar 3.39 FY 10-11 HT

687 KW09RM4082 Karawal Nagar Instalation of 1x4way at D-Block

Dayalpur 5.55 FY 10-11 HT

688 KW09RM4083 Karawal Nagar Instalation of RMU at G-block

Bhagirathi Vihar 3.45 FY 10-11 HT

689 KW10MS4116 Karawal Nagar

N/C OF 25KW IN F/O TATA

TELE SERVICES AJAY KOSHIK

H.NO-18/2 GALI NO-6PH-4 SHIV

VIHAR

1.83 FY 10-11 HT

690 KY10NC2026 KCC Schemes

(BS-7110) Providing new load of

300KW under MLHT(HT) category

in f/o Chintamani Commodities, A-

20, Jhilmil Ind Area, Delhi.

4.85 FY 10-11 HT

691 KY10NC2028 KCC Schemes

Providing new load of 200KW

making total 200KW under

MLHT(HT) category in f/o Jasmeet

Singh Marwah, 10-B, Rajindra

Park, Pusa Road, New Delhi.

6.19 FY 10-11 HT

692 NN09RM4001 Nand Nagri Installation of RMU at STP Plant

near DP. 3.64 FY 10-11 HT

693 PG09AT4110 Paharganj ADDL. INSTALLATION OF

630KVA TRF. AT MANTOLA S/S 2.52 FY 10-11 HT

Page 35: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

694 PG10MS1026 Paharganj Estimate for shifting of HT Cables

in Pahar Ganj division. 0.81 FY 10-11 HT

695 PN09UT4054 Patel Nagar

Augmentation UG. OF 2X630 TO

2X990 KVA DTR AT 12 BLK

EAST PATEL NAGAR

2.95 FY 10-11 HT

696 PN10LT2057 Patel Nagar Electrification of Jal Board Colony

at Patel Road. 1.32 FY 10-11 LT

697 SR08RM4069 Shankar Road Installation of 3 Way RMU at

Raiseena Over Head. 3.27 FY 10-11 HT

698 SR09LT4026 Shankar Road Laying of 4 New Feeder from New

Salwan sub-station. 15.60 FY 10-11 LT

699 SR09LT4027 Shankar Road Laying of 1 new Feeder from 21

Block ORN Sub-station. 7.59 FY 10-11 LT

700 SR09LT4028 Shankar Road Laying of 2 new Feeder from

Sindhi Park Sub-station. 3.33 FY 10-11 LT

701 SR09LT4032 Shankar Road Replacement of 1 N0 LT feeder

from 17 B Bazar Marg. 3.91 FY 10-11 LT

702 SR09LT4033 Shankar Road Replacement of 1 No LT Feeder

from Nehru Park. 3.82 FY 10-11 LT

703 BYSCADA0809 BYPL SCADA SCADA Change Management 107.95 FY 10-11 Others

704 DELGIY4002 BYPL GIS Geographical Information System 579.03 FY 10-11 Others

705 BY08ITISU BYPL SAP ISUImplementation Project of SAP-

ISU/CCS Phase-1400.57 FY 10-11 Others

706 CC09CV4053 Chandni Chowk

Civil works for installation of RO in

various offices, Grid & S/Stn.

under CCK.

0.48 FY 10-11 Others

707 CC10CV4026 Chandni ChowkLaying of RMC, raising of low

laying plinth (D)CCK3.14 FY 10-11 Others

708 DG09CV4048 Daryaganj

Civil works for installation of RO in

various offices, Grid & S/Stn.

under DRG.

1.31 FY 10-11 Others

709 DG09CV4070 Daryaganj

Providing Tr. Encloser & SGR

floor raising at Rajendra Bhawan

Sub- Station (D) DRG

1.61 FY 10-11 Others

710 DG09CV4071 Daryaganj

C/O of Toe wall & Providing

fencing at Mohalla Kabristan (D)

DRG

1.46 FY 10-11 Others

711 DG09CV4073 Daryaganj

Repair of floor & transformer top

encloser at Bulbuli Khanna (D)

DRG

1.73 FY 10-11 Others

712 DG10CV4021 DaryaganjCivil work at 33 KV Grid Bldg

.G.B.Pant (D) DRG14.98 FY 10-11 Others

713 DG10CV4025 Daryaganj

Renovation of Toilet block, flooring

in Control room and Electrical

work at IG Grid S/Stn (D) DRG

4.10 FY 10-11 Others

714 DL09CV4059 Dilshad Garden

Civil works for installation of RO in

various offices, Grid & S/Stn.

under Dilshad Garden

0.43 FY 10-11 Others

715 DL09CV4078 Dilshad Garden

Repair of Kiosk & PL/M s/stn. at

E- Block New Seema Puri in Div.

Dilshad garden.

3.68 FY 10-11 Others

716 DL09CV4080 Dilshad GardenRepair of fencing at PL/M

s/stn.Khera Village (D) DGN1.12 FY 10-11 Others

717 JM09CV4100 Karkardooma

Civil works for installation of RO in

various offices, Grid & S/Stn.

under JLM

1.08 FY 10-11 Others

718 KN09CV4062 Krishna Nagar

Civil works for installation of RO in

various offices, Grid & S/Stn.

under KRN.

0.77 FY 10-11 Others

719 KW09CV4109 Karawal Nagar

Civil works for installation of RO in

various offices, Grid & S/Stn.

under KWN.

0.39 FY 10-11 Others

720 KW09CV4154 Karawal NagarRepair of fencing / plinth at PL/M

s/stn at Dayalpur Tanki D-KWR.1.64 FY 10-11 Others

721 LN09CV4153 Laxmi Nagar

Civil works for installation of RO in

various offices, Grid & S/Stn.

under LNR2.47 FY 10-11 Others

Page 36: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

722 LN09CV4248 Laxmi Nagar

P/F fencing around and top of

West Angad Nagar & Pluto school

S/Stn. Inside school premises

under LNR.

2.15 FY 10-11 Others

723 LN09CV4340 Laxmi Nagar

Repairing & raising of fencing &

floor at Gazipur school S/Stn.

under LNR.

0.63 FY 10-11 Others

724 M309CV4038 Mayur Vihar Ph-3

Civil works for installation of RO in

various offices, Grid & S/Stn.

under MVR-III

0.26 FY 10-11 Others

725 MV09CV4041Mayur Vihar Ph-

1&2

Civil works for installation of RO in

various offices, Grid & S/Stn

Mayur Vihar Sub-station.

0.31 FY 10-11 Others

726 MV09CV4043Mayur Vihar Ph-

1&2

Repairing of unattended 11kv

s/stn. at Block - 31 TKP (D)

MVR-PH 1 & 11.

3.02 FY 10-11 Others

727 NN09CV4111 Nand Nagri

Civil works for installation of RO in

various offices, Grid & S/Stn.

under NNG

0.38 FY 10-11 Others

728 NN09CV4140 Nand NagriRepair Work of PL/M & Steel

Kiosk at Mandoli Main Road1.43 FY 10-11 Others

729 NN09CV4144 Nand Nagri

Raising & repair of fencing &

repair of Massonary Kiosk at F-1,

Sunder Nagari

1.72 FY 10-11 Others

730 PG09CV4079 Paharganj

Civil works for installation of RO in

various offices, Grid & S/Stn.

under PHG.

0.71 FY 10-11 Others

731 PG09CV4091 PaharganjRepair to Fencing at Gali Zamir &

covering at Neem wali (D) PHG.0.72 FY 10-11 Others

732 PG09CV4098 Paharganj

Covering of Tr. by Providing mesh

at Mantola , Mother dairy & MCD

school(Dispensary) s/stn. (D)

PHG.

2.75 FY 10-11 Others

733 PN09CV4043 Patel Nagar

Civil works for installation of RO in

various offices, Grid & S/Stn.

under PNR.

0.61 FY 10-11 Others

734 PN10CV4031 Patel NagarCivil work at 33 KV grid DMS

Patel Nager21.53 FY 10-11 Others

735 SR08CV4097 Shankar Road

Raising of plinth & other Civil work

at Shastri Park Switching Sub-

station Shankar Road.

0.88 FY 10-11 Others

736 SR09CV4066 Shankar Road

Civil works for installation of RO in

various offices, Grid & S/Stn.

under SRD.

0.59 FY 10-11 Others

737 SR09CV4091 Shankar RoadRepair of fencing at Khalsa

College,Ramjas & Tibia (D) SRD.1.19 FY 10-11 Others

738 YV09CV4104 Yamuna Vihar

Civil works for installation of RO in

various offices, Grid & S/Stn.

under YVR.

0.42 FY 10-11 Others

739 YV09CV4121 Yamuna Vihar

Repair of Steel Kiosk & PL/M

s/stn. at Vijay Park Jafarabad

Road in Div. Yamuna Vihar.

0.97 FY 10-11 Others

740 YV09CV4122 Yamuna Vihar

Repair of PL/M s/stn. & Steel

Kiosk at E- Block Seelampur in

Div. Yamuna Vihar.

1.84 FY 10-11 Others

741 YV09CV4123 Yamuna Vihar

Repair of PL/M s/stn. & Steel

Kiosk at Ist Pusta Usmanpur in

Div. Yamuna Vihar.

1.20 FY 10-11 Others

742 YV09CV4125 Yamuna Vihar

Covering of Top with IRC welded

mesh fencing and repairing at

Chauhan Bangar s/stn. School

Gali No.10 & repair of fencing at

S/stn gali no -5 Chauhan Banger

Div. YVR.

3.96 FY 10-11 Others

743 EC04IF3540 EHV Central

Laying of 4 Nos. 33 kV

3x400sqmm XLPE cable from

RPH bay no 19 and 20 to Kamla

Market.

658.52 FY 09-10 EHV

Page 37: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

744 EC04IF3573 EHV Central

Laying of 2 nos. 33kV, 3x400 mm²

XLPE cables from 33/11kV

Shankar Rd to 33/11kV DMS grid

s/stn.

307.13 FY 09-10 EHV

745 EC07IF1504 EHV Central

Providing new load of 10MVA

under MLHT category on HT 33

KV system of supply in f/o MCD

Civic Centre ,J,L Nehru Marg

Minto Road New Delhi

279.51 FY 09-10 EHV

746 EC08FA4009 EHV Central

Augmentation of the existing

balance O/H portion of 33KV

feeder from bay no.31 IP station to

IG stadium.

56.35 FY 09-10 EHV

747 EC08SH1010 EHV Central

Shifting of 33 KV O/H line due to

the construction of Over Head

Elevated Structure by by DMRC

at Vande Matram Marg.

61.97 FY 09-10 EHV

748 EE07SH1501 EHV East

Part Conversion of 66 kV D/C T/L

(Patparganj Industrial Area –

Vivek Vihar) infringing MRTS

Corridor (Anand Vihar – Vaishali)

112.24 FY 09-10 EHV

749 EE07SH1507 EHV East

Shifting of 66 kV D/C Tower Lines

at NH-24 on account of widening

of NH-24 from 4 lane to 8 lane

from Patpar Gang to Ghazipur

183.48 FY 09-10 EHV

750 EE08SH1011 EHV East

Shifting of 66 KV Double circuit

tower line between 220KV Gazipur-

Vivek Vihar on account of

construction of underpass by

PWD on road no 56

221.32 FY 09-10 EHV

751 EE08SH1014 EHV East

Shifting of 66 KV 3 Nos

1X630sqmm XLPE cables from

Vivek Vihar Dilshad Garden on

account of construction of

Underpass by PWD on road No.

56.

II. Shifting of 33 KV existing

U/Gcircuits at road No. 56, Apsara

Border road intersection due to

construction of grade Separator by

PWD

66.81 FY 09-10 EHV

752 EE08SH4045 EHV East

Shifting of 33kv U/G 3x400 sqmm

XLPE cable from 33kv shakarpur

grid to patparganj grid.

18.76 FY 09-10 EHV

753 EE09IF4013 EHV East

Laying of interconnector with 2

nos 33 KV 3X400 sq. mm XLPE

Cable KKD Grid to CBD-2 GRID

and Laying of inter connector with

2 nos 33 kv 3x400 sq. mm XLPE

Cable from CBD-1 Grid to CBD-2

Grid.

4.30 FY 09-10 EHV

754 EE09SH1002 EHV East

DTTDC Nandnagri Road No. 56

Shifting of 33KV Feeders on a/c of

construction of RUB & ROB

73.70 FY 09-10 EHV

755 KN08MS4200 Krishna Nagar

LT APFC Panel Scheme For Div.

KRN aganist DERC Approval (06-

07) for 2 No. of 200 KVAR and 13

No. of 300 KVAR

48.84 FY 09-10 LT

756 KN08MS4201 Krishna Nagar

Installation of 7 No LT APFC Panel

200 KVAR in S/Stns S/Divn Geeta

Colony In D-KRN

19.62 FY 09-10 LT

757 LN08MS4347 Laxmi NagarInstallation of LT APFC Panel In

Div. LNR47.20 FY 09-10 LT

758 M308MS4087 Mayur Vihar Ph-3

LT APFC Panel Scheme for Div

MVR 3 against DERC approval

(06-07) For 6 Nos of 200 KVAR

15.06 FY 09-10 LT

Page 38: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

759 CC06FA4061 Chandni ChowkReplacement of Old sick Pilca

cable feeding to Railway audit.5.48 FY 09-10 HT

760 CC06FA4084 Chandni Chowk

Replacement of old 11 KV HT

cable 3x300 MM2 from Lahori gate

to Novelty s/stn in D-CCK

16.10 FY 09-10 HT

761 CC06FA4098 Chandni ChowkLaying of HT Cable 3X300 MM2

from Engg College to GPO D-CCK30.00 FY 09-10 HT

762 CC06FA4100 Chandni Chowk

Laying of HT Cable 3X300 mm2

from Monkey Bridge to Elct.

Crematorium in D-CCK.

29.41 FY 09-10 HT

763 CC06FA4101 Chandni Chowk

Laying of HT Cable 3X300 MM2

from Bela Road to Monkey Bridge

Via Priya Darshni & Vijay Ghat

Pump Station in D-CCK

27.28 FY 09-10 HT

764 CC06FA4109 Chandni Chowk

Rep. of old 11 K V HT cable 3x300

mm2 from Fountain grid to railway

power house s/stn in D-CCK

17.46 FY 09-10 HT

765 CC06RM4050 Chandni Chowk

Replacement of old 7panel board

with 2 Nos 4 way I/D SF6 RMU at

Ghee Mandi S/Stn in Div CCK

12.51 FY 09-10 HT

766 CC06RM4090 Chandni ChowkRep of old panel by 4 way RMU at

Katra Bariyan s/stn in D-CCK6.35 FY 09-10 HT

767 CC06RM4091 Chandni ChowkRep of old panel by 4 way RMU at

CLOTH MKT s/stn in D-CCK5.59 FY 09-10 HT

768 CC06RM4094 Chandni ChowkRep of old panels by 4 Way RMU

at S N Mkt S/Stn in D-CCK.6.07 FY 09-10 HT

769 CC06RM4121 Chandni ChowkInstallation of 4 Way RMU at

Railway P/H S/Stn.5.84 FY 09-10 HT

770 CC06RM4123 Chandni ChowkInstallation of 4 Way RMU at

Subhash Marg in D-CCK5.68 FY 09-10 HT

771 CC06RM4126 Chandni ChowkRep of old RMU at Nigam Bhawan

S/stn in D- CCK4.01 FY 09-10 HT

772 CC08FA4036 Chandni ChowkRep of old cable CM Rd to SP

Marg via car parking s/stn3.51 FY 09-10 HT

773 CC08LT4014 Chandni Chowk

Laying of LT feeder from

Allahabad Bank feeder Pillar to

Katra Subhas in D-CCK

29.75 FY 09-10 LT

774 CC08LT4015 Chandni Chowk

Stringing of LT 2 Nos LT Feeder

from Cherkhey Walan to 1)Mohlla

Desan 2)Kubrapeepal in D-CCK

3.55 FY 09-10 LT

775 CC08LT4016 Chandni Chowk

Stringing of LT Feeder from

Barsabolla to Gali Logey Wali in D-

CCK

1.71 FY 09-10 LT

776 CC08LT4018 Chandni Chowk

Stringing of LT Fdr from Gali

Sehtara towards Barat Ghar in D-

CCK

1.42 FY 09-10 LT

777 CC08LT4019 Chandni Chowk

String of 2 LT feeder from Lal

Kuan DMS to 1)Gali Meer Jumla

2)Main Road Lal Kuan in D-CCK

1.32 FY 09-10 LT

778 CC08LT4020 Chandni ChowkStringing of LT Feeder from

Rodrgran to Maqbara in D-CCK0.94 FY 09-10 LT

779 CC08LT4033 Chandni ChowkConversion of old conductor /Span

into LTAB Cable in D-CCK.119.97 FY 09-10 LT

780 CC08LT4037 Chandni Chowk

Laying of 2 No LT feeder from

Fountain to Gurudawara Feeder

Pillar & Maharashtra Bank Feeder

Pillar

3.68 FY 09-10 LT

781 CC08LT4057 Chandni Chowk

Laying of two Nos Guru Nanak

Mkt S/Stn to Bara Bazar & Subzi

Mandi

2.41 FY 09-10 LT

Page 39: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

782 CC08LT4059 Chandni Chowk

Laying of LT feeder from Balmiki

Mandir Feeder Pillar to Ram

Misthan Feeder Pillar in Chandni

Chowk.

3.64 FY 09-10 LT

783 CC08LT4060 Chandni Chowk

Laying of four LT cable at M bridge

Pkg - F.P.1&2, Flower shop

Suthare shah.

5.71 FY 09-10 LT

784 CC08LT4063 Chandni ChowkLaying of LT fdr from SN Mkt to

Masjid Tewar Khan in D-CCK1.79 FY 09-10 LT

785 CC08LT4064 Chandni Chowk

Stringing of 1 No LT fdr from Ghee

Mandi to Chaman Wara in D-

CCK

1.75 FY 09-10 LT

786 CC08MS4053 Chandni ChowkLT Clean Up work in the area of

Lahori Gate Sub Div in D - CCK100.94 FY 09-10 LT

787 CC08MS4054 Chandni ChowkLT Clean Up in the area of Laj Pat

Rai Mkt Sub Div in D- CCK101.19 FY 09-10 LT

788 CC08MS4055 Chandni ChowkLT Clean Up in the area of

Hemilton Road S/Div in D- CCK83.18 FY 09-10 LT

789 CC08RM4061 Chandni ChowkInst.1Way RMU at Dewan hall D-

CCK2.54 FY 09-10 HT

790 CC08SH1065 Chandni Chowk

Shifting of existing kiosk S/Stn.of

M.C.D.office complex at Old Hindu

College building Kashmeree gate

to the new permanent structure in

Distt : C C K

1.68 FY 09-10 HT

791 CC08UT4022 Chandni ChowkAug of 630 KVA Trf into 990 KVA

at Kachha Bag in D- CCK0.41 FY 09-10 HT

792 CC09LT4023 Chandni ChowkStringing of one LT feeder from KT

Khushal Trf-3 to Ram Mandir.1.23 FY 09-10 LT

793 CC09LT4024 Chandni ChowkStringing of 1 LT Feeder from

Roshanpura Trf to Chowk.0.91 FY 09-10 LT

794 CC09LT4025 Chandni ChowkStringing of 2 LT Feeder Pt

brothers-Shriram to Nai sarak2.73 FY 09-10 LT

795 CC09LT4029 Chandni ChowkStringing of 1 LT feeder Naya

Bans Pkg to Makkhan Lal.0.57 FY 09-10 LT

796 CC09LT4030 Chandni ChowkStringing 2 LT Feeder S.N.Mkt

Back/Main Side G.B.Road.2.99 FY 09-10 LT

797 CC09LT4034 Chandni ChowkStringing 2 LT Fdr Novelty to

Baradari, Chandni Chowk.1.50 FY 09-10 LT

798 CC09LT4035 Chandni Chowk

Stringing 1 LT Fdr Jai Puria to

Tilak Bazar Corne, Chandni

Chowk.

1.03 FY 09-10 LT

799 CC09LT4037 Chandni ChowkTaking out of 1 LT Feeder New

Hauz Qazi to 2868 Sirkiwalan.3.25 FY 09-10 LT

800 CC09LT4038 Chandni Chowk

Taking out 2 LT Feeder P.S Hauz

3439 Gali Faraqtulla, Chandni

Chowk.

3.93 FY 09-10 LT

801 CC09LT4040 Chandni ChowkT/O 2 LT Feeder Lambi Gali 3175

Galivakil- Behind School1.46 FY 09-10 LT

802 CC09LT4041 Chandni ChowkT/O 2 LT Feeder Laldarwaj 1832

Lal Darwaja 185 Laldarwaja1.20 FY 09-10 LT

803 CC09MS4042 Chandni Chowk

LT Clean-Up from Kumar S/S up

to T/Hall Main Chandni Chowk

Road in D-CCK

80.73 FY 09-10 LT

804 CC09MS4043 Chandni ChowkLT Clean-Up from Lahorigate

Chowk to Ajmeri Gate in D-CCK74.01 FY 09-10 LT

805 CC09MS4044 Chandni ChowkLT Clean-Up from Barsaboola to

New Hauz Qazi in D-CCK77.74 FY 09-10 LT

806 CC09RM4005 Chandni Chowk

Replacement of old MEI make

existing 3 way RMU at Nigam

bodh Pump House.

3.24 FY 09-10 HT

807 CC09RM4006 Chandni Chowk

Replacment of old MEI make

existing 3 way RMU at Railway

Auditorium.

3.20 FY 09-10 HT

808 CC09UT4012 Chandni Chowk

Augmentation of 630 KVA

Transformer into 990 KVA at

Novelty Cinema Substation.

1.16 FY 09-10 HT

Page 40: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

809 DG05FA4159 Daryaganj

Conversion of HT O/H system into

U/G system between WHO to

CNG S/Stn

28.12 FY 09-10 HT

810 DG06FA4231 Daryaganj

Replacement of old sick HT PILCA

cable into HT 3Cx300 MM2 XLPE

cable from New LNJP s/stn to Bal

Bhawan s/stn Via Old

LNJP,MAMC Dental Wing &

MAMC in Div. Darya Ganj.

36.54 FY 09-10 HT

811 DG06FA4233 Daryaganj

Replacement HT PILCA cable into

HT 3Cx300 MM2 XLPE cable from

Sheesh Mahal s/stn to Ganj Meer

Khan s/stn in Div. Darya Ganj.

2.90 FY 09-10 HT

812 DG06FA4234 Daryaganj

Replacement & Re-routing of old

sick mixed (PILCA+XLPE) cable

into HT 3Cx300 mm2 XLPE cable

from Minto Road H/Complex to 84-

Ghanta S/stn in Div. Darya Ganj.

65.72 FY 09-10 HT

813 DG06FA4236 Daryaganj

Replacement & Re-rouiting of Part

PILCA porion of HT Feeder

Gandhi Nidhi to Rose Garden

S/stn into HT 3cx300 MM2 XLPE

cable from Gandhi Nidhi to Corner

of Gulab Vatika in Div. Darya

Ganj.

2.67 FY 09-10 HT

814 DG06NF4239 Daryaganj

T/O New 11 HT feeder from

Ghandi Darshan S/stn to Kanchan

Puri S/stn in Div. Darya Ganj.

8.61 FY 09-10 HT

815 DG07SH1518 Daryaganj Shifting of electric services due

to widening of minto road bridge4.01 FY 09-10 LT

816 DG08AT4041 Daryaganj

Installation of additional 400 KVA

Transformer at Bachoo Ka Ghar

s/st. in Div. Darya Ganj.

2.80 FY 09-10 HT

817 DG08CV4114 DaryaganjRepair & raising of fencing & floor

at DAG II s/stn. (D)DRG ..0.98 FY 09-10 Others

818 DG08FA4084 Daryaganj

Conversion of HT O/H system into

U/G system & augmentation of HT

cable into 3X300MM2 cable from

Gandhi Nidhi to Gandhi Darshan S-

Stn

26.47 FY 09-10 HT

819 DG08LT4063 Daryaganj

T/O of new 3 No.LT O/H feeder of

size 4Cx300MM2 from newly

installed 990KVA Tr. at Dujjana

House S/Stn in Div Darya Ganj.

5.55 FY 09-10 LT

820 DG08LT4068 Daryaganj

T/O of 6 No.New LT O/H

Fdrs.size 4Cx300 mm2 (3 No.

from newly proposed 400 KVA & 3

No.from existing transformes)

from 84 Ghanta S/Stn

9.95 FY 09-10 LT

821 DG08LT4070 Daryaganj

T/O of 3 No.New LT O/H feeders

of Size 4Cx300MM2 for newly

proposed 400KVA transformer at

Bachoo Ka Ghar S/Stn in Div

Darya Ganj.

6.26 FY 09-10 LT

822 DG08LT4072 Daryaganj

T/O of 3 No.new LT O/H feeders

of size 4Cx300MM2 for new

proposed 400KVA Transformer at

Commercial School S/Stn in Div

Darya Ganj.

4.95 FY 09-10 LT

823 DG08LT4073 Daryaganj

T/O of 6 No.new LT O/H Fdrs.of

size 4Cx300 mm2 (3 No.from

Aug.purposed 990 KVA &3 No.

from existing 630 KVA Trs.) from

T B Khan S/Stn

6.92 FY 09-10 LT

Page 41: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

824 DG08LT4087 Daryaganj

Replacement of 2 No.LT feeder

from Kotla Road S/stn to

Mahawat Khan Rd & Pole Near

Kotla Rd.in Div Darya Ganj.

4.16 FY 09-10 LT

825 DG08LT4088 Daryaganj

Replacement of part portion of old

LT U/G feeder from Mahawat

Khan Rd S/Stn to feeder Pillar of

Kotla Rd,in Div Darya Ganj.

2.13 FY 09-10 LT

826 DG08LT4089 Daryaganj

Laying of 2 no. LT feeder from

Minto Road H/Complex S/Stn to

Sakoor Ki Dandi in Div Darya Ganj

4.06 FY 09-10 LT

827 DG08LT4094 DaryaganjNew LT Feeder from DAG-II at

Asaf Ali Road11.79 FY 09-10 LT

828 DG08LT4103 DaryaganjConversion of old leads into AB

cable109.54 FY 09-10 LT

829 DG08MS4067 DaryaganjReplacement of old Service Lines

in Div Darya Ganj101.61 FY 09-10 LT

830 DG08MS4097 Daryaganj

Shifting/Divert of HT feeder from

Shakti Sadan to Azad Bhawan at

Hans Bhawan S/S to provide

alternative Source to Hans

Bhawan

2.33 FY 09-10 HT

831 DG08MS4101 DaryaganjReplacementof old Service Line in

Div Darya Ganj(Part-2)87.36 FY 09-10 LT

832 DG08NF4047 Daryaganj

Laying of new HT feeder from

Jama Masjid Grid Package S/stn

to New Dujjana House S/stn in Div

Darya Ganj.

39.48 FY 09-10 HT

833 DG08RM4002 Daryaganj

Replacement of old 8 Panel Board

with 2*4 way + 1*1 way I/D(SF-6)

at VVIP S/Stn Bldg. in Div. Darya

Ganj.

11.81 FY 09-10 HT

834 DG08RM4011 Daryaganj

Replacement of old RMU with 3

way I/D (SF-6) at Vikas

Bhawans/Stn Bldg. in Div. Darya

Ganj.

3.78 FY 09-10 HT

835 DG08RM4013 Daryaganj

Replacement of old RMU with 3

way I/D(SF-6) at Bar Council of

India S/Stn Bldg. in Div. Darya

Ganj.

4.01 FY 09-10 HT

836 DG08RM4014 Daryaganj

Replacement of old RMU with 3

way I/D(SF-6) at Indian Physical

Handicraft S/Stn Bldg. in Div.

Darya Ganj.

4.19 FY 09-10 HT

837 DG08RM4020 Daryaganj

Replacement of old RMU with 3

Way I/D (SF-6) at C.A.G. S/Stn

Bldg. in Div. Darya Ganj

3.73 FY 09-10 HT

838 DG08RM4029 Daryaganj

Replacement of Old RMU with 1*3

Way I/D (SF-6) at ITPI S/Stn.in

Div.Darya Ganj

3.82 FY 09-10 HT

839 DG08RM4033 DaryaganjIns of HT Panel at Bachoo Ka

Ghar s/stn4.41 FY 09-10 HT

840 DG08RM4035 Daryaganj

Installation of 3 Way O/D(SF-6) at

Ansari Road No-1 S/Stn. in

Div.Darya Ganj

4.32 FY 09-10 HT

841 DG08SH1100 Daryaganj

Shifting of U/G Jama Masjid S/stn

by installing Three No. 990KVA

Package S/stn in Div Darya Ganj

74.87 FY 09-10 HT

842 DG08SL1078 Daryaganj

Installation of 3 No.High Mast in

the Constituency of Hon'ble MLA

Shri Shoaib Iqbal

5.03 FY 09-10 LT

843 DG08SL1079 Daryaganj

Installation of Street Light Point In

The Constituency of Sh. Kapil

Sibbal, MP.

1.93 FY 09-10 LT

844 DG08SL1080 Daryaganj

Installation of 2 No.High Mast in

the Constituency of Hon'ble MLA

Shri Shoaib Iqbal.

3.36 FY 09-10 LT

Page 42: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

845 DG09FA4019 Daryaganj

Replacement/Re-Routing of old

PILCA cable into cable into

3CX300MM2 XLPE Cable from ISI

to I.P.H Substation in division

Daryaganj.

1.90 FY 09-10 HT

846 DG09LT4015 Daryaganj

Conversion of old leades &

conductor into AB cable at

different places in Div Darya Ganj

95.44 FY 09-10 LT

847 DG09LT4027 Daryaganj

T/O of New LT feeder from DDA

Turkman Gate S/Stn to Kali

Masjid in Div Darya Ganj.

3.21 FY 09-10 LT

848 DG09LT4028 Daryaganj

T/O of New LT feeder from

Girdhar Panna S/Stn to Chowk

Moll. Qabristan in Div Darya Ganj.

2.18 FY 09-10 LT

849 DG09LT4029 Daryaganj

T/O of new LT Feeder from Hotel

President S/Stn to Conductor

Back Side Asif Ali Road in Div

Darya Ganj.

1.29 FY 09-10 LT

850 DG09LT4030 Daryaganj

T/O of new LT Feeder from Jama

Masjid Grid S/Stn to Katra

Nizamul in Div Darya Ganj.

1.45 FY 09-10 LT

851 DG09LT4031 Daryaganj

Replacement of Old LT Feeder

from new Dujjana S/Stn to

Jawahar Hotel In Div Darya Ganj.

1.42 FY 09-10 LT

852 DG09LT4032 Daryaganj

T/O of NEW LT FEEDER FROM

SSA ROAD S/STN TO KUCHA

TARA CHAND IN DIV DARYA

GANJ

1.70 FY 09-10 LT

853 DG09LT4036 Daryaganj

T/O of new LT Feeder from Anglo

Sanskrit S/Stn to back side N S

Marg in Div Darya Ganj.

2.80 FY 09-10 LT

854 DG09LT4039 Daryaganj

T/O of new 2 No LT Feeder from

Laxmi Insurance S/Stn in Div

Darya Ganj.

2.03 FY 09-10 LT

855 DG09LT4044 Daryaganj

LT-6248 LA of 75KW making

Total Load of 95 KW in f/o Andhra

Edu. Society

3.44 FY 09-10 LT

856 DG09LT4060 Daryaganj

LAYING of LT FEEDER FROM

KANCHAN PURI S/STN FOR

PROVODE ADDL. LOAD TO IGL

STORE IN DIV DARYA GANJ.

3.87 FY 09-10 LT

857 DG09MS4016 DaryaganjReplacement of old service line in

Div Darya Ganj (Part-3)71.46 FY 09-10 LT

858 DG09RM4001 Daryaganj

Replacement of old 8 panel board

with 2*4 way I/D (SF-6) at

Footover bridge substation

Building in division daryaganj.

10.40 FY 09-10 HT

859 DG09RM4002 Daryaganj

Replacement of Old panel with 3

Way I/D (SF-6) at 56- quarter

Substation Building in division

Daryaganj.

3.12 FY 09-10 HT

860 DG09RM4003 Daryaganj

Replacement of Old RMU With 3

Way I/D(Sf-6) at U.G.C. S/Stn

Bldg. in Div. Darya Ganj

3.04 FY 09-10 HT

861 DG09RM4004 Daryaganj

Replacement of old panel with 3

way I/D(SF-6) at Minto Road

Railway Pump substation building

in division Daryaganj.

3.49 FY 09-10 HT

862 DG09RM4005 Daryaganj

Replacement of Old 7 Panel Board

with 2*4 Way I/D(Sf-6) at ISI

S/Stn. in Div. Darya Ganj

9.94 FY 09-10 HT

Page 43: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

863 DG09RM4006 Daryaganj

Replacement of old Panel with 1*3

WAY I/D(SF-6) at Awane gali

Substation in division Daryaganj.

3.45 FY 09-10 HT

864 DG09RM4007 Daryaganj

Replacement of Old RMU With

1*3 Way I/D(Sf-6) at All India

Univarsity S/Stn. in Div. Daryaganj

3.52 FY 09-10 HT

865 DG09RM4008 Daryaganj

Replacement of old RMU with 1*3

WAY I/D(SF-6) at Guru Nanak

eye Hospital Substation in division

Daryaganj.

3.39 FY 09-10 HT

866 DG09RM4009 Daryaganj

Replacement of old 4 Panel Board

with 2*4 WAY I/D(SF-6) at

Girdhar Panna Substation Building

in division Daryaganj.

11.14 FY 09-10 HT

867 DG09RM4012 Daryaganj

Replacement of old 3 Panel board

with 3 WAY I/D(SF-6) at Mahavir

vatika Substation Building in

Division Daryaganj.

3.48 FY 09-10 HT

868 DG09RM4013 Daryaganj

Replacement of old 4 Panel Board

with 4 WAY I/D(SF-6) at MSO

Building Substation in division

Daryaganj.

5.75 FY 09-10 HT

869 DG09SH1057 Daryaganj

Shifting of electric Pole due to

Leakage of DJB Water pipe line

infront of Shop No.-248 Kamla

Market, Ajmeri Gate in Darya

Ganj.

0.12 FY 09-10 LT

870 DG09SH1095 Daryaganj

Removal of S/Stn. for construction

of 140 Nos. Type-V & 104 Nos.,

Type-IV Flats in Pcoket-6, , Deen

Dayal Upadhayay Marg, New

Delhi.

16.83 FY 09-10 LT

871 DG09UT4017 Daryaganj

Augmentation of 400 KVA

Transformer with 990 KVA

Transformer at Laxmi Insurance

Substation in division Daryaganj.

11.32 FY 09-10 HT

872 DL05FA4184 Dilshad Garden

Replacement of HT 11 kV Cable

XLPE from Ghonda to Khera

Village S.Stn (DSR Feeder)

52.95 FY 09-10 HT

873 DL05FA4195 Dilshad Garden

Replacement of HT 11 kV Cable

XLPE from G.T.Road to Dilshad

Garden S.Stn.-3 to Sita Flats to

Dilshad Garden S.Stn-4 to S.Stn-5

to S.Stn -3 to Shopping Center

Dilshad Garden

56.41 FY 09-10 HT

874 DL06LT4512 Dilshad GardenConversion of LT O/H to U/G

Cable at Gali No.1 to 9 & 1353.25 FY 09-10 LT

875 DL07EL2066 Dilshad Garden

Electrification of Police Station

Building and Staff Quarters Type II

& III at Seema Puri, Delhi

15.47 FY 09-10 HT

876 DL08AT4059 Dilshad Garden

Electrification and inst.a newly

proposed 990 KVA Trf.at Pathar

Wali Gali Burgees Park near

Apsra Border Dilshad Garden and

T/O 8 No. LT Fdr. from newly

proposed Trf.

27.94 FY 09-10 HT

877 DL08AT4079 Dilshad Garden

Installing newly proposed 400 KVA

transformer at near MS Park

Metro Station Gali No-1 and taking

out 3 no LT feeders from this

transformer.

14.79 FY 09-10 HT

878 DL08AT4080 Dilshad Garden

Installing newly proposed 400 KVA

transformer at Shopping Complex

S/stn Dilshad Garden near B/D

office.

8.12 FY 09-10 HT

Page 44: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

879 DL08AT4087 Dilshad Garden

LT-5305 NC of 52 KW in f/o Anil

Kr Gambir, 1/429/5A, Gali No. -1,

FCIA , GT Road

27.41 FY 09-10 HT

880 DL08EL1086 Dilshad Garden

Electrification of 96 MIG,96 LIG

DDA flats at Dilshad Garden R

Block at GT Road.

55.64 FY 09-10 HT

881 DL08EL1089 Dilshad Garden

Electrification of 96 MIG,96 LIG

DDA flats at Dilsad Garden R

Block at GT Road.

8.54 FY 09-10 LT

882 DL08LT4074 Dilshad Garden

Replacement/Installation of DB

Single Phase and Three Phase in

Div. GTR

12.18 FY 09-10 LT

883 DL08MS4044 Dilshad GardenProviding Meter Gland and

Flaexible Pipe in Div.G.T.Road26.31 FY 09-10 LT

884 DL08MS4046 Dilshad GardenRep. of S/Cable in Div. GTR

where LTMP work has been done.304.89 FY 09-10 LT

885 DL08NF4072 Dilshad Garden

T/O one No.11 KV HT fdr.from

DSIDC Grid to Paper Product

Friends Colony

19.72 FY 09-10 HT

886 DL08RM4004 Dilshad GardenReplacement of 7 panel board at

Sahi Mohalla7.29 FY 09-10 HT

887 DL08RM4017 Dilshad GardenInstallation of 4 Way at Mandoli

Road Shd5.97 FY 09-10 HT

888 DL08RM4061 Dilshad GardenInstallation of 7 Panel Board at

Zulfe Bengal No.-2 Substation.14.33 FY 09-10 HT

889 DL08RM4066 Dilshad Garden

Inst. of 3-Panel Board at

Rly.Stn.Shd.Road DP S/stn near

Shriram Nagar

4.84 FY 09-10 HT

890 DL09EL1062 Dilshad Garden

Electrification of Police Station

Building and Staff Quarters Type II

& III at Seema Puri, Delhi

0.61 FY 09-10 LT

891 DL09MS4047 Dilshad Garden

Erection of New Pole and

Replacement of Broken Pole,AB

Cable and ACSR Conductor in

Division GTR

74.78 FY 09-10 LT

892 DL09MS4088 Dilshad Garden

Conversion of HTAB Cable from D-

Block Dilshad colony pole to

Hanuman Mandir Pole Leprosy

colony into under ground cable.

2.21 FY 09-10 HT

893 JM06EL2003 KarkardoomaElectrification of CBD Shahadra

Complex substation Portion.47.36 FY 09-10 HT

894 JM06FA4016 Karkardooma

Augmentation of feeder with 3 x

300 XLPE from Saini Enclave to A

Block Anand Vihar in Div KKD

BYPL

8.20 FY 09-10 HT

895 JM06RM4022 KarkardoomaInstallation of RMU at East Arjun

Substation, Jhilmil.3.96 FY 09-10 HT

896 JM06RM4025 KarkardoomaInstallation of RMU at Sai baba

mandir Substation, Jhilmil.3.99 FY 09-10 HT

897 JM06RM4026 KarkardoomaReplacement of HT Panel 4-Way

at LSC A-Blk.Surajmal Vihar S/S5.54 FY 09-10 HT

898 JM06RM4027 KarkardoomaReplacement of HT Panel 4-Way

at A-Blk.Surajmal Vihar S/S5.98 FY 09-10 HT

899 JM06RM4030 KarkardoomaRep. of HT Panel 4-Way (2 No) at

Surya Niketan S/Stn.12.23 FY 09-10 HT

900 JM06RM4057 KarkardoomaReplacement of HT Panel 4+1

Way at Police Qtr.Vivek Vihar.S/S8.86 FY 09-10 HT

901 JM06RM4078 KarkardoomaRep. of HT Panel (4+1)-Way at

Anaj Mandi.S/Stn.6.07 FY 09-10 HT

902 JM06RM4080 Karkardooma

Replacement/Installation of HT

Panel (4+1)-Way at Karkari Road

S/S

8.69 FY 09-10 HT

903 JM06RM4083 KarkardoomaRep/Inst. of HT Panel 2* 4-Way at

Institutional Area.S/S12.36 FY 09-10 HT

Page 45: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

904 JM06RM4084 KarkardoomaReplacement of HT Panel 2* 4-

Way at Mahila Daxsh Samiti.S/S11.16 FY 09-10 HT

905 JM06RM4085 KarkardoomaReplacement/Installation of HT

Panel 4-Way at CBD S/S5.86 FY 09-10 HT

906 JM06RM4086 Karkardooma

Installation of RMU 3-Way O/D at

MTNL Exchange KKD S/S (FSS

of MTNL Exchange.Fdr.from KKD

Grid )

4.02 FY 09-10 HT

907 JM06RM4087 Karkardooma

Installation of RMU 3-Way O/D at

Yudhister Gali 60` Ft Road

Vishwas Ngr.S/S (FSS of 18 Qtr.

Fdr.from CBD Grid )

4.02 FY 09-10 HT

908 JM06RM4094 KarkardoomaReplacemnt of HT Panel at Yojna

vihar Substation, Jhilmil.11.15 FY 09-10 HT

909 JM07FA4569 Karkardooma

Augmentation of feeder with

3Cx300 XLPE from Partap Khand

to Police Quarters.Div KKD

25.58 FY 09-10 HT

910 JM07RM4517 Karkardooma

Installation of RMU (3+2)Way

(O/D) at Super Bazar Vivek Vihar

B-Blk.Ph-1.S/S

9.38 FY 09-10 HT

911 JM07RM4519 KarkardoomaRep. of HT Panel at B-Blk.Anand

Vihar S/S.6.11 FY 09-10 HT

912 JM07RM4520 KarkardoomaRep. of HT Panel at C-Blk. Anand

Vihar S/S.6.30 FY 09-10 HT

913 JM07RM4522 KarkardoomaReplacement of HT Panel at D-

Blk.Surajmal Vihar S/S11.73 FY 09-10 HT

914 JM07RM4523 KarkardoomaRep. of HT Panel at Vigyan Vihar

S/S.6.24 FY 09-10 HT

915 JM07RM4539 KarkardoomaRep. of HT Panel at Sharad Vihar

S/S.6.36 FY 09-10 HT

916 JM07RM4543 KarkardoomaRep. of HT Panel at LSC Saini

Enclave S/S.6.39 FY 09-10 HT

917 JM07RM4544 KarkardoomaReplacement of HT Panel at

Rishab Vihar Substation.5.11 FY 09-10 HT

918 JM07RM4545 KarkardoomaRep. of HT Panel at Jagriti

Enclave S/S.6.17 FY 09-10 HT

919 JM07RM4546 KarkardoomaReplacement of HT RMU 3-Way

(I/D) at Jagriti Enclave Extn..S/S3.96 FY 09-10 HT

920 JM07RM4547 KarkardoomaReplacement of HT RMU 3-Way

(I/D) at Ayra Nagar S/S4.04 FY 09-10 HT

921 JM07RM4551 KarkardoomaRep. of HT Panel at Hansa Apptt.-

1 S/S.6.35 FY 09-10 HT

922 JM07UT4510 Karkardooma

Augmentation of existing

transformer from 400 KVA to 630

KVA at Bhikam Singh Cly. P/M.

7.04 FY 09-10 HT

923 JM07UT4605 Karkardooma

Aug.of 400 KVA Trf.to 630 KVA

Trf.at Aggarwal Bhawan Bhola

Nath Nagar.

2.98 FY 09-10 HT

924 JM08EL1090 KarkardoomaElectrification of Shops / Banks in

Court premises Karkardooma. 0.28 FY 09-10 LT

925 JM08EL2089 KarkardoomaElectrification of Shops / Banks in

Court premises Karkardooma. 6.84 FY 09-10 LT

926 JM08FA4001 Karkardooma

Rep./Aug. of HT U/G Cable from

Vishwas Nagar to DCP office S/S

Via Gali No 16 S/S Vishwas Nagar

S/S

26.13 FY 09-10 HT

927 JM08FA4002 Karkardooma

Rep/Aug of HT U/G feeder from

LIC Appt. S/S to Hedgewar Hosp.

S/S to Anupam App. S/S no 2

17.02 FY 09-10 HT

928 JM08FA4003 KarkardoomaAug/Rep of HT cable from Saini

Enclave to D-Blk Surajmal Vihar.31.42 FY 09-10 HT

929 JM08FA4004 Karkardooma

Rep./Aug. of HT cable from DCP

office S/S To Pila Mandir S/S to

Dalhai Mohalla S/S

11.83 FY 09-10 HT

Page 46: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

930 JM08FA4005 Karkardooma

Rep./Aug. of HT cable from

Vishnu Gali Nala Side to Shivam

S/S No 2

7.38 FY 09-10 HT

931 JM08LT4018 KarkardoomaT/O 3 Nos LT feeders at Rishabh

Vihar S/S8.73 FY 09-10 LT

932 JM08LT4019 KarkardoomaT/O 3 Nos LT Feeders at

Hargovind Encl.S/S14.29 FY 09-10 LT

933 JM08LT4020 KarkardoomaT/O 3 Nos LT Feeders at LSC

Saini S/S5.32 FY 09-10 LT

934 JM08LT4021 KarkardoomaT/O 3 Nos LT Fdrs at Gali No 16

Vishwas Nagar S/S6.73 FY 09-10 LT

935 JM08LT4022 KarkardoomaT/O 3 Nos LT Feeders at Bhikam

Singh Cly.S/Stn.7.13 FY 09-10 LT

936 JM08LT4039 KarkardoomaT/O 3 Nos LT Fdr at Bihari Cly

Extn S/S10.00 FY 09-10 LT

937 JM08LT4084 Karkardooma

New AB cable from commercial

Block Substation Vishwas nagar

+ installation of ACB 400A to

provide a new connection of

50KW in f/o Ramesh Bansal, 1/60

Gali no.2 Vishwas Nagar , LT

5254

0.67 FY 09-10 LT

938 JM08LT4086 KarkardoomaRep of old LT U/G feeder

Commercial Blk S/Stn.5.10 FY 09-10 LT

939 JM08MS4056 KarkardoomaRep/Aug. of L.V Mains in Surajmal

Vihar A,B,C,D-Blocks Etc.43.09 FY 09-10 LT

940 JM08NF4023 Karkardooma

Providing midfeed between Ram

Vihars/S to CBD Ground E Blk

S/S

14.73 FY 09-10 HT

941 JM08RM4025 KarkardoomaReplacement of RMU 2X4-Way at

Dayanand Vihar S/S9.01 FY 09-10 HT

942 JM08RM4026 KarkardoomaRep. of HT panels at A-Blk Vivek

Vihar Ph-I Nursery.3.75 FY 09-10 HT

943 JM08RM4035 KarkardoomaReplacement of panel 2X4-Way at

AGCR Enclave9.10 FY 09-10 HT

944 JM08RM4072 Karkardooma

Installation of O/D RMU at C Block

Vivek Vihar Parkwala

Substation.Jhilmil.

3.88 FY 09-10 HT

945 JM08RM4076 KarkardoomaRep.of I/D RMU at Chitrakoot

Appts. S/S3.76 FY 09-10 HT

946 JM08RM4077 KarkardoomaInstallation of O/D 3 WAY RMU at

Idgah Substation Jhilmil.3.88 FY 09-10 HT

947 JM08RM4078 KarkardoomaInstallation of O/D RMU at Dalhai

Mohalla Substation Jhilmil.3.87 FY 09-10 HT

948 JM08RM4079 KarkardoomaInstallation of O/D 3 WAY RMU at

Pathanpura Substation, Jhilmil.3.89 FY 09-10 HT

949 JM08UT4010 Karkardooma

Augmentation Tr.from 400 to 990

KVA at Bhikam Singh

Cly.Schoolwala S/S

9.63 FY 09-10 HT

950 JM08UT4013 KarkardoomaAug. of Tr. from 630 KVA to 990

KVA at Shrestha Vihar.10.46 FY 09-10 HT

951 JM08UT4014 KarkardoomaAug of Tr. 630 To 990 KVA at

Dayanand Vihar S/S.10.28 FY 09-10 HT

952 JM08UT4015 KarkardoomaAug of Tr. 630 To 990 KVA at

Hargovind Encl. S/S.10.39 FY 09-10 HT

953 JM09AT4079 KarkardoomaProviding additional Transformer

of 400kVA at Delhi Gate.2.47 FY 09-10 HT

954 JM09LT4032 Karkardooma

Conversion of L.V Mains with LT

AB and replacement of service line

at Tejab Mill.

43.21 FY 09-10 LT

955 JM09LT4033 KarkardoomaRemodelling of L.V mains with LT

AB at Jhilmil Colony All Blocks.33.55 FY 09-10 LT

956 JM09MS4059 KarkardoomaReplacement of burnt DB's and

lock in division Karkardooma.40.04 FY 09-10 LT

957 JM09MS4062 KarkardoomaProviding earthing of LV mains

circuit in division Karkardooma.27.42 FY 09-10 LT

Page 47: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

958 JM09MS4063 KarkardoomaProviding earthing on Rail Poles in

division Karkardooma.7.66 FY 09-10 LT

959 JM09MS4065 KarkardoomaFixing/Providing of glands in

meters in Div Karkardooma.57.22 FY 09-10 LT

960 JM09MS4089 Karkardooma

Rep./ Aug. of Service Line in LOP

in Div. KKD (Mahavir

Blk,Bholanath Nagar,Bihari Cly.

Etc.)

69.95 FY 09-10 LT

961 JM09MS4092 KarkardoomaRep. of Service Line in J.J Cluster

Anand Vihar.6.52 FY 09-10 LT

962 JM09MS4168 Karkardooma

Conversion of Overhead lines into

underground crossing main Roads

belongs to MCD in division

Karkardooma.

35.41 FY 09-10 LT

963 JM09SL1103 Karkardooma

Providing Street Lights in

Unauthorised Colonies of

Karkardooma Division in the Area

of Sh.Naseeb Singh,MLA.

11.65 FY 09-10 LT

964 JM09UT4057 Karkardooma

Augmentation of Transformer from

400KVA to 630KVA at C- Block

Yojna Vihar Substation.

1.96 FY 09-10 HT

965 KN04AT4509 Krishna Nagar

Establishment of new 630 KVA

PL/M sub station.opposite Dr.

Ambedkar Bhawan at Rahdey

Shyam Park.

33.60 FY 09-10 HT

966 KN04EL2625 Krishna Nagar

Electrification of Surangini Co

operative Group Housing Society

at Block No 5 Geeta Colony

Facility Centre near St. Lawrence

Convent School Delhi.

47.52 FY 09-10 HT

967 KN06LT4055 Krishna Nagar

Replacement of Old damaged,

undersized existing conductor with

AB cable at Shiv Puri, Silver Park,

Golden Park, West Chander

Nagar, Ganesh Park and Rashid

Market

184.43 FY 09-10 LT

968 KN06LT4064 Krishna Nagar

Replacement of Old damaged,

undersized existing conductor with

AB cable at East & west Azad Ngr

121.44 FY 09-10 LT

969 KN06LT4066 Krishna Nagar

Replacement of Old damaged,

undersized existing conductor with

AB cable at Shastri Park, Pandit

Park, Jheel Area

64.89 FY 09-10 LT

970 KN07AT4523 Krishna Nagar

Installation of additional 400 KVA

trf at 5 Blk Geeta Colony (DDA

PARK)

1.37 FY 09-10 HT

971 KN07AT4530 Krishna NagarProviding additional transformer of

400KVA at 16 blk Geeta colony1.99 FY 09-10 HT

972 KN07AT4577 Krishna Nagar

Providing additional Trf 400 KVA

at Gali Gurudwara Dharampura in

Gandhi Ngr Area

1.71 FY 09-10 HT

973 KN07LT4549 Krishna NagarT/o 2 nos LT feeders F Blk O/S

S/stn in krishna nagar division.10.88 FY 09-10 LT

974 KN07RM4534 Krishna Nagar

Replacement/Providing 1X4Way

I/D RMU at S/Stn Gali No 5 West

Kanti Ngr in D- KRN.

5.74 FY 09-10 HT

975 KN07RM4535 Krishna Nagar

Replacement /Providing 1x4way

I/D RMU at s/stn New Layal Pur in

D- KRN

7.49 FY 09-10 HT

976 KN07RM4539 Krishna Nagar

Replacement /Providing 3X4 way

I/D RMU at S/Stn C Blk. Krishna

Ngr in D- KRN.

20.12 FY 09-10 HT

977 KN07RM4541 Krishna Nagar

Replacement /Providing 2x4way

I/D RMU at B&D blk west Azad

Ngr

14.62 FY 09-10 HT

978 KN07RM4542 Krishna Nagar

Replacement /Providing 1x4way

I/D at s/stn 3 blk Geeta colony in

D- KRN

6.52 FY 09-10 HT

Page 48: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

979 KN07RM4551 Krishna Nagar

Replacement /Providing 1x4way

I/D RMU at Mausam Vihar in D-

KRN

7.33 FY 09-10 HT

980 KN07UT4556 Krishna Nagar

Augmentation of 630 KVA trf. into

990 KVA trf at 16 Blk Geeta

Colony

9.06 FY 09-10 HT

981 KN07UT4558 Krishna Nagar

Augmentation of 630 KVA

transformer into 990 KVA

transformer at New Pulia Old

Seelampur

9.30 FY 09-10 HT

982 KN08AT4055 Krishna NagarProviding additional Transformer

at Jagat Puri1.98 FY 09-10 HT

983 KN08AT4056 Krishna NagarProviding additional Transformer

at Shastri Nagar Nala2.02 FY 09-10 HT

984 KN08AT4071 Krishna NagarInstallation of additional 630 KVA

transformer at Laxman Park2.92 FY 09-10 HT

985 KN08AT4085 Krishna Nagar

Installation of additional

Transformer at Kanti Nagar Ext.

Nala

2.18 FY 09-10 HT

986 KN08AT4129 Krishna NagarProviding additional 400 KVA Trf

at 8 blk (Disp) Geeta Colony1.61 FY 09-10 HT

987 KN08AT4130 Krishna NagarProviding additional 400 KVA Trf

at Jheel Busha Mandi1.61 FY 09-10 HT

988 KN08AT4131 Krishna NagarProviding additional 400 KVA Trf

at BTS Prem Gali1.66 FY 09-10 HT

989 KN08AT4148 Krishna NagarProviding additional 400 KVA Trf

at Gopal Park1.95 FY 09-10 HT

990 KN08AT4171 Krishna NagarProviding additional 400KVA Trf at

17 blk Geeta colony1.76 FY 09-10 HT

991 KN08EL2181 Krishna NagarElectrification of Mayur Dhwaj

CGHS at Geeta Colony52.60 FY 09-10 HT

992 KN08FA4111 Krishna Nagar

Replacement of interconnector of

3X150 mm2 PILCA to 3X300

XLPE between Mausam Vihar to

Gagan Vihar

27.11 FY 09-10 HT

993 KN08LT4058 Krishna NagarReplacement of LT Cable at Meera

Mandal6.29 FY 09-10 LT

994 KN08LT4059 Krishna Nagar Rep. of LT cable at Ganesh Park. 5.88 FY 09-10 LT

995 KN08LT4061 Krishna NagarRep./Provd LT cable at Chandu

Park.4.28 FY 09-10 LT

996 KN08LT4064 Krishna NagarReplacement of LT Cable at Kanti

Nagar Kabari Wala6.61 FY 09-10 LT

997 KN08LT4073 Krishna NagarT/O 3 Nos LT feeder from Laxman

Park5.51 FY 09-10 LT

998 KN08LT4080 Krishna NagarT/O 3 Nos LT feeder from Bhagat

Sing Park4.91 FY 09-10 LT

999 KN08LT4082 Krishna NagarT/O 3 Nos LT feeder from Kanti

Ngr Main5.00 FY 09-10 LT

1000 KN08LT4086 Krishna NagarT/O 3 Nos LT feeder frm Kanti Ngr

Ext Nala2.93 FY 09-10 LT

1001 KN08LT4093 Krishna NagarT/O 3 Nos LT feeder from Shyam

Block1.67 FY 09-10 LT

1002 KN08LT4095 Krishna NagarT/O 3 Nos LT feeder from 13 Blk

Geeta Colony6.38 FY 09-10 LT

1003 KN08LT4096 Krishna NagarT/O 3 Nos LT feeder from Rani

Garden Park8.87 FY 09-10 LT

1004 KN08LT4098 Krishna NagarT/O 3 Nos LT feeder from Rajgarh

M Stadium5.85 FY 09-10 LT

1005 KN08LT4106 Krishna NagarReplacement of damaged LT ACB

in S/Stns in D-KRN30.63 FY 09-10 LT

1006 KN08LT4123 Krishna NagarPdg L.T.Panel Boards in Taj Enl,

Ekta & Geeta Apptt in D- KRN33.20 FY 09-10 LT

1007 KN08LT4132 Krishna Nagar Pdg/Repl LT Fdr from S/Stn 17

Blk Geeta Colony6.27 FY 09-10 LT

1008 KN08LT4133 Krishna NagarPdg/Repl LT fdr S/stn 13 blk

Geeta colony5.63 FY 09-10 LT

1009 KN08LT4134 Krishna NagarPdg/Repl LT fdr S/stn 6 blk Geeta

colony5.76 FY 09-10 LT

Page 49: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

1010 KN08LT4135 Krishna NagarPdg/Repl LT Fdr from S/Stn Jheel

Busa Mandi8.54 FY 09-10 LT

1011 KN08LT4136 Krishna NagarPdg/Repl LT Fdr from S/Stn 8 Blk

Geeta Colony8.28 FY 09-10 LT

1012 KN08LT4137 Krishna NagarPdg/Repl LT fdr S/stn 2 blk

Geeta Colony10.81 FY 09-10 LT

1013 KN08LT4139 Krishna NagarPdg/Repl LT fdr S/stn Su Pk

Tikona Prk3.26 FY 09-10 LT

1014 KN08LT4140 Krishna NagarPdg/Repl LT Fdr from S/Stn 14

Blk Geeta Colony2.17 FY 09-10 LT

1015 KN08LT4142 Krishna Nagar

Pgd/ Replacement of Old LT

Feeders from S/Stn Old Govind

Pura

3.85 FY 09-10 LT

1016 KN08LT4143 Krishna NagarPdg/Repl LT fdr S/stn Rd 57 Jgt

Puri3.68 FY 09-10 LT

1017 KN08LT4144 Krishna Nagar Pdg/Repl LT fdr S/stn Gagan Viar 4.03 FY 09-10 LT

1018 KN08LT4145 Krishna NagarPdg/Rep of old LT fdr from S/Stn

B Blk Jagat Puri In D-KRN6.93 FY 09-10 LT

1019 KN08LT4146 Krishna NagarPdg/Rep of old LT fdr from S/Stn

Aram Park in D-KRN7.31 FY 09-10 LT

1020 KN08LT4147 Krishna Nagar Pdg/Repl LT fdr S/stn Vivekanand 8.64 FY 09-10 LT

1021 KN08LT4153 Krishna NagarPdg/Repl LT fdr from S/Stn Old

Anarkali in Div KRN8.26 FY 09-10 LT

1022 KN08LT4154 Krishna NagarPdg/Repl LT fdr S/stn west Arjun

Ngr s/st6.83 FY 09-10 LT

1023 KN08LT4155 Krishna NagarPdg/Repl LT fdr S/stn Lajpat Rai

chowk s/st10.38 FY 09-10 LT

1024 KN08LT4156 Krishna Nagar

PDG/REP of OLD LT FDR FROM

S/STN TIKONA PARK EAST

AZAD NGR IN D-KRN

5.40 FY 09-10 LT

1025 KN08LT4158 Krishna NagarPdg/Repl LT Feeder S/Stn Kanti

Ngr Ext Gali in D-Krishna nagar.2.43 FY 09-10 LT

1026 KN08LT4159 Krishna NagarPdg/Repl LT fdr from S/Stn

Shanker Ngr Main in Div KRN7.42 FY 09-10 LT

1027 KN08LT4160 Krishna NagarPdg/Repl LT fdr S/stn RLG

Kehar.Singh3.07 FY 09-10 LT

1028 KN08LT4162 Krishna NagarPdg/Repl LT Fdr S/Stn B&D Blk

West Azad Ngr in D-KRN2.36 FY 09-10 LT

1029 KN08LT4163 Krishna NagarPdg/Repl LT fdr S/stn Shastri

Park2.50 FY 09-10 LT

1030 KN08LT4164 Krishna NagarPdg/Repl LT fdr S/stn Pandit

Park4.36 FY 09-10 LT

1031 KN08LT4168 Krishna NagarPdg additional poles with AB cable

in Dist KRN11.99 FY 09-10 LT

1032 KN08LT4170 Krishna Nagar

T/O Out Three Nos LT Feeder

from P. S. Gandhi Nagar to Shivaji

Gali

6.19 FY 09-10 LT

1033 KN08LT4172 Krishna NagarPDG/REPL LT FDR S/STN

GOPAL PARK IN D-KRN5.92 FY 09-10 LT

1034 KN08LT4173 Krishna NagarPdg/Repl LT Fdr S/Stn 3&5 Jheel

in D-KRN25.51 FY 09-10 LT

1035 KN08NF4072 Krishna NagarHT Feed to newly proposed S/Stn

at Laxman Park4.90 FY 09-10 HT

1036 KN08RM4002 Krishna NagarInstallation of (1X4+ 1S/W) O/D

RMU at Ganesh Park6.45 FY 09-10 HT

1037 KN08RM4003 Krishna NagarInstallation of (1X3+ 1S/W) O/D

RMU at Jagat puri F- Block.6.09 FY 09-10 HT

1038 KN08RM4004 Krishna NagarIns. of (1X3Way) O/D RMU at

Silver Park3.10 FY 09-10 HT

1039 KN08RM4009 Krishna Nagar

Ins. f (1X3Way) O/D RMU at 17

Bk Geeta Colony Community

Center.

4.04 FY 09-10 HT

1040 KN08RM4010 Krishna NagarIns. of (1X3Way) O/D RMU at

Rani Garden Park.6.83 FY 09-10 HT

1041 KN08RM4012 Krishna NagarIns. of (1X3Way)+2X1Way O/D

RMU at Rani G.School.9.62 FY 09-10 HT

1042 KN08RM4013 Krishna NagarIns. of (1X3Way) O/D RMU at

BTS Multani4.13 FY 09-10 HT

Page 50: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

1043 KN08RM4014 Krishna Nagar

Installation of (1X3WAY) O/D

RMU at Saraswati Bhander,

Jhilmil.

3.60 FY 09-10 HT

1044 KN08RM4020 Krishna NagarIns. of (1X3Way) O/D RMU at K

Ngr Kabari3.44 FY 09-10 HT

1045 KN08RM4021 Krishna NagarInstallation (1X3WAY) O/D RMU

at Chachi Building, jhilmil.3.81 FY 09-10 HT

1046 KN08RM4022 Krishna NagarInstallation of (1X3WAY) O/D

RMU at Rasgullewala, Jhilmil.3.67 FY 09-10 HT

1047 KN08RM4028 Krishna NagarIns. of (1X3Way) O/D RMU at

Hathi Wala Park3.49 FY 09-10 HT

1048 KN08RM4029 Krishna NagarINS. of (1X3+ 1S/W) O/D RMU at

Kailash Nagar Gali No-1510.27 FY 09-10 HT

1049 KN08RM4030 Krishna NagarIns. of (1X3Way) O/D RMU at

Amar Mohalla3.05 FY 09-10 HT

1050 KN08RM4031 Krishna NagarInstallation (1X3WAY) O/D RMU

at Ahata Karam Chand, Jhilmil.3.82 FY 09-10 HT

1051 KN08RM4032 Krishna NagarIns. of (1X4Way) I/D RMU at

Kanchan Apt.6.34 FY 09-10 HT

1052 KN08RM4034 Krishna NagarInstallation of (1X3WAY) I/D

RMU at Police Station4.36 FY 09-10 HT

1053 KN08RM4035 Krishna NagarIns. of (1X4Way) I/D RMU at Taj

Apartment.6.14 FY 09-10 HT

1054 KN08RM4036 Krishna NagarIns. of (2X4Way) I/D RMU at Taj

Apt No-26.23 FY 09-10 HT

1055 KN08RM4037 Krishna NagarInstallation of (1X4WAY) I/D

RMU at Ekta Aptt6.16 FY 09-10 HT

1056 KN08RM4038 Krishna NagarIns. of (1X3Way) I/D RMU at 14

Blk Geeta Colony.4.07 FY 09-10 HT

1057 KN08RM4039 Krishna NagarInstallation of (1X4Way+1) I/D

RMU at Darbar Marg9.61 FY 09-10 HT

1058 KN08RM4042 Krishna NagarInstallation of (2X4Way) I/D RMU

at Baldev Park11.88 FY 09-10 HT

1059 KN08RM4043 Krishna NagarReplacementl /Pdg 2X4 Way

RMU at Chander Ngr in D KRN12.16 FY 09-10 HT

1060 KN08RM4046 Krishna NagarIns. of (2X4Way) I/D RMU at

Jagat Puri B Block11.61 FY 09-10 HT

1061 KN08RM4048 Krishna NagarIns. of (1X4Way+1) I/D RMU at

Chandu Park9.04 FY 09-10 HT

1062 KN08RM4049 Krishna NagarIns. of (1X4Way+1) I/D RMU at

Ram Nagar9.24 FY 09-10 HT

1063 KN08RM4067 Krishna NagarRep. of RMU at Shyam Blk Pusta

No-1.4.04 FY 09-10 HT

1064 KN08RM4069 Krishna Nagar Rep. of RMU at Laxman Park 3.62 FY 09-10 HT

1065 KN08RM4116 Krishna NagarPdg o/d RMU (1RMU+2S/P) at

Govind Park7.00 FY 09-10 HT

1066 KN08UT4050 Krishna Nagar

Augmentation of Tranformer from

630 KVA to 990 KVA at 13 Blk

Geeta Colony.

10.90 FY 09-10 HT

1067 KN08UT4051 Krishna Nagar

Augmentation of tranformer from

630 KVA to 990 KVA at Chandu

Park

10.61 FY 09-10 HT

1068 KN08UT4053 Krishna NagarAugmentation of transformer at

Ganesh Park1.21 FY 09-10 HT

1069 KN08UT4077 Krishna Nagar

Augmentation of Tranformer from

630 KVA to 990 KVA at J Blk

Krishna Ngr

10.05 FY 09-10 HT

1070 KN08UT4079 Krishna NagarAugmentation of transformer at

Bhagat Singh Park0.82 FY 09-10 HT

1071 KN08UT4081 Krishna NagarAugmentation of transformer at

Kanti Ngr Main Road1.24 FY 09-10 HT

1072 KN08UT4097 Krishna Nagar

Augmentation of tranformer from

630 KVA to 990 KVA at 12 Blk

Geeta Colony.

10.17 FY 09-10 HT

1073 KN08UT4100 Krishna NagarAug of 400KVA Trf to 630 KVA at

Shiv Puri1.89 FY 09-10 HT

1074 KN08UT4104 Krishna Nagar

Augmentation of transformer from

630 KVA to 990 KVA at Bedi

Market in D KRN

10.76 FY 09-10 HT

Page 51: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

1075 KN08UT4108 Krishna Nagar

Augmentation of 630 to 990 KVA

transformer at Chander Ngr in D-

KRN

10.85 FY 09-10 HT

1076 KN08UT4109 Krishna NagarAugmentation of 630 to 990 KVA

transformer at Baldev Park10.50 FY 09-10 HT

1077 KN08UT4120 Krishna NagarAug. of transformer from 630 to

990 KVA at Chander puri9.13 FY 09-10 HT

1078 KN08UT4126 Krishna NagarAug of trf 630 to 990 KVA at 6 blk

Geeta Colony10.17 FY 09-10 HT

1079 KN08UT4127 Krishna NagarAug of trf 630 to 990 KVA at 3 blk

Geeta Colony10.16 FY 09-10 HT

1080 KN08UT4149 Krishna NagarAug of 630 - 990KVA Trf at Aram

ParK S/Stn in Div KRN11.22 FY 09-10 HT

1081 KN08UT4152 Krishna NagarAug of 400 - 630KVA Trf at Ram

Ngr Ext0.22 FY 09-10 HT

1082 KN08UT4175 Krishna NagarAug of 630 trf to 900 at Police

Station Geeta Colony1.82 FY 09-10 HT

1083 KN09LT4001 Krishna NagarReplacement of Sick LT Feeder

from Shiv Kutee to Zero No Gali3.67 FY 09-10 LT

1084 KN09LT4002 Krishna Nagar

Replacement of LT Feeder from

Kothi bhagwan Dass O/S to Jain

Mandir Gali and Prabhujoot

Building

4.43 FY 09-10 LT

1085 KN09LT4008 Krishna NagarTaking out 3 nos. LT Feeders from

Tagore Gali S/Stn.7.44 FY 09-10 LT

1086 KN09LT4014 Krishna Nagar

Taking out 1no LT Feeder from

DAV School to Near Kabaree

Wala

1.98 FY 09-10 LT

1087 KN09LT4015 Krishna Nagar

Taking Out 1 no. LT Feeder from

Police Station Gandhi Nagar Trf

no.- 2 to Near Punjab National

Bank .

3.15 FY 09-10 LT

1088 KN09LT4032 Krishna NagarReplacement and taking out of LT

Feeder from Khureji S/Stn.5.81 FY 09-10 LT

1089 KN09LT4035 Krishna Nagar

Replacement and taking out of LT

Feeder from south anarkali

S/Stn.

4.84 FY 09-10 LT

1090 KN09LT4048 Krishna Nagar

REPL of LT FDR FR S/STN

SHASTRI NGR KIOSK IN S/D-

GEETA CO IN D-KRN

3.63 FY 09-10 LT

1091 KN09LT4052 Krishna NagarPrividing two LT feeders from

Baldev Park in D-Krishna Nagar.2.46 FY 09-10 LT

1092 KN09LT4058 Krishna NagarRepl of Burnt & Damaged LT Dist.

Box in D- KNR74.93 FY 09-10 LT

1093 KN09RM4044 Krishna Nagar

Replacement of old Panel with

2X4WAY RMU at RLG Kehr

Singh, in division Krishna Nagar.

10.37 FY 09-10 HT

1094 KN09RM4045 Krishna NagarPdg O/D RMU at Jheel No 1 In D-

KRN3.17 FY 09-10 HT

1095 KW07SH4025 Karawal Nagar

Diversion of load of 11KV feeder

Wazirabad -1 to Moonga Nagar at

Bhagirathi Grid

32.30 FY 09-10 HT

1096 KW08FA4009 Karawal Nagar

Replacement of existing 3X150

PILCA into 3X300 XLPE cable

from Nanaksir Gurudwara Red

Light to Flood Water Pump

5.60 FY 09-10 HT

1097 KW08LT4171 Karawal Nagar

Replacement of 2 Nos LT Panel at

E&F Block Chand bag Div.Krawal

nagar.

6.90 FY 09-10 LT

1098 KW08MS4155 Karawal NagarRep. of existing O/H Cond. F Blk.

Khajoori to Bhagirathi Grid.9.36 FY 09-10 LT

1099 KW08MS4156 Karawal NagarRep.of Exis. O/H Cond. F Blk.

Khajoori to Bhagirathi Grid6.33 FY 09-10 LT

1100 KW08MS4157 Karawal Nagar

Replacement of exis. O/H Cond.

Khajoori Red Light to Tukhmir Pur

Vill. S.S. No. 2

6.33 FY 09-10 LT

1101 KW08MS4163 Karawal Nagar

Replacement of HVDS Poles

which become very down (7 feet-9

feet) due to road filling in various

colonies of Div.KWN

35.44 FY 09-10 HT

Page 52: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

1102 KW08MS4180 Karawal Nagar

Augmentation of Transformer. 100

KVA into 400 KVA at Annapurna

Mandir in Div. KWR

1.65 FY 09-10 HT

1103 KW08RM4065 Karawal NagarInstallation of new 3 Way RMU

O/D at Dayal Pur Tanki S/Stn.8.83 FY 09-10 HT

1104 KW08RM4178 Karawal NagarInstallation of 3 Way RMU at A

Blk.Gokal Puri in Div. KWR3.81 FY 09-10 HT

1105 KW08SL1075 Karawal NagarProviding Street Lighting in Babu

Nagar Div. KWR.2.00 FY 09-10 LT

1106 KW08SL1076 Karawal NagarProviding Street Lighting in Brij

Puri Div. KWR.3.14 FY 09-10 LT

1107 KW08SL1077 Karawal NagarProviding Street Lighting in

Chandu Nagar Div. KWR.0.91 FY 09-10 LT

1108 KW08SL1078 Karawal NagarProviding Street Lighting in Ganga

Vihar Div. KWR.4.51 FY 09-10 LT

1109 KW08SL1079 Karawal NagarProviding street lighting in Khajoori

colony E-Blk Div. KWR5.65 FY 09-10 LT

1110 KW08SL1080 Karawal NagarProviding Street Lighting in

Mahalaxmi Enclave Div. KWR.2.55 FY 09-10 LT

1111 KW08SL1081 Karawal Nagar

Providing street lighting in Milan

garden near Sabhapur Ext. Div.

KWR

1.74 FY 09-10 LT

1112 KW08SL1082 Karawal NagarProviding street lighting in Mukund

vihar Div. KWR5.74 FY 09-10 LT

1113 KW08SL1083 Karawal NagarProviding street lighting in Munga

nagar Div. KWR2.17 FY 09-10 LT

1114 KW08SL1084 Karawal NagarProviding Street Lighting in

Mustafabad Ext. Div. KWR.8.19 FY 09-10 LT

1115 KW08SL1087 Karawal NagarProviding Street Lighting in Prem

Nagar Div. KWR.2.31 FY 09-10 LT

1116 KW08SL1089 Karawal Nagar

Providing street lighting in

Shaheed Bhagat Singh Colony

Div. KWR

5.00 FY 09-10 LT

1117 KW08SL1091 Karawal NagarProviding street lighting in Shri

Ram Colony Div. KWR15.27 FY 09-10 LT

1118 KW08SL1092 Karawal NagarProviding Street Lighting in Vill

Dayalpur Ext. Div. KWR.1.91 FY 09-10 LT

1119 KW08SL1093 Karawal Nagar

Providing Street Lighting in

Chanderpuri Chand Bhag Div.

KWR.

4.57 FY 09-10 LT

1120 KW08SL1094 Karawal Nagar

Providing Street Lighting in

Sadatpur Ext.Pusta Area K,L,M,N

Blk Div. KWR.

2.34 FY 09-10 LT

1121 KW08SL1095 Karawal NagarProviding Street Lighting in E-Blk

Ext. Khajoori LOP Area Div. KWR.1.01 FY 09-10 LT

1122 KW08SL1096 Karawal NagarProviding street lighting in Amar

Vihar HVDS Div. KWR2.81 FY 09-10 LT

1123 KW08SL1097 Karawal Nagar Providing street lighting in Ambika

Vihar HVDS Div. KWR5.51 FY 09-10 LT

1124 KW08SL1098 Karawal NagarProviding street lighting in Ambika

Vihar A Blk. HVDS Div. KWR1.68 FY 09-10 LT

1125 KW08SL1099 Karawal NagarProviding street lighting in Bhagat

Vihar HVDS Div. KWR3.10 FY 09-10 LT

1126 KW08SL1100 Karawal Nagar

Providing street lighting in

Bhagirathi Vihar Ph. 2 HVDS Div.

KWR

5.13 FY 09-10 LT

1127 KW08SL1101 Karawal NagarProviding street lighting in

Chaman Park HVDS Div. KWR1.91 FY 09-10 LT

1128 KW08SL1102 Karawal Nagar

Providing street lighting in Dagar

Pur Mohlla Johri Pur HVDS Div.

KWR

0.75 FY 09-10 LT

1129 KW08SL1103 Karawal NagarProviding street lighting in Dayal

Pur C Blk. HVDS Div. KWR5.33 FY 09-10 LT

1130 KW08SL1104 Karawal Nagar

Providing street lighting in Dr.

Ambedkar Vihar Harijan Basti

Johri Pur HVDS Div. KWR

3.80 FY 09-10 LT

Page 53: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

1131 KW08SL1105 Karawal Nagar

Providing street lighting in Dr.

Ambekar Colony A & B Blk. Johri

Pur HVDS Div. KWR

2.42 FY 09-10 LT

1132 KW08SL1106 Karawal NagarProviding Street Lighting in East

Sadat Pur Ext. HVDS Div. KWR.1.16 FY 09-10 LT

1133 KW08SL1107 Karawal Nagar

Providing street lighting in

Ziauddin Pur Ext. East Gokal Puri

HVDS Div. KWR

1.52 FY 09-10 LT

1134 KW08SL1108 Karawal NagarProviding street lighting in East

Govind Vihar HVDS Div. KWR1.90 FY 09-10 LT

1135 KW08SL1109 Karawal Nagar

Providing street lighting in East

Harijan Basti A, B, &C Blk. HVDS

Div. KWR

4.25 FY 09-10 LT

1136 KW08SL1110 Karawal NagarProviding street lighting in Indira

Vihar Ph. 2 HVDS Div. KWR3.47 FY 09-10 LT

1137 KW08SL1111 Karawal NagarProviding street lighting in Janki

Panchal Vihar HVDS Div. KWR4.28 FY 09-10 LT

1138 KW08SL1112 Karawal NagarProviding street lighting in Johri

Pur Ext. HVDS Div. KWR2.88 FY 09-10 LT

1139 KW08SL1113 Karawal NagarProviding street lighting in Amar

Vihar Ext. HVDS Div. KWR2.82 FY 09-10 LT

1140 KW08SL1114 Karawal NagarProviding street lighting in Kamal

Vihar Ext. HVDS Div. KWR1.70 FY 09-10 LT

1141 KW08SL1115 Karawal NagarProviding street lighting in Kamal

Vihar Ext. HVDS Div. KWR2.06 FY 09-10 LT

1142 KW08SL1116 Karawal Nagar

Providing street lighting in Karawal

Nagar East Pushkar Vihar HVDS

Div. KWR

1.26 FY 09-10 LT

1143 KW08SL1117 Karawal Nagar

Providing Street Lighting in

Karawal Nagar Ext. HVDS Div.

KWR.

2.62 FY 09-10 LT

1144 KW08SL1118 Karawal NagarProviding street lighting in Kardam

Farm HVDS Div. KWR1.74 FY 09-10 LT

1145 KW08SL1119 Karawal Nagar

Providing street lighting in Maa

Rama Bai Ambedkar Mohlla

HVDS Div. KWR

1.48 FY 09-10 LT

1146 KW08SL1120 Karawal NagarProviding street lighting in

Mahalaxmi Vihar HVDS Div. KWR1.84 FY 09-10 LT

1147 KW08SL1121 Karawal NagarProviding Street Lighting in

Parkash Vihar HVDS Div. KWR.1.72 FY 09-10 LT

1148 KW08SL1122 Karawal Nagar

Providing street lighting in Prem

Vihar Purvi Karawal Nagar HVDS

Div. KWR

9.41 FY 09-10 LT

1149 KW08SL1123 Karawal NagarProviding street lighting in Rama

Garden HVDS Div. KWR2.59 FY 09-10 LT

1150 KW08SL1124 Karawal NagarProviding street lighting in Rama

Garden B Blk. HVDS Div. KWR1.45 FY 09-10 LT

1151 KW08SL1125 Karawal Nagar

Providing Street Lighting in

Roshan Vihar East Sadat Pur

HVDS Div. KWR.

1.89 FY 09-10 LT

1152 KW08SL1126 Karawal Nagar

Providing Street Lighting in

Sadatpur Ext. Blk-C-5 Or C-6

HVDS Div. KWR.

1.33 FY 09-10 LT

1153 KW08SL1127 Karawal Nagar Providing street lighting in Shanti

Nagar Shiv Vihar HVDS Div. KWR1.83 FY 09-10 LT

1154 KW08SL1128 Karawal NagarProviding street lighting in Shiv

Vihar Ph-6 HVDS Div. KWR3.48 FY 09-10 LT

1155 KW08SL1129 Karawal NagarProviding Street Lighting in Shiv

Vihar Ph-7 HVDS Div. KWR.2.93 FY 09-10 LT

1156 KW08SL1130 Karawal NagarProviding Street Lighting In Shiv

Vihar Ph-8 HVDS Div. KWR.1.10 FY 09-10 LT

1157 KW08SL1131 Karawal NagarProviding street lighting in Shiv

Vihar Ph-9 HVDS Div. KWR3.88 FY 09-10 LT

1158 KW08SL1132 Karawal NagarProviding Street Lighting In Shiv

Vihar Ph-2 HVDS Div. KWR.4.62 FY 09-10 LT

Page 54: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

1159 KW08SL1133 Karawal NagarProviding Street Lighting In Shiv

Vihar Ph-1 HVDS Div. KWR.3.83 FY 09-10 LT

1160 KW08SL1134 Karawal NagarProviding Street Lighting In Shiv

Vihar Ph. 3 HVDS Div. KWR.2.39 FY 09-10 LT

1161 KW08SL1135 Karawal NagarProviding Street Lighting In Shiv

Vihar Ph. 4 HVDS Div. KWR.2.62 FY 09-10 LT

1162 KW08SL1136 Karawal NagarProviding Street Lighting In Shiv

Vihar Ph-V HVDS Div. KWR.2.36 FY 09-10 LT

1163 KW08SL1137 Karawal NagarProviding Street Lighting In Shiv

Vihar U-Blk HVDS Div. KWR.2.03 FY 09-10 LT

1164 KW08SL1138 Karawal NagarProviding Street Lighting In Shiv

Vihar Ph-10 HVDS Div. KWR.6.16 FY 09-10 LT

1165 KW08SL1140 Karawal NagarProviding Street Lighting In Soniya

Vihar HVDS Div. KWR.96.42 FY 09-10 LT

1166 KW08SL1141 Karawal NagarProviding street lighting in Surya

Vihar HVDS Div. KWR1.41 FY 09-10 LT

1167 KW08SL1142 Karawal NagarProviding street lighting in

Tukmirpur Ext. HVDS Div. KWR0.30 FY 09-10 LT

1168 KW08SL1143 Karawal NagarProviding street lighting in Vill

Tukmirpur Abadi HVDS Div. KWR0.30 FY 09-10 LT

1169 KW08SL1144 Karawal NagarProviding street lighting in West

Karawal Nagar HVDS Div. KWR4.45 FY 09-10 LT

1170 KW08SL1145 Karawal Nagar

Providing street lighting in West

Karawal Nagar Blk A&B HVDS

Div. KWR

2.70 FY 09-10 LT

1171 KW08SL1146 Karawal NagarProviding street lighting in West

Karawal Nagar HVDS Div. KWR3.43 FY 09-10 LT

1172 KW08SL1149 Karawal Nagar

Providing street lighting in

Ziauddinpur Near Brijpuri Pulia

HVDS Div. KWR

1.23 FY 09-10 LT

1173 KW08SL1150 Karawal Nagar

Providing street lighting in

Jagdamba Colony Johripur HVDS

Div. KWR

3.32 FY 09-10 LT

1174 KW08SL1151 Karawal NagarProviding street lighting in Ankur

Enclave HVDS Div. KWR4.99 FY 09-10 LT

1175 KW08SL1152 Karawal NagarProviding Street Lighting In

Biharipur Ext. HVDS Div. KWR.0.81 FY 09-10 LT

1176 KW08SL1153 Karawal NagarProviding street lighting in Ram

Vihar Johri Pur HVDS Div. KWR0.27 FY 09-10 LT

1177 KW09LT4002 Karawal Nagar

T/O 3 NOS. LT FDRS. FROM

KARAWAL NAGAR COMP.

CENTRE DIV. KWR

2.63 FY 09-10 LT

1178 KW09LT4007 Karawal NagarT/O 2 NOS. LT FDRS. FROM

NEHRU VIHAR DIV. KWR3.01 FY 09-10 LT

1179 KW09LT4008 Karawal Nagar

T/O 5 NOS. LT FDRS. FROM

DGH OLD MUSTAFABAD DIV.

KWR

6.29 FY 09-10 LT

1180 KW09LT4010 Karawal NagarT/O 4 NOS. LT FDRS. FROM

FatMA NURSERY DIV. KWR6.84 FY 09-10 LT

1181 KW09LT4063 Karawal Nagar

N125109030135 NC of 15 KW in

f/o Wireless T.T Info Srvices

Limited,63 Main Road, Karawal

Nagar,Near Chauhanpur -94

0.17 FY 09-10 LT

1182 KW09MS4058 Karawal Nagar

Reliance Infratel Limited, Pushkar

Vihar Shiv Vihar Phase-4

Shahdara(15 KW)

1.27 FY 09-10 LT

1183 KW09MS4059 Karawal NagarReliance Infratel Limited, Gali No-

6, Phase V Shiv Vihar Delhi-841.33 FY 09-10 LT

1184 KW09MS4110 Karawal NagarElectrification of E-2 Sonia Vihar

5Th Pusta (LOP) in Div. KWR10.30 FY 09-10 LT

1185 KW09RM4014 Karawal NagarRep. of Exist. 3 Into 3 Way RMU

H Blk. Ganga Vihar In Div. KWR3.39 FY 09-10 HT

1186 KW09RM4017 Karawal NagarRep. of Exist. 3 Into 3 Way C-1

Nehru Vihar In Div. KWR3.03 FY 09-10 HT

1187 KW09RM4018 Karawal NagarRep. of Exist. 3 Into 3 Way K Blk.

Sadat Pur In Div. KWR4.45 FY 09-10 HT

Page 55: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

1188 KW09RM4019 Karawal NagarInst. of 3 Way RMU at S/Stn. No.

4 KWR In Div. KWR3.47 FY 09-10 HT

1189 KW09RM4020 Karawal NagarInst. of 3 Way RMU at Comp.

Centr KWR In Div. KWR2.96 FY 09-10 HT

1190 KW09RM4021 Karawal NagarRep. of Exist. 3 Into 3 Way D Blk.

Mukund Vihar In Div. KWR3.05 FY 09-10 HT

1191 KW09RM4022 Karawal NagarRep. of Exist. 3 Into 3 Way B Blk.

Mukund Vihar In Div. KWR3.05 FY 09-10 HT

1192 KW09RM4023 Karawal NagarRep. of Exist. 3 Into 3 Way Sbs

Colony S/Stn No. 1 In Div. KWR3.07 FY 09-10 HT

1193 KW09RM4024 Karawal NagarRep. of Exist. 3 Into 3 Way Sbs

Colony S/Stn. No. 2 In Div. KWR4.35 FY 09-10 HT

1194 KW09RM4025 Karawal NagarRep. of Exist. 3 Into 3 Way Sbs

Colony S/Stn. No. 3 In Div. KWR3.09 FY 09-10 HT

1195 KW09RM4026 Karawal NagarInst. of 3 Way RMU at S/Stn. No.

5 KWR5.56 FY 09-10 HT

1196 KW09RM4027 Karawal NagarRep. of Exist. 4 Into 4 Way Kamal

Vihar S/Stn In Div. KWR4.49 FY 09-10 HT

1197 KW09RM4028 Karawal NagarRep. of Exist. 3 Into 3 Way Shakti

Vihar In Div. KWR3.04 FY 09-10 HT

1198 KW09RM4029 Karawal NagarRep. of Exist. 3 Into 3 Way Prem

Vihar In Div. KWR4.79 FY 09-10 HT

1199 KW09RM4030 Karawal NagarInst. of 3 Way RMU at Sbs Colony

S/Stn No. 4 In Div. KWR3.44 FY 09-10 HT

1200 KW09RM4031 Karawal NagarInst. of 4 Way RMU at Jawahar

Ngr. Loni Road In Div. KWR5.41 FY 09-10 HT

1201 KW09RM4032 Karawal NagarRep. of Exist. 3 Into 4 Way Akbari

Masjid In Div. KWR4.53 FY 09-10 HT

1202 KW09RM4033 Karawal NagarRep. of Exist. 3 Into 5 Way RMU

at A Blk. Mukund Vihar4.49 FY 09-10 HT

1203 KW09RM4035 Karawal NagarRep. of Exist. 3 Into 4 Way E-1

Nehru Vihar In Div. KWR4.51 FY 09-10 HT

1204 KW09RM4036 Karawal NagarInst. of 3 Way RMU at Behari Pur

Vill. In Div. KWR3.58 FY 09-10 HT

1205 KW09RM4037 Karawal NagarInst. of 4 Way RMU at Sher Pur

Chowk In Div. KWR5.37 FY 09-10 HT

1206 KW09RM4039 Karawal NagarRep. of Exist. 3 Into 3 Way Chand

Bagh E Blk. In Div. KWR3.05 FY 09-10 HT

1207 KW09RM4040 Karawal NagarRep. of Exist. 3 Into 3 Way Chand

Bagh B Blk. In Div. KWR4.25 FY 09-10 HT

1208 KW09RM4041 Karawal NagarRep. of Exist. 3 Into 3 Way Chand

Bagh F Blk. In Div. KWR3.07 FY 09-10 HT

1209 KW09UT4056 Karawal Nagar

Augmentation of existing

Transformer into 630 KVA at H-

Block Ganga Vihar in Division

Karawal Nagar.

1.29 FY 09-10 HT

1210 KW09UT4115 Karawal Nagar

NC OF 90KW IN F/O M/S A.K

ENTERPRISES , B-15, KH NO.

21/6, GALI NO.10

12.70 FY 09-10 HT

1211 KW09UT4181 Karawal Nagar

Augmentation of 16KVA

Transformer at kabir Mandir

Panchal Vihar in division Karawal

Nagar.

2.54 FY 09-10 HT

1212 KY05LA2074 KCC Schemes

Amalgamation of Existing Loads of

1378KW and 351KW and

Providing addl load of 198.76 KW

making Total Load as 1928 Kwon

HT system of Supply under MLHT

category.

52.62 FY 09-10 HT

1213 KY06NC2013 KCC Schemes

Providing new load of 125KW in

f/o SE(E)-3 under MLHT category

on HT system of supply at ESIC

Dispensory, Nanad Nagari, New

Delhi.

12.01 FY 09-10 HT

1214 KY07EL2523 KCC Schemes Estimate for electrification of

ESIC Dispansary, Nand Nagri.8.10 FY 09-10 HT

Page 56: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

1215 KY07LA1566 KCC Schemes

Estimate for amalgamation and

Addl. load of 75KW making total

load of 180KW on LT system of

supply F/o M/s Allen Leasing &

Finance (P) Ltd., Plot No-6, FF &

SF, Pusa Road.

2.00 FY 09-10 LT

1216 KY07LA2526 KCC Schemes

Providing additional load of

367KW making total load of

442KW on HT system of supply

under MLHT category in f/o MCD,

Dr.Ambedkar Stadium, Delhi Gate.

7.03 FY 09-10 HT

1217 KY07NC2524 KCC Schemes

Providing new load of 2250KW on

HT system of supply under MLHT

category in f/o Dr.B.L.Kapur

Memorial Hospital, Pusa Road,

New Delhi.

48.19 FY 09-10 HT

1218 KY08LA1008 KCC SchemesLA in F/o AE, Harsh Vihar storm

water0.63 FY 09-10 HT

1219 KY08LA1027 KCC Schemes

Estimate for amalgamation of 3

nos meters & providing addl. Load

of 74KW making total load of

125KW on LT system in F/o

Girish Gujral, 10212 to 10216,

Ganga Ram Building, Ajmal Khan

Road, New Delhi.

2.70 FY 09-10 LT

1220 KY08LA2029 KCC Schemes

Providing Addl. Load of 158.55KW

making total load 198KW under

MLHT(LT) category on LT system

of supply against Ref. No-

121021000086 at CNG Filling

Station, Dilshad Garden.

11.68 FY 09-10 HT

1221 KY08LA2037 KCC Schemes

(BS-8024) Amal. and Addl. load of

346.86KW total 400 KW f/o

Regional Director ESIC 3-4Th

Floor, DDA Shopping Centre,

Rajinder Nagar.

8.82 FY 09-10 HT

1222 KY08LA2045 KCC Schemes

(BS-8056)Dismentalling and

Reinstallation of Substation and

Additional Load Making Total Load

of 590KW In F/O Associated

General Herald House.

5.88 FY 09-10 HT

1223 KY08NC1042 KCC Schemes

(BS-8053)New Load 195KW on

LT system of supply f/o Pradeep

Merchants Pvt. Ltd., 9B,Rajinder

Park, Pusa Rd.

1.97 FY 09-10 LT

1224 KY08NC2002 KCC Schemes

(BS-4156) New Load of 252 KW

on HT system of supply under

MLHT Category for Railway Pump

House Opp. Akshardham, New

Delhi.

8.35 FY 09-10 HT

1225 KY08NC2016 KCC Schemes

Providing new load of 105KW on

HT system of supply under MLHT

category in f/o Director, EMMC,

C/o BECIL, 14-B, IP Estate.

6.36 FY 09-10 HT

1226 KY08NC2030 KCC SchemesNC of 150KW on HT in f/o Yorco

Sales (P)6.67 FY 09-10 HT

1227 KY08NC2032 KCC Schemes

(BS 7035) Providing new load of

180KW under MLHT(LT) on LT

system of supply in f/o M/s Capital

Car P Ltd., Plot No-1, Patparganj

Industrial Complex, Delhi-92.

10.80 FY 09-10 HT

1228 KY08NC2035 KCC SchemesNew load 2700 KW Indoor

Stadium Yamuna Sports Complex112.04 FY 09-10 HT

Page 57: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

1229 KY08NC2039 KCC SchemesNew load 300KW f/o Arsha

Dharma Parishad16.87 FY 09-10 HT

1230 KY08NC2043 KCC Schemes

(BS-8050) New load of 700 KW

making total 700 KW under MLHT

category on HT system of supply

f/o Delhi Stock Exchange, Asaf Ali

Road.

12.13 FY 09-10 HT

1231 KY08NC5010 KCC Schemes(BS-7028)Ex.Eng(E&M)TY F/o

Seelampur2.33 FY 09-10 LT

1232 KY09LA1002 KCC Schemes

(BS-7054) Addl.load of 70 KW

making total 110 KW on HT

system of supply under MLHT

category. f/o IGL, CBD Ground

Near Crossriver Mall, KKD

3.37 FY 09-10 LT

1233 KY09LA1004 KCC Schemes

(BS-8054) Providing additional

Load of 21KW making total 120

KW on LT System in F/O

Dhanuka Agritech Limited 861-

862, Joshi Road Karol bagh.

2.96 FY 09-10 LT

1234 KY09LA2005 KCC Schemes

BS 8004 , Providing 150KW HT

connection to Balbhatri Public

School Gangaram hospital marg

with Load addition of 72KW.

9.65 FY 09-10 HT

1235 KY09NC1001 KCC Schemes

BS-7061 ,New temporary

connection of 500 KW in f/o

Simplex Infrastructure Limited ,

BELW Geeta Colony Fly Over

Near PAC Camp

6.02 FY 09-10 HT

1236 KY09NC2003 KCC Schemes

Providing new load of 60KW

making total 60KW under NDLT

category on LT system of supply

f/o Priyadarshni Working Women

Hostel, Vishwas Nagar, Shahadra,

Delhi.

12.57 FY 09-10 HT

1237 KY09NC2008 KCC Schemes

Providing new connection of

110KW to M/S Gagan Theatre,

Community centre Nand Nagri

4.48 FY 09-10 HT

1238 KY09NC2011 KCC Schemes

(BS-8064)Providing Temp.

connection of 500KW under

MLHT(HT) category on HT system

of supply in f/o Simplex

Infrastructure at Fly ash pond,

Rajghat Power House.

4.54 FY 09-10 HT

1239 KY09NC2012 KCC Schemes

Providing new load of 1600KW

makinf total load of 1600KW under

MLHT category on HT system of

supply in your favour.

6.89 FY 09-10 HT

1240 KY09NC2013 KCC Schemes

Providing New load of 220KW f/o

M/s P.S Ravindran, 9B, Bara

Bazar Marg, Old Rajinder Nagar,

Delhi-60.

12.20 FY 09-10 HT

1241 LN05EL2278 Laxmi Nagar

Electrification of Community

Facility Institutional Complex

Mandawli Fazalpur Distt. Laxmi

Nagar.

165.32 FY 09-10 HT

1242 LN05JJ4272 Laxmi Nagar

Electrification of JJ Cluster at

Rajeev Camp (NH-24), Laxshmi

Nagar

6.99 FY 09-10 LT

1243 LN05LT4101 Laxmi Nagar

Laying of 2 Nos, LT feeders of

size of 3.5*300 Sq mm XLPE from

E.G.A.N. S/Stn. to PCC Pole Near

H.No 26

3.42 FY 09-10 LT

1244 LN05NF4048 Laxmi Nagar

Provision of one No. HT feeder

from Preet Vihar Grid to G-1 S/Stn

with one No Addl. Panel at Preet

Vihar Grid and one No Addl. Panel

at G-1 S/Stn

34.02 FY 09-10 HT

1245 LN06LT4228 Laxmi NagarReplacement of damaged feeder

pillars in I.P. Extn., PPG.39.41 FY 09-10 LT

Page 58: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

1246 LN06RM4184 Laxmi Nagar

Providing 4 way RMU at Indoor

S/Stn.,South Ganesh Ngr. (Near

Chaudhary Nursing Home)

6.59 FY 09-10 HT

1247 LN06SH2215 Laxmi Nagar

Shifting of electrical services due

to construction of under pass with

four clover leaves at ITO Chungi

Xing at Intersection of Vikas Marg

& MB Road in Trans Yamuna Area

25.30 FY 09-10 HT

1248 LN07FA4540 Laxmi Nagar

Replacement of 3*300 PILCA HT

11KV cable to 3*300 Sq.MM

XLPE cable from S/Stn No.2 to

Chetna CGHS Via Deepa and

Swati CGHS.

20.49 FY 09-10 HT

1249 LN07FA4541 Laxmi Nagar

Aug of 11 KV HT PILCA cable of

3x300sqmm to 3x300XLPE cable

from GH-I to S/Stn No.19 via

S/Stn No.11, Arya Ngr 1&2, Jai

Santoshi.

13.14 FY 09-10 HT

1250 LN07FA4542 Laxmi Nagar

Aug.of 11 KV Pilca cable of 3*300

Sq mm to 3*300 XLPE cable from

S/S No.1 Chetna to Uttranchal to

Una to Konark to Aditi Appt..

21.69 FY 09-10 HT

1251 LN07FA4544 Laxmi Nagar

Aug.of 11 KV HT cable Pilca to

3*300 sqmm XLPE cable from

S/S No.6 to Saransh-1 Saransh-2

to Subham to Paradish to

Panchhmahal S/S 5

19.34 FY 09-10 HT

1252 LN07LT4545 Laxmi Nagar

Laying of 4-Nos. LT feeder of size

3.5X300 Sqmm from Mother Dairy

S/Stn MVR to C-208 Nirman

Vihar, Mother Dairy S/Stn MVR to

D-228 Nirman Vihar, Mother Dairy

S/Stn MVR to D-244 Nirman

Vihar, Mother Dairy S/Stn MVR to

C-187 Nirman Vihar div. LNR.

17.08 FY 09-10 LT

1253 LN07LT4546 Laxmi Nagar

Replacement of one No. LT feeder

of size 3.5x300sqmm from Mother

Dairy Nirman Vihar S/Stn. to D-

244 Nirman Vihar feeder Pillars

0.44 FY 09-10 LT

1254 LN07LT4547 Laxmi Nagar

Replacement of one No. LT

Feeder of Size 3.5X300Sqmm

from Mother Dairy Nirman Vihar

S/Stn. to D-228 Nirman Vihar

Feeder Pillars.

2.33 FY 09-10 LT

1255 LN07LT4548 Laxmi Nagar

Replacement of one No.LT Feeder

of Size 3.5X300Sqmm From

Mother Dairy Nirman Vihar S/Stn.

to C-187 Nirman Vihar Feeder

Pillars.

1.73 FY 09-10 LT

1256 LN07LT4550 Laxmi Nagar

Laying of 3 Nos. LT Feeder of Size

3.5X150 Sqmm from A-62 Fdr

Pillar to A-16 Nirman Vihar Fdr

Pillar, H.No.C-208 Fdr Pillar to

H.No.C-213 Nvr & H.No.D-228

Fdr Pillar to H.No. A-24 Fdr Pillar

Nvr In Laxmi Nagar .

1.24 FY 09-10 LT

1257 LN07SH1552 Laxmi NagarShifting of electric services due to

widening of the Road NH-2440.07 FY 09-10 HT

1258 LN07SH1651 Laxmi Nagar

Shifting of electric services due to

construction of Grade Separator at

Shastri nagar intersection at

Marginal Bund Road

57.41 FY 09-10 HT

1259 LN07SH1658 Laxmi Nagar

Shifting of S/Stn. opposite to

Manokamna Durga Mandir at

School Block Shakarpur.

6.69 FY 09-10 HT

Page 59: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

1260 LN07UT4503 Laxmi Nagar

Augmentation of 630 KVA Tr. into

990 KVA Tr. at J-Park Pandav

Nagar and T/O two Nos. LT

feeders.

14.41 FY 09-10 HT

1261 LN07UT4513 Laxmi Nagar

Augmentation of 630 KVA Tr. into

990 KVA Tr. at E-Blk GNPN

Compex and T/O two Nos. LT

feeders in Div. LNR.

5.26 FY 09-10 HT

1262 LN07UT4525 Laxmi Nagar

Augmentation of 1X630 KVA Tr.

into 1X990 KVA Tr. at H-Block

Laxmi Nagar S/Stn. and T/O 2 No

LT feeder from the Said S/Stn.

14.41 FY 09-10 HT

1263 LN07UT4527 Laxmi Nagar

Augmentation of 1X630 KVA Tr.

into 1X990 KVA Tr. at Police Qtr.

S/Stn. and T/O 2 No LTt feeder

from the Said S/Stn.

15.84 FY 09-10 HT

1264 LN08EL1205 Laxmi Nagar

Electrification of Plot No. 6 in LSC

Near Prince & Kothari

CGHS,Mandawali Fazalpur.

0.05 FY 09-10 HT

1265 LN08EL2147 Laxmi Nagar

Electrification of Fruit Vegetable &

Food grains Market at IFC

(DAMB),Pocket A Gazipur-HT

Portion

22.11 FY 09-10 HT

1266 LN08FA4056 Laxmi Nagar

Aug. of existing HT 11 KV cable

3*300 mm2 Pilca 3*300 mm2

XLPE cable from S/S No.6 to

Prashant Aptt.

5.73 FY 09-10 HT

1267 LN08FA4083 Laxmi Nagar

Augmentation of 3*150 cable to

3*300 cable XLPE P.D. Vhr S/Stn

to Mangal Bazar in Div LNR.

10.36 FY 09-10 HT

1268 LN08FA4110 Laxmi Nagar

500 mtr portion to be replaced with

3X300 XLPE cable from DDA

pump Swasth Vihar Sub-Station to

turning of Swasth vihar colony.

13.86 FY 09-10 HT

1269 LN08FP4124 Laxmi Nagar

Replacement of damaged feeder

pillars at DSIDC in FIE Patparganj

in Divn.LNR

6.15 FY 09-10 LT

1270 LN08LT4005 Laxmi Nagar

Laying of one no LT Fdr of Size

4X300 XLPE cable from G-1 S/S

to Pole Near F-36, Preet Vihar

4.27 FY 09-10 LT

1271 LN08LT4006 Laxmi Nagar

Laying of one LT fdr of size 4X300

XLPE cable from C-Blk Preet

Vihar S/S to pole near H.No.C-48,

Preet Vihar

4.28 FY 09-10 LT

1272 LN08LT4010 Laxmi Nagar

Laying of one no. LT fdr of size

4X300 mm2 XLPE cable from

East Guru Angad Ngr Ss to Gali

No. 5, Guru Angad Ngr in Div.

LNR.

2.77 FY 09-10 LT

1273 LN08LT4017 Laxmi Nagar

Laying of 1 No. LT feeder 4X300

mm2 XLPE cable from Kuldeep

Nursing Homes/S to H.No 228

Guru Ram Dass Nagar.

2.24 FY 09-10 LT

1274 LN08LT4084 Laxmi Nagar

Conversion of O/H Conductor in to

LTAB Cable in Division. Laxmi

Nagar

128.75 FY 09-10 LT

1275 LN08LT4107 Laxmi Nagar

Laying of 2-Nos LT fdr at S-Blk

Pandav Nagar to near pole H.No

26 & C-215 in Div LNR

3.31 FY 09-10 LT

1276 LN08LT4108 Laxmi NagarAug of 1 No. LT Fdr C-Blk GNPN

Com. to Pole opposite STD Booth2.24 FY 09-10 LT

1277 LN08LT4116 Laxmi Nagar

Augmentation of LT cable 4X300

XLPE cable from Khatta S/S to

Gali No.7 Sch. Blk Mandawali

1.92 FY 09-10 LT

Page 60: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

1278 LN08LT4126 Laxmi Nagar

Laying of 2 Nos LT feeders from

DT at S/St No 24 FIE to be

augmented from 630 KVA DT to

990 KVA against Scheme No

LN08UT4026.

4.59 FY 09-10 LT

1279 LN08LT4129 Laxmi Nagar

Laying of 1 No LT feeder from DT

at Railway Colony Mandawali S/St

to be augmented against Scheme

LN08UT4118.

4.58 FY 09-10 LT

1280 LN08LT4131 Laxmi Nagar

Laying of 3 Nos LT fdrs from

Kishan Kunj Extn Part 2 DT to be

augmented against Scheme

LN08UT4078.

5.79 FY 09-10 LT

1281 LN08LT4133 Laxmi Nagar

Laying of 4 Nos LT fdrs on DT to

be augmented against Scheme

LN08UT4076 and 2 Nos addl fdrs

from existing DT

12.29 FY 09-10 LT

1282 LN08LT4136 Laxmi Nagar

Laying of 3 Nos LT fdrs on Dtr to

be augumented against Scheme

LN08UT4081 at U Blk Dhaba.

5.65 FY 09-10 LT

1283 LN08LT4137 Laxmi Nagar

Laying of 1 No LT feeder on Dtr to

be augumented agauinst Scheme

LN08UT4119 at Chander Vihar

S/Stn.

2.39 FY 09-10 LT

1284 LN08LT4142 Laxmi NagarReplacement of damaged LT

Panel Board in Divs. Laxmi Nagar114.96 FY 09-10 LT

1285 LN08LT4152 Laxmi Nagar

Conversion of O/H conductor into

LT AB cable at Laxmi

Nagar,Shakarpur ,School Block

Divn.LNR

143.90 FY 09-10 LT

1286 LN08LT4242 Laxmi Nagar

Laying of 1 Nos LT Fdr 4X300

Sqmm XLPE from Sanjay Park

S/St

5.00 FY 09-10 LT

1287 LN08LT4244 Laxmi Nagar

Laying of LT Fdr 3.5X300 Sqmm

XLPE from Budh Vihar Kiosk

S/Stn LNR

6.06 FY 09-10 LT

1288 LN08LT4245 Laxmi NagarLaying of LT Fdr 3.5X300 Sqmm

XLPE from Mangal Bazar S/Stn5.50 FY 09-10 LT

1289 LN08LT4249 Laxmi Nagar

Laying of 2 Nos LT Feeder

3.5X300 Sqmm XLPE from

Ganesh Nagar Phatak S/Stn

11.15 FY 09-10 LT

1290 LN08LT4250 Laxmi NagarLaying of LT Fdr 3.5X300 Sqmm

XLPE from Nehru Enclave S/Stn5.79 FY 09-10 LT

1291 LN08LT4251 Laxmi NagarLaying of LT Fdr 3.5X300 Sqmm

XLPE from R Block Shakar Pur.4.47 FY 09-10 LT

1292 LN08LT4253 Laxmi Nagar

Laying of 2 Nos LT Fdr 3.5X300

Sqmm XLPE from H Blk Laxmi

Nagar.

10.14 FY 09-10 LT

1293 LN08LT4256 Laxmi Nagar

Laying of 2 Nos LT Fdr 3.5X300

Sqmm XLPE from Kundan Nagar

S/Stn

9.82 FY 09-10 LT

1294 LN08LT4318 Laxmi NagarPilot Project at Gujarat Vihar, Div.

Laxmi Nagar11.27 FY 09-10 LT

1295 LN08MS1149 Laxmi NagarShifting of Feeder Pilar in front of

Plot No 376, FIE Patpar Ganj.0.20 FY 09-10 LT

1296 LN08MS4138 Laxmi NagarLT Clean Up for Laxmi Nagar &

Shakarpur37.46 FY 09-10 LT

1297 LN08MS4204 Laxmi Nagar

Replacementl of LT Panel Board

in I.P.Extn Societies (Zone 2503 &

2504)

58.09 FY 09-10 LT

1298 LN08RM4040 Laxmi Nagar

Installation of 3 Way O/D RMU at

W.G.Angad Ngr.Sch. to replace

existing D.P.

5.18 FY 09-10 HT

1299 LN08RM4042 Laxmi Nagar

Replacement of single Panel board

at S/Stn Unchpur Mandawali in

Div LNR

2.55 FY 09-10 HT

1300 LN08RM4044 Laxmi NagarInstallation of sigle panel board at

Primary School Mandawali3.16 FY 09-10 HT

Page 61: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

1301 LN08RM4051 Laxmi Nagar

Installation of Single Panel Board

RMU at B-Blk Mandawali in Div

LNR

2.99 FY 09-10 HT

1302 LN08RM4073 Laxmi Nagar

Installation of 4 Way RMU O/D at

Ramesh Park Nr V10 to replace

existing D.P.

7.19 FY 09-10 HT

1303 LN08RM4089 Laxmi Nagar

Rep.of damaged 4 PB at

Sadbhawna CGHS IP Ext with

1X4 Way RMU.

6.22 FY 09-10 HT

1304 LN08RM4093 Laxmi Nagar

Rep.of damaged 4PB at

Priyadarshini CGHS IP Ext with

1X4Way RMU.

6.30 FY 09-10 HT

1305 LN08RM4094 Laxmi Nagar

Rep.of damaged panels at S/S2

Chander Vihar with 1X4Way

RMU.

6.42 FY 09-10 HT

1306 LN08RM4098 Laxmi Nagar

Replacement of 4-Way Panel

Board RMU at DDA Pumping

Chitra Vhr in Div LNR

6.30 FY 09-10 HT

1307 LN08RM4100 Laxmi Nagar

Inst 4 Way O/D RMU at Police

Booth Shakarpur to replace

existing D.P.

7.13 FY 09-10 HT

1308 LN08RM4101 Laxmi Nagar

Con.of DP into RMU at Veer

Savarkar Blk Shakarpur in Div

LNR

4.71 FY 09-10 HT

1309 LN08RM4104 Laxmi NagarInstlation of addl. Panel at

Manglam S/S West Vinod Nagar2.72 FY 09-10 HT

1310 LN08RM4154 Laxmi NagarRep of old damaged 4 P.B at Batla

S/S 16.42 FY 09-10 HT

1311 LN08RM4155 Laxmi NagarRep of old damaged 4 P.B at Batla

S/S 26.39 FY 09-10 HT

1312 LN08RM4156 Laxmi NagarRep of old damaged 4 P.B at

Karishma S/S25.46 FY 09-10 HT

1313 LN08RM4157 Laxmi NagarRep of old damaged 4 P.B at

Kirpal S/S5.53 FY 09-10 HT

1314 LN08RM4158 Laxmi NagarRep of old damaged 4 P.B at

Savarkar S/S5.51 FY 09-10 HT

1315 LN08RM4159 Laxmi Nagar

Replacement of old damaged 4

panel board at Ajanta CGHS S/S

With 1X4 Way RMU

6.14 FY 09-10 HT

1316 LN08RM4160 Laxmi Nagar

Replacement of old damaged 4

panel board at Vandana CGHS

S/S with 1X4 Way RMU

6.34 FY 09-10 HT

1317 LN08RM4161 Laxmi Nagar

Replacement of old damaged 4

panel board at Brothers CGHS

S/S with 1X4 Way RMU

6.23 FY 09-10 HT

1318 LN08RM4162 Laxmi Nagar

Rep of old damaged 3 Panel

Board at Bharat Kohinoor CGHS

S/S with 1X3 way RMU

4.15 FY 09-10 HT

1319 LN08RM4163 Laxmi Nagar

Rep of old damaged 4 Panel

Board at Parivar CGHS S/S with

1X4 way RMU

6.48 FY 09-10 HT

1320 LN08RM4164 Laxmi Nagar

Rep of old damaged 4 Panel

Board at Paradise CGHS S/S 1

with 1X4 way RMU

6.18 FY 09-10 HT

1321 LN08RM4166 Laxmi Nagar

Replacement of old damaged 4

panel board at Shubham CGHS

S/S with 1X4 Way RMU

6.34 FY 09-10 HT

1322 LN08RM4167 Laxmi NagarRep of old damaged 4 PB at

Saransh S/S15.88 FY 09-10 HT

1323 LN08RM4168 Laxmi NagarRep of old damaged 4 PB at

Saransh S/S25.83 FY 09-10 HT

1324 LN08RM4169 Laxmi NagarRep of old 4 PB at Saraswati Kunj

S/S16.40 FY 09-10 HT

1325 LN08RM4170 Laxmi Nagar Rep of old 4 PB at Retreat S/S1 6.43 FY 09-10 HT

1326 LN08RM4171 Laxmi Nagar Rep of old 4 PB at Retreat S/S2 7.20 FY 09-10 HT

1327 LN08RM4172 Laxmi Nagar Rep of old 4 PB at Tarang S/S1 6.01 FY 09-10 HT

1328 LN08RM4173 Laxmi Nagar Rep of old 4 PB at Tarang S/S2 5.90 FY 09-10 HT

Page 62: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

1329 LN08RM4174 Laxmi Nagar

Replacement of old damaged 4

panel board at Ekta Garden CGHS

S/S1 with 1X4 Way RMU

6.66 FY 09-10 HT

1330 LN08RM4175 Laxmi Nagar

Replacement of old damaged 4

panel board at Ekta Garden CGHS

S/S 2 with 1X4 way RMU

6.42 FY 09-10 HT

1331 LN08RM4176 Laxmi Nagar Rep of old 4 PB at Navkunj S/S1 6.40 FY 09-10 HT

1332 LN08RM4177 Laxmi Nagar

Replacement of old damaged 4

panel board at Navkunj CGHS

S/S2 with 1X4 Way RMU

6.51 FY 09-10 HT

1333 LN08RM4178 Laxmi Nagar

Replacement of old damaged 4

panel board at Link CGHS S/S

with 1X4 Way RMU

6.69 FY 09-10 HT

1334 LN08RM4179 Laxmi Nagar

Replacement of old damaged 4

panel board at Aditi CGHS S/S

with 1X4 Way RMU

6.34 FY 09-10 HT

1335 LN08RM4180 Laxmi Nagar

Replacement of old damaged 4

panel board at Navkala CGHS S/S

with 1X4 Way RMU

6.14 FY 09-10 HT

1336 LN08RM4181 Laxmi Nagar

Replacement of Old damaged 4

panel board at Dhruva CGHS S/S

with 1X4 Way RMU

6.54 FY 09-10 HT

1337 LN08RM4182 Laxmi Nagar Rep of old 5 PB at Una S/S 9.24 FY 09-10 HT

1338 LN08RM4183 Laxmi NagarRep of old damaged 4PB at

Uttranchal S/S6.85 FY 09-10 HT

1339 LN08RM4184 Laxmi Nagar

Replacement of Old damaged 4

panel board at Deepa CGHS S/S

with 1X4 Way RMU

6.76 FY 09-10 HT

1340 LN08RM4185 Laxmi NagarRep of old damaged 4PB at Swati

S/S6.51 FY 09-10 HT

1341 LN08RM4186 Laxmi NagarRep of old damaged 4PB at

Panchmahal S/S5.74 FY 09-10 HT

1342 LN08RM4187 Laxmi NagarRep of old damaged 4PB at

Engineers S/S16.08 FY 09-10 HT

1343 LN08RM4188 Laxmi Nagar

Replacement of old damaged 4

panel board at Engineers CGHS

S/S2 with 1X4 Way RMU

6.27 FY 09-10 HT

1344 LN08RM4189 Laxmi NagarRep of old damaged 4PB at

Technology S/S5.84 FY 09-10 HT

1345 LN08RM4190 Laxmi Nagar

Replacement of old damaged 4

panel board at Oriental CGHS S/S

with 1X4 way RMU

6.74 FY 09-10 HT

1346 LN08RM4191 Laxmi Nagar

Replacement of old damaged 4

panel board at Ankur CGHS S/S1

with 1X4 Way RMU

6.76 FY 09-10 HT

1347 LN08RM4192 Laxmi Nagar

Replacement of old damaged 4

panel board at Ankur CGHS S/S2

With 1X4 way RMU

6.77 FY 09-10 HT

1348 LN08RM4193 Laxmi NagarRep of old damaged 3PB at

Deshbandhu S/S4.24 FY 09-10 HT

1349 LN08RM4194 Laxmi NagarRep of old damaged 3PB at J Park

Pandav Nagar3.96 FY 09-10 HT

1350 LN08RM4195 Laxmi NagarRep of old damaged 3PB at

Chander Vihar S/S13.74 FY 09-10 HT

1351 LN08RM4197 Laxmi Nagar

Rep of old damaged 4 Panel

Board at E Blk West Vinod Nagar

S/S with 1X4 way RMU

5.66 FY 09-10 HT

1352 LN08RM4198 Laxmi NagarRep of old damaged 4PB at D Blk

West Vinod Nagar5.95 FY 09-10 HT

1353 LN08RM4199 Laxmi NagarRep of old damaged 4PB at A Blk

West Vinod Nagar5.94 FY 09-10 HT

1354 LN08RM4200 Laxmi NagarRep of old damaged 4PB at DDA

Booster Pump6.23 FY 09-10 HT

1355 LN08RM4201 Laxmi NagarRep of old damaged 3PB at DDA

Sewage Pump3.72 FY 09-10 HT

1356 LN08RM4202 Laxmi NagarRep of old damaged 4PB at

Prashant S/Stn6.10 FY 09-10 HT

1357 LN08RM4206 Laxmi NagarRep of old damaged 7PB at DDA

Flat Nirman Vihar11.15 FY 09-10 HT

Page 63: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

1358 LN08RM4208 Laxmi NagarRep of old damaged RMU at N.V

Kiosk3.80 FY 09-10 HT

1359 LN08RM4209 Laxmi Nagar

Rep of old damaged RMU at

Bharti Artist Colony with 1X3 way

RMU

3.89 FY 09-10 HT

1360 LN08RM4210 Laxmi NagarRep of old damaged RMU at B Blk

Nr Mkt Preet3.89 FY 09-10 HT

1361 LN08RM4211 Laxmi NagarRep of old damaged 4PB at LSC1

Preet Vihar5.95 FY 09-10 HT

1362 LN08RM4212 Laxmi NagarRep of old damaged 5PB at LSC3

Preet Vihar6.00 FY 09-10 HT

1363 LN08RM4213 Laxmi Nagar

Rep of old damaged RMU at

Madhuban Kiosk with 1X3 way

RMU.

3.97 FY 09-10 HT

1364 LN08RM4214 Laxmi Nagar

Rep of old damaged 4 P.B at Distt

Center -2 Preet Vihar with 1X4

way RMU

5.58 FY 09-10 HT

1365 LN08RM4215 Laxmi NagarRep of old damaged 4PB at

Shankar Vihar5.76 FY 09-10 HT

1366 LN08RM4216 Laxmi NagarRep of old damaged 4PB at

Defence Enclave5.92 FY 09-10 HT

1367 LN08RM4217 Laxmi NagarRep of old damaged 4PB at East

Guru Angad Nagar8.74 FY 09-10 HT

1368 LN08RM4218 Laxmi Nagar

Rep of existing D.P at Swasthya

Vihar Kiosk with 1X3 way O/D

RMU.

4.44 FY 09-10 HT

1369 LN08RM4220 Laxmi Nagar

Replacement of existing D.P at

Urja Vihar Substation with 1X3

WAY O/D RMU, Laxmi Nagar.

3.71 FY 09-10 HT

1370 LN08RM4221 Laxmi NagarRep of old damaged 7PB at

Tikona Park LNR11.65 FY 09-10 HT

1371 LN08RM4222 Laxmi NagarRep of old damaged 4PB at S/Stn

12 FIE5.89 FY 09-10 HT

1372 LN08RM4224 Laxmi NagarRep of old damaged 4PB at S/Stn

15 FIE5.72 FY 09-10 HT

1373 LN08RM4225 Laxmi NagarRep of old damaged 4PB at S/Stn

16 FIE5.67 FY 09-10 HT

1374 LN08RM4226 Laxmi NagarRep of old damaged 4PB at S/Stn

17 FIE6.14 FY 09-10 HT

1375 LN08RM4227 Laxmi NagarRep of old damaged 3PB at S/Stn

18 FIE4.17 FY 09-10 HT

1376 LN08RM4228 Laxmi Nagar

Rep of old damaged 4 Panel

Board at S/Stn 20 FIE with 1X4

way RMU

5.79 FY 09-10 HT

1377 LN08RM4229 Laxmi NagarRep of old damaged 4PB at S/Stn

21 FIE6.37 FY 09-10 HT

1378 LN08RM4230 Laxmi NagarRep of old damaged 4PB at S/Stn

23 FIE6.12 FY 09-10 HT

1379 LN08RM4232 Laxmi NagarRep of old damaged 4PB at S/Stn

5 FIE3.87 FY 09-10 HT

1380 LN08RM4234 Laxmi NagarRep of old damaged 4PB at S/Stn

6 FIE3.94 FY 09-10 HT

1381 LN08RM4236 Laxmi Nagar

Rep of old damaged RMU at Gazi

Pur DTC Depot with 1X3 way

RMU

3.64 FY 09-10 HT

1382 LN08RM4257 Laxmi Nagar

Rep of old damaged RMU at

Durga Mandir (K)S/S Gazipur with

1X3 way RMU

3.61 FY 09-10 HT

1383 LN08RM4258 Laxmi NagarRep of old damaged RMU at S/S

19 CGHS with 1X3 way RMU4.11 FY 09-10 HT

1384 LN08RM4259 Laxmi NagarRep of old damaged 4PB at Arya

Nagar CGHS S/S16.14 FY 09-10 HT

1385 LN08RM4260 Laxmi NagarRep of old damaged 4PB at Arya

Nagar CGHS S/S25.87 FY 09-10 HT

1386 LN08RM4265 Laxmi NagarRep of damaged RMU at Aruna

CGHS S/S5.51 FY 09-10 HT

1387 LN08RM4267 Laxmi Nagar

Replacement of Old damaged 4

panel board at Balco CGHS S/S

with 1X4 Way RMU

6.55 FY 09-10 HT

Page 64: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

1388 LN08RM4269 Laxmi Nagar

Replacement of old damaged 4

panel board at Amarapali S/Stn 1

CGHS with 1X4 Way RMU

5.95 FY 09-10 HT

1389 LN08RM4272 Laxmi NagarRep of damaged RMU at S/S No

14 CGHS S/S4.42 FY 09-10 HT

1390 LN08RM4275 Laxmi NagarRep of old damaged 4PB at S/S

18 CGHS4.13 FY 09-10 HT

1391 LN08RM4277 Laxmi NagarRep of damaged RMU at attrilokia

CGHS S/S4.38 FY 09-10 HT

1392 LN08RM4297 Laxmi NagarRep of D.P at Rita Blk SKP with

1x 3 Way RMU4.89 FY 09-10 HT

1393 LN08RM4301 Laxmi Nagar

Replacement of D.P at Dal Mill

Shakarpur with 1X3 WAY O/D

RMU in Laxmi Nagar.

6.29 FY 09-10 HT

1394 LN08RM4302 Laxmi Nagar

Replacement of D.P at Nehru

enclave Harizan Basti Shakarpur

with 1X4 WAY O/D RMU, Laxmi

Nagar.

6.11 FY 09-10 HT

1395 LN08RM4303 Laxmi NagarRep of D.P at Ramesh Park

Akhara LNR6.10 FY 09-10 HT

1396 LN08RM4304 Laxmi Nagar

Replacement of D.P at Ramesh

Park JJ Cluster LNR with 1X3

Way O/D RMU

3.89 FY 09-10 HT

1397 LN08SH1140 Laxmi Nagar

Shifting of electric services due to

construction of flyover at Gazipur

& making the junction signal free

on at NH-24 bypass

69.37 FY 09-10 HT

1398 LN08UT4074 Laxmi Nagar

Augmentation of 630 KVA Tr. into

990 KVA Tr. at Sunder

Blkshakarpur In LNR Div.

1.74 FY 09-10 HT

1399 LN08UT4075 Laxmi Nagar

Augmentation of 400 KVA Tr.into

630 KVA Tr. at Kishan Kunj Kiosk

in Div LNR.

1.04 FY 09-10 HT

1400 LN08UT4076 Laxmi Nagar

Augmentation of 400KVA

transformer to 630 KVA Tr. T/O 3-

LT Fdr at V-10 Near Narain Ngr in

LNR Div.

0.36 FY 09-10 HT

1401 LN08UT4077 Laxmi Nagar

Augmentation of 400KVA

transformer to 630 KVA Tr. T/O 2-

LT Fdr at Primary School West

Guru Angad Ngr in Div LNR

1.69 FY 09-10 HT

1402 LN08UT4080 Laxmi Nagar

Augmentation of 630 KVA Tr. into

990 KVA Tr. at Dr. Walia Nursing

Home In Div LNR.

1.23 FY 09-10 HT

1403 LN08UT4081 Laxmi Nagar

Augmentation of 630 KVA Tr.into

990 KVA Tr.at U-Blk

Dabashakarpur in LNR Div.

1.44 FY 09-10 HT

1404 LN08UT4151 Laxmi Nagar

Augmentation of 630 KVA Tr into

990 KVA Tr at Guru Nanak Pura

Sub Stn Laxmi Nagar

0.79 FY 09-10 HT

1405 LN09AT4120 Laxmi Nagar

Providing additional Transformer

of 630kVA at Shiromani

Substation.

4.61 FY 09-10 HT

1406 LN09LT4122 Laxmi Nagar

Laying of 2 Nos LT Feeder

4X300Sqmm at G Block Shakar

Pur Sub Station.

12.15 FY 09-10 LT

1407 LN09LT4131 Laxmi Nagar

Laying of two No LT feeder

4X300mmsq XLPE Cable from

WB block Shakarpur S/Stn to

WB-154 Shakarpur and WB Block

S/S to Ganesh Nagar S/tn.

6.23 FY 09-10 LT

1408 LN09LT4152 Laxmi Nagar

LT 5429 Load addition of 60KW at

136 Gazipur in F/O Subhash

Chander Making total Load of

90KW against CRN No.

1230039420

0.84 FY 09-10 LT

Page 65: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

1409 LN09RM4002 Laxmi Nagar

Replacement of old & damaged

11KV Panels at Substation No.-2

Patparganj.

10.45 FY 09-10 HT

1410 LN09RM4005 Laxmi Nagar

Replacement of old & damaged

11KV Panel at Substation No.-8

Patparganj.

5.36 FY 09-10 HT

1411 LN09RM4012 Laxmi Nagar

Re[lacement of old & Damaged

11KV Panels at Indraprastha

CGHS Substation.

5.81 FY 09-10 HT

1412 LN09RM4017 Laxmi Nagar

Replacemnt of Old & Damaged

11KV Panels at Doorsanchar

CGHS Substation. Laxmi Nagar.

5.69 FY 09-10 HT

1413 LN09RM4073 Laxmi Nagar

Replacement of Old & Damaged

11KV Panels at WB Block

Shakarpur Substation.Laxmi

Nagar.

5.35 FY 09-10 HT

1414 LN09RM4076 Laxmi Nagar

Replacement of Old & Damaged

11 Kv Panels at G Block Shakar

Pur S/Stn.

3.10 FY 09-10 HT

1415 LN09RM4077 Laxmi Nagar

Replacement of old & damaged

11KV Panels at Commercial

Practice Shakarpur Substation,

Laxmi Nagar.

10.59 FY 09-10 HT

1416 LN09RM4079 Laxmi Nagar

Replacement of old & damaged

11KV Panels at Kuldeep Nursing

Home Substation.Laxmi Nagar.

10.60 FY 09-10 HT

1417 LN09RM4080 Laxmi Nagar

Replacement of Old & damaged

11KV Panels at V-7 Rennywell

Substation.

3.64 FY 09-10 HT

1418 LN09RM4081 Laxmi Nagar

Replacement of Old & Damaged

11 Kv Panels at Budh Vihar Kiosk

S/Stn

3.08 FY 09-10 HT

1419 LN09SH1361 Laxmi Nagar

Shifting of O/H line at PPG Road

from Radhu Place to A-4 P.D.

Vihar.

4.50 FY 09-10 HT

1420 LN09SL1181 Laxmi Nagar

Providing Street Lights at

Unauthorised Colonies Madhu

Vihar,Gazi Pur& Joshi Colony in

A.C of Sh Naseeb Singh (MLA)

6.91 FY 09-10 LT

1421 M306FA4569 Mayur Vihar Ph-3

Replacement of H.T.Conductor

into 3x300 sq.mm XLPE Cable

from S/Stn No - 6 V.Encl. to

Dallupura Village Near Durga Park

via Summer Villa Public School to

Dallupura Harijan Basti to IBP

Petrol Pump to IOL Petrol Pump in

division Mayur Vihar-3

52.34 FY 09-10 HT

1422 M306SH2575 Mayur Vihar Ph-3

Shifting of electrical services from

Kondli Gharoli Storm Water Drain

from Dallupura village to Noida

Road (upto Bharat Petrol pump).

7.78 FY 09-10 HT

1423 M307RM4022 Mayur Vihar Ph-3 Replacement of 11kV 4 Way

Panel Board at S.Stn-C2 MVR-35.65 FY 09-10 HT

1424 M307RM4023 Mayur Vihar Ph-3

Replacement of 11kV 4 Way

Panel Board at S.Stn-5 Pkt A2

,MVR-3

6.14 FY 09-10 HT

1425 M307RM4024 Mayur Vihar Ph-3 Replacement of 11kV 4 Way

Panel Board at S.Stn-9 A3 MVR35.88 FY 09-10 HT

1426 M307RM4025 Mayur Vihar Ph-3 Replacement of 11kV 4 Way

Panel Board at S.Stn-D-2 MVR-35.71 FY 09-10 HT

1427 M307RM4026 Mayur Vihar Ph-3

Replacement of 11kV 4 Way

Panel Board at S.Stn-6 Pkt A3

MVR Ph-3

6.03 FY 09-10 HT

Page 66: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

1428 M307RM4027 Mayur Vihar Ph-3

Replacement of 11 KV 4 Way

Panel Board at S.Stn-7 Pkt A3

MVR Ph-3.

6.05 FY 09-10 HT

1429 M307RM4029 Mayur Vihar Ph-3

Replacement of 11kV 4 Way

Panel Board at S.Stn-4 Pkt B8

MVR Ph-3

6.11 FY 09-10 HT

1430 M307RM4030 Mayur Vihar Ph-3

Replacement of 11KV 4 Way

Panel Board at S.STN-4 VSE

MVR-3

6.09 FY 09-10 HT

1431 M307RM4031 Mayur Vihar Ph-3 Replacement of 11kV 3 Way

Panel at S.Stn-2 VSE MVR Ph-33.97 FY 09-10 HT

1432 M307RM4032 Mayur Vihar Ph-3

Replacement of 11 KV 4 Way

Panel Board at S.Stn-3 VSE MVR

Ph-3.

6.03 FY 09-10 HT

1433 M307RM4034 Mayur Vihar Ph-3 Rep.of HT 11 KV Panel at S/S 2

Mix Housing MVR Ph-35.41 FY 09-10 HT

1434 M307RM4036 Mayur Vihar Ph-3

Replacement of 11KV 4 Way

Panel Board at S.STN-HINDON

CGHS MVR PH-3

5.52 FY 09-10 HT

1435 M307RM4037 Mayur Vihar Ph-3 Rep.of HT 11 KV Panel at S/S B-1

MVR Ph-311.41 FY 09-10 HT

1436 M307RM4039 Mayur Vihar Ph-3 Rep.of HT 11 KV Panel at S/S 10

Mix Housing MVR Ph-311.28 FY 09-10 HT

1437 M308FA4061 Mayur Vihar Ph-3

Providing duplicate source of 11

KV supply to Sardar Patel DP

from 4 Pole Structure T Point Near

School

24.52 FY 09-10 HT

1438 M308FA4062 Mayur Vihar Ph-3

Replacement of 11 KV PILCA

cable of Size 3X300 Sqmm to

XLPE cable of size 3X300 Sqmm

from E2 To C5 New Ashok Nagar

10.02 FY 09-10 HT

1439 M308FA4063 Mayur Vihar Ph-3

Replacment of 11KV PILCA Cable

of size 3CX300mm2 to XLPE

cable of size 3CX300 mm2 from

Substation C5 to C4 New Ashok

Nagar.

11.83 FY 09-10 HT

1440 M308FA4080 Mayur Vihar Ph-3

Replacement of 11 KV PILCA

cable of Size 3X300 Sqmm to

XLPE cable of Size 3X300 Sqmm

from Kondli Grid to Sewage

Pumping Stn Dallupura.

82.40 FY 09-10 HT

1441 M308LT4004 Mayur Vihar Ph-3 Provision of LTAB Cable at Pandit

Mohalla4.48 FY 09-10 LT

1442 M308LT4006 Mayur Vihar Ph-3 T.O 2 LT fdr from augmented trf at

Harijan.Basti at Dallupura16.04 FY 09-10 LT

1443 M308LT4009 Mayur Vihar Ph-3 T.O 3 Nos.LT fdr from S.Stn-4 Pkt-

B 8 MVR-36.29 FY 09-10 LT

1444 M308LT4012 Mayur Vihar Ph-3 T.O 3 Nos.LT fdr From S.Stn-4

Gharoli Dairy farm13.08 FY 09-10 LT

1445 M308LT4013 Mayur Vihar Ph-3 T.O 2 Nos.LT fdr from C Blk New

Kondli12.92 FY 09-10 LT

1446 M308LT4054 Mayur Vihar Ph-3 Provision of LT AB Cable in LOP

at Mayur Vihar III19.57 FY 09-10 LT

1447 M308MS1036 Mayur Vihar Ph-3

Insatallation of street lighting

points at C BLK NEW ASHOK

NAGAR mentioned in the list of

1539 colonies at Sr no-778/reg no-

428.

0.74 FY 09-10 LT

1448 M308MS1037 Mayur Vihar Ph-3

Installation of Street Lighting

Points at B-1 Blk New Ashok

Nagar mentioned in the list of

1539 Un Authorized Colonies at Sr

No 773/Reg No 677.

4.84 FY 09-10 LT

1449 M308MS1038 Mayur Vihar Ph-3

Installation of Street Lighting

Points at Kondli mentioned in the

list of 1539 Un Authorized

Colonies at Sr No 523/Reg No

1288.

2.63 FY 09-10 LT

Page 67: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

1450 M308MS1039 Mayur Vihar Ph-3

Installation of Street Lighting

Points at Ext A Blk and Sapera

Basti Village Gharoli. mentioned in

the list of 1539 Un.authorized

Colonies at Sr. No-1125/Reg No

1274.

1.96 FY 09-10 LT

1451 M308MS1040 Mayur Vihar Ph-3

Installation of street lighting points

at E & ED BLK NEW ASHOK

NAGAR mentioned in the list of

1539 unauthorised colonies at

Sr.No-772/reg.No-878.

6.69 FY 09-10 LT

1452 M308MS4030 Mayur Vihar Ph-3 Replacement of Feeder Pillars at B-

1 New.Ashok Nagar12.52 FY 09-10 LT

1453 M308MS4031 Mayur Vihar Ph-3 Replacement of Feeder Pillars at E

Blk New Ashok Nagar11.62 FY 09-10 LT

1454 M308MS4032 Mayur Vihar Ph-3 Replacement of Feeder. Pillars at

Mix Housing10.82 FY 09-10 LT

1455 M308RM4024 Mayur Vihar Ph-3 Replacement of HT 5 Way Panel

at S.Stn 9 East End Appt8.69 FY 09-10 HT

1456 M308RM4025 Mayur Vihar Ph-3 Rep.of HT 5Way Panel at S.2

East End App10.86 FY 09-10 HT

1457 M308RM4026 Mayur Vihar Ph-3 Replacement of HT 6 way Panel at

S/Stn No 3 New Ashok Nagar10.95 FY 09-10 HT

1458 M308RM4055 Mayur Vihar Ph-3 Provision of 11KV RMU(3 WAY)

at Sardar Patel DP. Mayur Vihar.3.45 FY 09-10 HT

1459 M308RM4058 Mayur Vihar Ph-3

Replacement of 11 KV 4 Way

Panel Board at Indian Express

Aptt.

5.25 FY 09-10 HT

1460 M308RM4059 Mayur Vihar Ph-3 Replacement of 11 KV 4 Way

Panel Board at AIIMS Aptt.5.25 FY 09-10 HT

1461 M308RM4060 Mayur Vihar Ph-3

Replacement of 11 KV 3 Way

Panel Board at Nagarjuna Aptt

S/S No 2

5.36 FY 09-10 HT

1462 M308RM4064 Mayur Vihar Ph-3

Replacement of 11 KV 4 Panel

Board at D1 Janta Flats MVR Ph-

3

8.66 FY 09-10 HT

1463 M308RM4065 Mayur Vihar Ph-3 Replacement of 11 KV 4 Panel

Board at Mansara CGHS MVR35.51 FY 09-10 HT

1464 M308RM4073 Mayur Vihar Ph-3

Replacement of 11 KV 4 Way

Panel Board at Lahore Gate

CGHS MVR-3

5.55 FY 09-10 HT

1465 M308RM4074 Mayur Vihar Ph-3

Replacement of 11 KV 7 Way

Panel Board at Mangal CGHS

MVR 3

11.20 FY 09-10 HT

1466 M308RM4075 Mayur Vihar Ph-3

Replacement of 11 KV 4 Way

Panel Board at Jansewak CGHS

S/S1 MVR3

5.52 FY 09-10 HT

1467 M308RM4076 Mayur Vihar Ph-3

Replacement of 11 KV 4 Way

Panel Board at Jansewak CGHS

S/S2 MVR3

5.52 FY 09-10 HT

1468 M308RM4077 Mayur Vihar Ph-3

Replacement of 11 KV 4 Way

Panel Board at Abul Fazal CGHS

MVR3

5.49 FY 09-10 HT

1469 M308RM4078 Mayur Vihar Ph-3

Replacement of 11 KV 4 Way

Panel Board at dainik Janyug

CGHS MVR3

5.57 FY 09-10 HT

1470 M308UT4003 Mayur Vihar Ph-3 Aug.of Tr. 630 To 990 KVA at

Rajveer Cly.10.26 FY 09-10 HT

1471 MV04EL2630Mayur Vihar Ph-

1&2

Electrification of Distt. Centre at

Mayur Vihar Phase-I near

Samachar Complex (HT part + 5

no. S/Stn.s+LT part) (50:50

PART)

129.55 FY 09-10 HT

1472 MV05JJ4191Mayur Vihar Ph-

1&2

Electrification of JJ Cluster J-

Block East Vinod Nagar Mayur

Vihar.

3.43 FY 09-10 LT

Page 68: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

1473 MV06FA4082Mayur Vihar Ph-

1&2

Replacement of 11KV HT 3x300

MM2 cable from Mayur vihar Grid

to S/STN NO. II (CGHS)

18.55 FY 09-10 HT

1474 MV06FA4092Mayur Vihar Ph-

1&2

Conversion of 11 KV HT O/H

Feeder into HT 3X300 SQMM

XLPE U/G cable from 23 Block

Trilok Puri to 27 Block Trilok puri.

22.48 FY 09-10 HT

1475 MV06FA4093Mayur Vihar Ph-

1&2

Conversion of 11 KV HT O/H

feeder into HT 3X300 sqmm XLPE

U/G cable from 23 block Trilok

Puri to 26 Block Trilok Puri

7.58 FY 09-10 HT

1476 MV06FA4094Mayur Vihar Ph-

1&2

Conversion of 11 KV HT O/H

Feeder into HT 3X300 SQMM

XLPE U/G cable from 25 Block

Sant Nirankari Bhawan to 23

Block Trilok Puri

27.27 FY 09-10 HT

1477 MV06RM4108Mayur Vihar Ph-

1&2

Installation of 11 KV 2X4 Way

Panel Board at 28 Block Trilok

Puri.

13.03 FY 09-10 HT

1478 MV07LT4578Mayur Vihar Ph-

1&2

T/O 3Nos LT feeders from S.Stn-6

Pkt-3 MVR-116.99 FY 09-10 LT

1479 MV08AT4133Mayur Vihar Ph-

1&2

Installation of new 400 KVA Tr.at

Kotla Village2.59 FY 09-10 HT

1480 MV08EL4049Mayur Vihar Ph-

1&2

Replacement of 1 No 630 KVA

Oil Filled Trs. with.1 no. 630 KVA

Dry Type Trs.at Bhagyawan

CGHS. D-MVR.1

13.72 FY 09-10 HT

1481 MV08FA4002Mayur Vihar Ph-

1&2

Augmentation of cable from

substation-3 CGHS to Substation-

1 Supreem Appartment.

2.79 FY 09-10 HT

1482 MV08FA4003Mayur Vihar Ph-

1&2

Rep.of sick cable from Gazi Pur

Grid to DDA Flat Gazi Pur39.44 FY 09-10 HT

1483 MV08FA4004Mayur Vihar Ph-

1&2

Replacement of sick cable from D

Blk Gazi Pur to Red Light Gazi

Pur

37.94 FY 09-10 HT

1484 MV08FA4005Mayur Vihar Ph-

1&2

Replacement of cable from S.Stn-

4 Pkt-1 to S.Stn-5 Pkt-3 MVR-18.37 FY 09-10 HT

1485 MV08FA4006Mayur Vihar Ph-

1&2

Rep.of cable J Blk to G Blk E.

Vinod Nagar up to Super Shine

Chowk

18.68 FY 09-10 HT

1486 MV08FA4007Mayur Vihar Ph-

1&2

Rep.of cable S.Stn-2 KHP to Mat

Mkt Khp34.78 FY 09-10 HT

1487 MV08FA4009Mayur Vihar Ph-

1&2

Aug.of cable from DDA Flat to D

Blk Gazi Pur20.42 FY 09-10 HT

1488 MV08FA4130Mayur Vihar Ph-

1&2

Rep.of Pilca cable from S/S 1

South of Lake to S/S Petrol Pump

(Via S/S 4 Pkt 5 To S/S ITI to S/S

3 Pkt 5 to S/S 2 Pkt5 )

22.32 FY 09-10 HT

1489 MV08FA4134Mayur Vihar Ph-

1&2

Provision of.HT feed for newly

proposed Tr.at Kotla Village1.73 FY 09-10 HT

1490 MV08LT4015Mayur Vihar Ph-

1&2

T.O 3 Nos.LT Fdr from addl Tr.at

2 Blk TKP9.54 FY 09-10 LT

1491 MV08LT4016Mayur Vihar Ph-

1&2

T.O 2 Nos.LT Fdr From Aug.Tr.at

17 Blk KLP10.74 FY 09-10 LT

1492 MV08LT4017Mayur Vihar Ph-

1&2

T.O 3 Nos.LT Fdr from Aug.Tr.at

Samas Pur Village.13.74 FY 09-10 LT

1493 MV08LT4018Mayur Vihar Ph-

1&2

T.O 2 Nos.LT Fdr from aug.Tr.at

Khichri Pur Vill.3.94 FY 09-10 LT

1494 MV08LT4047Mayur Vihar Ph-

1&2

Replacement of S.L Cable at MVR-

1&2 Area Acharya Niketan Samas

Pur Vill,Kalyan Puri KHP,TKP

28.60 FY 09-10 LT

1495 MV08LT4117Mayur Vihar Ph-

1&2

Provision of LT AB Cable in LOP

portions MVR-1 Div.11.52 FY 09-10 LT

Page 69: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

1496 MV08LT4138Mayur Vihar Ph-

1&2

Rep.of damaged feeder pillars in

MVR-1&220.68 FY 09-10 LT

1497 MV08MS1056Mayur Vihar Ph-

1&2

Installation of Street Lighting

Points at East Vinod Nagar

mentioned in the list of 1539 Un

Authorized Colonies at Sr No 68/

Reg No 1500.

4.35 FY 09-10 HT

1498 MV08MS1057Mayur Vihar Ph-

1&2

Provision of street light points on

road opp. Samachar,Galexo

CGHS.

4.36 FY 09-10 LT

1499 MV08MS1058Mayur Vihar Ph-

1&2

Provision of street light points on

road stretch from ASN school Kala

Vihar,Manas,Parwan Nirman &

near Rose Wood CGHS.

10.93 FY 09-10 LT

1500 MV08RM4022Mayur Vihar Ph-

1&2

Replacement of HT 4Way Panel at

R Blk East Vinod Nagar9.10 FY 09-10 HT

1501 MV08RM4093Mayur Vihar Ph-

1&2

Replacement of 11 KV 4 Panel

Board at OCS CGHS5.98 FY 09-10 HT

1502 MV08RM4094Mayur Vihar Ph-

1&2

Rep. of HT Panel at Supreem

S.Stn-16.00 FY 09-10 HT

1503 MV08RM4095Mayur Vihar Ph-

1&2

Rep. of HT Panel at Supreem

S.Stn-25.78 FY 09-10 HT

1504 MV08RM4096Mayur Vihar Ph-

1&2

Rep. of HT Panel at S.Stn Medha

CGHS5.76 FY 09-10 HT

1505 MV08RM4097Mayur Vihar Ph-

1&2

Rep. of HT Panel at S.Stn River

View CGHS5.72 FY 09-10 HT

1506 MV08RM4098Mayur Vihar Ph-

1&2

Rep. of HT 4 Way Panel at S.Stn-

1 Samachar CGHS5.64 FY 09-10 HT

1507 MV08RM4099Mayur Vihar Ph-

1&2

Rep. of HT 4Way Panel at S.Stn-2

Samachar CGHS5.64 FY 09-10 HT

1508 MV08RM4100Mayur Vihar Ph-

1&2

Rep. of HT 4 Way Panel at S.Stn-

Fine Home CGHS5.96 FY 09-10 HT

1509 MV08RM4101Mayur Vihar Ph-

1&2

Rep. of HT 4Way Panel at P.Stn

23 Blk TKP5.83 FY 09-10 HT

1510 MV08RM4107Mayur Vihar Ph-

1&2

Rep of HT Panel at S/Stn 15 Blk

KLP5.89 FY 09-10 HT

1511 MV08RM4108Mayur Vihar Ph-

1&2

Rep of HT Panel at S/Stn-1

Nirman CGHS4.01 FY 09-10 HT

1512 MV08RM4109Mayur Vihar Ph-

1&2

Rep of HT Panel at S/Stn-2

Nirman CGHS6.04 FY 09-10 HT

1513 MV08RM4110Mayur Vihar Ph-

1&2

Rep of HT Panel at S/Stn Galexo

CGHS8.82 FY 09-10 HT

1514 MV08RM4111Mayur Vihar Ph-

1&2

Rep of HT Panel at S/Stn LSC

Samachar6.13 FY 09-10 HT

1515 MV08RM4112Mayur Vihar Ph-

1&2

Provision of 3 Way O/D RMU at

Substation DP near Fine home

CGHS, Mayur Vihar.

3.70 FY 09-10 HT

1516 MV08RM4116Mayur Vihar Ph-

1&2

Installation O/D RMU at

Substation Adresh Mohalla. Mayur

Vihar.

6.37 FY 09-10 HT

1517 MV08RM4118Mayur Vihar Ph-

1&2

Rep of HT Panel at Parwana Ss 1

CGHS6.02 FY 09-10 HT

1518 MV08RM4119Mayur Vihar Ph-

1&2

Rep of HT Panel at Parwana Ss 2

CGHS6.11 FY 09-10 HT

1519 MV08RM4120Mayur Vihar Ph-

1&2

Rep of HT Panel at Substation- 3

Pkt-E MVR-25.87 FY 09-10 HT

1520 MV08RM4121Mayur Vihar Ph-

1&2

Rep of HT Panel at Substation- 2

Pkt-F MVR-28.76 FY 09-10 HT

1521 MV08RM4122Mayur Vihar Ph-

1&2

Rep.HT Panel Board at S.Stn-1

Pkt-F MVR-26.23 FY 09-10 HT

1522 MV08RM4125Mayur Vihar Ph-

1&2

Rep.HT Panel Board at S.Stn-4

Pkt-E MVR-26.15 FY 09-10 HT

1523 MV08RM4126Mayur Vihar Ph-

1&2

Rep.HT Panel Board at S.Stn-2

Pkt-A MVR-26.11 FY 09-10 HT

1524 MV08RM4127Mayur Vihar Ph-

1&2

Rep.HT Panel Board at S.Stn-3

Pkt-A MVR-28.88 FY 09-10 HT

1525 MV08RM4128Mayur Vihar Ph-

1&2

Rep.HT Panel Board at S.Stn-6

Pkt-D MVR-25.84 FY 09-10 HT

1526 MV08RM4131Mayur Vihar Ph-

1&2

Pro. RMU for newly proposed

TRF.at Kotla4.22 FY 09-10 HT

Page 70: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

1527 MV08SH1149Mayur Vihar Ph-

1&2

Shiftring of HT poles from 13

Block Trilokpuri to Bridge (Near

Dharam Shila Hospital)

35.58 FY 09-10 HT

1528 MV08UT4048Mayur Vihar Ph-

1&2

Aug. of 100 KVA Tr to 400 KVA Tr

at CNG Petrol Pump Shashi

Garden

1.14 FY 09-10 HT

1529 MV09LT4037Mayur Vihar Ph-

1&2

Conversion of O/H conductor into

LT AB cable at Pkt-A,B,C&F

Mayur Vihar Ph-2

94.02 FY 09-10 LT

1530 MV09LT4038Mayur Vihar Ph-

1&2

Conversion of O/H cond into LT

AB cable at Pkt 1,2,3,4&5 MVR-1127.87 FY 09-10 LT

1531 MV09RM4001Mayur Vihar Ph-

1&2

Replacement of 11 Kv 4 Way

Panel Board at Akash Darshan

CGHS

5.70 FY 09-10 HT

1532 MV09RM4002Mayur Vihar Ph-

1&2

Replacement of 11 Kv 4 Way

Panel Board at Gyandeep CGHS4.87 FY 09-10 HT

1533 MV09RM4003Mayur Vihar Ph-

1&2

Replacement of 11 Kv 4 Way

Panel Board at Kala Vihar CGHS4.93 FY 09-10 HT

1534 MV09RM4004Mayur Vihar Ph-

1&2

Replacement of 11 Kv 4 Way

Panel Board at Lovely Cghs4.93 FY 09-10 HT

1535 MV09RM4017Mayur Vihar Ph-

1&2

Replacement of 11 Kv 4 Way

Panel Board at D Blk Gazipur3.21 FY 09-10 HT

1536 MV09RM4019Mayur Vihar Ph-

1&2

Replacement of 11 Kv 4 Way

Panel Board at S/S 7 Pkt C MVR-

II

5.68 FY 09-10 HT

1537 MV09RM4020Mayur Vihar Ph-

1&2

Replacement of 11 Kv 4 Way

Panel Board at 8A Blk Trilokpuri5.09 FY 09-10 HT

1538 MV09RM4023Mayur Vihar Ph-

1&2

Replacement of 11 Kv 3 Way

Panel Board at M15 Ranney Well3.03 FY 09-10 HT

1539 MV09SH1120Mayur Vihar Ph-

1&2

Shifting of Electrical Poles /

Services from Khudi Ram Marg

passing between Noida Road to

block no 15 in Tirlok Puri AC-37

Sh.(S) Zone. (Noida Road to

Jevan Anmole Hospital)

1.87 FY 09-10 LT

1540 NN07FA4545 Nand Nagri

Augmentation of 3X150 mm Sq

Pilca cable into 3X300 mm Sq

XLPE cable between Ashok Nagar

‗B‘ Blk & Hardev Puri No, 2

S/Stns.in D – NNG.

19.55 FY 09-10 HT

1541 NN08AT4146 Nand Nagri

Two connection in F/O Mohd

Yamin & Sahid MLCC0807018 &

MLCC0807018

3.57 FY 09-10 HT

1542 NN08AT4147 Nand Nagri

MLCC 08010014 & MLCC

08010014 to release two No.

connection in f/o Saroj Devi &

Attar Kali (100 KVA)

5.20 FY 09-10 HT

1543 NN08EL4126 Nand NagriElectrification of LOP of Shushila

Garden in D-NNG12.28 FY 09-10 LT

1544 NN08FA4109 Nand Nagri

Replacement of PILCA cable

between GTB Hospital S/S &

Dilshad Garden Grid

(Replacement of cablel Under

Nalla Only)

31.16 FY 09-10 HT

1545 NN08FA4110 Nand Nagri

Replacement of Pilca cable into

3X300 mm Sq XLPE between

Sewage Treatment Plant &

Ghonda Grid

24.28 FY 09-10 HT

1546 NN08FA4117 Nand Nagri

Augmentation of 3X150 mm Sq

PILCA cable into 3X300 XLPE

between O/H D Blk Ashok Nagar

feeder & D Blk Ashok Nagar

S/Stn. Gali No. 13

1.86 FY 09-10 HT

Page 71: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

1547 NN08FA4140 Nand Nagri

Rep.of HT cable 3X240 Sqmm

into 3X300 Sqmm between

Seelam Pur Grid To Nahar Road

Sudama Puri O/H

58.62 FY 09-10 HT

1548 NN08LT4099 Nand NagriLTMP of Gali No. 13 D Block

Ashok Nagar (D)NNG22.22 FY 09-10 LT

1549 NN08LT4112 Nand NagriReplacement of feeder pillars in

Mandoli Extn in D-NNG.2.24 FY 09-10 LT

1550 NN08MS4096 Nand Nagri

Providing meter glands and flexible

pipes in energy meters in D –

NNG.

54.01 FY 09-10 LT

1551 NN08MS4102 Nand NagriElectrification of Jain Complex in B

Blk Harsh Vihar8.28 FY 09-10 LT

1552 NN08MS4105 Nand NagriElectrification of A-3 Pocket Harsh

Vihar.20.90 FY 09-10 LT

1553 NN08MS4108 Nand Nagri

Installation of HVDS Poles & 25

KVA Trs at different places in

HVDS area such as Ganga Sahai

Ciolony,Shushila Garden Etc. D-

NNG.

25.99 FY 09-10 HT

1554 NN08MS4125 Nand Nagri

Inst.of Db'S at different places

such as Pratap Ngr,Harsh

Vihar,Nand Nagari,Ashok Ngr

Jyoti Clny,Kabir Ngr Kardam

Puri,Saboli Mandol.

27.13 FY 09-10 LT

1555 NN08MS4152 Nand Nagri

Two no. of Connection of 11Kw

each in F/O Rajkumar &

Chimannlal

3.08 FY 09-10 HT

1556 NN08NF4002 Nand Nagri

Interconnection of HT Cable

3X300 Sq mm between LIG S/Stn

No.7 to E Block Ashok Nagar

Kanch Godam

5.24 FY 09-10 HT

1557 NN08NF4010 Nand Nagri

Laying of HT Cable 3CX300 Sq

mm between A Blk Meet Ngr to

Primary School S/Stn (D) NNG

6.43 FY 09-10 HT

1558 NN08RM4025 Nand Nagri

Replacement of I/D 4 Panel Board

at West Jyoti Nagar Harijan Basti

and Providing 4 Way I/D RMU

(D)NNG

5.88 FY 09-10 HT

1559 NN08RM4034 Nand Nagri

Replacement of RMU and

providing of 4 Way I/D RMU at

Ashok Ngr Gali No.13 (D)NNG

5.91 FY 09-10 HT

1560 NN08RM4036 Nand Nagri

Replacement of RMU and

providing of 4 Way I/D RMU at

LIG S/Stn No.6 (D)NNG

5.82 FY 09-10 HT

1561 NN08RM4042 Nand NagriInstallation of 4 Way I/D RMU at

Janta Flat S/Stn No.2 (D)NNG5.86 FY 09-10 HT

1562 NN08RM4043 Nand Nagri

Replacement of 7 Panel Board &

installation of 2X4 Way I/D RMU

at Weavers Complex

S/Stn.Sunder Nagri in D - NNG.

12.36 FY 09-10 HT

1563 NN08RM4067 Nand Nagri

Installation of 3 Way O/D RMU at

Mala Devi S/Stn Babar Pur in

(D)NNG

6.73 FY 09-10 HT

1564 NN08RM4103 Nand NagriInst. of 3 way O/D RMU at Panch

wati. S/Stn.3.77 FY 09-10 HT

1565 NN08RM4122 Nand Nagri

Installation of 3 Way RMU at

Chunna Bhatti Sewa Dham Road

D-NNG

7.04 FY 09-10 HT

1566 NN08SL1078 Nand Nagri

Providing of Street Lighting at

colony reg. no. 1245,

Dr.Ambedkar Colony Radha Vihar

Near Saboli in D-NNG.

4.58 FY 09-10 LT

1567 NN08SL1082 Nand Nagri

Providing of Street Lighting at

colony reg. no. 1110, Harizan

Basti, D Blk East Gokalpur Amar

Colony in D-NNG.

5.81 FY 09-10 LT

Page 72: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

1568 NN08SL1083 Nand Nagri

Providing of Street Lighting at

colony reg. no. 1117, Harsh Vihar

Colony(‗A & B‘Blk) in D-NNG.

14.01 FY 09-10 LT

1569 NN08SL1084 Nand Nagri

Providing of Street Lighting at

colony reg. no. 1118, Harsh Vihar

Extn. Colony (‗C‘ Blk harsh Vihar)

in D-NNG.

4.17 FY 09-10 LT

1570 NN08SL1085 Nand Nagri

Providing of Street Lighting at

Colony Reg. No. 248, Harsh Vihar

‗D‘ Blk In D-NNG.

9.62 FY 09-10 LT

1571 NN08SL1086 Nand Nagri

Providing of Street Lighting at

Colony Reg. No. 49, Milan Garden

Main Mandoli Road In D-NNG.

3.64 FY 09-10 LT

1572 NN08SL1087 Nand Nagri

Providing of Street Lighting at

colony reg. no. 1179, Pratap

Nagar Harizan Basti Nand Nagri in

D-NNG.

2.45 FY 09-10 LT

1573 NN08SL1088 Nand Nagri

Providing of Street Lighting at

colony reg. no.1370, Pratap Nagar

Saboli Village in D-NNG.

4.32 FY 09-10 LT

1574 NN08SL1089 Nand Nagri

Providing of Street Lighting at

Colony Reg. No. 884, Rajeev

Nagar In D-NNG.

7.11 FY 09-10 LT

1575 NN08SL1090 Nand Nagri

Providing of Street Lighting at

colony reg. no.1138, Shakti

garden Harizan Basti ‘E‘ blk East

Gokalpur in D-NNG.

3.87 FY 09-10 LT

1576 NN08SL1091 Nand Nagri

Providing of Street Lighting at

colony reg. no. 614, Shri Ram

Colony Rajiv Nagar(Ganga Sahay

Colony)in D-NNG.

2.44 FY 09-10 LT

1577 NN08SL1092 Nand Nagri

Providing of Street Lighting at

colony reg. no. 863, Sushila

Garden Mandoli in D-NNG.

0.51 FY 09-10 LT

1578 NN08SL1093 Nand NagriProviding S/L Reg.No.1206

Mandoli Ext Harijan Basti D-932.35 FY 09-10 LT

1579 NN08SL1094 Nand Nagri

Providing of Street Lighting at

Colony Reg. No. 958, ‗B‘ Blk East

Gokalpur, Amar Colony

respectively in D-NNG.

0.57 FY 09-10 LT

1580 NN08UT4153 Nand Nagri

LT-5377, D.P No.1915-16 in f/o

Jai Prakash Gupta M-1, Gali ,Ph-

3,Vishnu Gali New Mandoli

Industrial Area -93

1.07 FY 09-10 HT

1581 NN09AT4208 Nand Nagri

INSTALLATION OF NEW 630

KVA TRANSFORMER AT KACHI

PURA VILLAGE IN D-NNG

6.96 FY 09-10 HT

1582 NN09EL4109 Nand Nagri

Providing additional LT poles in

Electrified areas in division Nand

Nagri.

11.59 FY 09-10 LT

1583 NN09FA4070 Nand Nagri

Laying of HT Cable in place of

O/H, A pocket , 240 MIG to Wever

complex . Nand Nagri.

0.97 FY 09-10 HT

1584 NN09FA4098 Nand Nagri

Replacment of O/H HT line into

3CX300 Sqmm underground cable

Chunabhatti to Pratap nagar,

Division Nand nagri.Nand Nagri.

12.82 FY 09-10 HT

1585 NN09LT4040 Nand Nagri

Replacemaent of O/H conductor

by LT AB 150Sq.mm, at F-

Pocket, GTB Enclave

42.36 FY 09-10 LT

1586 NN09LT4051 Nand NagriLaying LT Cable at Durgapuri Gali

No 10 , Distt.-Nand Nagri.4.72 FY 09-10 LT

1587 NN09LT4053 Nand NagriLAYING LT CABLE , at D-1

ASHOK NAGAR, DISTT.-NNG1.92 FY 09-10 LT

Page 73: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

1588 NN09LT4054 Nand NagriLaying LT Cable , at E-Blk. Ashok

Nagar,Distt.-Nand Nagari.4.70 FY 09-10 LT

1589 NN09LT4055 Nand NagriLAYING LT CABLE , at

JAGatPURI MAIN, DISTT.-NNG3.43 FY 09-10 LT

1590 NN09LT4060 Nand NagriLaying LT Cable , at West Jyoti

Nagar, Distt.-Nand Nagri.7.46 FY 09-10 LT

1591 NN09LT4061 Nand NagriLaying LT Cable , at Harijan

Basti,Distt.-Nand Nagri.3.22 FY 09-10 LT

1592 NN09LT4062 Nand NagriLAYING LT CABLE , at KHET

WALA, DISTT.-NNG2.62 FY 09-10 LT

1593 NN09LT4063 Nand Nagri

LAYING LT CABLE , at

RAGHUVEER GARDEN, DISTT.-

NNG

4.80 FY 09-10 LT

1594 NN09LT4102 Nand Nagri

Taking out 07 Nos LT Feeder of

Size 4X300 Sqmm from S/Stn

Weaver Complex D-Nand nagri.

17.21 FY 09-10 LT

1595 NN09LT4209 Nand Nagri

LAYING of LT FEEDER

4X300SQMM FROM S/STN

KACHI PURA IN D-NNG

3.46 FY 09-10 LT

1596 NN09MS4134 Nand Nagri

Augmentation of 25 KVA to 400

KVA Transformer at D.P.NO.

1926-1926 , Industrial Area.

1.11 FY 09-10 HT

1597 NN09MS4135 Nand Nagri

Augmentation of Transformer from

25 KVA to 400 KVA at

D.P.NO.1980-1981 Industrial

Area. Nand Nagri.

1.15 FY 09-10 HT

1598 NN09NF4077 Nand Nagri

Laying HT cable at E-2 Safai

Karamchari to wazirabad CNG

Pump station Nand Nagri.

4.23 FY 09-10 HT

1599 NN09NF4095 Nand Nagri

Laying HT cable Rajeev Nagar

RMU to Sewadham Road DP N-

2033-2034, division- Nand Nagri.

22.02 FY 09-10 HT

1600 NN09UT4034 Nand Nagri

Augmentaion of Transformer from

400KVA to 630KVA at Janta Flat

Substation No.-3, Zone2901,

Division Nand Nagri.

1.20 FY 09-10 HT

1601 NN09UT4036 Nand Nagri

Augmentation of Transformer from

400KVA to 630 KVA at Kapoor

Petrol Pump,Zone -2902, Division -

Nand Nagri.

0.26 FY 09-10 HT

1602 NN09UT4107 Nand Nagri

LT-5420 LA of 45KW making total

load of 70 KW in f/o Sh Ram

Kishore Aggarwal , Mandoli

1.18 FY 09-10 HT

1603 NN09UT4128 Nand Nagri

Augmentation of 100 KVA in to

400kVA Transformer at Milan

Garden in division Nand Nagri.

3.22 FY 09-10 HT

1604 NN09UT4133 Nand Nagri

Augmentation of 100KVA

Transformer into 400KVA at D.P

No. 2009-10 in Industrial Area

division Nand Nagri.

1.16 FY 09-10 HT

1605 PG08FA4037 PaharganjRep. of Pilca cable with XLPE

from Lahori Gate to Matawali Gali42.59 FY 09-10 HT

1606 PG08FA4038 Paharganj

Rep.of sick Pilca cable 3*300

mmsq with XLPE cable from

Laxman Puri to Gali Tel Mil S/S

12.55 FY 09-10 HT

1607 PG08FA4040 Paharganj

Rep.of Pilca cable 3*300 mmsq

with XLPE from Chuna Mandi to

PG Dispensary

19.00 FY 09-10 HT

1608 PG08FA4041 Paharganj

Rep.of Pilca 3*95 with 3*150

Sqmm cable from Ram Ngr.to

Sheela Cinema S/S

6.44 FY 09-10 HT

1609 PG08FA4042 Paharganj

Rep of Pilca to XLPE Cable from

D-Bk Motia Khan to MM Rd Kiosk

S/S

15.00 FY 09-10 HT

Page 74: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

1610 PG08FA4043 Paharganj

Rep. of Pilca 3X150 to 3X300

Sqmm cable with XLPE from MM

Road to Motia Khan Package

14.25 FY 09-10 HT

1611 PG08FA4064 PaharganjRep.of Pilca Cable from Loha

Mandi to Pahar Ganj Thana14.95 FY 09-10 HT

1612 PG08FA4065 PaharganjRep of Pilca cable from Pradhan

Chowk to Ashoka Basti12.51 FY 09-10 HT

1613 PG08FA4066 PaharganjRep. of Pilca cable from 6 Tooti to

Khanna Cinema S/S7.46 FY 09-10 HT

1614 PG09AT4017 Paharganj

ADD. INSTALLATION OF ONE

NO.630KVA TRF AT NARAIN

MKT S\S.

2.11 FY 09-10 HT

1615 PG09LT1078 Paharganj

Conv of LT O/H into LT U/G

system by line Behind Hotel Nest

for Beautification.

3.62 FY 09-10 LT

1616 PG09LT1088 Paharganj

Shifting of services for work of

construction of ROB at DB Gupta

road across Qutab Road by

Paharganj push boxes in place of

arch. bridge.

10.57 FY 09-10 LT

1617 PG09LT4034 Paharganj

T\O 3 Nos. O\H LT feedrs from

Aug.990 KVA Trf. at Nawab Road -

2 S\S

3.58 FY 09-10 LT

1618 PG09LT4035 PaharganjT\O 3 Nos. O\H LT feeders from

aug.990 Kva Trf. at 24 Qtr S\Stn.3.31 FY 09-10 LT

1619 PG09LT4036 Paharganj

T\O 3 Nos. O\H LT Feeders from

aug.990 Kva Trf. Chowk Singhara

S\Stn.

3.65 FY 09-10 LT

1620 PG09LT4037 Paharganj

T\O 3 Nos. O\H LT Feeders from

Newly Proposed Trf. 400 KVA Trf

at Narain Market S\Stn.

4.27 FY 09-10 LT

1621 PG09LT4038 Paharganj

T\O 4 Nos. O\H LT Feeders from

existing Pakage Type 990KVA Trf.

at Tikonapark S\Stn.

3.80 FY 09-10 LT

1622 PG09LT4039 Paharganj

T\O 2 Nos. O\H LT Feeders from

existing 990KVA Trf. at Ahata

Kidara Chowk Police Post Pl\M

S\Stn.

1.86 FY 09-10 LT

1623 PG09LT4040 Paharganj

T\O 1 No. O\H LT feeders and

Rep.\Aug.of existing LT Feeders

3.5*150 sqmm from existing

400KVA Trf. at Ahata Kidara

Chowk S\Stn.

1.71 FY 09-10 LT

1624 PG09LT4041 Paharganj

T\O 3 Nos. O\H LT Feeders from

existing 1000KVA Trf. at Choti

Masjid S\Stn.

3.03 FY 09-10 LT

1625 PG09LT4042 Paharganj

T\O 2 Nos. O\H LT Feeders from

existing 630KVA Trf. at Basti

Harphool Singh S\Stn.

2.23 FY 09-10 LT

1626 PG09LT4043 Paharganj

T\O 2 Nos. O\H LT Feeders from

existing 630KVA Trf. at Nawab

Road No-1 S\Stn.

2.44 FY 09-10 LT

1627 PG09LT4046 Paharganj

T\O 2 Nos. O\H LT Feeders from

existing 990KVA Trf. at Sadar

Dispansary S\Stn.

2.57 FY 09-10 LT

1628 PG09LT4047 Paharganj

T\O 2 Nos. O\H LT Feeders from

existing 990KVA Trf.-1 at Sadar

Cloth Mkt. S\Stn.

2.44 FY 09-10 LT

1629 PG09LT4048 Paharganj

T\O 2 Nos. O\H Lt Feeders from

existing 990KVA Trf-2 at Sadar

Cloth Mkt.S\Stn.

3.25 FY 09-10 LT

1630 PG09LT4049 Paharganj

T\O 2 Nos. O\H LT feeders from

existing Pakage 990KVA Trf-2 at

12 Tooti Sadar Bazar S\Stn.

4.01 FY 09-10 LT

1631 PG09LT4050 Paharganj

T\O 1 Nos. O\H LT Feeders from

existing 630KVA Trf. Westend

Cinema S\Stn.

1.21 FY 09-10 LT

Page 75: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

1632 PG09LT4051 Paharganj

T\O 3 Nos. O\H LT Feeders from

existing 990KVA Trf-2 at Khushid

Mkt Sadar Bazars S\Stn.

3.28 FY 09-10 LT

1633 PG09LT4052 Paharganj

T\O 3 Nos. O\H LT Feeders from

existing 990KVA Trf. at Narain Mkt

Sadar Bazar S\Stn.

3.80 FY 09-10 LT

1634 PG09LT4053 Paharganj

T\O 3 Nos. O\H LT feeders from

existing 630KVA Trf. at Tanga

Stand Pl\M S\Stn.

2.29 FY 09-10 LT

1635 PG09LT4054 Paharganj

T\O 3 Nos. O\H LT Feeders from

existing Pakage 990KVA Trf. at

Jhabbar Mal Dharmashala Sadar

Bazar S\Stn.

3.44 FY 09-10 LT

1636 PG09LT4055 Paharganj

T\O 2 Nos. O\H LT feedrs from

existing 1000KVA Trf.-1 at Fire

Station Sadar bazar S\Stn.

3.04 FY 09-10 LT

1637 PG09LT4056 Paharganj

T\O 2 Nos. O\H LT feedrs from

existing 1000KVA Trf.-2 at Fire

station sadar bazar S\Stn.

3.76 FY 09-10 LT

1638 PG09LT4057 Paharganj

Replacement of O\H Existing one

no LT feeder from foota road S\S

to Gali Mahabir

2.37 FY 09-10 LT

1639 PG09LT4058 Paharganj

Replacement of O\H existing one

No LT Feeder from Chimini Mill

Pl\M (1000Kva Trf) to Nai Basti

1.80 FY 09-10 LT

1640 PG09LT4059 Paharganj

Replacement of O\H existing one

no LT feeder from Gali Neem Wali

S\Stn to Gali Zameer Wali.

1.58 FY 09-10 LT

1641 PG09LT4060 Paharganj

Replacement of O\H existing two

no LT feeder from Filmistan

Cinema S\Stn to Anaj Mandi and

Katra Gauri Shanker

3.53 FY 09-10 LT

1642 PG09LT4061 Paharganj

Replacment of O\H existing one

No LT feeder Gali Mata Wali S\Stn

to Mahabir Bazarn, Paharganj.

1.52 FY 09-10 LT

1643 PG09LT4062 Paharganj

Replacement of O\H existing one

No LT feeder from Chimini Mill

Kiosk S\Stn to Gali Tyre Wali.

1.74 FY 09-10 LT

1644 PG09LT4063 Paharganj

Replacement of O\H Existing two

No LT Feeder from Gali Bahuji

Kiosk S\Stn to Gali Ahirian and

Sheesh Mahal.

2.46 FY 09-10 LT

1645 PG09LT4064 Paharganj

Replacement of O\H existing one

no LT feeder from Tokriwalan

S\Stn to Pulmithai.

0.98 FY 09-10 LT

1646 PG09LT4066 PaharganjReplacement of Feeder Piller A

Type at Sarai Khalil Flat S/Stn.3.05 FY 09-10 LT

1647 PG09LT4099 Paharganj

T/O One No.Addlfdrfrom Duputy

Ganj K to Give Kcc

Connection.(75 KW)

1.08 FY 09-10 LT

1648 PG09MS1125 Paharganj

Installation new street light(35

nos.) points near Metro Station

R.K.Mission Ashram to Nehru

Bazar as proposal under ―My Delhi

I Care Fund‖ in Div. PHG.

2.38 FY 09-10 LT

1649 PG09MS4067 PaharganjRep.of old S/Cable 2X10 in LOP

area of Chuna Mandi Zone84.58 FY 09-10 LT

1650 PG09MS4068 PaharganjRep.of old S/Cable 2X10 in LOP

area of Ram Ngr Zone124.01 FY 09-10 LT

1651 PG09MS4069 PaharganjRep.of old S/Cable 2X10 in LOP

area in PP Qtr.Zone105.09 FY 09-10 LT

1652 PG09MS4070 PaharganjRep.of old S/Cable 2X10 in LOP

area of BG Rd Zone76.53 FY 09-10 LT

1653 PG09MS4071 PaharganjLT Clean up in LOP area of Ram

Ngr Zone15.19 FY 09-10 LT

Page 76: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

1654 PG09MS4072 PaharganjLT Clean up in LOP area of Chuna

Mandi Zone13.31 FY 09-10 LT

1655 PG09MS4073 PaharganjLT Clean up in LOP area of PP

Qtr, Zone17.93 FY 09-10 LT

1656 PG09MS4074 PaharganjLT Clean up in LOP area of BG

Rd Zone17.38 FY 09-10 LT

1657 PG09UT4015 Paharganj

Augmentation of existing

Transformer from 630KVA to

990KVA at Nawab Road

Substation.

9.71 FY 09-10 HT

1658 PG09UT4016 Paharganj

Augmentation of existing

Transformer from 630KVA to

990kVA at 24 Quarter Substation

in division Paharganj.

10.00 FY 09-10 HT

1659 PN05RM4156 Patel Nagar

Replacement of 7 Panel board by

2*4W indoor RMU at Z-block(K),

Patel Nagar

11.88 FY 09-10 HT

1660 PN06RM4575 Patel Nagar

Replacement of 11 KV old HT

panel board with 01 No. 4 Way SF-

6 indoor RMU at Padma Tower No

1 in Div. PNR

6.96 FY 09-10 HT

1661 PN06RM4577 Patel Nagar

Replacement of 11 KV old HT

Panel Board with 01 No. 4 Way

SF-6 Indoor RMU at Gagandeep

Tower in Div. PNR.

6.68 FY 09-10 HT

1662 PN06RM4578 Patel Nagar

Replacement of 11 KV old HT

panel board with 01 No.4 Way SF-

6 indoor RMU at Deepshikha

Tower in Div. PNR.

6.81 FY 09-10 HT

1663 PN06RM4583 Patel Nagar

Replacement of 11 KV OLD HT

panel board with 01 No. 4 Way

and 1no. single way SF-6 Indoor

RMU at Bank House in Div. PNR.

8.78 FY 09-10 HT

1664 PN06RM4601 Patel Nagar

Replacement of old 11 KV

panelboard with 1 no. 4 way and 1

no. single way SF-6 RMU at MCD

Devnagar in Div. PNR.

8.34 FY 09-10 HT

1665 PN06RM4605 Patel Nagar

Raplcement of old G.O.switch

with 3+1 way O/D RMU SF-6 at

Rajesthan Colony in Div. PNR.

6.32 FY 09-10 HT

1666 PN06RM4614 Patel Nagar

Replacement of damaged HT

Panel 4 Way I/D at Punjabi Basti

Military Rd in Div. PNR.

6.47 FY 09-10 HT

1667 PN06RM4628 Patel Nagar

Replacement of 11 KV G.O switch

with 3 way O/D RMU at Tank

Road outsider in Div. PNR

3.56 FY 09-10 HT

1668 PN08FA4102 Patel Nagar

Replacement of HT Pilca Cable

3C150 Sqmm to 3C300 Sqmm

XLPE Cable at F&G Blk to Shakti

Mandir West Patel Nagar

26.57 FY 09-10 HT

1669 PN08FA4110 Patel Nagar

Replacement of 3CX300mm2

PILCA H.T. Cable to XLPE Cable

size 3CX300mm2 from Prashad

Nagar Grid to Regarpura in

division Patel Nagar.

13.63 FY 09-10 HT

1670 PN08FA4111 Patel Nagar

Replacement of 3CX300 mm2

Pilca H.T.cable to XLPE cable size

3CX300 mm2 from Prashad

Nagar Grid to H.S.Road in Div

PNR

76.49 FY 09-10 HT

1671 PN08FA4112 Patel Nagar

Replacement of 3CX300 mm2

Pilca H.T. cable to XLPE cable

size 3CX300 mm2 from Prashad

Nagar Grid to Vikrant Tower in Div

PNR

11.82 FY 09-10 HT

Page 77: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

1672 PN08FA4114 Patel Nagar

Replacement of 3CX300 mm2

Pilca H.T. cable to XLPE cable

size 3CX300 mm2 from Prashad

Nagar Grid to 10 B ,Rajendra

Place (Patel Auto)

43.00 FY 09-10 HT

1673 PN08LT4001 Patel Nagar

REPLACEMENT of LT CABLE

3*150 SQMM TO 4*300 SQ MM

at DMS COLONY IN DIVPatEL

NAGAR

1.04 FY 09-10 LT

1674 PN08LT4084 Patel Nagar

LAYING of U/G ADDITIONAL

ONE NO L.T.FEEDER FROME

S/STN TO GALI NO.2 BLK NO 3

DEV NAGR

0.95 FY 09-10 LT

1675 PN08LT4124 Patel Nagar

Replacement of Bare Conductor

by AB Cable at Janta Park Nehru

Nagar Baljeet Nagar in Div PNR

89.70 FY 09-10 LT

1676 PN08LT4126 Patel Nagar

Replacement of bare conductor by

AB conductor at Military Road

Than Singh Nagar Dev Nagar in

Div PNR

90.31 FY 09-10 LT

1677 PN08NF4123 Patel Nagar

Newly laid HT feeder 3*300 Sq

mm from Road No 3 to E Type

S/S in Div PNR

5.70 FY 09-10 HT

1678 PN08RM4038 Patel Nagar

Installation of RMU, 11Kv, Manual

3Way(1Cb+2Iso)I/D Ext-1No

Subjee Mkt Than Singh Nagar

Anand Parvat

3.14 FY 09-10 HT

1679 PN08RM4043 Patel Nagar

Installation of additional RMU, 11

KV, Manual 1 Way(1Cb) O/D Ext

(Required of Schneider Make) at

Militory Road Pl/M S/Stn

2.67 FY 09-10 HT

1680 PN08RM4046 Patel Nagar

Installation of RMU, 11KV, Manual

3 Way(1Cb+2Iso) Near Gali No-4

Cemented Road Anand Parvat

4.25 FY 09-10 HT

1681 PN08RM4078 Patel Nagar

Requirement of with 3 Way+

Single Breaker 2 Nos.Tank Road

Khatta

9.21 FY 09-10 HT

1682 PN08SL1143 Patel Nagar

Providing of New St lighting fitting

of 70+150 Watt HPSV in the Area

of Hon‘able MLA Sh. Rajesh

Lillotia Ji

4.92 FY 09-10 LT

1683 PN08SL1144 Patel Nagar

Installation of 5 nos semi high

masts in the constituency of

hon'ble MLA Sh Rajesh Lilotia

6.18 FY 09-10 LT

1684 PN08SS4020 Patel NagarNew 11kV 400KVA Substation at

15 Block East Patel Nagar.7.13 FY 09-10 HT

1685 PN08UT4052 Patel Nagar

Augmentation of transformer from

2X630 to 2X990 KVA at 11-B A.S.

Road, Bapa Nagar Pl/M S/Stn

12.67 FY 09-10 HT

1686 PN08UT4053 Patel Nagar

Aug. of Transformer from 630 To

990 KVA at Vijay Chowk Bapa

Nagar.

10.73 FY 09-10 HT

1687 PN08UT4054 Patel NagarAug. of Tr.from 630 To 990 KVA

at Bakriwala S/Stn Bapa Nagar2.10 FY 09-10 HT

1688 PN08UT4059 Patel NagarAug. of Tr. from 630 to 990 KVA

at Tank Khatta S/Stn11.10 FY 09-10 HT

1689 PN08UT4060 Patel NagarAug.of Tr. from 630 To 990 KVA

at P.S. Road Bapa Ngar.11.11 FY 09-10 HT

1690 PN08UT4140 Patel Nagar

Augmentation of Transformer from

630 to 990 KVA at Nalla

Substation Patel Nagar

12.31 FY 09-10 HT

1691 PN09AT4001 Patel Nagar

ADDITIONAL 630 KVA DTR AT B

BLOCK WEST PATEL NAGAR

DIV PATEL NAGR

2.67 FY 09-10 HT

Page 78: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

1692 PN09LT4033 Patel Nagar

LAYING LT CABLE 4*300 SQ MM

FROM FEEDER PILLER TO

FEEDER PILLER at DDAFLat

PARSHAD NAGAR TYPE 3 IN

DIV PatEL NAGAR

2.01 FY 09-10 LT

1693 PN09LT4048 Patel Nagar

Provide additional O/H LTAB

Cable in Anand Parvat industrial

area HR Road from Police Post

Substation.

3.16 FY 09-10 LT

1694 PN09LT4049 Patel Nagar

Additional O/H feeder in gali no.-9

Anand Parvat industrial area from

Pappu wala Substation.

1.51 FY 09-10 LT

1695 PN09RM4012 Patel Nagar

Rep of 4 Panel Bord To 4Way Sf6

I/D RMU at J Block West Patel

Nagar

4.42 FY 09-10 HT

1696 PN09RM4014 Patel NagarInstallation 3Way O/D RMU at B

Blk Wp Ngr4.81 FY 09-10 HT

1697 PN09SL1045 Patel Nagar

Installation of street light point

from H-16/827 to I-16/462 Bapa

nagar Pyarelal Road (both side) as

per request of resident welfare

Association Bapa nagar (Regd) for

under "My Delhi I care fund" Delhi

Govt.

2.19 FY 09-10 LT

1698 PN09UT4003 Patel Nagar

Augmentation of Transformer from

2X630 KVA to 2X990 KVA at

Supper Bazar in division Patel

Nagar.

19.48 FY 09-10 HT

1699 PN09UT4005 Patel Nagar

Augmentation of Transformer from

400 KVA to 630 KVA at 29 Block

West Patel Nagar.

1.32 FY 09-10 HT

1700 PN09UT4006 Patel Nagar

Augmentation of Transformer from

400 KVA to 630 KVA at F&G

Block West Patel Nagar.

2.18 FY 09-10 HT

1701 PN09UT4007 Patel Nagar

Augmentation of Transformer from

400 KVA to 630 KVA at Baba

Farid Puri Substation in division

Patel Nagar.

1.47 FY 09-10 HT

1702 PN09UT4008 Patel Nagar

Augmentation of Transformer from

400 KVA to 630 KVA at DMS

Colony in division Patel Nagar.

2.75 FY 09-10 HT

1703 SR06FA4074 Shankar Road

Augmentation of 11 KV HT cable

3x150 Pilca to 3x300 XLPE from

Raisina O/H to S.P. Mukherji

market via Janta Mkt, Old

Varunalay, New Varunalaya,

Khanna Ice Factory

49.84 FY 09-10 HT

1704 SR06FA4077 Shankar Road

Augmentation of 11 KV HTcable

3x150 Pilca to 3x300 XLPE from

Jhandewalan no 1 to Jhandewalan

no 3 via boothnath, 2E P/M to 4E

gurudwara via 2E(K), 2E P/M to

Jhandewala no 1, Jhandewalan no

3 to O/H and Jhadewalan no 1 to

Delhi Press.

44.17 FY 09-10 HT

1705 SR06FA4080 Shankar Road

Replacement/Augmentation of 11

KV HT cable 3x150/3x300 Pilca to

3x300 XLPE from Shankar Road

Grid to Millenium Hospital via

Ganga Ram Hospital

48.05 FY 09-10 HT

1706 SR06RM4087 Shankar Road

Installation/Replacement of 5 Way

panel with 4 way RMU I/D +one

single panel I/D at C Blk Flatted

Factory in D-SRD

10.42 FY 09-10 HT

1707 SR07RM4530 Shankar Road

Installation of new 2 nos single

Way panel I/D at Shastri Park

S/stn in D-SRD

6.39 FY 09-10 HT

Page 79: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

1708 SR08AT4001 Shankar Road

Additional transformer of 400 KVA

at H.S Road Bsement Karol Bagh

S/stn in Div. Shankar Road.

0.90 FY 09-10 HT

1709 SR08AT4006 Shankar Road

Additional transformer of 400 KVA

at Handiwala S/Stn In Div.

Shankar Road.

0.83 FY 09-10 HT

1710 SR08LT4059 Shankar Road

Laying of 4 No LT feeders from

newly proposed transformer at

Handiwala S/stn

2.70 FY 09-10 LT

1711 SR08LT4061 Shankar Road

Replacement/New 2 No. LT

Feeders from existing 990 KVA

transformer at Rajendra Park (K)

S/Stn.,Old Rajinder Nagar

3.45 FY 09-10 LT

1712 SR08LT4092 Shankar RoadLaying of one no LT feeder from

Link Road to Springdales School10.11 FY 09-10 LT

1713 SR08RM4046 Shankar Road

Install of 4 Way+2 No 1 Way I/D

at H.S.Road Basement S/stn in

Karol Bagh

12.79 FY 09-10 HT

1714 SR08RM4048 Shankar RoadInstallation of one single panel O/D

at NPL PL/M S/Stn in D-SRD2.69 FY 09-10 HT

1715 SR08RM4051 Shankar Road

Installation of one additional one

Way I/D at NPL indoor S/Stn in D-

SRD

3.20 FY 09-10 HT

1716 SR08RM4052 Shankar RoadInstallation of one single panel I/D

at Ram Nath Viz S/Stn in D-SRD.2.65 FY 09-10 HT

1717 SR08RM4053 Shankar RoadInstallation of One Way I/D at

Sindhi Park S/Stn in D-SRD3.56 FY 09-10 HT

1718 SR08RM4055 Shankar RoadInstallation of one Single Panel I/D

at 13 Blk WEA S/Stn in D-SRD3.26 FY 09-10 HT

1719 SR08RM4088 Shankar RoadInstallation of 2 Nos single way

O/D at P.O. No 1 S/Stn in D-SRD.5.41 FY 09-10 HT

1720 SR08RM4090 Shankar RoadInstallation of 3Way + 2 single way

at Tikona Park Karol Bagh S/Stn.9.26 FY 09-10 HT

1721 SR08SL1084 Shankar Road

Providing of new St Ltg fittings of

150 Watt HPSV in Old Rajinder

Nagar Area requested by SDM

Karol Bagh.

2.35 FY 09-10 LT

1722 SR08SS4082 Shankar Road

Installation of New 990 KVA

transformer with HT system at 26

Pusa Road near Karol Bagh Metro

Station in D-SRD

30.62 FY 09-10 HT

1723 SR09EL1114 Shankar Road

INSTALLATION OF 400KVA D

TRAT RAJINDER POLICE

STATION (SERVICE CONNECTI

ON)

0.81 FY 09-10 LT

1724 SR09EL2113 Shankar Road

INSTALLATION OF 400KVA D.T

AT RAJENDER NAGAR POLICE

STAION

5.67 FY 09-10 LT

1725 SR09LT4031 Shankar Road

Laying of 2 nos LT Feeders from

Sethi Substation to Ganga Ram

Road, Old Rajinder nagar.Shankar

Road.

4.03 FY 09-10 LT

1726 SR09LT4034 Shankar Road

REPLACEMENT of LT FEEDER

FROM NPL MULTISTOREY

S/STN. TO ENQUIRY

ofFICESIDE, NEW RAJINDER

NAGAR

0.36 FY 09-10 LT

1727 SR09LT4048 Shankar Road

Replacement of existing LV O/H

mains by LT AB cable in Zone

Chapperwala & Pusa Road.

129.93 FY 09-10 LT

Page 80: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

1728 SR09LT4054 Shankar Road

Replacement of existing O/H

conductor to LT AB Cable in Old &

New Rajinder Nagar.

112.24 FY 09-10 LT

1729 SR09ML1058 Shankar Road

Providing of new 50 nos St Ltg

fittings of 150 Watt HPSV with 5

nos PCC Pole in New & Old

Rajinder Nagar Area

1.70 FY 09-10 LT

1730 SR09MS4051 Shankar Road

Replacement of existing ACSR

Rabbit/Raccon/Squiral Conductor

by DOG Conductor in Zone- Pusa

Road, Shankar Road.

17.90 FY 09-10 LT

1731 SR09RM4003 Shankar Road

Installation of 4 Way HT panel at

Nehru Park Substation, New

Rajinder Nagar.

6.32 FY 09-10 HT

1732 SR09RM4005 Shankar RoadInstallation of 3 Way RMU at A.S.

Road No 1 S/Stn.3.62 FY 09-10 HT

1733 SR09SH1071 Shankar Road

SHIFTING OF POLE AT TIBIA

COLLEGE KAROL BAGH DIV

SRD

0.78 FY 09-10 LT

1734 SR09UT4012 Shankar Road

Augmentation of Transformer from

400kVA to 990KVA at 13 Block

WEA Karol Bagh Substation.

9.60 FY 09-10 HT

1735 SR09UT4013 Shankar Road

Augmentation of Transformer from

630 KVA to 990 KVA at 2E

Jhandewalan Substation.

9.49 FY 09-10 HT

1736 SR09UT4015 Shankar Road

Augmentation of Transformer from

630KVA to 990 KVA at 2E

Jhandewalan Substation.

9.48 FY 09-10 HT

1737 YV06CV4059 Yamuna ViharRenovation of Cash Counter at

Seelampur complaint centre.0.54 FY 09-10 Others

1738 YV07SH4522 Yamuna Vihar

Diversion of load of 11KV

Wazirabad Grid to C-7 Yamuna

Vihar feeder at YVR Grid.

6.00 FY 09-10 HT

1739 YV07SH4523 Yamuna Vihar

Diversion of load of 11KV

Wazirabad Grid to Gautam Vihar

feeder at Yamuna Vihaer Grid.

32.11 FY 09-10 HT

1740 YV07SH4525 Yamuna Vihar

Diversion of load of 11KV Panel

from Wazirabad Grid to D - Block

Bhajanpura at Yamuna Vihar.

67.84 FY 09-10 HT

1741 YV08FA4033 Yamuna ViharAug. of cable from Sabji Mandi to

Baburam Chowk Moujpur14.94 FY 09-10 HT

1742 YV08FA4035 Yamuna ViharAug. of cable from Sanjay Mohalla

to Subash Mohalla No-319.35 FY 09-10 HT

1743 YV08FA4037 Yamuna ViharAug of cable between Kartar

Nagar to Ballu Ka Tube Well23.15 FY 09-10 HT

1744 YV08LT4042 Yamuna ViharRep of LT Cable between K Blk

Ghonda To Gali No-114.68 FY 09-10 LT

1745 YV08LT4043 Yamuna ViharRep of LT Cable between J Blk

Seelampur to School wali gali2.89 FY 09-10 LT

1746 YV08LT4044 Yamuna Vihar

Rep of LT Cable between Jagjeet

Nagar Kiosk to Post office Wali

Gali

7.51 FY 09-10 LT

1747 YV08LT4046 Yamuna ViharRep of LT Cable between Chetram

To Ashok Mohalla7.97 FY 09-10 LT

1748 YV08LT4047 Yamuna ViharRep of LT Cable between B Blk

O/H To Petrol Pump9.17 FY 09-10 LT

1749 YV08LT4048 Yamuna ViharRep of LT Cable between A Blk

Bhaj To Gali No-513.10 FY 09-10 LT

1750 YV08LT4049 Yamuna ViharRep of LT Cable between B Blk

Bhaj To Gali No-1110.45 FY 09-10 LT

1751 YV08LT4050 Yamuna ViharReplacement of LT cable between

D Blk Bhajanpura to Gali No-911.50 FY 09-10 LT

1752 YV08LT4051 Yamuna ViharRep of LT Cable From JP-2 To

Kasai Wala8.46 FY 09-10 LT

Page 81: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

1753 YV08LT4052 Yamuna ViharREP of LT CABLE BETWEEN K

NAGAR TO GALI NO-23.59 FY 09-10 LT

1754 YV08LT4053 Yamuna ViharRep of LT Cable Between 2Nd

Pusta To Sani Halwai6.90 FY 09-10 LT

1755 YV08LT4054 Yamuna ViharRep of LT Cable Between X Blk

Khatta To Gali No-57.48 FY 09-10 LT

1756 YV08LT4056 Yamuna Vihar

Rep of LT cable between

Ambedkar Basti to Khazoor Wali

Gali

2.55 FY 09-10 LT

1757 YV08LT4082 Yamuna ViharReplacement of Service Pillar &

Fdr Pillar in D-YVR38.92 FY 09-10 LT

1758 YV08MS4068 Yamuna ViharProviding gland and flexible pipe in

Div.YVR39.41 FY 09-10 LT

1759 YV08MS4091 Yamuna Vihar

Replacement of Service Cable in

Zaffrabad, Road No-66, Chauhan

Bangar, Markazi Chowk,Rishi

Kardam Marg

59.83 FY 09-10 LT

1760 YV08MS4092 Yamuna ViharRepl. of Service Cable in Welcome

& Kabootar Mkt.82.77 FY 09-10 LT

1761 YV08MS4094 Yamuna Vihar

Replacement of service cable in

Shastri Park, DDA,MCD Flats

Shastri Park & Gautam Puri

46.88 FY 09-10 LT

1762 YV08MS4095 Yamuna Vihar

Replacement of service cable in

Brahampuri, Gautam Vihar,X Blk

Brahmpuri,Moni Baba Mandir

118.44 FY 09-10 LT

1763 YV08MS4098 Yamuna Vihar

Replacement of Service Cable in

Jagjeet Nagar, Kartar

Nagar,Arvind Nagar and Vijay

Colony

48.86 FY 09-10 LT

1764 YV08MS4103 Yamuna Vihar

Replacement of Service Cable in

Gautam Puri & Shastri Park MCD

Flats

56.29 FY 09-10 LT

1765 YV08MS4104 Yamuna ViharReplacement of Service Cable in

Ghonda47.56 FY 09-10 LT

1766 YV08NF4061 Yamuna ViharPdg HT fd Chn Bngr G No5 to

Sandhya Public School12.31 FY 09-10 HT

1767 YV08RM4025 Yamuna ViharRep. of 5 Panel Board at B Blk

Bhajanpura8.51 FY 09-10 HT

1768 YV08SH1124 Yamuna Vihar

Shifting of HT 11KV O/H feeder on

PWD Road no 59 in Yamuna

Vihar C-Block Near Brij Puri

Chowk due to construction of foot

over bridge D-NNG.

5.46 FY 09-10 HT

1769 YV08SL1070 Yamuna ViharProviding street lighting in Sanjay

Mohlla div. YVR0.42 FY 09-10 LT

1770 YV08SL1071 Yamuna Vihar Providing street lighting in CA

BHAJAN PURA1.20 FY 09-10 LT

1771 YV08SL1072 Yamuna Vihar

Providing street lighting in

Subhash Mohalla in division

Yamuna Vihar.

1.68 FY 09-10 LT

1772 YV08SL1073 Yamuna ViharProviding street lighting in C Block

Bhajanpura Gali No. 1 to 5.1.74 FY 09-10 LT

1773 YV08SL1074 Yamuna Vihar

Providing street lighting in Vijay

Park LOP Maujpur in division

Yamuna Vihar.

0.69 FY 09-10 LT

1774 YV08SL1075 Yamuna Vihar

Providing street lighting in

Subhash Mohalla North Ghonda

Div. YVR

1.76 FY 09-10 LT

1775 YV08SL1076 Yamuna ViharProviding Street Lighting in Shastri

Park E&F Blk Extn Area Div. YVR.1.06 FY 09-10 LT

1776 YV08SL1077 Yamuna ViharProviding street lighting in Buland

Masjid Div. YVR0.48 FY 09-10 LT

1777 YV08SL1078 Yamuna ViharProviding street lighting in Village

Garhi Mandu Div. YVR5.81 FY 09-10 LT

1778 YV08SL1079 Yamuna Vihar

Providing street lighting in Bhagat

Singh Mohalla(South) New

Usmanpur Div. YVR

0.05 FY 09-10 LT

Page 82: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

1779 YV09LT4005 Yamuna ViharReplacement of LT cable at inside

Kothi Zafrabad.Yamuna Vihar.3.27 FY 09-10 LT

1780 YV09LT4011 Yamuna Vihar

Replacement 3 Nos and 1 No new

LT feeder at CPJ Block Seelampur

Yamuna Vihar.

2.78 FY 09-10 LT

1781 YV09LT4012 Yamuna ViharREP.of 3 NOS LT CABLE at RED

LIGHT SHASTRI PARK2.98 FY 09-10 LT

1782 YV09LT4013 Yamuna Vihar

Replacement of 3 Nos LT Cable at

Banarsi das Clinic Rishi Kadam

Marg Yamuna Vihar.

2.11 FY 09-10 LT

1783 YV09LT4033 Yamuna Vihar

Replacement of 3 NO LT Cable at

Subhash Mohalla Substation

Yamuna Vihar.

2.33 FY 09-10 LT

1784 YV09LT4035 Yamuna ViharReplacement 2 nos LT Cables at

B-1 Substation Yamuna Vihar.1.11 FY 09-10 LT

1785 YV09LT4038 Yamuna ViharReplacement of 3 no LT cables at

C-8 Substation Yamuna Vihar.2.47 FY 09-10 LT

1786 YV09LT4039 Yamuna ViharReplacement of 2 no. LT Cables at

C-9 Yamuna Vihar.3.16 FY 09-10 LT

1787 YV09LT4044 Yamuna ViharProviding new O/H cable at C-8

Substation Yamuna Vihar.1.60 FY 09-10 LT

1788 YV09LT4047 Yamuna Vihar

REPLACEMENT of 3 NO LT

CABLE at B-5 YVR TO RAMLILA

MAIDAN

4.91 FY 09-10 LT

1789 YV09LT4054 Yamuna Vihar

Replacement of LT feeder at

Primary School Ballu ka

Tubewell.Yamuna Vihar.

4.02 FY 09-10 LT

1790 YV09LT4055 Yamuna Vihar

Replacement of LT feeder at

Gautam Vihar Primary

School.Yamuna Vihar.

2.75 FY 09-10 LT

1791 YV09LT4098 Yamuna ViharProviding PCC Poles and LT AB

cable in Div -Yamuna Vihar19.08 FY 09-10 LT

1792 YV09LT4152 Yamuna Vihar

Replacement of Old Conductor

with LT AB Cable at B- Block and

Part of C block Yamuna Vihar.

45.88 FY 09-10 LT

1793 YV09MS4099 Yamuna ViharProvinding Single Phase & 3

Phase Distribution Box in D-YVR26.28 FY 09-10 LT

1794 YV09MS4102 Yamuna ViharProvide earthing for the substation

in Yamuna Vihar.21.08 FY 09-10 LT

1795 YV09RM4014 Yamuna ViharRep of 3 Way RMU at Dda Flat

Shastri Park3.07 FY 09-10 HT

1796 YV09RM4015 Yamuna ViharRep of 3 Way RMU at O/H Shastri

Park3.20 FY 09-10 HT

1797 YV09RM4016 Yamuna ViharInstallation of 3 Way RMU at

Janta Cly at Welcome3.34 FY 09-10 HT

1798 YV09RM4017 Yamuna ViharInstallation of 3 Way RMU at Gali

No 5, Chanhan Banger3.05 FY 09-10 HT

1799 YV09RM4018 Yamuna ViharRep of 4 Way RMU at First Pusta,

Usman Pur5.26 FY 09-10 HT

1800 YV09RM4019 Yamuna ViharRep of 3 Way RMU at Mcd S/Stn

No 23.01 FY 09-10 HT

1801 YV09RM4021 Yamuna ViharInstallation of 3 Way RMU at Cpj

Seelampur3.02 FY 09-10 HT

1802 YV09RM4022 Yamuna ViharInstallation of 3 Way RMU at

Photo Chowk,Welcome3.19 FY 09-10 HT

1803 YV09RM4023 Yamuna ViharInstallation of 3 Way RMU at

Bhagat Singh Mohalla3.05 FY 09-10 HT

1804 YV09RM4025 Yamuna ViharRep of 3 Way RMU at Police

Station Seelampur3.03 FY 09-10 HT

1805 YV09RM4026 Yamuna ViharReplacement of 3 Way RMU at

PWD office4.92 FY 09-10 HT

1806 YV09RM4060 Yamuna ViharNew RMU at C Block Gali No 7

Bhajanpura5.10 FY 09-10 HT

1807 YV09RM4061 Yamuna ViharPro`ofnew RMUat Sanjay Mohala

Bhajanpura YVR4.56 FY 09-10 HT

Page 83: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

1808 YV09RM4062 Yamuna ViharHt Pannel at Pump House

Bhajanpura5.29 FY 09-10 HT

1809 YV09RM4065 Yamuna ViharReplacement of HT Panel at

Cricient Public School.3.31 FY 09-10 HT

1810 YV09RM4066 Yamuna ViharReplacement of HT panel at C-11

Yamuna Vihar.4.43 FY 09-10 HT

1811 YV09RM4069 Yamuna ViharReplacement of HT Panel at C-7/2

Yamuna Vihar.4.50 FY 09-10 HT

1812 YV09RM4077 Yamuna ViharReplacement of 4 Panel Board at

Bhag Wali Masjid.4.54 FY 09-10 HT

1813 YV09SH1106 Yamuna Vihar

Shifting of electric poles /

transformer at gali no 1 Braham

puri D YVR.

5.66 FY 09-10 LT

1814 YV09UT4028 Yamuna Vihar

Augmentation of 400kVA

Transformer into 630kVA

Transformer at Rishi kardam

marg.

10.27 FY 09-10 HT

1815 YV09UT4029 Yamuna Vihar

AUG. OF T/F FROM 400 KVA TO

630KVA AT BANARSHI DASS

CLINIC

0.35 FY 09-10 HT

1816 CC08CV4071 Chandni Chowk Rep. & rsg fcng at Maliwara s/stn. 0.31 FY 09-10 Others

1817 CC08CV4072 Chandni Chowk Rep. & rsg fcng at Nai Sarak Pyao 0.55 FY 09-10 Others

1818 CC08CV4077 Chandni Chowk Rpg flr & Toe wall at Roshan pura 0.44 FY 09-10 Others

1819 CC08CV4085 Chandni ChowkToe wall &Providing Fencing at

Kinari Ba0.68 FY 09-10 Others

1820 CC08CV4086 Chandni ChowkRpg & rsg fencing & flor

KatraKhushalRai0.84 FY 09-10 Others

1821 CC09CV4071 Chandni Chowk Repair of roof at Katra Baryan 2.48 FY 09-10 Others

1822 CC09CV4073 Chandni ChowkC/O of Toe wall & Prov. Fncg

Dewan hall0.96 FY 09-10 Others

1823 DG08CV4115 Daryaganj Rpg flr & gate at 56 Qtr. 0.43 FY 09-10 Others

1824 DL08CV4102 Dilshad Garden Raising of s/stn at Mansarovar

Park1.02 FY 09-10 Others

1825 DL08CV4103 Dilshad GardenRprg of s/stn at C block New

Seemapuri2.24 FY 09-10 Others

1826 KN08CV4184 Krishna NagarRepair of PL/M s/stn. at Scooter

mkt0.20 FY 09-10 Others

1827 KN08CV4191 Krishna NagarProviding fencing at Surya Nursing

home1.40 FY 09-10 Others

1828 KN08CV4199 Krishna NagarRepair steel ksk Nallah Furniture

mkt1.62 FY 09-10 Others

1829 KN09CV4064 Krishna Nagartr. Fencing at E- block West

Arjun Nag0.76 FY 09-10 Others

1830 KN09CV4066 Krishna Nagar s/stn. Rani Garden School 1.85 FY 09-10 Others

1831 KW08CV4193 Karawal NagarRaising of s/stn. building at D-

3Nehru2.71 FY 09-10 Others

1832 KW09CV4113 Karawal NagarConstn of Complaint Centre Sonia

Vihar8.88 FY 09-10 Others

1833 KW09CV4129 Karawal NagarCovering Top with IRC Sabhapur

mukund0.72 FY 09-10 Others

1834 KW09CV4130 Karawal NagarRpr fncg PL/M s/stn Hotal Mayur

BrijPur0.45 FY 09-10 Others

1835 KW09CV4131 Karawal NagarRepair fcng PL/M s/stn A-Blk

Gokulpur0.71 FY 09-10 Others

1836 KW09CV4134 Karawal NagarRepair fncg / plinth s/st Johripur

Extn1.26 FY 09-10 Others

1837 KW09CV4151 Karawal NagarRepair fencing PL/M s/stn Guzzar

mohallh0.33 FY 09-10 Others

1838 KW09CV4152 Karawal NagarRr fncg PL/M s/stn Jwhr ngr loni

road1.58 FY 09-10 Others

1839 LN08CV4344 Laxmi Nagar Civil worka at Gazipur ni 1,2,3 & 4. 1.25 FY 09-10 Others

1840 LN09CV4183 Laxmi Nagar Upgradation of Gazipur store. 3.11 FY 09-10 Others

1841 LN09CV4336 Laxmi NagarRpr fng Primry schl Mandawali &

/Stn 171.39 FY 09-10 Others

1842 M308CV4084 Mayur Vihar Ph-3 PL/M s/stn. at A blk new ashok

Ngr LOP1.34 FY 09-10 Others

Page 84: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

1843 M308CV4086 Mayur Vihar Ph-3 Repair11kv s/stn.at B-Blk N.Ask

Ngr1.22 FY 09-10 Others

1844 MV09CV4045Mayur Vihar Ph-

1&2

Rpg and rsg of 11 Kv at 16 blk

TKP1.31 FY 09-10 Others

1845 MV09CV4046Mayur Vihar Ph-

1&2

P/F fencing at PL/M s/stn. Shashi

Gaden1.22 FY 09-10 Others

1846 MV09CV4048Mayur Vihar Ph-

1&2

P/F fencing at PL/M s/stn. Pratap

nagar0.65 FY 09-10 Others

1847 NN07CV4509 Nand NagriRen. of Cust. Care Centre Nand

Nagri36.51 FY 09-10 Others

1848 NN08CV4154 Nand NagriRepair Work of PL/M & Kiosk at

IJK blk3.20 FY 09-10 Others

1849 NN08CV4156 Nand NagriRepair Work Steel Kiosk at Nathu

chowk1.56 FY 09-10 Others

1850 NN08CV4159 Nand NagriRepair Work of S/Stn I & II

Kapoor wala1.53 FY 09-10 Others

1851 NN08CV4162 Nand NagriCivil works at Azad chowk

Kardampuri0.97 FY 09-10 Others

1852 NN08CV4163 Nand NagriRepairing of s/stn at A block Meet

nagar4.22 FY 09-10 Others

1853 NN09CV4150 Nand NagriProv new fncg s/stn Saboli primry

school0.82 FY 09-10 Others

1854 NN09CV4151 Nand Nagri Rpr to b/wall gate MIG 3 EOL road 0.65 FY 09-10 Others

1855 PG08CV4109 Paharganj P/F Fencing at MM Road 0.85 FY 09-10 Others

1856 PG08CV4111 Paharganj P/F IRC Fencing at Ratan Market 0.74 FY 09-10 Others

1857 PG09CV4089 Paharganj Repair work Steel kiosk JHL Rd. 2.09 FY 09-10 Others

1858 YV08CV4121 Yamuna Vihar p/f fencing C blk Janta cly

Shashtripar0.55 FY 09-10 Others

1859 YV08CV4122 Yamuna ViharRepair of s/stn no. 3 MCD flats

Usmanpur1.26 FY 09-10 Others

1860 YV09CV4117 Yamuna ViharRepair s/stn. Kabutar Mkt

&Shashtri park1.77 FY 09-10 Others

1861 YV09CV4124 Yamuna ViharP / fIRC fncg D-block Shashtri

Park0.94 FY 09-10 Others

1862 YV09CV4139 Yamuna ViharRepair to fncg PL/M s/stn

Gautam vihar0.40 FY 09-10 Others

1863 EE07AT3525 EHV East

Installation of 2nd Power

Transformer of 66/11KV 20MVA

capacity at Patparganj Industrial

Area Grid Station

147.46 FY 08-09 EHV

1864 EC04IF2552 EHV Central

Laying of 2 Nos. 33 kV 3x400

sqmm XLPE cable from Anand

Prabat to Faiz Road.

317.17 FY 08-09 EHV

1865 EC04IF3503 EHV Central

Laying of 4 nos 33 KV

3x400sqmm XLPE Cables from

Shastri Park 66/33 KV Grid to

proposed Anand Parbat 33/11 KV

Grid S/stn.

271.05 FY 08-09 EHV

1866 EC04IF3570 EHV Central

Laying of additional 6 Nos. 66 kV

1x630 sqmm XLPE cables from

Park Street to Shastri Park.

636.86 FY 08-09 EHV

1867 EC04IF3574 EHV Central

Replacement of old PILCA cable

by laying 2 Nos. 33 kV 3x400

sqmm XLPE cable from Rohtak

road to DMS.

382.46 FY 08-09 EHV

1868 EC04IF4589 EHV Central

Laying of 2 Nos. 33 kV

3x400sqmm XLPE cable from

Rohtak Road to Prasad Nagar.

590.35 FY 08-09 EHV

1869 EC04SW3608 EHV Central

Replacement of 2 No. OCB by 33

KV Outdoor Breakers (VCB) at

DMS.

4.70 FY 08-09 EHV

1870 EC04SW4534 EHV Central Replacement of 22 Nos.11 kV

switchgear panel at Kamla Market136.60 FY 08-09 EHV

Page 85: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

1871 EE04AT3555 EHV East

Addition of 33/11 kV,dismantled

16 MVA Power Transformer along

with associated equipment at

Karawal Nagar Medical Complex.

363.48 FY 08-09 EHV

1872 EE04AT3651 EHV East

Addition of 1 No. 66/11 kV, 20

MVA power transformer along with

associated bay equipment and 11

kV, 7 Nos. switchgear panel at

Nand Nagri.EE04AT2561

248.80 FY 08-09 EHV

1873 EE04BE3584 EHV East

Addition of 2 Nos. 33 KV bays at

Dwarkapuri for 2 nos. spare bay

available at Dwarkapuri.

43.98 FY 08-09 EHV

1874 EE04IF2548 EHV East

Laying of additional 1 No. 33 KV

3cx400 sq.mm XLPE cable from

proposed 33 KV Mother Diary to

33 KV Scope complex Grid.

104.55 FY 08-09 EHV

1875 EE04IF3560 EHV East

Providing 33kV feed to 33kV grid

s/stn. at Tahirpur industrial area

(D.S.I.D.C Jhilmil) with laying of 2

no. XLPE 3x400mm² U/G cables

from existing 66/33kV Vivek Vihar

grid.

80.44 FY 08-09 EHV

1876 EE04SW4535 EHV East

Replacement of 8 Nos.11 kV

switchgear panel at Karawal

Nagar.

63.11 FY 08-09 EHV

1877 EE05SH2003 EHV East

Shifting of 66 kV O/H Tower line of

220 kV Patparganj - Vivek Vihar

opposite to Anand Vihar Railway

Station.

135.62 FY 08-09 EHV

1878 EE07SH1503 EHV East

Shifting of 66KV Double circuit

Tower line Mayur Vihar Ph I-Mayur

vihar Ph-II Due to its infringing

with MRTS Corridor( Indraprastha-

New Ashok Nagar)

69.84 FY 08-09 EHV

1879 EE07SH1526 EHV East

Shifting of 33KV Shakur Pur-

Kailash Nagar O/H circuit at Raja

Ram Kohli Marg and Shastri

Nagar Intersection at Marginal

Bund Road .

110.89 FY 08-09 EHV

1880 EE07SH1527 EHV East

Shifting 33 KV underground

feeders viz (1.) Patparganj Geeta

Colony(02 Nos.) (2.) I.G.-Geeta

Colony Stadium (01 No.) (3.).

Geeta Colony -Kailash Nagar( 02

Nos.)

192.59 FY 08-09 EHV

1881 EE07SH1530 EHV East

Shifting of 33kV U/G cables at

1. Ghonda - GT Road

2. Bhagarthi - Dwarka Puri

3. Shastri Park - Shymlal College

Keshav Chowk G.T.Road in East

Delhi due to construction of Grade

Seprator & Underpass for free flow

of Traffic

96.93 FY 08-09 EHV

1882 EE08SH1013 EHV East

Shifting of 33KV O/H Line and

U/G cables along M B Road near

ITO CHUNGI.

34.30 FY 08-09 EHV

1883 EC04IF4514 EHV Central

Balance Works for providing

interconnector between Motia

Khan 33/11 kV grid s/stn. to Faiz

rd. 33/11 kV grid s/stn. by laying

of two nos. 33 kV 3x400mm²

XLPE cable.

0.64 FY 08-09 EHV

1884 EC05FA2009 EHV Central

Replacement of old PILCA cable

by laying 2 Nos. 33 KV 3CX400

sqmm XLPE cable in part portion

of I. P. Station bay No. 31 to I. G.

Stadium

34.44 FY 08-09 EHV

Page 86: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

1885 EC05FA3010 EHV Central

Shifting of 33 kv U/G XLPE cable

of size 3X400 sq mm Ckt.-I&2

from existing old to new GIS panel

board at 220 kv substation at Sabji

Mandi.

7.67 FY 08-09 EHV

1886 EE04BE4564 EHV East

Erection, testing and

commissioning of 66KV

equipments in one No. addl. Bay

at 66KV Vivek Vihar Grid S/stn

48.55 FY 08-09 EHV

1887 EE06GS3020 EHV East

Replacement with Installation of

11KV higher ratio CTS at Yamuna

Vihar 66/11KV Grid & at 33/11KV

Shakarpur Grid & Pending Civil

Works at CBD-II, DSIDC Jhilmil,

Shakarpur, Yamuna Vihar, Anand

Parbat and East of Loni Road.

20.08 FY 08-09 EHV

1888 EC08SH1006 EHV Central

Shifting of 33 KV O/H Line due to

the construction of U/G Tunnel by

DMRC at ridge road

11.35 FY 08-09 EHV

1889 EE06SH2011 EHV East

Part conversion of 66 kV D/C

Tower Line between Patparganj

220 Kv grid and Vivek Vihar grid

due to infringing MRTS Corridor

71.82 FY 08-09 EHV

1890 EE06SH2028 EHV East Shiftng of O/H Vivek Vihar to G.T

Road.37.56 FY 08-09 EHV

1891 EE07SH1504 EHV East

Shifting of 33KV Under ground

cables near Karkari More due

construction of Road from

Marginal bund Road to Karkari

More by PWD

12.79 FY 08-09 EHV

1892 EE07SH1512 EHV East

Shifting of 33kV XLPE U/G Cables

from 220kV PPG to Preet Vihar

Grid due to construction of Master

Plan Road by PWD at Karkari

More

6.59 FY 08-09 EHV

1893 EE05GS3016 EHV East

Installation of 11KV,5.4 MVAR

(3.6+1.8) capacitor bank at Nand

Nagri Grid

25.20 FY 08-09 EHV

1894 EC06CB4006 EHV Central

Installation of Door Interlocking

Device for 11 KV Capacitor Bank

in Central Circle‘s 66/33 KV Grid

Stations.

1.83 FY 08-09 EHV

1895 EE06CB4016 EHV East

Installation of 11KV, 2X5.4 MVAR

Capacitor Bank at Shastri Park

(East) Grid.

36.45 FY 08-09 EHV

1896 EE06CB4021 EHV East

Installation of 11KV, 5.4 MVAR

Capacitor Bank at Karawal Nagar

Grid.

21.72 FY 08-09 EHV

1897 EE06CB4022 EHV East

Installation of 11KV, 5.4 MVAR

Capacitor Bank at CBD Shadara

Grid.

17.81 FY 08-09 EHV

1898 EE06CB4035 EHV East

Installation of Door Interlocking

Device for 11 KV Capacitor Bank

in East Circle‘s 66/33 KV Grid

Stations.

4.45 FY 08-09 EHV

1899 AFOATYA00661 Yamuna Vihar

To Provide 3X300 MM2 11 Kv

XLPE Feed at Subhash Mohalla

S/Stn No 2 From Proposed

Yammuna Vihar Grid And T/O 2

No 11 Kv Out Let Of Size 3X240

Mm

9.50 FY 08-09 HT

1900 AFOW00593 Yamuna Vihar

Provision of 2 Nos. 66/33 kV 30

MVA power transformers with 33

kV bays at Bhagirathi.

AFOW00503

62.88 FY 08-09 LT

Page 87: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

1901 AFOW07094 Krishna Nagar

Establishment of 33/11KV

Permanent Grid in place of

Temporary Grid at Kailash

Nagar(Balance Work of Old

Scheme)

15.06 FY 08-09 HT

1902 AFOW07641 Karkardooma Electrification Of C.B.D. Shahdara 16.38 FY 08-09 LT

1903 AFOW13064 Yamuna ViharMiscellaneous Civil works at

Shastri Park 66KV Grid S/Stn.90.06 FY 08-09 LT

1904 AFOW14155 Karawal NagarE/o unauthorized colony shiv vihar

ph 101.70 FY 08-09 LT

1905 AFOW15782 Daryaganj

Balance work for providing

additional feed to Jama Masjid

Grid Stn from Kashmere Gate 220

KV Sub Stn and laying of

additional cable from RPH to Tee

Off Point on RPH Civil Lines

Feeder

18.33 FY 08-09 HT

1906 AFOW16396 Yamuna ViharElectrification of Community

Centre Yamuna Vihar.17.03 FY 08-09 LT

1907 AFOW16888 KarkardoomaElectrification of District Centre

and Facility Centre.32.48 FY 08-09 LT

1908 AFOW16890 KarkardoomaElectrification of District Centre

and Facility Centre.20.04 FY 08-09 LT

1909 AFOW16892 KarkardoomaElectrification of District Centre

and Facility Centre.11.65 FY 08-09 LT

1910 AFOW-20143 Laxmi NagarConstruction of Boundary Wall at

proposed 33 KV Shakarpur Grid9.33 FY 08-09 LT

1911 BS3234 KCC SchemesAdditional Load on LT Making

Total 125 KW LOAD.0.70 FY 08-09 LT

1912 CC04FA4599 Chandni Chowk

Augmentation of 11KV,U/G Cable

3x150mm2 PILCA to 3x300mm2

XLPE from New Kashmere Gate

sub station Mori Gate sub station

plinth mounted Chabi Ganj

Nicholson Road Punja Sharif.

34.42 FY 08-09 HT

1913 CC04FA4608 Chandni Chowk

Replacement of old sick cable

from Town Hall Grid to Tilak

Bazar.

19.43 FY 08-09 HT

1914 CC04LT4578 Chandni Chowk

Laying of new LT feeder of

3.5Cx300 sq. mm XLPE Cable

from Jaipuria Building sub station

tn. to Mahaveer Bazar Feeder

Pillar.

1.59 FY 08-09 LT

1915 CC04LT4580 Chandni ChowkTaking out LT feederfm

CycleStand to A'bad BankFP1.50 FY 08-09 LT

1916 CC04PS4516 Chandni Chowk

Conversion of existing 630 kVA

plinth mounted Sub station. into

Package Unit with 990 kVA

Transformer at Bata Chowk Sub

station., Chandni Chowk.

22.99 FY 08-09 HT

1917 CC04PS4523 Chandni Chowk

Conversion of existing 630 kVA

P/M S/Stn. into Package Unit with

990 kVA Transformer at Katra

Asharfee S/Stn., Chandni Chowk.

22.93 FY 08-09 HT

1918 CC04PS4538 Chandni Chowk

Conversion of existing 630 kVA

P/M S/Stn. into Package Unit with

990 kVA Transformer at Naya

Baans S/Stn., Chandni Chowk.

23.88 FY 08-09 HT

1919 CC04RM4659 Chandni Chowk

Replacement of existing old Panel

board with new Panel board at

noveLTy cinema in Distt Chandani

Chowk

5.03 FY 08-09 HT

1920 CC05LT4021 Chandni ChowkReplacement of LT ACB in distt.

Chandni Chowk47.30 FY 08-09 LT

Page 88: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

1921 CC05LT4029 Chandni Chowk

Replacement of old existing sick

cable with new LT 3x3.5 sqmm

XLPE betweenBand box to

Annapoorna F P and S N 1825 to

SN 1824 feeder pillar

0.48 FY 08-09 LT

1922 CC05RM4042 Chandni ChowkReplacement of old RMU at

Gadodia Market Sub station.4.96 FY 08-09 HT

1923 CC05RM4043 Chandni ChowkReplacement of old RMU at

Ganda Nallah Sub station.5.01 FY 08-09 HT

1924 CC05RM4049 Chandni Chowk

REPLACEMENT OF OLD 7

PANEL BOARD WITH NEW 4

PANEL BOARD AT BELA ROAD

S/S IN (D) CCK.

7.84 FY 08-09 HT

1925 CC05RM4051 Chandni ChowkReplacement of RMU at Railway

Gate no. 2 Substation5.13 FY 08-09 HT

1926 CC05RM4055 Chandni Chowk

Replacement of 5Panel board into

5 Panel board at CM Road

Substation

7.92 FY 08-09 HT

1927 CC05RM4058 Chandni ChowkReplacement of old Panel at Old

Lajpat Rai Market Substation11.62 FY 08-09 HT

1928 CC05RM4084 Chandni Chowk

Installation/Replacement of 4

Panel board with motorised RMU

with SCADA compatibility at -

Gali.Quasim.Jaan Substation

12.81 FY 08-09 HT

1929 CC05RM4085 Chandni ChowkRep of 3 PB by 1no 3Way I/D

RMU at G.Mkt I/D4.93 FY 08-09 HT

1930 CC05RM4098 Chandni Chowk

Installation of 3Way outdoor RMU

at Katra Baryan Sub stationtn, in

CCK Division

4.55 FY 08-09 HT

1931 CC05SH2096 Chandni ChowkConversionersion of OH to UG at

conn'g rd of Gita Colony0.58 FY 08-09 HT

1932 CC06AT4038 Chandni Chowk

Installation Of One Additional 400

Kva Dtr At Lal Darwaza In Div.

Cck.

0.68 FY 08-09 HT

1933 CC06FA4087 Chandni Chowk

Rep. Of Old HT Cable 3X300

MM2 from Gali Samosan P/M To

Zeenat Mahel S/Stn In D-CCK

3.10 FY 08-09 HT

1934 CC06FA4089 Chandni Chowk

Replacement of HT 11 KV 3X300

MM2 from Bata Substation to

Haveli Haider Quli in Division-

Chandni chowk.

2.11 FY 08-09 HT

1935 CC06FA4092 Chandni Chowk

Replacement of HT 11 KV 3X300

MM2 old Cable from S.N Market

to Mother Dairy Via Railway

Godown in Division Chandni

Chowk.

6.70 FY 08-09 HT

1936 CC06FA4093 Chandni Chowk

Laying of HT 11 KV 3X300 MM2

from Disel P/H to Mother dairy in

Division Chandni chowk.

14.90 FY 08-09 HT

1937 CC06FA4095 Chandni Chowk

Laying Of HT Cable 3X300 MM2

from Diesel P.H. to Gadodis S/Stn

in D-CCK

13.29 FY 08-09 HT

1938 CC06FA4096 Chandni Chowk

Laying Of HT Cable 3X300 Mm2

from Lahori Gate Grid to Lahori

Gate Dispensary in CCK.

1.26 FY 08-09 HT

1939 CC06FA4097 Chandni Chowk

Laying Of HT Cable 3X300 MM2

from New Hauz Qazi to Hamdard

in D-CCK

40.47 FY 08-09 HT

1940 CC06FA4099 Chandni ChowkLaying of HT Cable 3X300 MM2

from Lal quan to Gali Samsan.2.92 FY 08-09 HT

1941 CC06FA4110 Chandni Chowk

Rep. of old 11 K V HT cable 3x300

mm2from New lajpat rai mkt s/stn

Parade ground s/stn in D-CCK

3.66 FY 08-09 HT

1942 CC06LT4065 Chandni Chowk

Laying of LT cable in UG manner

& installation of feeder/service

pillar at Bhagirath place in D-CCK

20.44 FY 08-09 LT

Page 89: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

1943 CC06LT4071 Chandni Chowk

Conversion Of OH Old Conductor

& Leads in to AB Cable at different

places of Old Lajpat Rai Mkt &

Hemilten Road Sub Division in D-

CCK

113.72 FY 08-09 LT

1944 CC06LT4072 Chandni ChowkConversion of O/H Conductor to 1

& 2 D-CCK131.28 FY 08-09 LT

1945 CC06LT4074 Chandni Chowk

Laying Of LT Feeder from Katra

Neel S/Stn N0 1 to Gali Telyan in

D-CCK.

3.17 FY 08-09 LT

1946 CC06LT4075 Chandni Chowk

Laying Of LT Cable from Khari

Bawli Package to Tilak Bazar N01

S/Stn in D - CCK.

1.33 FY 08-09 LT

1947 CC06LT4076 Chandni Chowk

Laying Of LT Cable From Khari

Bawli Package To Tilak Bazar N02

S/Stn In D - Cck

1.01 FY 08-09 LT

1948 CC06LT4078 Chandni Chowk

Stringiging /Laying of LT cable

from old Hauz Qazi N0 1 to

Chaunmuka mandir papal

mahadev

1.51 FY 08-09 LT

1949 CC06LT4079 Chandni Chowk

Laying Of LT Cable from CM Road

N0 2 to Pole Near Church in D-

CCK.

0.68 FY 08-09 LT

1950 CC06LT4080 Chandni Chowk

Laying Of LT Cable from Old C M

Road N01 to Pole Near Charch

(Kumar Studio)

0.79 FY 08-09 LT

1951 CC06LT4081 Chandni Chowk

Lay Of New LT Cable 31/2X300

MM2 from Gadodia Kiosk to Kt.

Ishwer Bhan in Side the Pole in D-

Cck

2.99 FY 08-09 LT

1952 CC06LT4114 Chandni Chowk

Laying Of LT Cable 3.5X300

MM2 from Mora Sarai Khatta

S/Stn 1 To 1521 Ram Gali

Bhagirath Place In D- CCK

3.12 FY 08-09 LT

1953 CC06LT4115 Chandni Chowk

Laying Of 2 N0S LT Cable

3.52X300 MM2 from Kuchha

Natwa Pss S/Stn To 1071 Kucha

Natwa& Sulabh Sauchalya In D-

Cck

2.09 FY 08-09 LT

1954 CC06LT4116 Chandni Chowk

Laying Of LT Cable 3.5X300

MM2 from Kuchha Natwa PSS

S/Stn to Sulabh Sauchalya Kucha

Natwa In D- CCK.

0.90 FY 08-09 LT

1955 CC06LT4117 Chandni Chowk

Laying Of LT Cable 31/2X300

MM2 from Polic Stn Town Hall

PSS S/Stn To Kucka Mahajani

1167 in D- CCK.

3.22 FY 08-09 LT

1956 CC06LT4118 Chandni Chowk

Laying Of LT Cable 3.5X300 MM2

from More Sarai Khata PSS S/Stn

2 To 237 Olr Market in D- CCK.

1.31 FY 08-09 LT

1957 CC06LT4119 Chandni Chowk

Laying Of LT Cable 3.5X300

MM2 from Deewan Hall S/Stn to

Measurment Office Bhagirath

Place in D- CCK.

2.22 FY 08-09 LT

1958 CC06RM4012 Chandni ChowkInstallationln of 4+1Way indoor

RMU at Jogiwara,Chandni chowk11.37 FY 08-09 HT

1959 CC06RM4014 Chandni ChowkInstallationl of 4+2*1 Way indoor

RMU at BSO (MES) Red Fort15.09 FY 08-09 HT

1960 CC06RM4028 Chandni Chowk

Installationln of 3*4+3*1 way

indoor RMU at N.HQCC,Chandni

chowk

34.32 FY 08-09 HT

1961 CC06RM4059 Chandni Chowk

Replacement of old 10 panel board

with new 10 panel board at

Paiwalan sub station.

26.58 FY 08-09 HT

1962 CC06RM4105 Chandni ChowkRep of old panels at GPO s/stn in

D-CCK10.49 FY 08-09 HT

1963 CC06RM4107 Chandni ChowkRepof old 4 panelsat Lgate disp in

D-CCK7.22 FY 08-09 HT

Page 90: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

1964 CC06RM4120 Chandni ChowkInstallation of 3+1 RMU at Dewaan

hall7.49 FY 08-09 HT

1965 CC06RM4122 Chandni ChowkInstallation of 3 Way RMU at

More Sarai Railway Colony.4.49 FY 08-09 HT

1966 CC07SL1566 Chandni Chowk

Installation of St Ltg Fitting In The

Constituency of Honbe M.L.A. Sh

Harun Yusuf Ji In D- CCK.

1.55 FY 08-09 LT

1967 CC07SL2509 Chandni ChowkProv OF st ltgin the area of Sh

Harun yu0.38 FY 08-09 LT

1968 CC07UT4512 Chandni Chowk

Aug. Of 630 KVA Transformer in

to 990 Kva transformer at Gali

Sehtara in D-CCK.

0.53 FY 08-09 HT

1969 CC07UT4518 Chandni Chowk

Aug Of 630 KVA Transformer in to

990 Kva Transformer at

Cherkheywalan in D-CCK.

0.53 FY 08-09 HT

1970 CC07UT4519 Chandni ChowkAug Of 630 Kva T/F into 990 Kva

T/F at Rodrgran in D-Cck0.54 FY 08-09 HT

1971 CC07UT4520 Chandni ChowkAug Of 630 Kva T/F into 990 Kva

T/F at Lal Kuana In D-CCK.0.52 FY 08-09 HT

1972 CC08LT4017 Chandni ChowkStriging of LT Cable from Zeenat

Mehel to Gali Rajan in D-CCK1.59 FY 08-09 LT

1973 CC08LT4021 Chandni Chowk

Stinging of LT Cable from Mohlla

Nihariyan towards Gali Akhery

Wali Gali in D-CCK

1.52 FY 08-09 LT

1974 CC08MS4038 Chandni ChowkLT Clean Up at Farash Khana Lal

Kuana Rodr Gran In D-CCK.22.45 FY 08-09 LT

1975 CC08MS4039 Chandni ChowkLT Clean Up at Chota Bazar Bara

Bazar Ram Bazar In D-CCK.30.39 FY 08-09 LT

1976 CC08MS4040 Chandni ChowkLT Clean Up at Mali Wara

Jogiwara Nai Sarak in D-CCK.41.39 FY 08-09 LT

1977 CC08MS4041 Chandni ChowkLT Clean Up at Ballimaran & Main

Road CCK In D-CCK.40.68 FY 08-09 LT

1978 CC08MS4042 Chandni Chowk

LT Cleanup at Cherkheywalan

Jamamaszid Mainroad Area

Chawri Bazar In D-CCK.

19.40 FY 08-09 LT

1979 CC08MS4043 Chandni Chowk

LT Clean Up at New Laj Pat Rai

Mkt Hathi Khana Katra Mashrooh

In D- CCK.

51.41 FY 08-09 LT

1980 CC08MS4044 Chandni Chowk

LT Clean Up at Fatehpuri Khari

Bawli Ki Bariyan Naya Bans in D-

CCK

39.39 FY 08-09 LT

1981 CC08MS4045 Chandni ChowkLT Clean Up at T.Hall Road Spm

Marg Katra Neel In D- CCK.41.54 FY 08-09 LT

1982 CC08MS4046 Chandni Chowk

LT clean Up at Naya Bazar Tilak

Bazar SN Mkt L Gate Xing in D-

CCK.

40.43 FY 08-09 LT

1983 CC08MS4047 Chandni Chowk

LT Clean Up at Subhas Marg Old

Lajpat Rai Mkt Bhagirath Place in

D- CCK.

33.51 FY 08-09 LT

1984 CC08MS4048 Chandni Chowk

LTclean Up atgb Road Ajmeeree

Gate Kucha Pandit Gali Sehtara In

D-CCK.

43.04 FY 08-09 LT

1985 CC08MS4049 Chandni ChowkLT Clean Up at Hauz Qazi Peepal

Mahadev Lal Kunana In D-CCK.34.31 FY 08-09 LT

1986 CC08RM4023 Chandni ChowkInstallation 3 Way O/D RMU at

Angoori Bag in D-CCK3.86 FY 08-09 HT

1987 CC08RM4024 Chandni ChowkInstallation of old RMU at

Esplanded Road in D-CCK3.86 FY 08-09 HT

1988 CC08RM4025 Chandni Chowk

Installation of 3 Way O/D RMU at

More Sarai Railway Coloney in D-

CCK

3.83 FY 08-09 HT

1989 CC08RM4027 Chandni ChowkInstallation of 3 Way O/D RMU at

Jubl in D-CCK3.89 FY 08-09 HT

1990 CC08RM4028 Chandni ChowkInstallation of O/D RMU at Zakir

Husain at Ajmeere Gate in -CCK3.78 FY 08-09 HT

Page 91: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

1991 CC08RM4029 Chandni ChowkReplacement of Old Panels at Gali

Guluan in D-CCK8.75 FY 08-09 HT

1992 CC08RM4030 Chandni ChowkInstallation of 4 Way O/D RMU at

Lal Darwaja in D-CCK6.37 FY 08-09 HT

1993 CC08RM4031 Chandni ChowkInstallation of 3 Way O/D RMU at

Kachha Bag in D-CCK3.86 FY 08-09 HT

1994 CC08RM4032 Chandni ChowkReplacement of Old Panel at

Pared Ground in D-CCK11.50 FY 08-09 HT

1995 CC08SH1050 Chandni Chowk

Shifting of O/H at Dewan Hall

Road near Old Lajpat rai Market

as per request MCD D-CCK

1.77 FY 08-09 LT

1996 CYV0241 Karawal Nagar E/O Shiv Vihar PH.5 48.88 FY 08-09 LT

1997 DG04EL2577 Daryaganj

Electrification of Plot No.-8 (Sub

Station Work), Asaf Ali Road,

Darya Ganj

1.84 FY 08-09 LT

1998 DG04EL2580 Daryaganj

Electrification of Plot No.-9

(Service Connection), Asaf Ali

Road, Darya Ganj

2.06 FY 08-09 LT

1999 DG04LT4505 DaryaganjReplacementof LT cable at diff

areas in Hauz QazI7.40 FY 08-09 LT

2000 DG04PS4601 DaryaganjProvision of 2 nos. PSS at Urdu

Bazar sub station ,DRG46.83 FY 08-09 HT

2001 DG04PS4634 DaryaganjProvision of 1 no. Package Sub

Station at Darya Ganj.11.01 FY 08-09 HT

2002 DG04RM4590 Daryaganj

Replacement of RMU with new

11kV Extensible RMU 3-Way SF6

type at Telephone Exchange Sub

station., Darya Ganj.

6.57 FY 08-09 HT

2003 DG04SH4553 Daryaganj

Shifting and dismantling of HT

and LT Cable and Panels at Delhi

Gate 33kV Grid Sub-Station,

DRG.

6.98 FY 08-09 HT

2004 DG05FA4075 Daryaganj

Replacement of existing 3Cx 300

mmsq. PILCA cable with new 3C

x 300 mm sq. XLPE cable

between Jama Masjid Grid to

Daryaganj s/stn in in Distt.

Daryaganj.

25.00 FY 08-09 HT

2005 DG05FA4082 Daryaganj

Replacement of existing 3C*300

mm sq PILCA cable with new

3C*300 mm sq XLPE cable

between Jama Masjid Grid to

Anglo Sanskrit School S/Stn Via

Subhash Park S/Stn

18.23 FY 08-09 HT

2006 DG05FA4084 Daryaganj

Replacement of existing 3C*300

mm sq.Pilca cable with new

3C*300 mmsq XLPE cable

between IP Estate Grid to IP

Storm Water Pumping Station

S/Stn

30.15 FY 08-09 HT

2007 DG05FA4098 Daryaganj

Replacement of existing 3Cx 300

mm sq PILCA cable with new 3C x

300 mm sq XLPE cable between

Peerlesub station to DDA

Turkman Gate H/Complex Sub

station in Distt. Daryaganj.

2.14 FY 08-09 HT

2008 DG05FA4104 Daryaganj

Replacement of existing 3CX300

mm sq.PILCA cable with new

3CX300 mmsq. XLPE cable

between Gulab Bhawan to Times

of India Sub station. in Distt: Darya

Ganj.

2.21 FY 08-09 HT

2009 DG05FA4106 Daryaganj

Replacement of existing 3CX300

mm sq.PILCA cable with new

3CX300 mm sq. XLPE cable

between Indian Express sub

station to Milap Pre sub station in

Distt: Darya Ganj.

1.85 FY 08-09 HT

Page 92: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

2010 DG05FA4109 Daryaganj

Replacement of existing 3CX300

mm sq.PILCA cable with new

3CX300 mmsq. XLPE cable

between Milap Pre sub station to

Tej Pre sub station in Distt: Darya

Ganj.

0.95 FY 08-09 HT

2011 DG05FA4110 Daryaganj

Replacement of existing 3CX300

mm sq.PILCA cable with new

3CX300 mmsq. XLPE cable

between Gulab Bhawan to Tej Pre

sub station in Distt: Darya Ganj.

2.06 FY 08-09 HT

2012 DG05NF4125 Daryaganj

Taking out new HT feeder 3CX300

Sq.mm from Yamuna Barrag

S/Stn to I P Strom Pumping

Station

27.36 FY 08-09 HT

2013 DG05RM4043 Daryaganj

Replacement of old 7 Panel board

with new 7 Panel board at

Turkman Gate H/Complex Sub

station in Distt: Darya Ganj

30.66 FY 08-09 HT

2014 DG06FA4227 Daryaganj

Replacement Old Sick HT PILCA

cable into HT 3cx300 MM2 XLPE

cable from Darya Ganj I/D S/stn to

EMCA House S/stn in Div. Darya

Ganj.

4.70 FY 08-09 HT

2015 DG06FA4228 Daryaganj

Replacement Old Sick HT PILCA

cable into HT 3cx300 MM2 XLPE

cable from Delhi Gate(K) S/stn to

Commercial school S/stn in Div.

Darya Ganj.

4.63 FY 08-09 HT

2016 DG06FA4229 Daryaganj

Replacement Old Sick HT PILCA

cable into HT 3cx300 MM2 XLPE

cable from Govt. Press S/stn to

Tagore Road Hostel s/stn Via

Minto Road Hostel in Div. Darya

Ganj.

10.91 FY 08-09 HT

2017 DG06FA4230 Daryaganj

Replacement Old Sick HT PILCA

cable into HT 3cx300 MM2 XLPE

cable from Minto Road Grid to 56-

Qtrs/stn Via Govt.Press in Div.

Darya Ganj

10.17 FY 08-09 HT

2018 DG06FA4232 Daryaganj

Replacement Old Sick HT PILCA

cable into HT 3cx300 MM2 XLPE

cable from Pant Qtr. s/stn to New

LNJP s/stn Via Pant Hospital in

Div. Darya Ganj.

27.09 FY 08-09 HT

2019 DG06FA4235 Daryaganj

Replacement HT PILCA cable

into HT 3cx300 MM2 XLPE cable

from Old Dujjana House to New

Dujjana House s/stn in Div. Darya

Ganj.

2.19 FY 08-09 HT

2020 DG06FA4237 Daryaganj

Replacement & Re-rouiting of Part

PILCA porion of HT Feeder I P

Grid to Man Power into HT 3cx300

MM2 XLPE cable from I P Grid to

Corner of SPA Bldg in Div. Darya

Ganj

12.06 FY 08-09 HT

2021 DG06FA4238 Daryaganj

Replacement Old sick PILCA

cable into HT 3cx300 MM2 XLPE

cable from I P Grid to ITPI Bldg.

via 23-story bldg. in Div. Darya

Ganj.

8.65 FY 08-09 HT

2022 DG06LT4199 Daryaganj

Restoration of LT /HT Supply after

demolition of Girdhar Panna S/Stn

Bldg.

0.93 FY 08-09 LT

Page 93: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

2023 DG06RM4210 Daryaganj

Replacement of Old 12 Panel

Board & one RMU With 3*4 Way

+ 1*1Way I/D(SF-6) at New

Dujjana House S/stn Bldg. in Div.

Darya Ganj

23.81 FY 08-09 HT

2024 DG06RM4211 Daryaganj

Replacement of Old 4 Panel

Board With 4 Way I/D(SF-6) at

Subhash Park Pump S/stn Bldg.

in Div. Darya Ganj

6.10 FY 08-09 HT

2025 DG06RM4213 Daryaganj

Replacement of Old 3 Panel Board

With 3 Way I/D(SF-6) at

Ambedker Stadium S/stn Bldg. in

Div. Darya Ganj

3.87 FY 08-09 HT

2026 DG06RM4217 Daryaganj

Replacement of Old 7 Panel Board

With 2*4 Way I/D(SF-6) at

Mirdard Road S/stn Bldg. in Div.

Darya Ganj

13.26 FY 08-09 HT

2027 DG06RM4218 Daryaganj

Replacement of Old 7 Panel Board

With 2*4 Way I/D(SF-6) at Pant

Qtr S/stn Bldg. in Div. Darya Ganj

13.19 FY 08-09 HT

2028 DG06RM4219 Daryaganj

Replacement of Old 3 Panel

Board With 3 Way I/D(SF-6) at

110 Bed LNJP S/stn Bldg. in Div.

Darya Ganj

4.05 FY 08-09 HT

2029 DG06RM4222 Daryaganj

Replacement of Old 3 Panel With

3 Way I/D(SF-6) at Income Tax

S/stn Bldg. in Div. Darya Ganj

3.90 FY 08-09 HT

2030 DG06RM4223 Daryaganj

Replacement of OldRMU With 3

Way I/D(SF-6) at AGCR S/stn

Bldg. in Div. Darya Ganj

4.01 FY 08-09 HT

2031 DG06SH2204 Daryaganj

Shifting of HT / LT / OH cable

(excluding Street Light) from

Tilak Bridge to Delhi Gate for High

Capacity Bus System Corridor.

12.34 FY 08-09 LT

2032 DG06SL2206 Daryaganj

Installation of Street Light point in

the constituency of Sh. Ashok

Jain,Councillor

1.22 FY 08-09 LT

2033 DG07LT4509 Daryaganj Laying of LT Feerde for A.I.T.U.C. 3.20 FY 08-09 LT

2034 DG07SH1511 Daryaganj

Shifting of Part Portain of HT

cable from Pant Hospital s/stn to

New L N J P S/stn due to

construction of U/G water Tank for

orthopadic block of LNJP Hospital

in Div Darya Ganj.

1.02 FY 08-09 LT

2035 DG07SL1512 Daryaganj

Installation of Street Light points

in the Constituency of Hon'ble

MLA Shri Shoaib Iqbal.

5.04 FY 08-09 LT

2036 DG07UT4516 Daryaganj

Augmentation of 630 Kva

Transformer with 990 KVA

Transformer at Telephone

Exchange(K)s/st. in Div. Darya

Ganj.

14.13 FY 08-09 HT

2037 DG08AT4039 Daryaganj

Installation of additional 400 KVA

Transformer at 84 Ghanta s/st. in

Div. Darya Ganj

2.17 FY 08-09 HT

2038 DG08AT4040 Daryaganj

Installation Of Additional 400 Kva

Transformer At Ansari Road No-1

S/St. In Div. Darya Ganj.

2.58 FY 08-09 HT

2039 DG08AT4043 Daryaganj

Installation Of Additional 400 Kva

Transformer At Commercial

School S/Stn. In Div. Darya Ganj.

3.11 FY 08-09 HT

2040 DG08AT4085 Daryaganj

Installation of additional 630 KVA

Transformer at Madina Library

S/St.in Div. Darya Ganj

2.75 FY 08-09 HT

Page 94: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

2041 DG08EL1082 Daryaganj

Electrification of Plot No. 30, Deen

Dayal Upadhayay Marg, New

Delhi.

1.16 FY 08-09 LT

2042 DG08LT4048 Daryaganj

Conversion Of Old Conductor &

Old Leads into AB Cable different

places in Division Darya Ganj

103.56 FY 08-09 LT

2043 DG08LT4051 Daryaganj

T/O Of New Lt O/H Feeder Of

Size 4Cx300Mm2 From Vikram

Nagar S/Stn To A

Blockvikrannagar Drg In Div Darya

Ganj.

2.54 FY 08-09 LT

2044 DG08LT4052 Daryaganj

Replacement Of Old LT Feeder

From Darya Ganj C/Center Tr. No-

2 To7 No. Drg In Div Darya Ganj.

1.50 FY 08-09 LT

2045 DG08LT4053 Daryaganj

T/O Of New LT O/H Feeder Of

Size 4Cx300Mm2 From Delhi

Gate (K) S/Stn To 24 No. Drg

Indiv Darya Ganj.

2.02 FY 08-09 LT

2046 DG08LT4054 Daryaganj

T/O New LT O/H Feeder From

Ghata Masjid S/Stn To Gali No-21

In Div Darya Ganj.

1.53 FY 08-09 LT

2047 DG08LT4055 Daryaganj

Replacement Of Old LT Feeder

From Darya Ganj C/Center Tr. No-

1 To U B S Ansari Road In Div

Darya Ganj.

1.83 FY 08-09 LT

2048 DG08LT4056 Daryaganj

Replacement Of Old LT Feeder

From Bharat Genral S/Stn To 9

No. Gali In Div Darya Ganj.

1.02 FY 08-09 LT

2049 DG08LT4057 Daryaganj

Replacement Of Old LT Feeder

From Dag-Ii S/Stn To Back Side

Asif Ali Road In Div Darya Ganj

2.97 FY 08-09 LT

2050 DG08LT4058 Daryaganj

T/O Of New LT O/H Feeder Of

Size 4Cx300Mm2 From Delite

Khatta S/Stn To Back Side Asif

Aliroad In Div Darya Ganj.

1.86 FY 08-09 LT

2051 DG08LT4059 Daryaganj

Replacement of old LT Feeder

from Jama Masjid Grid S/Stn to

Kala Mahalin Div Darya Ganj.

3.10 FY 08-09 LT

2052 DG08LT4060 Daryaganj

Replacement/Augmentation of old

LT Feeder from Delhi Gate (K)

S/Stn to Gali Jatwara in Div Darya

Ganj.

3.15 FY 08-09 LT

2053 DG08LT4064 Daryaganj

T/O of New LT O/H Feeder of

Size 4Cx300MM2 from Kucha

Challan S/Stn to Bara

Dari(Galiresham Wali) in Div

Darya Ganj.

2.46 FY 08-09 LT

2054 DG08LT4065 Daryaganj

T/O of New LT O/H Feeder of

Size 4Cx300MM2 from Urdu

Bazar S/Stn to Gali Khan Khana in

Div Darya Ganj.

1.85 FY 08-09 LT

2055 DG08LT4069 DaryaganjNew 7 No. LT Fdrs from Ansari

Rd No-1 S/9.89 FY 08-09 LT

2056 DG08LT4074 Daryaganj

T/O of 5 No.LT O/H Fdrs.of Size

4Cx300MM2(3 No.from

augmentation Proposed 990KVA

& 2 No. from Existing 990 KVA

Trs.) from Foot Over Bridge S/stn

8.37 FY 08-09 LT

2057 DG08LT4076 Daryaganj

Laying of LT U/G Feeder from

Hindi Park (K) S/stn for provide

new connection in F/o V.K.

Gupta, ICICI Prudential Insurance

Co. Ltd. , 29 Netaji Subhash Marg

Darya Ganj

3.05 FY 08-09 LT

Page 95: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

2058 DG08LT4081 Daryaganj

Laying Of LT U/G Feeder From I P

Grid S/Stn For Provide New

Connection In F/O M/S C.K.

Associates Part Lal Ji I M A House

I P. Marg Darya Ganj.(LT-6107).

1.65 FY 08-09 LT

2059 DG08LT4083 Daryaganj

Laying Of LT O/H Feeder From

Khatta Delite S/Stn For Provide

New Connection In F/O Dhruv

Devansh Investment Pvt LTd, 4/11

Asif Ali Road In Div Darya

Ganj.(LT-6098).

1.88 FY 08-09 LT

2060 DG08LT4086 Daryaganj

Replacement of Old Conductor&

Old Leads into AB Cable in

Diffrent Places of Div Darya

Ganj(Part-2)

85.30 FY 08-09 LT

2061 DG08LT4090 Daryaganj

Replacement of LT Feeder from

Tagore Road Hostel to Sakoor Ki

Dandi in div Darya Ganj.

4.70 FY 08-09 LT

2062 DG08MS4066 Daryaganj L T Clean-up in Division DRG-3 32.83 FY 08-09 LT

2063 DG08RM4003 Daryaganj

Replacement of Old 4 Panel Board

With 4 Way I/D(Sf-6) at Indian

Express S/Stn Bldg. in Div. Darya

Ganj

8.40 FY 08-09 HT

2064 DG08RM4004 Daryaganj

Replacement Of Old 4 Panel

Board With 4 Way I/D(Sf-6) at

Azad Bhawan I/D S/Stn Bldg. In

Div. Darya Ganj.

4.15 FY 08-09 HT

2065 DG08RM4005 Daryaganj

Replacement of Old 4 Panel Board

With 4 Way I/D(Sf-6) at Tiraha

Behramkhan S/Stn Bldg. in Div.

Darya Ganj

5.85 FY 08-09 HT

2066 DG08RM4006 Daryaganj

Replacement Of Old 4 Panel

Board With 4 Way I/D(Sf-6) at

Minto Road Hostel S/Stn Bldg. In

Div. Darya Ganj.

5.55 FY 08-09 HT

2067 DG08RM4007 Daryaganj

Replacement Of 4 Panel Board

With 4 Way I/D(Sf-6) at Oriental

Insurance S/Stn Bldg. In Div.

Darya Ganj.

5.54 FY 08-09 HT

2068 DG08RM4008 Daryaganj

Replacement Of Old Rmu With 3

Way I/D(Sf-6) at Nehru

Houses/Stn Bldg. In Div. Darya

Ganj.

3.94 FY 08-09 HT

2069 DG08RM4009 Daryaganj

Replacement Of Old Rmu With 3

Way I/D(Sf-6) at Patriot(Link

House) S/Stn Bldg. In Div. Darya

Ganj.

3.77 FY 08-09 HT

2070 DG08RM4010 Daryaganj

Replacement Of Old Rmu With 3

Way I/D(Sf-6) at Ghandi Darshan

S/Stn Bldg. In Div. Darya Ganj

3.92 FY 08-09 HT

2071 DG08RM4012 DaryaganjRep. of HT Panel at Ghandi

Darshan S/stn3.82 FY 08-09 HT

2072 DG08RM4016 Daryaganj

Replacement of Old RMU With 3

Way I/D(Sf-6) at Rail Yatri Niwas

S/Stn Bldg. in Div. Darya Ganj

4.00 FY 08-09 HT

2073 DG08RM4017 Daryaganj

Replacement of Old RMU With 3

Way I/D(Sf-6) at Peer less S/Stn

Bldg. in Div. Darya Ganj

3.91 FY 08-09 HT

2074 DG08RM4018 Daryaganj

Replacement of Old RMU With 3

Way I/D(Sf-6) at Zakir Hussain

Collage S/Stn Bldg. in Div. Darya

Ganj

3.74 FY 08-09 HT

2075 DG08RM4021 DaryaganjInstallation of 3 Way O/D(Sf-6) at

Kotwali S/Stn. in Div. Darya Ganj3.61 FY 08-09 HT

2076 DG08RM4022 DaryaganjRep. of HT Panel at Laxmi

Insurance s/s3.79 FY 08-09 HT

Page 96: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

2077 DG08RM4023 Daryaganj

Replacement Of Old 3 Panel

Board With 3 Way I/D(Sf-6) at Bal

Bhawan S/Stn Bldg. In Div. Darya

Ganj.

4.15 FY 08-09 HT

2078 DG08RM4024 Daryaganj

Replacement Of Old 4 Panel

Board With 3 Way I/D(Sf-6) at

Milap Press Bldg. S/Stn Bldg. In

Div. Darya Ganj.

3.80 FY 08-09 HT

2079 DG08RM4025 DaryaganjRep. of HT Panel at Pant Hospital

s/stn3.93 FY 08-09 HT

2080 DG08RM4026 Daryaganj

Replacement Of Old 3 Panel

Board With 3 Way I/D(Sf-6) At

Old Lnjp S/Stn Bldg. In Div.

Darya Ganj.

4.26 FY 08-09 HT

2081 DG08RM4031 Daryaganj

Replacement of Old 3 Panel Board

With 1*3 Way I/D(Sf-6) at Times

of india S/Stn. in Div. Darya Ganj

3.82 FY 08-09 HT

2082 DG08RM4032 Daryaganj

Installation Of 3 Way O/D(Sf-6) at

Commercial School S/Stn. In Div.

Darya Ganj.

3.85 FY 08-09 HT

2083 DG08RM4037 DaryaganjIns.of Addinal 1 Panel at New

Dujjana Ho2.90 FY 08-09 HT

2084 DG08SH1098 Daryaganj

Shifting of Electric pole from

central verge at Netaji subhash

Marg near Foort Over Bridge, Red

Light, Darya Ganj, Delhi

1.47 FY 08-09 LT

2085 DG08UT4044 DaryaganjAug. 630 t0 990 KVA Tr at T B

Khan s/stn1.30 FY 08-09 HT

2086 DG08UT4045 Daryaganj

Augmentation of 630 Kva

Transformer with 990 KVA

Transformer at Foot Over Bridge

s/st.in Div. Darya Ganj.

2.62 FY 08-09 HT

2087 DL05RM4049 Dilshad Garden

Installation/Replacement of 4

Panel Board with motorised RMU

with SCADA compatibility at -

Seeta.MIG.Flats

12.86 FY 08-09 HT

2088 DL05RM4050 Dilshad Garden

Installation/Replacement of 4

Panel Board with motorised RMU

with SCADA compatibility at -

A.Pocket.Dilshad.Gdn

8.75 FY 08-09 HT

2089 DL05RM4051 Dilshad Garden

Installation/Replacement of 4

Panel Board with motorised RMU

with SCADA compatibility at -

J&K.Pocket.SS 3.Dilshad.Garden

12.65 FY 08-09 HT

2090 DL05RM4052 Dilshad Garden

Installation/Replacement of 4

Panel Board with motorised RMU

with SCADA compatibility at -

Police.Station.Seemapuri

8.30 FY 08-09 HT

2091 DL05RM4087 Dilshad GardenReplacement of HT Panel at S.N

compund sub station.14.06 FY 08-09 HT

2092 DL05RM4088 Dilshad GardenReplacement of HT Panel at Moti

Ram Road S/Stn33.98 FY 08-09 HT

2093 DL05SH2031 Dilshad Garden Shifting of Electrification. Services 31.99 FY 08-09 HT

2094 DL05UT4234 Dilshad Garden

Augmentation of Existing

Transformer 400 kVA To 990

kVA at C block dilshad colony.

0.77 FY 08-09 HT

2095 DL06FA4541 Dilshad Garden

Replacement Of HT 11KV Cable

from G.T.Road Grid to K.L.Rathi

Feeder Up To Near Rly. Line

M.S.Park.

18.74 FY 08-09 HT

2096 DL06FA4543 Dilshad Garden

Replacement Of HT 11KV Cable

from Balbir Nagar School to 60

Foota Balbir Nagar S/Stn

8.04 FY 08-09 HT

2097 DL06FA4546 Dilshad Garden

Replacement of HT 11KV Cable

from Jaiswal Marg to Subhash

Marg Ram Nagar S/Stn.

10.95 FY 08-09 HT

Page 97: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

2098 DL06FA4547 Dilshad Garden

Rep. Of Ht 11Kv Cbl Xlpe From

Subhash Marg To Ram Nagar To

Ram Nagar School S/Stn

14.67 FY 08-09 HT

2099 DL06FA4555 Dilshad Garden

Replacement of HT 11KV Cable

from Dilshad Garden Grid to

Sewage Pump Seemapuri to L&H-

Pkt. S/Stn.

33.40 FY 08-09 HT

2100 DL06FA4563 Dilshad Garden

Replacement HT 11KV XLPE

Cable from K.L.Rathi substation

to Khattawala Substation Loni

Road.Dilshad Garden.

2.16 FY 08-09 HT

2101 DL06FA4571 Dilshad Garden

Replacement of HT 11KV from

G.No. 1 to Hansraj Compound

S/Stn.

3.76 FY 08-09 HT

2102 DL06LT4518 Dilshad GardenConversion of LT O/H to cable at

Tahirpur Village.29.51 FY 08-09 LT

2103 DL06LT4523 Dilshad GardenConversion of LT overhead to

CBL at Sub.park no-219.77 FY 08-09 LT

2104 DL06LT4527 Dilshad GardenConv. of LT O/H to LT AB Cable

at part of Kabool Nagar.20.36 FY 08-09 LT

2105 DL06LT4572 Dilshad Garden

Replacement of 2 No. LT Feeder

from 1000 Kva Transformer at Gali

No. 1 Friends Colony

2.72 FY 08-09 LT

2106 DL06LT4573 Dilshad Garden

T/O Of 2 No. LT feeder from 1000

Kva Transformer at Gali No. 1

Friends Colony

2.68 FY 08-09 LT

2107 DL06LT4581 Dilshad Garden

Conversion of LT O/H to LTAB at

Balbir Nagar & Balbir Nagar

Extension.

187.12 FY 08-09 LT

2108 DL06LT4585 Dilshad GardenConversion of LT O/H to LT AB at

East Gorakh Park .50.83 FY 08-09 LT

2109 DL06NF4529 Dilshad Garden

Providing Mid Feed HT HT 11KV

from K.L.Rathi to Balbir Nagar

School Kiosk.

7.32 FY 08-09 HT

2110 DL06NF4530 Dilshad Garden

Providing HT 11 KV feed from

Dwarikapuri Grid to Near

Dwarikapuri Grid S/Stn

1.53 FY 08-09 HT

2111 DL06NF4531 Dilshad Garden

Prov. HT 11KV feed from

Dwarikapuri Grid to Ice Factory

Subhash Park S/Stn

10.62 FY 08-09 HT

2112 DL06NF4545 Dilshad Garden

Providing HT 11KV Mid feed

betwwn K.L Rathi to Jaiswal Marg

Substation.

6.93 FY 08-09 HT

2113 DL06RM4090 Dilshad GardenReplacement of HT Panel Board at

N.Modern Shadara18.22 FY 08-09 HT

2114 DL06RM4501 Dilshad GardenInstallation of 3 Way RMU at A-

Block, New Seema Puri8.60 FY 08-09 HT

2115 DL06RM4503 Dilshad GardenInstallation of 2*4+1Way RMU at

DSIDC.substation.No.3 GT Road14.87 FY 08-09 HT

2116 DL06RM4504 Dilshad GardenInstallation of 3 Way at B-Block,

New Seema Puri-38.87 FY 08-09 HT

2117 DL06RM4533 Dilshad GardenInstallation of RMU at Jaiswal

Marg S/Stn. 4.28 FY 08-09 HT

2118 DL06RM4548 Dilshad Garden Installation Of RMU at Ram

Nagar School. 4.42 FY 08-09 HT

2119 DL06RM4549 Dilshad GardenReplacement. Of Old Panel at

J&K S/Stn. No.-2 Dilshad Garden. 7.12 FY 08-09 HT

2120 DL06RM4550 Dilshad GardenRep. Of Old Panel at J&K S/Stn.

No.-4 Dilshad Garden.11.78 FY 08-09 HT

2121 DL06RM4551 Dilshad Garden Rep. Of Old Panel at J&K S/Stn.

No.-1 Dilshad Garden. 7.50 FY 08-09 HT

2122 DL06RM4553 Dilshad GardenInstallation Of RMU at Dal Mill

S/Stn. Dilshad Garden. 4.56 FY 08-09 HT

2123 DL06RM4554 Dilshad GardenRep. Of Old Panel at I-Pkt. S/Stn.

Dilshad Garden. 7.33 FY 08-09 HT

Page 98: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

2124 DL06RM4556 Dilshad GardenReplacement Of Old Panel at

Prem Ice Factory Dilshad Garden. 6.88 FY 08-09 HT

2125 DL06RM4557 Dilshad GardenReplacement of Old Panel at LIC

Colony S/Stn. Dilshad Garden. 6.79 FY 08-09 HT

2126 DL06RM4558 Dilshad GardenInstallation Of RMU at Apsara

Border Seemapuri. 4.31 FY 08-09 HT

2127 DL06RM4559 Dilshad GardenReplacement of Old Pannel at

Sewage Pump Seemapuri. 4.10 FY 08-09 HT

2128 DL06RM4560 Dilshad GardenInstallation Of 3 Way RMU at C-

Blk.Dilshad Colony. 4.82 FY 08-09 HT

2129 DL06RM4561 Dilshad Garden Installation Of 3 Way RMU at

Leprocy Colony S/Stn. No-2. 4.08 FY 08-09 HT

2130 DL06RM4564 Dilshad Garden

Installation Of 1 No 3 Way & 2 No.

Single Way RMU at Subhash

Marg Ram Nagar S/Stn

9.31 FY 08-09 HT

2131 DL06RM4565 Dilshad GardenInstallation Of 1 No 3 Way at

DDA Flat Seema Puri4.36 FY 08-09 HT

2132 DL06RM4569 Dilshad Garden

Installation. Of 1 No. 3 Way & 3

No. Single Way RMU at G.No.1B

Friends Colony.

12.44 FY 08-09 HT

2133 DL06RM4593 Dilshad Garden

Installation of 3 Way RMU at 4

Pole Structure Infront of Masjid

Dilshad Garden

4.37 FY 08-09 HT

2134 DL06SH2580 Dilshad Garden

Shifting of 2 No. of S/Stns. by

DMRC due to construction of

DMRC Track between Shahdara &

Dilshad Garden

13.64 FY 08-09 HT

2135 DL06UT4575 Dilshad GardenAugmentation of 400 KVA to 1000

KVA at HansRaj3.10 FY 08-09 HT

2136 DL07AT4015 Dilshad GardenInst.Of New 630 Kva Trf.At B&D-

Block Dilshad Colony.1.41 FY 08-09 HT

2137 DL07AT4022 Dilshad GardenInstallation of New 400 KVA Trf. at

L&H Pkt, near L Block Market2.00 FY 08-09 HT

2138 DL07AT4023 Dilshad GardenInstallation of New 400 Kva Trf. at

Bus Stand Old Seema Puri.2.66 FY 08-09 HT

2139 DL07AT4026 Dilshad Garden Installation Of New 400 KVA Trf.

AB-Blk, Seema Puri Veg Market2.58 FY 08-09 HT

2140 DL07AT4027 Dilshad Garden Installation Of New 400 Kva

Trf.AB-Blk, Seemapuri Veg Market2.31 FY 08-09 HT

2141 DL07AT4028 Dilshad GardenInstallation of New 400 KVA Trf. at

A-Blk, Jhilmil Industrial Area2.45 FY 08-09 HT

2142 DL07AT4029 Dilshad GardenInstallation of New 400 KVA Trf. at

F-Block Dilshad Colony2.54 FY 08-09 HT

2143 DL07AT4030 Dilshad GardenInstallation of New 400 KVA Trf.at

A-Blk, Jhilmil Industrial Area2.72 FY 08-09 HT

2144 DL07AT4031 Dilshad GardenInstallation Of New 400 Kva Trf.at

DSIDC S/stn -12.32 FY 08-09 HT

2145 DL07AT4032 Dilshad GardenInstallation of New 400 KVA Trf. at

J&K Pkt, S/Stn 4, Dilshad Garden2.40 FY 08-09 HT

2146 DL07AT4033 Dilshad GardenInstallation of New 400 KVA Trf.

at Zulfe Bengal 2, Dilshad Garden2.75 FY 08-09 HT

2147 DL07AT4034 Dilshad Garden Installation of New 400 KVA Trf.

at Satish Factory Shahadra2.27 FY 08-09 HT

2148 DL07AT4035 Dilshad GardenInst.Of New 400 Kva Trf.at C-

Block Dilshad Colony2.60 FY 08-09 HT

2149 DL07AT4036 Dilshad Garden

Installation Of New 400 Kva Trf.at

Gali No.- 5 & 6 Friends Colony

Railway Line

2.08 FY 08-09 HT

2150 DL07AT4037 Dilshad GardenInst.Of New 400 Kva Trf.at Verma

Castle (Friends Colony)2.45 FY 08-09 HT

Page 99: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

2151 DL07EL4059 Dilshad GardenElectrification of new Meena Bazar

old Seemapuri near Apsra border.90.44 FY 08-09 LT

2152 DL07LT4012 Dilshad Garden

T/O 4 Nos.LT Feeder From Newly

Installed 630 Kva Transformer At

B&D,Blk Ss/Tn No. Dilshad

Colony.

6.80 FY 08-09 LT

2153 DL07LT4013 Dilshad Garden

T/O 3 Nos.LT Feeder from Newly

Augumented Transformer at Gali

No. 1B ,T/O 4 No.LT Feeder from

Exing 2X990 Kva Trf.at Gali No. 1

Friends Colony and Aug Of LT

O/H Mains at Gali No.0,1&1B

Friends Colony

14.83 FY 08-09 LT

2154 DL07LT4018 Dilshad Garden

T/O. 1No. LT Feeder from DSIDC

Shed 1000Kva Transformer and

Aug Of LV O/H Mains at A Block

Tahir Pur.

5.31 FY 08-09 LT

2155 DL07LT4021 Dilshad Garden

T/O 2 Nos.LT Feeder from

Existing 1000 KVA Transformer at

Gali No. 3 & 4 Friends Colony

5.52 FY 08-09 LT

2156 DL07LT4041 Dilshad Garden

T/O 3 Nos.LT Feeder from Newly

Installed 400 Kva transformer at

Bus Stand Old Seema Puri

7.28 FY 08-09 LT

2157 DL07LT4055 Dilshad Garden

T/O 3 Nos.LT Feeder From Newly

Augumented 630 Kva Transformer

At Balbir Nagar60 Ft. Road

9.62 FY 08-09 LT

2158 DL07ML1063 Dilshad Garden

Installation of Street Light Pole

With Fitting in the Area Of C Block

Dilshad Garden.

1.71 FY 08-09 LT

2159 DL07ML1065 Dilshad GardenInst.Of 62 Nos.Street Light Point

In Dilshad Garden29.53 FY 08-09 LT

2160 DL07SH1064 Dilshad Garden

Shifting of existing BSES 11KV

S/Stn. of Radhu Talkies Building,

G.T. Road, Shahdara, Delhi

8.04 FY 08-09 HT

2161 DL07UT4025 Dilshad GardenAug.Of 630 Kva Trf. to 990 Kva

Trf.at Dal Mill Dilshad Garden 1.40 FY 08-09 HT

2162 DL07UT4038 Dilshad GardenAug.Of 400 Kva Trf.To 630 Kva

Trf.at Balbir Nagar 60 FT.Road 1.47 FY 08-09 HT

2163 DL07UT4039 Dilshad GardenAug.Of 630 Kva Trf to 990 Kva at

Rain Basera Babarpur Road1.41 FY 08-09 HT

2164 DL07UT5017 Dilshad GardenAug.Of 630 Kva Trf.To 990 Kva

Trf.at Gali No.1B Friends Colony 1.05 FY 08-09 HT

2165 DL08LT4042 Dilshad Garden

Conversion of LT O/H mains to LT

AB cbl at part of M S Park ,of

Village Ram Nagar Mordern

Shahadra Ram Nagar Exten.

92.12 FY 08-09 LT

2166 DL08LT4048 Dilshad Garden

T/O 2 No LT Feeders From Verma

Castle 1000Kva Trf. To Gali No 5

Friends Colony And Aug. Of Lv

O/H Mains And Newely Prposed

/Electrification.

6.11 FY 08-09 LT

2167 DL08LT4049 Dilshad Garden

T/O 2 No LT Feeder From 1000

Kva Tr. At S/Stn. No 4 Dilshad

Garden To Laxmi Narain Mandir

Industrial Area Dilshad Garden

And Aug. Of Lv O/H Mains.

8.17 FY 08-09 LT

2168 DL08LT4050 Dilshad Garden

T/O.4No. LT Fdr. From The 2

No.630 Kva Tran. In Diffrent S/Stn

At Dsidc Complex With New

Installed Feeder Pillar.

6.99 FY 08-09 LT

2169 DL08LT4052 Dilshad Garden

Rep. Of 4 Nos LT Feeder & Aug.

With Feeder Piller And Dog

Conductor In Gali No 1A Friends

Colony.

11.79 FY 08-09 LT

Page 100: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

2170 DL08MS4077 Dilshad Garden

Rep.of LV Mains & Alongwith LT

AB At Prem Ice Factory to Pathar

Wali Gali

1.23 FY 08-09 LT

2171 DL08NF4039 Dilshad Garden

Midfeed 11kV R-Blk. Rehman

Building Naveen Shahdara to

Radhu Cinema

3.57 FY 08-09 HT

2172 DL08NF4056 Dilshad Garden

Providing the New HT 11kV Cable

at Newly installed S/Stn B-Block

Dilshad Colony

1.98 FY 08-09 HT

2173 DL08RM4003 Dilshad GardenReplacement of 4 Panel Board at

E Block New Seemapuri6.54 FY 08-09 HT

2174 DL08RM4005 Dilshad GardenInstallation of 4 Panel Board at F

Block New Seemapuri6.22 FY 08-09 HT

2175 DL08RM4006 Dilshad GardenInstallation of 3 Way at Shankar Ki

DP A Blk Jhilmil Industrial.Area4.10 FY 08-09 HT

2176 DL08RM4007 Dilshad GardenInstallation of 3 Way at Tahir Pur

Village Shiv Mandir4.07 FY 08-09 HT

2177 DL08RM4008 Dilshad GardenInstallation of 3 Way at Tahir Pur

Sarai3.98 FY 08-09 HT

2178 DL08RM4009 Dilshad GardenInstallation of 3 Way at Tahir Pur

Koriya Colony Hanuman Mandir4.34 FY 08-09 HT

2179 DL08RM4010 Dilshad GardenReplacement of 4 Panel Board at

SG Pkt Dilshad Garden5.64 FY 08-09 HT

2180 DL08RM4011 Dilshad GardenReplacement of 4 Panel Board at

HMT Colony6.40 FY 08-09 HT

2181 DL08RM4012 Dilshad GardenReplacement of 4 Panel Board at

Paper Product F. Colony3.87 FY 08-09 HT

2182 DL08RM4013 Dilshad GardenReplacement of 3 Panel Board at

Railway Road Shd.Stn.4.22 FY 08-09 HT

2183 DL08RM4016 Dilshad GardenInstallation of 3 Way at C/C Gtr

Shd.6.13 FY 08-09 HT

2184 DL08RM4018 Dilshad GardenReplacement of 7 Panel Board at

Zafrabad No.-110.98 FY 08-09 HT

2185 DL08RM4019 Dilshad GardenReplacement of 5 Panel Board at

Zafrabad No.-28.67 FY 08-09 HT

2186 DL08RM4020 Dilshad GardenInstallation of 4 Way at Ashok

Wala Zafrabad3.99 FY 08-09 HT

2187 DL08RM4021 Dilshad GardenInstallation of 3 Way at K-Blk.

Park Wala Naveen Shahdara3.97 FY 08-09 HT

2188 DL08RM4022 Dilshad GardenInstallation of 3 Way at Police

Station Shahdara4.21 FY 08-09 HT

2189 DL08RM4024 Dilshad GardenInstallation of 3 Way at Chunni

Wala Rohtash Nagar3.88 FY 08-09 HT

2190 DL08RM4025 Dilshad GardenInstallation of 4 Way at Kabool

Nagar Mother Dairy6.18 FY 08-09 HT

2191 DL08RM4027 Dilshad GardenInstallation of 4 Way at in Front of

Dwarka Puri Grid S/Stn6.49 FY 08-09 HT

2192 DL08RM4028 Dilshad GardenInstallation of 3 Way at Mohan

Park Naveen Shahdara3.85 FY 08-09 HT

2193 DL08RM4029 Dilshad GardenInstallation of 4 Way at Tikona

Park Loni Road6.78 FY 08-09 HT

2194 DL08RM4030 Dilshad GardenInstallation of 4 Way at Nav Durga

Mandir West Gorakh Park9.17 FY 08-09 HT

2195 DL08RM4031 Dilshad GardenInstallation of 4 Way at Rain

Basera Naveen Shahdara6.37 FY 08-09 HT

2196 DL08RM4032 Dilshad GardenInstallationof 3 Way at Gali No- 16

Balbir Nagar4.25 FY 08-09 HT

2197 DL08RM4033 Dilshad GardenInstallation of 3 Way at Uldhan Pur

Naveen Shahdara3.69 FY 08-09 HT

2198 DL08RM4035 Dilshad GardenInstallation of 3 Way at K-Blk.

Mandir Wala Naveen Shahdara3.97 FY 08-09 HT

2199 DL08RM4036 Dilshad Garden

Installation of 3 Way at R-Blk.

Rehman Building Naveen

Shahdara

3.95 FY 08-09 HT

2200 DL08RM4053 Dilshad Garden

Installation A RMU at New S/Stn

New Meena Bazar Near Apsara

Border Old Seema Puri

3.78 FY 08-09 HT

Page 101: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

2201 DL08RM4054 Dilshad GardenInstallation of RMU at Newly S/Stn

B Block Dilshad Colony3.92 FY 08-09 HT

2202 DL08RM4062 Dilshad GardenReplacement of 3-Panel Board at

SSR S/S4.34 FY 08-09 HT

2203 DL08RM4063 Dilshad GardenReplacement of 4-Panel Board at

D-Pkt.S/S Dilshad Garden6.44 FY 08-09 HT

2204 DL08RM4065 Dilshad GardenReplacement of 4-Panel Board at

Gen.Hospital S/Stn.5.84 FY 08-09 HT

2205 DL08RM4068 Dilshad GardenReplacement of 3-Panel Board at

DTC Depo N.Seema Puri3.72 FY 08-09 HT

2206 DL08RM4069 Dilshad Garden

Replacement of 4-Panel Board at

Shopping Complex B Block

Dilshad Garden.

8.63 FY 08-09 HT

2207 DL08RM4070 Dilshad GardenReplacement of 4-Panel Board at

F Block Dilshad Colony11.81 FY 08-09 HT

2208 DL08RM4071 Dilshad GardenReplacement of 7-Panel Board at

Balbir Nagar School15.35 FY 08-09 HT

2209 DL08RM4073 Dilshad GardenInstallation of 4-Panel Board at

Zulfe Bengal No.1 S/S6.93 FY 08-09 HT

2210 DL08RM4081 Dilshad Garden

Replacement of 3-Panel Board at

Vimla Rolling Mill S/Stn.B Block

Jlm ind.Area Shd

3.75 FY 08-09 HT

2211 DL08UT4051 Dilshad Garden

Aug. Of 400 Kva Tr.To 1000 Kva

Trf. at Gali No.5 Railway Line

S/Stn.And T/O 4No. LT Fdr. From

The Same Transformer.

7.80 FY 08-09 HT

2212 JM04AT4676 KarkardoomaInstallation of additional 630 KVA

transformer's at Leprosy colony.4.63 FY 08-09 HT

2213 JM04FA4550 Karkardooma

Provided underground XLPE HT

Feeder of size 3x300 sq. mm

XLPE to the Newly Installed 630

KVA transformer at D- Block

Anand Vihar.

11.84 FY 08-09 HT

2214 JM04FA4684 Karkardooma

Replacement of HT 11KV cable

from Vivek vihar grid to ESI

Hospital.

58.89 FY 08-09 HT

2215 JM04LT2N025 Karkardooma

T/O 3 Nos. LT Feeder from

existing 990 KVA Tr. at New

Zafrabad S/Stn No. I.

2.26 FY 08-09 LT

2216 JM04LT2N046 Karkardooma

T/O 1 No. LT feeder from existing

990 KVA Tr. At Shahdara City to

Gurhai Mohalla

2.13 FY 08-09 LT

2217 JM04LT4702 Karkardooma

Rep. of 2 Nos. L.T Feeder at

Jagrity Enclave From Saini

Enclave s/s

3.76 FY 08-09 LT

2218 JM04LT4710 KarkardoomaReplacement of L.V.Mains in

Jwala Nagar Mukesh Nagar C.R.A102.24 FY 08-09 LT

2219 JM04LT4711 KarkardoomaReplacement L.V. mains in

Vishwas Nagar.(All Lanes)184.94 FY 08-09 LT

2220 JM04NF2N003 Karkardooma

Laying of underground XLPE HT

cable 3*300 sq. mm at loni Road,

Jhilmil.

21.31 FY 08-09 HT

2221 JM04RM4623 KarkardoomaInstallation of 7 Panel board at 28-

29 Qtr Vishwas Nagar11.42 FY 08-09 HT

2222 JM04RM4664 KarkardoomaReplacement of 4 Panel board at

SG pocket Dilshad garden.0.06 FY 08-09 HT

2223 JM04SS2N007 KarkardoomaInstallation of new 11KV 250MVA

7 Panel board at Jhilmil4.15 FY 08-09 HT

2224 JM04SS2N019 Karkardooma

Aug. of 630 KVA to 990 KVA. at

Mother Dairy Mansarovar Park

S/Stn

3.77 FY 08-09 HT

2225 JM04SS2N026 KarkardoomaAdditional 630KVA D/Tr. At

Zafrabad Cons2.76 FY 08-09 HT

Page 102: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

2226 JM04SS2N032 Karkardooma

Providing Mid Feed of U/G XLPE

HT Cable from New Durga Mandir

S/Stn to Police Station shahdara.

3.24 FY 08-09 HT

2227 JM04SS2N033 KarkardoomaInstallation of New 630 KVA PLM

Tansformer at Jhilmil.0.43 FY 08-09 HT

2228 JM04SS2N038 KarkardoomaAdditional 630 KVA D/Tr. at

Kabool Nagar2.12 FY 08-09 HT

2229 JM04SS4572 Karkardooma

Augmentation of 630 kVA to 990

kVA D/Transformer at Abudana

Sub station Vivek Vihar Taking out

2 Nos. LT feeder from

Augmentationmented 630 kVA to

990 kVA D/Transformer at

Abudana Sub station Vivek Vihar

0.20 FY 08-09 HT

2230 JM04SS4596 Karkardooma

Installation of new 11KV 250MVA

7 Panel board (VCB Type) in place

of very old HT Panel board at

Halkara Kuan sub station.

23.68 FY 08-09 HT

2231 JM05EL2448 KarkardoomaElectrification of ITI Staff Quarter

Vivek Vihar LT & Service part.7.30 FY 08-09 LT

2232 JM05EL2449 Karkardooma

Electrification of of ITI Staff

Quarter Vivek Vihar - HT 7

substation Portion.

19.95 FY 08-09 HT

2233 JM05NF4428 Karkardooma

Laying of 11 KV Interconnector

between Law Apartment S/Stn &

KKD Community Complex

5.63 FY 08-09 HT

2234 JM05RM4036 KarkardoomaReplacement of HT Panel Board at

Sarvaria.14.03 FY 08-09 HT

2235 JM05RM4331 KarkardoomaReplacement of HT Panel at Delhi

Administration Flats Substation.6.98 FY 08-09 HT

2236 JM05SH2406 KarkardoomaShifting of Electrical services due

to construction1.60 FY 08-09 HT

2237 JM06FA4039 Karkardooma

Augmentation of feeder with 3 x

300 XLPE from Saini Enclave to

Bahubali Enclave Via LSC Market

,Saini Enclave and Sharad Vihar

substation in Div KKD.

27.28 FY 08-09 HT

2238 JM06FA4042 Karkardooma

Replacement of HT U/G 11KV

feeder from CBD GRID to Rama

block(Up to Nallah Gali No. -5

Viswash Nagar) Bhola nath

Nagar. Div. KKD

18.40 FY 08-09 HT

2239 JM06FA4076 Karkardooma

AUG. OF HT U/G 3x150 Pilca in

3x300 sqmm XLPE FROM D- bl.

Vivek Vihar (Parkwala)s/s to C-

bl.dsidc Jhilmil cly., to D-Bl. Dsidc

Jhilmil cly. to E-bl.Dsidc Jhilmil

cly.to E- Blk. JJ-cluster D/P to A-

Blk. Dsidc Jhilmil cly. To B-Blk.

Dsidc Jhilmil Cly. ,

63.69 FY 08-09 HT

2240 JM06FA4089 Karkardooma

Augmentation of feeder with 3 x

300 XLPE from Rama Block to

four pole to Delhi gate Substation

in Div KKD.

12.72 FY 08-09 HT

2241 JM06LT4046 Karkardooma

Conversion of LT O/H To LTAB at

KKD Village,Arya Nagar,& Inder

Puri - Div. KKD

40.70 FY 08-09 LT

2242 JM06LT4051 Karkardooma

Conversion of LT O/H to LTAB at

Anaj Mandi, Chotta Bazar, Bara

Bazar ,& Tele Wara Etc. - Div.

Kkd

51.23 FY 08-09 LT

Page 103: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

2243 JM06LT4052 Karkardooma

Conversion of LT O/H to LTAB at

Tikona Park, Dunger Mohalla, Tel

Mill, & Rajput Mohalla Etc. - Div.

Kkd

28.51 FY 08-09 LT

2244 JM06RM4002 KarkardoomaInstallation of 4+1W at Jeevan

Beema Division Karkadooma11.53 FY 08-09 HT

2245 JM06RM4028 Karkardooma Installation of Rmu (3+1)Way at

Gali No-10 Vishwas Substation.6.57 FY 08-09 HT

2246 JM06RM4029 KarkardoomaInsl. of HT Panel at Jeewan bima

aptt. Substation.7.20 FY 08-09 HT

2247 JM06RM4041 KarkardoomaReplacement of HT Panel at

Shalimar park s/stn7.58 FY 08-09 HT

2248 JM06RM4074 KarkardoomaReplacement HT Panel at Bihari

Colony.14.67 FY 08-09 HT

2249 JM06RM4077 KarkardoomaInstallation of RMU at ESI

Substation.7.64 FY 08-09 HT

2250 JM06RM4079 KarkardoomaRep. Of HT Panel 2* 4-Way at

District Court Kkd.10.60 FY 08-09 HT

2251 JM06RM4088 Karkardooma

Installation of RMU 3-Way O/D

at East End Club s/s (FSS of

Pratab Khand . Fdr. Form CBD-2

Grid )

4.26 FY 08-09 HT

2252 JM06SH2053 Karkardooma

Shifting of electrical services due

to Construction of RUB Near

Vivek Vihar Railway Station

connecting G.T. Road to I.T.I.

Vivek Vihar.

12.61 FY 08-09 HT

2253 JM07AT4571 Karkardooma

Installation Of New Transformer

400 Kva at E- Blk. Jhilmill Cly JJ

Cluster . P/M.

2.61 FY 08-09 HT

2254 JM07AT4574 Karkardooma

Installation Of New Transformer

400 Kva at C- Blk. Vivek Vihar

Park Wala SS

3.58 FY 08-09 HT

2255 JM07FA4514 Karkardooma

Augmentation of feeder with 3 x

300 XLPE from 928 QTR. SS TO

SHIVAM ENCLAVE -1 SS in Div

KKD BYPL

6.02 FY 08-09 HT

2256 JM07FA4515 Karkardooma

Augmentation of feeder with 3 x

300 XLPE from 928 Qtr. S/Stn to

A Block Vihar Vihar PH-2 in Div

KKD.

13.92 FY 08-09 HT

2257 JM07FA4561 Karkardooma

Augmentation of feeder with 3 x

300 XLPE from Shanti vihar ss to

Bahubali enclave Via Kiran vihar

ss & Rishabh Vihar SS in Div

KKD BYPL

21.93 FY 08-09 HT

2258 JM07FA4570 Karkardooma

Augmentation 3X150 PILCA into

3CX 300 XLPE from CBD

Substation to Hansha

Appartments Substation No.-1 and

2 to Chitrakoot Appartment

Substation ,Div KKD

15.39 FY 08-09 HT

2259 JM07FA4572 Karkardooma

Augmentation of 3CX150PILCA

with 3CX 300 XLPE from

Dayanand Vihar substation to

Hargovined Enclave Substation in

Div KKD

11.01 FY 08-09 HT

2260 JM07LT4505 Karkardooma

Conversion Of LV O/H Mains into

LTAB Cable and dismantling of

partially installed uncommissioned

HVDS System in JJ Cluster (New

Sanjay Amar Colony) Div. KKD.

34.45 FY 08-09 LT

2261 JM07LT4601 Karkardooma

T/O 3 No. LT U/G Feeders from

Newly Installed Trf. at Tash

Factory Vishwas Ngr. Substation.

5.45 FY 08-09 LT

Page 104: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

2262 JM07LT4602 Karkardooma

T/O 3 No. LT U/G Feeders from

Newly installed Trf. at 4 Pole

Pandev Road Vishwas Ngr

3.04 FY 08-09 LT

2263 JM07RM4513 Karkardooma

Replacement of HT Panel 4-Way

at Vivek Vihar Ph-2 (Complaint

Center Kasturba Ngr.) S/S

7.05 FY 08-09 HT

2264 JM07RM4518 KarkardoomaReplacement Of HT Panel(2X4

Way) at Delhi Gate S/Stn11.30 FY 08-09 HT

2265 JM07RM4521 KarkardoomaInstallation Of RMU 3-Way (O/D)

at Bihari Cly. Extn. S/S4.00 FY 08-09 HT

2266 JM07RM4527 Karkardooma

Rep. Of HT Panel 4+1 Way At

Railway Nursary Anand Vihar

S/S

7.09 FY 08-09 HT

2267 JM07RM4528 KarkardoomaReplacement. Of HT Panel 4+1

Way at Shivam Enclave S/S-27.46 FY 08-09 HT

2268 JM07RM4529 Karkardooma

Rep.Of HT Rmu 3-Way (I/D) at

E-Blk. Dsidc Shades Jhilmill Cly.

S/S.

3.82 FY 08-09 HT

2269 JM07RM4530 Karkardooma

Replacement of HT RMU 3-Way

(I/D) at C-Blk. DSIDC Shades

Jhilmill Cly. S/S

4.32 FY 08-09 HT

2270 JM07RM4532 Karkardooma

Replacement of HT RMU 3-Way

(I/D) at D-Blk. DSIDC Shades

Jhilmill Cly. S/S

3.97 FY 08-09 HT

2271 JM07RM4534 Karkardooma

Installation Of RMU (3+1)Way

(O/D) at Gali No.-8 Vishwas Ngr.

Nala Side.. S/S

7.89 FY 08-09 HT

2272 JM07RM4540 Karkardooma Replacement of HT Panel at Kiran

Vihar S/S7.12 FY 08-09 HT

2273 JM07RM4548 KarkardoomaReplacement Of HT Panel at

Swayam Sewa Sansthan S/S5.65 FY 08-09 HT

2274 JM07RM4552 KarkardoomaReplacement of HT Panel at

Hansa Apptt.-2 S/S7.53 FY 08-09 HT

2275 JM07RM4558 KarkardoomaInstallation of RMU 3-Way (O/D)

at KKD Village . S/S4.21 FY 08-09 HT

2276 JM07RM4560 Karkardooma

Installation Of RMU (3+1)Way

(O/D) at Shamshan Ghat Jwala

Ngr... S/S

6.85 FY 08-09 HT

2277 JM07RM4564 Karkardooma Replacement Of HT Panel at

Shreshtha Vihar S/S15.07 FY 08-09 HT

2278 JM07RM4565 Karkardooma

Installation Of RMU 3-Way (O/D)

at Aggerwal Bhawan Shalimar

Park. S/S

4.10 FY 08-09 HT

2279 JM07UT4580 Karkardooma

Aug.Of 400 Kva Trf.To 990 Kva

Trf.at 18 Qtr. Vishwas Ngr. Behind

Shivam Enclave

3.03 FY 08-09 HT

2280 JM08AT4007 KarkardoomaInstallation of additional 400KVA

Transformer at Saini Enclave S/S2.20 FY 08-09 HT

2281 JM08EL1061 Karkardooma

Electrification of 480 Nos. Lawyers

Chamber constructed in the Court

Complex Karkardooma, Delhi

11.29 FY 08-09 LT

2282 JM08EL2059 Karkardooma

Providing LT Service Connection

To 480 Nos. Lawyers

Chambers Being Constructed In

The Court Complex Karkardooma.

3.32 FY 08-09 HT

2283 JM08EL2060 Karkardooma

Electrification of 480 Nos. Lawyers

Chambers constructed in the

Court Complex Karkardooma,

Delhi.

56.49 FY 08-09 HT

2284 JM08LT4085 KarkardoomaRep of old LT U/G Fdr C-Blk

Anand Vihar5.09 FY 08-09 LT

2285 JM08MS4049 Karkardooma

Rep. of Service Line in Vishwas

Nagar All Lans, Bhikam Singh

Colony.

76.01 FY 08-09 LT

Page 105: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

2286 JM08MS4050 Karkardooma

Rep. Of Service Line in Bihari

Colony,Bhola Nath Nagar, Tejab

Mill Etc.

44.40 FY 08-09 LT

2287 JM08MS4051 Karkardooma

Rep. Of Service Line in Shalimar

Park, Rama Blk Mohalla Dalhai

Etc

17.35 FY 08-09 LT

2288 JM08MS4052 KarkardoomaRep. Of Service Line in Jhilmil

Colony all Blocks28.36 FY 08-09 LT

2289 JM08MS4053 Karkardooma

Rep. Of Service Line in Teliwara,

Anaj Mandi, Pathan Pura, Chotta

Bazar Etc.

29.05 FY 08-09 LT

2290 JM08MS4054 Karkardooma

Rep. Of Service Line in Kasturba

Nagar, New Vishwas

Nagar,Jawala Nagar Etc

27.98 FY 08-09 LT

2291 JM08MS4055 KarkardoomaReplacement/Aug of L V Mains in

S M Vihar All Blks45.53 FY 08-09 LT

2292 JM08RM4027 KarkardoomaRep. Of HT Panels at Janta Qtr

Vivek Vihar.3.95 FY 08-09 HT

2293 JM08RM4029 KarkardoomaRep. Of HT Panels at Savita

Vihar.6.41 FY 08-09 HT

2294 JM08RM4030 KarkardoomaRep Of HT Rmu 3-Way at Dsidc

A-Blk Jlm.3.90 FY 08-09 HT

2295 JM08RM4031 KarkardoomaRep Of HT Rmu 3-Way at Dsidc

B-Blk Jlm.4.05 FY 08-09 HT

2296 JM08RM4032 KarkardoomaRep Of HT Rmu 3-Way at

Bhahubali Encl.3.90 FY 08-09 HT

2297 JM08RM4034 KarkardoomaRep Of HT Pannel 4-Way at Mtnl-

2 Staff Qtr.5.90 FY 08-09 HT

2298 JM08RM4036 KarkardoomaRep Of HT Pannel 4-Way at Ram

Vihar6.42 FY 08-09 HT

2299 JM08RM4037 Karkardooma Rep. Of HT Panels at Shanti Vihar 5.90 FY 08-09 HT

2300 JM08RM4038 KarkardoomaRep. Of HT Panels at Jagriti

Pumping S/S.4.07 FY 08-09 HT

2301 JM08RM4057 KarkardoomaIns Of HT Rmu 3-Way at a-Blk

V.Vihar Ph-24.03 FY 08-09 HT

2302 JM08UT4008 Karkardooma

Augmentation of transformer from

400 KVA to 990 KVA at Jagriti

Enclave Extn S/S

1.95 FY 08-09 HT

2303 JM08UT4011 KarkardoomaAugmentation of transformer 400

to 990 KVA at Rishabh Vihar S/S1.95 FY 08-09 HT

2304 JM08UT4012 KarkardoomaAugmentation of transformer 400

to 630 KVA at LSC Mkt. Saini S/S1.12 FY 08-09 HT

2305 KN04FA4567 Krishna Nagar

Estimate for replacement of out

door Service Feeder Pillars in

Distt. Krishna Nagar

12.36 FY 08-09 HT

2306 KN04LT4572 Krishna NagarT/O 2 NO LT Fdrs from Rani

Garden Park2.07 FY 08-09 LT

2307 KN04RM4614 Krishna NagarInstallation of RMU at Ambedkar

college.6.00 FY 08-09 HT

2308 KN04RM4618 Krishna NagarInstallation of RMU (SF-6) at

Vivekanand Hospital.6.22 FY 08-09 HT

2309 KN04SS4580 Krishna Nagar

Installation of 630 KVA

transformer at 13 Blk Geeta

Colony

2.11 FY 08-09 HT

2310 KN05FA4005 Krishna Nagar

Augmentation of 11 kV HT Cable

3x150 mm2 PILCA to 3x300 mm2

XLPE cable from Shastri Nagar

KIOSK to Sarojini Park Ghore

Tange Wala Sub station.

4.29 FY 08-09 HT

2311 KN05LT4041 Krishna Nagar

Replacement of LT Sick Cable

from South Anarkali Sub station to

pole no. 1190and pole no. 1156

main road south Anarkali in

District Krishna Nagar

7.56 FY 08-09 LT

Page 106: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

2312 KN05LT4220 Krishna Nagar

Replacement of 2 no. LT Sick

cable of 3.5*300 mm2 XLPE cable

from Subhash Mohalla sub station

to Gali no.2 and Gali no.4 Amar

Mohalla, Gandhi Nagar

5.96 FY 08-09 LT

2313 KN05RM4251 Krishna NagarInstallation. of 7 panel at Kanti

nagar.15.20 FY 08-09 HT

2314 KN05RM4252 Krishna NagarInstallation. 8 panel at Rani

Garden18.95 FY 08-09 HT

2315 KN06LT4056 Krishna Nagar

Replacement of Old damaged,

undersized existing conductor with

AB cable at New Govind Pura Old

Govind pura Bedi Market South

Anarkali Baldev Park Govind Park

175.95 FY 08-09 LT

2316 KN06LT4057 Krishna NagarRpl of old cond.with AB cable at

RS Park.159.83 FY 08-09 LT

2317 KN06LT4058 Krishna Nagar

Replacement of Old damaged,

undersized existing conductor with

AB cable at Tagore Gali Subhash

Road Shambhu Nath Buildg Prem

Gali Banarasi Dass Buildg

Saraswati Bhandar & Shyam

Block.

180.28 FY 08-09 LT

2318 KN06LT4059 Krishna Nagar

Replacement of Old damaged,

undersized existing conductor with

AB cable at Jitar Nagar, F,G, & H

block JagatPuri

146.08 FY 08-09 LT

2319 KN06LT4060 Krishna NagarRpl of old cond.with AB cable at

AR Park.176.90 FY 08-09 LT

2320 KN06LT4061 Krishna Nagar

Replacement of Old damaged,

undersized existing conductor with

AB cable at Geeta Colony, Jheel

Subzi Mandi and 12 blk JJ Cluster

181.78 FY 08-09 LT

2321 KN06LT4062 Krishna Nagar

Replacement of Old damaged,

undersized existing conductor with

AB cable at Rajgarh & Extn colony

157.05 FY 08-09 LT

2322 KN06LT4063 Krishna Nagar

Replacement of Old damaged,

undersized existing conductor with

AB cable at Shanker Ngr &

Shanker Ngr Ext.

128.36 FY 08-09 LT

2323 KN06LT4065 Krishna NagarRpl of old cond. into AB cable at

Radhey Puajn Nagar.121.57 FY 08-09 LT

2324 KN06LT4067 Krishna Nagar

Replacement of Old damaged,

undersized existing conductor with

AB cable at Ram Ngr & Ram Ngr

Extn

59.64 FY 08-09 LT

2325 KN06LT4068 Krishna Nagar

Replacement of Old damaged,

undersized existing conductor with

AB cable at A Blk , B blk, D blk E

blk Krishna Ngr

133.56 FY 08-09 LT

2326 KN06LT4069 Krishna NagarRpl of old cond.into AB cable at

Dharm Pura.145.24 FY 08-09 LT

2327 KN06LT4070 Krishna Nagar

Replacement of Old damaged,

undersized existing conductor with

AB cable at Ram Ngr Gali No 0 to

12 Jawaher Mohalla,Chand Moh

Raghuver Pura No 1 & 2 Tagore

Gali & Shivaji Gali

134.58 FY 08-09 LT

2328 KN06LT4072 Krishna Nagar

Replacement of Old damaged,

undersized existing conductor with

AB cable at Ashok Gali, Guru

Nanak Gali, Satnarayan Mandir

Gali, Shyam Gali etc in Gandhi

Ngr

68.62 FY 08-09 LT

Page 107: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

2329 KN06RM4006 Krishna NagarReplmt of existing 4 panal bd at

double6.97 FY 08-09 HT

2330 KN06RM4007 Krishna NagarReplaceent of 8 Panel board at

Shiv Kutty D-KRN21.26 FY 08-09 HT

2331 KN06RM4083 Krishna Nagar

  Replacement /Providing 1x4way

I/D RMU at Koti Bhagwandass in

D- KRN

6.88 FY 08-09 HT

2332 KN06RM4084 Krishna Nagar

Replacement /Providing

1x4way+1way I/D RMU at 9 blk

Geeta colony in D- KRN

9.51 FY 08-09 HT

2333 KN06RM4089 Krishna Nagar

Replacement /Providing 1x4way

I/D RMU at 10 blk Geeta colony in

D- KRN

6.39 FY 08-09 HT

2334 KN06RM4090 Krishna Nagar

  Replacement /Providing 2x4way

I/D RMU at 8A blk Geeta colony in

D- KRN

13.19 FY 08-09 HT

2335 KN06RM4093 Krishna Nagar

Replacement /Providing 2x4way

I/D RMU at Tikona Park in D-

KRN

13.23 FY 08-09 HT

2336 KN06RM4095 Krishna Nagar

  Replacement /Providing 2x4way

I/D RMU at Raj Garh Mini Stadium

in D- KRN

14.03 FY 08-09 HT

2337 KN07AT4514 Krishna Nagar

Providing additional transformer of

630KVA at H-Blk Mother Dairy

Krishna Nagar

2.10 FY 08-09 HT

2338 KN07AT4522 Krishna Nagar Installation of Additional 400 KVA

trf at s/stn Rani Garden school 1.32 FY 08-09 HT

2339 KN07AT4524 Krishna Nagar

Installation of 400KVA Trf at MB

Road near Masjid Multani Mohalla

(new S/stn)

2.19 FY 08-09 HT

2340 KN07AT4555 Krishna Nagar

Pdg additional trf of 630KVA at

Main road Primary school Gandhi

Ngr in D KRN

2.04 FY 08-09 HT

2341 KN07AT4561 Krishna Nagar

 Pdg additional trf of 630KVA at

S/stn Mother Dairy Rajgarh in D

KRN

1.97 FY 08-09 HT

2342 KN07AT4564 Krishna NagarProviding additional Tansformer of

630KVA at Old Anarkali in D-KRN2.11 FY 08-09 HT

2343 KN07FP4560 Krishna Nagar

Replacement of Type A fdr pillar at

Taj Sartaj Apptt. Geeta Colony &

in other society

6.49 FY 08-09 LT

2344 KN07LT4527 Krishna Nagar

Providing 3Nos LT Feeder from

Newly Proposed S/Stn at MB

Road Multani Mohalla

4.38 FY 08-09 LT

2345 KN07LT4546 Krishna Nagar

  Providing 3Nos LT Feeder from

Mahila Colony S/Stn Gandhi

Nagar in D-Krishna Nagar.

6.87 FY 08-09 LT

2346 KN07LT4547 Krishna Nagar

Providing 3nos LT feeder from

newly proposed s/stn at Main

Road Primary school Kailash Ngr

6.01 FY 08-09 LT

2347 KN07LT4548 Krishna Nagar

Providing 3nos LT feeder from

newly proposed Trf at H blk

Mother Dairy Krishna Ngr

6.85 FY 08-09 LT

2348 KN07LT4562 Krishna Nagar

Pdg 3nos LT fdr from newly

proposed 630KVA trf at S/Stn

Mother Dairy Rajgarh in D-KRN

6.37 FY 08-09 LT

2349 KN07NF4526 Krishna NagarProviding HT feed to proposed

s/stn at MB road Masjid.10.12 FY 08-09 HT

2350 KN07RM4529 Krishna Nagar

Providing 3way O/D RMU at

Newly proposed S/stn at MB road

near Masjid Multani Moh

4.10 FY 08-09 HT

2351 KN07RM4533 Krishna Nagar

Replacement /Providing 1X4Way

I/D+1Way Rmu at S/Stn Khureji In

D- Krn.

5.87 FY 08-09 HT

Page 108: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

2352 KN07RM4536 Krishna Nagar

Name of the Scheme:

Replacement /Providing 1x4way

I/D+1way RMU at Old Anarkali

colony in D- KRN

10.62 FY 08-09 HT

2353 KN07RM4537 Krishna Nagar

Replacement /Providing 1X4Way

I/D+1Way Rmu at S/Stn Jeel No4

In D- Krn.

9.09 FY 08-09 HT

2354 KN07RM4538 Krishna Nagar

Replacement /Providing 1X4Way

I/D+1Way Rmu at S/Stn Bedi

Market In D- Krn.

9.11 FY 08-09 HT

2355 KN07RM4540 Krishna Nagar

Name of the Scheme:

Replacement /Providing 1x4way

I/D+1way RMU at s/stn Jeel No 5

in D- KRN

10.59 FY 08-09 HT

2356 KN07RM4552 Krishna Nagar

Replacement /Providing 1x4way

I/D RMU at s/stn No 1 in Geeta

apptt in D- KRN

6.38 FY 08-09 HT

2357 KN07RM4553 Krishna Nagar

Replacement /Providing 1x4way

I/D RMU at S/stn 2 Geeta apptt in

D- KRN

6.06 FY 08-09 HT

2358 KN07RM4554 Krishna Nagar

Replacement /Providing 1X4Way

I/D Rmu at S/Stn Gagan Vihar

Ext. In D- Krn.

5.92 FY 08-09 HT

2359 KN07SS4567 Krishna NagarShifting of 11KV S/stn at Shiv

Mandir4.13 FY 08-09 HT

2360 KN07UT4520 Krishna NagarAugmentation of 400KVA trf. to

630KVA trf. at Silver Park.1.10 FY 08-09 HT

2361 KN07UT4543 Krishna Nagar

Augmentation of 400KVA trf. into

630 KVA trf at F Blk Krishna

Nagar

7.86 FY 08-09 HT

2362 KN07UT4545 Krishna NagarAugmentation of 630KVA trf. into

990 KVA trf at Shiv Kutty.9.35 FY 08-09 HT

2363 KN07UT4559 Krishna Nagar

Augmentation of 630KVA trf. into

990 KVA trf at Kailash Ngr kiosk

in D-KRN

8.34 FY 08-09 HT

2364 KN08LT4057 Krishna Nagar Rep. of LT cable at Shivkutti 4.59 FY 08-09 LT

2365 KN08LT4060 Krishna NagarReplacement of LT Cable at Shiv

Puri1.66 FY 08-09 LT

2366 KN08LT4063 Krishna NagarRep. Of LT Cable At A Blk

Jagatpuri.3.44 FY 08-09 LT

2367 KN08LT4078 Krishna NagarT/O 3 Nos LT Feeder from J Blk

KRN3.91 FY 08-09 LT

2368 KN08LT4088 Krishna NagarT/O 3 Nos LT Feeder from 16 Blk

Geeta Colony2.44 FY 08-09 LT

2369 KN08LT4089 Krishna NagarT/O 3 Nos LT Feeder from 8 Blk

Geeta Colony1.30 FY 08-09 LT

2370 KN08LT4090 Krishna NagarT/O 3 Nos LT Feeder from 9 Blk

Geeta Colony2.75 FY 08-09 LT

2371 KN08LT4091 Krishna NagarT/O 3 Nos LT Feeder from BTS

to Geeta Colony2.35 FY 08-09 LT

2372 KN08LT4092 Krishna NagarT/O 3 Nos LT Feeder from

Primary Sch. Ghandhi Nagar4.51 FY 08-09 LT

2373 KN08LT4094 Krishna NagarT/O 3 Nos LT Feeder from

Subash Rd Tikona Park3.24 FY 08-09 LT

2374 KN08LT4138 Krishna NagarPdg/Repl LT fdr S/stn10 blk

Geeta Co2.72 FY 08-09 LT

2375 KN08LT4141 Krishna NagarPdg/Repl LT fdr S/stn Amdkr

Park to 9 b5.01 FY 08-09 LT

2376 KN08SL1118 Krishna NagarProviding St Lighting at Kanti Ngr

Exten In D-KRN.1.43 FY 08-09 LT

2377 KN08SL1119 Krishna NagarProviding Street Ltg at Rani

Garden In D -KRN.1.46 FY 08-09 LT

2378 KW04RM4059 Karawal Nagar

Providing RMU at DP at Jhoripur

extension for ABC O/H feeder

Kajoori khas from Ghonda Grid

4.80 FY 08-09 HT

2379 KW04RM4060 Karawal NagarProviding RMU at DP at Medical

Center Karwal Nagar 4.72 FY 08-09 HT

2380 KW05EL4099 Karawal Nagar Electrification of Village Johri Pur 8.95 FY 08-09 LT

2381 KW05EL4100 Karawal NagarElectrification of Rama GDN on

LVDS (MC-HVDS)4.04 FY 08-09 LT

Page 109: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

2382 KW05EL4101 Karawal NagarElectrification of LOP Roshan

Vihar2.66 FY 08-09 LT

2383 KW05EL4102 Karawal NagarElectrification of LOP Sonia Vihar

on LVDS(MC-HVDS)2.86 FY 08-09 LT

2384 KW05EL4124 Karawal NagarElectrification of Bu Nagar

Karawal Nagar0.01 FY 08-09 HT

2385 KW06FA4534 Karawal Nagar

Replacement of Existing 3CX150

PILCA Cable into 3CX300 XLPE

Cable from E.Block Khajoori to D-

1 Khajoori,Karawal nagar.

7.96 FY 08-09 HT

2386 KW06JJ4504 Karawal Nagar

Elec. Of A Blk. Sri Ram Colony

on LT AB Cable at Karawal Nagar

Division

71.80 FY 08-09 LT

2387 KW06RM4540 Karawal NagarProvide New RMU at Khajoori

Village Div. Karawal Nagar4.71 FY 08-09 HT

2388 KW06RM4542 Karawal Nagar

Provide New RMU at Red Light

Khajoori For Mukund Vihar Fdr.

Div. Karawal Nagar

5.11 FY 08-09 HT

2389 KW06RM4544 Karawal Nagar

Provide New Rmu at Major

Malhotra Farm For Khajoori Khas

Fdr. Div. Karawal Nagar.

4.87 FY 08-09 HT

2390 KW07AT4019 Karawal Nagar

Installation of New transformer

400 KVA at B Blk. Chand Bagh

div. Karawal Nagar

2.26 FY 08-09 HT

2391 KW07FA4011 Karawal Nagar

Replacement of Old 3CX300mm2

XLPE cable from Govind vihar to

Rama Garden at div Karawal

Nagar

46.67 FY 08-09 HT

2392 KW07LT4002 Karawal NagarConversion Of O/H Conductor into

LTAB Cable at Prem Nagar 43.75 FY 08-09 LT

2393 KW07LT4020 Karawal Nagar

T/O 3 NO. LT U/G Feeder from

newly installed 400 KVA Trf at ‗B‘

block Chand Bagh.

6.22 FY 08-09 LT

2394 KW07RM4005 Karawal Nagar

Replacement Of Old Existing 4

Panel Into 8 Panel at Ganga Vihar

No. 2.

11.58 FY 08-09 HT

2395 KW07RM4007 Karawal Nagar

Replacement Of Old Existing

Panel Into 3 Way at Sampat

Nagar.

3.91 FY 08-09 HT

2396 KW07SH4022 Karawal Nagar

Diversion of load of 11KV feeder

Wazirabad 1 to Raw Water at

Yamuna Vihar Grid.

10.63 FY 08-09 HT

2397 KW07SH4023 Karawal Nagar

Diversion of loading 11KV feeder

Waziarbad to Mukand Vihar at

Karawal Nagar Grid.

36.65 FY 08-09 HT

2398 KW07SH4024 Karawal Nagar

Diversion of load of 11KV feeder

from Wazirabad 1 to Khajoori

Switching Station -1 at Yamuna

Vihar Grid .

1.67 FY 08-09 HT

2399 KW08AT4037 Karawal Nagar

Installation Of Addl. 400 Kva Trf.

At Old Mustafabad Gali No. 3

Div.Kwn.

2.46 FY 08-09 HT

2400 KW08AT4038 Karawal NagarInstallation Of Addl. 400 Kva Trf.

At Man Singh Nagar S/Stn.1.31 FY 08-09 HT

2401 KW08AT4039 Karawal NagarInstallation Of Addl. 400 Kva Trf.

At Man Singh Nagar S/Stn.1.37 FY 08-09 HT

2402 KW08LT4016 Karawal NagarT/O 2 Nos. LT Fdrs. 3.5X300 U/G

From Sher Pur Chowk S/Stn.3.16 FY 08-09 LT

2403 KW08LT4017 Karawal Nagar

T/O 3 Nos. LT Fdrs. 3.5X300

U/G from Jawahar Nagar Loni

Road S/Stn.

3.39 FY 08-09 LT

2404 KW08LT4018 Karawal NagarT/O 1 No. LT Fdr. 3.5X300 U/G

From Thurmas Factory Johri Pur.0.90 FY 08-09 LT

2405 KW08LT4019 Karawal Nagar

T/O 1 No. LT Fdr 3.5X300 U/G

Xlpe From Tunda Nagar No. 2

S/Stn.

1.77 FY 08-09 LT

Page 110: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

2406 KW08LT4020 Karawal Nagar

T/O 3 Nos. LT Fdrs. 3.5X300 U/G

From Sampat Nagar S/Stn Div

Kwr.

3.24 FY 08-09 LT

2407 KW08LT4021 Karawal NagarT/O 5 Nos. LT Fdrs. 3.5X300 U/G

Cable From Mansingh Nagar.4.46 FY 08-09 LT

2408 KW08LT4022 Karawal Nagar

T/O 3 Nos.LT Fdrs. 3.5X300 U/G

XLPE Cable from Old Mustafabad

Gali No.6

2.83 FY 08-09 LT

2409 KW08LT4023 Karawal NagarT/O 4 Nos. LT Fdrs. 3.5X300 Old

Mustafabad Gali No. 3 Div Kwr.4.43 FY 08-09 LT

2410 KW08LT4067 Karawal Nagar

T/O 2 Nos. LT U/G Fdrs.

3.5X300 Sq. MM Cable from R.G.

Nagar G.No. 21 S/Stn. to

Kabristan

2.77 FY 08-09 LT

2411 KW08LT4068 Karawal Nagar

T/O 1 Nos. LT U/G 3.5X300 Sq.

Mm Cable From R.G. Nagar Gali

No. 15 To Gali No. 12.

1.77 FY 08-09 LT

2412 KW08LT4069 Karawal Nagar

T/O 3 Nos. LT U/G 3.5X300 Sq.

Mm Cable From Karawal Nagar

Comp. To Infront Of Comp.

Centre.

1.59 FY 08-09 LT

2413 KW08LT4070 Karawal Nagar

T/O 2 Nos. LT U/G Fdrs. 3.5X300

Cable From S/Stn. No.5 To Gatta

Factory Div Kwr.

3.14 FY 08-09 LT

2414 KW08LT4071 Karawal Nagar

T/O of 1 No. LT U/G 3.5X300 Sq.

MM Cable from Dall Mill S/Stn to

Karnipahalwan

1.97 FY 08-09 LT

2415 KW08LT4073 Karawal NagarT/O 6 Nos. LT Fdrs. From Akbari

Masjid S/Stn.5.89 FY 08-09 LT

2416 KW08MS4158 Karawal NagarAug. of Trf. 16 Kva To 100 Kva

Bala Ji Temple Sonia Vihar.1.33 FY 08-09 HT

2417 KW08MS4159 Karawal Nagar

Replacement of Service Line In

Chand Bagh, Old Mustafabad,

Sampat Nagar, Akbari Masjid,

Man Singh Nagar, Babu Nagar,

Parts of Sri Ram Colony Etc.

274.45 FY 08-09 LT

2418 KW08MS4164 Karawal Nagar

Replacement of HT AB Cable of

HVDS System in Div Karawal

Nagar

56.99 FY 08-09 HT

2419 KW08MS4182 Karawal NagarInstalation of New DB for New

Connection31.99 FY 08-09 LT

2420 KW08MS4184 Karawal Nagar

Augmentation of T/F from 25KVA

to 400KVA , to provide NC of

56KW in F/O Ajay Ku Bansal ,

Plot No. 54, Gautam Marg,

Joharipur .

1.19 FY 08-09 HT

2421 KW08MS4187 Karawal Nagar

Installation of 100 KVA

transformer. at Sonia Vihar C-D

Blk. KCC connection

2.77 FY 08-09 HT

2422 KW08NF4001 Karawal Nagar

Providing interconnector 11kV

3X300 XLPE cable between Gali

No. 10 to Sonia Vihar V Pocket

14.83 FY 08-09 HT

2423 KW08NF4005 Karawal Nagar

Providing interconnector 11 kV

3X300 XLPE Cable between

Gujjar Mohlla No. 2 to O/H Line of

Shanti Nagar Feeder.

2.83 FY 08-09 HT

2424 KW08NF4006 Karawal Nagar

Providing interconnector 11 kV

3X300 XLPE Cable between G&H

Blk. West Karawal Nagar to G.No.

16 Sbs Colony

11.01 FY 08-09 HT

2425 KW08NF4072 Karawal Nagar

Providing interconnector 11 kV

3X300 XLPE Cable from Karawal

Nagar Comp. to S/Stn. No. 5

Karawal Nagar (Bank Wala)

9.62 FY 08-09 HT

2426 KW08RM4040 Karawal Nagar

Replacement of exisitng 4 Panel

into 5 Panel at C Blk. Khajoori

S/Stn.

9.74 FY 08-09 HT

Page 111: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

2427 KW08RM4041 Karawal NagarReplacement of existing 4 Panel

into 4 Panel at F Blk. Khajoori5.49 FY 08-09 HT

2428 KW08RM4042 Karawal Nagar

Replacement of existing 3 Way

RMU into 3 Way RMU at Raw

Water S/Stn.

3.91 FY 08-09 HT

2429 KW08RM4044 Karawal Nagar

Replacement of existing 4 Panel

into 5 Panel at A Blk. Bhagirathi

Vihar S/Stn.

9.61 FY 08-09 HT

2430 KW08RM4046 Karawal NagarReplacement of existing 3 Way to

4 Way RMU at Mansingh Nagar5.39 FY 08-09 HT

2431 KW08RM4047 Karawal Nagar

Replacement of existing 4 Panel

into 2X4 Way Panel at G.No. 6

Old Mustafabad S/Stn.

11.35 FY 08-09 HT

2432 KW08RM4050 Karawal Nagar

Replacement of existing 3 Panel

into 3 Way RMU at Rajeev Gandhi

Nagar G.No. 8

3.70 FY 08-09 HT

2433 KW08RM4051 Karawal Nagar

Replacement of existing 3 Panel

into 4 Panel at Jeewan Jyoti

School Sadatpur S/Tn.

5.61 FY 08-09 HT

2434 KW08RM4052 Karawal Nagar

Replacement of existing 3 Panel

into 3 Way at R.G. Nagar G.No.

15

4.04 FY 08-09 HT

2435 KW08RM4053 Karawal Nagar

Replacement of existing 3 Panel

into 3 Way RMU at R.G. Nagar

G.No. 3 S/Stn.

4.18 FY 08-09 HT

2436 KW08RM4056 Karawal Nagar

Replacement of existing 3 Panel

into 3 Way RMU at D Blk. Nehru

Vihar S/Stn.

3.68 FY 08-09 HT

2437 KW08RM4057 Karawal Nagar

Replacement of existing 3 Panel

into 4 Way RMU at A Blk. Nehru

Vihar S/Stn.

6.55 FY 08-09 HT

2438 KW08RM4059 Karawal Nagar

Replacement of existing 4 Panel

into 2X4 Way at E-2 Nehru Vihar

S/Stn.

11.34 FY 08-09 HT

2439 KW08RM4061 Karawal Nagar

Replacement of existing 8 Panel

into 2X4 Way Comp. Centre

Karawal Nagar S/Stn.

11.72 FY 08-09 HT

2440 KW08RM4063 Karawal NagarInstallation of new 1 way breaker

at E Blk. Bhagirathi Vihar2.85 FY 08-09 HT

2441 KW08RM4173 Karawal NagarReplacement of existing 3 Way

into 2X3 Way at B Blk. Sadat Pur10.15 FY 08-09 HT

2442 KW08RM4174 Karawal NagarInstallation of Single Way RMU at

G.No. 3 Old Mustafabad3.15 FY 08-09 HT

2443 KW08RM4175 Karawal NagarInstallation of Single Way RMU at

Sampat Nagar Div. KWR2.90 FY 08-09 HT

2444 KW08RM4176 Karawal Nagar

Replacement of existing 3 Way

RMU into 4 Way RMU at L Blk.

Sadat Pur Div. KWR

3.67 FY 08-09 HT

2445 KW08RM4177 Karawal Nagar

Replacement of existing 3 Way

RMU into 4 Way RMU at Flood

Water Pump Div. KWR

5.45 FY 08-09 HT

2446 KW08RM4179 Karawal Nagar

Replacement of Existing 4 Way

into 2X3 Way into D Blk. Brijpuri in

Div. KWR

9.42 FY 08-09 HT

2447 KW08SH1160 Karawal Nagar

Shifting of Electric Services due

to widening and improvement of

Krawal Nagar Road from

Wazirabad Road to Chand Bagh

Pulia.

14.69 FY 08-09 LT

2448 KW08SL1085 Karawal NagarProviding Street Lighting In Nehru

Vihar Div. KWR.9.46 FY 08-09 LT

2449 KW08SL1086 Karawal Nagar

Providing street lighting in Old

Mustafabad Gali no-1 to 9 Div.

KWR

3.01 FY 08-09 LT

2450 KW08SL1088 Karawal NagarProviding Street Lighting In

Gandhi Nagar Div. KWR.6.05 FY 08-09 LT

2451 KW08SL1090 Karawal NagarProviding Street Lighting In Shakti

Vihar Div. KWR.1.93 FY 08-09 LT

Page 112: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

2452 KW08UT4024 Karawal NagarAug. Of Trf. 630 Kva To 990 Kva

At Sher Pur Chowk S/Stn.0.85 FY 08-09 HT

2453 KW08UT4025 Karawal Nagar

Aug. Of Trf. Aug. Of 630 Kva To

990 Kva At S/Stn.No. 5 Bank

Wala Karawal Nagar.

0.65 FY 08-09 HT

2454 KW08UT4026 Karawal NagarAug. Of Trf. 630 Kva To 990 Kva

At Gokal Puri Dispensary S/Stn.0.65 FY 08-09 HT

2455 KW08UT4027 Karawal NagarAug. Of 630 To 990 Kva Trf. At

Ganga Vihar No. 2 S/Stn.0.87 FY 08-09 HT

2456 KW08UT4028 Karawal NagarAug. Of 630 To 990 Kva Trf. At C

Blk. Brijpuri S/Stn.0.83 FY 08-09 HT

2457 KW08UT4030 Karawal NagarAug. Of Trf. 400 To 630 Kva At B

Blk. Gokal Puri S/Stn.Div Kwr.0.58 FY 08-09 HT

2458 KW08UT4031 Karawal NagarAug. Of Trf. 400 Kva To 630 Kva

At Akbari Masjid S/Stn.0.72 FY 08-09 HT

2459 KW08UT4185 Karawal Nagar

Augmentation of transformer

25KVA to 100KVA to Provide New

Connection in F/O Reliance

Infratel Limited Gali No.3 Shiv

Vihar Karawal Ngr

1.97 FY 08-09 HT

2460 KY04LA2504 KCC Schemes80KW LT J S Furnishing 240

karolbaag2.04 FY 08-09 LT

2461 KY04LA2511 KCC Schemes

Addl Load of 62.131 (P&L) on

MLHT category making total as

149KW P&L on LT system in f/o

M/s connaught Plaza Resturant

(P) Ltd at A-5/76, WEA ,Karol

bag.

2.15 FY 08-09 HT

2462 KY04LA2517 KCC Schemes

Addl. Load of 80KW making total

load as 130KW on LT system of

supply under MLHT category in f/o

M/s Oriental Bank Of Commerce

,8/1 Abdul Aziz Road karol Bagh

New Delhi

8.82 FY 08-09 HT

2463 KY04LA2519 KCC SchemesElectrification of

Obc,4E/11,Jhandewalen Ext. Nd0.37 FY 08-09 LT

2464 KY04LA2520 KCC Schemes

Amalgamation of load of 70 KW &

25 KW and additional load of 30

KW making total load of 125 KW

on LT system under MLHT

category ,SUNIL KUMAR

,5/71,Padam Singh road .,KAROL

BAGH

0.54 FY 08-09 LT

2465 KY04LA2547 KCC SchemesLoad Additional in f/o Shanti Devi

Prog. Soc.7.32 FY 08-09 HT

2466 KY04NC2508 KCC Schemes

New Connection for Load of

1335KW (1186.5KW) in f/o 216

Beded Government Hospital at

Geeta Colony Delhi.

38.94 FY 08-09 HT

2467 KY04NC2542 KCC SchemesProv. 2nd Source to

STP,YVR,625 KW9.74 FY 08-09 HT

2468 KY04NC2556 KCC SchemesNew load of 190 KW in f/o Vishal

Relail3.11 FY 08-09 HT

2469 KY04NC2562 KCC SchemesProv NC(250 KW) in f/o MGF

Auto, PHG8.02 FY 08-09 HT

2470 KY05LA2043 KCC Schemes

Load addition in favour of

Arwachin PubLIC Sr. Secondary

(110kW)

1.85 FY 08-09 LT

2471 KY05LA2068 KCC SchemesLoad addition in favour of 99.7KW

so T Load 236KW in f/oDir.FPO9.35 FY 08-09 LT

2472 KY05NC2024 KCC SchemesNew Load of 772.5kW in favour of

Dee/G, Nr, Dr5.77 FY 08-09 LT

2473 KY05NC2038 KCC SchemesSunny Arora,Dilshad Garoad en

inds. Area0.40 FY 08-09 LT

Page 113: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

2474 KY05NC2039 KCC SchemesNc(90 kW) in favour of Him

Motors,338,FIE,Patpar Ganj7.64 FY 08-09 LT

2475 KY05NC2046 KCC Schemes

Providing New Connection of

213kW in favour of Sanjeevan

Hospital

9.81 FY 08-09 LT

2476 KY05NC2072 KCC SchemesProviding New Connection of

595kW at Anand Vihar R.Station87.00 FY 08-09 LT

2477 KY05NC2089 KCC SchemesNew load addition of 410KW in

favour of CBSE8.16 FY 08-09 LT

2478 KY06LA2008 KCC SchemesAdditional load addition of 108 KW

in favour of Saurabh Gupta2.58 FY 08-09 LT

2479 KY06LA2014 KCC SchemesLA in f/o Patel NagarRailway

Station1.65 FY 08-09 LT

2480 KY06LA2065 KCC Schemes

Load Addition of 113KW to

making 200KW in f/o JD TYTLER

SC

1.55 FY 08-09 LT

2481 KY06NC2021 KCC Schemes

Additional load of 78.03 KW

making total load of 128.03 KW

under MLHT category on LT

system of power supply in f/o

Branch Manager, LIC of India,

1/28, Sunlight Building, Asaf Ali

Road, New Delhi.

3.87 FY 08-09 LT

2482 KY06NC2024 KCC SchemesNew Connection in front of

Ritnand School7.27 FY 08-09 LT

2483 KY06NC2041 KCC SchemesNew connection for Sonia Vihar

DJB Plant 564KW142.83 FY 08-09 LT

2484 KY06NC2043 KCC SchemesNC for Streetlight at Shakarpur

Pusta0.27 FY 08-09 LT

2485 KY06NC2052 KCC SchemesElectrification of 2KW each for 56

f/o Ashok Sharma5.20 FY 08-09 LT

2486 KY06NC2054 KCC SchemesNC of 394.2KW on HT in f/o DJB

Kanti Nag21.65 FY 08-09 HT

2487 KY06NC2057 KCC Schemes(BS-4045) Dholi Co. (P) LTD.

Rajinder Place18.94 FY 08-09 HT

2488 KY06NC2069 KCC Schemes(BS-3002) new load 3000KW in

f/o GTB25.67 FY 08-09 HT

2489 KY07LA1556 KCC Schemes

Providing Additional load of

125KW making total load of

200KW on LT system of supply in

f/o M/s Champion Properties Ltd.,

Maharaja Ranjeet Singh Marg

0.31 FY 08-09 LT

2490 KY07LA1564 KCC Schemes

Providing additional load of 99KW

making total 198KW on LT system

in f/o M/s MMTC Ltd., F-3 to 19,

Flatted Factories Complex,

Jhandewalan.

1.37 FY 08-09 LT

2491 KY07LA2503 KCC SchemesLoad addition making total 195kW

on HT in f/o Raisena Co.13.28 FY 08-09 HT

2492 KY07LA5554 KCC Schemes

Providing additional load of

141KW making total load of

197KW on LT system of Supply in

F/o M/s IGL LTD

11.52 FY 08-09 HT

2493 KY07NC1519 KCC SchemesNC of 11KW near fire brigade

office, DDA0.15 FY 08-09 LT

2494 KY07NC1532 KCC Schemes

Providing 3phase connection of

11KW each at 4 point on LT in

F/o Executive Engineer(E) PWD

Elect Maint Division M251 MSO

building I.P Estate

3.38 FY 08-09 LT

2495 KY07NC1550 KCC Schemes

Estimate for Providing 1kW

connection on LT system of

supply to 11 no. Police Booth in

East Delhi in F/o ACP/HQ, office

of DCP, east Delhi

1.97 FY 08-09 LT

Page 114: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

2496 KY07NC2528 KCC Schemes

Providing new load of 1800KW

making total 1800KW f/o YMC

Buildmore Pvt. Ltd., Plot No-12,

Laxmi Palace, Vikas Marg, New

Delhi.

49.16 FY 08-09 HT

2497 KY07NC2530 KCC Schemes

Estimate for providing new load of

1600KW on HT systems for M/s

Aggarwal Plaza Pvt Ltd., 278,

Aggarwal City Plaza.

9.72 FY 08-09 HT

2498 KY07NC2543 KCC Schemes

Providing new load of 950 KW HT

System of supply on consumer

request under MLHT Category in

f/o Drug Controller (India), Food &

Drug Administration Bhawan,

CHEB Campus, Opp. Mata

Sundari College, Kotla Road, New

Delhi-110002

11.74 FY 08-09 HT

2499 KY07NC2544 KCC Schemes

  New Load of 600KW on HT in

F/o M/s Rajesh projects (India)

pvt. Ltd.

7.10 FY 08-09 HT

2500 KY07NC2545 KCC Schemes

New Load of 900KW on HT

system of Supply in F/o Principal

Engineering College, geeta Colony

, Krishna Nagar district.

18.55 FY 08-09 HT

2501 KY07NC2551 KCC Schemes

Estimate for providing new load of

95 KW on LT system in AE(E&M)

IV, DJB, Park at Gali No. 6, Prem

Nagar, B.P. Station

4.17 FY 08-09 LT

2502 KY07NC2567 KCC Schemes

Providing New Load of

148KW(125.8KW) on LT system

in f/o SBI Life Insurance Co.Ltd.,

112, Dayanand Road, Darya Ganj.

9.72 FY 08-09 HT

2503 KY07NC5538 KCC Schemes

Estimate For Providing New

Connection On LT In F/O Dy

Director(Hrt) Division , M-224 Pwd

Location Seed Bed Nursery

Gazipur.

1.16 FY 08-09 LT

2504 KY07NC5539 KCC Schemes

Providing New Connection On LT

In F/O Dy. Director(Hort) , Near

Anand Vihar Isbt.

2.28 FY 08-09 LT

2505 KY07NC5559 KCC Schemes

Providing New Load of 5KW On

LT System of Supply In F/O Sdo,

Mtnl, Khajoori Khas, Dlc, Mtnl,

Police Training School,

Wazirabad.

0.28 FY 08-09 LT

2506 KY08LA1021 KCC Schemes

Providing Additional Load of

100KW Making Total Load of

400KW On LT System of Supply

In F/O M/S Igl LTd. Location: Cng

Mega Patparganj Station, I.P

Extension, New Delhi

1.37 FY 08-09 LT

2507 KY08LA2013 KCC Schemes

Estimate of Amalgamation of

Meter 1120/2100/1200(60KW) &

1120001040(40KW) + Providing

Addl. Load of 80KW On LT

System of Supply In F/O Mbd-

Alchemie, Gulab Bhawan, New

Delhi.

0.89 FY 08-09 LT

2508 KY08LA2023 KCC Schemes

Providing Addl. Load 157.55KW

Making Total Load of 198KW

Under MlHT(LT) Category On LT

System of Supply Against Ref. No.

1260/2100/0002 at Cng Filling

Station, Nand Nagri.

6.35 FY 08-09 HT

Page 115: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

2509 KY08LA2026 KCC Schemes

Providing addl. Load of 336.21KW

making total load of 373.21KW

under MLHT category on HT

system of supply against Ref No-

1130/6001/0015 F/o SHO, Police

Station, Kamla Mkt, Ajmari Gate.

8.36 FY 08-09 HT

2510 KY08LA2033 KCC SchemesAddl load 153KW total 198KW f/o

IGL2.46 FY 08-09 HT

2511 KY08LA2034 KCC SchemesAddl. load 153KW total 198KW f/o

IGL2.40 FY 08-09 HT

2512 KY08LA5012 KCC Schemes

Providing Addl. Load of 155KW

Making Total Load of 195KW On

MlHT(LT) Category In F/O Igl, Cng

Filling Station, Nh-24, Khiripur

Delhi.

1.64 FY 08-09 HT

2513 KY08NC1020 KCC Schemes

Providing New Temporary Load of

25KW F/O Chief Fire officer,

Tahirpur.

0.54 FY 08-09 LT

2514 KY08NC1022 KCC Schemes

Estimate For Providing New Load

of 200KW Making Total Load of

200KW On LT System In F/O Idbi

LTd., 11B/8, Gf, Pusa Road, New

Delhi.

3.79 FY 08-09 LT

2515 KY08NC2024 KCC Schemes

Providing New Load of 900KW

Making Total Load As 900KW

Under MlHT Category On HT

System of Supply F/O Oriental

Buildtech(P) LTd., 16/10194,

Gurdwara Road, Karol Bagh.

13.78 FY 08-09 HT

2516 KY08NC2025 KCC Schemes

Providing new load of 433KW

under MLHT category on HT

system in F/o SHO, Police Station,

Rajinder Nagar.

23.04 FY 08-09 HT

2517 KY08NC2031 KCC SchemesHT temp. conn. of 425KW f/o

ITD(BS-7041)4.49 FY 08-09 HT

2518 KY08NC5003 KCC Schemes

Providing New Load of 800KW On

HT System of Supply In F/O

Parsvanath Shahdra Metro Mall.

6.20 FY 08-09 HT

2519 KY08NC5009 KCC Schemes

Providing New Load of 64KW at

Yamuna Bridge of Shantivan,

Geeta Colony.

21.72 FY 08-09 HT

2520 KY08NC5011 KCC Schemes

Providing new load of 120KW

making total load as 120KW in f/o

Rajan Kumar, B-20 & A-21, Guru

Nanak Pura, Laxmi Nagar.

0.52 FY 08-09 LT

2521 LN04FA4542 Laxmi NagarAug of cable from V 10 R Well-

Jagat Ram Park14.47 FY 08-09 HT

2522 LN04LT4527 Laxmi NagarT/O 2 LT feeder from JE EX. LN

AT KISHAN KUNJ4.55 FY 08-09 LT

2523 LN04LT4574 Laxmi Nagar

Taking out 4 No. LT Feedeers

from WB block. Shakapur

(transformer Already

Augmentation)

9.41 FY 08-09 LT

2524 LN04LT4627 Laxmi Nagar

Taking Out 2 No LT Feeder from

Joshi colony Substation to Joshi

colony.

3.86 FY 08-09 LT

2525 LN04LT4744 Laxmi NagarTaking out 3 NO LT Feeder from

P/M Substation at C BLK WVN8.33 FY 08-09 LT

2526 LN04LT4747 Laxmi NagarTaking out 4 N. LT Feeder from

Manglam Hospital.14.52 FY 08-09 LT

2527 LN04LT4751 Laxmi NagarTaking out 6 No. LT Feeder from

E Block West Vinod Nagar.11.69 FY 08-09 LT

2528 LN04RM3596 Laxmi Nagar

Replacement of HT 11 KV 5 P

board with HT 11 KV 350 7 Panel

board 710 One no LT feeders

3.5x300 Augmentation of exiting

Cond. ACSR dog Cond. at

Swasthya Vihar

28.66 FY 08-09 HT

Page 116: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

2529 LN04RM4719 Laxmi NagarProviding RMU Replacement GO

Switch at Railway colony Gali No.27.52 FY 08-09 HT

2530 LN05CV4310 Laxmi NagarCreation of special court at PPG

Ind. Ar1.55 FY 08-09 Others

2531 LN05EL4250 Laxmi NagarElectrification of JJ Cluster

Madhuvan camp,(DIV-LNR)1.11 FY 08-09 LT

2532 LN05FA4023 Laxmi Nagar

Augmentation of 3x300 sq.m.m.

PILCA cable to 3x300 sq.m.m.

XLPE cable from Sadbhawna to

Dharma via Navkala, Deshbandhu,

Dharma Patpar Ganj CGHS

27.13 FY 08-09 HT

2533 LN05JJ4307 Laxmi NagarElectrification of JJ Cluster at

Mazdoor Camp,Laxmi Nagar6.25 FY 08-09 LT

2534 LN05LT4085 Laxmi Nagar

Laying Of 3 Nos, LT Feeders Of

Size Of 3.5*300 Sq MM XLPE

from S/Stn.to H-No G-73,G173,G-

78

5.10 FY 08-09 LT

2535 LN05LT4086 Laxmi Nagar

Laying Of 2 Nos, LT Feeders of

Size Of 3.5*300 Sq MM XLPE

from B-42,B-38 Preet Vihar,B

Block in D-LNR.

2.83 FY 08-09 LT

2536 LN05LT4091 Laxmi NagarLay LT fdr 3.5*300 XLPE frm A

Blk Mandwali2.34 FY 08-09 LT

2537 LN05LT4102 Laxmi Nagar

Laying Of LT Feeder Of Size Of

3.5*300 Sq MM XLPE from

Defence Enclave S/Stn to Pcc

Pole .

1.85 FY 08-09 LT

2538 LN05LT4221 Laxmi NagarReplacement of Feeder Pillar Type-

A in Patpar Ganj26.96 FY 08-09 LT

2539 LN05NF4043 Laxmi Nagar

Provision of one No.HT 11kV,

RMU (Sf6) at H-Block, Laxmi

Nagar.

43.64 FY 08-09 HT

2540 LN05NF4044 Laxmi Nagar

Providing HT 11KV XLPE Cbl of

3CX300 Sq.mm from proposed at

shakarpur

36.55 FY 08-09 HT

2541 LN05RM4173 Laxmi NagarProviding of 11KV,SF-6,RMU

Krishnapuri mandwa4.49 FY 08-09 HT

2542 LN05RM4175 Laxmi NagarProviding of 11KV,SF-6,RMU

Sunder Block4.83 FY 08-09 HT

2543 LN05RM4181 Laxmi NagarProviding of 11KV,SF-6,RMU U

Block Shakarpur4.26 FY 08-09 HT

2544 LN05RM4290 Laxmi Nagar

Installation/Replacement of 4

Panel Board with motorised RMU

with SCADA compatibility at -

Uttri.N.School block.Mandawal

13.53 FY 08-09 HT

2545 LN05UT4116 Laxmi Nagar

Augmentation of 630kVA to 990

kVA Transformer at V Jand K

block sub station T

1.51 FY 08-09 HT

2546 LN05UT4125 Laxmi Nagar

Augmentation From 400 To 630

kVA Pole Mounted Sub Station.

South Ganesh Nagar

2.13 FY 08-09 HT

2547 LN05UT4147 Laxmi Nagar

Augmentation Of Existing 400

Kva Trf to 630 KVA at S/Stn No 2,

CGHS,PPG in D-LNR.

0.61 FY 08-09 HT

2548 LN06AT4169 Laxmi Nagar

Providing 400 KVA additional

transformer at Ek Minar Masjid

S/Stn., LNR

0.82 FY 08-09 HT

2549 LN06AT4170 Laxmi Nagar

Providing 400 KVA additional

transformer at Bank Enclave

S/Stn., LNR

0.91 FY 08-09 HT

2550 LN06FA4112 Laxmi Nagar

Augmentation of 3X150SQMM

PILCA Cbl into 3X300SQMM

XLPE Kundan Nagar to Bank

Enclave via DC Office S/Stn

34.29 FY 08-09 HT

2551 LN06JJ4196 Laxmi NagarElectrification of JJ at D-Blk West

Vinod Nagar, LNR.0.26 FY 08-09 LT

Page 117: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

2552 LN06JJ4308 Laxmi NagarElectrification of JJ Cluster Guru

Angad Nagar,LNR.1.85 FY 08-09 LT

2553 LN06LT4056 Laxmi NagarConversion of LT overhead to LT

ABC at B Block MANDAWALI22.22 FY 08-09 LT

2554 LN06LT4058 Laxmi NagarConversion of LT overhead to LT

ABC at A Block MANDAWALI32.66 FY 08-09 LT

2555 LN06LT4073 Laxmi NagarConversion of LT O/H tO LT AB at

S Ganesh E Block.29.01 FY 08-09 LT

2556 LN06LT4074 Laxmi NagarConversion of LT O/H tO LT AB at

W V N Manglam.27.71 FY 08-09 LT

2557 LN06LT4077 Laxmi Nagar

Conversion of O/H Conductor in

LT AB cable at Chander Vihar

S/Stn. 2.

7.21 FY 08-09 LT

2558 LN06LT4151 Laxmi Nagar

T/O One No. LT Feeder from D-

Park S/Stn. to C-98 Pandav

Nagar.

3.91 FY 08-09 LT

2559 LN06LT4186 Laxmi Nagar

Conversion of O/H Conductor in

LTAB Cable at Kundan Nagar,

LNR

9.71 FY 08-09 LT

2560 LN06LT4187 Laxmi Nagar

Conversion of O/H Conductor in

LTAB Cable at Dayanand Block,

LNR

11.55 FY 08-09 LT

2561 LN06LT4188 Laxmi Nagar

Conversion of O/H Conductor in

LTAB Cable at Veer Savarkar

Block, LNR

11.10 FY 08-09 LT

2562 LN06LT4189 Laxmi NagarConversion of O/H Conductor in

LTAB Cable at Tikona Park, LNR24.56 FY 08-09 LT

2563 LN06LT4190 Laxmi NagarConversion of O/H Conductor in

LTAB Cable at Mohan Park, LNR15.37 FY 08-09 LT

2564 LN06LT4191 Laxmi Nagar

Conversion of O/H Conductor in

LTAB Cable at West Guru Angad

Nagar, LNR

11.56 FY 08-09 LT

2565 LN06LT4192 Laxmi Nagar

Conversion of O/H Conductor in

LTAB Cable at Sr. Sec. School,

LNR

9.05 FY 08-09 LT

2566 LN06LT4193 Laxmi Nagar

Conversion of O/H Conductor in

LTAB Cable at old Complaint

Center, LNR

21.62 FY 08-09 LT

2567 LN06LT4194 Laxmi NagarConversion of O/H Conductor in

LTAB Cable at Lalita Park, LNR17.45 FY 08-09 LT

2568 LN06LT4196 Laxmi NagarConversion of O/H Conductor in

LTAB Cable at J&K block, LNR13.45 FY 08-09 LT

2569 LN06LT4197 Laxmi Nagar

Conversion of O/H Conductor in

LTAB Cable at Ramesh Park Gali

No. 12, LNR

15.64 FY 08-09 LT

2570 LN06LT4198 Laxmi Nagar

Conversion of O/H Conductor in

LTAB Cable at Jagat Ram Park,

LNR

33.83 FY 08-09 LT

2571 LN06LT4199 Laxmi Nagar

Conversion of O/H Conductor in

LTAB Cable at Guru Ram Dass

Nagar, LNR

19.44 FY 08-09 LT

2572 LN06LT4201 Laxmi Nagar

Conversion of O/H Conductor in

LTAB Cable at Kishan kunj Kiosk,

LNR

21.56 FY 08-09 LT

2573 LN06LT4204 Laxmi Nagar

Conversion of O/H Conductor in

LTAB Cable at D-Block West

Vinod Nagar, LNR

22.33 FY 08-09 LT

2574 LN06LT4205 Laxmi Nagar

Conversion of O/H Conductor in

LTAB Cable at Mandawali near

Mayur School Nagar, LNR

16.15 FY 08-09 LT

2575 LN06LT4207 Laxmi NagarConversion of O/H Conductor in

LTAB Cable at Madhu Vihar, LNR33.84 FY 08-09 LT

2576 LN06RM4150 Laxmi Nagar

Replacement Of 9 Panel Board

With Rmu‘S at Old Complaint

Center Lnr.

16.93 FY 08-09 HT

2577 LN06RM4158 Laxmi Nagar Replacement Of 7 Panel Board at

Urja Vihar S/Stn.13.03 FY 08-09 HT

Page 118: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

2578 LN06RM4159 Laxmi Nagar

Replacement Of 4 Panel Board

With 5 Boards at Shiv Mandir

Marg, A-Block Mandawali S/Stn

10.84 FY 08-09 HT

2579 LN06RM4209 Laxmi NagarReplacement of 7 Panel Board at

Tata Telco No. 3 S/Stn12.85 FY 08-09 HT

2580 LN06SH1241 Laxmi Nagar

Shifting of electric services due to

construction of Master Plan Road

over discussed canal in East Delhi

from Karkari More to Marginal

Bundh Road. – Estimate for

shifting of 11KV HT U/G cables

near Karkari More Crossing

6.00 FY 08-09 HT

2581 LN07EL2501 Laxmi NagarElectrification of LSC near Prince

Kothari CGHS patparganj..29.55 FY 08-09 HT

2582 LN07EL4504 Laxmi NagarElectrification of JJ Cluster at

Chitra Vihar Division-Laxmi Nagar.3.89 FY 08-09 LT

2583 LN07LT4505 Laxmi Nagar

Conversion of O/H conductor / HT-

AB cable into LT-AB cable at Joshi

Colony, Maniacal in LNR Div

36.26 FY 08-09 LT

2584 LN07LT4522 Laxmi Nagar

Laying Of One No. LT Feeder Of

Size 3.5X300Sqmm From

Priyadarshini Vihar To Pole Near

Park In Div. Lnr.

3.62 FY 08-09 LT

2585 LN07LT4561 Laxmi Nagar

Laying of one No. LT feeder of

size 3.5x300sqmm XLPE Cable

from Defence Enclave S/Stn. to

H.No.96 (Back Side), Pole,

Defence Enclave in Div. LNR.

2.99 FY 08-09 LT

2586 LN07RM4536 Laxmi Nagar

Installation / Replacement of 3-

Way outdoor RMU at Mangal

Bazar S/Stn. Div. LNR

4.30 FY 08-09 HT

2587 LN07SH1652 Laxmi Nagar

Shifting of electric services due to

construction of road over disused

canal ---Shifting of Preet Vihar

Grid-preet vihar feeder near G-13

Preet Vihar (old Jagdish Store

Building)

2.20 FY 08-09 HT

2588 LN07SH1657 Laxmi Nagar

Shifting of electric Services/Poles

at Truck Market, Mangal pandey

Marg (Near Narvana Road) D-

LNR

1.04 FY 08-09 HT

2589 LN07SH1659 Laxmi Nagar

Shifting of HT 11KV U/G cable

3x300sqmm at Balaji Medical &

Diagnostic Research Centre

5.42 FY 08-09 HT

2590 LN07SH1660 Laxmi Nagar

Shifting of Feeder pillar in front of

plot no. 332, PPG Industrial

AREA D-LNR

0.06 FY 08-09 LT

2591 LN07SH1661 Laxmi Nagar

Shifting of PCC Pole in front of

plot no. 1, Gali No. 2 West Guru

Angad Nagar,laxmi Nagar D-LNR

0.08 FY 08-09 LT

2592 LN07SL1656 Laxmi Nagar

Installation of 16 Mtrs. High Mast

Lighting System Opposite Navkala

Apartment CGHS Patparganj,

Delhi

1.88 FY 08-09 LT

2593 LN07UT4519 Laxmi Nagar

Augmentation of transformer

630kVA to 990kVA at Jagat Ram

Park

0.30 FY 08-09 HT

2594 LN08EL4020 Laxmi Nagar

Electrification of Nehru Camp JJ

cluster Truck Market along NH-24

in LNR Div

5.47 FY 08-09 LT

2595 LN08FA4055 Laxmi Nagar

Augmentation of 11kV 3*300MM2

PILCA Cable to 3*300MM2 Cable

from A-Blk Mandawali to B-Blk

Mandawaali in Nr Div.

6.96 FY 08-09 HT

Page 119: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

2596 LN08LT4007 Laxmi Nagar

Aug Of LT Cable 3.5X95Mm2 To

3.5X150Mm2 Cable From Fdr

Pillar Nearh,No.A-88Viaa-93,A-

96,A-98,A102,A109,A-88 P.D

Vihar In Div. Lnr.

2.77 FY 08-09 LT

2597 LN08LT4008 Laxmi Nagar

Aug.Of LT Cable Size 3.5X95

Mm2 To 3.5X150 Xlpe Cable

From P.D Vihar Club Fdr Pillar

No.1 To H.No.B-168,F.Pillar

No.6& Fdr 1 T182.

1.31 FY 08-09 LT

2598 LN08LT4009 Laxmi Nagar

Aug Of LT Cable Size 3.5X95Mm2

To 3.5X150Mm2 Via Fdr Pillar

H.No.A-53,A-15,A-22,A-25,A-98,A-

131,A-135,A-139,A-146 P.D Vihar

Lnr

3.27 FY 08-09 LT

2599 LN08LT4011 Laxmi Nagar

Laying of LT Fdr 4X300 MM2

XLPE Cable from Lalita Park

Kiosk S/S to Pole Near H.No.H-73

Lalita Park

1.18 FY 08-09 LT

2600 LN08LT4013 Laxmi Nagar

Laying of 2 Nos. LT Feeder

4X300MM2 XLPE Cable from Ek

Minar Masjid 990KVA Tr. to Near

H.Nao.6/280 Lalita P.& Another

Cable gali No.11

4.67 FY 08-09 LT

2601 LN08LT4014 Laxmi Nagar

Laying of one no. LT Fdr 4X300

XLPE cable from Guru Ram Dass

Ngr 990KVA Tr. to H.No.34A

Guru Ram Dass Ngr

2.33 FY 08-09 LT

2602 LN08LT4016 Laxmi Nagar

Laying Of 1-No. LT Feeder Of

Size 4X300Sqmm From U-Blk

Vikas Marg Ss To H.No.U-157

Shakarpur In Div. Lnr.

0.64 FY 08-09 LT

2603 LN08LT4132 Laxmi Nagar

Laying Of 4 Nos LT Fdrs On Dtr

To Be Augumented Against

Scheme LN08UT4074 at Sunder

Blk S/Stn.

8.43 FY 08-09 LT

2604 LN08LT4134 Laxmi Nagar

Laying of 2 Nos LT fdrs from DT

to augmented against Scheme

LN08UT4077 at West Guru

Angad Nagar S/St

3.44 FY 08-09 LT

2605 LN08LT4219 Laxmi Nagar

Laying Of 1 No LT Feeder

3.5X300 Sqmm From G-1 S/Stn

To F-26 Preet Vihar To Provide

New Connection For Ing Vyasa

Bank.

4.51 FY 08-09 LT

2606 LN08MS4203 Laxmi NagarReplacement of LT Panel Board

in I P Extn (Zone 2503)104.11 FY 08-09 LT

2607 LN08NF4082 Laxmi Nagar

Laying of New HT Feeder

Shakarpur Chhungi to DDA Park

Shakarpur provinding the Second

Source

6.76 FY 08-09 HT

2608 LN08RM3114 Laxmi Nagar

Replacement of damaged Panels

at S/S No.4, CGHS I.P. Extn. 1St

SW Stn With 1X4Way RMU

5.75 FY 08-09 HT

2609 LN08RM4031 Laxmi Nagar

Replacement of 1X3 & 1X4 panel

Board at S/Stn. SFS Gazipur in

Div LNR

8.56 FY 08-09 HT

2610 LN08RM4034 Laxmi Nagar

Replacement of damaged 4 PB at

E Blk GNPN Complex With 2X4

Way RMU ( 1st switching Stn)

11.43 FY 08-09 HT

2611 LN08RM4035 Laxmi Nagar

Replacement of damaged 4 PB at

C Bl. GNPN Complex With 2X4

Way RMU

11.74 FY 08-09 HT

2612 LN08RM4047 Laxmi Nagar

Replacement of damaged panels

at S/S No.3 CGHS I.P. Extn. 1st

SW Stn. With 1X3Way RMU

4.06 FY 08-09 HT

Page 120: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

2613 LN08RM4048 Laxmi Nagar

Replacement of damaged panels

at S/S No.6 CGHS I.P.Ext 1st SW

Stn With 1X4Way RMU

5.61 FY 08-09 HT

2614 LN08RM4049 Laxmi Nagar

Replacement of damaged panels

at S/S No.7 CGHS I.P.Ext 1st SW

Stn With 1X4 Way RMU

5.76 FY 08-09 HT

2615 LN08RM4052 Laxmi Nagar

RMU.1 St Sw. Stn.inst 4Way

RMU I/D at D Park Pandav Ngr

With Existing 1X4Way+2X1Way

RMU.1St Sw. Stn.

5.89 FY 08-09 HT

2616 LN08RM4057 Laxmi NagarRep.of dmg pnls at police qtr

Shakarpur12.01 FY 08-09 HT

2617 LN08RM4059 Laxmi Nagar

Replacement of damaged 7Panel

board at Kishan Kunj Kiosk With

2X4Way+1X1Way RMU

14.19 FY 08-09 HT

2618 LN08RM4061 Laxmi NagarReplacement Of 7Panel Board

Rmu At Old Madhuban In Lnr Div.14.74 FY 08-09 HT

2619 LN08RM4065 Laxmi Nagar

Replacement of damaged panel at

S/S 22 FIE PPG With 1X4 Way

RMU

5.63 FY 08-09 HT

2620 LN08RM4069 Laxmi Nagar

Akshardham Templerep. Of Dmgd

4 Pb at Renny Well No.9 With

1X4 Way Rmu(Alt. Fed

Toakshardham Temple.

5.83 FY 08-09 HT

2621 LN08RM4071 Laxmi Nagar

Replacement of damaged RMU at

SDM office LNR With 1X3 Way

RMU.

3.80 FY 08-09 HT

2622 LN08RM4072 Laxmi Nagar

Inst 4Way Rmu O/D At

Kishankunj P-Ii To Replace

Existing D.P.

6.64 FY 08-09 HT

2623 LN08RM4085 Laxmi Nagar

Replacement of damaged panels

at Dharma CGHS I.P.Ext With

1X4 Way RMU.

5.58 FY 08-09 HT

2624 LN08RM4086 Laxmi Nagar

Replacement of damaged 4 panel

board at Konark CGHS IP Extn.

with 1X4Way RMU

5.76 FY 08-09 HT

2625 LN08RM4097 Laxmi Nagar

Replacement of 2*4 Way RMU at

Dist Centre -1, Preet Vihar in Div.

LNR

11.09 FY 08-09 HT

2626 LN08RM4102 Laxmi Nagar

Replacement of damaged 4 panel

board at Ghai Pal Preet Vihar With

1X4Way+1X1Way RMU

9.17 FY 08-09 HT

2627 LN08RM4105 Laxmi Nagar

Replacementof damaged 4 panel

board at S/S2 Saraswati Kunj

CGHS With 1X4Way+1X1Way

RMU

9.07 FY 08-09 HT

2628 LN08RM4115 Laxmi Nagar

Replacement of damaged panel

board at Chetna CGHS I.P. Ext.

1st Sw Stn With

1X4Way+1X1Way RMU

8.71 FY 08-09 HT

2629 LN08RM4261 Laxmi Nagar

Replacement of Old damaged 4

panel board at Arya Ngr CGHS

S/S 3 With 1X4 Way RMU

5.82 FY 08-09 HT

2630 LN08RM4262 Laxmi Nagar

Replacement of Old damaged 4

panel board at Jailaxmi CGHS S/S

With 1X4 Way RMU

5.62 FY 08-09 HT

2631 LN08RM4263 Laxmi Nagar

Replacement of Old damaged 4

panel board at Vijai Laxmi CGHS

S/S With 1X4 Way RMU

5.77 FY 08-09 HT

2632 LN08RM4264 Laxmi Nagar

Replacement of Old damaged 4

panel board at Kalol CGHS S/S

With 1X4 Way RMU

6.28 FY 08-09 HT

2633 LN08RM4266 Laxmi Nagar

Replacement of damaged 4 panel

board at Kailash CGHS S/S With

1X4 Way RMU

5.55 FY 08-09 HT

Page 121: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

2634 LN08RM4270 Laxmi Nagar

Replacement of Old damaged 4

panel board at Amarapali D/Dtn

No 2 CGHS With 1X4 Way RMU

5.55 FY 08-09 HT

2635 LN08RM4273 Laxmi Nagar

Replacement of Old damaged 4

panel board at Parasawanath

CGHS S/S With 1X4 Way RMU

6.34 FY 08-09 HT

2636 LN08RM4274 Laxmi Nagar

Replacement of Old damaged 4

panel board at Sidh CGHS S/S

With 1X4 Way RMU

5.94 FY 08-09 HT

2637 LN08RM4276 Laxmi Nagar

Replacement of Old damaged 4

panel board at Vidyut Nikunj

CGHS S/S With 1X4 Way RMU

5.85 FY 08-09 HT

2638 LN08SH1330 Laxmi Nagar

Shifting of electric Services due to

Construction of Metro Station at

ISBT Anand Vihar D-LNR

6.66 FY 08-09 HT

2639 LN08SS4312 Laxmi Nagar

Establishment Of New S/St at

Budha Marg 630 Kva Plinth

Mounted.

37.14 FY 08-09 HT

2640 M305RM4053 Mayur Vihar Ph-3 Replacement of 4 panel board at

substation E-1 N Ashok Nagar7.78 FY 08-09 HT

2641 M305RM4101 Mayur Vihar Ph-3

Installation / Replacement of 3

Panel board with motorized RMU

with SCADA Compatibility at D-

Block Harijan Basti.

4.58 FY 08-09 HT

2642 M305UT4032 Mayur Vihar Ph-3 Augmentation of 630-990kVA trf.

at Gharoli Village S/Stn1.04 FY 08-09 HT

2643 M306EL2508 Mayur Vihar Ph-3

Electrification work MAHESH

CGHS VASUNDHRA HT

substation

37.51 FY 08-09 HT

2644 M306EL2517 Mayur Vihar Ph-3 Electrification LSC B 1 DDA

MVR33.10 FY 08-09 HT

2645 M306FA4566 Mayur Vihar Ph-3

Aug of 11 KV Pilca Cable of size 3

x 300 sq mm from S/s A 12 to S/s

A 1 via S/s no 2 Pkt A 1 MVR PH

3 IN DIVISION MVR-3

21.24 FY 08-09 HT

2646 M306FA4570 Mayur Vihar Ph-3

Augmentation of 11 KV Pilca 3 x

300 sq mm into 3 x 300 sq mm

from S/S no 7 East End Apt to S/S

no 9 East End Apt via S/S no 8 to

S/S no 10 East End Apt. in

DIVISION MVR-3

10.71 FY 08-09 HT

2647 M306FA4572 Mayur Vihar Ph-3

Augmentation of 11 KV XLPE 3 x

300 sq mm cable from E 1 New

Ashok Nagar Sub Stn to E 2 New

Ashok Nagar Sub Stn in DIVISION

MVR-3

8.72 FY 08-09 HT

2648 M306LT4522 Mayur Vihar Ph-3 LTMP Scheme of C block Mulla

Colony Gharoli Extension.34.95 FY 08-09 LT

2649 M306RM4513 Mayur Vihar Ph-3 Installation of 4 Way at Abhiyanta

Appt.7.75 FY 08-09 HT

2650 M306RM4514 Mayur Vihar Ph-3 Installation of 4 Way at MOD

Appt.7.60 FY 08-09 HT

2651 M306RM4546 Mayur Vihar Ph-3

Providing new 3 way RMU at Sub

Stn B 1 Block New Ashok Nagar

in DIVISION MVR-3

3.97 FY 08-09 HT

2652 M306RM4547 Mayur Vihar Ph-3

Providing new 3 way RMU at Sub

Stn D Block New Ashok Nagar in

DIVISION MVR-3

4.16 FY 08-09 HT

2653 M306RM4548 Mayur Vihar Ph-3

Providing new 3 way RMU at Sub

Stn B 2 Block New Ashok Nagar

in Division MVR-3

4.07 FY 08-09 HT

2654 M306RM4550 Mayur Vihar Ph-3

Providing new 4 way RMU at Sub

Stn C 4 New Ashok Nagar in

Division MVR-3

6.69 FY 08-09 HT

2655 M306RM4553 Mayur Vihar Ph-3

Providing new 4 way RMU at Sub

Stn A Block loop New Ashok

Nagar in DIVISION MVR-3

6.47 FY 08-09 HT

Page 122: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

2656 M306UT4555 Mayur Vihar Ph-3

Augmentation of 400 KVA Trans.

To 630 KVA Trans. at D block

Harizan Basti Shankwar Hospital

Vill Kondli in DIVISION MVR - 3

0.80 FY 08-09 HT

2657 M306UT4557 Mayur Vihar Ph-3

Augmentation of 400 KVA Trans.

To 630 KVA Trans. at Harizan

Basti Village Dallupura in Div MVR

- 3

0.80 FY 08-09 HT

2658 M306UT4560 Mayur Vihar Ph-3

Augmentation of 400 KVA Trans.

To 630 KVA Trans. at C block

New Kondli in Div MVR-3

0.80 FY 08-09 HT

2659 M307AT4005 Mayur Vihar Ph-3

Provision of additional

Transformer of 400KVA at D Blk

New Kondli

1.46 FY 08-09 HT

2660 M307AT4006 Mayur Vihar Ph-3

Provision Of Additional.

Transformer of 400KVA at SS No-

5,Pkt A2, MVR Ph-3

1.45 FY 08-09 HT

2661 M307AT4007 Mayur Vihar Ph-3

Provision of Additional Tr of

400KVA at S/S No-3,Pkt B7 MVR

Ph-3

1.45 FY 08-09 HT

2662 M307AT4008 Mayur Vihar Ph-3

Provision Of Additional

Transformer of 400Kva at Ss No-

4, Pkt B8 MVR Ph-3

1.41 FY 08-09 HT

2663 M307AT4010 Mayur Vihar Ph-3

Provision of Additional

Transformer of 400Kva at SS No-

7, Pkt A3,MVR Ph-3

1.46 FY 08-09 HT

2664 M307AT4011 Mayur Vihar Ph-3

Provision of Additional

Transformer Of 400Kva at Ss No-

3,Gharoli Dairy Farm

1.46 FY 08-09 HT

2665 M307AT4012 Mayur Vihar Ph-3

Provision Of Additional

Transformer Of 400Kva at SS No-

4,Gharoli Dairy Farm

1.41 FY 08-09 HT

2666 M307AT4071 Mayur Vihar Ph-3

Provision Of Add. Transformer Of

400Kva at SS No-1 Vasundhra

Enclave Mayur Vihar Ph-3

1.28 FY 08-09 HT

2667 M307EL1047 Mayur Vihar Ph-3

Electrification of Plot no. 4 of M/S

Babushka Pomotors Pvt Ltd. in

LSC Sector G Kondli Gharoli 0.17 FY 08-09 LT

2668 M307FP4004 Mayur Vihar Ph-3

Replacement Of Old Faulty Feeder

Pillars in New Ashok Nagar

Division MVR - III

8.99 FY 08-09 LT

2669 M307RM4028 Mayur Vihar Ph-3

Replacement Of 11Kv 4 Way

Panel Board at S.Stn-C New

Kondli.

5.72 FY 08-09 HT

2670 M307RM4033 Mayur Vihar Ph-3

Replacement Of 11Kv 4 Way

Panel Board at S.Stn-9 Mix

Housing Mvr-3.

6.33 FY 08-09 HT

2671 M307RM4035 Mayur Vihar Ph-3

Replacement Of 11Kv 4 Way

Panel Board at S.Stn-5 Vse Mvr

Ph-3.

6.32 FY 08-09 HT

2672 M307RM4038 Mayur Vihar Ph-3

Replacement of 11KV 4 Way

Panel Board at S.STN-8 PKT A3

MVR PH-3

13.09 FY 08-09 HT

2673 M307RM4040 Mayur Vihar Ph-3

Replacement Of 11Kv 4 Way

Panel Board at S.Stn-7 Mix

Housing Mvr Ph-3.

11.37 FY 08-09 HT

2674 M307RM4041 Mayur Vihar Ph-3

Replacement Of 11Kv 4 Way

Panel Board at S.Stn-New Delhi,

Mvr Ph-3.

6.09 FY 08-09 HT

2675 M307RM4042 Mayur Vihar Ph-3

Replacement of 11kV 4 Way

Panel Board at S.Stn-Naval CGHS

MVR Ph-3

6.04 FY 08-09 HT

2676 M307RM4043 Mayur Vihar Ph-3

Replacement of 11kV 4 Way

Panel Board at S.Stn- Over Seas

CGHS VSE MVR Ph-3

5.54 FY 08-09 HT

Page 123: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

2677 M307RM4044 Mayur Vihar Ph-3

Replacement Iacement of 11kV 4

Way Panel Board at S.Stn- Illa

CGHS MVR Ph-3

5.58 FY 08-09 HT

2678 M307RM4045 Mayur Vihar Ph-3

Replacement of 11kV 4 Way

Panel Board at S.Stn-Shanti Doot

CGHS MVR Ph-3

5.58 FY 08-09 HT

2679 M308LT4005 Mayur Vihar Ph-3

T.O 2 Nos LT fdr from

augmentation Tr.at D Blk Harijan

Basti Kondli

4.38 FY 08-09 LT

2680 M308LT4008 Mayur Vihar Ph-3 T.O 3 Nos.LT fdr from S.Stn-3

Pkt-B7 MVR-33.63 FY 08-09 LT

2681 M308LT4011 Mayur Vihar Ph-3 T.O. 3 Nos LT Fdrs Froms/Stn No

3 Gharoli Dairy Farm.7.05 FY 08-09 LT

2682 M308LT4014 Mayur Vihar Ph-3 T.O 2 Nos.LT fdr from S.Stn

Mulla Colony4.77 FY 08-09 LT

2683 M308LT4015 Mayur Vihar Ph-3 T.O 2 Nos.LT fdr from S.S

Rajveer Colony5.36 FY 08-09 LT

2684 M308LT4017 Mayur Vihar Ph-3 T.O 3 Nos.LT Fdr from D Blk N.

Ashok Ngr4.08 FY 08-09 LT

2685 M308LT4066 Mayur Vihar Ph-3 Replacement of LT Panel at S/S

No 2 Mix Housing MVR-36.53 FY 08-09 LT

2686 M308LT4068 Mayur Vihar Ph-3 Replacement of LT Panel at S/S

No 3 Mix Housing MVR-36.53 FY 08-09 LT

2687 M308LT4069 Mayur Vihar Ph-3 Replacement of LT Panel at S/S

No 4 Mix Housing MVR-36.54 FY 08-09 LT

2688 M308LT4079 Mayur Vihar Ph-3

Conversion of O/H Conductor to

LT AB Cable at Pkt A1 to A3,B1 to

B8,D1-D2,Janta Flats and Kondli

MVR III

56.60 FY 08-09 LT

2689 M308RM4027 Mayur Vihar Ph-3 Replacement of HT 6Way Panel at

S.Stn-9 Vasundhra Enclave5.44 FY 08-09 HT

2690 M308RM4029 Mayur Vihar Ph-3 Replacement OF HT 4 Way Panel

at S.Stn-8 East End Apartments.5.47 FY 08-09 HT

2691 MV04EL2729Mayur Vihar Ph-

1&2

Electrification of Service Centre

No 2 and Facility Centre No 26 at

Village Dallupura.

154.30 FY 08-09 LT

2692 MV04NF4508Mayur Vihar Ph-

1&2

Providing of second source to

acharya niketan from Mayur Vihar

grid 1 and installation of single

panel.

39.74 FY 08-09 HT

2693 MV04RM4684Mayur Vihar Ph-

1&2

Providing11 KV RMU at DP NO 6

NH 245.01 FY 08-09 HT

2694 MV04RM4702Mayur Vihar Ph-

1&2

Providing 11 KV RMU at Chilla

Village SS NO. 14.49 FY 08-09 HT

2695 MV04RM4703Mayur Vihar Ph-

1&2

Providing 11 KV RMU at Chilla

Village SS NO. 24.54 FY 08-09 HT

2696 MV04RM4711Mayur Vihar Ph-

1&2

Providing 11 KV RMU at Kondli

Village.0.28 FY 08-09 HT

2697 MV04RM4748Mayur Vihar Ph-

1&2

Providing 3 WAY RMU at E Block

East vinod nagar4.39 FY 08-09 HT

2698 MV04RM4751Mayur Vihar Ph-

1&2

Providing 4 WAY RMU at CNG

Petrol Pump Kharpur.4.40 FY 08-09 HT

2699 MV04RM4752Mayur Vihar Ph-

1&2

Providing 4 WAY RMU at New

khichripur colony 10 Block4.28 FY 08-09 HT

2700 MV04SH2593Mayur Vihar Ph-

1&2

Shifting of 100KVA distribution

transformer at gazipue chowk.1.00 FY 08-09 HT

2701 MV04UT4570Mayur Vihar Ph-

1&2

Augmentation of 400KVA

transformer to 630KVA at sub

station 1, C-2 block. Kondli.

0.21 FY 08-09 HT

2702 MV04UT4573Mayur Vihar Ph-

1&2

Augmentation of 400KVA

transformer to 630KVA at 31 block

trilokpuri.

0.20 FY 08-09 HT

2703 MV04UT4574Mayur Vihar Ph-

1&2

Augmentation of 400KVA

transformer to 630KVA at sub

station No 2 Mayur Vihar I CGHS

5.01 FY 08-09 HT

2704 MV04UT4579Mayur Vihar Ph-

1&2

Augmentation of 630KVA

transformer to 990KVA at 15 block

Kalyanpuri.

6.85 FY 08-09 HT

Page 124: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

2705 MV05FA4005Mayur Vihar Ph-

1&2

Replacement of HT Cable from

MVR-II Grid to S/Stn No-3, Feeder

No-I (Part Portion Under Bridge)

15.59 FY 08-09 HT

2706 MV05FA4015Mayur Vihar Ph-

1&2

Augmentation of 3X150 PILCA

Cbl with 3X300 XLPE from S/Stn

Pkt-II to 48 Work Centre

3.98 FY 08-09 HT

2707 MV05FA4023Mayur Vihar Ph-

1&2

Augmentation of 3x150 PILCA

Cable with 3x300 XLPE from ARC

Mayur Vihar to Old Wire Less

7.39 FY 08-09 HT

2708 MV05JJ4177Mayur Vihar Ph-

1&2

Electrification of JJ Cluster at

Harijan Camp Block-

31,EXT./32,Triolpkpuri, Mayur

Vihar

1.10 FY 08-09 LT

2709 MV05LT4086Mayur Vihar Ph-

1&2

Taking out 1NO LT Feder Adarsh

Mohalla.1.17 FY 08-09 LT

2710 MV05LT4088Mayur Vihar Ph-

1&2

T/O 2 Nos LT Feeder at 630Kva at

31 Trilokpuri.0.89 FY 08-09 LT

2711 MV05RM4143Mayur Vihar Ph-

1&2

Replacement of HT 11 Panel at

Switching Station Sub station No.

8, pocket -1 Mayur Vihar - I

33.57 FY 08-09 HT

2712 MV05RM4145Mayur Vihar Ph-

1&2

Replacement of 5 Panel Board at

S/S -1 MVR-I12.74 FY 08-09 HT

2713 MV05RM4167Mayur Vihar Ph-

1&2

Replacement of RMU at M-16

Renny well Phase-2,Mayur Vihar 0.26 FY 08-09 HT

2714 MV05UT4116Mayur Vihar Ph-

1&2

Augmentation of 400-990 kVA

Transformer at Mat Market.0.30 FY 08-09 HT

2715 MV05UT4124Mayur Vihar Ph-

1&2

Augmentation of 400-630 kVA

Transformer at Acharya Niketan.1.48 FY 08-09 HT

2716 MV06FA4091Mayur Vihar Ph-

1&2

Laying of New 11KV HT

3x300SQMM XLPE Cable from J

block East Vinod nagar to LSC III

near Walia Hospital. Mayur Vihar.

13.87 FY 08-09 HT

2717 MV06FA4104Mayur Vihar Ph-

1&2

Replacement of 11KV HT

3x300SQMM PILCA Sick cable

from S/STN 6C to S/STN 1A (Via-

S/STN 5B,LSC3,LSC1,4B,LSC2)

in MVR Ph-2.

19.53 FY 08-09 HT

2718 MV06JJ4197Mayur Vihar Ph-

1&2

Electrification of JJ at 8-Block

Khichdipur Mayur Vihar.5.12 FY 08-09 LT

2719 MV06LT4014Mayur Vihar Ph-

1&2

Conversion of LT OH to LT AB at

8 extra Block Trilok Puri in Div. -

MVR

6.11 FY 08-09 LT

2720 MV06LT4029Mayur Vihar Ph-

1&2

Conversion of LT OH to LT AB at

2 Block Trilok Puri in Div. - MVR22.05 FY 08-09 LT

2721 MV06LT4090Mayur Vihar Ph-

1&2

Replacement of LT 3.5x300 mm2

XLPE sick cable from 17 Block to

21 Block Kalyanpuri.

3.39 FY 08-09 LT

2722 MV06LT4095Mayur Vihar Ph-

1&2

Replacement of LT 3.3x300

SQMM XLPE SICK CABLE from

S/STN. NO 5 Trilok Puri to 4/30

Trilok Puri

1.16 FY 08-09 LT

2723 MV06LT4096Mayur Vihar Ph-

1&2

Replacement of LT 3.3x300

SQMM XLPE sick cable from

S/STN. NO 5 Trilok Puri to 3/ 23

Trilok Puri

2.43 FY 08-09 LT

2724 MV06LT4097Mayur Vihar Ph-

1&2

Replacement of LT 3.3x300

SQMM XLPE Sick cable from

S/STN. NO 5 Trilok Puri to 5/ 29 &

30 Trilok Puri

11.88 FY 08-09 LT

2725 MV06LT4133Mayur Vihar Ph-

1&2

Conversion O/H Conductor into

AB Cable at DDA Gazipur.20.06 FY 08-09 LT

Page 125: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

2726 MV06LT4135Mayur Vihar Ph-

1&2

Conversion of O/H conductor into

AB Cable at East Vinod Nagar.38.95 FY 08-09 LT

2727 MV06RM4008Mayur Vihar Ph-

1&2

Installation of 4+1 Way at 8-Blk,

Extra. Trilokpuri7.10 FY 08-09 HT

2728 MV06RM4083Mayur Vihar Ph-

1&2

Replacement Of 11Kv 4 Way

Panel Board at S/Stn. Noii

(CGHS) Mvr.

6.17 FY 08-09 HT

2729 MV06RM4085Mayur Vihar Ph-

1&2

Replacement Of 11Kv 4 Way

Panel Board at Rosewood S/Stn.

Mvr.

5.95 FY 08-09 HT

2730 MV06RM4086Mayur Vihar Ph-

1&2

Replacement Of 11Kv 2X 4 Way

Panel Board at Dronacharya

S/Stn. No I & Ii Mvr.

12.05 FY 08-09 HT

2731 MV06RM4101Mayur Vihar Ph-

1&2

Replacement of 11KV 3 Way

Panel Board by 4 Way Panel

Board at 7 Block Trilok Puri S/STN

6.52 FY 08-09 HT

2732 MV06RM4103Mayur Vihar Ph-

1&2

Replacement of 11KV 4 Way

Panel Board at S/STN. NO 4 ,

PKT B , MVR PH-2

7.02 FY 08-09 HT

2733 MV06RM4107Mayur Vihar Ph-

1&2

Replacement of 11KV 4 Way

Panel Board at KHICHRI PUR

VILLAGE

7.41 FY 08-09 HT

2734 MV06RM4110Mayur Vihar Ph-

1&2

Replacement of 11KV 4 Way

Panel Board at 27 BLOCK

TRILOK PURI.

7.09 FY 08-09 HT

2735 MV06RM4111Mayur Vihar Ph-

1&2

   Installation of 11KV RMU

(3Way+1Way) O/D at 23 Block

Trilok Puri

7.63 FY 08-09 HT

2736 MV06RM4146Mayur Vihar Ph-

1&2

Replacement of 5 Panel Board at

S/S 2 MVR-111.69 FY 08-09 HT

2737 MV06RM4147Mayur Vihar Ph-

1&2

Replacement of 7 Panel Board at

S/S NO-3 MVR-119.33 FY 08-09 HT

2738 MV06RM4187Mayur Vihar Ph-

1&2

Installation. of 7 panel RMU at

Police Substation15.30 FY 08-09 HT

2739 MV06RM4189Mayur Vihar Ph-

1&2

Installation. of 3 panel bord at 19

Blk7.66 FY 08-09 HT

2740 MV06RM4732Mayur Vihar Ph-

1&2

Replacement of 7 Panel Board at

Kalyan Vas Substation.19.44 FY 08-09 HT

2741 MV07AT4508Mayur Vihar Ph-

1&2

Provision Of Add. Tr Of 400Kva At

2 Blk Trilok Puri2.28 FY 08-09 HT

2742 MV07AT4573Mayur Vihar Ph-

1&2

Provision Of Add. Tr Of 400Kva

at G Blk East Vinod Nagar2.10 FY 08-09 HT

2743 MV07AT4574Mayur Vihar Ph-

1&2

Provision Of Add. Tr Of 400Kva

at Ss 6, Pkt-3,Mvr-12.02 FY 08-09 HT

2744 MV07AT4575Mayur Vihar Ph-

1&2

Provision Of Pole Mounted.

Transformer Of 400Kva at

Acharya Niketan

1.11 FY 08-09 HT

2745 MV07EL2590Mayur Vihar Ph-

1&2

Electrification of Plot No. 4 in LSC

west of Tirlok Puri, Mayur Vihar

Ph.I.

0.16 FY 08-09 LT

2746 MV07LT1584Mayur Vihar Ph-

1&2

Shifting Of LT Pole At Rishabh

Public School Pkt-4 Mvr Ph-1.0.07 FY 08-09 LT

2747 MV07LT4576Mayur Vihar Ph-

1&2

T/O of 3 Nos LT Feeders 3.5x300

SQMM XLPE Cable from S/STN.

Acharya Niketan main Road.

8.15 FY 08-09 LT

2748 MV07LT4577Mayur Vihar Ph-

1&2

T/O of 3 Nos LT Feeders 3.5x300

SQMM XLPE Cable from

substation G Block East Vinod

Nagar.

7.36 FY 08-09 LT

2749 MV07RM4511Mayur Vihar Ph-

1&2

Replacement Of 11Kv 4 Way

Panel Board at S.Stn-3 Pkt 4

Mvr1.

5.37 FY 08-09 HT

2750 MV07RM4512Mayur Vihar Ph-

1&2

Replacement of 11KV 7 Way

Panel Board at S.STN-4 PKT 4

MVR PH-1

15.04 FY 08-09 HT

Page 126: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

2751 MV07RM4513Mayur Vihar Ph-

1&2

Replacement Of 11Kv 4 Way

Panel Board at S.Stn-2 CGHS

Chilla.

5.90 FY 08-09 HT

2752 MV07RM4514Mayur Vihar Ph-

1&2

Replacement Of 11Kv 4 Way

Panel Board at S.Stn-Lsc 2 Mvr

Ph-2.

6.02 FY 08-09 HT

2753 MV07RM4515Mayur Vihar Ph-

1&2

Replacement Of 11Kv 4 Way

Panel Board at S.Stn-Nav Bharat

Times CGHS.

6.64 FY 08-09 HT

2754 MV07RM4516Mayur Vihar Ph-

1&2

Replacement Of 11Kv 4 Way

Panel Board at S.Stn-6 Pkt C

North Of Lake Mvr Ph-2.

5.77 FY 08-09 HT

2755 MV07RM4517Mayur Vihar Ph-

1&2

Replacement of 11KV 4 Way

Panel Board at SS 31 BLK TKP8.87 FY 08-09 HT

2756 MV07RM4518Mayur Vihar Ph-

1&2

Replacement of 11KV 4 Way

Panel Board at S.STN-8 Munni

Boarder.

9.27 FY 08-09 HT

2757 MV07RM4519Mayur Vihar Ph-

1&2

Replacement of 11KV 4 Way

Panel Board at S.STN-13 BLK

TKP

9.85 FY 08-09 HT

2758 MV07RM4520Mayur Vihar Ph-

1&2

Replacement Of 11Kv 4 Way

Panel Board at S.Stn-8 Pkt C

North Of Lake Mvr Ph-2.

5.95 FY 08-09 HT

2759 MV07UT4509Mayur Vihar Ph-

1&2

Augmentation of 400 KVA Trans.

To 630 KVA Trans. at 17 Block

Kalyanpuri.

6.88 FY 08-09 HT

2760 MV08AT4019Mayur Vihar Ph-

1&2

Req. Of Add.Tr.400Kva At Samas

Pur Vill.0.77 FY 08-09 HT

2761 MV08EL1054Mayur Vihar Ph-

1&2

Electrification of 196 Nos. of Type-

I & Type-II reconstructed flats for

General Pool Residential

Accommodation at Kalyan Vas

3.03 FY 08-09 LT

2762 MV08EL1139Mayur Vihar Ph-

1&2

Electrification of Plot No. 11 at

LSC, Sector-G Kondli

Gharoli Mayur Vihar Ph.3

0.09 FY 08-09 LT

2763 MV08EL2053Mayur Vihar Ph-

1&2

Electrification of 196 Nos. of Type-

I & Type-II reconstructed flats for

General Pool Residential

Accommodation at Kalyan Vas

13.81 FY 08-09 LT

2764 MV08EL2061Mayur Vihar Ph-

1&2

Electrification of Plot No. 6 at LSC,

Sector-G Kondli Gharoli

Mayur Vihar Ph.3

0.11 FY 08-09 LT

2765 MV08FA4010Mayur Vihar Ph-

1&2

Augmentation of Cable M-15

Renney Well to ARC7.28 FY 08-09 HT

2766 MV08FA4011Mayur Vihar Ph-

1&2

Augmentation of Cable S.Stn ARC

to ARC-2(NTRO)8.11 FY 08-09 HT

2767 MV08LT4013Mayur Vihar Ph-

1&2

Conversion LT U/G system in to

LT AB Cable at Fish Market in

Div. - MVR

11.98 FY 08-09 LT

2768 MV08LT4014Mayur Vihar Ph-

1&2

Provision of LT AB Cable at LOP

Chilla Village in Div. - MVR4.63 FY 08-09 LT

2769 MV08LT4050Mayur Vihar Ph-

1&2

Laying of AB Cable from Pratap

nagar substation.(OLD)2.50 FY 08-09 LT

2770 MV08LT4063Mayur Vihar Ph-

1&2

Replacementof LT Panel at Delhi

Police CGHS3.30 FY 08-09 LT

2771 MV08LT4064Mayur Vihar Ph-

1&2

Replacement of LT Panel at Delhi

Polce CGHS3.30 FY 08-09 LT

2772 MV08LT4065Mayur Vihar Ph-

1&2

Replacement of LT Panel at

Sahyog S/S 1 CGHS6.55 FY 08-09 LT

2773 MV08LT4066Mayur Vihar Ph-

1&2

Replacement of LT Panel at

Sehyog S/s 2 CGHS6.55 FY 08-09 LT

2774 MV08LT4067Mayur Vihar Ph-

1&2

Replacement of LT Panel at UNA

Ss 1 CGHS6.68 FY 08-09 LT

2775 MV08LT4068Mayur Vihar Ph-

1&2

Replacement of LT Panel at UNA

Ss 2 CGHS6.61 FY 08-09 LT

2776 MV08LT4069Mayur Vihar Ph-

1&2

Replacement of LT Panel at

Maitry Ss 2 CGHS3.36 FY 08-09 LT

2777 MV08LT4070Mayur Vihar Ph-

1&2

Replacement of LT Panel at Manu

Ss 1 CGHS6.66 FY 08-09 LT

Page 127: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

2778 MV08LT4071Mayur Vihar Ph-

1&2

Replacement of LT Panel at Manu

Ss 2 CGHS6.66 FY 08-09 LT

2779 MV08LT4072Mayur Vihar Ph-

1&2

Replacement of LT Panel at Nav

Bharat Ss CGHS6.74 FY 08-09 LT

2780 MV08LT4073Mayur Vihar Ph-

1&2

Replacement of LT Panel at Rose

Wood CGHS3.38 FY 08-09 LT

2781 MV08LT4074Mayur Vihar Ph-

1&2

Replacement of LT Panel at

Mavilla CGHS6.76 FY 08-09 LT

2782 MV08LT4075Mayur Vihar Ph-

1&2

Replacement of LT Panel at Fine

Home CGHS6.76 FY 08-09 LT

2783 MV08LT4076Mayur Vihar Ph-

1&2

Replacement of LT Panel at

Supremess 1 CGHS6.76 FY 08-09 LT

2784 MV08LT4077Mayur Vihar Ph-

1&2

Replacement of LT Panel at

Supremess 2 CGHS6.76 FY 08-09 LT

2785 MV08LT4078Mayur Vihar Ph-

1&2

Replacement of LT Panel at

Supremess 3 CGHS6.68 FY 08-09 LT

2786 MV08LT4079Mayur Vihar Ph-

1&2

Replacement of LT Panel at

Samachar Ss 1 CGHS6.64 FY 08-09 LT

2787 MV08LT4080Mayur Vihar Ph-

1&2

Replacement of LT Panel at

Samachar Ss 2 CGHS3.32 FY 08-09 LT

2788 MV08LT4081Mayur Vihar Ph-

1&2

Replacement of LT Panel at

Hindustan Ss CGHS3.32 FY 08-09 LT

2789 MV08LT4082Mayur Vihar Ph-

1&2

Replacement of LT Panel at IFS

Ss 1CGHS3.32 FY 08-09 LT

2790 MV08LT4083Mayur Vihar Ph-

1&2

Replacement of LT Panel at IFS

Ss 2 CGHS3.32 FY 08-09 LT

2791 MV08LT4084Mayur Vihar Ph-

1&2

Replacement of LT Panel at

Akash Darshan CGHS6.75 FY 08-09 LT

2792 MV08LT4085Mayur Vihar Ph-

1&2

Replacement of LT Panel at

Medha CGHS6.76 FY 08-09 LT

2793 MV08LT4086Mayur Vihar Ph-

1&2

Replacement of LT Panel at OCS

CGHS6.75 FY 08-09 LT

2794 MV08LT4087Mayur Vihar Ph-

1&2

Replacement of LT Panel at

Daronacharya Ss 1 CGHS6.76 FY 08-09 LT

2795 MV08LT4088Mayur Vihar Ph-

1&2

Replacement of LT Panel at

Daronacharya Ss 2 CGHS6.76 FY 08-09 LT

2796 MV08LT4089Mayur Vihar Ph-

1&2

Replacement of LT Panel at

Nirman CGHS6.65 FY 08-09 LT

2797 MV08LT4090Mayur Vihar Ph-

1&2

Replacement of LT Panel at Kirti

CGHS6.65 FY 08-09 LT

2798 MV08LT4091Mayur Vihar Ph-

1&2

Replacement of LT Panel at

Rever View CGHS6.65 FY 08-09 LT

2799 MV08LT4115Mayur Vihar Ph-

1&2

Coversion of LT O/H Cond into LT

AB Cable at DDA Chilla7.88 FY 08-09 LT

2800 MV08MS4055Mayur Vihar Ph-

1&2

Shifting of LT Pole St Ltg From

Outside0.02 FY 08-09 LT

2801 MV08MS4140Mayur Vihar Ph-

1&2

Replacement of Oil Type Tr.of

630KVA*2 Mos into Dry Type at

S/Stn 5,Pkt B,Mvr-II

23.40 FY 08-09 HT

2802 MV08RM4020Mayur Vihar Ph-

1&2

Replacement of 11 kV HT 5 Way

Panel at S/Stn-3, Khichari Pur8.64 FY 08-09 HT

2803 MV08RM4021Mayur Vihar Ph-

1&2

Replacement of HT 4Way Panel

at S.Stn-1 Fish Mkt Gazi Pur5.57 FY 08-09 HT

2804 MV08RM4023Mayur Vihar Ph-

1&2

Replacement of 11 kV HT 5 Way

Panel at S/Stn-B,Pkt 2 MVR-19.17 FY 08-09 HT

2805 MV08RM4024Mayur Vihar Ph-

1&2

Replacement of HT 4+1Way

Panel at DDA Flat Gazi Pur8.71 FY 08-09 HT

2806 MV08RM4025Mayur Vihar Ph-

1&2

Replacement of HT 4Way Panel

at S.Stn 1 CGHS Sadar office5.86 FY 08-09 HT

2807 MV08RM4026Mayur Vihar Ph-

1&2

Replacement of HT 4 Way Panel

at S.Stn 5 Pkt-D MVR-26.19 FY 08-09 HT

2808 MV08RM4027Mayur Vihar Ph-

1&2

Replacement of HT 4Way Panel

at S.Stn LBS Hospital5.90 FY 08-09 HT

2809 MV08RM4028Mayur Vihar Ph-

1&2

Replacement of HT 7Way Panel

at S.Stn-2 Pkt-E MVR8.69 FY 08-09 HT

2810 MV08RM4029Mayur Vihar Ph-

1&2

Replacement of HT 4Way Panel

at S.Stn-3 Fish Mkt5.57 FY 08-09 HT

Page 128: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

2811 MV08RM4030Mayur Vihar Ph-

1&2

Replacement of HT 4Way Panel

at 11 Blk Kalyan Puri9.14 FY 08-09 HT

2812 MV08RM4031Mayur Vihar Ph-

1&2

Rep.of HT 4Way Panel at 2 Blk

Khichri Pur5.77 FY 08-09 HT

2813 MV08RM4032Mayur Vihar Ph-

1&2

Replacement of HT 4Way Panel

at S.Stn-2 Fish Mkt8.77 FY 08-09 HT

2814 MV08RM4033Mayur Vihar Ph-

1&2

Replacement of HT 4Way Panel

at Bhagyawan CGHS5.67 FY 08-09 HT

2815 MV08RM4034Mayur Vihar Ph-

1&2

Rep.of HT 4Way Panel at B Blk

Anand Lok5.99 FY 08-09 HT

2816 MV08RM4035Mayur Vihar Ph-

1&2

Replacement of HT 4Way Panel

at D Blk Anand Lok CGHS6.11 FY 08-09 HT

2817 MV08RM4036Mayur Vihar Ph-

1&2

Replacement of HT 4Way Panel

at S.Stn-1 Pkt-1 Mvr-13.99 FY 08-09 HT

2818 MV08RM4037Mayur Vihar Ph-

1&2

Replacement of HT 11 kV 3 Way

Panel at Ss 7 Pkt 1,MVR13.97 FY 08-09 HT

2819 MV08RM4038Mayur Vihar Ph-

1&2

Rep.of HT 4Way Panel at S.Stn-4

Pkt-1 MVR-14.31 FY 08-09 HT

2820 MV08RM4039Mayur Vihar Ph-

1&2

Rep.of HT 4Way Panel at S.Stn-3

Pkt-1 MVR-15.69 FY 08-09 HT

2821 MV08RM4040Mayur Vihar Ph-

1&2

Replacement of HT 3Way Panel

at S.Stn-5 Pkt-3 MVR-13.82 FY 08-09 HT

2822 MV08RM4041Mayur Vihar Ph-

1&2

Replacement of HT 3Way Panel

at S.Stn-6 Pkt-3 MVR-13.79 FY 08-09 HT

2823 MV08RM4042Mayur Vihar Ph-

1&2

Replacement of HT 3Way Panel

at P-5 Renney Well3.79 FY 08-09 HT

2824 MV08RM4043Mayur Vihar Ph-

1&2

Rep.of HT 3Way Panel at S.1

D.Police CGHS4.03 FY 08-09 HT

2825 MV08RM4044Mayur Vihar Ph-

1&2

Replacement of HT 3Way Panel

at S.Stn-2 Delhi Police CGHS4.29 FY 08-09 HT

2826 MV08RM4045Mayur Vihar Ph-

1&2

Replacement of HT 3Way Panel

With 4 Way at S.Stn DSIDC Trilok

Puri

5.70 FY 08-09 HT

2827 MV08RM4046Mayur Vihar Ph-

1&2

Rep.of HT 4Way Panel at S.Stn-2

Pkt-5 MCR-14.39 FY 08-09 HT

2828 MV08RM4102Mayur Vihar Ph-

1&2

Rep. of HT 3Way Panel at Amar

Jyoti CGHS3.66 FY 08-09 HT

2829 MV08RM4103Mayur Vihar Ph-

1&2Rep of HT Panel at Maitry CGHS 4.11 FY 08-09 HT

2830 MV08RM4104Mayur Vihar Ph-

1&2Rep of HT Panel at Manu CGHS 6.14 FY 08-09 HT

2831 MV08RM4105Mayur Vihar Ph-

1&2

Rep of HT Panel at Manu S/Stn-2

CGHS6.24 FY 08-09 HT

2832 MV08RM4106Mayur Vihar Ph-

1&2

Rep of HT Panel at S/Stn Manas

CGHS5.92 FY 08-09 HT

2833 MV08RM4114Mayur Vihar Ph-

1&2

Rep of HT Panel at S/Stn Sewage

Pump 113.81 FY 08-09 HT

2834 MV08UT4012Mayur Vihar Ph-

1&2

Aug.Of Tr. 400 To 630 Kva At

Main Rd Khichri Pur Village.6.53 FY 08-09 HT

2835 NN04RM3555 Nand Nagri

Installation of 1 RMUs + 1 single

Panel board (extensible)instead of

damaged RMU board at C Block

Kabir Nagar sub station

8.63 FY 08-09 HT

2836 NN05EL4115 Nand NagriElectrification of LOP at Mandli

Village.69.36 FY 08-09 LT

2837 NN05EL4118 Nand NagriElectrification of LOP of Village-

Saboli on LVDS System.10.35 FY 08-09 LT

2838 NN05EL4135 Nand NagriElectrification of LOP at Gokalpur

Village Nand nagri.21.41 FY 08-09 LT

2839 NN05MS4110 Nand Nagri

Installation of 3, 400 kVA

Transformer at Toonda Nagar

Nand Nagri

1.18 FY 08-09 HT

2840 NN05NF4119 Nand Nagri

Providing 11 kv HT Feed to chuna

Bhati & Manoli S/stn from Nand

Nagri

141.07 FY 08-09 HT

2841 NN05RM4082 Nand NagriProviding RMU at sudamapuri

substation No.45.41 FY 08-09 HT

Page 129: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

2842 NN05RM4083 Nand NagriProviding RMU at sudamapuri

substation No.55.27 FY 08-09 HT

2843 NN06LT4014 Nand NagriConversion of LT O/H to LT AB

Cable at Ashok Nagar247.96 FY 08-09 LT

2844 NN06RM4001 Nand NagriInstallation of 2*4 way at Mandoli

substation-216.15 FY 08-09 HT

2845 NN06RM4100 Nand Nagri

Replacement of 5 Panel Board

with RMU at F-1 Substation

Sunder Nagri.

10.47 FY 08-09 HT

2846 NN07AT4534 Nand Nagri

Addition of 630KVA transformer at

‗O‘ Block. S/Stn. Sunder Nagri in

D – NNG

11.51 FY 08-09 HT

2847 NN07AT4535 Nand Nagri

Addition of 630KVA transformer at

Kardam Puri S/Stn Gali No. 8 in D

– NNG

7.87 FY 08-09 HT

2848 NN07EL4570 Nand Nagri

Electrification of Left Out Pockets

of Pratap Nagar, Saboli In Distt.

NNG.

0.87 FY 08-09 LT

2849 NN07FA4544 Nand Nagri

Augmentation of 3x150 mm sq

PILCA cable into 3x300 mm sq

XLPE cable between Nathu

Colony & Hardev Puri No, 1

S/Stns. In D – NNG .

11.69 FY 08-09 HT

2850 NN07FA4546 Nand Nagri

Augmentation of 3x150 mm sq

PILCA cable into 3x300 mm sq

XLPE cable between Durga Puri

Extn. & Hardev Puri No, 2

S/Stns. In D – NNG .

5.65 FY 08-09 HT

2851 NN07FA4547 Nand Nagri

Augmentation of 3x150 mm sq

PILCA cable into 3x300 mm sq

XLPE cable between Hardev Puri

No. 1 & Hardev Puri No. 2

S/Stns. In D – NNG .

3.77 FY 08-09 HT

2852 NN07LT4536 Nand Nagri

Laying of 3 Nos. LT Feeders of

size 3.5x300 mm sq XLPE cable

at Janta Flat S/Stn No. 1 GTB

Enclave in D – NNG .

7.78 FY 08-09 LT

2853 NN07LT4537 Nand Nagri

Laying of 3 Nos. LT Feeders of

size 3.5x300 mm sq XLPE cable

at GTB Hospital Campus S/Stn.

GTB Enclave in D – NNG .

8.27 FY 08-09 LT

2854 NN07LT4549 Nand NagriReplacement of feeder pillars in

Mandoli Extn. in D – NNG .18.89 FY 08-09 LT

2855 NN07LT4564 Nand Nagri

Laying of 2 Nos. LT Feeders of

size 3.5x300 mm sq XLPE cable

at Sudama Puri S/Stn . No. 2 in

D – NNG

4.84 FY 08-09 LT

2856 NN07RM4516 Nand Nagri

    Installation of RMU 4 Way I / D

at C – 2 Block Nand Nagri in D –

NNG .

13.10 FY 08-09 HT

2857 NN07RM4517 Nand Nagri

Installation of RMU 4 Way I / D at

B – 4 Block SNand Nagri in D –

NNG

13.60 FY 08-09 HT

2858 NN07RM4518 Nand Nagri

Installation of RMU 4 Way I / D at

A – 4 Block S /Stn .Nand Nagri

in D – NNG

6.71 FY 08-09 HT

2859 NN07RM4519 Nand Nagri

Installation of RMU 4 Way O / D at

‗H‘ Block Sunder Nagri in D –

NNG

6.38 FY 08-09 HT

2860 NN07RM4520 Nand Nagri

Installation of RMU 4 Way I / D at

IJK Block Sunder Nagri in D –

NNG

6.59 FY 08-09 HT

2861 NN07RM4521 Nand Nagri

Installation of RMU 4 Way I / D at

MN Block Sunder Nagri in D –

NNG

6.70 FY 08-09 HT

2862 NN07RM4522 Nand NagriInstallation of RMU 3 Way O / D at

Rajiv Gandhi Hospital in D – NNG 4.26 FY 08-09 HT

Page 130: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

2863 NN07RM4523 Nand Nagri

Installation of RMU 4 Way I / D at

Weavers Complex S/Stn .Sunder

Nagri in D – NNG

6.67 FY 08-09 HT

2864 NN07RM4524 Nand Nagri

Installation of RMU 2x 4 Way I / D

at GTB Hospital S/Stn. GTB

Enclave , in D – NNG

13.32 FY 08-09 HT

2865 NN07RM4525 Nand Nagri

Installation of RMU 4 Way I / D at

Janta Flat S/Stn. No. 1 GTB

Enclave , in D – NNG

6.50 FY 08-09 HT

2866 NN07RM4526 Nand Nagri

Installation of RMU 4 Way I / D at

Janta Flat S/Stn. No. 3 GTB

Enclave , in D – NNG

6.64 FY 08-09 HT

2867 NN07RM4527 Nand Nagri

Installation of RMU 4 Way I / D at

‗F‘ Pkt S/Stn. No. 3 GTB Enclave

, in D – NNG

6.68 FY 08-09 HT

2868 NN07RM4528 Nand Nagri

Installation of RMU 2x 4 Way I / D

at ‗D‘ blk Ashok Nagar S/Stn. Gali

No. 3 in D – NNG

12.85 FY 08-09 HT

2869 NN07RM4529 Nand Nagri

Installation of RMU 3x 4 Way I / D

at Nathu Colony S/Stn. in D –

NNG

20.06 FY 08-09 HT

2870 NN07RM4530 Nand Nagri

Installation of RMU 2x 4 Way I / D

at LIG S/Stn. No. 7 East of loni

Road, in D – NNG

13.12 FY 08-09 HT

2871 NN07RM4531 Nand Nagri

Installation of RMU 2x 4 Way I / D

at Pkt ‗A‘ 240 MIG S/Stn. GTB

Enclave , in D – NNG

13.29 FY 08-09 HT

2872 NN07RM4532 Nand Nagri

Installation of RMU 4 Way I / D at

Barafkhana S/Stn. Village Gokal

Pur in D – NNG

6.57 FY 08-09 HT

2873 NN07RM4548 Nand Nagri

Installation of RMU 4 Way I / D at

Hardev Puri No. 1 S/Stn in D –

NNG

6.52 FY 08-09 HT

2874 NN07RM4552 Nand Nagri

Installation of RMU 4 Way I / D at

Mandoli Extn. S/Stn. No. 1 in D –

NNG

6.74 FY 08-09 HT

2875 NN07UT4533 Nand Nagri

Augmentation of 400KVA

transformer into 630KVA at A –

1 Block S/stn. Nand Nagri in D –

NNG

8.38 FY 08-09 HT

2876 NN07UT4579 Nand Nagri

Aug Of 25 Kva Transformer at

Chuna Bhatti Sewa Dham Road

Village Mandoli in (D)NNG

1.24 FY 08-09 HT

2877 NN07UT4580 Nand Nagri

Aug Of 100 KVA Transformer in

New Mandoli Industrial Area,

Village Mandoli In (D)NNG

0.22 FY 08-09 HT

2878 NN07UT4582 Nand Nagri

Aug Of 25 KVA Transformer in

New Mandoli Industrial Area

Village Mandoli in (D)NNG

1.24 FY 08-09 HT

2879 NN07UT4583 Nand Nagri

Aug Of 100 KVA Transformer in

New Mandoli Industrial Area,

Village Mandoli in (D)NNG.

0.25 FY 08-09 HT

2880 NN07UT4584 Nand Nagri

Aug Of 100 Kva Transformer

Sewa Dham Road , Village

Mandoli in (D)NNG

0.24 FY 08-09 HT

2881 NN07UT4585 Nand Nagri

Aug Of 25 Kva Transformer at

Chuna Bhatti Sewa Dham Road

Village Mandoli in (D)NNG

1.25 FY 08-09 HT

2882 NN07UT4587 Nand Nagri

Aug Of 25 Kva Transformer at D P

No. 1957 – 1958 at New Mandoli

Industrial Area, Village Mandoli in

(D)NNG

1.11 FY 08-09 HT

2883 NN07UT4588 Nand Nagri

Aug Of 100 Kva Transformer

Sewa Dham Road,New Mandoli

Industrial Area, Village Mandoli in

(D)Nng

0.23 FY 08-09 HT

2884 NN07UT4589 Nand Nagri

Aug Of 25 Kva Transformer at D P

No. 394 – 395 In New Mandoli

Industrial Area, Village Mandoli In

(D)Nng

1.09 FY 08-09 HT

Page 131: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

2885 NN07UT4590 Nand Nagri

Aug Of 25 Kva Transformer at D P

No.2033 – 2034 in New Mandoli

Industrial Area, Village Mandoli in

(D)NNG

1.07 FY 08-09 HT

2886 NN07UT4591 Nand Nagri

Aug Of 25 Kva Transformer at D P

No.2407 – 2408 in New Mandoli

Industrial Area, Village Mandoli in

(D)NNG

1.07 FY 08-09 HT

2887 NN07UT4592 Nand Nagri

Aug Of 25 Kva Transformer in

Mela Ram Farm Sewa Dham

Road Mandoli in (D)NNG

1.09 FY 08-09 HT

2888 NN07UT4594 Nand Nagri

Aug Of 25 Kva Transformer at

Rajeev Nagar Ind Area at D.P. No.

2242-2243 in (D)NNG

1.00 FY 08-09 HT

2889 NN07UT4598 Nand Nagri

Augmentation Of 250Kva Tr at

D.P.No. 2349-50 In Mandoli Ind

Area (D)NNG

0.99 FY 08-09 HT

2890 NN07UT4608 Nand Nagri

Aug of 100 kva transformer in

madhav Puram near pole no. 2080

(D)NNG

0.16 FY 08-09 HT

2891 NN07UT4620 Nand Nagri

Aug Of 25 Kva Transformer at

D.P.No.2039-2041In Mandoli Ind

Area in (D)NNG

1.09 FY 08-09 HT

2892 NN08AT4069 Nand Nagri

Addition Of 630 Kva Transformer

at Shamshan Ghat Kabir Nagar

(D)Nng.

2.48 FY 08-09 HT

2893 NN08AT4116 Nand NagriAddition of 400 KVA Transformer

at Balbir Nagar Exstn. in D - NNG.2.66 FY 08-09 HT

2894 NN08AT4150 Nand Nagri LT 5328 in f/o uttam kumar 2.11 FY 08-09 HT

2895 NN08AT4151 Nand NagriN126008110442 reliance infratel

radha V2.66 FY 08-09 HT

2896 NN08FA4009 Nand Nagri

Augmentationof HT Cable

3X150Sq MM PILCA into

3X300Sq MM XLPE between A

Block Kabir Nagar S/Stn to North

Chhajju Pur S/Stn (D)Nng

14.39 FY 08-09 HT

2897 NN08FA4012 Nand Nagri

Aug of HT Cable 3X150SqMM

PILCA into 3X300SqMM Xple

Cable between B-4 Nand Nagari &

School Block Nathu Colony S/Stn

(D)Nng

16.08 FY 08-09 HT

2898 NN08LT4053 Nand NagriReplacement Of Feeder Pillar At

Mandoli Ext. D-Nng.35.17 FY 08-09 LT

2899 NN08LT4054 Nand Nagri

Laying of 4X300 SqMM LT Cable

from Sudama Puri Sa/Stn to

Tagore Gali Bhagat Singh Gali

2.62 FY 08-09 LT

2900 NN08LT4055 Nand Nagri

Laying Of 4X300 Sqmm LT Cable

From Chajju Gate S/Stn To Gai

Chajju Marg (D)Nng.

4.18 FY 08-09 LT

2901 NN08LT4056 Nand Nagri

Laying of 4X300 SqMM LT Cable

from Kabristan S/Stn to Panchayat

Ghar Main Road

4.04 FY 08-09 LT

2902 NN08LT4057 Nand Nagri

Laying Of 4X300 Sqmm Cable LT

From North Chajju Pur S/Stn To

Gali 4/2 Gali No.2 (D)Nng.

6.04 FY 08-09 LT

2903 NN08LT4058 Nand Nagri

Laying Of LT 4X300 Sqmm Cable

At S/Stn Kabir Nagar To Taxsila

School Bblk Gali No. 4 (D)Nng.

5.49 FY 08-09 LT

2904 NN08LT4059 Nand Nagri

Laying Of LT Cable 4X300 Sqmm

From Kardam Puri Ext. Azad

Chowk To Galino.1 Kardam Puri

(D)Nng.

2.41 FY 08-09 LT

2905 NN08LT4061 Nand Nagri

Laying Of LT Cable Of Size 4X300

Sqmm at Jyoti Nagar To Gali No.

8 D-Nng.

3.97 FY 08-09 LT

2906 NN08LT4068 Nand NagriLTMP of janta Flat GTB Enclave

Nand Nagri (D)NNG123.41 FY 08-09 LT

Page 132: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

2907 NN08LT4071 Nand Nagri

Laying Of LT Feeder Of Size

4X300Sqmm at Sham Shan Ghat

Kabir Nagar (D)Nng.

5.33 FY 08-09 LT

2908 NN08LT4120 Nand Nagri

Replacement of 3 Nos LT

Feeders of Size 4X300 MM Sq

XLPE at Mandoli Extn. S/S No.

2,Gali No 12 in D - NNG

5.99 FY 08-09 LT

2909 NN08LT4121 Nand Nagri

Addition of 2 Nos. LT Feeders of

Size 4X300 MM Sq XLPE at

Nathu Pradhan S/Stn. Village

Saboli in D - NNG

3.49 FY 08-09 LT

2910 NN08MS4098 Nand Nagri

Replacement of service line

where LTMP was carried out in

(D)NNG

160.87 FY 08-09 LT

2911 NN08MS4104 Nand Nagri

Aug of 25 Kva Transformer at

D.P.No. 2330-2331 In Rajeev

Nagar Ind Area In (D)NNG

1.67 FY 08-09 HT

2912 NN08MS4114 Nand NagriReplacement of LT Panels in D-

NNG15.85 FY 08-09 LT

2913 NN08MS4137 Nand Nagri

New DP to be installed at site with

100KVA T/F in F/O Reliance

Infratel , Gali No. 18 Harsh Vihar

3.41 FY 08-09 HT

2914 NN08MS4138 Nand Nagri

Installation 25 KVA 3Ph DT

regarding release of New Conn. of

15 KW I/F of Rel infratel in D-NNG

2.37 FY 08-09 HT

2915 NN08NF4001 Nand Nagri

Interconn.of H.T Cable 3X300Sq

MM XLPE between Ashok Nagar

S/Stn Gali No.13 to MIG Corner D-

1/1 Ashok Nagar

6.87 FY 08-09 HT

2916 NN08RM4028 Nand Nagri

Providing of 3 Way O/D RMU at

Khet Wala S/Stn West Jyoti

Nagar (D)NNG

9.58 FY 08-09 HT

2917 NN08RM4030 Nand Nagri

Replacement of RMU and

Providing 2X4 Panel I/D RMU at

Kardam Puri Ext.(D)NNG

9.23 FY 08-09 HT

2918 NN08RM4033 Nand NagriProviding of 3 Way O/D RMU at

100 Ft Road Shiv Mandir (D)NNG6.96 FY 08-09 HT

2919 NN08RM4041 Nand NagriInstallation of 4 Way RMU at

Jagat Puri Ext No.2 (D)NNG9.03 FY 08-09 HT

2920 NN08SH1111 Nand Nagri

Shifting Of HT 11KV O/H Feeder

On Pwd Road No 63 In Ashok

Nagar Wazirabad Road Due To

Construction Of Footover Bridge D-

Nng.

5.77 FY 08-09 HT

2921 NN08SL1074 Nand Nagri

Providing of Street Lighting at

Colony Reg. No. 830, ‗C‘ Blk East

Gokalpur, Amar Colony In D-NNG.

2.43 FY 08-09 LT

2922 NN08SL1075 Nand Nagri

Providing of Street Lighting at

colony reg. no. 581, Bank Colony

in D-NNG.

2.96 FY 08-09 LT

2923 NN08SL1076 Nand Nagri

Providing of Street Lighting at

colony reg. no. 267, Budh Vihar

Colony in D-NNG.

3.47 FY 08-09 LT

2924 NN08SL1077 Nand Nagri

Providing of Street Lighting at

colony reg. no. 1258, Budh Vihar,

Harizan basti Mandoli in D-NNG.

6.61 FY 08-09 LT

2925 NN08SL1079 Nand Nagri

Providing of Street Lighting at

Colony Reg. No. 1157, E Blk East

Gokal Pur Amar Colony Harizan

Basti In D-NNG.

5.62 FY 08-09 LT

2926 NN08SL1080 Nand Nagri

Providing of Street Lighting at

Colony Reg. No. 791, East

Mandoli Ext. Harizan Basti In D-

NNG.

1.16 FY 08-09 LT

Page 133: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

2927 NN08SL1081 Nand Nagri

Providing of Street Lighting at

Colony Reg. No. 1426, Harizan

Basti, ‗A‘ Blk East Gokal Pur Lop

Amar Colony In D-NNG.

2.88 FY 08-09 LT

2928 NN08UT4115 Nand Nagri

Aug Of 100 Kva Tr At D.P. No.

1995-1996 In Mamdoili Ind Area

Dnng.

0.49 FY 08-09 HT

2929 NN08UT4123 Nand Nagri

Augmentation Of 100Kva Tr At

D.P.No.2018-2019 In Mandoli Ind

Area D-Nng.

0.49 FY 08-09 HT

2930 NN08UT4127 Nand Nagri

Augmentation of 100 KVA

Transformer at D.P. No. 2302-

2303 in Rajeev Nagar Ind Area.

1.27 FY 08-09 HT

2931 NN08UT4128 Nand Nagri

Lt5286, Load Addition Of 39Kw

Making Total Load Of 50Kw In F/O

Smt Anita Jain,Opp.Sachdeva

Farm, Arjun Gali, Mandoli, Dp

1900-01.

0.87 FY 08-09 HT

2932 NN08UT4132 Nand Nagri

Lt5286, Load Addition Of 39Kw

Making Total Load Of 50Kw In F/O

Smt Anita Jain,Opp.Sachdeva

Farm, Arjun Gali, Mandoli, Dp

1900-01.

0.89 FY 08-09 HT

2933 NN08UT4134 Nand Nagri

D.P No. 1997-98, LT5292 LA of

40KW Making total Load of 60KW

in F/O Manya Enterprises, L-1, Kh

No. -69, Saboli Industrial Area

Delhi

1.22 FY 08-09 HT

2934 NN08UT4135 Nand Nagri

D.P No. 1942-43, NC of 90 KW in

F/O Aakash Goel , P. No. 15,

Khasra No.29,Mandoli, LT5302

1.39 FY 08-09 HT

2935 NN08UT4136 Nand Nagri

Augmentation of transformer from

25KVA to 100KVA to provide

connection in F/O Rel. infratel

Limited Harsh Vihar Gali No.9 ,

Budh Bazaar

2.07 FY 08-09 HT

2936 NN08UT4143 Nand NagriAug of 25 KVA tr at D.P.No.2057-

20582.17 FY 08-09 HT

2937 NN08UT4144 Nand NagriAug of 25 KVA tr at D.P.No.1971-

19722.14 FY 08-09 HT

2938 NN08UT4145 Nand NagriAug of 25 KVA tr at D.P.No.2063-

20642.16 FY 08-09 HT

2939 NN08UT4149 Nand NagriLT5337 Sushil Kr jain , plot no. 17

mand1.38 FY 08-09 HT

2940 PG04RM4502 Paharganj

Replacement of existing

unservicable 11kV 4-Panel board

by 6-Panel board SF6 type at

A.B.Patrica sub station

18.20 FY 08-09 HT

2941 PG04RM4638 Paharganj

Replacement of existing old 4-

Panel board OCB type by new 4-

Panel board VCB type at Saroad

ar Thana Kiosk sub station.

8.91 FY 08-09 HT

2942 PG04SS4585 PaharganjAugmentation to 990kVA with

E.RMU at PradhanChowk7.54 FY 08-09 HT

2943 PG05RM4071 PaharganjReplacement of 3 Panel Board by

1no 3W I/D RMU at PHG Thana5.27 FY 08-09 HT

2944 PG05UT4016 PaharganjAugmentation of DT 400 TO 630

KVA at Ladoo Ghati0.42 FY 08-09 HT

2945 PG05UT4022 Paharganj

Augmentation of Transformer

from 630 kVA to 990 kVA plinth

mounted at Krishna Market(K) in

Zone-113

6.76 FY 08-09 HT

2946 PG06EL1082 PaharganjTemporary Electrification of 66

DDA Quarters at Motia Khan.1.74 FY 08-09 HT

2947 PG06EL2065 PaharganjE/o 66 SFS Flats Blk-1, Motia

Khan19.19 FY 08-09 HT

Page 134: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

2948 PG06FA4048 Paharganj

1)     Replacement of Partly sick

PILCA Cable 3X300 mm2 by

XLPE Cable size 3X300 mm2

from Lahori gate to Khurshid Mkt

(Isolator)

8.27 FY 08-09 HT

2949 PG06FA4049 Paharganj

Replacement Of Partly Sick Pilca

Cable 3X300 Mm2 With Xlpe

Cable Size 3X300 Mm2 From

Motia Khan To A K Tanki

(Partialy).

10.97 FY 08-09 HT

2950 PG06FA4053 Paharganj

  Replacement of Partly sick

PILCA Cable 3X300 mm2 by

XLPE Cable size 3X300 mm2

from Lahori gate to Khurshid Mkt

(ocb)

6.77 FY 08-09 HT

2951 PG06LT4061 Paharganj

Replacement of Old bare LT

Overhead conductor with AB

Conductor (3x150mm2

+1X70mm2+1x16mm2) ) in pan

mandi,bartan mkt, gali chulhe wali,

basti pipal wali,gali barna,sadar

nala road,gali nathan singh,gali

mohan singh jat,ahata ki dara

(gher),sadar bazar,R

124.79 FY 08-09 LT

2952 PG06RM4041 Paharganj

Replacement of 12 Panel Board (

MKR BHEL11&MEI1) B.G Road

Z 112 D-PHG

31.60 FY 08-09 HT

2953 PG06RM4042 Paharganj

Replacement 10 Panel Board

make Southern FF Khurshid

Market Z11 1D-PHG

23.33 FY 08-09 HT

2954 PG06RM4046 Paharganj

Replacement 8 Panel Board at

Hela Ram Bagh No -1 Z113 D-

PHG

14.21 FY 08-09 HT

2955 PG06RM4048 PaharganjReplacement of 4 Panel MEI at

Azad Market. Z 112D PHG4.72 FY 08-09 HT

2956 PG06RM4075 Paharganj

Installation of (3+1) O/D RMU/

Panel board at 6 Tooti Pl/ Stn in

Division Paharganj

6.67 FY 08-09 HT

2957 PG06RM4076 Paharganj

Replacement of 3 Way I/D RMU

at 6 Tooti (K) Stn in division

paharganj

4.15 FY 08-09 HT

2958 PG07AT4540 Paharganj

Installation of additional

400kvatransformer and taking out

3nos lt feeders from proposed new

400kva transformer at Model basti

s/st P P QTR ZONE Pahar ganj

7.27 FY 08-09 HT

2959 PG07AT4541 Paharganj

Installation of additionalone no.

400kva transformer and taking out

3 nos. LT feeders from propused

new transformer at Chara mandi

pl/m s/st Zone Ram Nagar Pahar

Ganj

7.81 FY 08-09 HT

2960 PG07AT4542 Paharganj

Installation of additional 2nos each

400kva transformers and taking

out 4 nos. LT feeder from

propused new transformers at

Pradhan chowk pl/ms/st Zone

Ram Nagar Pahar Ganj

6.06 FY 08-09 HT

2961 PG07AT4543 Paharganj

Installation of additionalone no.

400kva transformer and taking out

3 nos. LT feeders from proposed

new transformer at Slaughter

house pl/m s/st Zone Ram Nagar

Pahar Ganj

6.27 FY 08-09 HT

Page 135: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

2962 PG07AT4544 Paharganj

Installation of additionalone no.

400kva transformer and taking out

3 nos. LT feeders from proposed

new transformer at Slaughter

house pl/m s/st Zone Ram Nagar

Pahar Ganj

7.18 FY 08-09 HT

2963 PG07RM4525 Paharganj

Installation of 1 No. additional

1Way I/D Panel and Replacement

of Existing old 4 Panel board make

Joyti at Foota Road S/Stn. in

Division Pahar Ganj

9.09 FY 08-09 HT

2964 PG08AT4006 Paharganj

Installation Of Additional One

No.400 Kva Transformer at

Railway Booking Pl/M Sadar

Bazar S/Stn. Div. Pahar Ganj

1.42 FY 08-09 HT

2965 PG08AT4028 Paharganj

Installation Of Additional One

No.400 Kva Transformer at Sadar

Thana Road S/Stn. Div. Pahar

Ganj

1.84 FY 08-09 HT

2966 PG08AT4029 Paharganj

Installation Of Additional One

No.400 Kva Transformer at New

Qusab Pura S/Stn. Div.Pahar

Ganj.

1.39 FY 08-09 HT

2967 PG08AT4030 Paharganj

Installation of additional

Transformer 400 KVA at Old

Qusab Pura Ss

2.01 FY 08-09 HT

2968 PG08AT4031 Paharganj

Installation Of Additional One

No.400 Kva Transformer at 4 Pole

Pp Qtrs.S/Stn. Div. Pahar Ganj

1.86 FY 08-09 HT

2969 PG08FA4045 PaharganjRep.of Plc Cbl Fr Motia Gd To Pp

Qtr.46.70 FY 08-09 HT

2970 PG08FA4072 PaharganjRep of HT Cbl Fr M Khn To Sarai

Khalil45.96 FY 08-09 HT

2971 PG08FA4073 PaharganjRep of HT Cbl Fr M Khn To Idgah

Kiosk7.21 FY 08-09 HT

2972 PG08FA4084 Paharganj

Rep. of HT Cable 3X300 Sqmm

From Jhandewalan P/M To Chowk

Singhara S/S

4.45 FY 08-09 HT

2973 PG08LT4007 Paharganj

T/O 3 No, LT Fdr.from Add.

Transformer.at Railway Booking

Pl/M Sadas Bazar

3.75 FY 08-09 LT

2974 PG08LT4008 PaharganjT/O 3 No LToh Fdrs From Aug.

Trf. at Sadas Thana S/S.3.87 FY 08-09 LT

2975 PG08LT4009 PaharganjT/O 3 No LToh Fdrs From Aug.

Trf. at 4 Pole Pp Qtr. Ss.3.87 FY 08-09 LT

2976 PG08LT4010 PaharganjT/O 3 No LToh Fdrs From Aug.

Trf. at Old Qusab Pura S/S.3.88 FY 08-09 LT

2977 PG08LT4011 PaharganjT/O 3 No.LT Fdr. from Add.400

KVA at New Qusab Pura Ss3.50 FY 08-09 LT

2978 PG08LT4012 PaharganjT/O 3 No LToh Fdrs From Aug.

Trf. at Idgah Pl/M Ss.3.90 FY 08-09 LT

2979 PG08LT4013 PaharganjT/O 3 No LToh Fdrs From Aug.

Trf. at A K Tanki Ss.3.87 FY 08-09 LT

2980 PG08LT4014 Paharganj/O 4 No LT O/H Fdrs From Aug.

02 Trfs. at BG Dispensary S/S.5.91 FY 08-09 LT

2981 PG08LT4033 PaharganjT/O 3 No LToh Fdrs From Aug.

Trf. at Chimni Mil Pl/M S/S.3.67 FY 08-09 LT

2982 PG08LT4034 PaharganjT/O 3 No LToh Fdrs From Aug.

Trf. at Chowk Kishan Ganj S/S.3.75 FY 08-09 LT

2983 PG08LT4035 Paharganj

T/O 3 No LT Fdrs from

augmented Transformer. at Gali

Neem Wali S/S

2.24 FY 08-09 LT

Page 136: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

2984 PG08LT4036 Paharganj

T/O 3 Nos LT Fdrs from

augmented Transformer. at Gali

Bahuji S/S

3.68 FY 08-09 LT

2985 PG08LT4055 Paharganj

Rep.of old conductor with AB

conductor in Leftout Pocket of

Ram Nagar Zone.

221.33 FY 08-09 LT

2986 PG08LT4056 Paharganj

Rep.of old conductor with LTAB

Conductor in Leftout Pocket of BG

Road Zone

151.30 FY 08-09 LT

2987 PG08LT4057 Paharganj

Rep.of old conductor with AB

Conductor in Leftout Pocket of

Chuna Mandi Zone.

134.79 FY 08-09 LT

2988 PG08LT4058 Paharganj

Rep.of old conductor with AB

Conductor in Leftout Pocket of PP

Quarter Zone.

212.84 FY 08-09 LT

2989 PG08LT4059 PaharganjLT Clean up in Peela Ki,Nai Basti

in Ram Ngr Zone2.77 FY 08-09 LT

2990 PG08LT4060 PaharganjLT Clean up in Multani Dhanda,Dp

Gp.Rd in Zone Ram Ngr.2.37 FY 08-09 LT

2991 PG08LT4061 PaharganjLT Clean up in Katra Het

Ram,Navikarim Zone Ram Ngr1.98 FY 08-09 LT

2992 PG08LT4062 Paharganj LT Cleanup in Amer Puri,Ashok

Basti Zone Ram Ngr.1.88 FY 08-09 LT

2993 PG08MS4063 PaharganjProviding The Gland and Flexible

Pipe in Meter Of Div. PHG.82.35 FY 08-09 LT

2994 PG08MS4067 PaharganjLT Clean up in the Area of Zone

Chuna Mandi.8.09 FY 08-09 LT

2995 PG08MS4068 PaharganjLT Clean up in the Area of Ram

Ngr.Zone9.95 FY 08-09 LT

2996 PG08MS4069 PaharganjLT Clean up in the area of Zone

PP Quarter.6.47 FY 08-09 LT

2997 PG08MS4070 PaharganjLT Clean Up in the area of BG

Road Zone12.05 FY 08-09 LT

2998 PG08MS4075 Paharganj

LT Cleanup in Qusab Pura,Ahata

kidara Sadar Bazar etc PP

Qtr.Zone

9.44 FY 08-09 LT

2999 PG08MS4076 PaharganjLT Cleanup in Bara Hindu

Rao,Etc. in Bg Road Zone9.64 FY 08-09 LT

3000 PG08MS4077 Paharganj

LT Cleanup in Nabi Kabimqila

Kadam Sharif,Etc in Ram Ngr

Zone

9.34 FY 08-09 LT

3001 PG08MS4078 PaharganjLT cleanup in Gali Sangatrashan

Etc Chuna Mandi Zone6.16 FY 08-09 LT

3002 PG08RM4003 PaharganjRep. Of HT Panel at D Bl. Motia

Khan S/S Ss.8.97 FY 08-09 HT

3003 PG08RM4004 PaharganjRep. Of HT Panel at C Bl. Motia

Khan S/S Ss.5.79 FY 08-09 HT

3004 PG08RM4046 PaharganjRep.Of 7 Panel Make Mei With

New at MM Rd Kiosk S/S.11.54 FY 08-09 HT

3005 PG08RM4047 PaharganjReplacement of HT RMU 4 Way

at Chimni Mil Kiosk Div. PHG5.72 FY 08-09 HT

3006 PG08RM4049 PaharganjReplacement of HT 3 Way I/D at

Sadar Dispensary Kiosk3.77 FY 08-09 HT

3007 PG08RM4050 PaharganjRep Of HT Panel (2X4)+1 I/D at

Ak Tanki.14.01 FY 08-09 HT

3008 PG08RM4051 PaharganjRep Of HT Panel 3 Way I/D at

Idgah Telephone Exchange Fss.3.89 FY 08-09 HT

3009 PG08RM4053 PaharganjInstallation of HT RMU O/D at

Pather Walan S/S3.89 FY 08-09 HT

3010 PG08RM4054 PaharganjRep Of HT 9 Panel Make Mei at

Pg Dispensary Ss.21.04 FY 08-09 HT

3011 PG08SL1071 Paharganj

Installation of of Street Light Poles

With Fitting at Azad Market Main

Road(Deposit Work.).

2.06 FY 08-09 LT

3012 PG08UT4020 Paharganj

Aug. Of Existing Trf.From 630-990

Kva at Gali Bahuji Pm/L Zone Bg

Road. SS.

1.58 FY 08-09 HT

Page 137: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

3013 PG08UT4021 PaharganjAug. Of Existing Trf.From 630-990

Kva at Chowk Kishan Gunj SS.0.88 FY 08-09 HT

3014 PG08UT4023 PaharganjAugmentation of Transformer.from

630 to 990 KVA at AK Tanki Pl/M9.08 FY 08-09 HT

3015 PG08UT4024 PaharganjAug. Of Existing Trf.From 630-990

Kva at Bg Dispensary Ss.1.24 FY 08-09 HT

3016 PG08UT4025 PaharganjAug. Of Existing Trf.From 630-990

Kva at Bg Dispensary SS.0.98 FY 08-09 HT

3017 PG08UT4026 PaharganjAug. Of Existing Trf.From 630-990

Kva at Chimni Mil Pl/M SS.9.42 FY 08-09 HT

3018 PG08UT4027 Paharganj

Augmentation of existing

transformer.from 630 to 990 KVA

at Gali Neemwali Pl/M S/S

0.98 FY 08-09 HT

3019 PN05EL4083 Patel Nagar

Electrification of LOP of Baljeet

Nagar (SH-4: HT feeder from

Jhandewalan chowk to opp Shiv

mandir punjabi basti, Baljeet

Nagar)

3.56 FY 08-09 LT

3020 PN05EL4084 Patel Nagar

Electrification of LOP of Baljeet

Nagar (SH-5: laying of 2 nos LT

feeders from khatta Baljeet Nagar

near Jhandewala ch

6.28 FY 08-09 LT

3021 PN05EL4087 Patel Nagar

Electrification of LOP of Baljeet

Nagar (SH-8: 2 nos LT feeders

from Jhandewala ch. punjabi basti,

Baljeet Nagar)

14.65 FY 08-09 LT

3022 PN05EL4089 Patel Nagar

Electrification of LOP of Baljeet

Nagar and Prem Nagar (SH-2:

HT feed from Ambedker pk to

Tikona pk.punjabi basti Baljeet

Nagar)

3.40 FY 08-09 LT

3023 PN05EL4091 Patel Nagar

Electrification of LOP of Baljeet

Nagar and Prem Nagar( SH-4:3

nos LT feeder from tikona pk.

napali mandir Baljeet Nagar)

11.27 FY 08-09 LT

3024 PN05EL4115 Patel Nagar

Electrification of LOP of Anand

Parbat (SH-3: laying of 3 nos LT

feeders from toli wala sochalya

Anand Parbat, Patel Nagar)

24.96 FY 08-09 LT

3025 PN05LT4065 Patel NagarAugmentation. of LV overhead

mains5.84 FY 08-09 LT

3026 PN05LT4066 Patel Nagar

Shifting of LT cable and

Installationof LT Panel at East

Patel Nagar Complaint centre.

11.32 FY 08-09 LT

3027 PN05LT4073 Patel NagarLT Cable replaced with overhead

at 47-block Pat2.56 FY 08-09 LT

3028 PN05LT4123 Patel Nagar

Replacement of old bare LT O/H

Conductor with Cond.

(3x150mm2+1x70mm2+1x16mm2

)in Prem Nagar, Division Patel

Nagar

23.68 FY 08-09 LT

3029 PN05RM4030 Patel NagarInstallation of 11kV RMU (SF-6) at

Duggal No.II, A.Parbat4.62 FY 08-09 HT

3030 PN05RM4032 Patel NagarInstallation of 11kV RMU (SF-6)

at Sanjay Park, Baljeet Nagar4.89 FY 08-09 HT

3031 PN05RM4039 Patel NagarInstallation of new 11KV RMU SF6

Police station Anand parbat5.67 FY 08-09 HT

3032 PN05RM4048 Patel Nagar

Installation of 11kV RMU

extensible (SF-6) with additional

Single Panel at 47-Block. East

Patel Nagar

8.28 FY 08-09 HT

3033 PN05RM4050 Patel Nagar

Replacement of old unserviceable

7 Panel board with a new RMU +

four addl Panel at Zakhira Under

Bridge Sub station.

16.66 FY 08-09 HT

Page 138: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

3034 PN05RM4053 Patel Nagar

Replacement of old unserviceable

3 Panel board with a new

extensible RMU (SF-6)+ one addl

Panel at Gali No. 7-8, Anand

Parbat

8.75 FY 08-09 HT

3035 PN05RM4080 Patel Nagar

Replacement of 7 Panel board

with RMU at 10B,Raj.Place,Patel

Nagar

16.99 FY 08-09 HT

3036 PN05RM4119 Patel NagarReplacent of 4 Panel Board by 1no

4W I/D RMU at Hog Mkt.7.74 FY 08-09 HT

3037 PN05RM4155 Patel NagarReplacement of 7 Panel board by

2*4W indoor RMU at DMS P.S I/D12.32 FY 08-09 HT

3038 PN05RM4158 Patel Nagar

Replacement of 7 Panel board by

2*4W indoor RMU at

D.Multan,Patel Nagar

11.40 FY 08-09 HT

3039 PN05UT4023 Patel Nagar

Augmentation of Transformer from

630 to 990 KVA at Z- Block West

Patel Nagar

0.24 FY 08-09 HT

3040 PN05UT4159 Patel Nagar

Replacement of 990 kVA oil type

transformer with 1000 kVA dry

type transformer at Rajinder

Bhawan.

7.51 FY 08-09 HT

3041 PN06FA4568 Patel Nagar

Replacement of Old PILCA Cable

3X150 sqmm to New HT 3cx300

MM2 XLPE cable from Sarai

RohillaTo_Military rd via Booster

Pump s/st. in Div. PNR.

12.10 FY 08-09 HT

3042 PN06FA4585 Patel Nagar

Replacement of Old PILCA Cable

3X150 sqmm to New HT

3cx300 MM2 XLPE cable from

BakriwalaTo_tank Road s/st. in

Div. _PNR_.

10.48 FY 08-09 HT

3043 PN06FA4589 Patel Nagar

Replacement of U/G PILCA cable

of size 3x150 sqmm to 3x300

sqmm XLPE from Underbridge to

Nehru Nagar S/STN in Div. PNR

8.77 FY 08-09 HT

3044 PN06FA4590 Patel Nagar

Replacement of U/G PILCA cable

of size 3x150 sqmm to 3x300

sqmm XLPE from Military Road to

Gurudwara S/stn near CNG Pump

in div. PNR

3.09 FY 08-09 HT

3045 PN06FA4591 Patel Nagar

Replacement of U/G PILCA cable

of size 3x150 sqmm to 3x300

sqmm XLPE from J BLK to

Mafatlal (K) West Patel Nagar

S/STN in Div. PNR

5.21 FY 08-09 HT

3046 PN06FA4592 Patel Nagar

Replacement of U/G PILCA cable

of size 3x150 sqmm to 3x300

sqmm XLPE from F&G BLK To H

BLK West Patel Nagar S/STN in

Div. PNR

4.71 FY 08-09 HT

3047 PN06FA4593 Patel Nagar

Replacement of HT cable 3x150

sqmm with new HT XLPE cable

3x300 sqmm from Baljit Nagar(K)

s/stn no. 1 to 30 Blk (K) s/stn

WPN in Div. PNR

4.09 FY 08-09 HT

3048 PN06FA4594 Patel Nagar

Replacement of U/G PILCA cable

of size 3x150 sqmm to 3x300

sqmm XLPE from D-BLK to J BLK

S/STN West Patel Nagar in Div.

PNR

6.31 FY 08-09 HT

3049 PN06FA4595 Patel Nagar

Replacement of U/G PILCA cable

of size 3x150 sqmm to 3x300

sqmm XLPE from H BLK to D

BKL s/stns West Patel Nagar in

Div. PNR

5.29 FY 08-09 HT

Page 139: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

3050 PN06FA4596 Patel Nagar

Replacement of U/G PILCA cable

of size 3x150 sqmm to 3x300

sqmm XLPE from Mafatlal kiosk to

Z BLK West Patel Nagar S/STN in

Div. PNR

6.16 FY 08-09 HT

3051 PN06FA4598 Patel Nagar

Replacement of U/G H.T.PILCA

Cable 3X150 sqmm with New

H.T.XLPE Cable 3X300 sqmm

from BALJEET Nagar Plinth/M

S/Stn No-4 To S BLOCK (K)

S/Stn W.P.Naga in Div. PNR.

8.56 FY 08-09 HT

3052 PN06LT4527 Patel NagarConversion LT overhead to LT

ABC at Tank Road Patel Nagar9.71 FY 08-09 LT

3053 PN06LT4528 Patel Nagar

Conversion LT overhead / LT

ABC Than singh nagar ,Patel

nagar

12.51 FY 08-09 LT

3054 PN06LT4529 Patel NagarConversion LT overhead / LT

ABC Naibasti ,Patel nagar12.78 FY 08-09 LT

3055 PN06LT4563 Patel NagarReplacement of bare cond by AB

C in PTN98.84 FY 08-09 LT

3056 PN06LT4622 Patel Nagar

Laying of 02 No. LT fdrs from

additional 630 KVA DTR at Jakhira

Underbridge S/stn Gali No. 13

Anand Parbat in Div. Patel Nagar.

5.79 FY 08-09 LT

3057 PN06RM4034 Patel Nagar

Installtion Of New 11 Kv RMU SF-

6 at DMS Colony Kiosk Baljeet

Nagar

5.24 FY 08-09 HT

3058 PN06RM4524 Patel NagarInstallationl of 2*4 WAY +1 Way

ID RMU at 22-Blk (K), PNR19.67 FY 08-09 HT

3059 PN06RM4574 Patel Nagar

Replacement of 11 KV OLD HT

panel board with 01 No. 4 Way SF-

6 Indoor RMU at Vikram Tower in

Div. PNR

6.70 FY 08-09 HT

3060 PN06RM4576 Patel Nagar

Replacement of 11 KV OLD HT

panel board with 01 No. 4 Way SF-

6 Indoor RMU at Pragati Tower in

Div. PNR.

7.51 FY 08-09 HT

3061 PN06RM4579 Patel Nagar

Replacement of 11 KV OLD HT

panel board with 01 No. 4 Way SF-

6 Indoor RMU at Padma Tower

No.2 in Div. PNR.

6.82 FY 08-09 HT

3062 PN06RM4580 Patel Nagar

Replacement of 11 KV OLD HT

panel board with 01 No. 4 Way SF-

6 Indoor RMU at Gopala Tower in

Div. PNR

6.36 FY 08-09 HT

3063 PN06RM4581 Patel Nagar

Replacement of 11 KV OLD HT

panel board with 01 No. 4 Way SF-

6 Indoor RMU at HemkuntTower

in Div. PNR

6.73 FY 08-09 HT

3064 PN06RM4582 Patel Nagar

Replacement of 11 KV OLD HT

panel board with 01 No. 4 Way SF-

6 Indoor RMU at Vikram Tower

Basement in Div. PNR.

6.97 FY 08-09 HT

3065 PN06RM4599 Patel NagarRepl.of HT panel by RMU at

Liberty Cinema.7.91 FY 08-09 HT

3066 PN06RM4600 Patel Nagar

Installation Of Single Way O/D

Rmu at 12 Blk Wp Nagar In Div

Pnr.

3.79 FY 08-09 HT

3067 PN06SL2546 Patel NagarInstallation of High Mast ,Sh

Goswami MLA9.01 FY 08-09 LT

3068 PN06UT4609 Patel Nagar

Augmentation Of 630 Kva

Transformer With 990 Kva

Transformer At Papuwala S/St. In

Div.Patel Nagar.

0.98 FY 08-09 HT

3069 PN07FA4017 Patel Nagar

Replacement of some portion

ofOld PILCA Cable 3X300 sqmm

to New HT 3cx300 MM2 XLPE

cable from _Super bazar to Pooja

Park in div PNR

3.77 FY 08-09 HT

Page 140: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

3070 PN07LT4010 Patel Nagar

Laying Of 01 No. LT Feeder From

630 KVA Transformer at

Ambedkar Park to Chotey Lal Wali

Gali Baljeet Nagar in Div. PNR.

1.97 FY 08-09 LT

3071 PN07NF4001 Patel Nagar

Laying of 3X300 sqmm XLPE

new HT cable from Anand Parbat

Grid to Underbridge S/Stn Anand

Parbat in Div. PNR

19.60 FY 08-09 HT

3072 PN07SL1015 Patel NagarInstallation of 20 No. 11 Mtrs high

mast24.73 FY 08-09 LT

3073 PN08AT4067 Patel Nagar

Additional Transformer of 630

KVA at Tank Road inside Bapa

Nagar

3.09 FY 08-09 HT

3074 PN08FA4113 Patel Nagar

Replacement of 3X300MM2

PILCA H.T. Cable to XLPE Cable

Size 3X300MM2 from Sarai

Rohilla S/S to Punjabi Basti

Militory Road in Div PNR

15.00 FY 08-09 HT

3075 PN08LT4099 Patel Nagar

Laying of U/G Replacement of

2Nos L.T.Feeder from S/Stn

17B.Dev Nager to H.No.16/361

Purani Chungi Bapa Nager

3.69 FY 08-09 LT

3076 PN08LT4104 Patel Nagar

Replacement of Bare Conductor

by AB Cable in Dev Nagar And

Mata Rameshwari Nehru Nagar

Tank Road

93.61 FY 08-09 LT

3077 PN08LT4105 Patel Nagar

Replacement of Bare Cnductor by

AB Cable In Baljeet Nagar Prem

Nagar Nehru Nagar

93.76 FY 08-09 LT

3078 PN08LT4119 Patel Nagar

Laying Of U/G Additional One No

LT Feeder 4*300 Sqmm From

10Blk Eastpatel Nagar To Back

Lane 1/7 East Patel Nagar 1/7

4.48 FY 08-09 LT

3079 PN08LT4125 Patel Nagar

Replacement of Bare Conductor

by LT AB Conductor at Rajasthan

Colony ,Baba Farid Puri ,West

Patel Nagar

84.91 FY 08-09 LT

3080 PN08LT4127 Patel Nagar

Replacement of bare conductor by

AB cable at Toliwala Anand Parbat

in Div Patel Nagar

89.02 FY 08-09 LT

3081 PN08MS4117 Patel Nagar

Replacement/Augmentation of

O/H LT Main Line Worn Out off

Size Conductor With New

Insulated Dog Conductor at Anad

Parbat Div Pnr.

43.75 FY 08-09 LT

3082 PN08RM4039 Patel Nagar

Installation of RMU, 11kV, Manual

3Way(1CB+2Iso) I/D Ext-1No at

Tikona Park Gadodia Road Anand

Parvat

3.88 FY 08-09 HT

3083 PN08RM4041 Patel Nagar

Installation Of Rmu, 11Kv, Manual

1Way(1Cb)I/D Ext-1No(Required

Of Abbmake) at Unde Bridge

S/Stn Anand.

3.05 FY 08-09 HT

3084 PN08RM4044 Patel Nagar

Installation of additional RMU,

11kV, Manual 1Way(1CB) O/D

Ext(Required of Cgl Make) at

Gurudwara Militory Road Pl/M

S/Stn

2.47 FY 08-09 HT

3085 PN08RM4071 Patel NagarReplacement of 4 Way SF6 at

C&A Parshad Nagar6.27 FY 08-09 HT

3086 PN08RM4072 Patel NagarReplacement of 3 Way SF6 at

Sidharth Hotel4.16 FY 08-09 HT

3087 PN08RM4076 Patel NagarPannel with replacement at

Parbhat Kiran tower9.38 FY 08-09 HT

3088 PN08RM4077 Patel NagarReplacement with 3Way+Single

Breaker at Kirshna Tirth 6 Block6.29 FY 08-09 HT

3089 PN08RM4079 Patel NagarReplacement of 4Way SF6-

11B.Dev Nager Arya Smaj Road6.88 FY 08-09 HT

Page 141: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

3090 PN08RM4080 Patel Nagar

Replacement of R.M.U 3 Way

SF6 at Than Singh Nagar Booster

Pump

3.83 FY 08-09 HT

3091 PN08RM4133 Patel NagarInstallation of additional 1 Way

RMU at Farid Puri S/S2.93 FY 08-09 HT

3092 PN08SL1109 Patel NagarInstallation of street light Baljeet

Nagar.3.64 FY 08-09 LT

3093 PN08SL1120 Patel Nagar

Providing of New St Ltg Fittings of

70 Watt Hpsv In Patel Nagar Area

For Development of Un Authorised

Colonies(Nepali Mandir)Baljeet

Ngr.

0.95 FY 08-09 LT

3094 PN08SL1121 Patel Nagar

Providing of New St Ltg Fittings of

70 Watt Hpsv In Patel Nagar Area

For Development of Un Authorised

Colonies(Tauli Wala)Baljeet Ngr.

0.94 FY 08-09 LT

3095 PN08SL1122 Patel Nagar

Providing of New St Ltg Fittings of

70 Watt Hpsv In Patel Nagar Area

For Development of Un Authorised

Colonies(Holychowk)Baljeet Ngr.

1.04 FY 08-09 LT

3096 PN08UT4048 Patel Nagar

Aug. Of Tr. From 630 To 990 Kva

at 13-B P.L Road Dev Nagar Pl/M

S/Stn.

9.16 FY 08-09 HT

3097 PN08UT4049 Patel NagarAug. Of Tr. From 630 To 990 Kva

at MCD Dev Nagar S/Stn.9.04 FY 08-09 HT

3098 PN08UT4058 Patel NagarAug. Of Tr. From 400 To 630 Kva

At Krishna Tirth Pl/M S/Stn.0.60 FY 08-09 HT

3099 PN08UT4062 Patel Nagar

Augmentation of transformer from

630 to 990 KVA at H.S Road(K)

S/Stn .

8.97 FY 08-09 HT

3100 PN08UT4065 Patel NagarAug. Of Tr. From 630 To 990 Kva

at Riwa Pl/M S/Stn Anand Parvat.9.19 FY 08-09 HT

3101 SR04EL4725 Shankar Road

Electrification of Plot No. I, New

Rajinder Nagar behind Fire

Station, Sroad .

4.92 FY 08-09 HT

3102 SR04LT4547 Shankar RoadTaking out 2no. LT feeder frm

Baljeet nagar No.5 sub station 1.86 FY 08-09 LT

3103 SR04LT4557 Shankar RoadTaking out 2no. LT feeder frm

Baljeet nagar No.3 sub station 1.96 FY 08-09 LT

3104 SR04LT4651 Shankar Road

Laying of 1 no. additional LT

feeders from R.K.Dass No. 3 and

4 sub station tn. at Karol Bagh,

Zone-1401.

1.89 FY 08-09 LT

3105 SR04LT4770 Shankar RoadReplacement of seek feeder and

Service Pillar in S road 57.83 FY 08-09 LT

3106 SR04NC2D001 Shankar RoadProviding additional connection

under ML/HT Category.4.61 FY 08-09 HT

3107 SR04RM4580 Shankar Road

Replacement of Old unserviceable

11 kV RMU with a new 11 kV SF6

type RMU with additional Single

Panel at Baljeet Nagar No.-III.

0.82 FY 08-09 HT

3108 SR04RM4584 Shankar RoadReplacementof PB by E.RMU at

Rajinder Park sub station 14.25 FY 08-09 HT

3109 SR04RM4590 Shankar Road

Replacement of Old unserviceable

11 kV 4-Panel board with a new

11 kV 7-Panel board VCB type at

O and M Block sub station, West

Patel Nagar.

9.18 FY 08-09 HT

3110 SR04RM4753 Shankar Road

Replacement of old damaged

unservicable RMU by new E.RMU

SF6 type at Rajinder Nagar.

11.62 FY 08-09 HT

Page 142: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

3111 SR04SS4554 Shankar Road

Augmentation of 630 kVA

Transformer to 990 kVA

transformer along with installation

of 11kV Extensible RMU SF6 type

at Tank Road No. 1 sub station

tn., Bapa Nagar, Karol Bagh.

15.34 FY 08-09 HT

3112 SR04SS4566 Shankar Road

Augmentation of 400 kVA

Transformer to 630 kVA

transformer at 5A-Block WEA,

Karol Bagh.

17.67 FY 08-09 HT

3113 SR04SS4690 Shankar Road

Augmentation of 2x400 kVA

Transformer to 2x990 kVA

transformer at Karachi Sweet,

Karol Bagh along with 5-Panel

board.

18.42 FY 08-09 HT

3114 SR04SS4707 Shankar Road

Augmentation of 630 kVA

Transformer to 990 kVA

Transformer along with Installation

of 11kV Extensible RMU SF6 type

+ 1 no. additional Single Panel at

Baljeet Nagar (Janta Park) Sub

station.

6.05 FY 08-09 HT

3115 SR04UT4751 Shankar Road

Augmentation of 2x400 kVA

Transformer to 1 no. 630 kVA and

1 no. 990 kVA Transformer at

Military Road, Anand Parbat.

0.58 FY 08-09 HT

3116 SR05FA4076 Shankar RoadAugmentation of HT 3X150-

3X300XLPE from Rajinder nagar48.64 FY 08-09 HT

3117 SR05JJ4100 Shankar Road

Electrification of JJ Colony at

Behind of D.B Gupta Road Police

Station, Divn: Sroad .

2.21 FY 08-09 LT

3118 SR05JJ4102 Shankar Road

Electrification of JJ Colony at

Jhandewalan near Karol Bagh,

Divn: SRD

14.75 FY 08-09 LT

3119 SR05LT4086 Shankar Road

Taking out 1no LT feeder from

Delhi Presub stationsub stationin

Sroad

4.10 FY 08-09 LT

3120 SR05LT4087 Shankar RoadTaking out 1no LT feeder from

Bhootnath sub stationin Sroad 0.35 FY 08-09 LT

3121 SR05LT4143 Shankar RoadTaking out 7 No. LT feeders at

Pole No. 1 Substation.7.45 FY 08-09 LT

3122 SR05RM4038 Shankar Road

Installation of 11kV RMU

extensible (SF-6)with additional

Single Panel at JaSub stationa

Ram karol Bagh

8.55 FY 08-09 HT

3123 SR05RM4081 Shankar Road

Installation of new RMU near

Shankar Road round about for

ridge road overhead feeder.

4.89 FY 08-09 HT

3124 SR05RM4127 Shankar Road

Replacement of 7 Panel board by

2*4W indoor RMU at 5-

block(K)Sroad

11.36 FY 08-09 HT

3125 SR05RM4132 Shankar RoadReplacement of 9 Panel board by

3*4W indoor RMU at A.Khan(K)17.31 FY 08-09 HT

3126 SR05RM4134 Shankar RoadReplacement of 7 Panel board by

2*4W indoor RMU at K'sa Colleg12.09 FY 08-09 HT

3127 SR06AT4068 Shankar Road

Providing of additional 630 KVA

transformer at Pusa Road

Complaint center in D-SRD

1.03 FY 08-09 HT

3128 SR06FA4075 Shankar Road

Augmentation of HT 11KV HT

cable 3x150 Pilca to 3x300 XLPE

from Regarpura to R.K. Das No 2

via R.K. Das 3, R.K. Das 1, 73

Regarpura, Hathiwala

19.78 FY 08-09 HT

Page 143: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

3129 SR06FA4076 Shankar Road

Replacement/Augmentation of HT

11KV HT cable 3x150/3x300 Pilca

to 3x300 XLPE from Shastri park

Grid to satbrahma P/M via 8C

Jassa Ram, Satbrahma (K), Jassa

Ram hospital and Shastri Park

Grid to Link Road

43.91 FY 08-09 HT

3130 SR06FA4078 Shankar Road

Replacement/Augmentation of HT

11KV HTcable 3x150/3x300 Pilca

to 3x300 XLPE from Shankar

Road Grid to andh mahavihyalaya

via Community Center, Manav

Sthali, Nehru Park, DI Khan, R

Blk, Ram Nath Viz.

46.41 FY 08-09 HT

3131 SR06FA4079 Shankar Road

Augmentation of HT 11KV

HTcable 3x150 Pilca to 3x300

XLPE from 51 Blk to 21 Blk Old

Rajinder Nagar via 17B, Old

Salwan and New Salwan

25.25 FY 08-09 HT

3132 SR06FA4081 Shankar Road

Replacement/Augmentation of HT

11KV HT cable 3x150/3x300 Pilca

to 3x300 XLPE from chapperwala

to P.O. No.3 via Police Qtr, H.S.

Basement , MCD Car Parking,

A.S. Road No 1, P.O. No 5, P.O.

No 6, P.O. No 7, P.O. No 1,2,

P.O. No 4.

34.61 FY 08-09 HT

3133 SR06FA4082 Shankar Road

Augmentation of HT 11KV

HTcable 3x150 Pilca to 3x300

XLPE from Chapperwala to Khalsa

P/M via liberty, Ramjas Rd (K) to

53 Blk (K) via 61 Blk, 53 Blk P/M,

Ramjas Rd to 53 Blk (K).

59.56 FY 08-09 HT

3134 SR06FA4083 Shankar Road

Augmentation of HT 11KV

HTcable 3x150 Pilca to 3x300

XLPE from Chapperwala to Joshi

Road P/M via Ajmal Khan (K),

Tibbia College, Sujan Singh Park,

Ajmal Khan Park, Khajoor Road

P/M, Khajoor Road (K), Joshi

Road (K) and Ajmal Khan Park to

O/H.

48.66 FY 08-09 HT

3135 SR06FA4084 Shankar Road

Replacement/Augmentation of HT

11KV HTcable 3x150/3x300 Pilca

to 3x300 XLPE from Prasad Nagar

to R.K. Das No.2 via Rama Ice,

Dhobi Ghat, Bapu Bhawan.

8.21 FY 08-09 HT

3136 SR06FA4085 Shankar Road

Replacement/Augmentation of HT

11KV HTcable 3x150/3x300 Pilca

to 3x300 XLPE from Prasad Nagar

to O/H DP via Khalsa College.

35.33 FY 08-09 HT

3137 SR06LT4093 Shankar Road

Laying of 1 No. LT feeders 990

KVA transformer at 61 Blk Ramjas

Road S/STN.

2.71 FY 08-09 LT

3138 SR06LT4103 Shankar Road

Laying of 2 No. LT feeders 2*990

KVA transformer at Karanchi

Sweet S/STN

3.96 FY 08-09 LT

3139 SR06LT4105 Shankar Road

Replacement/new 3 No. LT

feeders from existing 2*990 KVA

transformer at Pusa Road S/STN

8.02 FY 08-09 LT

Page 144: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

3140 SR06LT4109 Shankar Road

Replacement/New 5 No. LT

Feeders from existing 2*990 KVA

transformer at R.K. Das No 3/2

S/Stn.

7.52 FY 08-09 LT

3141 SR06LT4112 Shankar Road

Replacement/new 3 No. LT

feeders from existing 2*990 KVA

transformer at Shastri Park

Switching Station S/STN

6.76 FY 08-09 LT

3142 SR06LT4114 Shankar Road

Laying of 1 No. new LT feeders

from existing 990 KVA transformer

at Old Salwan S/STN

1.00 FY 08-09 LT

3143 SR06NF4086 Shankar Road

Laying of new HT cable 3x300 sq

mm XLPE between DDA complex

to NPL Indoor S/stn.

16.85 FY 08-09 HT

3144 SR06RM4042 Shankar Road

Installation of 4 Way RMU I/D at

Community Center in Shankar

Road

7.92 FY 08-09 HT

3145 SR06RM4043 Shankar RoadInstallation of 5 Way RMU I/D at

Sindhi Park in D-SRD7.33 FY 08-09 HT

3146 SR06RM4046 Shankar RoadInstallation of 2 no 4 way RMU I/D

at 51-52 Blk in SRD.15.29 FY 08-09 HT

3147 SR06RM4051 Shankar RoadInstalltion of 5 Way RMU I/D at

R.K. Das no 1 D-SRD11.89 FY 08-09 HT

3148 SR06UT4052 Shankar Road

Augmentation of transformer of

400 KVA to 630 KVA at Jassa

Ram Hospital S/stn in Div.

Shankar Road

0.66 FY 08-09 HT

3149 SR06UT4058 Shankar Road

Augmentation of transformer of

630 KVA to 990 KVA at P.L. Road

Nala S/Stn in Div. Shankar Road

0.76 FY 08-09 HT

3150 SR07AT4514 Shankar Road

Additional transformer of 630 KVA

at Old Salwan S/stn in Shakar

road Div.

1.16 FY 08-09 HT

3151 SR07AT4517 Shankar Road

Additional transformer of 400 KVA

at Tikona Park in Shankar road

Div.

0.90 FY 08-09 HT

3152 SR07AT4518 Shankar Road

Additional transformer of 400 KVA

at 2E Jhandewalan PL/M S/stn in

Shankar road Div.

0.93 FY 08-09 HT

3153 SR07AT4520 Shankar Road

Providing of additional 400 KVA

transformer at 13 Blk WEA karol

Bagh in D-SRD.

0.74 FY 08-09 HT

3154 SR07AT4521 Shankar Road

Providing of additional 630 KVA

transformer at Ram Nath Viz S/stn

in D-SRD

1.35 FY 08-09 HT

3155 SR07AT4529 Shankar Road

Providing of additional 990 KVA

transformer at Shastri Park S/stn

in D-SRD.

9.14 FY 08-09 HT

3156 SR07AT4531 Shankar Road

Additional transformer of 400 KVA

at New Salwan S/stn in Div.

Shankar Road

0.66 FY 08-09 HT

3157 SR07AT4532 Shankar Road

Additional transformer of 400 KVA

at 6 Blk WEA Karol Bagh S/stn in

Div. Shankar Road

0.73 FY 08-09 HT

3158 SR07LT4522 Shankar Road

Laying of 4 No. new LT feeders

from existing 2*990 KVA

transformer at Tikona Park

S/STN.

7.95 FY 08-09 LT

3159 SR07LT4524 Shankar Road

Laying of 5 No. new LT feeders

from existing 2*990 KVA

transformer at Sethi Petro Pump

Old Rajinder Nagar S/STN.

8.88 FY 08-09 LT

3160 SR07LT4525 Shankar Road

Laying of 4 No. new LT feeders

from existing 990 KVA transformer

at Ram Nth Viz New Rajinder

Nagar S/STN.

5.82 FY 08-09 LT

Page 145: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

3161 SR07LT4526 Shankar Road

Laying of 4 No. new LT feeders

from existing 990 KVA transformer

at Ganga Ram Hospital S/STN

9.80 FY 08-09 LT

3162 SR07RM4527 Shankar Road

Installation of 5 Way panel with 3

way RMU O/D + two singal panel

O/D at 2E PL/M Jhandewalan in D-

SRD

10.33 FY 08-09 HT

3163 SR07RM4535 Shankar Road

Installation of new 1 nos single

Way panel (Samme Make) I/D at

Old Salwan S/stn in D-SRD

3.64 FY 08-09 HT

3164 SR08AT4004 Shankar Road

Additional transformer of 630 KVA

at Chapperwala Karol Bagh S/Stn

In Div. Shankar Road

0.84 FY 08-09 HT

3165 SR08AT4005 Shankar Road

Additional transformer of 400 KVA

at Agarawal Sweet S/Stn In Div.

Shankar Road.

1.15 FY 08-09 HT

3166 SR08AT4007 Shankar Road

Additional Transformer Of 400 Kva

At Npl P/M S/Stn In Div. Shankar

Road0.53 FY 08-09 HT

3167 SR08LT4012 Shankar Road

1 No Additional L T Feeders from

newly augmented 630 KVA

Transformer at Joshi Road Pl/M

S/Stn

1.97 FY 08-09 LT

3168 SR08LT4013 Shankar Road

2 Nos New L T Feeders from

Newly proposed 400 KVA

Transformer

4.44 FY 08-09 LT

3169 SR08LT4016 Shankar Road

2 Nos Additional L T Feeders from

proposed 400 KVA Transformer at

Ajmalkhna (K) S/Stn in D-SRD

2.23 FY 08-09 LT

3170 SR08LT4021 Shankar Road

1 No Additional L T Feeders from

existing 630 KVA Transformer at

Janta market Pl/M S/Stn.

1.46 FY 08-09 LT

3171 SR08LT4022 Shankar RoadRep 1 No LT fdr from

Jhandewalan No 30.68 FY 08-09 LT

3172 SR08LT4024 Shankar Road

2 Nos additional L T Feeders and

1 no replacement of L T Feeder

from newly augmented 990 KVA

transformer at Khajoor Road Pl/M

S/Stn.

3.23 FY 08-09 LT

3173 SR08LT4028 Shankar Road

Replacement of 1 Nos L T

Feeders from 990 KVA

Transformer at MCD Car parking

S/Stn.

2.74 FY 08-09 LT

3174 SR08LT4031 Shankar Road Rep 1 No LT Fdr from P.O. No 6 0.63 FY 08-09 LT

3175 SR08LT4032 Shankar Road

Replacement of 1 Nos L T

Feeders and 1 No additional

feeder from 990 KVA transformer

at P.O. No 5 S/Stn.

1.34 FY 08-09 LT

3176 SR08LT4058 Shankar Road

Laying Of 1No. LT Feeder From

52 Block S/Stn To 51/40,Old

Rajinder Nagar & O/H Conductor

Upto Ganga Ram Road.

7.68 FY 08-09 LT

3177 SR08LT4063 Shankar Road

Replacement of existing bare

conductor with AB conductor in D-

SRD

38.71 FY 08-09 LT

3178 SR08LT4074 Shankar Roadlaying of 2 nos LT feeder from

NPL PL/M3.81 FY 08-09 LT

3179 SR08LT4075 Shankar RoadLaying of 3 Nos New LT Feeder

from R.K. Das 1S/Stn in D-SRD4.40 FY 08-09 LT

3180 SR08LT4093 Shankar Road

Replacement of one No. LT

feeder from SRD Building to

Pumposh Road.

3.29 FY 08-09 LT

Page 146: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

3181 SR08MS4076 Shankar Road

Augmentation to Dog Conductor

from the Existing Lower Size

Conductor in Naiwala and

Beadonpura in D-SRD.

11.31 FY 08-09 LT

3182 SR08MS4077 Shankar RoadCon. of Raiseena O/H Ht Line to

HT AB4.98 FY 08-09 LT

3183 SR08MS4079 Shankar Road

Augmentation to Dog Conductor

from the Existing Lower Size

Conductor at Old and New

Rajinder Nagar in D-SRD

10.97 FY 08-09 LT

3184 SR08MS4080 Shankar Road

Replacement Of Service Cable in

Jhadewalan, Sat Nagar, Janta

Market, Mukhargi Market.

9.31 FY 08-09 LT

3185 SR08NF4068 Shankar RoadNew Feeder from 3A WEA to R.K.

Das 2 Via Bapu Dham S/Stn12.30 FY 08-09 HT

3186 SR08RM4040 Shankar Road

Installation of 4 Way Panel With 3

Way RMU O/D + One Single

Panel

6.66 FY 08-09 HT

3187 SR08RM4041 Shankar RoadInstallation of 3 Way RMU O/D at

Bapu Dham S/Stn in D-SRD4.13 FY 08-09 HT

3188 SR08RM4044 Shankar RoadInstallation of one Single Panel I/D

at 4E Gurudwara S/Stn in D-SRD3.04 FY 08-09 HT

3189 SR08RM4047 Shankar RoadInstallation of One Singal Panel I/D

at Agarwal Sweet S/Stn in D-SRD2.96 FY 08-09 HT

3190 SR08RM4056 Shankar Road

Installation of 3 Way RMU O/D at

40 Regarpura Karol Bagh in

Shankar road

3.90 FY 08-09 HT

3191 SR08SL1083 Shankar Road

Providing of New 40 Nos St Ltg

Fittings of 150 Watt Hpsv In New

Rajinder Nagar.

1.49 FY 08-09 LT

3192 SR08SL1085 Shankar Road

Providing of New 7 Nos St Ltg

Fittings of 150 Watt Hpsv With

Pcc Pole In New Rajinder Nagar

Area Requested By SDM Karol

Bagh.

0.62 FY 08-09 LT

3193 SR08UT4009 Shankar Road

Augmentation Of 630 Kva To 990

Kva 51-52 Blk Old Rajinder Nagar

S/Stn In Div. Shankar Road.

0.76 FY 08-09 HT

3194 SR08UT4010 Shankar Road

Augmentation Of 630 Kva To 990

Kva Birla Flat S/Stn In Div.

Shankar Road.

0.77 FY 08-09 HT

3195 SR08UT4086 Shankar Road

Augmentation Of 630 Kva To 990

Kva Transformer at Nala A.S.

Road (K) In D-SRD.

0.72 FY 08-09 HT

3196 SR08UT4087 Shankar Road

Augmentation Of 630 Kva To 990

Kva Transformer at R.K. Das No 1

S/Stn Ind-Srd.

0.63 FY 08-09 HT

3197 YV0418126 Yamuna ViharInstallation of additional 400 KVA

transformer at Noore nagar0.05 FY 08-09 HT

3198 YV04NF4620 Yamuna ViharProviding HT feed to EX.

ushmanpur from Shastri park grid.1.17 FY 08-09 HT

3199 YV04PS4606 Yamuna Vihar

Providing Package Substation

With HT and Lt Feed at C-3

Yamuna Vihar

21.45 FY 08-09 HT

3200 YV05LT4164 Yamuna ViharLVDS work at BRAHMPURI NO 1

(Yamuna vihar-630&400)1.01 FY 08-09 LT

3201 YV05LT4165 Yamuna ViharLTMP of Chauhaan banger No. 2

Yamuna vihar7.27 FY 08-09 LT

3202 YV05LT4166 Yamuna ViharLVDS work at Nala No.1 Zafrabad

(Yamuna vihar)13.83 FY 08-09 LT

3203 YV05LT4168 Yamuna ViharLVDS work at Area outside School

Zafrabad.10.01 FY 08-09 LT

3204 YV05LT4169 Yamuna ViharLVDS work at INSIDE KOTHI

ZAFARAD, Yamuna vihar12.10 FY 08-09 LT

Page 147: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

3205 YV05LT4171 Yamuna ViharLVDS work at Outside Kothi

Zafrabad -Yamuna vihar9.74 FY 08-09 LT

3206 YV05LT4174 Yamuna ViharLVDS work at Chauhan Bangar

Gali No.-5-Yamuna vihar19.54 FY 08-09 LT

3207 YV05LT4177 Yamuna Vihar

LVDS work at Mercury

chowk,Chauhan Bangar-Yamuna

vihar

12.56 FY 08-09 LT

3208 YV05LT4178 Yamuna ViharLVDS work at Road No 66

Zafrabad Khatta-Yamuna vihar18.76 FY 08-09 LT

3209 YV05RM4043 Yamuna Vihar

Replacement of 7 panel board

make RBL to seven Panel board at

Vijai park kiosk, Distt.Yamuna

Vihar

25.09 FY 08-09 HT

3210 YV06LT4041 Yamuna Vihar

Replacement Of Three Nos. Old

Sick Cable at D Block Gamri Gali

No-10

6.02 FY 08-09 LT

3211 YV06RM4039 Yamuna ViharInstallation of RMU at Village

Gamri.7.16 FY 08-09 HT

3212 YV06RM4040 Yamuna ViharReplacement Of Four Panel Board

at South Gamri Kiosk.12.08 FY 08-09 HT

3213 YV06RM4042 Yamuna ViharProviding RMU at Seth bhagwaan

dass school4.25 FY 08-09 HT

3214 YV06RM4046 Yamuna ViharReplacement of Panel Board at

DTC Office YVR.6.97 FY 08-09 HT

3215 YV07AT4509 Yamuna Vihar

Installation Of New Transformer

400 Kva at Chauhan Banger Gali

No-10

1.48 FY 08-09 HT

3216 YV07AT4510 Yamuna Vihar

Installation Of New Transformer

400 Kva at Banarsi Dass Engg.

College

2.09 FY 08-09 HT

3217 YV07AT4513 Yamuna ViharInstallation Of New Transformer

400 Kva at Subash Mohalla No-1 1.31 FY 08-09 HT

3218 YV07AT4514 Yamuna ViharInstallation Of New Transformer

630 Kva at Mohanpuri Div-YVR1.84 FY 08-09 HT

3219 YV07EL2539 Yamuna Vihar

Electrification of DMRC Staff

Quarter in D-7 Block (Type-2) & D-

8 Block (Type-3) at Shastri Park,

Delhi.( For HT, LT & S/Stn. (50:50

share part,100:0 part framed vide

SAP no. YV07EL2540)

24.24 FY 08-09 HT

3220 YV07EL2540 Yamuna Vihar

Electrification of DMRC Staff

Quarter in D-7 Block (Type-2) & D-

8 Block (Type-3) at Shastri Park,

Delhi.(For Service Connection).

(100:0 part ,50 :50 part framed

vide SAP no. YV07EL2539 )

2.59 FY 08-09 HT

3221 YV07HT4515 Yamuna Vihar

Providing HT feed to newly

installed transformer at Mohanpuri

school

5.51 FY 08-09 HT

3222 YV07JJ4501 Yamuna ViharElectrification of JJ cluter J,k & b

pur106.71 FY 08-09 LT

3223 YV07LT4508 Yamuna Vihar

T/O Four Nos. LT Feeder from

Augmented Transformer at

Crescebnt School

6.64 FY 08-09 LT

3224 YV07LT4516 Yamuna Vihar

T/O 3 No. Lt U/G Feeder from

Newly Installed 630 Kva Trf at

‗Mohanpuri School

5.86 FY 08-09 LT

3225 YV07LT4517 Yamuna Vihar

T/O 3 No. Lt U/G Feeder from

Newly Aumented Trf at Photo

Chowk Welcome

5.96 FY 08-09 LT

3226 YV07LT4519 Yamuna Vihar

T/O 3 No. LT U/G Feeder From

Newly Installed 400 Kva Trf

Banarsi Dass Engineering College.

6.84 FY 08-09 LT

3227 YV07LT4520 Yamuna Vihar

T/O 3 No. Lt U/G Feeder from

Newly Installed 400 Kva Trf at

Chauhan Banger Gali No-10

7.43 FY 08-09 LT

Page 148: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

3228 YV07LT4521 Yamuna Vihar

  T/O 3 NO. LT U/G Feeder from

newly installed 400 KVA Trf at

Subhash Mohalla.No.-1

6.27 FY 08-09 LT

3229 YV07SH1528 Yamuna Vihar

Shifting of electric poles on 1.

Railway Factory Road, 2 – Vijay

Park Main Road from Mohanpuri

to Road No. 66.

3.39 FY 08-09 LT

3230 YV07SH4524 Yamuna Vihar

Diversion of load of 11KV

Wazirabad Grid-1 to O/H Gamri at

Wazirabad II Grid.5.05 FY 08-09 HT

3231 YV07UT4511 Yamuna Vihar

Augmentation Of Transformer

from 630Kva to 990 Kva at Photo

Chowk Welcome Div-YVR.

1.15 FY 08-09 HT

3232 YV08FA4031 Yamuna ViharAugmentation of Cable from SBI to

Kab. Market11.88 FY 08-09 HT

3233 YV08FA4032 Yamuna ViharAugmentation of Cable from Z-2 to

Bagwali Masjid4.78 FY 08-09 HT

3234 YV08FA4034 Yamuna ViharAugmentation of Cable from PWD

to E Block S Park4.78 FY 08-09 HT

3235 YV08LT4039 Yamuna Vihar

Replacement of LT Cable

between Adarsh Mohalla Gali No-

14

9.89 FY 08-09 LT

3236 YV08LT4040 Yamuna ViharRep of LT Cable between

Vijaypark To Gali No-24.85 FY 08-09 LT

3237 YV08LT4045 Yamuna ViharRep of LT Cable between Sanjay

Mohalla To Gali No-110.06 FY 08-09 LT

3238 YV08LT4055 Yamuna ViharRep of LT Cable Between Moni

Baba To Gali No-97.12 FY 08-09 LT

3239 YV08LT4083 Yamuna ViharPdg Addl P.C.C.Poles & L T Ab

Cables In D-YVR18.49 FY 08-09 LT

3240 YV08LT4087 Yamuna Vihar New cable at C-9 PSS YVR. 9.68 FY 08-09 LT

3241 YV08LT4088 Yamuna Vihar New cable at C-10 PSS YVR. 8.03 FY 08-09 LT

3242 YV08MS4089 Yamuna ViharReplacement of DB one phase

distt. YVR34.39 FY 08-09 LT

3243 YV08MS4093 Yamuna ViharReplacement of Service Cable in

Seelampur H,J, K, CPJ Block54.45 FY 08-09 LT

3244 YV08MS4096 Yamuna Vihar

Replacement of Service Cable in

Maujpur, Vijay Park , Vijay

Mohalla and Jamalu Ka Bagh

65.66 FY 08-09 LT

3245 YV08MS4097 Yamuna Vihar

Replacement of Service Cable in

Ghonda , Gamri Ext and J P

Nagar

51.52 FY 08-09 LT

3246 YV08MS4099 Yamuna Vihar

Replacement of Service Cable in

Bhajanpura , Subhash Mohalla,

Sanjay Mohalla , Gadhi Mandu

56.91 FY 08-09 LT

3247 YV08MS4100 Yamuna Vihar

Replacement of Service Cable in

Noor-E-Lahi, Mohan Puri, DJB

YVR

9.66 FY 08-09 LT

3248 YV08MS4101 Yamuna ViharRepl. of Service Cable In Chauhan

Bangar65.25 FY 08-09 LT

3249 YV08MS4102 Yamuna ViharReplacement of Service Cable in

Janta Colony & SBI Welcome58.43 FY 08-09 LT

3250 YV08MS4105 Yamuna ViharReplacement of Service Cable in

Vijay Mohalla & Jamlo Ka Bahg37.78 FY 08-09 LT

3251 YV08NF4059 Yamuna ViharPdg HT fd H blk to CPJ Slm Pur

D-YVR5.47 FY 08-09 HT

3252 YV08NF4063 Yamuna ViharPdg H.T.Feed Dwarka Grid to

Janta Colony Jafarabad in D-YVR7.30 FY 08-09 HT

3253 YV08RM4002 Yamuna ViharReplacement of 7 Panel Board at

Seelampur Comp.Center11.11 FY 08-09 HT

3254 YV08RM4003 Yamuna ViharReplacement of 5 Panel Board at

E Blk Seelampur9.46 FY 08-09 HT

3255 YV08RM4006 Yamuna ViharReplacement of 5 Panel Board at

C-8 Yvr9.62 FY 08-09 HT

3256 YV08RM4007 Yamuna ViharReplacement of 5 Panel Board at

C Blk Shastri Park5.53 FY 08-09 HT

Page 149: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

3257 YV08RM4010 Yamuna ViharReplacement of 5 Panel Board at

MCD Flat No-35.61 FY 08-09 HT

3258 YV08RM4013 Yamuna ViharReplacement of 6 Pnel Board at J

Block Seelampur11.88 FY 08-09 HT

3259 YV08RM4015 Yamuna ViharInstallation of 3 Panel Board at H

Blk Seelampur3.63 FY 08-09 HT

3260 YV08RM4016 Yamuna ViharInstallation of 3 Panel Board at

Kblk Seelampur3.91 FY 08-09 HT

3261 YV08RM4020 Yamuna ViharInstallation of 3 Panel Board at

Janta Colony P Mitti3.88 FY 08-09 HT

3262 YV08RM4024 Yamuna ViharReplacement of 4 Pnel Board at

Sabji Mandi Moujpur6.77 FY 08-09 HT

3263 YV08SS4085 Yamuna ViharPdg L T Panel Board in B-1,B-4, C-

11&12, C-7/2 etc in D- YVR35.12 FY 08-09 LT

3264 EC04MS4533 EHV Central Construction of toilet block etc. at

66KV Grid s/s East of Loni Road.2.35 FY 08-09 EHV

3265 EE04GC2N004 EHV East C/O 15 MVA Transformer

foundation at Kailash Nagar.1.67 FY 08-09 EHV

3266 CC05RS4082 Chandni ChowkRennovation of Customer care

center at Chandni Chowk division21.92 FY 08-09 Others

3267 CC06CV4129 Chandni ChowkRep.asbestos sheet cap. bnk Twn

hall grd0.53 FY 08-09 Others

3268 DG05RS4153 DaryaganjRennovation of Customer care

center at Daryaganj division25.55 FY 08-09 Others

3269 DG07CV4505 Daryaganj

Creation of office for Delhi Power

Purchasing group at Gandhi

Market in Daryaganj division

10.26 FY 08-09 Others

3270 DG07CV4510 DaryaganjCreation of DPPG office at Gandhi

Market.7.68 FY 08-09 Others

3271 DL05RS4054 Dilshad GardenConstruction 11KV Unattended at

G.T.ROAD0.32 FY 08-09 Others

3272 DL06RS4587 Dilshad GardenCivil works at 11 kv unattended

s/stn. -1 J&K Pkt. Dilshad Garden.0.85 FY 08-09 Others

3273 JM05RS4427 KarkardoomaCivil Work 11kv unattended S/S

Dayanand0.04 FY 08-09 Others

3274 JM06RS4031 KarkardoomaCivil Work P/M Transformer.

Nehru Gali Vishwash nagar.0.38 FY 08-09 Others

3275 JM07CV4504 KarkardoomaUpgradation of meter testing lab -

NABL35.32 FY 08-09 Others

3276 JM07CV4609 Karkardooma

Interior & civil works for

Renovation of 2nd floor of Shakti

kiran building at karkardooma.

141.27 FY 08-09 Others

3277 JM07RS4512 KarkardoomaRenovation of electricity court for

special court at Karkarddoma.10.58 FY 08-09 Others

3278 KN06CV4043 Krishna Nagar Riasing fencing at Rani Garden 0.53 FY 08-09 Others

3279 KW05RS4110 Karawal NagarCons. new plinth & rep. existing D-

10.29 FY 08-09 Others

3280 LN05RS4281 Laxmi NagarR&M 11KV S/STN Utrry School

Block.1.90 FY 08-09 Others

3281 LN05RS4296 Laxmi NagarR/M 11KV S/Stn -4 at CGHS

Patparganj R/W0.55 FY 08-09 Others

3282 LN05RS4297 Laxmi NagarRaising of floor & roof at 11kv

S/Stn R/3.24 FY 08-09 Others

3283 LN06CV4014 Laxmi NagarRaising SGR & Tr. A-block vinod

nagar.2.76 FY 08-09 Others

3284 LN06CV4019 Laxmi NagarRpg.cvrg of drain&rsg of fncg

Rameshpark0.48 FY 08-09 Others

3285 LN06CV4038 Laxmi NagarRaising Fencing & Floor at Mangal

Bazar.0.43 FY 08-09 Others

3286 LN06CV4040 Laxmi NagarRsg. fencing & floor Guru Ram

Dass nagar0.52 FY 08-09 Others

3287 LN06CV4041 Laxmi NagarRsg. of fencing & floor at Halwai

walan0.26 FY 08-09 Others

3288 LN06CV4045 Laxmi NagarRsg.fencing & floor at Jagar Ram

Park.0.69 FY 08-09 Others

3289 LN06CV4122 Laxmi NagarRpg & rsg of fencingat truck

market0.79 FY 08-09 Others

Page 150: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

3290 LN06CV4127 Laxmi NagarRaising fencing floor Bodh Vihar

kiosk0.23 FY 08-09 Others

3291 LN06CV4128 Laxmi NagarRsg. fencing & floor at west angad

nagar0.27 FY 08-09 Others

3292 LN06CV4143 Laxmi Nagarraising fng & floor S-blk Pandav

nagar0.36 FY 08-09 Others

3293 LN06CV4208 Laxmi NagarCons. of office at Preet ViharGrid

SS35.70 FY 08-09 Others

3294 LN06CV4318 Laxmi NagarReplacement CGI Sheet at Chetan

Marg Kiosk.0.38 FY 08-09 Others

3295 LN06RS4286 Laxmi Nagar

Civil Work For Crating The Office

Of Legal & Enforcement At S/Stn

No. -5 CGHS Patparganj (D)Lnr.

18.45 FY 08-09 Others

3296 PN06CV4508 Patel NagarExtension & repair of fencing at D-

block west Patel Nagar.0.76 FY 08-09 Others

3297 PN06CV4559 Patel NagarC/o Tr. Plinth at Sanjay Park

Baljeet nagar.0.19 FY 08-09 Others

3298 PREETRENVO Laxmi Nagarrenovation of s/stn bldg. at preet

vihar21.22 FY 08-09 Others

3299 SR07CV4511 Shankar Road  Premonsoon preventive

measures of s/stn. SRD1.04 FY 08-09 Others

3300 WOBSESYPL039 BYPL Civil Rennovation of sub station 4.79 FY 08-09 Others

3301 WOBYPL035 Laxmi Nagar

C/o Boundary Wall at proposed 66

KV Grid S/stn Pkt B integrated

freight complex

5.23 FY 08-09 Others

3302 YV05RS4157 Yamuna ViharRepair 11KV S/Stn D-Blk

Bhajanpura -YVR1.88 FY 08-09 LT

3303 YV05RS4160 Yamuna ViharRepair to 11kv s/stn 3.5Pusta

Nagar - YV0.85 FY 08-09 LT

3304 YV05RS4162 Yamuna ViharRepair of 11KV S/Stn Jagjeet Ngr -

Yvr1.79 FY 08-09 LT

3305 YV06RS4008 Yamuna ViharRepair to 11 KV S/stn SBI

Welcome (D) YVR.1.68 FY 08-09 LT

3306 HYLNRLNR-349B Yamuna ViharNEAR THE PARK

NEWSEELAMPUR F BLOCK69.08 FY 08-09 HT

3307 HYYVRDPECB8 Karawal Nagar DAYALPUR C BLOCK 315.63 FY 08-09 HT

3308 EC04UT3579 EHV Central

Augmentation of 2 Nos. 33/11 kV

16 MVA Power Transformer to 20

MVA at Motia Khan.

230.25 FY 07-08 EHV

3309 EC06SH1009 EHV Central

Shifting of 33kv U/G cables from

RR – Anand Parvat RR-Prasad

Nagar RR-DMS

54.40 FY 07-08 EHV

3310 EC04IF3568 EHV Central

Replacement of old PILCA by

laying 2 Nos. 33 kV 3x400 sqmm

XLPE cable from I. G. Stadium to

Delhi Gate.

132.06 FY 07-08 EHV

3311 EC04IF3575 EHV Central

Replacement of old PILCA by

laying 1 No. 33 kV 3x400 sqmm

XLPE cable from I. P. Station bay

No. 17 to Delhi Gate.

109.39 FY 07-08 EHV

3312 EE04IF3557 EHV East

Laying of 2 Nos. 33 kV 3x400

sqmm XLPE cable from 220 kV

grid substation Geeta Colony to

Shakarpur.

247.02 FY 07-08 EHV

3313 EE04SW4536 EHV East Replacement of 17 Nos.11 kV

switchgear panel at Seelampur.91.25 FY 07-08 EHV

3314 EC04FA4516 EHV Central

Providing duplicate feed to

Fountain 33/11 kV Grid S/stn.

from RPH by laying 2 Nos. 33 KV

3x400 sq.mm. XLPE cables.

306.40 FY 07-08 EHV

3315 EC04SW3551 EHV Central

Replacement of 9 No. OCBs by 33

KV Indoor Switchgear Panels at

Lahori Gate

108.48 FY 07-08 EHV

3316 EC04SW4538 EHV Central

Replacement of 8 Nos.11 kV

switchgear panel at Shankar

Road.

41.72 FY 07-08 EHV

3317 EE05UT4013 EHV East

Augmentation of 1 No. 33/11 kV

16 MVA power transformer to 20

MVA at Seelampur.

100.70 FY 07-08 EHV

Page 151: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

3318 EE06SH2012 EHV East

Shifting of 66 kV D/C T/L between

Vivek Vihar to Dilshad Garden Sub

station near Intersection of G. T.

Road No. 26 due to infriging with

DMRC Corridor

92.54 FY 07-08 EHV

3319 EE06SH2019 EHV East

Shifting of 33 kV O/H feeder

between Vivek Vihar and Preet

Vihar grid at Vikas Marg near

Deepak Hospital.(100% DMRC

Share)

50.84 FY 07-08 EHV

3320 EE06SW4034 EHV East

Replacement of 1 No. 66 kV OCB

by SF6 for 66 kV Capacitor Bank

at Dilshad Garden.

8.22 FY 07-08 EHV

3321 EE04IF3575 EHV East

Laying of 2 Nos. 33 kV 3cx400

sq.mm XLPE cable from Shastri

Park to Dwarkapuri.

172.61 FY 07-08 EHV

3322 EC04SH2521 EHV Central

Shifting of 33 kV cable(I.P. Stn to

I.G. stadium Bay no -29) between

Vikas Marg Rd and boundary wall

of I.P.Stn near Delhi Sectt. Due to

laying of water pipe line through

trenchless technology by DJB.

1.18 FY 07-08 EHV

3323 EC04FA4513 EHV Central

Laying of 33 kV cables from RPH

Bay No.17 and 18 to Town Hall in

lieu of old cables.(Cable Length -

11.1 km)

343.02 FY 07-08 EHV

3324 EC04UT4585 EHV Central

Augmentation of Power

Transformer from 15MVA to

20MVA at Jama Masjid Grid

107.44 FY 07-08 EHV

3325 EE06SW4037 EHV East Additional of 11 KV panels at

Mayur Vihar Ph-I & GH-II11.72 FY 07-08 EHV

3326 AFOW14154 Yamuna ViharElectrification of unauthorized

colony shiv vihar ph 100.211 FY 07-08 LT

3327 AFOW16539 Laxmi Nagar

Augmentation of 11 KV 3*150

MM2 Cable with XLPE U/G Cable

3*300 MM2 from B Block to G

Block Shakarpur Ganesh Nagar.

1.96 FY 07-08 HT

3328 AFOW19037 Laxmi Nagar

Electrification of proposed plot in

the specific area at Patparganj

Industrial Complex

0.77 FY 07-08 LT

3329 AFOW21139Mayur Vihar Ph-

1&2

Electrification 480 MIG at Kondli

Vihar Mayur Vihar .0.0209 FY 07-08 LT

3330 CC04FA3616 Chandni Chowk

Replacement of sick cable into

3x300mm2 XLPE cable from Gali

Qasim Jan sub station to

Hamdard sub station in division

Chandni Chowk.

5.89 FY 07-08 HT

3331 CC04FA4600 Chandni Chowk

Replacement of old sick cable

from Kamala Market Grid to

Mother Dairy sub station in

division Chandni Chowk.

29.06 FY 07-08 HT

3332 CC04FA4639 Chandni Chowk

Replacementof HT cable from

T.Bazar to Khari Baoli SS in

division Chandni Chowk.

5.07 FY 07-08 HT

3333 CC04PS4505 Chandni Chowk

Conversion of existing 630 kVA

P/M S/Stn. into Package Unit with

990 kVA Transformer at Taxi

Stand S/Stn., Kashmiri Gate in

division Chandni Chowk.

20.78 FY 07-08 HT

3334 CC04PS4506 Chandni Chowk

Conversion of existing 630 kVA

P/M S/Stn. into Package Unit with

990 kVA Transformer at Nicholson

Road S/Stn., Kashmiri Gate.

21.45 FY 07-08 HT

Page 152: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

3335 CC04PS4509 Chandni Chowk

Conversion of existing 630 kVA

P/M S/Stn. into Package Unit with

990 kVA Transformer at

Chabiganj S/Stn., Kashmiri Gate.

20.64 FY 07-08 HT

3336 CC04PS4510 Chandni Chowk

Conversion of existing 630 kVA

plinth mounted sub station tn. into

Package Unit with 990 kVA

Transformer at Babuna Market

sub station Kashmiri Gate in

division Chandni Chowk.

2.71 FY 07-08 HT

3337 CC04PS4513 Chandni Chowk

Conversion of existing 630 kVA

plinth mounted Sub station. into

Package Unit with 990 kVA

Transformer at Sri Ram and Sons

Sub station.,Chandni Chowk.

42.82 FY 07-08 HT

3338 CC04PS4514 Chandni Chowk

Conversion of existing 630 kVA

plinth mounted Sub station. into

Package Unit with 990 kVA

Transformer at Kucha Natwa Sub

station., Chandni Chowk.

21.07 FY 07-08 HT

3339 CC04PS4518 Chandni Chowk

Conversion of existing 630 kVA

P/M S/Stn. into Package Unit with

990 kVA Transformer at Town Hall

Police Station S/Stn., Chandni

Chowk.

21.25 FY 07-08 HT

3340 CC04PS4520 Chandni Chowk

Conversion of existing 630 kVA

P/M S/Stn. into Package Unit with

990 kVA Transformer at More

Sarai S/Stn., Chandni Chowk.

21.42 FY 07-08 HT

3341 CC04PS4524 Chandni Chowk

Conversion of existing 630 kVA

plinth mounted sub station tn. into

Package Unit with 990 kVA

Transformer at Moti Bazar sub

station, Chandni Chowk.

2.99 FY 07-08 HT

3342 CC04PS4537 Chandni Chowk

Conversion of existing 630 kVA

plinth mounted Sub station. into

Package Unit with 990 kVA

Transformer at Gadodia Sub

station., Chandni Chowk.

21.48 FY 07-08 HT

3343 CC04PS4541 Chandni Chowk

Conversion of existing 630 kVA

P/M S/Stn. into Package Unit with

990 kVA Transformer at

Farashkhana S/Stn., Chandni

Chowk.

21.18 FY 07-08 HT

3344 CC04PS4542 Chandni Chowk

Conversion of existing 630 kVA

P/M S/Stn. into Package Unit with

990 kVA Transformer at

S.P.Mukherjee Marg S/Stn.,

Chandni Chowk.

20.65 FY 07-08 HT

3345 CC04PS4544 Chandni Chowk

Conversion of existing 630 kVA

plinth mounted Sub station. into

Package Unit with 990 kVA

Transformer at Kucha Ghasi Ram

Sub station in division Chandni

Chowk..

18.49 FY 07-08 HT

3346 CC04PS4629 Chandni Chowk

Conversion of existing 630 kVA

P/M S/Stn. into Package Unit with

990 kVA Transformer at Maliwara

S/Stn., Chandni Chowk.

20.53 FY 07-08 HT

3347 CC04PS4632 Chandni Chowk

Conversion of existing Plinth

Mounted Sub station. into

Package Unit with 990 kVA

Transformer at Old Krishna

Market Sub station in division

Chandni Chowk.

18.47 FY 07-08 HT

Page 153: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

3348 CC04PS4633 Chandni Chowk

Conversion of existing Plinth

Mounted S/Stn. into Package Unit

with 990 kVA Transformer at

More Sarai Khatta S/Stn in division

Chandni Chowk.

21.00 FY 07-08 HT

3349 CC05FA4003 Chandni Chowk

Replacement of HT Cable from

Khari Baoli to Gadolia Kiosk in

division Chandni Chowk.

3.48 FY 07-08 HT

3350 CC05FA4005 Chandni Chowk

Replacement of HT CBL

3X300mm2 PILCA into

3x300mm2 XLPE from G P O to

Electric Crimtorium via Angori

Bagh in division Chandni Chowk.

43.14 FY 07-08 HT

3351 CC05FA4010 Chandni Chowk

Replacement of existing old PILCA

cable 3x300mm2 to 3x300mm2

XLPE cable between Town Hall

Grid to Old Lajpat Rai Market via

Kumar Cinema in division Chandni

Chowk.

29.56 FY 07-08 HT

3352 CC05FA4070 Chandni Chowk

Replacement of feeder from SPM

Marg to Old Railway station in

Distt Chandani Chowk

1.15 FY 07-08 HT

3353 CC05LT4039 Chandni Chowk

Replacement of old sick XLPE

Single core 185/150mm2 in

division Chandni Chowk.

16.66 FY 07-08 LT

3354 CC05PS4094 Chandni Chowk

Conversion of existing Plinth

mounted S/Stn. into Package Unit

with 990 kVA Transformer at

Pandit brothers SS in division

Chandni Chowk.

21.89 FY 07-08 HT

3355 CC05RM4040 Chandni Chowk

Replacement of old RMU at Guru

Nanak Market Sub station in

division Chandni Chowk.

4.62 FY 07-08 HT

3356 CC05RM4044 Chandni Chowk

Replacement of old RMU at

Railway Pumping Station Sub

station in division Chandni Chowk.

4.63 FY 07-08 HT

3357 CC05RM4045 Chandni Chowk

Replacement of old RMU at

Railway Gate No. 3 Sub station in

division Chandni Chowk.

4.56 FY 07-08 HT

3358 CC05RM4046 Chandni Chowk

Replacement of old RMU at Gali

Shatara Sub station in division

Chandni Chowk.

5.01 FY 07-08 HT

3359 CC05RM4054 Chandni Chowk

Replacement of HT 7 Panel into 8

Panel at Patel Nagar B Substation

in division Chandni Chowk.

17.54 FY 07-08 HT

3360 CC05RM4056 Chandni Chowk

Replacement of RMU at Naya

Bazar Substation in division

Chandni Chowk.

4.55 FY 07-08 HT

3361 CC05RM4101 Chandni Chowk

Replacement of 3Panel Board by

3W I/D RMU at Roadgran,CC in

division Chandni Chowk.

7.07 FY 07-08 HT

3362 CC05RM4102 Chandni Chowk

Replacement of 7 Panel board by

2*4W at K.Khushal Rai,Chandni

Chowk

21.76 FY 07-08 HT

3363 CC05SH2083 Chandni Chowk

Shifting of existing kiosk S/Stn of

M.C.D office complex at old Hindu

College building Kashmiri Gate to

the new permanent structure in in

division Chandni Chowk.(Deposit

work of M.C.D)

3.46 FY 07-08 HT

3364 CC06AT4030 Chandni Chowk

Add Trf & Shifting of ACBs at KT.

Khushal in division Chandni

Chowk.

3.49 FY 07-08 HT

3365 CC06LT4015 Chandni Chowk

Conversion of O/H LT Bare

Conductor into LT AB Cable at

Kucha Moihtar Khan M. gate in

division Chandni Chowk.

8.02 FY 07-08 LT

Page 154: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

3366 CC06LT4016 Chandni Chowk

Conversion of O/H LT Bare

Conductor into LT AB Cable at

Lahori Gate No.1&2 in division

Chandni Chowk.

29.78 FY 07-08 LT

3367 CC06LT4021 Chandni Chowk

Conversion of O/H LT Bare

Conductor into LT AB Cable at

Old Market L R Market in division

Chandni Chowk.

16.81 FY 07-08 LT

3368 CC06LT4022 Chandni Chowk

Conversion of O/H LT Bare

Conductor into LT AB Cable at

SPM Marg in division Chandni

Chowk.

2.81 FY 07-08 LT

3369 CC06LT4040 Chandni Chowk

LT Cleanup at Jain Cloth

Markrt,Haveli Jugal Kishore etc in

division Chandni chowk.

1.98 FY 07-08 LT

3370 CC06LT4042 Chandni Chowk

LT clean up at Jain Cloth

Market,Haveili Jugal

Kishore,Mahavir Bazar Gali

Ghentey wali Katra Mashroh

Dariba in division Chandni chowk.

2.09 FY 07-08 LT

3371 CC06LT4043 Chandni Chowk

LT Clean up at Bhagirathi place,

Kucha Mahajani, Gali Kachha

Bagh, Katra Satya Narain, Marwari

Katra, Mahalakshmi Market ,Katra

Sahansai and Chawri Bazar etc in

division Chandni Chowk.

2.95 FY 07-08 LT

3372 CC06LT4044 Chandni Chowk

LT clean up at coronation building,

Chadha market , Bansi market

Naya Bazar , Bala market,

chaman wara,Katra Neel, SPM

Marg, Ghee mandi etc in division

Chandni Chowk.

4.22 FY 07-08 LT

3373 CC06LT4049 Chandni Chowk

Stringing of 3 No O/H LT Cable

from Newly inatalled Package Sub-

station at Pandit Brother to

Maliwara and Gali Chipiyan in

division Chandni chowk.

8.66 FY 07-08 LT

3374 CC06LT4051 Chandni ChowkStringing of LT AB Cable in

division Chandni chowk.70.16 FY 07-08 LT

3375 CC06LT4062 Chandni ChowkLT Clean up at Katra Shahansai in

division Chandni chowk.2.47 FY 07-08 LT

3376 CC06LT4063 Chandni Chowk

Conversion of O/H LT Bare

Conductor into LT AB Cable at &

LT Clean up at Bhagirath place in

division Chandni chowk.

13.23 FY 07-08 LT

3377 CC06LT4073 Chandni Chowk

Laying of LT Cable 3X1/2

300MM2 From SPM Package Sub-

Station to Reegal Cinema in

division Chandni chowk.

0.94 FY 07-08 LT

3378 CC06LT4077 Chandni Chowk

Laying of LT CABLE from Old

Hauz qazi No,-2 to 3503 Chawari

Bazar in division Chandni Chowk.

1.59 FY 07-08 LT

3379 CC06LT4082 Chandni Chowk

Stringing of LT cable 3.5X300

MM2 from S.N Market No- 1 to

pole near Police station in division

Chandni chowk.

0.91 FY 07-08 LT

3380 CC06LT4083 Chandni Chowk

Stringing of LT cable 3.5X300

MM2 from S.N Market No -1 to

pole back side of khatta Sub-

station in division Chandni chowk.

0.493 FY 07-08 LT

3381 CC06LT4113 Chandni Chowk

Stringing of LT Cable 3.5X300

MM2 from Kt Kaushal Rai

substation to vaid vara in division

Chandni chowk.

2.71 FY 07-08 LT

Page 155: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

3382 CC06RM4013 Chandni Chowk

Installationl of 2*4+1 Way indoor

RMU at Delhi Polytehnic Chandni

chowk

17.88 FY 07-08 HT

3383 CC06RM4048 Chandni Chowk

Replacement of old 8 panel board

with new 8 panel board at New

Kashmiri Gate sub station in

division Chandni chowk.

18.62 FY 07-08 HT

3384 CC06RM4106 Chandni ChowkRep of old 8 panels at H.road in

division Chandni chowk.20.09 FY 07-08 HT

3385 CC06RM4108 Chandni ChowkRepof old 4 panelat N L R MKT in

D-CCK6.81 FY 07-08 HT

3386 CC07UT4513 Chandni Chowk

Augmentation of 630 KVA

Transformer into 990 KVA

Transformer at Mohalla Nihariyan

in division Chandni Chowk.

1.01 FY 07-08 HT

3387 CC07UT4517 Chandni Chowk

Augmentation of 630 KVA

Transformer into 990 KVA

Transformer at Barsaboolah sub-

station in division Chandni Chowk.

0.312 FY 07-08 HT

3388 CMLAD050 Chandni Chowk

Supply and Installation of 9 nos.

of high mast street lighting in

division Chandni Chowk.

8.15 FY 07-08 LT

3389 CYV0084 Yamuna ViharProviding HT feed from Wazirabad

Grid in division Yamuna Vihar19.28 FY 07-08 HT

3390 DCC0003P&C Chandni ChowkShifting of stay/Support/Electric

poles in front of Lahori Gate

Dispensari.

0.99 FY 07-08 LT

3391 DG04PS4528 Daryaganj

Conversion of plinth mounted sub

station with Package Unit sub

station tn. of 990 KVA

Transformer at Sir Sayed Ahmed

Road in division Daryaganj.

21.60 FY 07-08 HT

3392 DG04RM4532 Daryaganj

Replacement of old 5-Panel board

by new 5-Panel board VCB type at

Minto Road Housing Complex sub

station, Daryaganj.

12.02 FY 07-08 HT

3393 DG04RM4535 Daryaganj

Replacement of old 4-Panel board

by new 4-Panel board VCB type at

Delhi Gate Telephone Exchange

sub station, Delhi Gate in division

Daryaganj.

7.78 FY 07-08 HT

3394 DG04RM4537 Daryaganj

Replacement of old 3-Panel board

by new 3-Panel board VCB type at

SPA sub station tn., Ring Road

near ITO in division Daryaganj.

5.48 FY 07-08 HT

3395 DG04RM4538 Daryaganj

Replacement of old 3-Panel board

by new 3-Panel board VCB type at

IAMR sub station tn., Ring Road

near ITO, Daryaganj.

5.23 FY 07-08 HT

3396 DG04RM4543 Daryaganj

Replacement of RMU by 3-Panel

board VCB type at IIPA sub

station tn., Ring Road near ITO in

division Daryaganj.

5.23 FY 07-08 HT

3397 DG04RM4588 Daryaganj

Replacement of existing Single

BuiLT in type 11kV HT Panel by 3-

Way Extensible RMU SF6 type at

Hans Bhawan Sub station in

division Daryaganj.

5.66 FY 07-08 HT

3398 DG05AT4058 Daryaganj

Installation of additional

Transformer of 990 kVA at

Chandni Mahal I/D Sub station in

division Daryaganj.

9.45 FY 07-08 HT

Page 156: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

3399 DG05AT4113 Daryaganj

Providing additional Transformers

at new Dujjana House S/Stn in

division Daryaganj.

9.16 FY 07-08 HT

3400 DG05FA4009 Daryaganj

Replacement of existing 3CX300

mm sq.PILCA cable with new

3CX300 mmsq. XLPE cable

between Delhi Gate Gridto I.P.

Grid in division Daryaganj.

39.19 FY 07-08 HT

3401 DG05FA4073 Daryaganj

Replacement of existing 3C*300

Sq.mm New 3C*300 XLPE Cbl

between Ambedker stadium to

vikram nagar s/stn in division

Daryaganj.

11.37 FY 07-08 HT

3402 DG05FA4090 Daryaganj

Replacement of existing 3C x 300

mm sq. PILCA cable with new 3C

x 300 mm sq. XLPE cable

between Azad Bhawan Pump to

Shakti Sadan Sub station in

division Daryaganj.

35.44 FY 07-08 HT

3403 DG05FA4097 Daryaganj

Replacement of existing 3Cx 300

mm sq PILCA cable with new 3C x

300 mm sq XLPE cable between

IP Estate Gridto National Science

Academy Sub station in division

Daryaganj.

24.23 FY 07-08 HT

3404 DG05FA4100 Daryaganj

Replacement of 3C*300 Sq.mm

Cbl Raj Engg to Fhatak Karore

S/Stn via Kunday Walan S/Stn in

division Daryaganj.

6.96 FY 07-08 HT

3405 DG05FA4105 Daryaganj

Replacement fo existing 3C*300

Sq.mm .PILCA Cbl 14-story S/Stn

to Times of India S/Stn in division

Daryaganj.

10.17 FY 07-08 HT

3406 DG05LT4162 Daryaganj

Replacement of worn out Sinle

core cable into LTAB Cable in

division Daryaganj.

39.26 FY 07-08 LT

3407 DG05NF4070 Daryaganj

Taking out new HT feeder Size

3C*300 Mmsq from IG Grid To

IP Estate Grid in division

Daryaganj.

23.45 FY 07-08 HT

3408 DG05NF4072 Daryaganj

Laying of new 11kV HT feeder 3C

x 300sq.mm XLPE Cable from

I.G. Grid Sub station. to Yamuna

Barrage Sub station in division

Daryaganj.

19.65 FY 07-08 HT

3409 DG05NF4126 Daryaganj

Taking out new HT feeder 3CX300

Sq.mm from I G Grid to A.I.R.

S/Stn in division Daryaganj.

35.85 FY 07-08 HT

3410 DG05RM4047 Daryaganj

Replacement of old 5 Panel board

with 3+2 way RMU at Raj engg.

in division Daryaganj.

9.96 FY 07-08 HT

3411 DG05RM4133 Daryaganj

Installation of RMU at Deen Dayal

Upadhyay Marg in Distt: Darya

Ganj

4.09 FY 07-08 HT

3412 DG05SL2150 Daryaganj

Installation of High Mast and

Street light point in the aSub

stationembly Constituency of

Shoaib Iqbal MLA in division

Daryaganj.

23.08 FY 07-08 LT

3413 DG06LT4209 DaryaganjConversion of LT conductor into

AB cable in division Daryaganj.162.62 FY 07-08 LT

3414 DG06LT4226 DaryaganjL T Clean-up in division

Daryaganj.4.61 FY 07-08 LT

3415 DG06LT4240 DaryaganjL T Clean-up in Division in division

Daryaganj Part-24.09 FY 07-08 LT

3416 DG06RM4176 Daryaganj

Installation of 3W O/D RMU at

Gali Dakotan,in division

Daryaganj.

4.17 FY 07-08 HT

Page 157: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

3417 DG06RM4179 DaryaganjInstallation of 3W ID RMU at Tej

Press,in division Daryaganj.4.82 FY 07-08 HT

3418 DG06RM4194 DaryaganjInstln of 3W+1W OD RMU at

CNG SS,in DRG7.06 FY 07-08 HT

3419 DG06RM4195 Daryaganj

Installationln of 3 way outdoor

RMU at workshop substation,

Daryaganj

4.67 FY 07-08 HT

3420 DG06RM4196 DaryaganjInstallationln of 1way indoor RMU

at IAMR substation, in Daryaganj2.78 FY 07-08 HT

3421 DG06RM4212 Daryaganj

Replacement of old panel at

Ghandi Nidhi in division

Daryaganj.

7.00 FY 07-08 HT

3422 DG06RM4214 DaryaganjReplacement of old panel at

M.A.M.C. in division Daryaganj.6.76 FY 07-08 HT

3423 DG06RM4215 Daryaganj

Replacement of old panel at

Himmat Garh in division

Daryaganj.

6.74 FY 07-08 HT

3424 DG06RM4216 DaryaganjReplacement of old panel at Govt.

Press in division Daryaganj.7.08 FY 07-08 HT

3425 DG06RM4220 Daryaganj

Replacement of old panel at Rose

Bird substation building in division

Daryaganj.

11.25 FY 07-08 HT

3426 DG06RM4221 Daryaganj

Replacement of old panel at

N.S.Acadmey in division

Daryaganj.

4.54 FY 07-08 HT

3427 DG06SH2243 Daryaganj

Shifting of LT pole beside

Arrythemia Center at G B Pant

Pant Hospital in division

Daryaganj.

0.248 FY 07-08 LT

3428 DG07LT4517 Daryaganj

Laying of LT U/G Feeder From

Himmat Garh S/stn to provide new

connection in F/o Regional

Manager,30-31,FF,Jeevan Vikas

Bldg, Asif Ali Road in Div-Darya

Ganj

2.20 FY 07-08 LT

3429 DG07SH1507 Daryaganj

Shifting of existing 4 Way (3

Way+ 1Way) CGL Make RMU

Due to leakage of U/G water pipe

line of DJB Near CNG S/Stn in

division Daryaganj.

0.60 FY 07-08 HT

3430 DG07SH1508 Daryaganj

Dismantling of HT O/H Line &

Laying of HT U/G cable due to

leakage of U/G Water pipe line of

DJB Near CNG S/stn in division

Daryaganj.

1.33 FY 07-08 HT

3431 DJM0003 Karkardooma

New connection for a load of

400KW in HT at Telephone

Exchange Karkardooma.

0.117 FY 07-08 HT

3432 DL04SH4001 Dilshad Garden

Diversion and Shifting of existing

HT and LT cable inside DSIDC

Complex in division Dilshad

Garden.

40.38 FY 07-08 LT

3433 DL05FA4207 Dilshad Garden

Replacement of HT 11 kV Cable

XLPE from Land H pocket To

Zulf-E-Bengal To LIC Quarter To

Prem Ice Fectory To Street

lighting Boroad er To Red Crosub

Stationold Seema Puri PoLICe

Stn. To Bus Stand in division

Dilshad Garden.

81.54 FY 07-08 HT

3434 DL05JJ4064 Dilshad Garden

Electrification of Bengali Colony

New Seemapuri in division Dilshad

Garden.

12.53 FY 07-08 LT

3435 DL05JJ4068 Dilshad Garden

Electrification of Sunlight Colony

old Seema Puri in division Dilshad

Garden.

7.02 FY 07-08 LT

Page 158: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

3436 DL05JJ4435 Dilshad Garden

Electrification JJ Cluster

Ambedkar Camp near Sawney

Tyre in division Dilshad Garden.

5.33 FY 07-08 LT

3437 DL05JJ4436 Dilshad Garden

Electrification JJ Cluster Rajeev

Camp near Sawney Tyre in

division Dilshad Garden.

2.56 FY 07-08 LT

3438 DL05LT4008 Dilshad Garden

Taking Out 2 Nos LT feeder Frm

Hansraj Compound in division

Dilshad Garden.

2.62 FY 07-08 LT

3439 DL05LT4019 Dilshad Garden

Replacement /Modification of LV

overhead mains in JLM industrial

area, A and B block in division

Dilshad Garden.

7.52 FY 07-08 LT

3440 DL05RM4064 Dilshad Garden

Replacement of H.T.Panel at

Kabool Nagar Sub station in

division Dilshad Garden.

14.82 FY 07-08 HT

3441 DL05RM4068 Dilshad Garden

Replacement of H.T.Panel at

D.S.R. Sub station in division

Dilshad Garden.

13.95 FY 07-08 HT

3442 DL05RM4070 Dilshad Garden

Replacement of H.T.Panel at Koria

Colony Sub station in division

Dilshad Garden.

7.99 FY 07-08 HT

3443 DL05RM4091 Dilshad Garden

Installation of 2*4 Way indoor

RMU at RAJ Engineering in

division Dilshad Garden.

14.96 FY 07-08 HT

3444 DL05RM4092 Dilshad Garden

Installation of 4 Way indoor RMU

at A.Block.Jhilmil indusrial area

substation No.2 in division Dilshad

Garden.

14.65 FY 07-08 HT

3445 DL06LT4508 Dilshad Garden

Conversion of LT O/H conductor

into LT AB Cable at Takiya Gali &

Lal Bagh area in division Dilshad

Garden.

39.65 FY 07-08 LT

3446 DL06LT4509 Dilshad Garden

Conversion of LT O/H conductor

into LT AB Cable at G&H Blk M S

ParK in division Dilshad Garden.

21.97 FY 07-08 LT

3447 DL06LT4510 Dilshad Garden

Conversion of LT O/H conductor

into LT AB Cable at GTRoad

Market in division Dilshad Garden.

5.62 FY 07-08 LT

3448 DL06LT4511 Dilshad Garden

Conversion of LT O/H conductor

into LT AB Cable Makki sarai in

division Dilshad Garden.

5.03 FY 07-08 LT

3449 DL06LT4513 Dilshad Garden

Conversion of LT O/H conductor

into LT AB Cable Village Ram

Nagar Extension in division

Dilshad Garden.

70.47 FY 07-08 LT

3450 DL06LT4514 Dilshad Garden

Conversion of LT O/H conductor

into LT AB Cable C D E & F, DDA

Flat in division Dilshad Garden.

117.85 FY 07-08 LT

3451 DL06LT4515 Dilshad Garden

Conversion of LT O/H conductor

into LT AB Cable at CDEFGHI&J

Old DDA Flats in division Dilshad

Garden.

93.72 FY 07-08 LT

3452 DL06LT4516 Dilshad Garden

Conversion of LT O/H conductor

into LT AB Cable ABCDEFGDGN

Colony in division Dilshad Garden.

93.35 FY 07-08 LT

3453 DL06LT4517 Dilshad Garden

Conversion of LT O/H conductor

into LT AB Cable at Leprocy

Colony in division Dilshad Garden.

38.22 FY 07-08 LT

3454 DL06LT4519 Dilshad Garden

Conversion of LT O/H conductor

into LT AB Cable at E&F,L&H -

Pocket in division Dilshad Garden.

148.30 FY 07-08 LT

Page 159: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

3455 DL06LT4521 Dilshad Garden

Conversion of LT O/H conductor

into LT AB Cable at Subhash Park

Extension in division Dilshad

Garden.

30.72 FY 07-08 LT

3456 DL06LT4522 Dilshad Garden

Conversion of LT O/H conductor

into LT AB Cable at part of subhas

park in division Dilshad Garden.

27.55 FY 07-08 LT

3457 DL06LT4524 Dilshad Garden

Conversion of LT O/H conductor

into LT AB Cable at DDA colony

Zafrabad in division Dilshad

Garden.

27.71 FY 07-08 LT

3458 DL06LT4525 Dilshad Garden

Conversion of LT O/H conductor

into LT AB Cable at part DDA

colony Zafrabad in division Dilshad

Garden.

22.54 FY 07-08 LT

3459 DL06LT4526 Dilshad Garden

Conversion of LT O/H conductor

into LT AB Cablet west Gorakh

Park Colony in division Dilshad

Garden.

21.85 FY 07-08 LT

3460 DL06LT4528 Dilshad Garden

Conversion of LT O/H conductor

into LT AB Cable in khera village in

division Dilshad Garden.

16.29 FY 07-08 LT

3461 DL06LT4582 Dilshad Garden

Conversion of LT O/H conductor

into LT AB Cable Navin Sahadara

in division Dilshad Garden.

94.67 FY 07-08 LT

3462 DL06LT4583 Dilshad Garden

Conversion of LT O/H conductor

into LT AB Cable in Part of Navin

Sahadara (Mohan Park Uldhanpur

shahi Mohalla) in division Dilshad

Garden.

82.63 FY 07-08 LT

3463 DL06LT4584 Dilshad Garden

Conversion of LT O/H conductor

into LT AB Cable in Part of Navin

Sahadara (Shivaji Park Rohtas

Nagar Kabool Nagar ) in division

Dilshad Garden.

93.87 FY 07-08 LT

3464 DL06RM4552 Dilshad Garden

Installlation 4+1 Way RMU at L&H

Pocket Sub-Station in division

Dilshad Garden.

13.81 FY 07-08 HT

3465 DL06RM4590 Dilshad Garden

Installation of 4 way RMU at

Dilshad Garden Sub-Station No.-3

in division Dilshad Garden.

13.52 FY 07-08 HT

3466 DL06RM4591 Dilshad Garden

Installation of 4 way RMU at

K.L.Rathi sub-Station in division

Dilshad Garden.

13.66 FY 07-08 HT

3467 DL06RM4592 Dilshad Garden

Installation of 4 way RMU at

Sansar Compound sub-Station in

division Dilshad Garden.

13.20 FY 07-08 HT

3468 DL06UT4576 Dilshad Garden

Augmentation of 630kVA

Transformer into 990KVA

Transformer & 1 No. Additional

990kVA Transformer at Hansraj

Compound S/Stn in division

Dilshad Garden.

5.04 FY 07-08 HT

3469 DL07LT4019 Dilshad Garden

Taking out 2 No. LT Feeder from

existing Transformer at Gali No.-

1A Friends Colony in division

Dilshad Garden.

7.22 FY 07-08 LT

3470 DL07LT4020 Dilshad Garden

T/O 1 no of LT Feeder from Prem

ice factory in division Dilshad

Garden.

1.30 FY 07-08 LT

3471 DL07LT4040 Dilshad Garden

T/O 3 no of LT Feeder from L&H

Pocket substation in division

Dilshad Garden.

6.96 FY 07-08 LT

3472 DL07LT4042 Dilshad Garden

T/O 3 no of LT Feeder from Dal

Mill Substation in division Dilshad

Garden.

8.82 FY 07-08 LT

Page 160: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

3473 DL07LT4043 Dilshad Garden

Taking out 3 no of LT feeder from

B Block Seemapuri Vegetable

Market Sub-station No.-1 in

division Dilshad Garden.

4.94 FY 07-08 LT

3474 DL07LT4044 Dilshad Garden

T/O 3 no of LT Feeder from A

Block Jhilmil Industrial area in

division Dilshad Garden.

3.01 FY 07-08 LT

3475 DL07LT4045 Dilshad Garden

T/O 3 no of LT Feeder from F

Block Dilshad colony in division

Dilshad Garden.

7.24 FY 07-08 LT

3476 DL07LT4046 Dilshad Garden

T/O 3 no of LT Feeder from A

Block Jhilmil Industrial area in

division Dilshad Garden.

5.24 FY 07-08 LT

3477 DL07LT4047 Dilshad Garden

Taking out 3 no of LT feeder from

B Block Seemapuri Vegetable

Market Sub-Station-2 in division

Dilshad Garden.

5.80 FY 07-08 LT

3478 DL07LT4048 Dilshad Garden

T/O 3 no of LT Feeder from

DSIDC substation Jhilmil Industrial

area in division Dilshad Garden.

2.81 FY 07-08 LT

3479 DL07LT4049 Dilshad Garden

T/O 3 no of LT Feeder from J&K

Substation No.4 in division Dilshad

Garden.

6.38 FY 07-08 LT

3480 DL07LT4050 Dilshad Garden

T/O 3 no of LT Feeder from Julfe

Bangal Substation No.-2 in division

Dilshad Garden.

3.59 FY 07-08 LT

3481 DL07LT4051 Dilshad Garden

T/O 3 no of LT Feeder from Satish

Factory Substation Shahdara in

division Dilshad Garden.

2.88 FY 07-08 LT

3482 DL07LT4052 Dilshad Garden

T/O 3 no of LT Feeder from C

Block Dilshad Colony Sub-station

in division Dilshad Garden.

5.11 FY 07-08 LT

3483 DL07LT4053 Dilshad Garden

T/O 3 no of LT Feeder from Gali

no 5 & 6 Sub-Station friends

Colony industrial area in division

Dilshad Garden.

4.68 FY 07-08 LT

3484 DL07LT4054 Dilshad Garden

T/O 3 no of LT Feeder from Verma

Castle Friends Colony Substation

industrial area in division Dilshad

Garden.

6.18 FY 07-08 LT

3485 DL07LT4056 Dilshad Garden

T/O 3 no of LT Feeder from Rain

Basera Babur pur Road in division

Dilshad Garden.

7.79 FY 07-08 LT

3486 DL07LT4057 Dilshad Garden

T/O 2 no of LT Feeder from

Shambhunath Compound Sub-

station in division Dilshad Garden.

5.14 FY 07-08 LT

3487 EMLAD049 Yamuna ViharSupply and installation of 10 no of

High Mast 5.50 FY 07-08 LT

3488 EMLAD051 Dilshad GardenSupply and installation of 6 no of

High Mast 5.10 FY 07-08 LT

3489 EMLAD052 Laxmi NagarProviding 6 no of 16 meter High

Mast 2.53 FY 07-08 LT

3490 JM04LT4670 Karkardooma

Replacement of feeder pillar and

service pillar at Jhilmil sub

division.

57.17 FY 07-08 LT

3491 JM04LT4675 Karkardooma

Taking out 2 LT feeder from

Damodar park sub station in

division Karkardooma

2.59 FY 07-08 LT

Page 161: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

3492 JM04LT4731 Karkardooma

Rep./Mod L.V mains in AGCR,

Harfgovind Encl, Dayanand, KKD

Village, Arya Nagar, Shanti Vihar,

Kiran Vihar, Rishabh Vihar, Ram

Vihar, Surya Nieketan, Pushpanjali

& Jagarti & Saini Enclave in

division Karkardooma

64.96 FY 07-08 LT

3493 JM04LT4732 Karkardooma

Replacement/Mout door. L.V.

mains in Anand Vihar, Yojna

Vihar, Savita Vihar, Surajmal

Vihar, ashoka, Niketan, Manak

Vihar, Vigyan Lok, Vigyan Vihar

etc in division Karkardooma

66.57 FY 07-08 LT

3494 JM04LT4735 Karkardooma

Replacement of Feeder Pillar in

Swayam Sewa vihar Market in

division Karkardooma

0.442 FY 07-08 LT

3495 JM04LT4738 Karkardooma

Replacement of feeder pillar in

P.S.S Vivek Vihar Staff quarter in

division Karkardooma.

0.436 FY 07-08 LT

3496 JM04LT4740 Karkardooma

Replacement of feeder pillar in

Hansha Apartment in division

Karkardooma

0.70 FY 07-08 LT

3497 JM04LT4744 Karkardooma

Replacement of feeder pillar in

Jagriti Enclave in division

Karkardooma

0.94 FY 07-08 LT

3498 JM04NF4695 Karkardooma

Providing 11 kV HT feed from

DSIDC Grid to Prem ice sub

station in division Karkardooma.

24.93 FY 07-08 HT

3499 JM04RM3595 Karkardooma

Installation of new HT 7 Panel

board (VCB) Type inplace of RMU

at H-Block Naveen Shahdara sub

station in division Karkardooma.

8.56 FY 07-08 HT

3500 JM04RM3634 Karkardooma

Installation of new 11KV RMU

Panel board in place of very old

HT Panel board at 928 QTR SS-II

Vivek Vihar in division

Karkardooma.

0.70 FY 07-08 HT

3501 JM04RM4615 Karkardooma

Installation of new HT RMU in

place of very old 7 Panel board at

Mansarovar Park, Mother Dairy

Sub station

13.98 FY 07-08 HT

3502 JM04RM4616 Karkardooma

Installation of new HT 1 RMU+1P

Panel board in place of scraped

single HT Panel board at Shakun

Engg. Jhilmil Industrial Area in

division Karkardooma.

0.149 FY 07-08 HT

3503 JM04RM4624 Karkardooma

Installation of 7 Panel board at GT

road shahdara complaint centre in

division Karkardooma.

1.42 FY 07-08 HT

3504 JM04RM4631 Karkardooma

Installation of new HT RMU in

place of very old Panel board at

Gorakh Park Kiosk Sub station in

division Karkardooma.

14.71 FY 07-08 HT

3505 JM04SL2658 Karkardooma

Providing street lighting on road

no 70 (PWD )in distt Jhilmil (100

%Deposit work )

2.03 FY 07-08 LT

3506 JM04SS2N026A Karkardooma

Taking out 4 Nos. LT Feeder from

Additional 630 Kva transformer in

division Karkardooma.

3.28 FY 07-08 HT

Page 162: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

3507 JM04SS2N032C Karkardooma

Providing Mid Feed of

underground XLPE HT Cable

from New Durga Mandir sub

station to Police Station shahdara.

Augmentation of D/transformer

from 400 KVA to 630 KVA at Nav

Durga Mandir sub station

tn.Augmentation of 630 to 990

KVA D/transformer at Nav Durga

mandir in division Karkardooma.

3.89 FY 07-08 HT

3508 JM04SS4528 Karkardooma

Augmentation of 400 KVA to 630

KVA D/transformer at Zulfe Bengal

sub station in division

Karkardooma.

2.63 FY 07-08 HT

3509 JM04SS4533 Karkardooma

Providing mid feed in between sub

station tn. No.4 J and K Block

Dilshad Garoad en to F-block

Dilshad Colony sub station in

division Karkardooma.

21.14 FY 07-08 HT

3510 JM04SS4546 Karkardooma

Additional 990 KVA D/transformer

at Shahi Mohalla sub station in

division Karkardooma.

5.03 FY 07-08 HT

3511 JM04SS4570 Karkardooma

Additional 990 KVA D/transformer

at Panchsheel Park (Jhoolewala)

sub station in division

Karkardooma.

8.81 FY 07-08 HT

3512 JM04SS4573 Karkardooma

Augmentation of 630 KVA to 990

KVA D/transformer at B-Block

Dilshad Colony sub station in

division Karkardooma.

0.286 FY 07-08 HT

3513 JM04SS4754 Karkardooma

Providing sub station at Plot

No.485-Dilshad Garden in division

Karkardooma.

12.27 FY 07-08 HT

3514 JM04UT4608 Karkardooma

Augumentation of 630 kVA to 990

kVA transformer At Subhash

Marg, New Modern Shahdara in

division Karkardooma.

0.329 FY 07-08 HT

3515 JM04UT4668 Karkardooma

Augumentation of 630 kVA to 990

kVA transformer At F block N

Seelampur in division

Karkardooma.

5.61 FY 07-08 HT

3516 JM04UT4673 Karkardooma

Augumentation of 630 kVA to 990

kVA transformer and taking oput 2

Nos. of LT feders at Tel Mill in

division Karkardooma.

2.95 FY 07-08 HT

3517 JM05EL4414 KarkardoomaElectrification of Preet Vihar,C

Block in division Karkardooma.0.65 FY 07-08 LT

3518 JM05FA4384 Karkardooma

Replacement of existing HT 11 KV

PILCA Cable into 3X300MM2

XLPE rom Bihari Colony to Bihari

Colony Extension to Mani Ram

Mandir to Shalimar Park in division

Karkardooma.

21.43 FY 07-08 HT

3519 JM05FA4387 Karkardooma

Augmentation of U/G Feeder from

Karkardooma Grid to to UTCS

S/Stn in division Karkardooma.

12.18 FY 07-08 HT

3520 JM05JJ4445 Karkardooma

E/O of JJ Cluster at Sonia camp

near Near Sawney tyre in division

Karkardooma.

3.99 FY 07-08 LT

3521 JM05LT4096 Karkardooma

Taking out 3 No LT Feeder from

Shastri Gali in division

Karkardooma.

4.14 FY 07-08 LT

3522 JM05LT4097 Karkardooma

Taking out 3 No LT Feeder from

Nehru Gali in division

Karkardooma.

4.72 FY 07-08 LT

Page 163: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

3523 JM05LT4106 Karkardooma

Taking out 3 No LT Feeder from D

block Surajmal 1 in division

Karkardooma.

9.73 FY 07-08 LT

3524 JM05LT4109 Karkardooma

Taking out 3 No LT Feeder from

Indra park substation in division

Karkardooma.

7.24 FY 07-08 LT

3525 JM05LT4139 Karkardooma

Taking out 3 No LT Feeder from

Gali no -10 Vishwas nagar

substation in division

Karkardooma.

4.37 FY 07-08 LT

3526 JM05LT4165 Karkardooma

Taking out 3 No LT Feeder from

Yjna vihar substation in division

Karkardooma.

7.44 FY 07-08 LT

3527 JM05LT4178 Karkardooma

Taking out 3 No LT Feeder from

Daksha gali substation in division

Karkardooma.

4.34 FY 07-08 LT

3528 JM05LT4180 Karkardooma

Taking out 3 No LT Feeder from

Yudhistir Gali in division

Karkardooma.

4.64 FY 07-08 LT

3529 JM05LT4336 Karkardooma

Replacement of feeder pillar at

Jagriti Enclave in division

Karkardooma.

0.480 FY 07-08 LT

3530 JM05RM4033 Karkardooma

Replacement of HT Panel board at

Shadara city substation in division

Karkardooma.

13.57 FY 07-08 HT

3531 JM05RM4042 Karkardooma

Replacement of HT Panel board at

Commercial complex substation in

division Karkardooma.

17.25 FY 07-08 HT

3532 JM05RM4044 Karkardooma

Replacement of H.T.Panel at

Rama Block Sub Station in

division Karkardooma.

7.08 FY 07-08 HT

3533 JM05RM4215 Karkardooma

Installation of RMU at bazar Gali

Sub Station in division

Karkardooma.

4.24 FY 07-08 HT

3534 JM05RM4446 Karkardooma

Installation of 4 Way at

substation1 Batra Jhilmil colony in

division Karkardooma.

7.27 FY 07-08 HT

3535 JM05RM4447 Karkardooma

Installation of 2*4 Way I/D RMU at

D Block Vivek Vihar in division

Karkardooma.

13.80 FY 07-08 HT

3536 JM05UT4262 Karkardooma

Augmentation of Existing

Transformer 630kVA To 990 kVA

at Ram Vihar No.1 in division

Karkardooma.

7.77 FY 07-08 HT

3537 JM05UT4263 Karkardooma

Augmentation of transformer 630-

990 KVA at Ram Vihar No 2 in

division Karkardooma.

1.66 FY 07-08 HT

3538 JM05UT4275 Karkardooma

Augmentation of transformer 630-

990 kVA at Manak Vihar in

division Karkardooma.

7.45 FY 07-08 HT

3539 JM05UT4297 Karkardooma

Augmentation of Existing

Transformer 400 kVA To 990 kVA

at Saini Encl. No.2 in division

Karkardooma.

5.97 FY 07-08 HT

3540 JM05UT4345 Karkardooma

Augmentation of transformer 630-

990kVA at Kiran Vihar S/Stn in

division Karkardooma.

7.94 FY 07-08 HT

3541 JM05UT4346 Karkardooma

Augmentation of transformer 630-

990kVA at Bihar Colony S/Stn in

division Karkardooma.

7.05 FY 07-08 HT

3542 JM05UT4365 Karkardooma

Augmentation of Existing

Transformer 630kVA To 990 kVA

at A- Block V. Vihar-II in division

Karkardooma.

12.95 FY 07-08 HT

3543 JM05UT4366 Karkardooma

Augmentation of Existing

Transformer 630kVA To 990 kVA

at B Block V.Vihar Mtd office in

division Karkardooma.

0.89 FY 07-08 HT

Page 164: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

3544 JM06EL2068 Karkardooma Elect.of plot no.20 at karkardooma 0.192 FY 07-08 HT

3545 JM06EL2069 Karkardooma Elect.of plot no.23 at karkardooma 0.368 FY 07-08 HT

3546 JM06FA4018 Karkardooma

Augmentation of HT feeder from

Commercial block to gali No. 10

vishwas nagar in division

Karkardooma.

9.67 FY 07-08 HT

3547 JM06FA4019 Karkardooma

Augmentation of HT U/G 11KV

Feeder from Bhola nath ngr. to

Shalimar park Via Aggarwal

Bhawan s/s in division

Karkardooma.

16.04 FY 07-08 HT

3548 JM06LT2064 Karkardooma

Providing feeder pillar at

institutional area in division

Karkardooma.

18.82 FY 07-08 LT

3549 JM06LT4037 Karkardooma

Taking out 3 N0 of LT U/G

Feeders from Transformer at

Shanti Vihar in division

Karkardooma.

5.89 FY 07-08 LT

3550 JM06LT4045 Karkardooma

Conversion of bare LT O/H

Conductor into LTAB Cable at

East Arjun nagar in division

Karkardooma.

13.12 FY 07-08 LT

3551 JM06LT4048 Karkardooma

Conversion of bare LT O/H

Conductor into LTAB Cable at

Mohalla Meram Nagar in division

Karkardooma.

16.75 FY 07-08 LT

3552 JM06LT4049 Karkardooma

Conversion of bare LT O/H

Conductor into LTAB Cable at

Indra park, Jwala nagar(Pandev

road), etc in division Karkardooma.

15.50 FY 07-08 LT

3553 JM06LT4050 Karkardooma

Conversion of bare LT O/H

Conductor into LTAB Cable at

New Vishwas Nagar & Kasturba

Nagar in division Karkardooma.

21.01 FY 07-08 LT

3554 JM06LT4058 Karkardooma

Conversion of bare LT O/H

Conductor into LTAB Cable at

Bhikam Singh colony etc. in

division Karkardooma.

32.47 FY 07-08 LT

3555 JM06LT4059 Karkardooma

Conversion of bare LT O/H

Conductor into LTAB Cable at

Sanjay amar Colony in division

Karkardooma.

25.00 FY 07-08 LT

3556 JM06LT4060 Karkardooma

Conversion of bare LT O/H

Conductor into LTAB Cable at

Jhilmil colony in division

Karkardooma.

30.73 FY 07-08 LT

3557 JM06LT4061 Karkardooma

Conversion of bare LT O/H

Conductor into LTAB Cable at

Pratap Khand Govind Khand &

Shiva Khand in division

Karkardooma.

21.64 FY 07-08 LT

3558 JM06LT4062 Karkardooma

Conversion of bare LT O/H

Conductor into LTAB Cable at 928

quarter DDA Flat Vivek Vihar in

division Karkardooma.

12.59 FY 07-08 LT

3559 JM06LT4063 Karkardooma

Conversion of bare LT O/H

Conductor into LTAB Cable at

Janta Quarter Vivek vihar in

division Karkardooma.

9.78 FY 07-08 LT

3560 JM06LT4070 Karkardooma

Conversion of bare LT O/H

Conductor into LTAB Cable at

Tejab mil(LOP) in division

Karkardooma.

4.89 FY 07-08 LT

3561 JM06LT4141 Karkardooma

Augmentation of Transformer from

630KVA tO 990KVA at D block

Vivek Vihar Substationin division

Karkardooma.

6.61 FY 07-08 HT

Page 165: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

3562 JM06RM4048 Karkardooma

Replacement of HT panel board at

A Block Anand Vihar in division

Karkardooma.

10.17 FY 07-08 HT

3563 JM06RM4052 KarkardoomaReplacement of HT Panel board at

C block division Karkardooma.6.90 FY 07-08 HT

3564 JM06RM4054 Karkardooma

Replacement of HT Panel Board at

Saini enclave in division

Karkardooma.

23.66 FY 07-08 HT

3565 JM07EL1538 Karkardooma

Electrification of CSC at Vigyan

Vihar (100:0 part) in division

Karkardooma.

0.339 FY 07-08 LT

3566 JM07EL1606 Karkardooma

Electrification of Plot No. 7 in

community center in division

Karkardooma.

0.104 FY 07-08 HT

3567 JM07EL2537 KarkardoomaElectrifiction of LSC Vigan Vihar in

division Karkardooma.15.51 FY 07-08 HT

3568 JM07LT1604 KarkardoomaShifting of pole at Surajmal Vihar

in division Karkardooma.0.149 FY 07-08 LT

3569 JM07LT4595 Karkardooma

Taking out 3 No. LT U/G Feeders

from Bhikam singh colony

substation in division

Karkardooma.

3.62 FY 07-08 LT

3570 JM07LT4596 Karkardooma

Taking out 3 No. LT U/G Feeders

from Aggarwal Bhawan substation

in division Karkardooma.

4.86 FY 07-08 LT

3571 JM07LT4597 Karkardooma

Taking out 3 No. LT U/G Feeders

from C-Block vivek vihar Parkwala

Substation in division

Karkardooma.

6.80 FY 07-08 LT

3572 JM07LT4598 Karkardooma

Taking out 4 No. LT U/G Feeders

from 18 Quarter Vishwas Nagar

behind shivam enclave Substation

in division Karkardooma.

6.21 FY 07-08 LT

3573 JM07LT4599 Karkardooma

T/O 4 NO. LT U/G feeders from

Yudhistir Gali 60 foota road

substation in division

Karkardooma.

4.40 FY 07-08 LT

3574 JM07UT4511 Karkardooma

Augmentation of transformer from

630 to 990 kVA at D. Block Vivek

vihar in division Karkardooma.

1.81 FY 07-08 HT

3575 JM07UT4582 Karkardooma

Augmentation of 400KVA

Transformer into 990 KVA

Transformer at Yudhistir Gali

Vishwas Nagar 60 foota road in

division Karkardooma.

2.54 FY 07-08 HT

3576 KN04LT4536 Krishna Nagar

Replacement of LT underground

cable from Kailash Nagar Gali No.

15 sub station tn. to Gali No. 17

Kailash Nagar.

1.81 FY 07-08 LT

3577 KN04PS4630 Krishna NagarInstalling Package sub station at

18 Block Geeta Colony0.86 FY 07-08 HT

3578 KN04RM4611 Krishna NagarInstallation of RMU at Surya

nursing home.5.81 FY 07-08 HT

3579 KN04RM4622 Krishna Nagar

Replacement of 4 Pnel board at E

block Krishna Nagar in division

Kriishna Nagar.

13.28 FY 07-08 HT

3580 KN05EL4271 Krishna NagarElectrification of Ext Portion of

New Shanti Mohalla12.50 FY 07-08 LT

3581 KN05EL4272 Krishna Nagar

Electrification of Extended Portion

of New Lahore Munshi Colony

(LOP

5.79 FY 07-08 LT

3582 KN05EL4273 Krishna Nagar E/o of West Laxmi Mkt 2.57 FY 07-08 LT

3583 KN05EL4274 Krishna NagarElectrification of 2A Block Geeta

Colony-LOP5.13 FY 07-08 LT

Page 166: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

3584 KN05JJ4269 Krishna Nagar

Electrification of JJ Clusters 8 Blk

Geeta Colony Krishna

Nagar.(OJJ)

2.14 FY 07-08 LT

3585 KN05JJ4270 Krishna NagarElectrification of JJ Cluster 12

Block Geeta Colony Krishna Nagar2.47 FY 07-08 LT

3586 KN05LT4017 Krishna Nagar

Augmentation of existing O/H

mains at 17 Block Geeta Colony in

division Krishna Nagar.

5.02 FY 07-08 LT

3587 KN05LT4040 Krishna Nagar

Replacement of LT sick cable from

Chander Magar Sub-Station to

Gali No.-3 East Chander Nagar in

division Krishna Nagar.

3.77 FY 07-08 LT

3588 KN05LT4062 Krishna Nagar

T/O 3 no of LT feeders from 5

block DDA Park Sub-Station in

division Krishna Nagar.

4.98 FY 07-08 LT

3589 KN05LT4208 Krishna Nagar

Augmentation /Replacement of

existing LV overhead mains at gali

no 8 to gali no 15 ajeet nagar

Gandhi nagar

6.26 FY 07-08 LT

3590 KN05LT4244 Krishna Nagar

Augmentation of LV O/H mains in

sub division Gagan vihar in

division Krishna Nagar.

29.19 FY 07-08 LT

3591 KN05PS4165 Krishna Nagar

Conversion of existing 630 kVA

transformer to 990 kVA package

substation at 15 block Geeta

colony.

23.36 FY 07-08 HT

3592 KN05RM4151 Krishna NagarProviding RMU at road No. 57,

Kanti Nagar4.79 FY 07-08 HT

3593 KN05RM4163 Krishna Nagar

Replacement of existing 11 kV 4

Panel board to 5 Panel board at

Gagan Vihar S.Stn.

22.89 FY 07-08 HT

3594 KN05RM4233 Krishna NagarRep. 4 panel bd. -7 panel bd. at

Jitar9.58 FY 07-08 HT

3595 KN05UT4067 Krishna Nagar

Augmentation of existing

Transformer to 990 kVA

Transformer at Viryam Kaur

0.60 FY 07-08 HT

3596 KN06EL4014 Krishna NagarElect of Rani Garden Ambedaker

Park in division Krishna Nagar.6.74 FY 07-08 LT

3597 KN06JJ4012 Krishna Nagar

Electrificationt of J J cluster

Shamsan Ghat Geeta Colony in

division Krishna Nagar.

10.22 FY 07-08 LT

3598 KN06LT4009 Krishna Nagar

Repl of LT sick cable at Shiv Kutty

Sub-station in division Krishna

Nagar.

8.04 FY 07-08 LT

3599 KN06LT4015 Krishna Nagar

Augmentation of LT O/H

Conductor with LTAB Cable in

Gandhi Nagar area Phase-I in

division Krishna Nagar.

144.35 FY 07-08 LT

3600 KN06LT4016 Krishna Nagar

Augmentation of LT O/H

Conductor with LTAB Cable in

Gandhi Nagar area Ph-II in division

Krishna Nagar.

151.06 FY 07-08 LT

3601 KN06LT4017 Krishna Nagar

Augmentation of LT O/H

Conductor with LTAB Cable in

Gandhi Nagar area Ph-III in

division Krishna Nagar.

136.89 FY 07-08 LT

3602 KN06LT4018 Krishna Nagar

Augmentation of LT O/H

Conductor with LTAB Cable in

Gagan Vihar Ph-4 in division

Krishna Nagar.

132.38 FY 07-08 LT

3603 KN06LT4021 Krishna NagarLVDS work at Aram Park Div

Krishna Nagar9.79 FY 07-08 LT

3604 KN06LT4023 Krishna NagarLVDS work at Munshi colony in

division Krishna Nagar11.57 FY 07-08 LT

Page 167: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

3605 KN06RM4001 Krishna Nagar

Installation of 4 Way RMU at

Shastri Nagar in division Krishna

nagar

6.74 FY 07-08 HT

3606 KN06RM4002 Krishna NagarInstallation of 2*4 Way RMU at16

Block,Geeta colony krishna nagar13.53 FY 07-08 HT

3607 KN06SH1103 Krishna Nagar

Shifting of Electric Services due

to Construction of flyover & clover

leaves at Raja Ram Kohli Marg

,Geeta Cly Intersection of M.B.

Road in East Delhi

15.69 FY 07-08 HT

3608 KN06SH2029 Krishna Nagar

Shifting of Pole in front of Sh.

Santosh Rani in division Krishna

Nagar.

0.0426 FY 07-08 LT

3609 KN07UT4515 Krishna Nagar

Augmentation of 400 KVA trf to

630 KVA Pandit Park in division

Krishna Nagar.

0.85 FY 07-08 HT

3610 KW05EL4121 Karawal NagarElectrification of D Block Ganga

Vihar in division Karawal Nagar.4.66 FY 07-08 LT

3611 KW05LT4107 Karawal Nagar

Replacement of existing overhead

LT conductor to LT AB cable at E

Block Chand Bagh Karawal Nagar

8.75 FY 07-08 LT

3612 KW05UT4051 Karawal Nagar

Augmentation of Transformer 630

kVA To 990 kVA at D3 Nehru

Vihar in division Karawal Nagar.

2.36 FY 07-08 HT

3613 KW06EL4511 Karawal Nagar

Electrification. of Dayalpur D

Block & Sadatpur Harizan basti in

division Karawal Nagar.

164.53 FY 07-08 LT

3614 KW06EL4512 Karawal Nagar

Replacement of conductor into

LTAB Cable at E Block Dayalpur

in division Karawal Nagar.

38.62 FY 07-08 LT

3615 KW06EL4549 Karawal NagarElectrification of LOP area of

Karawal Nagar division.95.98 FY 07-08 LT

3616 KW06JJ4503 Karawal Nagar

Electrification of B block Sri Ram

Colony with LTAB Cable in

Karawal Nagar division.

56.27 FY 07-08 LT

3617 KW06JJ4505 Karawal Nagar

Electrification of C block Sri Ram

Colony with LTAB Cable in

Karawal Nagar division.

55.11 FY 07-08 LT

3618 KW06JJ4532 Karawal NagarElectrification of Sanjay Amar

Colony in division Karawal Nagar.15.07 FY 07-08 LT

3619 KW06LT4508 Karawal Nagar

Replacement of O/H conductor

into LTAB Cable at Bhagirathi

vihar in division Karawal Nagar.

77.28 FY 07-08 LT

3620 KW06LT4509 Karawal Nagar

Replacement of O/H conductor

into LTAB Cable at Brijpuri in

division Karawal Nagar.

108.15 FY 07-08 LT

3621 KW06LT4510 Karawal Nagar

Replacement of O/H conductor

into LTAB Cable at Chandu Nagar

in division Karawal Nagar.

30.20 FY 07-08 LT

3622 KW06LT4513 Karawal Nagar

Replacement of O/H conductor

into LTAB Cable at Ganga Vihar in

division Karawal Nagar.

133.85 FY 07-08 LT

3623 KW06LT4514 Karawal Nagar

Replacement of O/H conductor

into LTAB Cable at Gokulpuri in

division Karawal Nagar.

94.50 FY 07-08 LT

3624 KW06LT4515 Karawal Nagar

Replacement of O/H conductor

into LTAB Cable at Khajoori in

division Karawal Nagar.

173.15 FY 07-08 LT

3625 KW06LT4516 Karawal Nagar

Replacement of O/H conductor

into LTAB Cable at Maha Laxmi

Enclave in division Karawal Nagar.

40.69 FY 07-08 LT

3626 KW06LT4517 Karawal Nagar

Replacement of O/H conductor

into LTAB Cable at Moonga Nagar

in division Karawal Nagar.

17.27 FY 07-08 LT

Page 168: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

3627 KW06LT4518 Karawal Nagar

Replacement of O/H conductor

into LTAB Cable at Mukund Vihar

in division Karawal Nagar.

105.46 FY 07-08 LT

3628 KW06LT4519 Karawal Nagar

Replacement of O/H conductor

into LTAB Cable at Nehru vihar in

division Karawal Nagar.

175.66 FY 07-08 LT

3629 KW06LT4520 Karawal Nagar

Replacement of O/H conductor

into LTAB Cable at Rajiv Gandhi in

division Karawal Nagar.

87.62 FY 07-08 LT

3630 KW06LT4521 Karawal Nagar

Replacement of O/H conductor

into LTAB Cable at sahpur in

division Karawal Nagar.

53.04 FY 07-08 LT

3631 KW06LT4522 Karawal Nagar

Replacement of O/H conductor

into LTAB Cable at Sherpur, Bahri

in division Karawal Nagar.

68.57 FY 07-08 LT

3632 KW06LT4523 Karawal Nagar

Replacement of O/H conductor

into LTAB Cable at Sonia Vihar B

Block in division Karawal Nagar.

64.75 FY 07-08 LT

3633 KW06LT4525 Karawal Nagar

Replacement of O/H conductor

into LTAB Cable at Mukhiya

Market in division Karawal Nagar.

55.82 FY 07-08 LT

3634 KW06LT4526 Karawal Nagar

Conversion of LT overhead

conductor into LTAB Cable shapur

in division Karawal Nagar.

71.78 FY 07-08 LT

3635 KW06LT4527 Karawal Nagar

Conversion of LT overhead

conductor into LTAB Cable at

Dayalpur in division Karawal

Nagar.

22.33 FY 07-08 LT

3636 KW06LT4528 Karawal Nagar

Conversion of LT overhead

conductor into LTAB Cable

Chauhan Patti in division Karawal

Nagar.

22.61 FY 07-08 LT

3637 KW06LT4529 Karawal Nagar

Conversion of LT overhead

conductor into LTAB Cable Shakti

Vihar in division Karawal Nagar.

31.06 FY 07-08 LT

3638 KW06LT4530 Karawal Nagar

Conversion of LT overhead

conductor into LTAB Cable SBS

colony in division Karawal Nagar.

70.39 FY 07-08 LT

3639 KW06LT4531 Karawal Nagar

Conversion of LT overhead

conductor into LTAB Cable

Johripur in division Karawal Nagar.

39.39 FY 07-08 LT

3640 KW06SS2547 Karawal Nagar

Installation of 100 kva transformer

for MTNL Khajoori Khas in division

Karawal Nagar.

1.79 FY 07-08 HT

3641 KW06SS4548 Karawal Nagar

Installation of 630 KVA Trf at

Khajoori Khas in division Karawal

Nagar.

23.96 FY 07-08 HT

3642 KY04LA4553 KCC Schemes

Load Additional in f/o Telephone

Exchange, in division Karawal

Nagar.

0.428 FY 07-08 HT

3643 KY04NC2512 KCC Schemes

New Connection under LIP

category for a load of 248.71KW

on HT system of supply making

total load as 248.71KW in f/o PRG

international, Jhilmil Industrial

Area, New Delhi

6.82 FY 07-08 HT

3644 KY04NC2566 KCC Schemes

New connection under MLHT

category for a load of 408 KW (P

& L) on HT system of supply in f/o

Ex. Engr. (E & M) NC/DJB at

Booster Pumping Stn, Baljeet

Nagar, Delhi

54.46 FY 07-08 HT

Page 169: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

3645 KY05NC2030 KCC Schemes

Providing New Load of 175 KW on

LT system of supply under MLHT

category in f/o Sh. King Kakar,

13/6, WEA, Karol Bagh, New

Delhi.

1.56 FY 07-08 LT

3646 KY05NC2058 KCC Schemes

Providing New Load of 15.84 KW

on LT in f/o Ex. Engineer PWD,

Div-31, Flatted Factory Complex,

Jhandewalan, New Delhi

0.68 FY 07-08 LT

3647 KY06CL2066 KCC Schemes

Providing new load of 12.86KW

under NDLT category on LT

system of supply in f/o E.E, DDA,

Sub P/Set no.1, Distt. Park, Kanti

Nagar,Phase-I, New Delhi.

0.229 FY 07-08 LT

3648 KY06LA2023 KCC Schemes

Providing addl load of 20KW

making total of 60KW in f/o Dr.

Prakash Keswani, Sai Memorial

Girls School, Facility Centre,

Geeta Colony.

0.61 FY 07-08 LT

3649 KY06LA2067 KCC Schemes

Providing additional load of 75KW

making Total load of 122KW on LT

In f/o Hinayana Vinimay , Plot no-

77

1.81 FY 07-08 HT

3650 KY06NC1071 KCC SchemesNC of 40KW in F/o Secretary LIC,

Seemapuri,GT Road0.373 FY 07-08 LT

3651 KY06NC2002 KCC Schemes

Providing New Load of 6675 KW

on HT supply under Domestic

category in f/o LNJP Hospital,

New Delhi

61.83 FY 07-08 HT

3652 KY06NC2042 KCC Schemes

Providing new HT of 685KW

connection in f/o Ex. Engineer at

Kondli Mayur Vihar

127.32 FY 07-08 HT

3653 KY06NC2045 KCC Schemes

Providing new load of 675 KW on

HT under (P&L) MLHT category in

f/o M/s DDCA, Ferozshah Kotla

Stadium, New Delhi

11.31 FY 07-08 HT

3654 KY06NC2047 KCC Schemes

For providing new load of

625KWin F/o BPS Chitra vihar,

Laxmi Nagar

9.58 FY 07-08 HT

3655 KY06NC2053 KCC Schemes

Providing new connection of

2008KW on HT system of Supply

for DJB at Bhagirath BPS

76.90 FY 07-08 HT

3656 KY06NC2055 KCC Schemes

Providing new load of 2011KW on

HT system under MLHT category

for DJB at Vishwakarma Park

Laxmi Nagar.

78.51 FY 07-08 HT

3657 KY06NC2056 KCC Schemes

Estimate for providing new load of

56.33KW under NDLT category

on LT system of Supply at STP

Kondli,MVR-3 in f/O AE(E), IV, SD-

IV/Elect. DIV-1,DDA

2.49 FY 07-08 HT

3658 KY06NC2063 KCC Schemes

Providing new load of 110 KW on

LT system of supply in f/o M/s UTI

Bank Limited, 4/6-B GF Asaf Ali

Road, New Delhi

3.16 FY 07-08 HT

3659 KY06NC2064 KCC Schemes

Providing new connection of

65KW in F/o Reliance Retail Pvt.

Ltd. , Laxmi Nagar

0.53 FY 07-08 LT

3660 KY07LA2501 KCC Schemes

Providing Additional Load of

300KVA making total load of

700KVA in f/o director Dharmshilla

Cancer Hosptal

4.60 FY 07-08 HT

Page 170: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

3661 KY07LA2515 KCC Schemes

LA of 3.25KW making total load

of 130KW on LT in f/o Ram lal

Kundan lal, orthopedic hospital,

Pandav Nagar

1.67 FY 07-08 LT

3662 KY07MS1512 KCC Schemes

Replacement of Metering Cubicle

in F/o Vishal aggarwal, B-42 jhilmil

Industrial area

0.405 FY 07-08 LT

3663 KY07NC1502 KCC Schemes

New connection of 23.18KW in

F/o Vice Principal , Govt Boys Sr.

Sec school, Sonia Vihar

0.216 FY 07-08 LT

3664 KY07NC1506 KCC Schemes

Providing new load of 70kw

making total load of 70KW on

NDLT category

0.440 FY 07-08 LT

3665 KY07NC1520 KCC Schemes

Estimate for providing addl. load of

104 KW making total load of 105

KW on LT system in F/o LIC of

India, 1/19B, Asaf Ali Road, New

Delhi.

1.70 FY 07-08 LT

3666 KY07NC1521 KCC Schemes

Providing new connection of

14.7KW in f/O Medical officer,

maternirty home, main road

karawal nagar

0.313 FY 07-08 LT

3667 KY07NC2508 KCC Schemes

New Connection of 160KW on HT

in F/o Noida Toll Bridge Co. Ltd.,

Toll bridge , Link road Mayur vihar

33.26 FY 07-08 HT

3668 KY07NC2513 KCC Schemes

Estimate for providing new

connection of 45KW in f/o Chief

Manager(E)IGL, 15th Floor Gopal

Dass Bhawan New Delhi

10.25 FY 07-08 HT

3669 KY07NC2514 KCC Schemes

Providing load of 45KW on LT in

F/o Chief manager(E),IGL, 15th

Floor Gopal Dass Bhawan ,

N.Delhi

10.74 FY 07-08 HT

3670 KY07NC2517 KCC Schemes

Providing New load of 1216 KW

on HT System of supply under

MLHT Category in f/o Director,

CAG of India, Pocket-9, Deen

Dayal Upadhaya Marg, New Delhi

67.24 FY 07-08 HT

3671 KY07NC4507 KCC Schemes

Estimate for providing new load of

55 KW on LT system in F/o Indian

Heritage Soiciety, Plot No. 65-66-

67, Deen Dayal Upadhayaya

Marg, New Delhi

22.30 FY 07-08 HT

3672 LN04AT2638 Laxmi Nagar

Provision of Second 630 kVA

transformer in Friends CGHS IP

Extension in division Laxmi Nagar.

0.127 FY 07-08 HT

3673 LN04AT2655 Laxmi Nagar

Installation of 630 kVA

D/transformer at Ras Vihar CGHS

Ltd. Patparganj in division Laxmi

Nagar.

0.387 FY 07-08 HT

3674 LN04LT4650 Laxmi Nagar

Replacement of feeder pillar A/B

and service pillar in division Laxmi

Nagar.

31.02 FY 07-08 LT

3675 LN04RM4649 Laxmi Nagar

Replacement of 4 Panel board

Make Southern at Madhu Vihar

sub station No. 1 in division Laxmi

Nagar.

7.90 FY 07-08 HT

3676 LN04RM4718 Laxmi Nagar

Providing RMU at Sonia Vihar sub

staton mandawali in division Laxmi

Nagar.

4.26 FY 07-08 HT

3677 LN04RM4720 Laxmi Nagar

Providing RMU and Replacement

GO Switch at Post Office in

division Laxmi Nagar.

4.55 FY 07-08 HT

Page 171: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

3678 LN04RM4785 Laxmi Nagar

Estimate/Testing/Commissioning

of RMU at truck market Pandav

nagar in division Laxmi Nagar.

5.36 FY 07-08 HT

3679 LN04SH2787 Laxmi Nagar

Shifting of Electric services for the

alignment of additional 4 Lane on

MB Road from ITO Chungi to

Kailash Nagar in division Laxmi

Nagar.

22.63 FY 07-08 HT

3680 LN04SS4581 Laxmi Nagar

Providing aditional tranformer with

SF6 RMU and Taking out LT

feeder at SS 10 CGHS in division

Laxmi Nagar.

5.39 FY 07-08 HT

3681 LN04UT4652 Laxmi Nagar

Augmentation of 630 to 990 KVA

transformer at subji mandi

mandawali tripole in division Laxmi

Nagar.

5.61 FY 07-08 HT

3682 LN05EL4249 Laxmi Nagar

Electrification of indira Camp,Joshi

Colony,Mandavali in division Laxmi

Nagar.

1.86 FY 07-08 LT

3683 LN05FA4007 Laxmi Nagar

Replacement of 3*150 HT 11KV

Cbl from Madhuban SS to

Madhuban Kiosk in division Laxmi

Nagar.

4.71 FY 07-08 HT

3684 LN05FA4011 Laxmi Nagar

Augmentation of 3*150 HT 11KV

Cbl from Madhuban S/Stn to DDA

Flats Nirman Vihar in division

Laxmi Nagar.

11.30 FY 07-08 HT

3685 LN05FA4012 Laxmi Nagar

Replacement of 3*300 HT 11KV

Cbl S/Stn No 5 to Panch Mahal in

division Laxmi Nagar.

15.80 FY 07-08 HT

3686 LN05FA4029 Laxmi Nagar

Replacement of 11KV HT PILCA

3*300 to 3*300 XLPE Cbl GH-1

Grid to Subzi Mandi Mandawali in

division Laxmi Nagar.

15.99 FY 07-08 HT

3687 LN05FA4034 Laxmi Nagar

Augmentation of 11KV HT PILCA

3*150 to 3*300 XLPE Cbl Mohan

Park to West Guru Angad Nagar

in division Laxmi Nagar.

4.87 FY 07-08 HT

3688 LN05FA4037 Laxmi Nagar

Augmentation of 11KV HT PILCA

3*150 TO 3*300 XLPE Cbl S/Stn

12 Chander Vihar to S/Stn No 2 in

division Laxmi Nagar.

3.54 FY 07-08 HT

3689 LN05NF4041 Laxmi Nagar

Providing of HT 11KV Cbl 3*300 C

Blk, Vinod Nagar in division Laxmi

Nagar.

11.34 FY 07-08 HT

3690 LN05NF4042 Laxmi Nagar

Providing 11KV HT XLPE 3*300

Cable from S/Stn 5 CGHS in

division Laxmi Nagar.

6.58 FY 07-08 HT

3691 LN05NF4045 Laxmi Nagar

Providing 11KV HT XLPE 3*300

cable from Commercial Practice in

division Laxmi Nagar.

9.91 FY 07-08 HT

3692 LN05RM4165 Laxmi Nagar

Providing of 11KV,SF-6,RMU J

Extension Vishwakarma Park in

division Laxmi Nagar.

4.07 FY 07-08 HT

3693 LN05RM4166 Laxmi Nagar

Providing of 11KV,SF-6,RMU at

Gurunanakpura in division Laxmi

Nagar.

4.08 FY 07-08 HT

3694 LN05RM4168 Laxmi Nagar

Providing of 11KV,SF-6,RMU at

Ramesh Park J&K Block in

division Laxmi Nagar.

4.08 FY 07-08 HT

3695 LN05RM4187 Laxmi Nagar

Replacement of 3 way RMU at

Anand Hospital in division Laxmi

Nagar.

3.84 FY 07-08 HT

Page 172: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

3696 LN05RM4292 Laxmi Nagar

Installation/Replacement of 4

Panel Board with motorised RMU

with SCADA compatibility at -

SS.24.FIE.PPG in division Laxmi

Nagar.

9.10 FY 07-08 HT

3697 LN05RM4294 Laxmi Nagar

Installation/Replacement of 7

Panel Board with Motorised RMU

with SCADA compatibility at -

Patper.Ganj.SS1 in division Laxmi

Nagar.

18.40 FY 07-08 HT

3698 LN05RM4295 Laxmi Nagar

Installation/Replacement of 3

Panel Board with motorised RMU

with SCADA compatibility at -

Mohan.Park.S/Stn in division

Laxmi Nagar.

9.03 FY 07-08 HT

3699 LN05RM4315 Laxmi Nagar

Installation of 4W ID RMU at

Ashirwad S/Stn No 1 in division

Laxmi Nagar.

8.24 FY 07-08 HT

3700 LN05RM4317 Laxmi NagarInstallation of 3+1 W old RMU at

Tripole in division Laxmi Nagar. 7.64 FY 07-08 HT

3701 LN05SH2215 Laxmi Nagar

Shifting of HT 11KV 3X300 MM2

cable to noida more due to

construction of slip road below the

clover leaf in division Laxmi Nagar.

3.15 FY 07-08 HT

3702 LN05SL2279 Laxmi Nagar

Estimate for street lighting at

Mandawali Fazalpur in division

Laxmi Nagar.

6.50 FY 07-08 LT

3703 LN06FA4114 Laxmi Nagar

Augmentation of 3X150SQMM

PILCA Cbl into 3X300SQMM

XLPE from Kuldeep Nursing

Home to Kishan Kunj Kiosk via

Guru Ram Das Nagar S/Stn in

division Laxmi Nagar.

18.39 FY 07-08 HT

3704 LN06FA4116 Laxmi Nagar

Augmentation of 3X300SQMM

PILCA Cbl into 3X300SQMM

XLPE from OLD Complaint Center

to Mangal Bazar S/Stn in division

Laxmi Nagar.

4.37 FY 07-08 HT

3705 LN06LT4046 Laxmi Nagar

Conversion of LT overhead

conductor into LT AB Cable at

PWD KIOSK substation in division

Laxmi Nagar.

7.61 FY 07-08 LT

3706 LN06LT4047 Laxmi Nagar

Conversion of LT overhead

conductor into LT AB Cable at

Vishwakarma Park in division

Laxmi Nagar.

8.22 FY 07-08 LT

3707 LN06LT4049 Laxmi Nagar

Conversion of LT overhead

conductor into LT AB Cable at

Kishan Kunj extension in division

Laxmi Nagar.

11.79 FY 07-08 LT

3708 LN06LT4050 Laxmi Nagar

Conversion of O/H Conductor in

LT AB cable at Lalita Park, Halwai

Wala.

8.58 FY 07-08 LT

3709 LN06LT4051 Laxmi Nagar

Conversion of O/H Conductor in

LT AB cable at Ramesh Park J.J.

Cluster.

3.93 FY 07-08 LT

3710 LN06LT4052 Laxmi NagarConversion of O/H Conductor in

LT AB cable at Ek Minar Masjid.12.60 FY 07-08 LT

3711 LN06LT4053 Laxmi NagarConversion of O/H Conductor in

LT AB cable at Chitra Vihar.2.24 FY 07-08 LT

3712 LN06LT4054 Laxmi Nagar

Conversion of O/H Conductor in

LT AB cable at East Guru Angad

Nagar.

14.85 FY 07-08 LT

3713 LN06LT4055 Laxmi NagarConversion of O/H Conductor in

LT AB cable at East Laxmi Market.8.74 FY 07-08 LT

Page 173: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

3714 LN06LT4057 Laxmi Nagar

Conversion of O/H Conductor in

LT AB cable at Uttari School

Block, Mandawali.

26.52 FY 07-08 LT

3715 LN06LT4061 Laxmi Nagar

Conversion of O/H Conductor in

LT AB cable at E-block, West

Vinod Nagar.

24.36 FY 07-08 LT

3716 LN06LT4062 Laxmi Nagar

Conversion of O/H Conductor in

LT AB cable at Primary School,

Mandawali.

23.65 FY 07-08 LT

3717 LN06LT4063 Laxmi Nagar

Conversion of O/H Conductor in

LT AB cable at Truck Market,

Mandawali.

9.06 FY 07-08 LT

3718 LN06LT4064 Laxmi Nagar

Conversion of O/H Conductor in

LT AB cable at Mandawali Khatta

S/Stn. 1.

13.22 FY 07-08 LT

3719 LN06LT4065 Laxmi Nagar

Conversion of O/H Conductor in

LT AB cable at Mandawali Khatta

S/Stn. 2.

6.48 FY 07-08 LT

3720 LN06LT4068 Laxmi Nagar

Conversion of O/H Conductor in

LT AB cable at Mandawali Post

Office.

21.39 FY 07-08 LT

3721 LN06LT4069 Laxmi Nagar

Conversion of O/H Conductor in

LT AB cable at S-block, Pandav

Nagar Near Patrol Pump.

13.40 FY 07-08 LT

3722 LN06LT4070 Laxmi Nagar

Conversion of O/H Conductor in

LT AB cable at S-block Pandav

Nagar.

16.80 FY 07-08 LT

3723 LN06LT4071 Laxmi Nagar

Conversion of O/H Conductor in

LT AB cable at C- block, GNPN

Complex., LNR.

25.46 FY 07-08 LT

3724 LN06LT4072 Laxmi Nagar

Conversion of O/H Conductor in

LT AB cable at South Ganesh

Nagar Extn.

17.52 FY 07-08 LT

3725 LN06LT4075 Laxmi Nagar

Conversion of O/H Conductor in

LT AB cable at South Ganesh

Nagar,

7.68 FY 07-08 LT

3726 LN06LT4076 Laxmi Nagar

Conversion of O/H Conductor in

LT AB cable at J-block, Pandav

Nagar.

7.53 FY 07-08 LT

3727 LN06LT4078 Laxmi Nagar

Conversion of O/H Conductor in

LT AB cable at Chander Vihar

S/Stn. No. 1

13.88 FY 07-08 LT

3728 LN06LT4079 Laxmi Nagar

Conversion of O/H Conductor in

LT AB cable at North Vinod Nagar,

A- Block

23.52 FY 07-08 LT

3729 LN06LT4080 Laxmi Nagar

Conversion of O/H Conductor in

LT AB cable at G-Block,

Shakarpur, LNR

22.24 FY 07-08 LT

3730 LN06LT4081 Laxmi Nagar

Conversion of O/H Conductor in

LT AB cable at Shiromani School

Block, Shakarpur.

13.61 FY 07-08 LT

3731 LN06LT4082 Laxmi Nagar

Conversion of O/H Conductor in

LT AB cable at DDA Park School

Block, LNR.

10.46 FY 07-08 LT

3732 LN06LT4083 Laxmi Nagar

Conversion of O/H Conductor in

LT AB cable at Nehru Enclave,

Shakarpur.

11.96 FY 07-08 LT

3733 LN06LT4084 Laxmi Nagar

Conversion of O/H Conductor in

LT AB cable at Tripole, Mandawali

Fazalpur

9.62 FY 07-08 LT

3734 LN06LT4085 Laxmi Nagar

Conversion of O/H Conductor in

LT AB cable at C-Block, West

Vinod Nagar.

14.10 FY 07-08 LT

3735 LN06LT4086 Laxmi Nagar

Conversion of LT overhead

conductor into LT AB Cable at D

park Pandav nagar

39.48 FY 07-08 LT

3736 LN06LT4087 Laxmi Nagar

Conversion of O/H Conductor in

LT AB cable at Mohan Baba

Mandir.

13.20 FY 07-08 LT

3737 LN06LT4088 Laxmi NagarConversion of O/H Conductor in

LT AB cable at U-Block Dhaba.10.30 FY 07-08 LT

Page 174: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

3738 LN06LT4089 Laxmi Nagar

Conversion of O/H Conductor in

LT AB cable at Master Block

Shakarpur

17.64 FY 07-08 LT

3739 LN06LT4090 Laxmi NagarConversion of O/H Conductor in

LT AB cable at Dall Mill.11.24 FY 07-08 LT

3740 LN06LT4091 Laxmi Nagar

Conversion of O/H Conductor in

LT AB cable at W B Block,

Shakarpur.

28.46 FY 07-08 LT

3741 LN06LT4092 Laxmi Nagar

Conversion of O/H Conductor in

LT AB cable at Sunder block ,

shakarpur

13.70 FY 07-08 LT

3742 LN06LT4093 Laxmi Nagar

Conversion of O/H Conductor in

LT AB cable at Sanjay Park

Kiosk,Shakarpur.

21.37 FY 07-08 LT

3743 LN06LT4095 Laxmi Nagar

Conversion of O/H Conductor in

LT AB cable at Police Booth ,

Shakarpur.

12.46 FY 07-08 LT

3744 LN06LT4096 Laxmi Nagar

Conversion of O/H Conductor in

LT AB cable at Rita Block, Vikas

Marg.

7.42 FY 07-08 LT

3745 LN06LT4097 Laxmi NagarConversion of O/H Conductor in

LT AB cable at Ara Machine.6.17 FY 07-08 LT

3746 LN06LT4098 Laxmi Nagar

Conversion of O/H Conductor in

LT AB cable at Ganesh Nagar

Phatak.

6.86 FY 07-08 LT

3747 LN06LT4099 Laxmi Nagar

Conversion of O/H Conductor in

LT AB cable at Sabzi Mandi,

Mandawali.

14.67 FY 07-08 LT

3748 LN06LT4100 Laxmi Nagar

Conversion of O/H Conductor in

LT AB cable at Mandawali Unche

Par.

15.25 FY 07-08 LT

3749 LN06LT4101 Laxmi Nagar

Conversion of O/H Conductor in

LT AB cable at Krishna Puri ,

Mandawali.

6.20 FY 07-08 LT

3750 LN06LT4102 Laxmi Nagar

Conversion of O/H Conductor in

LT AB cable at Mandawali

Dispensary.

6.23 FY 07-08 LT

3751 LN06LT4103 Laxmi Nagar

Conversion of O/H Conductor in

LT AB cable at Allah Colony,

Mandawali.

9.46 FY 07-08 LT

3752 LN06LT4104 Laxmi Nagar

Conversion of O/H Conductor in

LT AB cable at Gali No. 2, Railway

Colony, Mandawali.

14.00 FY 07-08 LT

3753 LN06LT4105 Laxmi Nagar

Conversion of O/H Conductor in

LT AB cable at Chaitan Jain Marg,

Shakarpur

10.24 FY 07-08 LT

3754 LN06LT4106 Laxmi Nagar

Conversion of O/H Conductor in

LT AB cable at Ramesh Park,

Near V-10.

12.96 FY 07-08 LT

3755 LN06LT4108 Laxmi Nagar

Conversion of O/H Conductor in

LT AB cable at Ramesh Park

Akhada Wala, LNR.

11.71 FY 07-08 LT

3756 LN06LT4109 Laxmi Nagar

Conversion of O/H Conductor in to

LT AB Cabel at West Jawahar

Park , LNR

9.08 FY 07-08 LT

3757 LN06LT4110 Laxmi Nagar

Conversion of O/H Conductor in to

LT AB Cabel at J Extn. Nanakwala

, LNR

6.57 FY 07-08 LT

3758 LN06LT4147 Laxmi NagarLT clean up at Shiv Mandir

Gazipur village Div LNR.18.81 FY 07-08 LT

3759 LN06LT4195 Laxmi NagarConversion of O/H Conductor in

LTAB Cable at Budh Vihar, LNR12.60 FY 07-08 LT

3760 LN06LT4200 Laxmi Nagar

Conversion of O/H Conductor in

LTAB Cable at Kuldeep Nursing

Home, LNR

11.23 FY 07-08 LT

3761 LN06LT4203 Laxmi Nagar

Conversion of O/H Conductor in

LTAB Cable at Shankar Marg

Mandawali, LNR

10.95 FY 07-08 LT

3762 LN06LT4206 Laxmi Nagar

Conversion of O/H Conductor in

LTAB Cable at Mandawali

Opposite Joshi Colony, LNR

9.44 FY 07-08 LT

Page 175: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

3763 LN06MS2213 Laxmi NagarProviding Projection with Angle on

HT Poles in division Laxmi Nagar.0.194 FY 07-08 LT

3764 LN06RM4001 Laxmi NagarInstallation of 4+1 Way at Gaurav

CGHS in division Laxmi Nagar. 10.36 FY 07-08 HT

3765 LN06RM4003 Laxmi NagarInstallation of 4 Way at Karishma

SS-1 in division Laxmi Nagar.6.91 FY 07-08 HT

3766 LN06RM4027 Laxmi Nagar

Replacement of 4 Panel Board at

Press CGHS in division Laxmi

Nagar.

7.49 FY 07-08 HT

3767 LN06RM4029 Laxmi Nagar

Replacement of 4 Panel Board at

Kaktia CGHS in division Laxmi

Nagar.

7.62 FY 07-08 HT

3768 LN06RM4030 Laxmi Nagar

Replacement of 4 Panel board at

Chitra Vihar in division Laxmi

nagar.

7.05 FY 07-08 HT

3769 LN06SH2229 Laxmi NagarShifting of feeder pillar at Sukh

sagar CGHS at Laxmi Nagar.0.299 FY 07-08 LT

3770 LN07EL1506 Laxmi Nagar

Elect.of LSC Plot no 1

mandawawali in division Laxmi

Nagar.

0.145 FY 07-08 LT

3771 LN07EL1507 Laxmi Nagar

Elect.of LSC Plot no 3

mandawawali in division Laxmi

Nagar.

0.148 FY 07-08 LT

3772 LN07EL1508 Laxmi Nagar

Elect.of LSC Plot no 8

mandawawali in division Laxmi

Nagar.

0.146 FY 07-08 LT

3773 LN07EL1509 Laxmi Nagar

Elect.of LSC Plot no 4

mandawawali in division Laxmi

Nagar.

0.213 FY 07-08 LT

3774 LN07EL1624 Laxmi Nagar

Electrification of Plot no. 9 of M/S

Wadhera Promotors Pvt Ltd. in

LSC near Prince & Kothari

CGHS,Mandawali Fazalpur in

division Laxmi Nagar.

0.094 FY 07-08 LT

3775 LN07LT4559 Laxmi Nagar

Laying of two Nos. LT feeders of

size 3.5x300sqmm XLPE Cable

from Esat Guru Angad Nager

S/Stn. to Pole at Gali No. 2, East

Guru Angad Nagar in division

Laxmi Nagar.

3.50 FY 07-08 LT

3776 LN07LT4579 Laxmi Nagar

Laying of LT feeder 3.5X300mmsq

XLPE Cable from J&K blk 630

KVA Tr. To Near H.No. H-18

Hanuman Mandir in division Laxmi

Nagar.

2.00 FY 07-08 LT

3777 LN07LT4584 Laxmi Nagar

Laying of 1-No.1 LT feeder

3.5X300mmsq XLPE Cable from J-

Extn. Ss (Nanak Wala) 990 KVA

Tr. to Near H.No. 141B J-Extn in

division Laxmi Nagar.

0.55 FY 07-08 LT

3778 LN07LT4585 Laxmi Nagar

Laying of 1-No. LT feeder

3.5X300mmsq XLPE Cable from

V-10 Ramesh Park (Narain Ngr)

400 KVA Tr. to Pole Near H.No.

817 in division Laxmi Nagar.

1.02 FY 07-08 LT

3779 LN07LT4586 Laxmi Nagar

Laying of 1-No LT feeder

3.5X300mmsq XLPE Cable from

Guru Nanak Pura 990 KVA Tr. SS

to Pole Near H.No. 125B Guru

Nanak Pura in division Laxmi

Nagar.

0.73 FY 07-08 LT

Page 176: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

3780 LN07LT4589 Laxmi Nagar

Laying of 1-No. LT feeder

3.5X300mmsq XLPE Cable from

VishKarma Park SS (Anar Masjid

990 KVA Tr. to Near H.N. F-9

West Jawahar Park in division

Laxmi Nagar.

2.28 FY 07-08 LT

3781 LN07LT4590 Laxmi Nagar

Laying of 1-No LT feeder

3.5X300mmsq XLPE Cable from

Police Qtr 630 KVA Tr. to Pole

Near H.No. F-50 Jawahar Park in

division Laxmi Nagar.

2.99 FY 07-08 LT

3782 LN07LT4591 Laxmi Nagar

Aug. of LT Feeder size 3.5X150

mmsq to 3.5X300 XLPE cable

from P.D.Vihar SS 990KVA to

Feeder Pillar Near H.No.A-146 in

division Laxmi Nagar.

1.18 FY 07-08 LT

3783 LN07LT4592 Laxmi Nagar

Aug. of LT Cable size 3.5X150

mmsq to 3.5X300 XLPE cable

from Feeder Pillar H.No. A-05 to

Feeder Pillar H. No.15 P.D Vihar

in division Laxmi Nagar.

2.84 FY 07-08 LT

3784 LN07LT4595 Laxmi Nagar

Aug. of one No. LT feeder of size

3.5X150sqmm to 3.5x300sqmm

XLPE Cable from Fdr Pillar near

H. No. E-365 to H. No. E-372

Nirman Vihar Feeder Pillars in

division Laxmi Nagar.

1.52 FY 07-08 LT

3785 LN07LT4596 Laxmi Nagar

Aug. of LT feeder of size

3.5X150mmsq to 3.5x300sqmm

XLPE Cable from Fdr Pillar Near

H.No.54 to Fdr Pillar Near H. No.

09 Bharti Artist Colony in division

Laxmi Nagar.

1.35 FY 07-08 LT

3786 LN07SH1601 Laxmi Nagar

Dismentalling of Sub-Station at

Radhu Place Cinema Building in

division Laxmi Nagar.

0.179 FY 07-08 HT

3787 LN07UT4517 Laxmi Nagar

Augmentation of transformer

630kVA to 990kVA at J-Extension

Nanakwala in division Laxmi

Nagar.

0.132 FY 07-08 HT

3788 LN07UT4518 Laxmi Nagar

Augmentation of transformer

630kVA to 990kVA at Anar Masjid

in division Laxmi Nagar.

0.132 FY 07-08 HT

3789 LN07UT4520 Laxmi Nagar

Augmentation of transformer

630kVA to 990kVA at

Gururamdas Nagar in division

Laxmi Nagar.

0.264 FY 07-08 HT

3790 LN07UT4524 Laxmi Nagar

Augmentation of 1X630 KVA

Transformer into 1X990 KVA

Transformer at west Guru Angad

Nagar Sub-station and T/O 2 No

LT Feeder from the said sub-

station in division Laxmi Nagar.

5.82 FY 07-08 HT

3791 LN07UT4526 Laxmi Nagar

Augmentation of 2X630 KVA

Transformer into 2X990 KVA

Transformer at D Block Khatta

Sub-Station and T/O 4 no of LT

Feeders from the said sub-station

in division Laxmi Nagar.

24.51 FY 07-08 HT

3792 LN07UT4531 Laxmi Nagar

Augmentation of 1X630 KVA

Transformer into 1X990 KVA

Transformer at Halwai wala Lalita

Park Sub-Station and T/O 1 No LT

Feeder from the said Sub-station

in division Laxmi Nagar.

3.38 FY 07-08 HT

3793 M305EL2076 Mayur Vihar Ph-3

Electrification of High Land CGHS

at Chilla Dallupura in division

Mayur Vihar Ph-III.

23.91 FY 07-08 LT

Page 177: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

3794 M305EL4080 Mayur Vihar Ph-3

Electrification of harijan basti C

block Gharoli in division Mayur

Vihar Ph-III

27.75 FY 07-08 LT

3795 M305LT4012 Mayur Vihar Ph-3

Taking out New 2 nos LT Feeder

of size 3.1/2 X300 mm sq XLPE

from C - 2 block Mayur Vihar -III

sub station

2.34 FY 07-08 LT

3796 M305LT4017 Mayur Vihar Ph-3

Taking out New 1 NO LT Feeder

of size 3.1/2 X300 mm sq XLPE

from Panchayat Ghar Vill Kondli in

division Mayur Vihar Ph-III.

1.74 FY 07-08 LT

3797 M305LT4019 Mayur Vihar Ph-3

Taking out New 1 NO LT Feeder

of size 3.1/2 X300 mm sq XLPE at

sub station No 2 Vasundhara

Enclve in division Mayur Vihar Ph-

III.

3.44 FY 07-08 LT

3798 M305LT4075 Mayur Vihar Ph-3

Taking out 3 NOS LT FEEDERS

at sub station NO.2,A-1 in division

Mayur Vihar Ph-III.

2.92 FY 07-08 LT

3799 M305MS4078 Mayur Vihar Ph-3

Installation of Metering Cubical at

Navjagriti CGHS Vasundhara

Enclave.

0.345 FY 07-08 LT

3800 M306EL2507 Mayur Vihar Ph-3 Electrification work at Mahesh

CGHS Vasundhara-(Service Part)5.69 FY 07-08 LT

3801 M306LT4509 Mayur Vihar Ph-3

Conversion of LT O/H Conductor

into LTAB Cable at Dallupura

Village in division Mayur Vihar Ph-

III.

60.19 FY 07-08 LT

3802 M306LT4519 Mayur Vihar Ph-3

Conversion of LT O/H Conductor

into LTAB Cable at Harizan Basti

Kondli Mayur Vihar Ph-III.

31.98 FY 07-08 LT

3803 M306LT4520 Mayur Vihar Ph-3

Conversion of LT O/H Conductor

into LTAB Cable at A & B Block

Rajveer Colony Mayur Vihar Ph-III.

41.68 FY 07-08 LT

3804 M306LT4521 Mayur Vihar Ph-3

Conversion of LT O/H Conductor

into LTAB Cable at village Gharoli

Mayur Vihar Ph-III.

16.92 FY 07-08 LT

3805 M306LT4523 Mayur Vihar Ph-3

Conversion of LT O/H Conductor

into LTAB Cable at F Pocket C1-2

B1, A1-2, DDA Pocket in Mayur

Vihar Ph-III.

29.21 FY 07-08 LT

3806 M306LT4524 Mayur Vihar Ph-3

Conversion of LT O/H Conductor

into LTAB Cable at B Block

Gharoli Dairy Colony Mayur Vihar

Ph-III.

44.78 FY 07-08 LT

3807 M306LT4525 Mayur Vihar Ph-3

Conversion of LT O/H Conductor

into LTAB Cable at A, B, C Block

New Kondli Mayur Vihar Ph-III.

61.52 FY 07-08 LT

3808 M306LT4526 Mayur Vihar Ph-3

Conversion of LT O/H Conductor

into LTAB Cable at C Block New

Ashok Mayur Vihar Ph-III.

58.86 FY 07-08 LT

3809 M306LT4527 Mayur Vihar Ph-3

Conversion of LT O/H Conductor

into LTAB Cable at A Block New

Ashok Nagar Mayur Vihar Ph-III.

66.65 FY 07-08 LT

3810 M306LT4528 Mayur Vihar Ph-3

Conversion of LT O/H Conductor

into LTAB Cable at D Block New

Ashok Nagar Mayur Vihar Ph-III.

30.95 FY 07-08 LT

3811 M306LT4529 Mayur Vihar Ph-3

Conversion of LT O/H Conductor

into LTAB Cable at B Block New

Ashok Nagar Mayur Vihar Ph-III.

62.40 FY 07-08 LT

3812 M306RM4549 Mayur Vihar Ph-3 Providing 4 way RMU at S/s B

Block New Ashok Nagar.6.57 FY 07-08 HT

3813 M306RM4551 Mayur Vihar Ph-3 Providing 4 way RMU at S/s C5

Block New Ashok Nagar6.79 FY 07-08 HT

Page 178: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

3814 M306RM4552 Mayur Vihar Ph-3

Providing 4 way RMU at S/s A

Block New Ashok Nagar in

division Mayur Vihar Ph-III

6.52 FY 07-08 HT

3815 M307EL1046 Mayur Vihar Ph-3

Electrification of Plot no. 1&2 of

M/S Babushka Promotors Pvt

Ltd. in LSC Sector G Kondli

Gharoli in division Mayur Vihar Ph-

III

0.265 FY 07-08 LT

3816 M307EL1049 Mayur Vihar Ph-3

Electrification of Plot No. 2 in LSC

west of Tirlok Puri Mayur Vihar

Ph.III.

0.345 FY 07-08 LT

3817 M307EL1078 Mayur Vihar Ph-3

Electrification of Plot no. 7 of M/S

SLS buildwell Ltd. in LSC Sector

G Kondli Gharoli in division Mayur

Vihar Ph III

0.087 FY 07-08 LT

3818 M307EL2013 Mayur Vihar Ph-3

Electrification of LSC kondli

Gharoli,sector G in division Mayur

Vihar Ph-III

4.65 FY 07-08 LT

3819 M307EL2014 Mayur Vihar Ph-3

Electrification of LSC Sec A Kondli

Gharoli in division Mayur Vihar Ph-

III

2.19 FY 07-08 LT

3820 M307EL3002 Mayur Vihar Ph-3

Elect.of City CGHS Chilla

Dallupura Kondli Ghazipur in

division Mayur Vihar Ph-III

5.95 FY 07-08 HT

3821 M307LT1015 Mayur Vihar Ph-3

Electri.of LSC Sec A Plot No 1

Kondli Ghazipur in division Mayur

Vihar Ph-III

0.243 FY 07-08 LT

3822 M307LT1016 Mayur Vihar Ph-3

Electrification of LSC Sec A Plot

No 2 Kondli Ghazipur in division

Mayur Vihar Ph-III.

0.284 FY 07-08 LT

3823 M307LT1018 Mayur Vihar Ph-3

Electrification of Plot No.-3 at LSC

Sector G Kondli in division Mayur

Vihar Ph-III.

0.184 FY 07-08 LT

3824 M307LT1019 Mayur Vihar Ph-3

Electrification of Plot no. 5 of M/S

V4 Infrastructure Pvt Ltd. in LSC

Sector G Kondli Gharoli in division

Mayur Vihar Ph-III.

0.195 FY 07-08 LT

3825 MV04AT4754Mayur Vihar Ph-

1&2

Providing additional transformer

and Taking out 2 LT feederAT

sub station 1A Gattawala in

division Mayur Vihar Ph-1&2.

1.43 FY 07-08 HT

3826 MV04FA4531Mayur Vihar Ph-

1&2

Augmentation of HT cable from

sub sttion no. 1 to khichripur

colony to 10 block khichripur

colony in division Mayur Vihar Ph-

1&2.

2.58 FY 07-08 HT

3827 MV04FA4534Mayur Vihar Ph-

1&2

Augmentation of HT cable of size

3X150MM2 PLICA into

3X300MM2 XLPE from khichripur

village to kalyan vas in Mayur

Vihar Ph-1&2.

2.50 FY 07-08 HT

3828 MV04FA4547Mayur Vihar Ph-

1&2

Augmentation of HT overhead

rabbit conductor to dog conductor

between nagarjuna CGHS to new

ashok nagar A block in division

Mayur Vihar Ph-1&2.

0.239 FY 07-08 HT

3829 MV04LT4553Mayur Vihar Ph-

1&2

Taking out 2 LT feeders 630 KVA

Distribution Transformer AT 16-

block Trilokpuri in division Mayur

Vihar Ph-1&2.

2.34 FY 07-08 LT

3830 MV04LT4665Mayur Vihar Ph-

1&2

Replacement of feeder

pillar/service pillar in district

.Mayur Vihar

54.83 FY 07-08 LT

3831 MV04LT4724Mayur Vihar Ph-

1&2

Providing LT feeder and

replacement of ACSR conductor in

E and F block in division Mayur

Vihar Ph-1&2.

6.31 FY 07-08 LT

Page 179: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

3832 MV04LT4725Mayur Vihar Ph-

1&2

Replacement and provision of 3

phase ACSR DOG conductor in 7

block Trilokpuri.

0.67 FY 07-08 LT

3833 MV04RM4634Mayur Vihar Ph-

1&2

Replacement of HT panel at

substation 3 Phase-I near Glaxo

appartment in division Mayur Vihar

Ph-1&2.

13.27 FY 07-08 HT

3834 MV04RM4641Mayur Vihar Ph-

1&2

Replacement of HT Panel at sub

station No. 9 pocket 2 in division

Mayur Vihar Ph-1&2.

5.35 FY 07-08 HT

3835 MV04RM4643Mayur Vihar Ph-

1&2

Replacement of HT 11 KV Panel

at Lahore CGHS Phase III in

division Mayur Vihar Ph-1&2.

7.88 FY 07-08 HT

3836 MV04RM4649Mayur Vihar Ph-

1&2

Replacement of HT 11 KV Panel

at sub station 26 block Trilokpuri

in division Mayur Vihar Ph-1&2.

15.61 FY 07-08 HT

3837 MV04RM4654Mayur Vihar Ph-

1&2

Replacement of HT panel at

substation ARC in division Mayur

Vihar Ph-1&2.

7.04 FY 07-08 HT

3838 MV04RM4681Mayur Vihar Ph-

1&2

Providing HT 11 kV RMU at Water

Pumping Sub-Station Pkt IV in

division Mayur Vihar Ph-1&2.

4.00 FY 07-08 HT

3839 MV04RM4706Mayur Vihar Ph-

1&2

Providing 11 kV RMU at DP B

block New Ashok Nagar in division

Mayur Vihar Ph-1&2.

6.18 FY 07-08 HT

3840 MV04RM4707Mayur Vihar Ph-

1&2

Providing 11 kV RMU at DP A

block Rajveer colony in division

Mayur Vihar Ph-1&2.

4.46 FY 07-08 HT

3841 MV04RM4712Mayur Vihar Ph-

1&2

Providing 11 KV RMU at Kondli

village new in division Mayur Vihar

Ph-1&2.

4.17 FY 07-08 HT

3842 MV04RM4733Mayur Vihar Ph-

1&2

Replacement of 4 panel board at

sub station B Block anand lok in

division Mayur Vihar Ph-1&2.

0.166 FY 07-08 HT

3843 MV04RM4734Mayur Vihar Ph-

1&2

Replacement of 4 panel board at

sub station C Block anand lok in

division Mayur Vihar Ph-1&2.

7.69 FY 07-08 HT

3844 MV04SS4535Mayur Vihar Ph-

1&2

Providing of HT feed to newly

proposed sub station shashi

garden and taking out 3 nos. LT

feeders from 400KVA transformer

and Augmentation of overhead

line conductors with ACSR Dog.

Conductor in division Mayur Vihar

Ph-1&2.

11.05 FY 07-08 HT

3845 MV04SS4566Mayur Vihar Ph-

1&2

Providing of HT feed 11 ,12 block

Trilokpuri ,Mayur Vihar 40.95 FY 07-08 HT

3846 MV04UT4526Mayur Vihar Ph-

1&2

Augmentation of 400KVA

transformer to 630KVA at 15 block

Kalyanpuri in division Mayur Vihar

Ph-1&2.

0.223 FY 07-08 HT

3847 MV04UT4575Mayur Vihar Ph-

1&2

Augmentation of 400KVA

transformer to 630KVA at S.S NO

III, C block New Ashok Nagar in

division Mayur Vihar Ph-1&2.

0.247 FY 07-08 HT

3848 MV04UT4576Mayur Vihar Ph-

1&2

Augmentation of 400KVA

transformer to 630KVA at 2 E

block New Ashok Nagar in division

Mayur Vihar Ph-1&2.

0.242 FY 07-08 HT

3849 MV04UT4577Mayur Vihar Ph-

1&2

Augmentation of 400KVA

transformer to 630KVA at C block

New Kondli in division Mayur Vihar

Ph-1&2.

0.244 FY 07-08 HT

Page 180: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

3850 MV04UT4578Mayur Vihar Ph-

1&2

Augmentation of 630KVA

transformer to 990KVA at 17

block Kalyanpuri in division Mayur

Vihar Ph-1&2.

0.233 FY 07-08 HT

3851 MV04UT4582Mayur Vihar Ph-

1&2

Augmentation of 630KVA

transformer to 990KVA at 16 block

Trilokpuri in division Mayur Vihar

Ph-1&2.

0.225 FY 07-08 HT

3852 MV04UT4584Mayur Vihar Ph-

1&2

Augmentation of 630KVA

transformer to 990KVA at 31

block. Trilokpuri. in division Mayur

Vihar Ph-1&2.

0.398 FY 07-08 HT

3853 MV05FA4007Mayur Vihar Ph-

1&2

Augmentation of 11kV HT PLICA

Cable with XLPE size 3x300mm2

from Mayur Vihar PH-I Groad to

Sub station 1 CGHS PH-1 in

division Mayur Vihar Ph-1&2.

14.26 FY 07-08 HT

3854 MV05FA4012Mayur Vihar Ph-

1&2

Augmentation of 3x150mm2

PLICA with 3x300 XLPE

inbetween Sub station No. 3

pocket - B and Sub station No. 2

pocket - F(Ram Mandir) in

division Mayur Vihar Ph-1&2.

9.57 FY 07-08 HT

3855 MV05FA4022Mayur Vihar Ph-

1&2

Augmentation of 3x150 PILCA

Cable with 3x300 XLPE from Sub

station No. 4 pocket - 3 Mayur

Vihar -I to Switching Sub station

no. 8 pocket - I Mayur Vihar

2.84 FY 07-08 HT

3856 MV05FA4034Mayur Vihar Ph-

1&2

Replacement of 3x300 PILCA

Cable with 3x300 XLPE from

Amar Jyoti CGHS to Sub station

No. 1 Supreme CGHS in division

Mayur Vihar Ph-1&2.

10.62 FY 07-08 HT

3857 MV05FA4035Mayur Vihar Ph-

1&2

Replacement of 3x300 PILCA

Cable with 3x300 XLPE from Sub

station No. 3 Ph-1 to B Block

Anand Lok

7.40 FY 07-08 HT

3858 MV05FA4037Mayur Vihar Ph-

1&2

Replacement of 3x300 PILCA

Cable with 3x300 XLPE from

Adarsh Mohalla PatPar Ganj to

Patpar Janj Kiosk in division

Mayur Vihar Ph-1&2.

8.87 FY 07-08 HT

3859 MV05FA4038Mayur Vihar Ph-

1&2

Replacement of 3x300 PILCA

Cable with 3x300 XLPE from Sub

station No. 3 CGHS to pocket - 4

Sub station No. 3 ( Via Shiv

Mandir) in division Mayur Vihar Ph-

1&2.

25.49 FY 07-08 HT

3860 MV05FA4042Mayur Vihar Ph-

1&2

Replacement of 3x300 PILCA

Cable with 3x300 XLPE from Sub

station No 3 Ph - 1 Mayur Vihar to

Sub station No 2 C Block I.F.S in

division Mayur Vihar Ph-1&2.

15.42 FY 07-08 HT

3861 MV06EL2002Mayur Vihar Ph-

1&2

Electrification of Poultry Market

Gazipur DAMM in division Mayur

Vihar Ph-1&2.

25.96 FY 07-08 HT

3862 MV06FA4087Mayur Vihar Ph-

1&2

Replacement of 11KV HT

3x300SQMM PILCA Cable from

Kalyanvas to Crossing G-Blk East

Vinod Nagar (Near Super Shine

Dry Cleaning Shop) in division

Mayur Vihar Ph-1&2.

9.54 FY 07-08 HT

3863 MV06LT4012Mayur Vihar Ph-

1&2

Conversion of O/H conductor into

LTAB Cable at 6 Block Trilokpuri

in division Mayur Vihar Ph-1&2.

14.44 FY 07-08 LT

Page 181: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

3864 MV06LT4013Mayur Vihar Ph-

1&2

Conversion of O/H conductor into

LTAB Cable at 7 Block Trilokpuri

in division Mayur Vihar Ph-1&2.

17.19 FY 07-08 LT

3865 MV06LT4015Mayur Vihar Ph-

1&2

Conversion of O/H conductor into

LTAB Cable at 8 A Block Trilokpuri

in division Mayur Viahar Ph-1&2.

13.34 FY 07-08 LT

3866 MV06LT4016Mayur Vihar Ph-

1&2

Conversion of O/H conductor into

LTAB Cable at 9 block Trilokpuri in

division Mayur Viahar Ph-1&2.

10.50 FY 07-08 LT

3867 MV06LT4018Mayur Vihar Ph-

1&2

Conversion of overhead Conductor

into LT AB Cable at 18 block

Trilokpuri in division Mayur Viahar

Ph-1&2.

11.92 FY 07-08 LT

3868 MV06LT4019Mayur Vihar Ph-

1&2

Conversion of O/H conductor into

LTAB Cable at 23 block Tirlok puri

in division Mayur Viahar Ph-1&2.

11.64 FY 07-08 LT

3869 MV06LT4026Mayur Vihar Ph-

1&2

Conversion of O/H conductor into

LTAB Cable at 29 block Trilokpuri

in division Mayur Viahar Ph-1&2.

15.67 FY 07-08 LT

3870 MV06LT4028Mayur Vihar Ph-

1&2

Conversion of O/H conductor into

LTAB Cable at 1 block Trilokpuri in

division Mayur Viahar Ph-1&2.

15.22 FY 07-08 LT

3871 MV06LT4030Mayur Vihar Ph-

1&2

Conversion of O/H conductor into

LTAB Cable at 3 block Trilokpuri in

division Mayur Viahar Ph-1&2.

16.00 FY 07-08 LT

3872 MV06LT4031Mayur Vihar Ph-

1&2

Conversion of O/H conductor into

LTAB Cable at 4 block Trilokpuri in

division Mayur Viahar Ph-1&2.

17.43 FY 07-08 LT

3873 MV06LT4032Mayur Vihar Ph-

1&2

Conversion of O/H conductor into

LTAB Cable at 5 block Trilokpuri in

division Mayur Viahar Ph-1&2.

18.39 FY 07-08 LT

3874 MV06LT4033Mayur Vihar Ph-

1&2

Conversion of O/H conductor into

LTAB Cable at 8 block Trilokpuri in

division Mayur Viahar Ph-1&2.

11.33 FY 07-08 LT

3875 MV06LT4034Mayur Vihar Ph-

1&2

Conversion of O/H conductor into

LTAB Cable at 10 block Trilokpuri

in division Mayur Viahar Ph-1&2.

8.09 FY 07-08 LT

3876 MV06LT4035Mayur Vihar Ph-

1&2

Conversion of O/H conductor into

LTAB Cable at 11 block Trilokpuri

in division Mayur Viahar Ph-1&2.

6.91 FY 07-08 LT

3877 MV06LT4036Mayur Vihar Ph-

1&2

Conversion of O/H conductor into

LTAB Cable at 12 block Trilokpuri

in division Mayur Viahar Ph-1&2.

6.55 FY 07-08 LT

3878 MV06LT4037Mayur Vihar Ph-

1&2

Conversion of O/H conductor into

LTAB Cable at 13 Block Trilokpuri

in division Mayur Viahar Ph-1&2.

17.35 FY 07-08 LT

3879 MV06LT4038Mayur Vihar Ph-

1&2

Conversion of O/H conductor into

LTAB Cable at 14 Block Tirlok puri

in division Mayur Viahar Ph-1&2.

9.58 FY 07-08 LT

3880 MV06LT4040Mayur Vihar Ph-

1&2

Conversion of O/H conductor into

LTAB Cable at 17 Block Tirlok puri

in division Mayur Viahar Ph-1&2.

13.25 FY 07-08 LT

Page 182: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

3881 MV06LT4041Mayur Vihar Ph-

1&2

Conversion of O/H conductor into

LTAB Cable at 19 Block Tirlok puri

in division Mayur Viahar Ph-1&2.

19.94 FY 07-08 LT

3882 MV06LT4042Mayur Vihar Ph-

1&2

Conversion of O/H conductor into

LTAB Cable at 20 Block Tirlok puri12.44 FY 07-08 LT

3883 MV06LT4044Mayur Vihar Ph-

1&2

Conversion of O/H conductor into

LTAB Cable at 22 Block Tirlok puri

in division Mayur Viahar Ph-1&2.

12.31 FY 07-08 LT

3884 MV06LT4045Mayur Vihar Ph-

1&2

Conversion of O/H conductor into

LTAB Cable at at 25 Block Tirlok

puri in division Mayur Viahar Ph-

1&2.

12.10 FY 07-08 LT

3885 MV06LT4048Mayur Vihar Ph-

1&2

Conversion of O/H conductor into

LTAB Cable at 31 Block Tirlok puri

in division Mayur Viahar Ph-1&2.

10.29 FY 07-08 LT

3886 MV06LT4052Mayur Vihar Ph-

1&2

Conversion of overhead of LT Bare

Cond to LT AB Cable at 35 Block

Tirlok puri in division Mayur Viahar

Ph-1&2.

19.12 FY 07-08 LT

3887 MV06LT4054Mayur Vihar Ph-

1&2

Conversion of overhead of LT Bare

Conductor into LT AB Cable at

Kotla Village in division Mayur

Viahar Ph-1&2.

26.73 FY 07-08 LT

3888 MV06LT4055Mayur Vihar Ph-

1&2

Conversion of overhead of LT Bare

Conductor into LT AB Cable at

Chilla Village in division Mayur

Viahar Ph-1&2.

29.44 FY 07-08 LT

3889 MV06LT4056Mayur Vihar Ph-

1&2

Conversion of overhead of LT Bare

Conductor into LT AB Cable at

Shashi Garden in division Mayur

Viahar Ph-1&2.

56.01 FY 07-08 LT

3890 MV06LT4057Mayur Vihar Ph-

1&2

Conversion of O/H conductor into

LTAB Cable at 11 Block

Kalyanpuri in division Mayur

Viahar Ph-1&2.

17.93 FY 07-08 LT

3891 MV06LT4058Mayur Vihar Ph-

1&2

Conversion of O/H conductor into

LTAB Cable at 12 Block

Kalyanpuri in division Mayur

Viahar Ph-1&2.

16.66 FY 07-08 LT

3892 MV06LT4059Mayur Vihar Ph-

1&2

Conversion of O/H conductor into

LTAB Cable at 15 Block

Kalyanpuri in division Mayur

Viahar Ph-1&2.

10.44 FY 07-08 LT

3893 MV06LT4060Mayur Vihar Ph-

1&2

Conversion of O/H conductor into

LTAB Cable at 19 Block

Kalyanpuri in division Mayur

Viahar Ph-1&2.

17.72 FY 07-08 LT

3894 MV06LT4061Mayur Vihar Ph-

1&2

Conversion of O/H conductor into

LTAB Cable at 2,3 & 5 Block

Khichripur in division Mayur Viahar

Ph-1&2.

33.33 FY 07-08 LT

3895 MV06LT4062Mayur Vihar Ph-

1&2

Conversion of O/H conductor into

LTAB Cable at 8 Block Khichripur

in division Mayur Viahar Ph-1&2.

12.94 FY 07-08 LT

3896 MV06LT4064Mayur Vihar Ph-

1&2

Conversion of O/H conductor into

LTAB Cable at G Block East Vinod

Nagar in division Mayur Viahar Ph-

1&2.

10.25 FY 07-08 LT

3897 MV06LT4066Mayur Vihar Ph-

1&2

Conversion of O/H conductor into

LTAB Cable at 4 Block Khichripur

in division Mayur Viahar Ph-1&2.

14.53 FY 07-08 LT

Page 183: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

3898 MV06LT4067Mayur Vihar Ph-

1&2

Conversion of O/H conductor into

LTAB Cable at 6 Block Khichripur

in division Mayur Viahar Ph-1&2.

14.14 FY 07-08 LT

3899 MV06LT4068Mayur Vihar Ph-

1&2

Conversion of O/H conductor into

LTAB Cable at Block Khichripur in

division Mayur Viahar Ph-1&2.

9.49 FY 07-08 LT

3900 MV06LT4069Mayur Vihar Ph-

1&2

Conversion of O/H conductor into

LTAB Cable at 9 Block Khichripur

in division Mayur Viahar Ph-1&2.

11.99 FY 07-08 LT

3901 MV06LT4070Mayur Vihar Ph-

1&2

Conversion of O/H conductor into

LTAB Cable at 10 Block

Khichripur in division Mayur Viahar

Ph-1&2.

12.28 FY 07-08 LT

3902 MV06LT4071Mayur Vihar Ph-

1&2

Conversion of O/H conductor into

LTAB Cable at 13 Block

Kalyanpuri in division Mayur

Viahar Ph-1&2.

10.45 FY 07-08 LT

3903 MV06LT4072Mayur Vihar Ph-

1&2

Conversion of O/H conductor into

LTAB Cable at 14 Block

Kalyanpuri in division Mayur

Viahar Ph-1&2.

8.92 FY 07-08 LT

3904 MV06LT4073Mayur Vihar Ph-

1&2

Conversion of O/H conductor into

LTAB Cable at 16 Block

Kalyanpuri in division Mayur

Viahar Ph-1&2.

14.96 FY 07-08 LT

3905 MV06LT4074Mayur Vihar Ph-

1&2

Conversion of O/H conductor into

LTAB Cable at 17 Block

Kalyanpuri in division Mayur

Viahar Ph-1&2.

33.18 FY 07-08 LT

3906 MV06LT4075Mayur Vihar Ph-

1&2

Conversion of O/H conductor into

LTAB Cable at 18 Block

Kalyanpuri in division Mayur

Viahar Ph-1&2.

24.83 FY 07-08 LT

3907 MV06LT4076Mayur Vihar Ph-

1&2

Conversion of O/H conductor into

LTAB Cable at 20 Block

Kalyanpuri in division Mayur

Viahar Ph-1&2.

15.88 FY 07-08 LT

3908 MV06LT4077Mayur Vihar Ph-

1&2

Conversion of O/H conductor into

LTAB Cable at 21 Block

Kalyanpuri in division Mayur

Viahar Ph-1&2. in division Mayur

Vihar Ph-1&2.

21.98 FY 07-08 LT

3909 MV06LT4080Mayur Vihar Ph-

1&2

Conversion of O/H conductor into

LTAB Cable at Patparganj Village

in division Mayur Vihar Ph-1 &2.

53.10 FY 07-08 LT

3910 MV06LT4113Mayur Vihar Ph-

1&2

Replacement of Feeder pillar in

division Mayur Vihar Ph-1&2.35.67 FY 07-08 LT

3911 MV06LT4136Mayur Vihar Ph-

1&2

Conversion of O/H conductor into

LTAB Cable at Pratap Nagar in

division Mayur Vihar Ph-1&2.

14.19 FY 07-08 LT

3912 MV06LT4137Mayur Vihar Ph-

1&2

Conversion of O/H conductor into

LTAB Cable at Acharya Niketan in

division Mayur Vihar Ph-1&2.

15.73 FY 07-08 LT

3913 MV06LT4138Mayur Vihar Ph-

1&2

Conversion of O/H conductor into

LTAB Cable at Samaspur &

Pandav Nagar in division Mayur

Vihar Ph-1&2.

42.22 FY 07-08 LT

3914 MV06LT4763Mayur Vihar Ph-

1&2

Conversion of O/H conductor into

LTAB Cable at 1 Block Kichripur in

division Mayur Vihar Ph-1&2.

12.87 FY 07-08 LT

3915 MV06RM4004Mayur Vihar Ph-

1&2

Installation of 4 Way at substation-

1, Pkt - 5 in division Mayur Vihar

Ph-1&2.

7.04 FY 07-08 HT

Page 184: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

3916 MV06RM4005Mayur Vihar Ph-

1&2

Installation of 4 way at Basant

G.H.S in division Mayur Vihar Ph-

1&2.

7.27 FY 07-08 HT

3917 MV06RM4006Mayur Vihar Ph-

1&2

Installation of 4 way at United

G.H.S.substation.3 in division

Mayur Vihar Ph-1&2.

7.09 FY 07-08 HT

3918 MV06RM4007Mayur Vihar Ph-

1&2

Installation of 4 way at Nirman

Viahr substation-2 in division

Mayur Vihar Ph-1&2.

7.33 FY 07-08 HT

3919 MV06RM4102Mayur Vihar Ph-

1&2

Replacement of 11KV 4 Way

Panel at substation 5 Pkt B in

division Mayur Vihar Ph-1&2.

6.97 FY 07-08 HT

3920 MV06RM4109Mayur Vihar Ph-

1&2

Replacement of 11KV 4 Way

Panel at DDA Chilla in division

Mayur Vihar Ph-1&2.

9.63 FY 07-08 HT

3921 MV06RM4122Mayur Vihar Ph-

1&2

Replacement of 11KV 4 Way

Panel at Acharya Niketan in

division Mayur Vihar Ph-1&2.

6.69 FY 07-08 HT

3922 MV06RM4670Mayur Vihar Ph-

1&2

Replacement of 4 Panel board at

Sub-Station Hindustan Times in

division Mayur Vihar Ph-1&2.

7.93 FY 07-08 HT

3923 MV07EL1524Mayur Vihar Ph-

1&2

Electrification of Plot No. 1 in LSC

west of Tirlok Puri in division

Mayur Vihar Ph-1&2.

0.309 FY 07-08 LT

3924 MV07LT4580Mayur Vihar Ph-

1&2

Conversion of U/G to O/H LT

System on Street ligt Poles on the

Road from Chilla Regulator to

Kondli Bridge in division Mayur

Vihar Ph-1&2.

3.39 FY 07-08 LT

3925 NN04NF4541 Nand Nagri

Augmentation OF HT cable EX

between 240MIG-F-1 Sunder

Nagar in Nand Nagri division .

14.57 FY 07-08 HT

3926 NN04RM3556 Nand Nagri

Installation of 1 RMUs + 1 single

Panel board (extensible)instead of

damaged 4 Panel board at B Block

Kabeer Nagir sub station in Nand

Nagri division .

7.78 FY 07-08 HT

3927 NN05FA4009 Nand Nagri

Augmentation 3*150 to 3*300

cable between west Jyoti N

Tokhetw

17.20 FY 07-08 HT

3928 NN05FA4018 Nand Nagri

Providing AB conductor Between

Four Pole Structure Wazirabad

Road to KachIpura Sub station in

Nand Nagri division .

9.92 FY 07-08 HT

3929 NN05FA4025 Nand Nagri

Providing 3X300 b/n Pumping

S/Stn Near Gopalpur Nallah on

Wazirabad Road to STP Plant in

Nand Nagri division .

7.59 FY 07-08 HT

3930 NN05FA4026 Nand NagriProviding of 3X300 b/n Durgapuri

to Jyoti Colony14.51 FY 07-08 HT

3931 NN05FA4027 Nand Nagri

Providing 3X300 b/n Jagjivan

Nagar to Chanderlok in Nand

Nagri division .

13.45 FY 07-08 HT

3932 NN05FA4029 Nand Nagri

Providing 3X300MM2 between

Ambedkar park to Jyoti S/Stn in

Nand Nagri division .

12.47 FY 07-08 HT

3933 NN05LT4044 Nand Nagri

Taking out 4 no LT feeders of size

3.5x300 mm sq from proposed

Augmentation of Transformer

From 630 kVA to 990 kVA at

H.block. Sunder Nagri Sub station

in Nand Nagri division .

5.56 FY 07-08 LT

3934 NN05PS4113 Nand Nagri

Installation of 2 Nos. 990kVA

Package Sub Station at West

Jyoti Ngaar, Nand Nagri

37.69 FY 07-08 HT

Page 185: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

3935 NN05RM4072 Nand Nagri

Providing of RMU at Babarpur

Kabristan Sub station in Nand

Nagri division .

4.23 FY 07-08 HT

3936 NN05RM4073 Nand NagriProv. Of RMU at Balbir Nagar

Extn. s/stn in Nand Nagri division .5.09 FY 07-08 HT

3937 NN05RM4080 Nand Nagri

Providing of RMU at Jagjivan

Nagar Sub station in Nand Nagri

division ..

5.10 FY 07-08 HT

3938 NN05RM4086 Nand NagriProviding RMU at New Kardam

puri in Nand Nagri division .4.27 FY 07-08 HT

3939 NN05RM4092 Nand Nagri

Providing RMU at Pani tanki

substation village Mandoli in Nand

Nagri division .

4.20 FY 07-08 HT

3940 NN05RM4093 Nand Nagri

Providing RMU at Village

Kachipura substation in Nand

Nagri division .

4.43 FY 07-08 HT

3941 NN05RM4096 Nand Nagri

Providing RMU at Street light

substation Gagan Cinema in Nand

Nagri division .

4.57 FY 07-08 HT

3942 NN05RM4099 Nand NagriInstallation 5 panel Board D-1

substation Nand nagri4.32 FY 07-08 HT

3943 NN06EL4131 Nand NagriElectri. of Amar Col. gali

no.1,2,3&4 LB51.01 FY 07-08 LT

3944 NN06EL4134 Nand NagriLTMP of FGH blk Jhuggis Sunder

Ngri in Nand Nagri division 18.74 FY 07-08 LT

3945 NN06EL4136 Nand NagriLTMP of E blk Safai Karmchari in

Nand Nagri division 7.52 FY 07-08 LT

3946 NN06EL4137 Nand NagriLTMP of D-1 Jhuggis in Nand

Nagri division 2.48 FY 07-08 LT

3947 NN06EL4138 Nand NagriLTMP of D blk Safai Karmchari in

Nand Nagri division 20.28 FY 07-08 LT

3948 NN06EL4139 Nand NagriLTMP of C & D blk i Kabir Nagar

in Nand Nagri division 17.52 FY 07-08 LT

3949 NN06EL4140 Nand NagriLTMP of B blk Meet Nagar in

Nand Nagri division 32.51 FY 07-08 LT

3950 NN06LT4008 Nand Nagri

LTMP Sscheme of Balbir nagar

Extension & Ambe Park in Nand

Nagri division

97.81 FY 07-08 LT

3951 NN06LT4009 Nand Nagri

Conversion of LT O/H Conductor

into LT AB Cable in Nand Nagri

division

328.12 FY 07-08 LT

3952 NN06LT4010 Nand Nagri

Conversion of LT O/H Conductor

into LT AB Cable at sunder nagri

in Nand Nagri division

208.15 FY 07-08 LT

3953 NN06LT4011 Nand Nagri

Conversion of LT O/H Conductor

into LT AB Cable at Jagat puri

extn in Nand Nagri division

31.07 FY 07-08 LT

3954 NN06LT4012 Nand Nagri

Conversion of LT O/H Conductor

into LT AB Cable at school Block

in Nand Nagri division

22.87 FY 07-08 LT

3955 NN06LT4013 Nand Nagri

Conversion of LT O/H Conductor

into LT AB Cable at Village

Kachhipur in Nand Nagri division

6.80 FY 07-08 LT

3956 NN06LT4015 Nand Nagri

Conversion of LT O/H Conductor

into LT AB Cable at Village gokal

pur in Nand Nagri division

72.96 FY 07-08 LT

3957 NN06LT4016 Nand Nagri

Conversion of LT O/H Conductor

into LT AB Cable at East jyoti

nagar in Nand Nagri division

28.41 FY 07-08 LT

3958 NN06LT4017 Nand Nagri

Conversion of LT O/H Conductor

into LT AB Cable at Hardev Puri in

Nand Nagri division

41.55 FY 07-08 LT

3959 NN06LT4018 Nand Nagri

Conversion of LT O/H Conductor

into LT AB Cable at Durga puri

extn in Nand Nagri division

24.88 FY 07-08 LT

3960 NN06LT4019 Nand Nagri

Conversion of LT O/H Conductor

into LT AB Cable at Nathu Colony

in Nand Nagri division

62.35 FY 07-08 LT

Page 186: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

3961 NN06LT4020 Nand NagriConversion of LT O/H Conductor

into LT AB Cable at Sudama Puri117.30 FY 07-08 LT

3962 NN06LT4021 Nand Nagri

Conversion of LT O/H Conductor

into LT AB Cable at Chhaju gate in

Nand Nagri division

85.47 FY 07-08 LT

3963 NN06LT4023 Nand Nagri

Conversion of LT O/H Conductor

into LT AB Cable at Jyoti colony in

Nand Nagri division

128.67 FY 07-08 LT

3964 NN06LT4024 Nand Nagri

Conversion of LT O/H Conductor

into LT AB Cable at at Keer nagar

in Nand Nagri division

112.58 FY 07-08 LT

3965 NN06LT4025 Nand Nagri

Conversion of LT O/H Conductor

into LT AB Cable at Kardam Puri

in Nand Nagri division

94.58 FY 07-08 LT

3966 NN06LT4026 Nand Nagri

Conversion of LT O/H Conductor

into LT AB Cable at North

Chhajupur in Nand Nagri division

98.55 FY 07-08 LT

3967 NN07LT4538 Nand Nagri

Laying of 3 Nos. LT Feeders of

size 3.5x300 mm sq XLPE cable

at Jagat Puri Extn. S/Stn. No. 1

in Nand Nagri division

7.94 FY 07-08 LT

3968 NN07LT4539 Nand Nagri

Laying of 2 Nos. LT Feeders of

size 3.5x300 mm sq XLPE cable

at Jagat Puri Extn. S/Stn . No. 2

in Nand Nagri division

5.73 FY 07-08 LT

3969 NN07LT4563 Nand Nagri

: Laying of 2 Nos. LT Feeders of

size 3.5x300 mm sq XLPE cable

at Chander Lok S/Stn in Nand

Nagri division

4.25 FY 07-08 LT

3970 NN07UT4515 Nand Nagri

Augmentation of 400KVA

transformer into 630KVA at C –

2 Nand Nagri in Nand Nagri

division

6.17 FY 07-08 HT

3971 NN07UT4561 Nand Nagri

Augmentation of 630KVA

transformer into 990KVA at

Sudama Puri S/Stn. No. 2 in Nand

Nagri division

1.47 FY 07-08 HT

3972 NN07UT4562 Nand Nagri

Augmentation of 400KVA

transformer into 630KVA at

Chander Lok S/Stn in Nand Nagri

division

0.68 FY 07-08 HT

3973 PG04FA4510 Paharganj

Replacement of sick cable of HT

3x300 PILCA Motia Khan Grid to

Sadar Disp. With 3x300 XLPE

Cable in division Paharganj.

30.55 FY 07-08 HT

3974 PG04FA4512 Paharganj

Replacement of sick of HT 3x150

PILCA P.G.Disp. To St. Anthony

with 3x300 XLPE Cable.

5.64 FY 07-08 HT

3975 PG04FA4513 Paharganj

Replacement of sick of HT 3x300

PILCA Arkasharoad . To Gali

School Wali with 3x300 XLPE

13.22 FY 07-08 HT

3976 PG04FA4645 Paharganj

Augmentation of HT 11kV

3x300sq.mm sick PILCA Cable

from Kamla Market Grid to

Ramnagar No.-1 with HT 11kV

3x300sq.mm XLPE Cable.

15.51 FY 07-08 HT

3977 PG04FA4646 Paharganj

Augmentation of HT 11kV

3x300sq.mm sick PILCA Cable

from Kamla Market Grid to Chuna

Mandi SubStation with HT 11kV

3x300sq.mm XLPE Cable in

division Paharganj.

37.47 FY 07-08 HT

Page 187: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

3978 PG04LT4521 Paharganj

Laying of 2 nos. additional new LT

feeders of 3.5Cx300 sq. mm

XLPE Cable from proposed

augmented 990 kVA Transformer

at Chamalian Road sub station in

division Paharganj.

2.71 FY 07-08 LT

3979 PG04LT4522 Paharganj

Laying of additional new LT

feeders of 3.5Cx300 sq. mm

XLPE Cable from proposed

Augmentationmented 990 kVA

Transformer at Yog Maya Sub

station.

1.08 FY 07-08 LT

3980 PG04LT4539 Paharganj

Laying of 2 nos. additional new LT

feeders of 3.5Cx300 sq. mm

XLPE Cable from proposed

augmented 990 kVA Transformer

at 12-Tooti Chowk sub station in

division Paharganj.

1.11 FY 07-08 LT

3981 PG04LT4542 Paharganj

Taking out LT feeder from

Tokriwalan sub station in division

Paharganj.

1.08 FY 07-08 LT

3982 PG04LT4557 Paharganj

Laying of additional new LT

feeders of 3.5Cx300 sq. mm

XLPE Cable from proposed

augmented 630 kVA Transformer

at Model Basti sub station in

division Paharganj.

1.91 FY 07-08 LT

3983 PG04LT4647 Paharganj

Replacement of 8 nos. sick

Feeder Pillars in Paharganj

District.

4.00 FY 07-08 LT

3984 PG04PS4569 Paharganj

Conversion of existing 315 kVA

plinth mounted sub station tn. into

Package Unit with 990 kVA

Transformer at Gali No. 5 Multani

Dhanda sub station in division

Paharganj.

1.83 FY 07-08 HT

3985 PG04RM4582 Paharganj

Instl of SF6 RMU at B.G.road

Dispensary sub station in division

Paharganj.

6.01 FY 07-08 HT

3986 PG04RM4596 Paharganj

Replacement of existing RMU

Panel by 3-Panel board VCB type

at Idgaha Booster Pump sub

station in division Paharganj.

7.79 FY 07-08 HT

3987 PG04RM4614 Paharganj

Installation of SF6 type RMU at

Krishna Market plinth mounted

sub station in division Paharganj.

6.00 FY 07-08 HT

3988 PG04RM4618 Paharganj

Replacement of existing old 4-

Panel board OCB type by new 4-

Panel board VCB type at

Jhandewalan Kiosk sub station in

division Paharganj.

16.15 FY 07-08 HT

3989 PG04RM4620 Paharganj

Replacement of existing old 4-

Panel board OCB type by new 4-

Panel board VCB type at Aram

Bagh No. III sub station in division

Paharganj.

5.39 FY 07-08 HT

3990 PG04RM4625 Paharganj

Replacement of existing old 4-

Panel board OCB type by new 4-

Panel board VCB type at Saroad

ar Cloth Market sub station in

division Paharganj.

12.14 FY 07-08 HT

3991 PG04RM4626 Paharganj

Replacement of existing old 8-

Panel board OCB type by new 9-

Panel board VCB type at Chuna

Mandi Sub station in division

Paharganj.

20.97 FY 07-08 HT

Page 188: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

3992 PG04SS4501 Paharganj

Laying of additonal HT 11KV

3x300mm2 XLPE cable from

Kamla Market Grid to A.B. Patrica

sub.stn with installation of 350

MVA HT 11 KV single panel at

Kamla Market Grid in division

Paharganj.

35.31 FY 07-08 HT

3993 PG04UT4575 Paharganj

Augmentation of 630 kVA

Transformer to 990 kVA

Transformer at Sadar Dispensary

sub station, Paharganj

0.400 FY 07-08 HT

3994 PG05LT4052 Paharganj

T/O 2 No LT Feeder from

Transformer at LAD in division

Paharganj.

1.49 FY 07-08 LT

3995 PG05LT4059 Paharganj

Taking out 3 No. LT 3.5X300sq.

XLPE feeder from Transformer at

Ram Nagar sub station in division

Paharganj.

2.23 FY 07-08 LT

3996 PG05LT4062 Paharganj

Taking out 3 No. LT 3.5X300sq.

XLPE feeder from Transformer at

Dariba Pan in division Paharganj.

0.268 FY 07-08 LT

3997 PG05LT4063 Paharganj

Taking out 3 No. LT 3.5X300sq.

XLPE feeder from Transformer at

Ara Kasha Road in division

Paharganj.

1.52 FY 07-08 LT

3998 PG05RM4051 Paharganj

Installation of SF 6 RMU at Gali

Jamir Wali Sub station. in Zone-

112 District Pahar Ganj

4.08 FY 07-08 HT

3999 PG05SL2070 Paharganj

Provision of street lighting in the

constituency of Harron Yusuf in

division Paharganj.

0.364 FY 07-08 LT

4000 PG06LT2224 PaharganjEl of 66 SFS DDA Flats Motia

Khan(LT) in division Paharganj.2.73 FY 07-08 LT

4001 PG06LT4025 Paharganj

Replacement of existing LV Mains

3 phase with Conductor at

Quasbpura area in Paharganj in

division Paharganj..

21.89 FY 07-08 LT

4002 PG06LT4026 Paharganj

Replacement of existing LV Mains

3 phase with Conductor in

Teliwara Sadar Bazar in division

Paharganj..

15.61 FY 07-08 LT

4003 PG06LT4027 Paharganj

Replacement of existing LV Mains

3 phase with Conductor at Naw

Ganj S/Stn B G Road Paharganj.

27.76 FY 07-08 LT

4004 PG06LT4028 Paharganj

Replacement of existing LV Mains

3 phase with Conductor at Motia

Khan Paharganj area Zone Chuna

Mandi in division Paharganj..

53.89 FY 07-08 LT

4005 PG06LT4029 Paharganj

Replacement of existing LV Mains

3 phase with Conductor at Bara

Hindu Rao Sadar B G Road in

division Paharganj.

38.26 FY 07-08 LT

4006 PG06LT4031 Paharganj

Replacement of existing LV Mains

3 phase with Conductor in Ram

Nagar area Gali Gurdwara Wali,

Shyam Mal lane gali 1 to 5,

Bagichi Allaudin , gali no 4, Prem

Nagar, youg maya , Amar puri,

Qila Qadam Sharif, Silk gram, Gali

Satya narayan, Gali Gurdwara

Paharganj.

86.82 FY 07-08 LT

Page 189: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

4007 PG06LT4032 Paharganj

Replacement of existing LV Mains

3 phase with Conductor in Area

Basi Jhulahan,Gali Chhole Wali,

Gali Kayla Wali, Gali brahaman,

Gali kumara Walan,Gali Umarao,

Gali No 11, Bagichi Raghu Nath,

Gali Chaukdar , Gali water Wali,

Gali Munsi dul raheem, Sher khlil

Paharganj

80.16 FY 07-08 LT

4008 PG06LT4033 Paharganj

Replacement of existing LV Mains

3 phase with Conductor in Motia

khan PaharGanj area chuna

Mandi, Gali chandi Wali, Dariba

pan , Ghee Mandi, ladoo ghati,

Bharat nagr , Katra Ravidas,

Kaseru Walan, General Mkt , Gali

School Wali Zone Chuna Mandi

Paharganj

71.89 FY 07-08 LT

4009 PG06LT4034 Paharganj

Replacement of existing LV Mains

3 phase with Conductor in area

Naw Ganj, Faiz Ganj, Sheesh

Mahal, Gali Vikram , Gali Bagichi,,

Chimney mil, Hath Khana in Zone

B G Road in Division Paharganj .

30.41 FY 07-08 LT

4010 PG06LT4037 Paharganj

L T Clean-up in the area

1473,1199,1175,2122,2160,2930

BG Road, 4894 to 96 Foota

road,2606 to 2607 Mahavir Bazar,

3263 BG Road,9729,9739,9635

Gali Neem Wali in Zone-BG Road

Dist-PHG

3.59 FY 07-08 LT

4011 PG06LT4038 Paharganj

L T Clean-up in Division -PHG

Zone Chuna Mandi area MM Road

Commercial Complex in division

Paharganj.

5.50 FY 07-08 LT

4012 PG06LT4039 Paharganj

L T Clean-up at 4474 to 4477 Gali

Jatan, 4576,77,83 Gali Nathan

Singh, 7114 Gali Pahar wali, 4914-

15 Rajan Mkt Foota Raod Sadar

Bazar, T-565 Chamelian Road in

Zone PP Qtr in Paharganj division

0.277 FY 07-08 LT

4013 PG06LT4040 Paharganj

L T Clean-up in the area

3928,3927 Gali Mandir

wali,3132,3197,3192,3133,3166

Gali Zamadar pahari dhiraj in Zone-

BG Road Dist-PHG

0.146 FY 07-08 LT

4014 PG06LT4041 Paharganj

L T Clean-up in the area A-34, A-

14,A4,B-40,B-56,B-25 Double

story qtr Ahata ki dara in Zone-PP

QTR Road Dist-PHG

0.390 FY 07-08 LT

4015 PG06LT4042 Paharganj

L T Clean-up in the area 10123

Libray Road,

911,9896,10036,9098 Nawab

Ganj in Zone-BG Road in

Paharganj division

0.259 FY 07-08 LT

4016 PG06LT4043 Paharganj

L T Clean-up in the area

857,486 Mantola 80,81 Krishna

Gali,in zone- Chuna Mandi in

Paharganj division

0.178 FY 07-08 LT

4017 PG06LT4044 Paharganj

L T Clean-up in the area Blk F-

151,F-161 Double Story, D-113,D-

108 D. Story, C-77,C-89 D

Double story qtr Ahata ki dara in

Zone-PP QTR Road in Paharganj

division

0.53 FY 07-08 LT

Page 190: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

4018 PG06LT4045 Paharganj

L T Clean-up in the area 4564

Katra Pratap, 4287 katra sunder

lal,4275 katra Raghu vans

singal,3007 saini mkt,4315-16 gali

bahuji in Zone-BG Road in

Paharganj division

0.65 FY 07-08 LT

4019 PG06LT4046 Paharganj

L T Clean-up in the area 8/4 D

B Gupta Road, 2352-57 ,

2335,2248-60,2439,2044 Rajguru

road in zone- Chuna Mandi in

Paharganj division

1.35 FY 07-08 LT

4020 PG06LT4047 Paharganj

L T Clean-up in the area T-353-

T-355,E-133-144, E-127 Double

story qtr Ahata ki dara in Zone-PP

QTR Road Dist-PHG

0.71 FY 07-08 LT

4021 PG06LT4062 Paharganj

Replacement of LT Bare Cond to

AB Cbl in Gali chandi wali,Dariba

pan in Paharganj division

123.05 FY 07-08 LT

4022 PG06LT4063 Paharganj

Replacement of LT Bare Cond to

AB Cbl in Ram Nagar Area Shyam

Mal Lane in Paharganj division

119.91 FY 07-08 LT

4023 PG06LT4657 Paharganj

Replacement of LT bare Cond to

AB Cbl in Teliwara, shesh

mahal,kishan ganj in Paharganj

division

149.30 FY 07-08 LT

4024 PG06ML2009 PaharganjInstl of High Mast in const of

H.Yusuf in Paharganj division1.79 FY 07-08 LT

4025 PG06ML2064 PaharganjInstalation of St Light through MLA

Fund in Paharganj division0.88 FY 07-08 LT

4026 PN05EL4097 Patel Nagar

Electrification of LOP of Nehru

Nagar( SH-2:2 nos LT feeder from

Nehru Nagar g no.10 anand

parbat) in division Patel Nagar.

8.77 FY 07-08 LT

4027 PN05EL4104 Patel Nagar

electrification of LOP of Baljeet

Nagar (SH-12: new 11 kV RMU (

SF-6) at opposite Shiv mandir

punjabi Basti Baljeet Nagar) in

division Patel Nagar.

10.33 FY 07-08 LT

4028 PN05EL4117 Patel Nagar

electrification of LOP of Anand

Parbat ( SH-5: new 630 kva

transformer at toli wala schochalya

Anand Parbat,Patel Nagar

2.31 FY 07-08 LT

4029 PN05JJ4142 Patel Nagar

Electrification of JJ Cluster at

Chetan Basti Anand Parvat in

division Patel Nagar.

6.92 FY 07-08 LT

4030 PN05LT4010 Patel Nagar

Laying of 2 no. feeders from D-

Block West Patel Nagar to Mafat

Lal site in division Patel Nagar.

2.28 FY 07-08 LT

4031 PN05LT4012 Patel Nagar

Replacement of old one no. sick

cable from H.S. road . Bapa Nagar

to Bout doorh Mandir Dev Nagar in

division Patel Nagar.

1.70 FY 07-08 LT

4032 PN05LT4018 Patel Nagar

Augmentation of LV overhead

mains from Rabbit to DOG

conductor at Gali No. 16 to 21 Nai

Basti, Anand Parbat in division

Patel Nagar.

5.98 FY 07-08 LT

4033 PN05LT4079 Patel NagarReplacement of OH LT circuit at

Kikarwala in Patel Nagar11.61 FY 07-08 LT

4034 PN05LT4133 Patel Nagar

Replacement of LT ACB of rating

400Amps / 800Amps / 1250Amps

/ 2000Amps / Damaged / Burnt /

Bypassed/ Un serviceable in

division Patel Nagar.

27.10 FY 07-08 LT

Page 191: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

4035 PN05RM4036 Patel Nagar

Installation of 11kV RMU (SF-6)

at D-Block, West Patel Nagar in

division Patel Nagar.

4.10 FY 07-08 HT

4036 PN05RM4037 Patel Nagar

Installation of 11kV RMU (SF-6)

at Gali No. 9, Anand Parbat in

division Patel Nagar.

4.46 FY 07-08 HT

4037 PN05RM4043 Patel Nagar

Installation of 11kV RMU

extensible (SF-6)with additional

Single Panel at Military Road plinth

mounted Sub station in division

Patel Nagar..

4.21 FY 07-08 HT

4038 PN05RM4051 Patel Nagar

Replacement of old unserviceable

RMU with a new RMU extensible

+singal Panel at DMS Colony (K)

Baljeet Nagar in division Patel

Nagar.

5.12 FY 07-08 HT

4039 PN05RM4054 Patel Nagar

Installation of 11kV RMU (SF-6)

at RIWA Sub station. A.Parbat in

division Patel Nagar.

4.07 FY 07-08 HT

4040 PN05RM4075 Patel Nagar

Replacement of 7 Panel board

with RMU at WPatel NagarI/D Sub

station,Patel Nagar

14.75 FY 07-08 HT

4041 PN05RM4120 Patel Nagar

Installation/Replacement of 8

Panel board with Motorised RMU

with SCADA compatibility at -

Bakri.Wala in division Patel Nagar.

15.05 FY 07-08 HT

4042 PN05RM4149 Patel Nagar

Replacement of 4 Panel board by

4W indoor RMU at

30block(K),West Patel Nagar

5.61 FY 07-08 HT

4043 PN05RM4150 Patel Nagar

Replacement of 7 Panel board by

2*4W indoor RMU at

V.tower,Patel Nagar

11.66 FY 07-08 HT

4044 PN05RM4151 Patel Nagar

Replacement of 4 Panel board by

4W indoor RMU at P.Nagar B/D

off in division Patel Nagar.

5.55 FY 07-08 HT

4045 PN05RM4153 Patel Nagar

Replacement of 7 Panel board by

2*4W indoor RMU at

Kamal(K),Patel Nagar

10.79 FY 07-08 HT

4046 PN05RM4154 Patel NagarReplacement of 7 Panel board by

2*4W indoor RMU at PujaPark(K)11.08 FY 07-08 HT

4047 PN05RM4157 Patel Nagar

Replacement of 7 Panel board by

2*4W indoor RMU at N'wala,Patel

Nagar

11.49 FY 07-08 HT

4048 PN06AT4586 Patel Nagar

Installation of new 630 KVA

Transformer at Under Bridge S/St

Anand Parbat in division Patel

Nagar.

1.85 FY 07-08 HT

4049 PN06AT4587 Patel Nagar

New Transformer 630 KVA

Installtion at Sohan Singh Anand

parvat Sub-Station in division Patel

Nagar.

2.00 FY 07-08 HT

4050 PN06AT4604 Patel Nagar

Istallation of additional DTR of 630

KVA at Rubywala in division Patel

Nagar.

1.79 FY 07-08 HT

4051 PN06AT4611 Patel Nagar

Additonal1 no. Transformer 630

KVA at Nanakwala Ananad Parbat

s/st. in Div. Patel Nagar.

1.12 FY 07-08 HT

4052 PN06EL4558 Patel Nagar

Electrification of Colony in the

backside of Nepali Mandir Baljeet

nagar in division Patel Nagar.

13.48 FY 07-08 LT

4053 PN06LT4564 Patel Nagar

Replacement of O/H bare

Conductor into LTAB Cable in

division Patel Nagar.

73.59 FY 07-08 LT

4054 PN06LT4565 Patel Nagar

Replacement of O/H bare

Conductor into LTAB Cable in in

division Patel Nagar.

71.44 FY 07-08 LT

Page 192: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

4055 PN06LT4566 Patel Nagar

Replacement of O/H bare

Conductor into LTAB Cable in in

division Patel Nagar.

65.83 FY 07-08 LT

4056 PN06LT4617 Patel Nagar

Laying of 03 No. LT fdrs from

additional 630 KVA DTR at Sohan

Singh S/stn Gali No.04 Anand

Parbat in Div. Patel Nagar.

5.08 FY 07-08 LT

4057 PN06LT4619 Patel Nagar

Laying of 02 No. LT fdrs from 990

KVA DTR at Cash Office S/stn

Gali No.8 Anand Parbat in Div.

Patel Nagar

4.59 FY 07-08 LT

4058 PN06LT4620 Patel Nagar

Laying of 02 No. LT fdrs from 990

KVA DTR at Pappuwala S/stn Gali

No.8 Anand Parbat in Div. Patel

Nagar

4.80 FY 07-08 LT

4059 PN06LT4621 Patel Nagar

Laying of 02 No. LT fdrs from 990

KVA DTR at Police Post Anand

Parbat in Div. Patel Nagar

4.94 FY 07-08 LT

4060 PN06LT4623 Patel Nagar

Laying of 02 No. LT fdrs from 630

KVA DTR at Post Office S/stn

Ghati road Anand Parbat in Div.

Patel Nagar

3.46 FY 07-08 LT

4061 PN06LT4624 Patel Nagar

Laying of 02 No. LT fdrs from 630

KVA DTR at Leadin S/stn New

Rohtak Road Anand Parbat in Div.

Patel Nagar

3.26 FY 07-08 LT

4062 PN06LT4625 Patel Nagar

Laying of 02 No. LT fdrs from

additional 630 KVA DTR at

Rubywala S/stn New Rohtak Road

Anand Parbat in Div. Patel Nagar

1.34 FY 07-08 LT

4063 PN06LT4627 Patel Nagar

Laying of 02 No. LT fdrs from 630

KVA DTR at Dhall S/stn Gali No.

06 Anand Parbat in Div. Patel

Nagar

2.25 FY 07-08 LT

4064 PN06RM4049 Patel Nagar

Propoed installation of 11KV RMU

extensible type SF6 with

additional single panel at prem

nagar road DP structure. (DMS

No:III) in division Patel Nagar..

18.13 FY 07-08 HT

4065 PN06RM4517 Patel Nagar

Installation of 3 Way O/D RMU at

gali no. 10(new) ss in division

Patel Nagar.

7.18 FY 07-08 HT

4066 PN06SL2545 Patel Nagar

Providing 100 x 150 W HPSV

Street light fittings in the area of

Sh Goswami in division Patel

Nagar.

2.44 FY 07-08 LT

4067 PN06SL2570 Patel Nagar

New st light in area of Rejesh

Lalotia MLA in division Patel

Nagar.

2.37 FY 07-08 LT

4068 PN06UT4555 Patel Nagar

Augmentation of transformer

630/990 KVA at Padamsingh

Road in division Patel Nagar.

0.67 FY 07-08 HT

4069 PN06UT4571 Patel Nagar

Augmentation of transformer by

990 KVA at 14 B Devnagar in

division Patel Nagar.

0.67 FY 07-08 HT

4070 PN06UT4588 Patel Nagar

Augmentation of 630 KVA DTR

with 990 KVA DTR at Leading

S/Stn Anand Parbat in division

Patel Nagar.

0.54 FY 07-08 HT

4071 PN06UT4607 Patel Nagar

Augmentation of 2X400 KVA DTR

to 2X630 KVA at Dhall Ananad

Parbat s/st. in division Patel

Nagar.

1.56 FY 07-08 HT

4072 PN06UT4610 Patel Nagar

Augmentation of 400 KVA DTR to

630 KVA at Kamal Hotel Ananad

Parbat s/st. in division Patel

Nagar.

0.68 FY 07-08 HT

Page 193: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

4073 PN07AT4013 Patel Nagar

Additional DTR of 400 KVA at 29

Blk West Patel Nagar in division

Patel Nagar.

1.61 FY 07-08 HT

4074 PN07AT4014 Patel Nagar

Additional DTR of 400 KVA at

Baba Farid Puri Kiosk in Div.

PNR.

1.79 FY 07-08 HT

4075 PN07LT4003 Patel Nagar

Replacement of old worn out and

off size conductor into new PVC

insulated ACSR Dog conductor at

different places of sub Div. Patel

Nagar in division Patel Nagar.

21.75 FY 07-08 LT

4076 PN07LT4005 Patel Nagar

Laying of 02 No. LT Fdrs from

Pooja Park S/Stn to 26/31 and

30/10 East Patel Nagar in division

Patel Nagar.

5.43 FY 07-08 LT

4077 PN07LT4006 Patel Nagar

Laying of 02 No. LT feedersfrom

990 KVA DTR at DAV Multan to

3/17 and 4 Blk West Patel Nagar

in division Patel Nagar.

6.75 FY 07-08 LT

4078 PN07LT4007 Patel Nagar

Laying of 2 no. LT fdrs from newly

proposed DTR of 400 KVA at 29

Blk West Patel Nagar in division

Patel Nagar.

2.61 FY 07-08 LT

4079 PN07LT4008 Patel Nagar

Laying of 01 No. LT Fdr size from

39 Blk S/Stn to 46 Blk East Patel

Nagar in division Patel Nagar.

2.23 FY 07-08 LT

4080 PN07LT4009 Patel Nagar

Laying of 1 No. LT fdr of size

3.5x300 sqmm from 990 KVA

DTR at 30 Blk West Patel

Nagars/stn to 29/27 WP Nagar in

division Patel Nagar.

2.22 FY 07-08 LT

4081 PN07SL1016 Patel Nagar

Installation of new street lights

point in Patel Nagar Constituency

of Hon'ble MLA Sh Ramakant

Goswami.

2.43 FY 07-08 LT

4082 PN07UT4011 Patel Nagar

Augmentation of 400 KVA existing

DTR to 630 KVA at Pooja Park in

division Patel Nagar.

0.87 FY 07-08 HT

4083 SR04AT4582 Shankar Road

Providing an additional 630 kVA

transformer At DDA Complex,

Rajinder Nagar in division Shankar

Road.

1.75 FY 07-08 HT

4084 SR04LT4521 Shankar Road

Laying of 2 nos. additional LT

feeders from Agarwal Sweet

House sub station tn. to reduce

the load of Bazar Marg Kiosk in

division Shankar Road.

3.80 FY 07-08 LT

4085 SR04LT4526 Shankar Road

Laying of 2 nos. additional LT

feeders from Faiz Road plinth

mounted -I sub station in division

Shankar Road.

0.96 FY 07-08 LT

4086 SR04LT4534 Shankar Road

Laying of 3 nos. additional LT

feeders from 1000 kVA

transformer at Jhakira sub station

under Jhakira Bridge.

3.33 FY 07-08 LT

4087 SR04LT4552 Shankar Road

Taking out 2no. LT feeder frm

Baljeet nagar No.3 sub station in

division Shankar Road.

3.38 FY 07-08 LT

4088 SR04LT4563 Shankar Road

Laying of 4 nos. additional LT

feeders from SOI Brothers No. 2

sub station Farid Puri in division

Shankar Road.

7.62 FY 07-08 LT

4089 SR04LT4627 Shankar Road

Taking out 2no LT feeder from

Birla Flat Karol Bagh sub station

in division Shankar Road.

2.34 FY 07-08 LT

Page 194: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

4090 SR04LT4662 Shankar Road

Taking out of LT feederfm Shastri

Park K.Bagh sub station in division

Shankar Road.

4.27 FY 07-08 LT

4091 SR04RM4583 Shankar Road

Replacement of Old unserviceable

11 kV 5-Panel board with a new

11 kV 7-Panel board VCB type at

Bazar Marg sub station tn.,

Rajinder Nagar in division Shankar

Road..

17.21 FY 07-08 HT

4092 SR04RM4700 Shankar Road

Replacement of Old unserviceable

11 kV RMU with a new 11 kV SF6

type RMU at Leading

(Doomermal/Gali No. 6 and half)

sub station tn., Anand Parbat in

division Shankar Road.

5.19 FY 07-08 HT

4093 SR04SS4538 Shankar Road

Augmentation of 630 kVA

Transformer to 990 kVA

transformer along with installation

of 11kV Extensible RMU SF6 type

at Christain Colony sub station tn.,

Karol Bagh in division Shankar

Road.

0.97 FY 07-08 HT

4094 SR04SS4543 Shankar Road

Augmentation of 630 kVA

Transformer to 990 kVA

transformer along with Installation

of 11kV Extensible RMU SF6 type

at H.S.Road office Sub station.,

Karol Bagh in division Shankar

Road..

26.15 FY 07-08 HT

4095 SR04SS4551 Shankar Road

Augmentation of 630 kVA

Transformer to 990 kVA

transformer along with installation

of 11kV Extensible RMU SF6 type

at Post Office No. 4 sub station

tn., Karol Bagh.

0.76 FY 07-08 HT

4096 SR04SS4553 Shankar Road

Augmentation of 630 kVA

Transformer to 990 kVA

transformer along with installation

of 11kV Extensible RMU SF6 type

at Post Office No. 7 sub station

tn., Karol Bagh in division Shankar

Road.

0.71 FY 07-08 HT

4097 SR04SS4559 Shankar Road

Augmentation of 630 kVA

Transformer to 990 kVA

transformer along with installation

of 11kV Extensible RMU + 1 no.

additional single panel SF6 type at

PNB sub station tn., Bapa Nagar,

Karol Bagh in division Shankar

Road.

6.66 FY 07-08 HT

4098 SR04SS4567 Shankar Road

Augmentation of 630 kVA

Transformer to 990 kVA

transformer along with installation

of 11kV Extensible RMU + 1 no.

additional single panel SF6 type at

Police Quarter sub station tn.,

Karol Bagh in division Shankar

Road.

9.15 FY 07-08 HT

4099 SR04SS4697 Shankar Road

Augmentation of 400 kVA

Transformer to 630 kVA

transformer along with Installation

of 11kV RMU SF6 type at Gali No.-

1 New P.O. Sub station., Anand

Parbat in division Shankar Road.

5.03 FY 07-08 HT

4100 SR04SS4712 Shankar Road

Augmentation to 990 Kva with

E.RMU at Farid Puri(K) S/S in

division Shankar Road.

9.90 FY 07-08 HT

Page 195: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

4101 SR04SS4714 Shankar Road

Installation of additional 630 kVA

Transformer along with installation

of 11kV Extensible RMU SF6 type

+ 1 no. additional Single Panel at

Nehru Nagar Kiosk sub station tn.

9.25 FY 07-08 HT

4102 SR04UT4693 Shankar Road

Augmentation of 400 kVA

Transformer into 630 kVA

Transformer at Duggal sub station

tn. No.-II, Anand Parbat in division

Shankar Road.

0.136 FY 07-08 HT

4103 SR04UT4724 Shankar Road

Augmentation of 400 kVA

Transformer to 630 kVA

Transformer at D-Block sub

station tn., West Patel Nagar in

division Shankar Road in division

Shankar Road.

0.331 FY 07-08 HT

4104 SR04UT4746 Shankar Road

Augmentation of 630 kVA

Transformer to 990 kVA

Transformer at Bazar Marg, Taxi

Stand sub station tn., Old Rajinder

Nagar in division Shankar Road.

5.84 FY 07-08 HT

4105 SR05LT4074 Shankar Road

Taking out LT feeders from

Transformer at OLD SALWAN

plinth mounted in division Shankar

Road.

7.06 FY 07-08 LT

4106 SR05LT4103 Shankar Road

Laying of 2nos. LT underground

feeder from 5-Block WEA P/M

Karol Bagh SStn to 5/54 & 4/55

WEA Karol Bagh, in division

Shankar Road.

4.77 FY 07-08 LT

4107 SR05LT4112 Shankar Road

Replacement. LT ACB

400/800/1250/200 Amp in division

Shankar Road.

16.54 FY 07-08 LT

4108 SR05RM4028 Shankar RoadInstallation of 11KV RMU (SF-6)

at Khalsa College P/M, Z-14044.70 FY 07-08 HT

4109 SR05RM4031 Shankar Road

Installation of 11kV RMU (SF-6)

at 61-Block, Ramjas Road in

division Shankar Road.

5.76 FY 07-08 HT

4110 SR05RM4032 Shankar Road

Installation of 11kV RMU (SF-6) at

53-Block, Ramjas Road in division

Shankar Road.

5.76 FY 07-08 HT

4111 SR05RM4033 Shankar Road

Installation of 11kV RMU (SF-6)

at Mother Dairy Sub station., Joshi

Road in division Shankar Road.

4.48 FY 07-08 HT

4112 SR05RM4034 Shankar Road

Installation of 11kV RMU (SF-6)

at Sujan Singh Sub station., Joshi

Road in division Shankar Road.

4.40 FY 07-08 HT

4113 SR05RM4036 Shankar Road

Installation of 11kV RMU

extensible type (SF-6) with

additional single Panel at 7A-

WEA, Karol Bagh in division

Shankar Road.

7.55 FY 07-08 HT

4114 SR05RM4039 Shankar Road

Replacement of old unserviceable

7 Panel board with a new RMU +

four addl Panel at Kikar Wala

Chowk, Regar Pura in division

Shankar Road.

14.18 FY 07-08 HT

4115 SR05RM4085 Shankar Road

Replacement of old unserviceable

7 Panel board with new 2 No.

11kV Four Panel board at Rama

Ice Factory in division Shankar

Road.

14.86 FY 07-08 HT

4116 SR05RM4123 Shankar Road

Installation of 3W+2*1W O/D

RMU at HSroad Khatta in division

Shankar Road.

10.25 FY 07-08 HT

Page 196: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

4117 SR05RM4124 Shankar Road

Installation of 3W+2*1W O/D

RMU at A.Khan,in division

Shankar Road.

11.38 FY 07-08 HT

4118 SR05RM4125 Shankar Road

Installation of 3W+1W O/D RMU

at NPL road , in division Shankar

Road.

7.27 FY 07-08 HT

4119 SR05RM4133 Shankar Road

Replacement of 9 Panel board by

3*4W indoor RMU at P.Road

CC,in division Shankar Road.

17.47 FY 07-08 HT

4120 SR06AT4060 Shankar Road

Providing additional transformer of

400 KVA at 12 Blk WEA S/stn in

division Shankar Road.

1.11 FY 07-08 HT

4121 SR06AT4069 Shankar Road

Providing of additional 630 KVA

transformer at 21 Blk Old Rajinder

Nagar in division Shankar Road.

0.89 FY 07-08 HT

4122 SR06AT4070 Shankar Road

Providing of additional 630 KVA

transformer at Police Qtr karol

Bagh in division Shankar Road.

1.20 FY 07-08 HT

4123 SR06LT4027 Shankar Road

Conversion of old LT conductor

with LT ABC at Regarpura and

Karol Bagh in in division Shankar

Road.

62.79 FY 07-08 LT

4124 SR06LT4030 Shankar Road

Laying of two no of LT Feeder

from 39 block Old Rajinder Nagar

in division Shankar Road.

4.87 FY 07-08 LT

4125 SR06LT4073 Shankar Road

Conversion of old LT conductor

with LT AB in Pusa Road &

Chapperwala sub Division in

division Shankar Road.

50.08 FY 07-08 LT

4126 SR06LT4089 Shankar Road

Laying of 2 No. LT feeders 990

KVA transformer at Rajinder Park

S/STN in division Shankar Road..

2.83 FY 07-08 LT

4127 SR06LT4090 Shankar Road

Laying of 2 No. LT feeders 990

KVA transformer at Sindhi Park

S/STN in division Shankar Road..

4.48 FY 07-08 LT

4128 SR06LT4091 Shankar Road

Laying of 2 No. LT feeders 630

KVA transformer at Andh

Mahavidhyalaya S/STN in division

Shankar Road..

3.11 FY 07-08 LT

4129 SR06LT4092 Shankar Road

Laying of 1 No. LT feeders 990

KVA transformer at Bajar Marg

S/STN in division Shankar Road..

1.78 FY 07-08 LT

4130 SR06LT4094 Shankar Road

Laying of 1 No. LT feeders 990

KVA transformer at 53 Blk P/M

S/STN in division Shankar Road.

1.06 FY 07-08 LT

4131 SR06LT4095 Shankar Road

Replacement/new 2 No. LT

feeders from existing 2*990 KVA

transformer at 5 Blk P/M S/STN.

2.98 FY 07-08 LT

4132 SR06LT4096 Shankar Road

Replacement/new 1 No. LT

feeders from existing 2*990 KVA

transformer at 5 Blk (K) S/STN in

division Shankar Road..

1.33 FY 07-08 LT

4133 SR06LT4100 Shankar Road

Replacement of 1 No. LT feeders

from existing 990 KVA transformer

at Nala (k) S/STN in division

Shankar Road..

2.90 FY 07-08 LT

4134 SR06LT4107 Shankar Road

Replacement/new 2 No. LT

feeders from existing 990 & 630

KVA transformer at R.K. Das No 1

S/STN in division Shankar Road..

3.53 FY 07-08 LT

Page 197: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

4135 SR06LT4113 Shankar Road

Laying of 1 No. LT feeders with

O/H conductor from 630 KVA

transformer at More Land S/STN

in division Shankar Road..

3.08 FY 07-08 LT

4136 SR06ML2116 Shankar Road

Providing 100 NOs Street Light

Fittings in the constituency of MLA

P.C Yogi in division Shankar

Road.

3.06 FY 07-08 LT

4137 SR06RM4040 Shankar Road

Providing 3 Way RMU I/D at

Khanna Ice Factory in division

Shankar Road.

4.53 FY 07-08 HT

4138 SR06RM4041 Shankar Road

Providing 3 Way RMU I/D at

Khajoor Road (K) in division

Shankar Road.

4.69 FY 07-08 HT

4139 SR06RM4044 Shankar RoadProviding 4 Way RMU I/D at Janki

Devi in division Shankar Road.6.97 FY 07-08 HT

4140 SR06RM4045 Shankar RoadProviding 3 way I/D at More Land

in division Shankar Road.4.64 FY 07-08 HT

4141 SR06RM4047 Shankar RoadProviding 4 Way RMU I/D at NPL

I/D in division Shankar Road.6.90 FY 07-08 HT

4142 SR06RM4048 Shankar RoadProviding 4 Way RMU I/D at J

Block in division Shankar Road.6.53 FY 07-08 HT

4143 SR06RM4049 Shankar Road

Providing 4 Way RMU I/D at 13

WEA Karol Bagh in division

Shankar Road.

6.67 FY 07-08 HT

4144 SR06RM4050 Shankar Road

Installation of 3 way I/D RMU at

Sat Brahma (K) in division

Shankar Road.

4.79 FY 07-08 HT

4145 SR06RM4115 Shankar RoadInstallation of O/D RMU at P.O

No.-3 in division Shankar Road.9.99 FY 07-08 HT

4146 SR06SL2033 Shankar Road

Providing Street Light in the area

of MLA Sh P.C Yogi in division

Shankar Road.

1.86 FY 07-08 LT

4147 SR06SL2071 Shankar Road

Fitting of 150W Lamp in the area

of Sh. S.P. Ratwal in division

Shankar Road.

1.37 FY 07-08 LT

4148 SR06UT4053 Shankar Road

Augmentation of transformer of

2x400 KVA to 2x630 KVA at 7A

WEA S/stn in Div. Shankar Road.

1.23 FY 07-08 HT

4149 SR06UT4055 Shankar Road

Augmentation of transformer of

400 KVA to 630 KVA at Joshi

Road Gali No 24 S/stn in Div.

Shankar Road

0.56 FY 07-08 HT

4150 SR06UT4061 Shankar Road

Augmentation of transformer 630

KVA to 990 KVA at J Blk New

Rajinder in division Shankar Road

0.90 FY 07-08 HT

4151 SR06UT4064 Shankar Road

Augmentation of transformer 630

KVA to 990 KVA at Tikona Park

WEA in division Shankar Road

0.90 FY 07-08 HT

4152 SR06UT4065 Shankar Road

Augmentation of transformer of

630 KVA to 990 KVA at 40

Regarpura S/stn in Div. Shankar

Road

0.398 FY 07-08 HT

4153 SR06UT4066 Shankar Road

Augmentation of transformer of

630 KVA to 990 KVA at Khajoor

Road PL/M S/stn in Div. Shankar

Road.

8.90 FY 07-08 HT

4154 SR06UT4067 Shankar Road

Augmentation of transformer of

630 KVA to 990 KVA at

Satbrahma PL/M S/stn in Div.

Shankar Road..

8.47 FY 07-08 HT

4155 SR07AT4513 Shankar Road

Addition of 400 KVA at andh

mahavidhyala in division Shankar

Road

0.63 FY 07-08 HT

Page 198: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

4156 SR07AT4515 Shankar Road

Additional transformer of 400 KVA

at 4E Gurudwara S/stn in division

Shankar Road

0.62 FY 07-08 HT

4157 SR07LT4523 Shankar Road

Laying of 4 No. new LT feeders

from existing 2*990 KVA

transformer at 21 Blk Old Rajinder

Nagar Sub-Station in division

Shankar Road.

8.18 FY 07-08 LT

4158 SR07SH1534 Shankar Road

Conversion of O/H conductor in to

U/G cable at Gurudwara Road

Karol Bagh in division Shankar

Road

3.56 FY 07-08 LT

4159 WOBSESYPL033 Laxmi Nagar

C/O 11 KV Sub-Station Building

for Electrification of Specified plot

of Patparganj Industrial area at

Udyog Sadan for relocation of

Industries.

3.50 FY 07-08 LT

4160 WOBSESYPL076 BYPL Civil

Creation of office accodiation at

various location in BYPL by

utilisation of dismatalled

workstation

2.41 FY 07-08 LT

4161 YV0418061 Yamuna Vihar

Augmentation of transformer 630

to 990 KVA at Bhagat Singh in

division Yamuna Vihar.

0.057 FY 07-08 LT

4162 YV04FA4616 Yamuna Vihar

Augmentation of existing 11 kV 3

x 240 sq mm and 3 x 150 sq mm

PILCA cable from Maujpur No 1

(Ghonda Chowk) to Gali No 10

Chauhan Banger & Providing an

additional feeder 3 x 300 sq mm

from Ghonda Chowk To Sandhya

Public School in division Yamuna

Vihar..

41.07 FY 07-08 HT

4163 YV04FA4639 Yamuna Vihar

Augmentation of HT 11 kV cable

3*150 sq.mm. PILCA to 3*300

sq.mm XLPE from Tishra Pusta to

Jagjit Nagar Sub station in division

Yamuna Vihar..

10.53 FY 07-08 HT

4164 YV04FA4643 Yamuna Vihar

Replacement/ Augmentation of

Exsisting HT cable 3*300 sq.mm.

PILCA to 3*300 sq.mm XLPE

between Shastri Park Sub station.

No.3 and Marginal Bandh Sub

station. Via, Shastri Park Sub

station.No.1, DDA Flat Shastri

Park and Buland Masjid Sub

station.

26.18 FY 07-08 HT

4165 YV04LT4632 Yamuna Vihar

Replacement of LT overhead

conductor at Chauhan Banger in

division Yamuna Vihar..

9.70 FY 07-08 LT

4166 YV04NC4555 Yamuna Vihar

Providing Metering panel at

WTP+RWP at DJB Sonia vihar in

division Yamuna Vihar.

2.74 FY 07-08 LT

4167 YV04NF2504 Yamuna Vihar

New HT Cable from South of

Wazirabad to DJB Sonia Vihar in

division Yamuna Vihar.

202.70 FY 07-08 HT

4168 YV04PS4631 Yamuna ViharInstallation of Package Substation

at C 4 in division Yamuna Vihar.23.16 FY 07-08 HT

4169 YV04RM4623 Yamuna Vihar

Providing 5 Panel Board at

Ushmanpur in division Yamuna

Vihar.

9.28 FY 07-08 HT

4170 YV04SH2546 Yamuna Vihar

Shifting Of Services Due To

Widening Of Johripur Road From

Loni Road To Brijpuri Road In

Waroad No 86 in division Yamuna

Vihar.

8.22 FY 07-08 HT

Page 199: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

4171 YV04SS4567 Yamuna Vihar

Augmentationof 630 KVA to 990

KVA D/transformerand Laying of

3 Nos additional LT Feeders along

with replacement of defective

service line at Bhagat Singh

Mohalla in division Yamuna Vihar.

4.71 FY 07-08 HT

4172 YV04SS4594 Yamuna Vihar

Providing HT feed to newly

proposed 400 KVA transformerat

road , NO 66 Zafarabad in division

Yamuna Vihar.

10.42 FY 07-08 HT

4173 YV04SS4600 Yamuna Vihar

Augmentation of transformer and

Taking out 2 LT feeder at Abdul

Hamid Marg in division Yamuna

Vihar.

4.02 FY 07-08 HT

4174 YV05EL4159 Yamuna Vihar

Electrificationtrification of Village

Garhi Mandu in division Yamuna

Vihar.

24.92 FY 07-08 LT

4175 YV05FA4127 Yamuna Vihar

Augmentation Of Existing Ht Cable

3X150 Mm2 Pilca To 3X300 Mm2

Xlpe From X Block Brahmpuri To

Moni Baba Mandir in division

Yamuna Vihar.

7.81 FY 07-08 HT

4176 YV05FA4128 Yamuna Vihar

Augmentation of HT 11 kV Old

And Damaged Cable 3X300 Mm2

PILCA to 3X300 Mm2 XLPE From

C-3 Yamuna Vihar Package to C-7

Yamuna Vihar in D-Yamuna Vihar.

5.89 FY 07-08 HT

4177 YV05FA4129 Yamuna Vihar

Replacement of HT Cbl from

Bhagirathi Grid to C7/2 Yamuna

Vihar

8.65 FY 07-08 HT

4178 YV05FA4130 Yamuna ViharReplacement of HT Cbl from

Ghonda Grid to C-7 Yamuna Vihar10.19 FY 07-08 HT

4179 YV05LT4105 Yamuna Vihar

Replacement/ Augmentation of LT

overhead Conductor at C and B

Blocks Yamuna Vihar (Entire) and

Sanjay Mohalla in division Yamuna

Vihar.

2.38 FY 07-08 LT

4180 YV05PS4058 Yamuna Vihar

Installation of 990 kVA Package

Sub Station at C-9 Distt.Yamuna

Vihar

21.57 FY 07-08 HT

4181 YV05PS4059 Yamuna Vihar

Installation of 990 kVA Package

Sub Station at C-10 Distt.Yamuna

Vihar

21.57 FY 07-08 HT

4182 YV05PS4132 Yamuna ViharInstallation of 990 kVA Package

sub station at B-2 Yamuna Vihar.20.75 FY 07-08 HT

4183 YV05RM4021 Yamuna Vihar

Frist Pusta Usmanpur for A B C

overhead Shahdara Bandh Feeder

from Wazirabad No.2 in division

Yamuna Vihar.

4.15 FY 07-08 HT

4184 YV05RM4029 Yamuna Vihar

Near Nala Vijay Colony for A B C

overhead Feeder 3-1/2 Pusta from

Wazirabad No.2 in division

Yamuna Vihar.

6.10 FY 07-08 HT

4185 YV05RM4038 Yamuna Vihar

Replacement of existing RMU to

new RMU K-block Gamri, Distt.

Yamuna Vihar.

4.90 FY 07-08 HT

4186 YV05RM4040 Yamuna Vihar

Replacement of existing old 7panel

board to new seven panel board

at Moni Baba Mandir in division

Yamuna Vihar.

14.40 FY 07-08 HT

4187 YV05RM4070 Yamuna Vihar

Replacement of 4 pannel board

make RBL to seven Panel board at

Jagjit Nagar, Distt.Yamuna Vihar

14.28 FY 07-08 HT

Page 200: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

4188 YV05RM4111 Yamuna Vihar

Replacement of existing RMU to

new seven Panel board at garhi

mandu distt Yamuna Vihar

14.35 FY 07-08 HT

4189 YV05RM4114 Yamuna ViharProviding 5 Way RMU at Jamalo

ka Bagh in division Yamuna Vihar.17.29 FY 07-08 HT

4190 YV06EL4010 Yamuna ViharElectrification of Janta Colony

welcome in division Yamuna Vihar.64.36 FY 07-08 LT

4191 YV06LT4017 Yamuna Vihar

Conversion of LT overhead into

LTAB Cable at Zero Pusta in

division Yamuna Vihar.

92.66 FY 07-08 LT

4192 YV06LT4018 Yamuna Vihar

Conversion of LT overhead into

LTAB cable at Vijai Park in division

Yamuna Vihar.

155.52 FY 07-08 LT

4193 YV06LT4019 Yamuna Vihar

Conversion of LT overhead into

LTAB cable at D Block Gamri in

division Yamuna Vihar.

103.29 FY 07-08 LT

4194 YV06LT4020 Yamuna Vihar

Conversion of LT overhead into

LTAB cable at GAMRI O/H in

division Yamuna Vihar.

126.00 FY 07-08 LT

4195 YV06LT4021 Yamuna Vihar

Conversion of LT overhead into

LTAB cable at Shadara Banndh in

division Yamuna Vihar.

100.89 FY 07-08 LT

4196 YV06LT4022 Yamuna Vihar

Conversion of LT overhead into

LTAB cable at B Block Bhajanpura

in division Yamuna Vihar.

61.80 FY 07-08 LT

4197 YV06LT4023 Yamuna Vihar

Conversion of LT overhead into

LTAB cable at D Block Bhajanpura

in division Yamuna Vihar.

115.26 FY 07-08 LT

4198 YV06LT4024 Yamuna Vihar

Conversion of LT overhead into

LTAB cable at DJB Bhajanpura in

division Yamuna Vihar.

73.38 FY 07-08 LT

4199 YV06LT4025 Yamuna Vihar

Conversion of LT overhead into

LTAB cable at Subhash Mohalla in

division Yamuna Vihar.

98.11 FY 07-08 LT

4200 YV06LT4026 Yamuna Vihar

Conversion of LT overhead into

LTAB cable at NOOR-E-ILAHI in

division Yamuna Vihar.

57.00 FY 07-08 LT

4201 YV06LT4027 Yamuna Vihar

Conversion of LT overhead into

LTAB Cable at Ghonda Chowk in

division Yamuna Vihar.

75.49 FY 07-08 LT

4202 YV06LT4028 Yamuna Vihar

Conversion of LT overhead into

LTAB cable at C-12 in division

Yamuna Vihar.

113.05 FY 07-08 LT

4203 YV06LT4029 Yamuna Vihar

Conversion of LT overhead into

LTAB Cable at Moujpur No-4 in

division Yamuna Vihar.

63.04 FY 07-08 LT

4204 YV06LT4030 Yamuna Vihar

Conversion of LT overhead into

LTAB cable at Moujpur No.-1 in

division Yamuna Vihar.

84.06 FY 07-08 LT

4205 YV06LT4031 Yamuna Vihar

Conversion of LT overhead into

LTAB cable at Vijay Colony in

division Yamuna Vihar.

139.47 FY 07-08 LT

4206 YV06LT4032 Yamuna Vihar

Conversion of LT overhead into

LTAB cable at Gautam Vihar in

division Yamuna Vihar.

128.45 FY 07-08 LT

4207 YV06LT4033 Yamuna Vihar

Conversion of LT overhead into

LTAB cable at MONI BABA in

division Yamuna Vihar.

129.09 FY 07-08 LT

4208 YV06LT4034 Yamuna Vihar

Conversion of LT overhead into

LTAB cable at X BLK BRAHAM in

division Yamuna Vihar.

101.43 FY 07-08 LT

4209 YV06LT4035 Yamuna Vihar

Conversion of LT overhead into

LTAB at Gautampuri in division

Yamuna Vihar.

178.03 FY 07-08 LT

4210 YV06LT4036 Yamuna Vihar

Conversion of LT overhead into

LTAB Cable at MB No.-2 in

division Yamuna Vihar.

116.41 FY 07-08 LT

Page 201: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

4211 YV06LT4037 Yamuna Vihar

Conversion of LT overhead into

LTAB cable at J Block Seelampur

in division Yamuna Vihar.

66.49 FY 07-08 LT

4212 YV06LT4038 Yamuna Vihar

conversion of LT overhead into

LTAB cable at Seelampur-3 in

division Yamuna Vihar.

105.71 FY 07-08 LT

4213 YV06LT4148 Yamuna ViharLTMP at Z-II block Seelam pur in

division Yamuna Vihar22.78 FY 07-08 LT

4214 YV06SH2052 Yamuna Vihar

Shifting of services G.T.Road

Road No 59 in Yamuna Vihar

division.

58.14 FY 07-08 HT

4215 YV06SH2053 Yamuna ViharShifting of Cable at Shastri Park

for DMRC Work.7.65 FY 07-08 HT

4216 CC06CV4005 Chandni Chowk

Raising & rep.steel koisk gali

shatara in division Chandni

Chowk.

1.11 FY 07-08 Others

4217 CC06CV4006 Chandni ChowkCivil works at Ganesh ice factory

in division Chandni Chowk.0.83 FY 07-08 Others

4218 CC06CV4007 Chandni ChowkCivil works at steel koisk Shahganj

in division Chandni Chowk.1.76 FY 07-08 Others

4219 CC06CV4008 Chandni ChowkC/O toe wall & fencing at Lal Kuan

in division Chandni Chowk.0.0174 FY 07-08 Others

4220 CC07CV4508 Chandni Chowk

Repair of roof &closing the entry at

record office at Lahori Gate in

division Chandni chowk.

1.06 FY 07-08 Others

4221 CCCTRJM006 Chandni ChowkCustomer Care center in Jama

Masjid10.17 FY 07-08 Others

4222 CCCTRPN004 Chandni ChowkCustomer Care center in Patel

nagar.66.63 FY 07-08 Others

4223 CCCTRRP005 Chandni ChowkCustomer Care center in Rajinder

Place11.63 FY 07-08 Others

4224 CCCTTPR001 Chandni ChowkCustomer Care center in Trilok

Puri9.19 FY 07-08 Others

4225 DL05RS4032 Dilshad Garden

Repairing & maintenance of

unattended 11 KV S/stn No.4 in

Dilshad Garden under district G T

Road Dilshad Garden.

1.34 FY 07-08 Others

4226 DL05RS4042 Dilshad Garden

Construction of 11KV Unattended

Sub-Station B Block in division

Dilshad Garden.

0.97 FY 07-08 Others

4227 DL05RS4043 Dilshad Garden

Civil work for unattended S/Stn

No. Named Shakun Engg. Under

district G.T.Road Dilshad Garden.

0.55 FY 07-08 Others

4228 DL05RS4053 Dilshad Garden

Civil Work for 11KV Unattended

S/Stn No. Named DSIDC SHED

S/Stn. J.L.M..Industrial Area

Under District G.T.Road, Dilshad

Garden.

1.16 FY 07-08 Others

4229 DL06CV4578 Dilshad Garden

Civil works for 11 kv unattended

s/stn. No.II J&K Pkt. Dilshad

Garden.

1.14 FY 07-08 Others

4230 DL06RS4586 Dilshad GardenCivil works at Pkt A S/stn. Dilshan

Garden1.51 FY 07-08 Others

4231 DL06RS4588 Dilshad GardenCivil works at 11KV SubStation at

S & G pkt. Dilshad Garden1.06 FY 07-08 Others

4232 JM05CV4432 KarkardoomaRennovation Shakti Kiran Building

Ph I in division Karkardooma.149.29 FY 07-08 Others

4233 JM05RS4421 Karkardooma

Civil Work for 11kv unattended

substation C-BLK in division

Karkardooma.

0.0480 FY 07-08 Others

Page 202: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

4234 JM05RS4425 Karkardooma

Civil Work 11kv unattended

substation HARGOBIND enclave

in division Karkardooma.

0.0375 FY 07-08 Others

4235 JM05RS4426 Karkardooma

Civil Work 11kv unattended

Substation AGCR Enclave in

division Karkardooma.

0.054 FY 07-08 Others

4236 JM06RS4013 KarkardoomaCivil work s/stn.-I indl. area. in

division Karkardooma.0.378 FY 07-08 Others

4237 JM06RS4014 KarkardoomaCivil works for s/stn. 2 Indl area in

division Karkardooma.0.389 FY 07-08 Others

4238 JM06RS4032 Karkardooma

Civil works at P/M transformer Id

Gah s/stn in division

Karkardooma.

0.413 FY 07-08 Others

4239 JM07CV4507 Karkardooma

Raising & raising of s/stn. Ram

Gali Kunti Marg Vishwas nagar in

division Karkardooma.

0.424 FY 07-08 Others

4240 KN05RS4243 Krishna NagarRennovation of Customer Care

Centre Krishna Nagar77.61 FY 07-08 Others

4241 KN05RS4258 Krishna NagarRepair of fen. 11kv S/Stn

Shayam II-BL0.0151 FY 07-08 Others

4242 KN06CV4046 Krishna NagarRepairing of fencing at Ambedkar

College in division Krishna Nagar.0.373 FY 07-08 Others

4243 KN06CV4048 Krishna Nagar

Raising of boundary wall at

Mausam Vihar in division Krishna

Nagar.

0.393 FY 07-08 Others

4244 KN07CV4505 Krishna NagarPremonsoon preventive measures

of s/stn in division Krishna Nagar.0.71 FY 07-08 Others

4245 KW05RS4108 Karawal NagarRenovation of existing Customer

Care Center at Karawal Nagar.65.95 FY 07-08 Others

4246 KW05RS4111 Karawal Nagar

Construction of new plinth &

repairing of Sharpur substation in

division Karawal Nagar.

0.271 FY 07-08 Others

4247 LN06CV4000 Laxmi Nagar

Raising boundarywall at Sub-

Station No-3 CGHS Patparganj in

division Laxmi Nagar.

0.64 FY 07-08 Others

4248 LN06CV4013 Laxmi Nagar

Raising of Switchgear &

Transformer Plinth at South

Ganesh Nagar in division Laxmi

Nagar.

2.68 FY 07-08 Others

4249 LN06CV4015 Laxmi Nagar

Repairing Raising & fencing of

kiosk at Sanjay Park in division

Laxmi Nagar.

1.26 FY 07-08 Others

4250 LN06CV4017 Laxmi Nagar

Painting of kiosk & repairing of

fencing at G- block Shakarpur

s/stn in division Laxmi Nagar.

0.068 FY 07-08 Others

4251 LN06CV4020 Laxmi Nagar

Repairing & raising of fencing at

Ek minar Masjid in division Laxmi

Nagar.

0.53 FY 07-08 Others

4252 LN06CV4118 Laxmi Nagar

Repairing & raising of fencing &

floor at Post office Mandawali in

division Laxmi Nagar.

0.207 FY 07-08 Others

4253 LN06CV4119 Laxmi Nagar

Repairing & raising of fencing &

floor at Sonia Vihar s/stn in

division Laxmi Nagar.

0.356 FY 07-08 Others

4254 LN06CV4121 Laxmi Nagar

Repairing & raising of fencing &

floor at C-block West vinod nagar

in division Laxmi Nagar.

0.53 FY 07-08 Others

4255 LN06CV4126 Laxmi Nagar

Raising of fencing & floor at DDA

park Shakarpur in division Laxmi

Nagar.

0.361 FY 07-08 Others

4256 LN06CV4131 Laxmi Nagar

Repairing & raising of fencing &

floor at sabji Mandi Mandawali in

division Laxmi Nagar.

0.415 FY 07-08 Others

4257 LN06CV4132 Laxmi Nagar

Repairing & raising of fencing 7

floor at Mangalam s/stn in division

Laxmi Nagar.

0.383 FY 07-08 Others

Page 203: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

4258 LN06CV4133 Laxmi Nagar

Repairing & raising of fencing &

floor at Mandawali Unchepar s/stn

in division Laxmi Nagar.

0.356 FY 07-08 Others

4259 LN06CV4141 Laxmi Nagar

Raising of floor at Uttary school

block old kiosk s/stn in division

Laxmi Nagar.

0.76 FY 07-08 Others

4260 LN06CV4142 Laxmi Nagar

Repairing & Raising of fencing &

floor at Mohan baba s/stn in

division Laxmi Nagar.

0.370 FY 07-08 Others

4261 LN06CV4225 Laxmi Nagar

Repairing & painting of fencing &

kiosk at Nehru Enclave s/stn in

division Laxmi Nagar.

0.496 FY 07-08 Others

4262 LN06CV4226 Laxmi Nagar

Raising & repairing of fencing at V-

10 Ramesh Park in division Laxmi

Nagar.

0.87 FY 07-08 Others

4263 LN07CV4529 Laxmi Nagar

Providing plinth, repairing & raising

of fencing and floor at U block

Shakarpur s/stn.

0.307 FY 07-08 Others

4264 M305RS4097 Mayur Vihar Ph-3 Renovation of Customer Care

Center at Mayur Vihar Ph-III.33.50 FY 07-08 Others

4265 MV05RS4178Mayur Vihar Ph-

1&2

Providing fencing around 11 kV

plinth mounting transformer At

Kotla Village under Distt. Mayur

Vihar

1.18 FY 07-08 Others

4266 MV06CV4123Mayur Vihar Ph-

1&2

P/f concertina wire on b/wall at

sadar Aptt. Manager (O&M) office

Mayur Vihar

0.262 FY 07-08 Others

4267 NN06CV4127 Nand NagriRpg. Tr. plh & encl B-block kir Ngr

in Nand Nagri division .0.66 FY 07-08 Others

4268 NN06CV4128 Nand NagriCivil works at 11 Kv C-block Kabir

Ngr in Nand Nagri division 1.88 FY 07-08 Others

4269 PG06CV4012 PaharganjCivil Rpr.at Bagichi allawdeen stl

kiosk in division Paharganj.0.095 FY 07-08 Others

4270 PG06CV4055 PaharganjRpg&rsg.floor level complaint Ram

Ngr in division Paharganj.0.287 FY 07-08 Others

4271 PG06CV4070 PaharganjCivil works steel kiosk old

Kasabpura in division Paharganj.0.417 FY 07-08 Others

4272 PG06CV4071 PaharganjCivil work masonary kiosk New

Kasabpura in division Paharganj.0.218 FY 07-08 Others

4273 PG06CV4072 PaharganjCvl repair work steel kiosk Naraina

Mkt in division Paharganj.0.422 FY 07-08 Others

4274 PG06CV4073 PaharganjP/F IRC fncg & rpg. existing fcg.

B.G.Rd in division Paharganj.0.333 FY 07-08 Others

4275 PG06CV4074 PaharganjCivil works stel kiosk Chini mill in

division Paharganj.0.67 FY 07-08 Others

4276 PN05RS4136 Patel NagarCivil Work at Zakhira S/Stn Anand

Pravat in division Patel Nagar.0.0196 FY 07-08 Others

4277 PN05RS4137 Patel NagarExt. & Rep. of fencing at Nandi

S/Stn in division Patel Nagar.0.0137 FY 07-08 Others

4278 PN05RS4139 Patel NagarExt. & Rep. of fencing at Duggal

S/Stn in division Patel Nagar.0.0104 FY 07-08 Others

4279 PN06CV4552 Patel NagarTr.plinth Janta park Baljeet nagar

in division Patel Nagar.0.112 FY 07-08 Others

4280 PN06CV4556 Patel NagarRepair of Drainage System

System at DMS Grid.1.58 FY 07-08 Others

4281 PN06CV4560 Patel NagarC/o Tr. plinth at gali 10 Anand

parvat in division Patel Nagar.0.094 FY 07-08 Others

4282 SR05CV4141 Shankar Road

Providing Fencing at 8A WEA

Karolbagh in division Shankar

Road.

0.59 FY 07-08 Others

4283 SR06CV4005 Shankar RoadExt. & rep. steel koisk sethi pet.

Pump in division Shankar Road.0.94 FY 07-08 Others

4284 SR06CV4031 Shankar RoadExt.& rep.fencing at sujan singh

Park in division Shankar Road.0.299 FY 07-08 Others

4285 YV05RS4161 Yamuna ViharRepair to 11kv s/stn C-12 in

Yamuna Vihar1.25 FY 07-08 LT

Page 204: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

4286 EC04AT3580 EHV Central

Addition of 1 No. 33/11 kV, 20

MVA power transformer along with

associated bay equipment and 8

Nos. 11 kV switchgear panel at

Minto Road.

147.90 FY 06-07 EHV

4287 EC04BE3542 EHV Central

Laying of 33 kV 2X3CX400sqmm

XLPE cable from RPH Bay no.16

to Minto Road route length

154.92 FY 06-07 EHV

4288 EC04FA3558 EHV Central

Laying of 33kV 3Cx400 sqmm

XLPE cable to convert a portion of

33kV O/H line between RPH bay

no. – 5 to Jama Masjid grid to

U/G.

4.37 FY 06-07 EHV

4289 EC04FA4502 EHV Central Laying of 33 kV Cable from Park

Street to Shankar Road. 157.01 FY 06-07 EHV

4290 EC04FA4504 EHV Central Laying of 33 kV cables from Park

Street to Prasad Nagar Grid348.91 FY 06-07 EHV

4291 EC04FA4508 EHV Central

Replacement of old PILCA by

laying 4 Nos. 33 kV 3x400sqmm

XLPE cable from RPH bay no 5

and 6 to Jama Masjid.

463.28 FY 06-07 EHV

4292 EC04GS3622 EHV Central Installation of Capacitor Bank at

DMS Grid.26.45 FY 06-07 EHV

4293 EC04SW3592 EHV Central

Replacement of 12 No. OCBs by

33 KV Indoor Switchgear Panels

(VCB) at Minto Road.

141.54 FY 06-07 EHV

4294 EC04SW3601 EHV Central

Replacement of 11 No. OCBs by

33 KV Indoor Switchgear Panels

(VCB) at Jama Masjid.

138.18 FY 06-07 EHV

4295 EC04SW3604 EHV Central Replacement of 1 Nos., 66 kV

OCB by VCB at Faiz Road.0.222 FY 06-07 EHV

4296 EC04UT3554 EHV Central

Addition of 1 No. 33/11 KV, 20

MVA power transformer along with

associated equipment and 7 Nos.

11 KV switchgear panels (VCB)

at G. B. Pant Grid S/Stn.(BSES

share-50% and Party share-50%)

80.29 FY 06-07 EHV

4297 EC04UT3577 EHV Central

Augmentation of 3x16 MVA, 33/11

kV Power transformer to 3x20

MVA at Kamla Market

322.29 FY 06-07 EHV

4298 EC05SW3012 EHV Central

Replacement of 26 No. OCB's by

11 KV Switchgear Panels (VCB)

Town Hall .

121.24 FY 06-07 EHV

4299 EC06GS4008 EHV Central

Establishment of 66/11 kV New

Grid substation with 2 Nos. 66/11

kV 20 MVA power transformer at

Tibia College.

99.17 FY 06-07 EHV

4300 EE04AT3576 EHV East

Addition of dismantled 33/11 kV

16 MVA Power transformer at

Dwarkapuri

62.68 FY 06-07 EHV

4301 EE04BE4565 EHV East

Erection, testing and

commissioning of 66KV

equipments in one No. addl. Bay

at 66KV Dilshad Garden Grid

S/stn

31.71 FY 06-07 EHV

4302 EE04BE4567 EHV East

Erection, testing and

commissioning of 66KV

equipments in two Nos. addl. Bays

at 66KV Yamuna Vihar Grid S/stn.

61.30 FY 06-07 EHV

4303 EE04FA3579 EHV East

Replacement of old PILCA cables

by 2 Nos. 33 kV 3cx400 sq.mm

XLPE cable from Ghonda to

G.T.Road.

40.94 FY 06-07 EHV

Page 205: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

4304 EE04FA3580 EHV East

Laying of 2 Nos. 33 kV 3x 400

sqmm XLPE cable from Ghonda

to G. T. Road.

366.75 FY 06-07 EHV

4305 EE04FA3583 EHV East

Replacement of old PILCA cables

by 2 Nos. 33 kV 3cx400 sq.mm

cable from two DPs of Vivek Vihar-

G.T. Road O/H feeder near railway

crossing.

22.88 FY 06-07 EHV

4306 EE04GS4562 EHV East

Laying of 66 kV single circuit

1x630 sqmm XLPE cable from

Vivek Vihar to Dlishad Garden with

one No. 66 kV bay at Vivek Vihar.

220.10 FY 06-07 EHV

4307 EE04IF2547 EHV East

33 KV input feed to proposed 33

KV Grid substation at Mother

Diary from Patparganj 220 KV

Grid of Delhi Transco Ltd.(BSES

Share-47.3% and Party Share-

52.7%).

138.26 FY 06-07 EHV

4308 EE04IF3568 EHV East

Laying of 2 Nos.33 kV

3x400sqmm XLPE cables from

Bhagirathi to Karawal Nagar.

223.03 FY 06-07 EHV

4309 EE04IF3573 EHV East

Laying of 2 Nos. 33 kV

3x400sqmm XLPE cable from

Patparganj to Preet Vihar.

225.66 FY 06-07 EHV

4310 EE04IF4563 EHV East

Laying of 66 kV D/C 1x630 sqmm

XLPE cable from Yamuna Vihar to

East of Loni Road with extension

of 2 Nos. of bays at Yamuna

Vihar.

640.63 FY 06-07 EHV

4311 EE04NF2552 EHV East Construction of 2 no. 33kV bays at

Shastri Park grid s/stn.30.37 FY 06-07 EHV

4312 EE04NF3546 EHV East

Replacement of old PILCA cable

by laying 2 Nos. 33 kV

3x400sqmm XLPE cable from

Patparganj to Karkardoma.(Cable

length - 9.6 km)

324.27 FY 06-07 EHV

4313 EE04NF3581 EHV East

Replacement of old PILCA cable

by laying 2 Nos. 33 kV 3x400

sqmm XLPE cable from Vivek

Vihar to G. T. Road.(cable length -

6.4 km)

159.66 FY 06-07 EHV

4314 EE04RM3586 EHV East

Replacement of 66 KV O/D

switchgear at 66 KV Dilshan

Garden grid s/stn.

48.11 FY 06-07 EHV

4315 EE04SW3587 EHV East Replacement of 10 Nos., 66 kV

OCB by SF6 at Ghonda.77.46 FY 06-07 EHV

4316 EE04SW4530 EHV East Replacement of 27 Nos.11 kV

switchgear panel at Ghonda.140.03 FY 06-07 EHV

4317 EE05MS2019 EHV East

Shifting of Stay poles from

Carriageway of road no-71 on

account of road widening by PWD

Div-23

0.260 FY 06-07 EHV

4318 EE05SW3005 EHV East

Replacement of 16 Nos.11 kV

switchgear panel at Mayur Vihar

Ph-I.

86.85 FY 06-07 EHV

4319 EE05SW3006 EHV East

Replacement of 16 Nos.11 kV

switchgear panel at Mayur Vihar

Ph-II.

98.40 FY 06-07 EHV

4320 EE05SW3007 EHV East Replacement of 17 Nos.11 kV

switchgear panel at GH-II.90.94 FY 06-07 EHV

4321 EE05SW3008 EHV East Replacement of 18 Nos.11 kV

switchgear panel at Vivek Vihar.102.35 FY 06-07 EHV

4322 EE05SW3009 EHV East Replacement of 15 Nos.11 kV

switchgear panel at Karkardooma.93.71 FY 06-07 EHV

4323 EE05SW3010 EHV East Replacement of 22 Nos.11 kV

switchgear panel at CBD-I.124.58 FY 06-07 EHV

Page 206: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

4324 EE05SW3011 EHV East Replacement of 19 Nos.11 kV

switchgear panel at GH-I.95.39 FY 06-07 EHV

4325 EE05SW3012 EHV East

Replacement of 26 Nos.11 kV

switchgear panel at Guru Angad

Nagar.

138.63 FY 06-07 EHV

4326 EE06GS4036 EHV East

Construction of Control Room

Building for Establishment of

33/11 kV Grid S/Stn. at CBD-III.

149.41 FY 06-07 EHV

4327 EE06SH2013 EHV East

Shifting of 33 kV O/H line between

Vivek vihar and G T Road grid

S/stn. Near Jhilmil Industrial Area

(Shahdara to Dilshad Garden

corridor).

(100% DMRC Share)

40.06 FY 06-07 EHV

4328 EE06SH2023 EHV East

Shifting of 1 No. DP of 33 kV

Preet Vihar - CBD - I Overhead

feeder near Raj Priya Society,

Karkardooma.(100% Party Share).

0.55 FY 06-07 EHV

4329 EE06SH2024 EHV East

Shifting of Vivek Vihar-DSIDC,

Vivek Vihar-GT Road 33 kV U/G

feeders due to infringing with

MRTS corridor (100% DMRC

Share)

32.69 FY 06-07 EHV

4330 EE06SW3005 EHV East

Replacement of 66KV sf-6 circuit

breaker at Kondli grid s/st. for the

shunt capacitor.

8.38 FY 06-07 EHV

4331 EE06SW3009 EHV East

Replacement of 1 No. 66 kV OCB

by SF6 for 66 kV Capacitor Bank

at Khichripur.

8.75 FY 06-07 EHV

4332 EHY6L01 EHV East66/11 kV Grid Sub-Stat. at East of

Loni Road1078.26 FY 06-07 EHV

4333 AFOW07639 Kakardooma Electrification Of C.B.D. Shahdara 158.91 FY 06-07 LT

4334 AFOW07640 Kakardooma Electrification Of C.B.D. Shahdara 1.06 FY 06-07 LT

4335 BYSCADA401 BYPL SCADA SCADA Work for BYPL 972.48 FY 06-07 Others

4336 CC04FA4641 Chandni Chowk

Replacement of HT 11KV 3C x

150sq.mm PILCA underground

Old/Sick Cable by new 11KV HT

3C x 300 sq.mm XLPE Cable

between Katra Pyare Lal S/Stn. to

Katra Khushal Rai S/Stn., Chandni

Chowk.

11.61 FY 06-07 HT

4337 CC04LT4063 Chandni Chowk

Shifting of Existing O/H LT Feeder

& Cable For Existing Connection

0F Electric Cremetorium Before

Shifting of Transformer at E/C

S/Stn in Distt Sub Station Chandni

Chowk

1.11 FY 06-07 LT

4338 CC04LT4565 Chandni Chowk

Replacement of over heated and

burnt out span of single core

XLPE Cable with new XLPE Cable

in overhead manner in the area of

Ballimaran Baradari, Peepal

Mahadev, Punjabi Phatak, Kucha

Rehman, Katra Ishwar Bhawan,

Hingabeg Gali.

2.70 FY 06-07 LT

4339 CC04RM4644 Chandni Chowk

Renovation of 11kV S/S and

replacement of old sick 7 Panel

Board with 2 nos. new RMU 4

Panel Board SF6 type at Electric

Crematorium S/Stn.

18.67 FY 06-07 HT

4340 CC04RM4649 Chandni Chowk

Replacement of 7 Panel board by

new 2 nos. 4-Way E.RMU + 1 no.

Single Panel breaker at Cycle

Stand, town Hall.

16.98 FY 06-07 HT

Page 207: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

4341 CC04UT4588 Chandni Chowk

Augmentation of 630 kVA

Transformer to 990 kVA

Transformer at Naya Bazar

Booster Pump S/Stn.

6.39 FY 06-07 HT

4342 CC05FA4001 Chandni Chowk

Replacement of HT Cable

3X300mm2 PILCA in to

3x300mm2 XLPE Bela road to

new Kashmiri gate via DOI Taxi

Stand O.H College in division

Chandni Chowk.

40.58 FY 06-07 HT

4343 CC05FA4002 Chandni Chowk

Replacement of HT Cable from

jaipuria Sub-station to Cloth

market in division Chandni Chowk.

2.59 FY 06-07 HT

4344 CC05FA4004 Chandni Chowk

Replacement of HT cable

3X300mm2 PILCA in to

3x300mm2 XLPE Town hall to

Kashmiri gate in division Chandni

Chowk.

40.99 FY 06-07 HT

4345 CC05FA4006 Chandni Chowk

Replacement of existing old PILCA

cable 3x300mm2 to 3x300mm2

XLPE cable between Sri Ram and

Sons to Jogiwara

7.28 FY 06-07 HT

4346 CC05FA4007 Chandni Chowk

Rep of HT cable from fountain grid

of lajpat rai mkt in division

Chandni Chowk.

24.44 FY 06-07 HT

4347 CC05FA4008 Chandni Chowk

Replacement of existing old PILCA

cable 3x300mm2 to 3x300mm2

XLPE cable between Darya Ganj

to MES

35.65 FY 06-07 HT

4348 CC05FA4009 Chandni Chowk

Replacement of HT cable from

Cycle stand to pandit brothers in

division Chandni Chowk.

3.54 FY 06-07 HT

4349 CC05FA4011 Chandni Chowk

Replacement HT Cable

3X300mm2 PILCA in to

3x300mm2 XLPE Katra Banyan to

Katra Bariyan P/M in division

Chandni Chowk.

2.71 FY 06-07 HT

4350 CC05FA4012 Chandni Chowk

Replacement of HT Cable from

Charkhewalan SStn to Chameli

Devi SStn in division Chandni

Chowk.

1.77 FY 06-07 HT

4351 CC05FA4013 Chandni Chowk

Replacement of HT cable from

Jeenat Mahal in division Chandni

Chowk.

10.24 FY 06-07 HT

4352 CC05FA4014 Chandni Chowk

Replacement of HT CABLE

3X300mm2 PILCA in to

3x300mm2 XLPE Gali Qasim Jan

to Lal Darwaza in division Chandni

Chowk.

6.83 FY 06-07 HT

4353 CC05FA4015 Chandni Chowk

Replacement of HT Cable

3X300mm2 PILCA in to

3x300mm2 XLPE New hauz Qazi

to Lambi gali in division Chandni

Chowk.

8.67 FY 06-07 HT

4354 CC05FA4016 Chandni Chowk

Replacement of 3CX300MM SQ

PILCA Cable with new

3CX300XLPE Cable beetween

Ghee Mandi to Booster Pump

Substation Naya Bazar in division

Chandni Chowk.

4.15 FY 06-07 HT

4355 CC05FA4017 Chandni Chowk

Replacement of existing 3*300

PILCA with 3*300 XLPE between

Booster Pump in division Chandni

Chowk.

5.94 FY 06-07 HT

4356 CC05FA4019 Chandni Chowk

Replacement of outdated old

conductor into ACSR DOG

conductor in dist. Chandni Chowk.

32.15 FY 06-07 HT

Page 208: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

4357 CC05LT2078 Chandni Chowk

Conversion of OH conductor in to

UG cable at GPO,K.Gate, in

division Chandni Chowk.

3.16 FY 06-07 LT

4358 CC05LT4023 Chandni Chowk

Replacement of old existing sick

cable with new LT 3x3.5sq.mm

XLPE between New Krishna Mkt

Feeder Pillar to Singer Machine

Feeder Pillar, in division Chandni

Chowk.

0.88 FY 06-07 LT

4359 CC05LT4024 Chandni Chowk

Replacement of old existing sick

cable with new LT 3x3.5 sqmm

XLPE between HamiLTon road to

Zeenat wari in division Chandni

Chowk.

2.89 FY 06-07 LT

4360 CC05LT4025 Chandni Chowk

Replacement of old existing sick

cable with new LT 3x3.5sq.mm

XLPE between Chabiganj to Katra

Mausam, in CCK Division

1.91 FY 06-07 LT

4361 CC05LT4026 Chandni Chowk

Replacement of old existing 5 nos

sick cable with new LT 3x3.5

sq.mm XLPE between Hamilton

Road S/stn to Chota Bazar, Ganda

Nala, Zeenatwari, P.S.K.Gate,

Kaurya Pul, in division Chandni

Chowk.

2.48 FY 06-07 LT

4362 CC05LT4028 Chandni Chowk

Replacement of old existing sick

cable with new LT 3x3.5 sqmm

XLPE between Fountain to

Annanpurna and Mahaveer feeder

pillar to Nagin chand feeder pillar

in division Chandni Chowk.

2.69 FY 06-07 LT

4363 CC05LT4030 Chandni Chowk

Replacement of old existing 3

NOS sick cable with new LT 3x3.5

sqmm XLPE between CYCLE

stand to K NatWA, Mahajani ,Kt

Hardayal in division Chandni

Chowk.

11.96 FY 06-07 LT

4364 CC05LT4031 Chandni Chowk

Replacement of old existing sick

cable with new LT 3x3.5 sqmm

XLPE between Wilson Feeder

Pillar to Mehra Feeder Pillar,in

division Chandni Chowk.

0.87 FY 06-07 LT

4365 CC05LT4032 Chandni Chowk

Replacement of old existing sick

cable with new LT 3x3.5 sqmm

XLPE betweenNew Lajpat Rai to

Wilson feeder pillar in division

Chandni Chowk.

3.91 FY 06-07 LT

4366 CC05LT4033 Chandni Chowk

Replacement of sick Cable at

Bikaner Raghudayal in division

Chandni Chowk.

1.21 FY 06-07 LT

4367 CC05LT4034 Chandni Chowk

Replacement of old existing sick

cable with new LT 3x3.5 sqmm

XLPE between Gauri Shanker

Mandir Feeder Pillar to Pleasure

Garden Feeder Pillar, in division

Chandni Chowk.

1.27 FY 06-07 LT

4368 CC05LT4036 Chandni Chowk

Replacement of old existing sick

cable with new LT 3x3.5 sqmm

XLPE between Gali Gulyan SStn

to Gali Dariba Bridge at Shop No.-

525, in division Chandni Chowk.

3.14 FY 06-07 LT

4369 CC05LT4037 Chandni Chowk

Replacement of old existing sick

cable with new LT 3x3.5 sqmm

XLPE between Railway Booking

SStn to 900 Kucha Kabil Attar, in

CCK Division

2.95 FY 06-07 LT

Page 209: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

4370 CC05LT4089 Chandni Chowk

Laying of underground cable in

place of overhead at 1157 Welfare

ASub stationociation, Kucha

Mahajani in Division Chandani

Chowk

0.212 FY 06-07 LT

4371 CC05NF4020 Chandni Chowk

Laying of HT Feeder from

Fountain Gridto Katra Khushal Rai

Sub Station in division Chandni

Chowk.

8.97 FY 06-07 HT

4372 CC05RM4041 Chandni Chowk

Replacement of old dated RMU at

Jaipura building in division

Chandni Chowk.

4.08 FY 06-07 HT

4373 CC05RM4047 Chandni Chowk

Replacement of 8 Patel Nagarale

board into 7 Panel board at Mori

Gate Substation in division

Chandni Chowk.

13.67 FY 06-07 HT

4374 CC05RM4100 Chandni ChowkInstallation of 3W+1W O/D RMU

at K.Bazar,Chandni Chowk7.15 FY 06-07 HT

4375 CC05RS4092 Chandni Chowk

Construction works at 11KV

Unattended Substation Chameli

Devi in division Chandni Chowk.

0.52 FY 06-07 Others

4376 CC05SL2081 Chandni ChowkShifting of street light pole near

Nigam bodh 0.238 FY 06-07 LT

4377 CC06LT4024 Chandni Chowk

Conversion of O/H conductor into

LTAB cable at H C Sain Road in

division Chandni Chowk.

2.31 FY 06-07 LT

4378 CC06LT4026 Chandni Chowk

Conversion of O/H conductor into

LTAB cable at Angoori bagh in

division Chandni Chowk.

3.28 FY 06-07 LT

4379 CC06LT4027 Chandni Chowk

Conversion of O/H conductor into

LTAB cable at Nigam Bodh Ghat

in division Chandni Chowk.

14.63 FY 06-07 LT

4380 CC06RM4010 Chandni Chowk

Installation of 3 Way O/D RMU at

Roshanpur SS in division

Daryaganj.

4.02 FY 06-07 HT

4381 CC06RM4011 Chandni Chowk

Installation of 3 Way O/D RMU at

Nai Sarak Piao SS in division

Daryaganj.

4.06 FY 06-07 HT

4382 CC06SH2039 Chandni ChowkShifting of street light pole at 1476

Rangma in division Daryaganj.0.024 FY 06-07 LT

4383 CC06UT4020 Chandni Chowk

Augmentation of transformer at

Police station HQ I and II in

division chandni Chowk

12.96 FY 06-07 HT

4384 DG04FA4557 Daryaganj

Replacement of part portion of

existing 3Cx300 sq. mm XLPE

Cable into new 3Cx300 sq. mm

XLPE Cable from Hindi Park

S/Stn. to Sub Station Road S/Stn.,

Distt.Daryaganj.

6.00 FY 06-07 HT

4385 DG04FA4564 Daryaganj

Augmentation of existing HT 11KV

cable of size 3x70 sq.mm with 300

sq.mm XLPE cable from UGC

S/Stn. to Link House S/Stn.

X(P&C)C.I/CDG/0008/02-03.

8.49 FY 06-07 HT

4386 DG04RM4599 Daryaganj

Replacement of 7 Panel Board at

Mata Sundari Road S/Stn in Distt.

Darya Ganj.

14.43 FY 06-07 HT

4387 DG04RM4626 Daryaganj

Installation of 350 Mva RMU SF-

6(O/D) at Kucha Chalan Sub

station in Distt-Daraygang

0.58 FY 06-07 HT

4388 DG05EL4155 Daryaganj

Electrification of Balmiki Basti

Colony Near Ito in Division Darya

Ganj

5.78 FY 06-07 LT

Page 210: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

4389 DG05FA4074 Daryaganj

Replacement of existing 3CX300

mm sq.PILCA cable with new

3CX300 mmsq. XLPE cable

between Delhi Gate Gridto Gandhi

Nidhi Sub station.

17.18 FY 06-07 HT

4390 DG05FA4076 Daryaganj

Replacement of existing 3c x 300

mm sq.P ILCA cable with new 3c

x 300 mm sq. XLPE cable

between Miroad aroad Road to

Guru Nanak Eye Hospital Sub

station in Distt. Daryaganj.

11.38 FY 06-07 HT

4391 DG05FA4077 Daryaganj

Replacement of existing 3c x 300

mmsq. PILCA cable with new 3c

x 300 mm sq. XLPE cable

between Guru Nanak Eye

Hospital to Pant Qtrs Sub station

in Distt. Daryaganj

14.70 FY 06-07 HT

4392 DG05FA4078 Daryaganj

Replacement of existing 3c x 300

mmsq. PILCA cable with new 3c

x 300 mm sq. XLPE cable

between Zakir HuSub stationain

College to Mata Sundari Road Sub

station in Distt. Daryaganj

17.50 FY 06-07 HT

4393 DG05FA4079 Daryaganj

Replacement of existing 3c x 300

mmsq. PILCA cable with new 3c

x 300 mm sq. XLPE cable

between Minto Road Gridto Pant

Qtrs. Sub station in Distt.

Daryaganj

22.62 FY 06-07 HT

4394 DG05FA4080 Daryaganj

Replacement of existing 3CX300

mm sq.PILCA cable with new

3CX300 mmsq. XLPE cable

between Minto Road Gridto Miroad

aroad Road Sub station. in Distt:

Darya Ganj.

9.95 FY 06-07 HT

4395 DG05FA4081 Daryaganj

eplacement of existing 3CX225

mm sq.PILCA cable with new

3CX300 mmsq. XLPE cable

between New Hauz Qazi to Seema

Lout doorge Sub station. via Gali

Bajrang Bali and Sarak Prem

Narian Sub station. in Distt: Darya

Ganj.

22.39 FY 06-07 HT

4396 DG05FA4083 Daryaganj

Replacement of existing 3C x300

mm sq. PILCA cable with new 3C

x 300 mm sq. XLPE cable

between Sir Sayeed Ahmed Road

s/stn to Mother Dairy s/stn in

Distt. Daryaganj.

4.59 FY 06-07 HT

4397 DG05FA4085 Daryaganj

REP OF EXISTING

3C*300MMSQ .Pilca cable with

new 3C*300mmsq Xlpe cable

between DELHI GATE TO HINDI

PARK(K) S/STN IN DISTT

:DARYA GANJ

10.70 FY 06-07 HT

4398 DG05FA4086 Daryaganj

Replacement of existing 3C x300

mm sq. PILCA cable with new 3c

x 300 mm sq. XLPE cable

between Mata Sundari Road to

Kotla Road plinth mounted Sub

station in Distt. Daryaganj.

19.50 FY 06-07 HT

Page 211: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

4399 DG05FA4087 Daryaganj

Re-routing and Augmentation of

existing 3C x150 mm sq. PILCA

cable with new 3c x 300 mm sq.

XLPE cable between Mata Sundari

Road to Rouse Avenue (k) Sub

station in Distt. Daryaganj.

13.06 FY 06-07 HT

4400 DG05FA4088 Daryaganj

Re-routing and Augmentation of

existing 3C x150 mm sq. PILCA

cable with new 3c x 300 mm sq.

XLPE cable between Mata Sundari

Road to Minto Road Railway

Pumping Sub station in Distt.

Daryaganj.

17.49 FY 06-07 HT

4401 DG05FA4092 Daryaganj

Replacement/Augmentation OF

EXIS 3c*150 MMSQ betweem

CAG to UAG sub station.

0.95 FY 06-07 HT

4402 DG05FA4093 Daryaganj

Replacement of existing 3c x 300

mm sq. PILCA cable with new 3

Cx 300 mm sq XLPE cable

between ISI to CAG Sub station in

Distt. Daryaganj

2.36 FY 06-07 HT

4403 DG05FA4095 Daryaganj

Replacement of existing 3 C x 300

mm sq PILCA cable with new 3C x

300 mm sq. XLPE cable between

Kotla Road plinth mounted to

Rajendra Bhawan Sub station in

Distt. Daryaganj.

7.58 FY 06-07 HT

4404 DG05FA4096 Daryaganj

Replacement/ Augmentation of

exsiting 3C x 150 mm sq PILCA

cable with new 3 C x 300 mmsq

XLPE cable between Masub

stationMailing to ISI Sub station in

Distt. Daryaganj

14.75 FY 06-07 HT

4405 DG05FA4099 Daryaganj

Replacement of existing 3Cx 300

mm sq PILCA cable with new 3C x

300 mm sq XLPE cable between

Minto Road Gridto DAG-I Sub

station in Distt. Daryaganj.

21.57 FY 06-07 HT

4406 DG05FA4101 Daryaganj

Replacement/Augmentation of

existing 3Cx 150 mm sq PILCA

cable with new 3C x 300 mm sq

XLPE cable between Kamla

Market Gridto Himmat Garh Sub

station in in Distt. Daryaganj.

7.74 FY 06-07 HT

4407 DG05FA4107 Daryaganj

Replacement of existing 3CX300

mm sq.PILCA cable with new

3CX300 mmsq. XLPE cable

between indian Expresub stationto

Gulab Bhawan Sub station. in

Distt: Darya Ganj.

5.36 FY 06-07 HT

4408 DG05FA4108 Daryaganj

Replacement of existing 3CX300

mm sq.PILCA cable with new

3CX300 mmsq. XLPE cable

between Vikram Nagar to indian

Expresub stationSub station. in

Distt: Darya Ganj.

6.94 FY 06-07 HT

4409 DG05FA4117 Daryaganj

Laying of HT 3C X300 Sqmm

XLPE Cable Bus stand at Vikas

Marg in National Science

Academy feeder in division

Daryaganj.

0.219 FY 06-07 HT

4410 DG05FA4157 Daryaganj

Conversion of HT O/H feeder Ring

Road into U/G system in division

Darya Ganj

23.86 FY 06-07 HT

Page 212: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

4411 DG05JJ4167 Daryaganj

Electrification of JJ Clusters at

Ghat No.26 and Meeroad aroad

Lane Pant Hospital in Division –

Darya Ganj

14.82 FY 06-07 LT

4412 DG05JJ4168 Daryaganj

Electrification of JJ Clusters at

Anna Nagar Sanjay Amar Colony

near ITO in division Daryaganj.

26.07 FY 06-07 LT

4413 DG05JJ4169 Daryaganj

Electrification of LOP by LT Cle

JJ Clusters near 100 Qtrs. in

division Daryaganj.

2.78 FY 06-07 LT

4414 DG05LT4008 Daryaganj

Taking out LT Feeder size

3.5*300mm sq in division

Daryaganj.

1.10 FY 06-07 LT

4415 DG05LT4010 Daryaganj

Taking out LT Feeder of size

3.5X300 XLPE from Transformer

at footover Gali in division

Daryaganj.

2.09 FY 06-07 LT

4416 DG05LT4146 Daryaganj

Taking out LT feeders frrom

substation to Shankar Gali in

Distt,Daryaganj

1.36 FY 06-07 LT

4417 DG05LT4160 Daryaganj

Replacement of Worn out single

core lead into AB Cable in Meena

Bazar in Division – Darya Ganj

2.05 FY 06-07 LT

4418 DG05LT4166 Daryaganj

Replacement of Worn out Single

Core lead into AB Cable in

different place (Kala Mahal, Uroad

u Bazar, Matia Mahal, Pataudi

House, Chitli Qabar) of Zone Jama

Masjid in Division Darya Ganj

(PART-2

26.88 FY 06-07 LT

4419 DG05NF4071 Daryaganj

Laying of new 11kV HT feeder 3C

x 300sq.mm XLPE Cable from

I.G. GridSub station. to Gulab

Bhawan Sub station.

49.32 FY 06-07 HT

4420 DG05NF4127 Daryaganj

Taking out New HT feeder. from

Minto Road grid to Shakti Sadan

Substation

40.08 FY 06-07 HT

4421 DG05RM4040 Daryaganj

Replacement of old7 Panel board

with new 7 Panel board at Chandni

Mahal Sub station in Distt.Darya

Ganj

15.13 FY 06-07 HT

4422 DG05RM4041 Daryaganj

Replacement of 7 Panel board into

8 Panel board at Hotel Broadway

Sub station in Distt:Darya Ganj

17.42 FY 06-07 HT

4423 DG05RM4042 Daryaganj

Replacement of RMU with SF-6 at

WHO Sub station. in Distt: Darya

Ganj

4.63 FY 06-07 HT

4424 DG05RM4046 Daryaganj

Replacement of old 8 Panel board

with new 8 Panel board at DAG-1

Sub station in Distt: Darya Ganj

14.23 FY 06-07 HT

4425 DG05RM4048 Daryaganj

Replacement of 4 Panel board

with RMU SF-6 Extensible with

one no. Singe Breaker Unit at

Hamdaroad Kiosk Sub station. in

Distt: Darya Ganj.

5.05 FY 06-07 HT

4426 DG05RM4049 Daryaganj

Replacement of RMU with SF-6 at

Phatak Karor Sub station. in Distt:

Darya Ganj

4.61 FY 06-07 HT

4427 DG05RM4050 Daryaganj

Replacement of RMU with RMU

SF-6 Extensible with Single

Breaker Unit at Bulbuli Khana Sub

station. in Distt: Darya Ganj

6.92 FY 06-07 HT

4428 DG05RM4051 Daryaganj

Replacement of RMU with SF-6 at

23-Story(Vikas Minar) Sub station.

in Distt: Darya Ganj

4.55 FY 06-07 HT

Page 213: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

4429 DG05RM4052 Daryaganj

Replacement of RMU with SF-6 at

institution of Charted Accountant

Sub station. in Distt: Darya Ganj

4.88 FY 06-07 HT

4430 DG05RM4055 Daryaganj

Replacement of RMU with SF-6 at

Vikram Nagar Sub station. in Distt:

Darya Ganj

4.56 FY 06-07 HT

4431 DG05RM4130 DaryaganjInstallation of RMU at kotla road

Sub station in division Daryaganj4.50 FY 06-07 HT

4432 DG05RM4131 Daryaganj

Replacement of 4 Panel board

with 4 way RMU at Mahavat khan

Sub station in division Daryaganj

7.16 FY 06-07 HT

4433 DG05RM4154 DaryaganjInstallation of RMU at Times of

india in division Daryaganj4.37 FY 06-07 HT

4434 DG05RM4171 Daryaganj

Replacement of old unserviceable

13panel board with new 3nos.

11kV 4Way RMU SF6 Extensible

type + 2nos. Single Breaker unit at

Daryaganj Complaint Centre

indoor Sub stationtn, in Darya

Ganj Division

28.43 FY 06-07 HT

4435 DG05RM4174 Daryaganj

Installation of 2nos. 4Way indoor

RMU at 84 Ghanta (Kiosk) Sub

stationtn, in Darya Ganj Division

10.36 FY 06-07 HT

4436 DG05RS4163 DaryaganjRepair fencing flooring & other at

minto Road in division Daryaganj2.45 FY 06-07 Others

4437 DG05SL2149 Daryaganj

Installation. High Mast

Asubstationembly, Tajdar Babar in

division Daryaganj

5.62 FY 06-07 LT

4438 DG05UT4144 DaryaganjAug. to 444-990kva at sir sayeed

ahemad in division Daryaganj8.27 FY 06-07 HT

4439 DG05UT4147 Daryaganj

Augmentation of 630kVA

transformer by 990kVA

transformer at Moll.Qabristan sub

station

6.20 FY 06-07 HT

4440 DG06LT4161 Daryaganj

Replacement. of O/H Conductor

into LTAB Cable in division

Daryaganj.

2.03 FY 06-07 LT

4441 DG06LT4188 Daryaganj

Conversion of O/H Conductor into

LTAB cable at Hauz Qazi in

division Daryaganj

77.96 FY 06-07 LT

4442 DG06RM4178 Daryaganj

Installation of 3 Way O/D RMU at

Mohalla Qabristan SS in division

Daryaganj

3.92 FY 06-07 HT

4443 DG06RM4180 DaryaganjInstallation of 3W ID RMU at

Mother Dairy,in division Daryaganj4.56 FY 06-07 HT

4444 DG06RM4181 Daryaganj

Installation of 4W ID RMU at

O.Dujana House,in division

Daryaganj

6.90 FY 06-07 HT

4445 DG06RM4182 DaryaganjInstallationl of 3*4+1 Way indoor

RMU at D.Gate - 2,Daryaganj22.55 FY 06-07 HT

4446 DG06RM4183 DaryaganjInstallationl of 2*4+1 Way indoor

RMU at 14-Storey, Daryaganj16.43 FY 06-07 HT

4447 DG06RM4184 Daryaganj

Installationl of 2*4 + 2*1 Way

indoor RMU at k hospital

Daryaganj

19.64 FY 06-07 HT

4448 DG06RM4185 DaryaganjInstallation of 3*4W+1W ID RMU

at G.Bhawan,DRG25.94 FY 06-07 HT

4449 DG06RM4186 DaryaganjInstallationln of 4 + 1Way indoor

RMU at R.Bhawan,Daryaganj11.16 FY 06-07 HT

4450 DG06RM4187 DaryaganjInstallationln of 4+1 Way indoor

RMU at T.Hostel, Daryaganj10.51 FY 06-07 HT

Page 214: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

4451 DG06RM4190 Daryaganj

Installation of 3 Way I/D RMU at

Hotel Resident I/D Kiosk SS in

division Daryaganj

4.49 FY 06-07 HT

4452 DG06RM4191 Daryaganj

Installation of 3 Way I/D RMU at

Girdhari Lal I/D SS in division

Daryaganj

4.57 FY 06-07 HT

4453 DG06RM4192 Daryaganj

Installation of 4 Way I/D RMU at I

P Storm water Pump I/D SS in

division Daryaganj

6.92 FY 06-07 HT

4454 DG06RM4193 Daryaganj

Installation of 3 Way O/D RMU at

Rose Garden SS in division

Daryaganj

6.62 FY 06-07 HT

4455 DG06SH2202 Daryaganj

Shifting of LT pole & LT Cable at

Tagore road feeding to Sakure Ki

Dandi due to Construction of Civic

Centre.

9.50 FY 06-07 LT

4456 DG06SH4197 Daryaganj

Conversion of O/H LT conductor

into U/G Cable Near Rajeev

Bhawan Mahawat Khan Road in

division Daryaganj

5.59 FY 06-07 LT

4457 DL04LT4699 Dilshad Garden

Taking out of 3 Nos. L.T feeders

at Old Seema Puri Bus Stand Sub

station in division Dilshad Garden.

6.69 FY 06-07 LT

4458 DL04LT4700 Dilshad Garden

Taking out of 3 Nos L.T feeders at

B block Old Seema Puri in division

Dilshad Garden.

5.58 FY 06-07 LT

4459 DL04LT4704 Dilshad Garden

Taking out 4 Nos LT Feeders fro

transformer at c block Seempuri in

division Dilshad Garden.

8.44 FY 06-07 LT

4460 DL04LT4709 Dilshad Garden

Replacement of 3 Nos L.T.

feeders at Radhu Sub station in

division Dilshad Garden.

5.11 FY 06-07 LT

4461 DL04LT4721 Dilshad Garden

Taking out of 3 Nos LT feeders

from Rani Jhansi Marg in division

Dilshad Garden.

4.06 FY 06-07 LT

4462 DL05AT4240 Dilshad Garden

Additional 630 kVA Transformer at

Subhash Park ICE Factory in

division Dilshad Garden.

2.05 FY 06-07 HT

4463 DL05EL4059 Dilshad Garden

Electrification of LOP of Leprosy

Colony Tahirpur GTR in division

Dilshad Garden.

7.07 FY 06-07 LT

4464 DL05EL4062 Dilshad Garden

Electrification of LOP of Part of

Khera Village GTR in division

Dilshad Garden.

10.23 FY 06-07 LT

4465 DL05EL4065 Dilshad Garden

Electrification of MS Park Along

Railway Line GTR in division

Dilshad Garden.

3.37 FY 06-07 LT

4466 DL05FA4179 Dilshad Garden

Replacement of HT 11 kV Cable

XLPE Zafrabad S.Stn to Stn No .2

to Nav Durga Mandir to

Panchsheel Garden to Ice Factory

in division Dilshad Garden.

36.25 FY 06-07 HT

4467 DL05FA4213 Dilshad Garden

Replacement of HT 11 KV Cable

and modification of HT circuit from

general Hospital to Shakun

Substation to Sansar substation in

division Dilshad Garden.

21.54 FY 06-07 HT

4468 DL05JJ4056 Dilshad Garden Electrification of Kalander Colony

GTR in division Dilshad Garden.27.95 FY 06-07 LT

4469 DL05JJ4057 Dilshad Garden

Electrification of LOP of Lal Bagh

G T Road in division Dilshad

Garden.

4.26 FY 06-07 LT

4470 DL05JJ4058 Dilshad Garden

Electrification of LOP of

Zafarabad(Janta Colony) G T

Road in division Dilshad Garden.

20.45 FY 06-07 LT

Page 215: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

4471 DL05JJ4060 Dilshad Garden

Electrification of LOP of Deepak

Camp G T Road in division

Dilshad Garden.

4.76 FY 06-07 LT

4472 DL05JJ4061 Dilshad GardenElectrification of Jain JJ Cluster in

division Dilshad Garden.10.29 FY 06-07 LT

4473 DL05JJ4067 Dilshad GardenElectrification of Aaridhika Colony

in division Dilshad Garden.5.14 FY 06-07 LT

4474 DL05JJ4071 Dilshad GardenElectrification of LOP Keshav

Chowk Dwarkapuri-G T Road1.49 FY 06-07 LT

4475 DL05LT4021 Dilshad Garden

Replacement/Mout door. of LV

mains in Kabool Nagar,Motiram

Road,Sri Ram Nagar and GT

Road Area in division Dilshad

Garden.

8.34 FY 06-07 LT

4476 DL05LT4223 Dilshad GardenRep of Feeder pillar and service

pillar in division Dilshad Garden.2.31 FY 06-07 LT

4477 DL05LT4224 Dilshad Garden

Replacement of feeder pillar/

service pillar at Dilshad Garoad

en.(Resi Area) in division Dilshad

Garden.

18.60 FY 06-07 LT

4478 DL05LT4226 Dilshad Garden

Replacement of feeder pillar/

service pillar at Friends Colony in

division Dilshad Garden.

2.62 FY 06-07 LT

4479 DL05LT4230 Dilshad Garden

Replacement of feeder pillar/

service pillar at DDA flats MS

Park in division Dilshad Garden.

6.41 FY 06-07 LT

4480 DL05ML2024 Dilshad Garden

Estimate for street lightning . pole

at- Seema Puri -Tahirpur in

division Dilshad Garden.

2.37 FY 06-07 LT

4481 DL05RM4048 Dilshad Garden

Installation/Replacement of 3

Panel board with motorised RMU

with SCADA compatibility at -

SubaShiftingPark 2.Ice.Factory in

division Dilshad Garden.

6.69 FY 06-07 HT

4482 DL05RM4065 Dilshad Garden

Replacement of H.T.Panel at

Panchsheel Garoad en Sub station

in division Dilshad Garden.

17.87 FY 06-07 HT

4483 DL05RM4066 Dilshad Garden

Replacement of H.T.Panel at

Radhu Sub station in division

Dilshad Garden.

13.64 FY 06-07 HT

4484 DL05RM4069 Dilshad Garden

Replacement of H.T.Panel at Old

Seema Puri Sub station. Near

Bus Stand in division Dilshad

Garden.

13.40 FY 06-07 HT

4485 DL05RM4079 Dilshad Garden

Installation of 3 Way out door

RMU at E.Gorakh.P.Gali no 4 in

division Dilshad Garden.

3.96 FY 06-07 HT

4486 DL05RM4080 Dilshad Garden

Installation of 3+1Way out door

RMU at H Mandir Sub station 3-

Ram Nagar in division Dilshad

Garden.

6.71 FY 06-07 HT

4487 DL05RM4119 Dilshad Garden

Replacement of HT Panel at A-

block JLM industrial area sub

station in division Dilshad Garden.

0.82 FY 06-07 HT

4488 DL05RS4027 Dilshad Garden

Civil work,repair of 11KV S/S

shahdara in division Dilshad

Garden.

1.33 FY 06-07 Others

4489 DL05RS4028 Dilshad Garden

Construction and Repair works at

11KV S/S in division Dilshad

Garden.

0.98 FY 06-07 Others

4490 DL05RS4033 Dilshad Garden

Civil work fro 11KV S/S at

Panchsheel Garden in division

Dilshad Garden.

1.07 FY 06-07 Others

4491 DL05RS4034 Dilshad GardenCivil work for 11KV S/S Gorakh

Park in division Dilshad Garden.1.22 FY 06-07 Others

Page 216: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

4492 DL05RS4036 Dilshad Garden

Civil works for 11KV substation at

Radhu Cinema in division Dilshad

Garden.

0.375 FY 06-07 Others

4493 DL05RS4041 Dilshad Garden

Construction works at 11KV

Unattended substation at -F-Blk in

division Dilshad Garden.

1.04 FY 06-07 Others

4494 DL05RS4044 Dilshad Garden

Construction works at 11KV

Unattended substation at -J&K Pkt

in division Dilshad Garden.

1.07 FY 06-07 Others

4495 DL05RS4046 Dilshad Garden

Construction works at 11KV

Unattended substation at -A-BLK

in division Dilshad Garden.

0.91 FY 06-07 Others

4496 DL05RS4047 Dilshad Garden

Construction works at 11KV

Unattended substation at Gorakh

Park in division Dilshad Garden.

1.55 FY 06-07 Others

4497 DL05RS4055 Dilshad Garden

Construction works at 11KV

Unattended substation at

G.T.Road in division Dilshad

Garden.

1.21 FY 06-07 Others

4498 DL06EL4540 Dilshad Garden

Electrification of Hanshraj

compound in division Dilshad

Garden.

21.48 FY 06-07 LT

4499 DL06LT4520 Dilshad Garden

conversion of LT overhead to LT

AB Cable at Gali No.9&10&11 in

division Dilshad Garden.

13.03 FY 06-07 LT

4500 DL06RM4505 Dilshad Garden

Installation of 3 Way at Balbir

nagar. Gali No. 15 in division

Dilshad Garden.

3.97 FY 06-07 HT

4501 DL06RM4507 Dilshad Garden

RMU Fencing at hanuman Mandir

Ram Nagar in division Dilshad

Garden.

0.243 FY 06-07 HT

4502 HYJLM JCNZB6 Karawal Nagar LTMP at C- Block Meet Nagar 309.48 FY 06-07 LT

4503 HYLNRLNR-141 Karawal Nagar LTMP at Sonia vihar G Block 249.54 FY 06-07 LT

4504 HYLNRLNR-336A Karawal Nagar LTMP at Sonia vihar G Block - 1 180.88 FY 06-07 LT

4505 HYLNRLNR-3A/89 Karawal Nagar LTMP at Sonia vihar G Block - 2 216.89 FY 06-07 LT

4506 HYNNGNNGJP2 Karawal NagarLTMP works near the Park new

Seelampur F-2 Block 186.63 FY 06-07 LT

4507 HYNNGNNGME1 Karawal NagarLTMP works near the Park new

Seelampur F-1 Block 184.67 FY 06-07 LT

4508 HYYVRBJPAB3 Karawal Nagar LTMP at Main Johripur Extn 74.01 FY 06-07 LT

4509 HYYVRCHBAB1 Karawal Nagar LTMP at C- Block Meet Nagar-I 90.94 FY 06-07 LT

4510 HYYVRCHBAB2 Karawal Nagar LTMP at new seelampur d block 24.71 FY 06-07 LT

4511 HYYVRNSPFB1 Karawal NagarLTMP at Shiv Vihar Ph. IV U

Block59.79 FY 06-07 LT

4512 HYYVRNSPFB2 Karawal Nagar LTMP at Biharipur extn. 134.86 FY 06-07 LT

4513 JM04EL2678 Karkardooma

Providing New Connection in F/O

CBD Ground in division

Karkardooma.

3.93 FY 06-07 HT

4514 JM04EL4594 Karkardooma

Electrification Of General Hospital

Chotta Bazar Shahdara in division

Karkardooma.

6.59 FY 06-07 LT

4515 JM04FA4617 Karkardooma

Replacement of existing 3x300

sq.mm PILCA Cable into 3x300

sq. mm XLPE Cable from General

Hospital to DSR Mill S/Stn in

division Karkardooma.

26.10 FY 06-07 HT

4516 JM04LT2N018 Karkardooma

Taking out 7 LT feeder from 630

KVA transformer at Tikona Park

S/Stn. Loni Road in division

Karkardooma in division

Karkardooma.

0.067 FY 06-07 LT

4517 JM04LT4566 Karkardooma

Taking Out 5 Nos. LT Feeder from

Package S/Stn. At Shamshan

Ghat in division Karkardooma.

5.80 FY 06-07 LT

4518 JM04LT4620 Karkardooma

Taking Out 2 Nos. LT Feeder from

existing 990 KVA Tr. at Jaiswal

Marg Ram nagar in division

Karkardooma.

4.41 FY 06-07 LT

Page 217: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

4519 JM04LT4705 Karkardooma

Replacement 3 Nos LT Feeder at

D Block Vivek Vihar Ph-I in

division Karkardooma.

5.58 FY 06-07 LT

4520 JM04LT4712 Karkardooma

Replacement L.V. mains in

Shahdra area(Anaj Mandi,

Telewara, Tejab Mill)etc. in

division Karkardooma.

11.75 FY 06-07 LT

4521 JM04LT4726 Karkardooma

Rep./Mod L.V mains in Bhola Nath

Nagar, Bihari Colony Etc in

division Karkardooma.

122.34 FY 06-07 LT

4522 JM04LT4727 Karkardooma

Rep./Mod L.V mains in Shalimar

Park, Dalhai Mohalla, Rama Blk

and Mahveer Pathan Pura, Gajju

Katra Etc in division Karkardooma.

64.71 FY 06-07 LT

4523 JM04LT4728 Karkardooma

Replacement L.V. mains in Vivek

Vihar A,B,C, D Block Vivek Vihar

in division Karkardooma.

28.65 FY 06-07 LT

4524 JM04LT4730 Karkardooma

Replacement L.V. mains in Jhilmil

Colony, Vishwakarma Nagar and

V.Vihar Ph-II in division

Karkardooma.

20.08 FY 06-07 LT

4525 JM04NF4529 Karkardooma

Laying of U/G XLPE HT cable

3*300 sq. mm. for newly proposed

Loni Road Grid to K.L. Rathi S/S

in division Karkardooma.

55.68 FY 06-07 HT

4526 JM04PS4644 Karkardooma

Providing a 990 kVA Package sub

station at G Block Mansarover

Park in division Karkardooma.

19.32 FY 06-07 HT

4527 JM04RM4636 Karkardooma

Installation of RMU Panel board

(VCB Type) in place of existing

very old 10 Panel board at B-block

Complaint office Jhilmil industrial

Area in division Karkardooma.

25.32 FY 06-07 HT

4528 JM04RM4662 Karkardooma

Replacement Of 4 Panel Board At

OP Pocket S/Stn. Dilshad Garden

in division Karkardooma.

7.64 FY 06-07 HT

4529 JM04RM4680 Karkardooma

Installation of 1 Additional 350

MVA single Panel at Telephone

Exchange Buildng, Karkardooma

in division Karkardooma.

3.28 FY 06-07 HT

4530 JM04RM4692 Karkardooma

Repalcement of old 4 Panel Board

at SS No. 1 Anupam Apartment in

division Karkardooma.

8.04 FY 06-07 HT

4531 JM04SH2683 KarkardoomaShifting of electric services at

Road 71 in division Karkardooma.65.78 FY 06-07 HT

4532 JM04SS2N004A Karkardooma

Taking out 5 Nos. LT feeder from

Additional 630 Kva transformer in

division Karkardooma in division

Karkardooma.

6.08 FY 06-07 LT

4533 JM05EL2429 KarkardoomaElectrification of Navrachna CGHS

in division Karkardooma.12.37 FY 06-07 HT

4534 JM05EL2433 Karkardooma

Electrification of Public/Semi

Public Institutional area at

Karkardooma.

64.85 FY 06-07 HT

4535 JM05EL4409 Karkardooma Electrification of indira Camp in

division Karkardooma.0.67 FY 06-07 LT

4536 JM05EL4410 Karkardooma

Electrification of indira Camp

Karkardooma (JL-J-06) in division

Karkardooma.

1.66 FY 06-07 LT

Page 218: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

4537 JM05EL4413 Karkardooma

Electrification of Rajeev Camp

Near( Bses office),in division

Karkardooma.

4.40 FY 06-07 LT

4538 JM05EL4416 Karkardooma

Electrification of 18 Vishwas

Nagar,Shahadara in division

Karkardooma.

0.59 FY 06-07 LT

4539 JM05FA4008 Karkardooma

Augmentation of Existing Under

Ground 11 kV Feeder From Vivek

Vihar Grid To SresHTha Vihar

Feeder. No:-1 in division

Karkardooma.

41.26 FY 06-07 HT

4540 JM05FA4373 Karkardooma

Augmentation of Existing Under

Ground 11 kV Feeder From C

Block. To A Block Anand Vihar.

Via B Block in division

Karkardooma.

17.81 FY 06-07 HT

4541 JM05FA4374 Karkardooma

Augmentation of Existing Under

Ground 11 kV Feeder From Vivek

Vihar Grid To Sarvaria Market in

division Karkardooma.

22.37 FY 06-07 HT

4542 JM05FA4378 Karkardooma

Augmentation OF underground

feeder from CBD II GRID TO Saini

enclave in division Karkardooma.

32.02 FY 06-07 HT

4543 JM05FA4381 Karkardooma

Augmentation OF underground

feeder from CBD Complex to urya

Niketan in division Karkardooma.

29.42 FY 06-07 HT

4544 JM05FA4383 Karkardooma

Augmentation of Existing Under

Ground 11 kV Feeder From

Karkaroad oom GridTo Sarvaria

market .

37.72 FY 06-07 HT

4545 JM05FA4386 Karkardooma

Augmentation of Existing Under

Ground 11 kV Feeder From

Commercial Block. to Gali No. 5

Vishwash Nagar in division

Karkardooma.

5.64 FY 06-07 HT

4546 JM05FA4389 Karkardooma

Augmentation U/G 11 KV Feeder

from Metro station Shahadara to

Tejab mill in division Karkardooma.

7.73 FY 06-07 HT

4547 JM05FA4390 Karkardooma

Augmentation of underground

feeder from Anaj Mandi to Delhi

Gate in division Karkardooma.

19.95 FY 06-07 HT

4548 JM05JJ4443 Karkardooma

Electrification of JJ Cluster at

Anand Vihar near Vivekananda

School,in division Karkardooma.

12.44 FY 06-07 LT

4549 JM05LT2430 Karkardooma

Electrification of Navratna CGHS

CBD Shadhra (LT Cable) in

division Karkardooma.

0.97 FY 06-07 LT

4550 JM05LT4099 Karkardooma

T/O 3 NO LT Feeder from

Transformer at Ram Vihar No-2

substation in division

Karkardooma.

8.26 FY 06-07 LT

4551 JM05LT4102 Karkardooma

Taking Out 3 Nos LT Feeders at

Shreshtha Vihar No.1 in division

Karkardooma.

6.43 FY 06-07 LT

4552 JM05LT4103 Karkardooma

T/O 3 NO LT U/G Feeders from

transformer at Shreshtha Vihar

No.2 in division Karkardooma.

8.69 FY 06-07 LT

4553 JM05LT4104 Karkardooma

Taking out 2 No LT Feeder from

Transformer at Mahabir Block in

division Karkardooma.

2.09 FY 06-07 LT

4554 JM05LT4110 Karkardooma

T/O 3 NO. LT U/G Feeders from

transformer at Manak vihar -1 in

division Karkardooma.

5.35 FY 06-07 LT

4555 JM05LT4112 Karkardooma

T/O 3 NO. LT U/G Feeders from

transformer at Manak vihar -2 in

division Karkardooma.

5.25 FY 06-07 LT

Page 219: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

4556 JM05LT4114 Karkardooma

T/O 3 NO. LT U/G Feeders from

transformer at Dayanand Vihar ph-

1 in division Karkardooma.

5.91 FY 06-07 LT

4557 JM05LT4115 Karkardooma

T/O 3 NO. LT U/G Feeders from

transformer at Dayanand Vihar ph-

2 in division Karkardooma.

7.86 FY 06-07 LT

4558 JM05LT4116 Karkardooma

Taking out 3 No LT feeder from

Transformer at karkardooma

Village P/M in division

karkardooma.

5.11 FY 06-07 LT

4559 JM05LT4129 Karkardooma

T/O 3 NO. LT U/G Feeders from

transformer at Anaj mandi

substation Shahadara in division

Karkardooma.

4.90 FY 06-07 LT

4560 JM05LT4130 Karkardooma

T/O 3 NO. LT U/G Feeders from

transformer at Shahadara City in

division karkardooma.

3.84 FY 06-07 LT

4561 JM05LT4131 Karkardooma

T/O 3 NO. LT U/G Feeders from

transformer at DCP office

Shahadara in division

Karkardooma.

4.50 FY 06-07 LT

4562 JM05LT4134 Karkardooma

T/O 3 NO. LT U/G Feeders from

transformer at A Block Surajmal

Vihar No-1 in division

Karkardooma.

5.70 FY 06-07 LT

4563 JM05LT4135 Karkardooma

T/O 3 NO. LT feeder from

Transformer at A Block surajmal

Vihar No-2 v

4.31 FY 06-07 LT

4564 JM05LT4138 Karkardooma

Taking Out 3 Nos LT Feeders at

Peela Mandir in division

Karkardooma.

3.14 FY 06-07 LT

4565 JM05LT4140 Karkardooma

Taking Out 3 Nos LT Feeders at

East Arjun Nagar in division

Karkardooma.

5.52 FY 06-07 LT

4566 JM05LT4143 Karkardooma

Taking out 3 NO LT Feeder from

Transformer at Jagrity Enclave

Extension in division

Karkardooma.

5.61 FY 06-07 LT

4567 JM05LT4144 Karkardooma

Taking out 3 NO LT Feeder from

Transformer at Saini Enclave No.

1 in division Karkardooma.

5.57 FY 06-07 LT

4568 JM05LT4146 Karkardooma

Taking out 3 NO LT Feeder from

Transformer at Tezab Mill in

division Karkardooma.

3.51 FY 06-07 LT

4569 JM05LT4157 Karkardooma

Taking out 3 NO LT Feeder from

Transformer at MANIRAM

MANDIR -2

4.96 FY 06-07 LT

4570 JM05LT4158 Karkardooma

Taking out 3 NO LT Feeder from

Transformer at LSC A Block

Surajmal viharNo-1 in division

Karkardooma.

6.80 FY 06-07 LT

4571 JM05LT4167 Karkardooma

Taking out 3 NO LT Feeder from

Transformer at Rama Block in

division Karkardooma.

3.22 FY 06-07 LT

4572 JM05LT4168 Karkardooma

Taking out 3 NO LT Feeder from

Transformer at Kiran Vihar in

division Karkardooma.

4.09 FY 06-07 LT

4573 JM05LT4169 Karkardooma

Taking out 3 NO LT Feeder from

Transformer at Bihari Colony-III in

division Karkardooma.

3.22 FY 06-07 LT

4574 JM05LT4170 Karkardooma

Taking out 3 NO LT Feeder from

Transformer at Surya Niketan -3 in

division Karkardooma.

8.81 FY 06-07 LT

4575 JM05LT4171 Karkardooma

Taking out 3 NO LT Feeder from

Transformer at AT LSC Rishab

Vihar -1 in division Karkardooma.

4.57 FY 06-07 LT

4576 JM05LT4173 Karkardooma

Taking out 3 NO LT Feeder from

Transformer at Delhi Admin Flat in

division Karkardooma.

3.70 FY 06-07 LT

Page 220: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

4577 JM05LT4190 Karkardooma

Taking out 3 NO LT Feeder from

Transformer at Pratap Khand

substation in division

Karkardooma.

8.62 FY 06-07 LT

4578 JM05LT4191 Karkardooma

Taking out 3 No. LT Feeder from

Transformer at A Block Vivek

Vihar -2 in division Karkardooma.

6.82 FY 06-07 LT

4579 JM05LT4192 Karkardooma

Taking out 3 NO LT Feeder from

Transformer at Govind Khand

Substation in division

Karkardooma.

6.76 FY 06-07 LT

4580 JM05LT4194 Karkardooma

Taking out 3 Nos LT Feeder from

Transformer at Batra Substation

Jhilmil Colony in division

Karkardooma.

5.94 FY 06-07 LT

4581 JM05LT4198 Karkardooma

Taking out 3 NO LT Feeder from

Transformer at jhilmil Colony

Nalewal Substation in division

Karkardooma.

7.00 FY 06-07 LT

4582 JM05LT4199 Karkardooma

Taking out 3 Nos LT Feedr from

Transformer at D Block Vivek

Vihar -1 in division Karkardooma.

5.45 FY 06-07 LT

4583 JM05LT4206 Karkardooma

Taking Out 3 Nos LT Feeders A-

Block V. Vihar-II in division

Karkardooma.

6.36 FY 06-07 LT

4584 JM05LT4208 Karkardooma

Taking Out 3 Nos LT Feeders at B

Block V.Vihar MTD office in

division Karkardooma.

8.19 FY 06-07 LT

4585 JM05LT4209 Karkardooma

Taking out LT U/G Feeders from

Janta Quarter Substation Vivek

Vihar in division Karkardooma.

8.27 FY 06-07 LT

4586 JM05LT4211 Karkardooma

Taking Out 3 Nos LT Feeders at

Police Station Vivek Vihar Sub

Station in division Karkardooma.

1.66 FY 06-07 LT

4587 JM05LT4334 Karkardooma

Taking out of 3 Nos L.T feeders at

Shakun Engg. Sub station in

division Karkardooma.

6.70 FY 06-07 LT

4588 JM05LT4431 KarkardoomaLTMP Work at Jawala Nagar in

division Karkardooma.13.14 FY 06-07 LT

4589 JM05RM2402 Karkardooma

Shifting of electric services due to

construction of master plan road

over disused canal in east delhi

from karkari more to marginal

bundh road in division

Karkardooma.

8.26 FY 06-07 HT

4590 JM05RM4032 Karkardooma

Replacement of H.T.Panel at

Trikona Park Sub Station in

division Karkardooma.

16.91 FY 06-07 HT

4591 JM05RM4043 Karkardooma

Replacement of H.T.Panel at DCP

office Sub Station in division

Karkardooma.

6.90 FY 06-07 HT

4592 JM05RM4047 Karkardooma

Replacement of HT Panel at

Manak Vihar (Vigyan Lok ) Sub-

station in division Karkardooma.

7.07 FY 06-07 HT

4593 JM05RM4056 Karkardooma

Replacement of H.T.Panel at

Hargovind Encl. Sub Station in

division Karkardooma.

6.76 FY 06-07 HT

4594 JM05RM4092 Karkardooma

Installation of RMU at Karan Gali

Sub Station in division

Karkardooma.

4.88 FY 06-07 HT

4595 JM05RM4214 Karkardooma

Installation of RMU at GSLI No. 5

Vishwas nagar substation in

division Karkardooma.

4.17 FY 06-07 HT

4596 JM05RM4218 Karkardooma

Installation of RMU at Teliwara

Pole Mounted in division

Karkardooma.

4.23 FY 06-07 HT

Page 221: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

4597 JM05RM4219 Karkardooma

Installation of RMU at Yudhisthir

Gali Sub Station in division

Karkardooma.

4.18 FY 06-07 HT

4598 JM05RM4441 Karkardooma

Installation of 3Way outdoor

RMU at Mohalla Mahram-

Karkadomma

3.97 FY 06-07 HT

4599 JM05RM4442 Karkardooma

Installation of 3+1 Way outdoor

RMU at Mukesh Nagar -

Karkadooma

6.88 FY 06-07 HT

4600 JM05RS4423 KarkardoomaCivil Work -11kv unattended S/S

Shrestha in division Karkardooma.0.96 FY 06-07 Others

4601 JM05SH2440 Karkardooma

Shifting of cable U/G Tank to Delhi

Admn. Staff Quarters at

Karkardooma

2.57 FY 06-07 HT

4602 JM05UT4270 Karkardooma

Augmentation of Existing

Transformer 630kVA To 990 kVA

at D Block Surajmal Vihar No.1 in

division Karkardooma.

1.02 FY 06-07 HT

4603 JM05UT4271 Karkardooma

Augmentation of Existing

Transformer 630kVA To 990 kVA

at D Block Surajmal Vihar No.2 in

division Karkardooma.

1.81 FY 06-07 HT

4604 JM05UT4280 Karkardooma

Augmentation of 400-990KVA at

Karkardooma village in division

Karkardooma.

8.31 FY 06-07 HT

4605 JM05UT4288 Karkardooma

Augmentation of Transformer from

630 KVA to 990KVA at A block

Surajmal Vihar Substation in

division Karkardooma.

7.73 FY 06-07 HT

4606 JM05UT4289 Karkardooma

Augmentation Transformer from

630 KVA to 990KVA at A Block

Surajmal Vihar No.-2 in division

Karkardooma.

7.67 FY 06-07 HT

4607 JM05UT4290 Karkardooma

Augmentation of Transformer from

400 KVA to 990KVA at Peela

Mandir Substation in division

Karkardooma.

6.89 FY 06-07 HT

4608 JM05UT4339 Karkardooma

Augmentation of Existing

Transformer 400 kVA To 630

kVA at LSC A Block Surajmal

Vihar No.1.

1.26 FY 06-07 HT

4609 JM05UT4342 Karkardooma

Augmentation of Existing

Transformer 630kVA To 990 kVA

at Yojana Vihar in division

Karkardooma.

1.45 FY 06-07 HT

4610 JM05UT4343 Karkardooma

Augmentation of Existing

Transformer 400 kVA To 990

kVA at Chitrakoot Apartmentt in

division Karkardooma.

0.63 FY 06-07 HT

4611 JM05UT4347 Karkardooma

Augmentation of Transformer from

630KVA to 990KVA at Surya

Niketan Substation in division

Karkardooma.

7.25 FY 06-07 HT

4612 JM05UT4348 Karkardooma

Augmentation of Transformer from

400KVA to 630KVA at Local

shopping Center rishabh vihar

Substation in division

Karkardooma.

1.37 FY 06-07 HT

4613 JM05UT4355 Karkardooma

Augmentation of Existing

Transformer 400kVA To 990 kVA

at B Block Yojana Vihar.

1.28 FY 06-07 HT

4614 JM05UT4359 Karkardooma

Augmentation transformer 400-

990 KVA at A- Block Vivek Vihar

PH 2

7.30 FY 06-07 HT

4615 JM05UT4362 Karkardooma

Augmentation of Transformer from

630KVA-990KVA at D Block

Jhilmil Colony Substation in

division Karkardooma.

7.97 FY 06-07 HT

Page 222: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

4616 JM05UT4363 Karkardooma

Augmentation of Trnasformer from

630KVA-990KVA Jhilmil Colony

Road Substation in division

Karkardooma.

7.87 FY 06-07 HT

4617 JM06AT4035 Karkardooma

Providing 100 KVA transformer

near Karkadooma store in division

Karkardooma.

0.73 FY 06-07 HT

4618 JM06FA4379 Karkardooma

Augmentation of U/G Feeder from

Saini Enclave to DDA Flat in

division Karkardooma.

40.88 FY 06-07 HT

4619 JM06LT4000 KarkardoomaLTMP work at samsanghat

division Karkadooma17.75 FY 06-07 LT

4620 JM06LT4010 KarkardoomaLT clean up job at E block Jhilmil

colony Div Karkardooma (Jhilmil).17.06 FY 06-07 LT

4621 JM06LT4036 Karkardooma

Replacement.of 4 no.LT fdrs.at

Ram ,Sahdev gali in division

Karkardooma.

9.38 FY 06-07 LT

4622 JM06LT4043 Karkardooma

Replacement. of F/Pillar Vivek

Apartment in division

Karkardooma.

1.08 FY 06-07 LT

4623 JM06LT4044 Karkardooma

Replacement of F/Pillar at

Gharonda Apartment in division

Karkardooma.

2.15 FY 06-07 LT

4624 JM06RM4001 Karkardooma

Installation of 2*4+1Way RMU at

Bhola nath nagar substation in

division Karkardooma.

16.08 FY 06-07 HT

4625 JM06RM4031 Karkardooma

Replacement of HT Panel Board

Pratap vihar in division

Karkardooma.

13.88 FY 06-07 HT

4626 JM06SH2011 Karkardooma

Shifting of main cable supplying

electric supply to District Court

Shahdara in division Karkardooma.

3.06 FY 06-07 HT

4627 JM06SH2047 Karkardooma

Dismentling of street light poles

road no 71 in division

Karkardooma.

0.457 FY 06-07 LT

4628 KN04AT4583 Krishna Nagar

Installation of additional 400KVA

transformer with Laying of 3 Nos.

LT Feeder at Double Story

Seelampur, Gandhi Nagar Distt.

Krishna Nagar.

3.72 FY 06-07 HT

4629 KN04AT4594 Krishna Nagar

To Convert 1 Ph Mains To 3 Ph at

Gali 6/7/8 & Comm Centre Road

at Dundela Chwok by providing

630 KVA Transformer in division

Krishna Nagar.

8.90 FY 06-07 HT

4630 KN04LT4593 Krishna Nagar

Estimate For Augmentation of LV

O/H Mains at Gali No. 5 & 7 New

Govind Pura Gandhi Park Sub

Station in division Krishna Nagar.

1.49 FY 06-07 LT

4631 KN04RM4609 Krishna Nagar

Installation of RMU at Radhey

puri extension-I in division Krishna

Nagar.

4.00 FY 06-07 HT

4632 KN04RM4610 Krishna Nagar

Installation of RMU at Radhey Puri

Extension Extension -II in division

Krishna Nagar.

3.99 FY 06-07 HT

4633 KN04RM4612 Krishna Nagar

Installation of RMU at GO Switch

Road No- 57 in division Krishna

Nagar.

3.95 FY 06-07 HT

4634 KN05AT4091 Krishna Nagar

Providing 630 kVA Transformer at

Mahilla Colony in division Krishna

Nagar.

2.14 FY 06-07 HT

4635 KN05AT4100 Krishna Nagar

Providing 630 kVA Transformer at

Gandhi Park New Govind Pura in

division Krishna Nagar.

1.00 FY 06-07 HT

Page 223: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

4636 KN05EL4199 Krishna Nagar

Providing 630 kVA Transformer at

Multani Mohalla, Geeta Colony in

division Krishna Nagar.

1.38 FY 06-07 LT

4637 KN05FA4002 Krishna Nagar

Augmentation of 11 kV HT Cable

3x150 mm2 PILCA to 3x300 mm2

XLPE cable from C. block.

Krishna Nagar to RLG Kahar

Singh Sub station in division

Krishna Nagar.

15.62 FY 06-07 HT

4638 KN05FA4006 Krishna Nagar

Provision of 11 kV HT cable 3x300

mm2 XLPE from switching stn to

Rani Garoad en Park Wala Sub

station in division Krishna Nagar.

6.50 FY 06-07 HT

4639 KN05FA4008 Krishna Nagar

Replace of 11 kV HT cable of size

3x300 PILCA to 3x300 mm2 XLPE

from Kailash Gridto Kothi

Bhagwan Das sub station G.

Nagar in division Krishna Nagar.

22.67 FY 06-07 HT

4640 KN05FA4009 Krishna Nagar

Augmentation of 11 kV HT Cable

3x150 mm2 PILCA to 3x300 mm2

XLPE cable from overhead road

no -57 to West Kanti Nagar Sub

station in division Krishna Nagar.

2.69 FY 06-07 HT

4641 KN05FA4010 Krishna Nagar

Augmentation of 11 kV HT Cable

3x150 mm2 PILCA to 3x300 mm2

XLPE cable from Kanti Nagar

extn Gali no-9 to raout door no 57

via Gali no-5 Kanti Nagar Extn.

10.18 FY 06-07 HT

4642 KN05FA4011 Krishna Nagar

Augmentation of 11 kV HT Cable

3x150 mm2 PILCA to 3x300 mm2

XLPE cable from 17 block. Geeta

Colony and Sarojni Park to place

at "A" in division Krishna Nagar.

6.98 FY 06-07 HT

4643 KN05FA4202 Krishna Nagar

Replacement of 3*300XLPE From

Kailash Nagar Grid in division

Krishna Nagar.

42.74 FY 06-07 HT

4644 KN05LT4027 Krishna Nagar

Replacement of LT sick cable from

Janta park s/s to Satnarayan

mandir in division Krishna Nagar.

6.78 FY 06-07 LT

4645 KN05LT4028 Krishna Nagar

Replacement of LT sick cable from

shanker nagar school blk to gali

no.7 shanker nagar extn in division

Krishna Nagar.

3.23 FY 06-07 LT

4646 KN05LT4029 Krishna Nagar

Replacement of LT sick cable from

b&d block west azad nagar to

shahdra main road in division

Krishna Nagar.

1.58 FY 06-07 LT

4647 KN05LT4030 Krishna Nagar

Replacement of LT sick cable from

bhagat singh park to gali no.8&9

west azad nagar in division

Krishna Nagar.

4.83 FY 06-07 LT

4648 KN05LT4031 Krishna Nagar

Replacement of LT sick cable from

bts multani moh. to prem gali

g.nagar in division Krishna Nagar.

1.06 FY 06-07 LT

4649 KN05LT4032 Krishna Nagar

Replacement of LT sick cable from

9 blk geeta cly to main road patel

gali in division Krishna Nagar.

1.81 FY 06-07 LT

4650 KN05LT4033 Krishna Nagar

Replacement of LT sick cable from

9 block geeta colony to main road

patel gali no.2 in division Krishna

Nagar.

3.44 FY 06-07 LT

Page 224: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

4651 KN05LT4034 Krishna Nagar

Replacement of LT sick cable from

9 block geeta colony to laxmi

cinema wali gali in division Krishna

Nagar.

2.59 FY 06-07 LT

4652 KN05LT4035 Krishna Nagar

Replacement of LT sick cable from

subhash road s/s to shambhu

nath bldg in division Krishna

Nagar.

2.72 FY 06-07 LT

4653 KN05LT4036 Krishna Nagar

Replacement of LT sick cable from

subhash road to krishna gali in

division Krishna Nagar.

1.10 FY 06-07 LT

4654 KN05LT4037 Krishna Nagar

Replacement of LT sick cable from

shiv kuti to gali no.5 ram nagar &

jain mandir gali no.3 in division

Krishna Nagar.

5.40 FY 06-07 LT

4655 KN05LT4039 Krishna Nagar

Replacement of LT Sick Cable

from Old Govindpura to Govind

pura Colony in division Krishna

nagar.

3.18 FY 06-07 LT

4656 KN05LT4043 Krishna Nagar

Replacement of LT sick cable from

gagan vihar s/s to main gate

gagan vihar pole no.19 in division

Krishna Nagar.

1.35 FY 06-07 LT

4657 KN05LT4044 Krishna Nagar

Replacement of LT Sick Cable

from Gagan Vihar extn to Gagan

Vihar colonypole no. 189 in District

Krishna Nagar

1.71 FY 06-07 LT

4658 KN05LT4045 Krishna Nagar

Taking out 3 no. LT feeders. from

proposed additional Transformer

of 630kva at ganghi park new

govind pura in division Krishna

Nagar.

2.02 FY 06-07 LT

4659 KN05LT4049 Krishna Nagar

Taking out 3 no. LT feeders with

upgradation of 630kva to 990 kva

at khureji khas in division Krishna

Nagar.

3.00 FY 06-07 LT

4660 KN05LT4051 Krishna Nagar

Taking out 3 no LT feeders with

upgradation of 400kva to 630 kva

at gagan vihar in division Krishna

Nagar.

2.45 FY 06-07 LT

4661 KN05LT4052 Krishna Nagar

Taking out 3 nobLT feeders with

upgradation of 630kva to 990 kva

at new govind pura in division

Krishna Nagar.

2.97 FY 06-07 LT

4662 KN05LT4054 Krishna Nagar

Replacement of LT sick cable from

new Krishna Nagar substation to

Ramlal Halwai Radhepuri in

division Krishna Nagar.

2.42 FY 06-07 LT

4663 KN05LT4055 Krishna Nagar

Replacement of LT cable from

School Block to Liberty Cinema in

division Krishna Nagar.

1.84 FY 06-07 LT

4664 KN05LT4056 Krishna Nagar

Replacement of LT sick cable from

Gopal Park to Gopal Park Colony

Pole No. 1327 in division Krishna

Nagar.

2.98 FY 06-07 LT

4665 KN05LT4057 Krishna Nagar

Taking out 2 No. LT feeders from

the existing Sub station Shastri

Nagar KIOSK in District Krishna

Nagar

2.12 FY 06-07 LT

4666 KN05LT4058 Krishna Nagar

Taking out 2 No. LT feeders from

the existing Sub station New

Lahore Extn (Nale Wala) pole no-

183 and pole no. 227 Pusta SDM

office in District Krishna Nagar

3.68 FY 06-07 LT

Page 225: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

4667 KN05LT4059 Krishna Nagar

Taking out 2 No. LT feeders from

the existing Sub station SWG

Switching Sub station Rani

Garoad en to pole no. 433 and

pole No. 434 17 block. Geeta

colony in District Krishna Nagar

2.60 FY 06-07 LT

4668 KN05LT4060 Krishna Nagar

Taking out 3 Nos LT Feeders from

Alok Bharti Substation to Pole no.-

3 & Pole no 29 main Road Laxmi

Nagar in division Krishna Nagar.

2.71 FY 06-07 LT

4669 KN05LT4061 Krishna Nagar

T/O 3 NO. LT Feeders from 16

Block Geeta colony I/D Substation

to Pole No 50 Sabji mandi in

division Krishna Nagar.

1.99 FY 06-07 LT

4670 KN05LT4206 Krishna Nagar

Augmentation /Replacement of

existing LV overhead mains at

main road Kailash Nagar and

Masjid wali Gali Gandhi Nagar in

division Krishna Nagar.

2.80 FY 06-07 LT

4671 KN05LT4207 Krishna Nagar

Augmentation /Replacement of

existing LV overhead mains at

mahavir gali to chander has gali,

gandhi nagar in division Krishna

Nagar.

6.07 FY 06-07 LT

4672 KN05LT4209 Krishna Nagar

Augmentation /Replacement of

existing LV overhead mains at

tagore gali, shivagi gali, pratap gali

and guru har kishan gali in division

Krishna Nagar.

2.81 FY 06-07 LT

4673 KN05LT4211 Krishna Nagar

Augmentation /Replacement of

existing LV overhead mains at Gali

No.5 to Gali No.8 Raghubar pura

in division Krishna Nagar.

2.77 FY 06-07 LT

4674 KN05LT4212 Krishna Nagar

Augmentation /Replacement of

existing LV overhead mains at Gali

No.10 to Gali No.13 Amar Mohalla

in division Krishna Nagar.

3.26 FY 06-07 LT

4675 KN05LT4218 Krishna Nagar

Replacement of LT Cable from

Gali No-8 to 9 Ajeet Nagar in

division Krishna Nagar.

1.25 FY 06-07 LT

4676 KN05LT4219 Krishna Nagar

Replacement of 1 no. LT Sick

cable of 3.5*300 mm2 XLPE cable

from Kailash nagar Kiosk to Gali

no.8 via main road Kailash Nagar

in division Krishna Nagar.

4.45 FY 06-07 LT

4677 KN05LT4239 Krishna Nagar

Augmentation of LV OH Mains in

Gandhi Nagar Sub Division,

Krishna Nagar

35.82 FY 06-07 LT

4678 KN05RM4105 Krishna Nagar

Providing. RMU at main road

Primary School in division Krishna

Nagar.

4.15 FY 06-07 HT

4679 KN05RM4107 Krishna Nagar

Providing 3 way RMU at Kaushik

Puri Nallah in division Krishna

Nagar.

4.03 FY 06-07 HT

4680 KN05RM4108 Krishna Nagar

Providing RMU at Shanti mohalla

JAL Board I/S in division Krishna

Nagar.

3.96 FY 06-07 HT

4681 KN05RM4112 Krishna Nagar

Providing 3 way RMU at DAV

School, Shahdara road in division

Krishna Nagar.

4.35 FY 06-07 HT

4682 KN05RM4114 Krishna Nagar

Providing RMU at Ram nagar

Peepal wala Peepal wala at P.S in

division Krishna Nagar.

3.90 FY 06-07 HT

4683 KN05RM4116 Krishna NagarProviding RMU at shyam Block G.

Nagar in division Krishna Nagar.3.95 FY 06-07 HT

Page 226: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

4684 KN05RM4117 Krishna Nagar

Providing 3 way RMU at Rajgarh

Mother Dairy, in division Krishna

Nagar.

4.18 FY 06-07 HT

4685 KN05RM4118 Krishna NagarProviding RMU at 2-A Block Geeta

colony in division Krishna Nagar.4.00 FY 06-07 HT

4686 KN05RM4119 Krishna Nagar

Providing 3 way RMU at 5-Block,

Geeta Colony in division Krishna

Nagar.

4.07 FY 06-07 HT

4687 KN05RM4120 Krishna NagarProviding RMU at Bhoosa Mandi

Jheel in division Krishna nagar.3.91 FY 06-07 HT

4688 KN05RM4121 Krishna NagarProviding. RMU at 11-Block Geeta

colony in division Krishna Nagar.3.95 FY 06-07 HT

4689 KN05RM4122 Krishna NagarProviding RMU at Alok Bharati in

division Krishna Nagar.3.91 FY 06-07 HT

4690 KN05RM4123 Krishna Nagar

Providing RMU at sarojini park,

Ghore tange west in division

Krishna Nagar.

4.08 FY 06-07 HT

4691 KN05RM4124 Krishna NagarProviding. RMU at 6- Block Geeta

Colony in division Krishna Nagar.3.91 FY 06-07 HT

4692 KN05RM4126 Krishna Nagar

Providing RMU at NewLlahore

munshi colony in division Krishna

Nagar.

3.96 FY 06-07 HT

4693 KN05RM4130 Krishna NagarProviding RMU at Kanti Nagar Gali

No.-5 in division Krishna Nagar.3.90 FY 06-07 HT

4694 KN05RM4133 Krishna NagarProviding RMU at Bhagat singh

park in division Krishna Nagar.3.94 FY 06-07 HT

4695 KN05RM4134 Krishna NagarProviding RMU at A-Block Krishna

nagar in division Krishna Nagar.3.90 FY 06-07 HT

4696 KN05RM4136 Krishna Nagar

Providing RMU at E-Block Krishna

nagar park in division Krishna

Nagar.

3.91 FY 06-07 HT

4697 KN05RM4137 Krishna Nagar

Providing RMU at Tanki wala East

Azad nagar in division Krishna

Nagar.

4.32 FY 06-07 HT

4698 KN05RM4141 Krishna NagarProviding RMU at D-Block Krishna

nagar in division Krishna Nagar.3.96 FY 06-07 HT

4699 KN05RM4144 Krishna NagarProviding RMU at B-Block Krishna

nagar in division Krishna Nagar.3.96 FY 06-07 HT

4700 KN05RM4146 Krishna NagarProviding RMU at Gandhi Park in

division Krishna Nagar.3.92 FY 06-07 HT

4701 KN05RM4147 Krishna NagarProviding RMU at Brijpuri in

division Krishna Nagar.3.91 FY 06-07 HT

4702 KN05RM4148 Krishna NagarProviding RMU at Jheel No-2 in

division Krishna Nagar.3.95 FY 06-07 HT

4703 KN05RM4150 Krishna NagarProviding RMU at Shastri Park in

division Krishna Nagar.3.96 FY 06-07 HT

4704 KN05RM4153 Krishna Nagar

Providing RMU at Baldev park

musical fountain in division

Krishna Nagar.

3.92 FY 06-07 HT

4705 KN05RM4154 Krishna NagarProviding RMU at Jagatpuri D-

Block in division Krishna Nagar.3.94 FY 06-07 HT

4706 KN05RM4155 Krishna NagarProviding RMU at Jagatpuri G-

Block in division Krishna Nagar.3.92 FY 06-07 HT

4707 KN05RM4156 Krishna Nagar

Providing 3 way RMU at Jagat

Puri A-block in division Krishna

Nagar.

4.12 FY 06-07 HT

4708 KN05RM4157 Krishna NagarProviding RMU at Aram Park in

division Krishna Nagar.3.90 FY 06-07 HT

4709 KN05RM4159 Krishna NagarProviding RMU at Laxmi Narayn

Mandir in division Krishna Nagar.3.91 FY 06-07 HT

4710 KN05RM4160 Krishna NagarProviding. RMU at Laxmi naryan

park in division Krishna Nagar.4.11 FY 06-07 HT

Page 227: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

4711 KN05RM4246 Krishna Nagar

Installation/Replacement of 3

Panel board with motorised RMU

with SCADA compatibility at -Gali-

6.R.Pura.2 in division Krishna

Nagar.

3.95 FY 06-07 HT

4712 KN05RM4248 Krishna Nagar

Installation/Replacement of 4

Panel Board with motorised RMU

with SCADA compatibility at -

Gurudwara.Gate.No1 in division

Krishna Nagar.

10.53 FY 06-07 HT

4713 KN05RM4249 Krishna Nagar

Installation/Replacement of 4

Panel Board with motorised RMU

with SCADA compatibility at -

West.Arjun.Nagar in division

Krishna Nagar.

7.04 FY 06-07 HT

4714 KN05RM4250 Krishna Nagar

Installation/Replacement of 7

Panel Board with Motorised RMU

with SCADA compatibility at -

Kailash.Nagar.Kiosk in division

Krishna Nagar.

17.60 FY 06-07 HT

4715 KN05RM4253 Krishna Nagar

Installation of 3 Panel board at -

Kaushik.Puri-II(Park) in division

Krishna Nagar.

3.98 FY 06-07 HT

4716 KN05RM4255 Krishna Nagar

Installation of 3 Panel Board at -

Shiv.Mandir(Phatak) S.Pur in

division Krishna Nagar.

4.02 FY 06-07 HT

4717 KN05RM4275 Krishna NagarInstallationof3W out doorRMUat

Satsang Marg -Krishna Nagar3.97 FY 06-07 HT

4718 KN05RM4276 Krishna Nagar

Installation of O/D 3 P BD at

Water Supply SS No-1 in division

Krishna Nagar.

4.06 FY 06-07 HT

4719 KN05RS4256 Krishna Nagar

Repair of fencing 11kv P/M S/STN

-Rani Garden in division Krishna

Nagar.

0.374 FY 06-07 Others

4720 KN05RS4257 Krishna NagarRepair of fencing 11kv S/STN -14

Block,in division Krishna Nagar.0.459 FY 06-07 Others

4721 KN05RS4259 Krishna Nagar

R/W 11KV S/Stn Tikona Park

Azad Nagar in division Krishna

Nagar.

0.429 FY 06-07 Others

4722 KN05RS4260 Krishna Nagar

Repair of fencing 11kv S/Stn

Chandr Park in division Krishna

Nagar.

0.447 FY 06-07 Others

4723 KN05RS4261 Krishna Nagar

Repair of fencing 11kv S/Stn

Bedi Mkt R/W in division Krishna

Nagar.

0.434 FY 06-07 Others

4724 KN05SH2240 Krishna Nagar

Shifting of Transformer at E- Block

Krishna nagar science Park in

division Krishna Nagar.

0.157 FY 06-07 HT

4725 KN05SH2263 Krishna Nagar Cbl Access. F/O Sh. Hansraj Cly. 0.016 FY 06-07 LT

4726 KN05SH2278 Krishna NagarShifting of Pole at B-5/26 Sh

Ashwani in division Krishna Nagar.0.029 FY 06-07 LT

4727 KN05SH2279 Krishna NagarShifting of pole in f/o 53 Chachhi

Building in division Krishna Nagar.0.029 FY 06-07 LT

4728 KN05SH2280 Krishna NagarShifting of pole in F/o A-5 in

division Krishna Nagar.0.049 FY 06-07 LT

4729 KN05SH2282 Krishna NagarShifting of pole f/o Sh. Kishan in

division Krishna Nagar.0.029 FY 06-07 LT

4730 KN05SH2283 Krishna NagarShifting of Pole in f/o Sh. Naresh

Malhotra in division Krishna Nagar.0.018 FY 06-07 LT

4731 KN05SH2284 Krishna NagarShifting of Pole in f/o Kanchan

Gupta in division Krishna Nagar.0.030 FY 06-07 LT

4732 KN05UT4065 Krishna Nagar

Installation of 990 KVA

Transformer at jal board Shanti

Mohalla substation in division

Krishna Nagar.

0.93 FY 06-07 HT

Page 228: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

4733 KN05UT4066 Krishna Nagar

Installation of 990 KVA

Transformer at Chameli devi

Substation in division Krishna

Nagar.

0.187 FY 06-07 HT

4734 KN05UT4074 Krishna Nagar

Installation 990 KVA Transformer

at New Govindpura (Ram Mandir)

in division Krishna Nagar.

0.181 FY 06-07 HT

4735 KN05UT4075 Krishna Nagar

Installation of 990 KVA

Transformer at Mausam vihar in

division Krishna Nagar.

0.88 FY 06-07 HT

4736 KN06EL4013 Krishna Nagar

Electrificationt of Exten. Portion of

Kaushik Puri in division Krishna

Nagar.

9.61 FY 06-07 LT

4737 KN06RM4000 Krishna Nagar

Installation of 3 Way at Public

School Opposite P.Stn G. Nagar

in division Krishna Nagar.

4.14 FY 06-07 HT

4738 KN06RM4003 Krishna Nagar

Installation of 3 Way at Ajait Ngr.

Gate No. 8 in division Krishna

Nagar.

3.97 FY 06-07 HT

4739 KN06RM4142 Krishna Nagar

Providing RMU at E block , Lajpat

Rai Chowk in division Krishna

Nagar.

3.91 FY 06-07 HT

4740 KN06RM4143 Krishna Nagar

Providing RMU at K Block

substation in division Krishna

nagar

3.95 FY 06-07 HT

4741 KN06SH2028 Krishna NagarShifting of Pole in F/O Sh J.C

Kapoor in division karawal Nagar.0.060 FY 06-07 LT

4742 KN06SH2032 Krishna Nagar

Shifting of Pole in F/O Sh Guryas

Mohammad in division karawal

Nagar.

0.022 FY 06-07 LT

4743 KN06SH2033 Krishna NagarShufting of pole in F/O Sh Garja

Ram in division karawal Nagar.0.024 FY 06-07 LT

4744 KW04FA4004 Karawal Nagar

Augmentation of HT 11 kV cable

3*150 sq.mm. PILCA to 3*300

sq.mm XLPE cable between

khajoori red ligHT Kiosk to A

Block Sonia Vihar in division

karawal Nagar.

56.89 FY 06-07 HT

4745 KW04FA4008 Karawal Nagar

To Provided the interconnecter

between B- Block Sonia Vihar to

C, D Block Sonia Vihar in division

karawal Nagar.

17.80 FY 06-07 HT

4746 KW04FA4009 Karawal Nagar

Replacement 11 kV. HT cable in

Between overhead Feeder Karawal

Nagar Road to Guzzar Mohalla

Johari Pur in division karawal

Nagar.

3.99 FY 06-07 HT

4747 KW04FA4010 Karawal Nagar

Extsisting HT cable from Johari

Pur Nala D.P. to old Mustafabad

Gali no.3 Sub station in division

karawal Nagar.

30.22 FY 06-07 HT

4748 KW04RM4069 Karawal Nagar

Replacement of existing RMU to

new RMU Govind Vihar in division

karawal Nagar.

4.73 FY 06-07 HT

4749 KW04RM4070 Karawal Nagar

Replacement of existing RMU to

new 3 way RMU Chandu Nagar

in division karawal Nagar.

4.44 FY 06-07 HT

4750 KW04RM4071 Karawal Nagar

Replacement of existing RMU to

new 3 way RMU B-1 Nehru

Vihar in division karawal Nagar.

4.06 FY 06-07 HT

4751 KW04RM4074 Karawal Nagar

Replacement of existing RMU to

new 3 way RMU B-block ,Brij

puri,in division karawal Nagar.

4.06 FY 06-07 HT

4752 KW04RM4075 Karawal Nagar

Replacement of existing RMU to

new 3 way RMU C-block ,Brij

puri, in division karawal Nagar.

4.44 FY 06-07 HT

Page 229: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

4753 KW04RM4076 Karawal Nagar

Replacement of existing RMU to

new 3 way RMU Babu Nagar, in

division karawal Nagar.

4.47 FY 06-07 HT

4754 KW04RM4083 Karawal Nagar

Replacement of existing old 7panel

board to new seven panel board

at Moonga Ngr.No.1 in division

karawal Nagar.

14.58 FY 06-07 HT

4755 KW04RM4084 Karawal Nagar

Replacement of 5pannel board

make RBL to seven Panel board at

Gokulour Dispensary in division

karawal Nagar.

13.93 FY 06-07 HT

4756 KW05EL4096 Karawal NagarElectrification of Subzi Mandi,

Gokulpuri1.90 FY 06-07 LT

4757 KW05EL4109 Karawal NagarElectrification of D,Gand H Block

Mustafabad,Near Noor Masjid61.13 FY 06-07 LT

4758 KW05EL4114 Karawal Nagar

Electrification of Rajeev Gandhi

Gali No. 22.5 and 14.5 in division

karawal Nagar.

1.97 FY 06-07 LT

4759 KW05EL4115 Karawal NagarElectrification of Part of Nehru

Vihar in division karawal Nagar.6.81 FY 06-07 LT

4760 KW05EL4116 Karawal NagarElectrification of Part of Karawal

Nagar 7.52 FY 06-07 LT

4761 KW05EL4117 Karawal NagarElectrification of Part of Sadatpur

in division karawal Nagar.7.37 FY 06-07 LT

4762 KW05EL4118 Karawal Nagar

Electrification of Mukund Vihar

near Ankur Vihar in division

karawal Nagar.

3.63 FY 06-07 LT

4763 KW05EL4119 Karawal NagarElectrification of of Part of Jawahar

Nagar in division karawal Nagar.3.21 FY 06-07 LT

4764 KW05EL4120 Karawal NagarElectrification of of C Block Brijpuri

in division karawal Nagar.4.61 FY 06-07 LT

4765 KW05EL4122 Karawal Nagar

Replacement of LT Overhead

With LT AB Cable at Abcd Chand

Bagh in division karawal Nagar.

22.50 FY 06-07 LT

4766 KW05EL4126 Karawal Nagar

Replacement of LT Overhead To

LT AB at Chand Bagh F Block in

division karawal Nagar.

16.00 FY 06-07 LT

4767 KW05LT4038 Karawal Nagar

Replacement/ Augmentation of LT

overhead Conductor at Ganag

Vihar Gokul Puri, Johri Pur,

Mustafabad, Jawahar Nagar in

division karawal Nagar.

4.71 FY 06-07 LT

4768 KW05LT4103 Karawal NagarLTMP work at Akbari masjid at

karawal Nagar10.77 FY 06-07 LT

4769 KW05LT4104 Karawal NagarLVDS work at Sampat nagar Div

Karawal Nagar8.96 FY 06-07 LT

4770 KW05LT4106 Karawal NagarLVDS work at Mansing nagar div

Karawal Nagar17.29 FY 06-07 LT

4771 KW05NF4016 Karawal Nagar

Providing New HT feeder from

Ghonda Gridto Johari Pur School

(Traning Center ) in division

karawal Nagar.

4.17 FY 06-07 HT

4772 KW05RM4112 Karawal Nagar

Installation/Replacement of 3

Panel Board with motorised RMU

with SCADA compatibility at -

A.block.Brijpuri in division karawal

Nagar.

7.10 FY 06-07 HT

4773 KW05RM4113 Karawal Nagar

Installation/Replacement of 3

Panel Board with motorised RMU

with SCADA compatibility at -

Shiv.Vihar.Phase1 in division

karawal Nagar.

4.18 FY 06-07 HT

Page 230: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

4774 KW05RM4127 Karawal Nagar

Inst of 3 Way O/D RMU at Tunda

Nagar no 1 in division karawal

Nagar.

4.12 FY 06-07 HT

4775 KW05SL4097 Karawal Nagar

Estimate of Providing of Street

light For Sonia Vihar Pusta in

division karawal Nagar.

4.67 FY 06-07 LT

4776 KW06JJ4506 Karawal Nagar

Electrification. of D&E Block. Sri

Ram Colony in division karawal

Nagar.

66.56 FY 06-07 LT

4777 KW06LT4507 Karawal Nagar

Replacement of O/H Conductor

into LT AB Cable at Gali No.-1 to

10 Old Mustafabad Karawal Nagar

division.

21.13 FY 06-07 LT

4778 KY04EL3574 KCC Schemes

Electrification (630KVA T/F)of

LSC Mandawali Fazalpur near

Natraj CGHS I.P Extension.

19.13 FY 06-07 HT

4779 KY04LA2530 KCC Schemes

Additional load of 1048.53 KW

(P&L) under LIP category making

total load of 1418.91 (P&L)

Director Institute of Human

Behaviour ,Dilshad Garden, Delhi

68.58 FY 06-07 HT

4780 KY04LA2561 KCC Schemes Additional Load in F/O D.G. ESIC 5.97 FY 06-07 HT

4781 KY04NC2502 KCC SchemesAdditional Load in F/O NC-II TYR

BPS Nand Nagri24.99 FY 06-07 HT

4782 KY04NC2524 KCC SchemesNew Connection For 200 Beded

Hospital Ad8.76 FY 06-07 HT

4783 KY04NC2550 KCC SchemesProviding new load of 2290.72

KW in f/o MTNL,JNU Marg29.67 FY 06-07 HT

4784 KY05EL2048 KCC SchemesSachdeva and Buildcon, plot -17

KKD13.93 FY 06-07 LT

4785 KY05EL2057 KCC SchemesElectrification at I.P.Extension

,MAYFAIR APPT.10.58 FY 06-07 HT

4786 KY05LA2006 KCC SchemesLA of 270 kW making Total 350

kW favour of LNG23.02 FY 06-07 LT

4787 KY05LA2032 KCC SchemesAvdut Swami Metal Works , New

Delhi7.14 FY 06-07 HT

4788 KY05LA2050 KCC Schemes

Load addition in favour of of

105kW in favour of Sohan, 6/18

Kb

1.36 FY 06-07 LT

4789 KY05LA2073 KCC Schemes

Load addition in favour of 33kWin

favour of

Sheetalmercantile,FIE,Patpar Ganj

5.60 FY 06-07 HT

4790 KY05LA2075 KCC Schemes

Load addition in favour of 40kW

in favour of Chander Abha,

485A/11A,

0.369 FY 06-07 LT

4791 KY05LA2078 KCC Schemes

Load addition in favour of 38kW

Total88kW in favour of Prabat

Aggarwal,

0.411 FY 06-07 LT

4792 KY05LA2088 KCC SchemesLoad addition in favour of

Principal Shaheed Rajguru0.52 FY 06-07 LT

4793 KY05LA4037 KCC SchemesLA of 250 KW in front of Div

Electrificationt. Engg,0.58 FY 06-07 HT

4794 KY05LT2081 KCC SchemesNew connection 120KW IN F/O

Social Health1.99 FY 06-07 LT

4795 KY05NC2008 KCC SchemesNew Connection of 615.7kW in

favour of Stp II Yamuna Vihar30.27 FY 06-07 HT

4796 KY05NC2033 KCC SchemesProviding New Connection at 9D

CBD Aggarwal Sub station.9.20 FY 06-07 HT

4797 KY05NC2035 KCC SchemesProviding New Connection of

155.41 kW in favour of DSSB7.43 FY 06-07 HT

4798 KY05NC2041 KCC SchemesProviding New Connection of 150

kW in favour of Dilbagh Rai3.92 FY 06-07 HT

4799 KY05NC2051 KCC SchemesNew Connection of 150kW in

favour ofamarjit Singh,7A/10,Kb3.14 FY 06-07 LT

4800 KY05NC2069 KCC Schemes

New Connection 1250kW in

favour of Gahoi Buildwell, Laxmi

Nagar

6.33 FY 06-07 HT

Page 231: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

4801 KY05NC2070 KCC SchemesProviding New Connection of

3.75kW at Ambedkar Park0.142 FY 06-07 LT

4802 KY05NC2071 KCC SchemesProviding New Connection of

15kW at Cbd Ground Shadra0.159 FY 06-07 LT

4803 KY05NC2077 KCC Schemes

Providing New Connection of

2.4kW Ea For 28 Sites of

Highmast

8.52 FY 06-07 LT

4804 KY05NC2083 KCC SchemesNew Load of 30kW in favour of

Ex. Eng0.63 FY 06-07 LT

4805 KY05NC2084 KCC SchemesConversionersion of OH to UG at

conn'g rd of Gita Colony0.416 FY 06-07 LT

4806 KY05NC2085 KCC SchemesNew Load addition of 18.90KW in

favour of Ex Engg0.094 FY 06-07 LT

4807 KY05NC2086 KCC SchemesNew load addition of 12KW in

favour of MTNL CDMA0.51 FY 06-07 LT

4808 KY05NC4082 KCC SchemesNew connection of 150KW in f/o

Shakti kiran bldg kkd1.14 FY 06-07 LT

4809 KY06EL2004 KCC Schemes Parmesh construction 15.45 FY 06-07 HT

4810 KY06EL2005 KCC SchemesElecectrification of 400 KW jindal

boichem15.29 FY 06-07 HT

4811 KY06EL2009 KCC SchemesElectrification of Rishab

Buildcon(P)7.49 FY 06-07 HT

4812 KY06EL2022 KCC Schemes

Electrification of M/S Nipun

Builders Developers ( P ) Ltd., Plot

No-15, CC, LSC Market ,

Karkardooma, Delhi

18.68 FY 06-07 LT

4813 KY06LA2000 KCC SchemesLoad addition of 145.79kw in

favour of EE(E)ED12,CPWD0.494 FY 06-07 LT

4814 KY06LA2003 KCC SchemesLoad addition Amalg tot load of

65kwat P&T,8A/34 KB0.343 FY 06-07 LT

4815 KY06LA2007 KCC SchemesLoad addition Amalg tot load of

65kwat P&T,8A/34 KB0.374 FY 06-07 LT

4816 KY06LA2011 KCC SchemesAdditional load of 137 KW in

favour of SBI0.60 FY 06-07 LT

4817 KY06LA2036 KCC SchemesLoad Addition in front of SDM,

Kashmere Gate2.04 FY 06-07 LT

4818 KY06LA2038 KCC Schemes Load Addition in f/o Jai Jawan 1.08 FY 06-07 LT

4819 KY06LA2040 KCC Schemes

Load Addition in f/o

RSG.Packaging Oberai

Compound

8.62 FY 06-07 HT

4820 KY06LA2046 KCC SchemesLoad Addition in f/o Sunrise Auto

Works PPG BS40541.18 FY 06-07 HT

4821 KY06LA4039 KCC SchemesLoad Addition of total load of

795.46KW in f/o GNEC0.428 FY 06-07 LT

4822 KY06LA4044 KCC SchemesLoad Addition of total load. of

2422.27KW in f/o GGSU0.56 FY 06-07 HT

4823 KY06MS2034 KCC SchemesShifting of services in front of

Anand hospital.0.60 FY 06-07 LT

4824 KY06NC2001 KCC Schemes

Providing New Load of 11KW

under NDLT category on LT

system of Supply at Ashok Nagar

0.141 FY 06-07 LT

4825 KY06NC2010 KCC SchemesNew Load addition of 55KW in

favour of Krishna0.365 FY 06-07 LT

4826 KY06NC2012 KCC SchemesNew Load addition of 90KW in

favour of GAIL0.428 FY 06-07 LT

4827 KY06NC2015 KCC SchemesNew Connection in front of MCD

Harijan Basti School0.400 FY 06-07 LT

4828 KY06NC2016 KCC Schemes New load of 10KW in f/o IGL 1.72 FY 06-07 LT

4829 KY06NC2019 KCC SchemesNew load of 11KW in f/o

A.E(E&M), DJB0.241 FY 06-07 LT

4830 KY06NC2020 KCC SchemesNew load of 11KW in front of

A.E(E&M), DJB0.425 FY 06-07 LT

4831 KY06NC2026 KCC SchemesInstallation of MC in f/o aggarwal

Ass.0.063 FY 06-07 HT

4832 KY06NC2028 KCC SchemesInstallation of MC in f/o Gohai

buildwell0.063 FY 06-07 HT

4833 KY06NC2035 KCC SchemesNew Connection in front of

Mahatta Towers Pvts Ltd.7.54 FY 06-07 HT

4834 KY06NC2037 KCC SchemesNew connection for Streetlight at

Chilla Regulator2.86 FY 06-07 HT

Page 232: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

4835 KY06NC2048 KCC SchemesNew connection for Centurian

Bank,Jhandewalan1.41 FY 06-07 LT

4836 KY06NC2049 KCC SchemesNew Connection for Tube well at

Sat Nagar,KarolBagh0.76 FY 06-07 LT

4837 KY06NC2050 KCC SchemesNew connection for Krishna

Mohan (p) Ltd.(delite)1.33 FY 06-07 LT

4838 KY06NC2051 KCC SchemesNew connection for AE MCD Rose

Garden0.76 FY 06-07 LT

4839 KY06NC2059 KCC SchemesNew Connection for MCD

Samaspur 3.49KW0.51 FY 06-07 LT

4840 KY06NC2060 KCC SchemesNew Connection for MCD Mayur

Vihar-2 ,18.59KW0.439 FY 06-07 LT

4841 KY06NC2061 KCC Schemes

For Providing Temporary

Connection of 60Kwon LT

category to DMRC Shakarpur

1.14 FY 06-07 LT

4842 KY06NC2062 KCC Schemes

New connection of 44.7KW in f/o

Commissioner Transport

Authority, Plot No. 7 CBD Ground

Suraj mal Vihar

0.73 FY 06-07 LT

4843 KY06SH2025 KCC SchemesShifting of services in f/o

Hindustan Foil ltd.0.098 FY 06-07 LT

4844 LN04EL2657 Laxmi Nagar

Electrification FIE Patparganj

Industrial area in division Laxmi

Nagar.

8.70 FY 06-07 HT

4845 LN04EL2N016 Laxmi NagarElectrification of LOP of Village

Gazipur in division Laxmi Nagar.0.058 FY 06-07 LT

4846 LN04FA4544 Laxmi Nagar

Augumentation of 11KV Rainy well

feeder of size 3*150 sq. mm. to

3*300 sq. mm. cable Zone-2503 in

division Laxmi Nagar.

29.46 FY 06-07 HT

4847 LN04FA4632 Laxmi Nagar

Augmentation of PILCA cable at

Joshi colony to tripole sub station

in division Laxmi Nagar.

4.11 FY 06-07 HT

4848 LN04LT4518 Laxmi Nagar

Taking out 4 No. LT Feeder from

"E" Blk. GNPN Comp. S/Stn. To

B,D & E Blk. in GNPN complex in

division Laxmi Nagar.

7.92 FY 06-07 LT

4849 LN04LT4653 Laxmi Nagar

Taking out 2 nos LT Feeder from

Transformer of Subzi Mandi

mandawali in division Laxmi

Nagar.

2.77 FY 06-07 LT

4850 LN04LT4773 Laxmi Nagar

Providing LT feeder from Exis. sub

station to exis. Feeder pillars from

sub stationNo. 18 industrial Area

Patparganj in division Laxmi

Nagar.

6.22 FY 06-07 LT

4851 LN04LT4774 Laxmi Nagar

Providing LT feeder from Exis. sub

station to exis. Feeder pillars from

sub stationNo. 17 industrial Area

Patparganj in division Laxmi

Nagar.

1.67 FY 06-07 LT

4852 LN04LT4775 Laxmi Nagar

Providing LT feeder from Exis. sub

station to exis. Feeder pillars from

sub stationNo. 5 industrial Area

Patparganj in division Laxmi

Nagar.

1.86 FY 06-07 LT

4853 LN04LT4776 Laxmi Nagar

Providing LT feeder from Exis. sub

station to exis. Feeder pillars from

sub stationNo. 15 industrial Area

Patparganj in division Laxmi

Nagar.

4.38 FY 06-07 LT

4854 LN04LT4778 Laxmi Nagar

Providing LT feeder from Exis. sub

station to exis. Feeder pillars from

sub stationNo. 13 industrial Area

Patparganj in division Laxmi

Nagar.

10.04 FY 06-07 LT

Page 233: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

4855 LN04LT4779 Laxmi Nagar

Providing LT feeder from Exis. sub

station to exis. Feeder pillars from

sub stationNo. 19 industrial Area

Patparganj in division Laxmi

Nagar.

2.01 FY 06-07 LT

4856 LN04LT4781 Laxmi Nagar

Providing LT feeder from Exis. sub

station to exis. Feeder pillars from

sub stationNo. 11 industrial Area

Patparganj in division Laxmi

Nagar.

1.28 FY 06-07 LT

4857 LN04LT4783 Laxmi Nagar

Providing LT feeder from Exis. sub

station to exis. Feeder pillars from

sub stationNo. 9 industrial Area

Patparganj in division Laxmi

Nagar.

11.79 FY 06-07 LT

4858 LN04LT4784 Laxmi Nagar

Providing LT feeder from Exis. sub

station to exis. Feeder pillars from

sub stationNo. 6 industrial Area

Patparganj in division Laxmi

Nagar.

3.20 FY 06-07 LT

4859 LN04NF4598 Laxmi Nagar

Providing of 11kV HT Feed From

New Proposed 33kV/11kV

GridSub Station. at Shakarpur

GridTo Pwd Sub Station in division

Laxmi Nagar.

11.03 FY 06-07 HT

4860 LN04NF4601 Laxmi Nagar

Providing Of 11KV Feed From

New Proposed Shakarpur Grid To

Shiromani S/Stn in division Laxmi

Nagar.

30.68 FY 06-07 HT

4861 LN04NF4733 Laxmi Nagar

Providing HT feed from GH I Grid

to pole mounted Sub Station

opposite Saraswati Kunj West

Vinod Nagar in division Laxmi

Nagar.

23.63 FY 06-07 HT

4862 LN04NF4764 Laxmi Nagar

Providing HT 11 KV XLPE cable

between GH I Grid to Sub Station

No. 12 CGHS in division Laxmi

Nagar.

31.21 FY 06-07 HT

4863 LN04RM4654 Laxmi Nagar

Replacement of 5 Panel Board To

7 Panel Board at C-Block Preet

Vihar in division Laxmi Nagar.

12.60 FY 06-07 HT

4864 LN04RM4716 Laxmi Nagar

Replacement Of 11Kv Rmu With

4 Panel Board At B Block

Mandawali in division Laxmi

Nagar.

0.61 FY 06-07 HT

4865 LN04RM4717 Laxmi Nagar

Replacement of 7 Panel Board On

4 Panel Board D Block Pandav

Nagar in division Laxmi Nagar.

15.33 FY 06-07 HT

4866 LN04RM4725 Laxmi Nagar

Providing RMU in Place of Go

Switch at Uncheypur plinth

mounted Sub Station mandawali

in division Laxmi Nagar.

4.12 FY 06-07 HT

4867 LN04RM4734 Laxmi Nagar

Replacement of 7 Panel Board at

Primary School Mandawali in

division Laxmi Nagar.

17.73 FY 06-07 HT

4868 LN04RM4742 Laxmi Nagar

Replacement of HT 11 KV RMU at

Post Renny Well No. P-3 in

division Laxmi Nagar.

5.39 FY 06-07 HT

4869 LN04UT4661 Laxmi Nagar

Augmentation OF 630-990 KVA

transformer at joshi colony in

division Laxmi Nagar.

6.72 FY 06-07 HT

4870 LN05EL4231 Laxmi NagarElectrification of Soniya Camp

(Urja Vihar) Distt. Laxmi Nagar1.83 FY 06-07 LT

4871 LN05EL4274 Laxmi Nagar

Electrification of L.O.P of E-Blk

Ganesh Ngr. Pandav Ngr,

Complex in division Laxmi Nagar.

2.06 FY 06-07 LT

Page 234: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

4872 LN05EL4275 Laxmi NagarElectrification of Kashyap Farm

Shakarpur in division Laxmi Nagar.1.19 FY 06-07 LT

4873 LN05EL4276 Laxmi Nagar

Electrification of L.O.P of Chander

Vihar, Mandawali in division Laxmi

Nagar.

1.38 FY 06-07 LT

4874 LN05EL4277 Laxmi Nagar

Material List for Electrification of

L.O.P of WB-Blk, Shakarpur in

division Laxmi Nagar.

2.50 FY 06-07 LT

4875 LN05FA4001 Laxmi Nagar

Augmentation of 150 Sq.M.M.

Pilca Cable To 300 Sq.M.M. XLPE

Cable Primary To Post office

Mandawali in division Laxmi

Nagar.

9.21 FY 06-07 HT

4876 LN05FA4008 Laxmi Nagar

Augmentation11kV Cable

150Sqmm To 300Sqmm From D

Block West Vinout Door Nagar To

Overhead Mandawali in division

Laxmi Nagar.

8.49 FY 06-07 HT

4877 LN05FA4010 Laxmi Nagar

Augmentation11kV Cab 150

Mmsq To 300Mmsq XLPE From E

Block West Vinod Nagar To A

Block West Vinod Nagar in

division Laxmi Nagar.

10.08 FY 06-07 HT

4878 LN05FA4016 Laxmi Nagar

Replacement of Mother Dairy HT

11 kV Overhead Feeder From

Ganesh Chowk To S Block

Pandav Nagar in division Laxmi

Nagar.

15.03 FY 06-07 HT

4879 LN05FA4019 Laxmi Nagar

Augmentation of 3X150 Sq.M.M.

Pilca Cable To 3X300 Sq.M.M.

XLPE at Nehru Enclave To Chetan

Jain Marg, Shakarpur in division

Laxmi Nagar.

6.85 FY 06-07 HT

4880 LN05FA4032 Laxmi Nagar

Augmentation/Replacement of

PILCA cable with XLPE 3x300

sq..m.m.between GaneshNagar

overhead Feeder to C.block

GaneshNagar Complex

7.48 FY 06-07 HT

4881 LN05FA4035 Laxmi Nagar

Augmentation of existing 11KV

PILCA Cable 3*150 SQ. MM. to

3*300 XLPE Cable at Sub-station

No-2 B block Mandawali in division

Laxmi Nagar.

10.02 FY 06-07 HT

4882 LN05JJ4301 Laxmi Nagar

Electrification of JJ Cluster

Ganesh Nagar in division Laxmi

Nagar.

0.349 FY 06-07 LT

4883 LN05JJ4302 Laxmi Nagar

Electrification of JJ Cluster Indra

Camp Near Kishen Kunj in division

Laxmi Nagar.

4.85 FY 06-07 LT

4884 LN05JJ4303 Laxmi NagarElectrification of JJ indra Camp Pt

1 Hasanpur Laxmi Nagar2.48 FY 06-07 LT

4885 LN05JJ4304 Laxmi NagarElectrification of JJ indra Camp Pt

2 Hasanpur Laxmi Nagar1.80 FY 06-07 LT

4886 LN05JJ4312 Laxmi Nagar

Electrification of JJ Cluster at

Ravidas Camp Pandav Nagar in

division Laxmi Nagar.

1.53 FY 06-07 LT

4887 LN05LT4061 Laxmi Nagar

Augmentation of LV Overhead

Conductor at Madhu Vihar Sub

Station. No. 1 and 2 in division

Laxmi Nagar.

4.81 FY 06-07 LT

4888 LN05LT4071 Laxmi Nagar

Augmentation of Squirrel

Conductor into DOG Conductor at

D Block Vikas Marg Khatta (Gali

No. 3 To 6) in division Laxmi

Nagar.

2.97 FY 06-07 LT

Page 235: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

4889 LN05LT4072 Laxmi Nagar

Augmentation of Squirrel

Conductor into DOG Conduct at

Pwd Kiosk Lalita Park (Main

Road) in division Laxmi Nagar.

1.01 FY 06-07 LT

4890 LN05LT4082 Laxmi Nagar

Laying of 6 Nos, LT Feeders of

size 3.5*300 MM2 XLPE from

substation to D-576,D-146A,D-

112,D-60 in division Laxmi Nagar.

12.23 FY 06-07 LT

4891 LN05LT4087 Laxmi Nagar

Laying of LT Feeder of size

3.5*300 XLPE from substation in

division Laxmi Nagar.

2.94 FY 06-07 LT

4892 LN05LT4088 Laxmi Nagar

Laying of LT Feeder of size

3.5*300 XLPE from Allah Colony

Sub-station in division Laxmi

Nagar.

2.26 FY 06-07 LT

4893 LN05LT4089 Laxmi Nagar

Laying of 2 Nos, LT Feeders of

size 3.5*300 SQ MM XLPE from

Primary School Substation in

division Laxmi Nagar.

5.61 FY 06-07 LT

4894 LN05LT4090 Laxmi Nagar

Laying of LT feeder 3.5*300

XLPE from khatt substation No. 3

in division Laxmi Nagar.

4.16 FY 06-07 LT

4895 LN05LT4093 Laxmi Nagar

Laying of LT feeder 3.5*300 XLPE

from Dispensary Substation in

division Laxmi Nagar.

4.22 FY 06-07 LT

4896 LN05LT4095 Laxmi Nagar

Laying of Additional. ( 2Nos.)

3.5X300 Sq.M.M. Cable From

Uttari School Block-1 To Harijan

Basti in division Laxmi Nagar.

3.92 FY 06-07 LT

4897 LN05LT4096 Laxmi Nagar

Laying of LT Feeder 3.5*300

XLPE from B Block Mandawali

Substation in division Laxmi

Nagar.

1.65 FY 06-07 LT

4898 LN05LT4097 Laxmi Nagar

Laying of LT feeder 3.5*300

XLPE substation No. 9 to Joshi

colony in division Laxmi Nagar.

4.91 FY 06-07 LT

4899 LN05LT4098 Laxmi Nagar

Laying of 3 Nos, LT Feeders of

size 3.5*300 MM2 XLPE from

Gazipur near Temple in division

Laxmi Nagar.

4.93 FY 06-07 LT

4900 LN05LT4099 Laxmi Nagar

Laying of 3 Nos, LT Feeders of

size 3.5*300MM2 XLPE from

Gazipur School in division Laxmi

Nagar.

6.63 FY 06-07 LT

4901 LN05LT4100 Laxmi Nagar

Laying of LT Feeder 3.5*300

XLPE from Madhu Vihar Sub-

station No- 1 in division Laxmi

Nagar.

6.30 FY 06-07 LT

4902 LN05LT4110 Laxmi Nagar

Laying of LT feeder 3.5*300 XLPE

from Baba Mandir substation in

division Laxmi Nagar.

4.62 FY 06-07 LT

4903 LN05LT4111 Laxmi Nagar

Laying of LT feeders of size

3.5*300 SQ MM XLPE from

Railway Colony tp Saket Colony in

division Laxmi Nagar.

3.52 FY 06-07 LT

4904 LN05LT4220 Laxmi Nagar

Replacement of Feeder Piller Type

A and B and Service Piller in IP

Extn in division Laxmi Nagar.

34.58 FY 06-07 LT

4905 LN05LT4247 Laxmi Nagar

Laying of 4 Nos. LT Feeders

From Kuldeep Nursing Home To

Guru Ram Das Nagar in division

Laxmi Nagar.

48.22 FY 06-07 LT

Page 236: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

4906 LN05LT4248 Laxmi Nagar

Estimate of For Taking Out Three

Nos L T Feeder

3.5X300SqmmXLPE From

Existing Sub Station Dda Flat

Nirman Vihar To D Ayanand Vihar

Shakar Pur in division Laxmi

Nagar.

8.18 FY 06-07 LT

4907 LN05LT4269 Laxmi NagarLVDS work at Gazipur Village,near

school in division Laxmi Nagar.24.65 FY 06-07 LT

4908 LN05LT4271 Laxmi Nagar

Installation of LT Dist board at

Kallol Apartment in division Laxmi

Nagar.

2.00 FY 06-07 LT

4909 LN05LT4299 Laxmi NagarLVDS work at Bada Hasanpur in

division Laxmi Nagar.5.10 FY 06-07 LT

4910 LN05NF4038 Laxmi Nagar

Providing HT 11KV XLPE CBL

3*300 from C Block Substation in

division Laxmi Nagar.

5.60 FY 06-07 HT

4911 LN05NF4267 Laxmi Nagar

Providing HT feed to substation -

10 patparganj industrial area in

division Laxmi Nagar.

3.86 FY 06-07 HT

4912 LN05RM4172 Laxmi Nagar

Replacement of RMU With 4

Panel at Madhu Vihar Sub Station.

No. 2 in division Laxmi Nagar.

7.20 FY 06-07 HT

4913 LN05RM4185 Laxmi Nagar

PROVOSION OF HT 11KV,SF-

6,RMU AT GAZIPUR NEAR

TEMPLE IN D-LNR

4.11 FY 06-07 HT

4914 LN05RM4193 Laxmi Nagar

Replacement of existing HT 11kV,

RMU+1 Panel board with new 4

panel board at Renny well no. V-

11. D-LNR

6.67 FY 06-07 HT

4915 LN05RM4198 Laxmi Nagar

Replacement of RMU With 4

Panel at CBSE,Preet Vihar in

division Laxmi Nagar.

4.56 FY 06-07 HT

4916 LN05RM4201 Laxmi Nagar

Replacement of RMU with 3 Panel

at Anand Hospital in division

Laxmi Nagar.

4.42 FY 06-07 HT

4917 LN05RM4202 Laxmi Nagar

Conversion of DP into RMU at Ek

Minar Masjid Lalita Park in division

Laxmi Nagar.

4.16 FY 06-07 HT

4918 LN05RM4204 Laxmi Nagar

RMU at DP of incoming Ganesh

Nagar Complex Feeder of

Outgoing From Patpar Ganj Grid

in division Laxmi Nagar.

4.20 FY 06-07 HT

4919 LN05RM4291 Laxmi Nagar

Installation/Replacement of 4

Panel Board with motorised RMU

with SCADA compatibility at -

SS.9.FIE.PPG in division Laxmi

Nagar.

8.55 FY 06-07 HT

4920 LN05RM4293 Laxmi Nagar

Installation/Replacement of 7

Panel Board with Motorised RMU

with SCADA compatibility at -

Sanjay.Park.Kiosk.SS in division

Laxmi Nagar.

17.46 FY 06-07 HT

4921 LN05RM4300 Laxmi Nagar

Replacement of 4 PANEL Board

with RMU at SS No. 9 IP Ext. in

division Laxmi Nagar.

7.40 FY 06-07 HT

4922 LN05RM4314 Laxmi Nagar

Installation 2*4 Way RMU at

Substation No.-5 in division Laxmi

Nagar.

15.26 FY 06-07 HT

4923 LN05RM4316 Laxmi Nagar

Installation of 4 Way ID RMU at

Kamyani Kunj Substation in

division Laxmi Nagar.

7.93 FY 06-07 HT

4924 LN05RS4298 Laxmi NagarCon. new plinth & reap. at Anar

Maszid in division Laxmi Nagar.0.187 FY 06-07 Others

4925 LN05SH2311 Laxmi Nagar

Shifting of 100KVA Pole Mounted

Tr. Installed at service road of

Road no. 57 in division Laxmi

Nagar.

0.261 FY 06-07 HT

Page 237: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

4926 LN05SH4306 Laxmi Nagar

Shifting of Sub station No. 3 FIE

industrial Area Patpar Ganj in

division Laxmi Nagar.

19.62 FY 06-07 LT

4927 LN05SS4227 Laxmi Nagar

Providing 2 Nos 630 kVA

Transformer in Place of 1No.

Transformer at Neelkanth CGHS

23.39 FY 06-07 HT

4928 LN05UT4115 Laxmi Nagar

Augmentation of Transformer 400

kVA To 630 kVA Kishan Kunj

Extn. Part-II in division Laxmi

Nagar.

1.85 FY 06-07 HT

4929 LN05UT4122 Laxmi Nagar

Augmentation of Transformer No.

1 at Bharty Colony Sub Station

From 630 To 990 kVA

Transformer in division Laxmi

Nagar.

0.83 FY 06-07 HT

4930 LN05UT4146 Laxmi Nagar

Augmentation of Transformer630

To 990 West Vinout Door Nagar

Transformerno.1, Mangalam in

division Laxmi Nagar.

6.48 FY 06-07 HT

4931 LN06AT4035 Laxmi Nagar

Additional 630 Kva transformer at

Lalita Park SS in division Laxmi

Nagar.

1.80 FY 06-07 HT

4932 LN06CV4043 Laxmi NagarRsg. fencing & floor at Veer

Sarvarkar in division Laxmi Nagar.0.253 FY 06-07 Others

4933 LN06CV4124 Laxmi Nagar

Rpg &rsg. fencing Allah colony

Mandawali in division Laxmi

Nagar.

0.324 FY 06-07 Others

4934 LN06EL2214 Laxmi Nagar

Electrification of a Pocket near

Plato Public School, I.P. Extension

for providing connection to Mother

Teresa Church from S/Stn. No. 16

, CGHS Patparganj, in division

Laxmi Nagar.

3.76 FY 06-07 LT

4935 LN06LT4037 Laxmi Nagar

Taking out 2 LT feeders from

Jagat ram park-J 33 in division

Laxmi Nagar.

4.17 FY 06-07 LT

4936 LN06LT4094 Laxmi Nagar

Laying of LT Cable from C Vihar to

A-47 C.Vihar in division Laxmi

Nagar.

6.54 FY 06-07 LT

4937 LN06RM4002 Laxmi Nagar

Installation of 4 Way RMU at

Neekanth Apptt in division Laxmi

Nagar.

6.74 FY 06-07 HT

4938 LN06RM4005 Laxmi Nagar

Installation. of 4 Way RMU at

Himversha in division Laxmi

Nagar.

6.72 FY 06-07 HT

4939 LN06RM4006 Laxmi Nagar

Installation of 4 Way RMU at Azad

Apartment substation-3 in division

Laxmi Nagar.

7.23 FY 06-07 HT

4940 LN06RM4007 Laxmi Nagar

Installation of 4 Way RMU at New

Rajdhani Enclave in division Laxmi

Nagar.

7.11 FY 06-07 HT

4941 LN06RM4008 Laxmi Nagar

Installation of 4+1 Way RMU at G-

1, Preet Vihar in division Laxmi

Nagar.

10.16 FY 06-07 HT

4942 LN06RM4009 Laxmi Nagar

Installation of 2*4+1 Way RMU at

Lalita Park in division Laxmi

Nagar.

17.67 FY 06-07 HT

4943 LN06RM4010 Laxmi Nagar

Installation of 2*4+2 Way RMU at

B-Block Preet Vihar in division

Laxmi Nagar.

21.23 FY 06-07 HT

4944 LN06RM4011 Laxmi NagarInstallation of 3 Way RMU at CNG

Pump in division Laxmi Nagar.4.15 FY 06-07 HT

4945 LN06RM4164 Laxmi Nagar

Providing of 11KV,SF-6,RMU at

Guru Ramdas Nagar Substation in

division Laxmi Nagar.

6.93 FY 06-07 HT

Page 238: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

4946 LN06RM4177 Laxmi Nagar

Providing of 11KV,SF-6,RMU at

master Block Shakarpur in division

Laxmi Nagar.

3.99 FY 06-07 HT

4947 LN06RM4196 Laxmi Nagar

Replacement of existing HT

11KV,RMU with new 4 panel

board at Madhu Vihar in division

Laxmi Nagar.

7.20 FY 06-07 HT

4948 LN06RM4313 Laxmi Nagar

Installation of 3*4 Way RMU at PD

Vihar Substation in division Laxmi

Nagar.

26.87 FY 06-07 HT

4949 LN06SH2012 Laxmi Nagar

Shifting of pole from drain-RUB

madhuban in division Laxmi

Nagar.

0.170 FY 06-07 LT

4950 LN06SH2026 Laxmi Nagar

Dismentalling of PCC Pole at

Road No. 56 in division Laxmi

Nagar.

0.200 FY 06-07 LT

4951 M305AT4038 Mayur Vihar Ph-3

Installation of additional

Transformer of 630 kVA at C 5

New Ashok Nagar in division

Mayur Vihar Ph-3.

1.45 FY 06-07 HT

4952 M305AT4039 Mayur Vihar Ph-3

Installation of additional

Transformer of 630 kVA at A

block sub station NO 7 New

Ashok Nagar in division Mayur

Vihar Ph-3.

1.91 FY 06-07 HT

4953 M305AT4041 Mayur Vihar Ph-3

Installation of additional

Transformer of 630 kVA at sub

station NO 2 A 1 in division Mayur

Vihar Ph-3.

2.07 FY 06-07 HT

4954 M305EL4102 Mayur Vihar Ph-3 Electrification of Gharoli Village

Extension Mayur Vihar Phase -37.25 FY 06-07 LT

4955 M305EL4103 Mayur Vihar Ph-3

Electrification of B Block Harijan

Basti Kondli Mayur Vihar Phase -

3

13.61 FY 06-07 LT

4956 M305EL4104 Mayur Vihar Ph-3

Electrification of main market

Village Dallupura in division Mayur

Vihar Ph-3.

1.21 FY 06-07 LT

4957 M305LT4010 Mayur Vihar Ph-3

Taking out New 3 NOS LT Feeder

of size 3.1/2 X300 mm sq XLPE at

Rajveer colony A block sub station

in division Mayur Vihar Ph-3.

6.34 FY 06-07 LT

4958 M305LT4011 Mayur Vihar Ph-3

Taking out New 3 NOS LT Feeder

of size 3.1/2 X300 mm sq XLPE

from Rajveer Colony B block sub

station in division Mayur Vihar Ph-

3.

8.12 FY 06-07 LT

4959 M305LT4018 Mayur Vihar Ph-3

Taking out New 2 NOs LT Feeder

of size 3.1/2 X300 mm sq XLPE at

Vill Dalllupura in division Mayur

Vihar Ph-3.

3.15 FY 06-07 LT

4960 M305LT4020 Mayur Vihar Ph-3

Taking out New LT Feeder of size

3.1/2 X300 mm sq XLPE from B

block New Ashok Nagar sub

station in division Mayur Vihar Ph-

3.

3.65 FY 06-07 LT

4961 M305LT4021 Mayur Vihar Ph-3

Augmentation of LV overhead

Conductor Village Gharoli in

division Mayur Vihar Ph-3.

2.89 FY 06-07 LT

4962 M305LT4027 Mayur Vihar Ph-3

Augmentation of LV overhead

Conductor A block New Ashok

Nagar in division Mayur Vihar Ph-

3.

2.92 FY 06-07 LT

4963 M305LT4069 Mayur Vihar Ph-3

Taking out 2 NOS LT Feeders at

B-1, New Ashok Nagar in division

Mayur Vihar Ph-3.

5.72 FY 06-07 LT

4964 M305LT4071 Mayur Vihar Ph-3

Taking out 2 NOS LT Feeders at

Sabji mandi harijan basti Mayur

Vihar III

5.98 FY 06-07 LT

Page 239: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

4965 M305LT4072 Mayur Vihar Ph-3

Taking out 1 NO LT feeders at

primary school kondli in division

Mayur Vihar Ph-3.

1.27 FY 06-07 LT

4966 M305LT4074 Mayur Vihar Ph-3

Taking out 2 NOS LT Feeders at

A-block, New Ashok Nagar sub

station-7 in division Mayur Vihar

Ph-3.

6.38 FY 06-07 LT

4967 M305NF4009 Mayur Vihar Ph-3

Laying of HT 11 kV feeder 3C x

300 sq.mm XLPE cable from sub

station No 9 Vasundhara Enclave

to sub station No 1 New Ashok

Nagar in division Mayur Vihar Ph-

3.

29.61 FY 06-07 HT

4968 M305RM4048 Mayur Vihar Ph-3

Replacement of 4 Panel Board at

sub station B- 2 in division Mayur

Vihar Ph-3.

4.38 FY 06-07 HT

4969 M305RM4051 Mayur Vihar Ph-3

Replacement of 10 Panel Board

at sub station A 1 in division

Mayur Vihar Ph-3.

20.95 FY 06-07 HT

4970 M305RM4052 Mayur Vihar Ph-3

Replacement of 4 Panel Board at

GDF sub station in division Mayur

Vihar Ph-3.

4.36 FY 06-07 HT

4971 M305RM4054 Mayur Vihar Ph-3

Replacement of 4 panel board at

substation E-2 N Ashok Nagar in

division Mayur Vihar Ph-3.

6.41 FY 06-07 HT

4972 M305RM4055 Mayur Vihar Ph-3

Replacement of 4 Panel board at

sub station NO 8 East end

apartment vasundhra enclave in

division Mayur Vihar Ph-3.

6.63 FY 06-07 HT

4973 M305RM4056 Mayur Vihar Ph-3

Replacement of 5 Panel board at

sub station NO 7 East end

apartment vasundhra enclave in

division Mayur Vihar Ph-3.

10.25 FY 06-07 HT

4974 M305RM4059 Mayur Vihar Ph-3

Replacement of 7 panel board at

substation 5 mix housing mayur

vihar in division Mayur Vihar Ph-3.

13.39 FY 06-07 HT

4975 M305RM4060 Mayur Vihar Ph-3

Replacement of 4 panel board at

substation 4 in division Mayur

Vihar Ph-3.

6.82 FY 06-07 HT

4976 M305RM4067 Mayur Vihar Ph-3

Replacement of 4 panel board at B-

8 paryatan vihar substation in

division Mayur Vihar Ph-3.

6.66 FY 06-07 HT

4977 M305RM4098 Mayur Vihar Ph-3

Installation/Replacement of 4

Panel Board with motorised RMU

with SCADA compatibility at -SS

8.Mix.Housing in division Mayur

Vihar Ph-3.

6.87 FY 06-07 HT

4978 M305RM4099 Mayur Vihar Ph-3

Installation/Replacement of 4

Panel Board with motorised RMU

with SCADA compatibility at -

Delux.SS1 in division Mayur Vihar

Ph-3.

6.87 FY 06-07 HT

4979 M305SL4105 Mayur Vihar Ph-3

Provision of Street Lighting at

Chilla Dallupura in division Mayur

Vihar Ph-3.

8.01 FY 06-07 LT

4980 M305UT4036 Mayur Vihar Ph-3

Augmentation of 400-630 kVA

Transformer at Primary school

village kondli in division Mayur

Vihar Ph-3.

0.162 FY 06-07 HT

4981 M305UT4077 Mayur Vihar Ph-3

Replacement of 630kVA oil type to

630kVA dry type transformer at B-

1 Neeraj coperative housing

society in division Mayur Vihar Ph-

3.

23.56 FY 06-07 HT

4982 M306LT4518 Mayur Vihar Ph-3 LTMP scheme of village Kondli

Mayur Vihar Ph-328.06 FY 06-07 LT

4983 M306SH2574 Mayur Vihar Ph-3

Shifting of HT cable at S/s no 1

Vasundhara Enclave in division

Mayur Vihar Ph-3.

0.83 FY 06-07 HT

Page 240: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

4984 M306SL2515 Mayur Vihar Ph-3 Providing of St. Ltg. On road near

Khandelwal Auto in Div MVR-31.48 FY 06-07 LT

4985 M306SS4531 Mayur Vihar Ph-3

Replacement of oil type

Transformer 630 into Dry type at

Diplomatic CGHS in division

Mayur Vihar Ph-3.

11.43 FY 06-07 LT

4986 MV04AT4726Mayur Vihar Ph-

1&2

Providing Additional Transformer.

630 KVA And Taking out 4 LT

Feeders at 7 Blk Trilokpuri.

8.23 FY 06-07 HT

4987 MV04FA4511Mayur Vihar Ph-

1&2

Augmentation of 11KV 3X150mm2

PILCA To 3X300 mm2 XLPE

From S/Stn No 2. To S/Stn No 1

Pkt-4 S/Stn Via DDA Pump House

Mayur Vihar

8.21 FY 06-07 HT

4988 MV04LT4562Mayur Vihar Ph-

1&2

Taking out 1 number of LT

feeders of size 3.5X300 MM2

XLPE from 1000 KVA sub station

for electrification of L.O.P. at B -

block New Ashok Nagar.

2.68 FY 06-07 LT

4989 MV04RM4676Mayur Vihar Ph-

1&2

Providing 11 KV RMU at Street

light DP No. 3 Noida Road3.98 FY 06-07 HT

4990 MV04RM4682Mayur Vihar Ph-

1&2

Providing 11 KV RMU AT

BHARAT PETROLEUM PKT 4 P4.23 FY 06-07 HT

4991 MV04RM4685Mayur Vihar Ph-

1&2

Providing 11 KV RMU at DP near

red light Gazipur in division Mayur

Vihar Ph-1&2.

4.13 FY 06-07 HT

4992 MV04RM4691Mayur Vihar Ph-

1&2

Providing 11 KV RMU at DP 32

Block Trilokpuri in division Mayur

Vihar Ph-1&2.

3.92 FY 06-07 HT

4993 MV04RM4692Mayur Vihar Ph-

1&2

Providing 11 KV RMU at DP 10

Block Trilokpuri in division Mayur

Vihar Ph-1&2.

3.91 FY 06-07 HT

4994 MV04RM4694Mayur Vihar Ph-

1&2

Providing 11 kV RMU at street

lighting DP No. 2 NOIDA Road in

division Mayur Vihar Ph-1&2.

4.20 FY 06-07 HT

4995 MV04RM4695Mayur Vihar Ph-

1&2

Providing 11 KV RMU at DP J

Block East Vinod nagar in division

Mayur Vihar Ph-1&2.

4.15 FY 06-07 HT

4996 MV04RM4696Mayur Vihar Ph-

1&2

Providing 11 KV RMU at DP G

Block East Vinod nagar in division

Mayur Vihar Ph-1&2.

3.93 FY 06-07 HT

4997 MV04RM4697Mayur Vihar Ph-

1&2

Providing 11 KV RMU at

Khichripuri village in division

Mayur Vihar Ph-1&2.

4.00 FY 06-07 HT

4998 MV04RM4701Mayur Vihar Ph-

1&2

Providing 11 kV RMU at 30 Extra

Trilokpuri substation in division

Mayur Vihar Ph-1&2.

4.09 FY 06-07 HT

4999 MV04RM4704Mayur Vihar Ph-

1&2

Providing 11 KV RMU at Chilla

Village Substation No-. 3 in

division Mayur Vihar Ph-1&2.

3.90 FY 06-07 HT

5000 MV04RM4705Mayur Vihar Ph-

1&2

Providing 11 KV RMU at Chilla

Village Substation No-. 4 in

division Mayur Vihar Ph-1&2.

4.04 FY 06-07 HT

5001 MV04RM4708Mayur Vihar Ph-

1&2

Providing 11 kV RMU at DP B

block Rajveer colony in division

Mayur Vihar Ph-1&2.

6.06 FY 06-07 HT

5002 MV04RM4710Mayur Vihar Ph-

1&2

Providing 11 KV RMU at Kondli

village panchayat ghar in division

Mayur Vihar Ph-1&2.

0.226 FY 06-07 HT

5003 MV04RM4714Mayur Vihar Ph-

1&2

Providing 4 panel board at 17

Block Kalyanpuri in division Mayur

Vihar Ph-1&2.

3.99 FY 06-07 HT

5004 MV04RM4715Mayur Vihar Ph-

1&2

Providing 4 Panel Board at

Samaspur Village in division

Mayur Vihar Ph-1&2.

4.28 FY 06-07 HT

Page 241: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

5005 MV04RM4718Mayur Vihar Ph-

1&2

Providing 11 KV RMU at south of

Lake near Bharat Petrolium in

division Mayur Vihar Ph-1&2.

3.78 FY 06-07 HT

5006 MV04RM4719Mayur Vihar Ph-

1&2

Providing 11 KV Panel Board at

NOIDA Road T point in division

Mayur Vihar Ph-1&2.

3.91 FY 06-07 HT

5007 MV04RM4720Mayur Vihar Ph-

1&2

Providing 11 KV RMU at Pratap

Nagar in division Mayur Vihar Ph-

1&2.

3.90 FY 06-07 HT

5008 MV04RM4750Mayur Vihar Ph-

1&2

Providing 3 Way RMU at Old

Khiripuri Colony 10 Block Mayur

Vihar Ph-1 & 2.

3.97 FY 06-07 HT

5009 MV05EL2161Mayur Vihar Ph-

1&2

Electrification of Quarter for

Kharkas near Live Stock Market at

Gazipur Shahdara South Zone in

division Mayur Vihar Ph-1&2.

14.22 FY 06-07 HT

5010 MV05EL2186Mayur Vihar Ph-

1&2

Electrification of OCF at Pocket B

Mayur Vihar Ph213.06 FY 06-07 HT

5011 MV05EL4192Mayur Vihar Ph-

1&2

Electrification of 31 TrilokPuri

Extra Mayur Vihar Phase -1 in

division Mayur Vihar Ph-1&2.

10.51 FY 06-07 LT

5012 MV05FA4009Mayur Vihar Ph-

1&2

Aug. of 11KV HT PLICA Cable

with XLPE size 3x300mm2 from

S/Stn No.1 CGHS PH-1 to S/Stn

8 pkt 1 in division Mayur Vihar Ph-

1&2.

39.55 FY 06-07 HT

5013 MV05FA4013Mayur Vihar Ph-

1&2

Augmentation . of 3x150 PILCA

Cable with 3x300 XLPE from Sub

station B pocket - II to Sub station

A pocket - II in division Mayur

Vihar Ph-1&2.

7.93 FY 06-07 HT

5014 MV05FA4016Mayur Vihar Ph-

1&2

Augmentation of 3x150 PILCA

Cable with 3x300 XLPE from

Switching Sub station no. 8 pocket

- I Mayur Vihar to L.S.C Trilok

Puri in division Mayur Vihar Ph-

1&2.

7.20 FY 06-07 HT

5015 MV05FA4020Mayur Vihar Ph-

1&2

Augmentation of 3x150 PILCA

Cable with 3x300 XLPE from Sub

station No. 2 pocket - I Mayur

Vihar to Sub station No. 3 pocket -

I Mayur Vihar

8.91 FY 06-07 HT

5016 MV05FA4021Mayur Vihar Ph-

1&2

Augmentation of 3x150 PILCA

Cable with 3x300 XLPE from Sub

station No. 3 pocket - I Mayur

Vihar to Switching Sub station no.

8 pocket - I Mayur Vihar

7.40 FY 06-07 HT

5017 MV05FA4024Mayur Vihar Ph-

1&2

Augmentation of 3x150 PILCA

Cable with 3x300 XLPE from Old

Wire Lesub stationto sub station

no 4 pocket - 4 Mayur Vihar in

division Mayur Vihar Ph-1&2.

22.29 FY 06-07 HT

5018 MV05FA4031Mayur Vihar Ph-

1&2

Replacement of 3x300 PILCA

Cable with 3x300 XLPE from Sub

station No. 2 Pkt -1 Mayur Vihar

to Fine Home CGHS in division

Mayur Vihar Ph-1&2.

8.76 FY 06-07 HT

5019 MV05FA4036Mayur Vihar Ph-

1&2

Replacement of 3x300 PILCA

Cable with 3x300 XLPE from D

Block Anand Lok to Adarsh

Mohalla Patparganj in division

Mayur Vihar Ph-1&2.

24.90 FY 06-07 HT

Page 242: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

5020 MV05FA4041Mayur Vihar Ph-

1&2

Replacement of 3x300 PILCA

Cable with 3x300 XLPE from

Switching Sub station no. 8 pocket

- I Mayur Vihar to Sub station No.

1 pocket - 4 Mayur Vihar Mayur

Vihar Ph-1&2.

21.89 FY 06-07 HT

5021 MV05JJ4193Mayur Vihar Ph-

1&2

Electrification of 9 to 12 block

Trilokpuri T Camp Mayur Vihar

Phase -1 Mayur Vihar Ph-1&2.

11.10 FY 06-07 LT

5022 MV05JJ4194Mayur Vihar Ph-

1&2

Electrification of DDA market 26

block TKP and JJ Clusters Mayur

Vihar Ph-1&2.

2.95 FY 06-07 LT

5023 MV05LT4087Mayur Vihar Ph-

1&2

Taking out 2 Nos LT Feeder from

1000 KVA Sub-station 31

Trilokpuri Mayur Vihar Ph-1&2.

2.94 FY 06-07 LT

5024 MV05LT4089Mayur Vihar Ph-

1&2

Taking out 2 Nos LT Feeder from

630 KVA S/S DDA,Trilokpuri

Mayur Vihar Ph-1&2.

2.74 FY 06-07 LT

5025 MV05LT4090Mayur Vihar Ph-

1&2

Taking out 2 Nos LT Feeder from

2X990 KVA Trilokpuri 26 block

Mayur Vihar Ph-1&2.

4.24 FY 06-07 LT

5026 MV05LT4098Mayur Vihar Ph-

1&2

Taking out 2 Nos LT Feeders at

Patparanj Bus Stand Sub-station

Mayur Vihar Ph-1&2.

2.27 FY 06-07 LT

5027 MV05RM4150Mayur Vihar Ph-

1&2

Replacement of HT 4 Panel at Sub

station No. 1 pocket - A Mayur

Vihar Ph-1&2.

7.00 FY 06-07 HT

5028 MV05RM4188Mayur Vihar Ph-

1&2

Installation of 3 Panel board at -

8a.block.Khichripur Mayur Vihar

Ph-1&2.

3.95 FY 06-07 HT

5029 MV05RM4195Mayur Vihar Ph-

1&2

Installation of 3 Way out door

RMU at 2 block Trilokpuri Mayur

Vihar Ph-1&2.

3.94 FY 06-07 HT

5030 MV05RS4180Mayur Vihar Ph-

1&2

P/F Fencing around 11kv P/M at

BLK-2 Mayur Vihar Ph-1&2.0.313 FY 06-07 Others

5031 MV05RS4181Mayur Vihar Ph-

1&2

Repair & Maintenance S/Stn -2A,

Khichripur colony Mayur Vihar Ph-

1&2.

0.75 FY 06-07 Others

5032 MV05RS4182Mayur Vihar Ph-

1&2

Repair & Maintenance S/Stn -7 at

Pkt-1 Acharya Nikaten Mayur

Vihar Ph-1&2.

0.63 FY 06-07 Others

5033 MV05RS4183Mayur Vihar Ph-

1&2

Prov. fencing plinth & rep. at 30-

Blk Mayur Vihar Ph-1&2.0.57 FY 06-07 Others

5034 MV05RS4184Mayur Vihar Ph-

1&2

Repair & Maintenance S/Stn -2 at

Pandav Nagar Mayur Vihar Ph-

1&2.

0.78 FY 06-07 Others

5035 MV05RS4185Mayur Vihar Ph-

1&2

Repair & Maintenance of

Patparganj Kiosk Mayur Vihar Ph-

1&2.

0.83 FY 06-07 Others

5036 MV05SH4162Mayur Vihar Ph-

1&2

Shifting of existing LT cables

3.5*300 sq mm and feeder pillar in

plot no, 4 Mayur Vihar Ph-1&2.

0.60 FY 06-07 LT

5037 MV06EL2530Mayur Vihar Ph-

1&2

Electrification LSC plot no 7 in

division Mayur Vihar Ph-1&2.0.090 FY 06-07 LT

5038 MV06LT4017Mayur Vihar Ph-

1&2

Conversion of LT Overhead

Conductor into LTAB cable at 16

block Trilokpuri in division Mayur

Vihar Ph-1&2.

13.08 FY 06-07 LT

5039 MV06LT4020Mayur Vihar Ph-

1&2

Conversion of LT Overhead

Conductor into LTAB cable at 24

block Tirlok puri in division Mayur

Vihar Ph-1&2.

9.21 FY 06-07 LT

5040 MV06LT4021Mayur Vihar Ph-

1&2

Conversion of LT Overhead

Conductor into LTAB cable at 26

block Tirlok puri in division Mayur

Vihar Ph-1&2.

16.64 FY 06-07 LT

Page 243: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

5041 MV06LT4024Mayur Vihar Ph-

1&2

Conversion of LT Overhead

Conductor into LTAB cable at 30

extension Block Tirlok puri in

division Mayur Vihar Ph-1&2.

14.45 FY 06-07 LT

5042 MV06LT4025Mayur Vihar Ph-

1&2

Conversion of LT Overhead

Conductor into LTAB cable at 35

block Tirlok puri in division Mayur

Vihar Ph-1&2.

3.79 FY 06-07 LT

5043 MV06LT4027Mayur Vihar Ph-

1&2

Conversion of LT Overhead

Conductor into LTAB cable at 30

Block Tirlok puri in division Mayur

Vihar Ph-1&2.

7.87 FY 06-07 LT

5044 MV06LT4039Mayur Vihar Ph-

1&2

Conversion of LT Overhead

Conductor into LTAB cable at 15

Block Tirlok puri in division Mayur

Vihar Ph-1&2.

10.52 FY 06-07 LT

5045 MV06LT4043Mayur Vihar Ph-

1&2

Conversion of LT Overhead

Conductor into LTAB cable at 21

Block Tirlok puri in division Mayur

Vihar Ph-1&2.

17.10 FY 06-07 LT

5046 MV06LT4046Mayur Vihar Ph-

1&2

Conversion of LT Overhead

Conductor into LTAB cable at 27

Block Tirlok puri in division Mayur

Vihar Ph-1&2.

15.26 FY 06-07 LT

5047 MV06LT4047Mayur Vihar Ph-

1&2

Conversion of LT Overhead

Conductor into LTAB cable at 28

Block Tirlok puri in division Mayur

Vihar Ph-1&2.

18.82 FY 06-07 LT

5048 MV06LT4049Mayur Vihar Ph-

1&2

Conversion of LT Overhead

Conductor into LTAB cable at 32

Block Tirlok puri in division Mayur

Vihar Ph-1&2.

19.89 FY 06-07 LT

5049 MV06LT4050Mayur Vihar Ph-

1&2

Conversion of LT Overhead

Conductor into LTAB cable at 33

Block Tirlok puri in division Mayur

Vihar Ph-1&2.

12.60 FY 06-07 LT

5050 MV06LT4051Mayur Vihar Ph-

1&2

Conversion of LT Overhead

Conductor into LTAB cable at 34

Block Tirlok puri in division Mayur

Vihar Ph-1&2.

18.68 FY 06-07 LT

5051 MV06LT4053Mayur Vihar Ph-

1&2

Conversion of LT Overhead

Conductor into LTAB cable at 36

Block Tirlok puri in division Mayur

Vihar Ph-1&2.

12.08 FY 06-07 LT

5052 MV06LT4063Mayur Vihar Ph-

1&2

Conversion of LT Overhead

Conductor into LTAB cable at

Khichripur village in division Mayur

Vihar Ph-1&2.

20.68 FY 06-07 LT

5053 MV06LT4078Mayur Vihar Ph-

1&2

Conversion of LT Overhead

Conductor into LTAB cable at

BCE Block GZP in division Mayur

Vihar Ph-1&2.

30.12 FY 06-07 LT

5054 MV06LT4079Mayur Vihar Ph-

1&2

Conversion of LT Overhead

Conductor into LTAB cable at D

Block Gazipur in division Mayur

Vihar Ph-1&2.

14.48 FY 06-07 LT

5055 MV06ML2134Mayur Vihar Ph-

1&2

Providing of St. Light point at

Pocket –V Mayur Vihar in division

Mayur Vihar Ph-1&2.

2.02 FY 06-07 LT

5056 MV06SL2127Mayur Vihar Ph-

1&2

Providing Street light at river side

club road in division Mayur Vihar

Ph-1&2.

1.45 FY 06-07 LT

5057 NN04FA4508 Nand Nagri

Augmentation of HT 11 KV U/G

PILCA cable size 3 x 150 sq mm

into 3 x 300 sq mm between

existing SS Durga Puri & O/H

Chanderlok in division Nand Nagri.

4.41 FY 06-07 HT

Page 244: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

5058 NN04RM3542 Nand Nagri

Installation of 2 RMUs + 2 single

Panel Board (extensible) instead of

damaged 7 Panel Board at Nathu

Colony Kiosk SS in division Nand

Nagri.

19.14 FY 06-07 HT

5059 NN04RM4565 Nand Nagri

Providing RMU at D Block Lalita

mandir Ashok nagar in division

Nand Nagri.

4.11 FY 06-07 HT

5060 NN04RM4566 Nand Nagri

Providing RMU at D 1 Block

Ashok nagar in division Nand

Nagri.

4.70 FY 06-07 HT

5061 NN04RM4567 Nand Nagri

Providing 4 PN BD at E Block

Ashok nagar CMM Centre in

division Nand Nagri.

4.40 FY 06-07 HT

5062 NN04RM4568 Nand NagriProviding RMU at Durga puri extra

substation in division Nand Nagri.4.24 FY 06-07 HT

5063 NN05EL4121 Nand NagriElectrification of LOP at Kardam

Puri Vistar in division Nand Nagri.2.43 FY 06-07 LT

5064 NN05EL4122 Nand NagriElectrificationect. LOP at West

Jyoti Nagar in division Nand Nagri.2.66 FY 06-07 LT

5065 NN05EL4123 Nand Nagri

Electrification of LOP at Sudama

Puri Near Gurudwara in division

Nand Nagri.

1.11 FY 06-07 LT

5066 NN05EL4124 Nand Nagri

Electrification of LOP at A block

and D block Kabeer Nagar in

division Nand Nagri.

1.07 FY 06-07 LT

5067 NN05EL4125 Nand Nagri

Electrification of LOP at Gali No

2and 9 C block Kabeer Nagar in

division Nand Nagri.

2.69 FY 06-07 LT

5068 NN05EL4128 Nand Nagri

Electrification of GOKUL PUR

A,B,C&D BLOCK,in division Nand

Nagri.

11.76 FY 06-07 LT

5069 NN05FA4002 Nand Nagri

Augmentation of 11kV HT under

ground PILCA cable 3X150 into

3X300 XLPE between F-1 Sub

station. Sunder Nagari to H-Block

Sunder Nagari in division Nand

Nagri.

7.61 FY 06-07 HT

5070 NN05FA4007 Nand Nagri

Augmentation of 11kV HT under

ground PILCA cable 3X150 into

3X300 XLPE between Weavers

Complex Sub station. to 'O' Block

Sub station in division Nand Nagri.

17.91 FY 06-07 HT

5071 NN05FA4011 Nand Nagri

Aug. of 11KV HT U/G PILCA

cable 3X150 into 3X300 XLPE

between East Jyoti Nagar

S/Stn.to Durga Puri Extn. S/Stn in

division Nand Nagri.

4.36 FY 06-07 HT

5072 NN05FA4014 Nand Nagri

Augmentation of 11kV HT under

ground 3X300 PILCA into 3X300

XLPE cable between Bhagirathi

Grid to Babarpur Kabristan Sub

station in division Nand Nagri.

70.55 FY 06-07 HT

5073 NN05FA4023 Nand Nagri

Providing AB conductor Between

Durga Puri Chowk to Nathu

Colony Sub station.

14.62 FY 06-07 HT

5074 NN05FA4024 Nand Nagri

Prov. AB conductor Between

Gokal Pur Kiost to Durga puri

Chowk

32.84 FY 06-07 HT

5075 NN05JJ4133 Nand NagriElectrification of JJ Cluster at

Kachi Pura,in division Nand Nagri.2.09 FY 06-07 LT

5076 NN05JJ4134 Nand NagriElectrification of JJ Cluster at D-3

Block,in division Nand Nagri.2.01 FY 06-07 LT

Page 245: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

5077 NN05JJ4437 Nand NagriElectrification of JJ Cluster at D-2-

Block, in division Nand Nagri.3.37 FY 06-07 LT

5078 NN05JJ4438 Nand Nagri

Electrification of JJ Cluster at

Sunder Nagari F- Block, in division

Nand Nagri.

8.20 FY 06-07 LT

5079 NN05LT4037 Nand Nagri

Taking out 5 no feeders of size

3.5x300 mm sq from newly

proposed 630 kVA transformer at

Ambedkar Park Sub station in

division Nand Nagri.

7.88 FY 06-07 LT

5080 NN05LT4038 Nand Nagri

Taking out 3 no LT feeders of size

3.5x300 mm sq from Newly

proposed 400kVA Transformer at

Jagjivan Nagar. Sub station in

division Nand Nagri.

5.34 FY 06-07 LT

5081 NN05LT4040 Nand Nagri

Taking out 2 no LT feeders of size

3.5x300 mm sq from proposed

Augmentation of Transformer

From 400 kVA to 630 kVA at

Chander Lok Sub station in

division Nand Nagri.

3.62 FY 06-07 LT

5082 NN05LT4048 Nand Nagri

Taking out 2 no LT feeders of size

3.5x300 mm sq from proposed

Augmentation of Transformer

From 630 kVA to 990 kVA at East

Jyoti Nagar Sub station in division

Nand Nagri.

4.59 FY 06-07 LT

5083 NN05LT4050 Nand Nagri

T/O 4 no Lt feeders of size

3.5x300 mm sq from proposed

augmentation of Tr. From 630KVA

to 990KVA at Mandoli Extn. S/Stn.

No.1 G.No.9 in division Nand

Nagri.

7.85 FY 06-07 LT

5084 NN05LT4053 Nand Nagri

T/O 3 no Lt feedrs of size 3.5x300

mm sq from Newly proposed 630

kva transformer at kabrishtan

Kabeer Nagar in division Nand

Nagri.

8.59 FY 06-07 LT

5085 NN05LT4108 Nand NagriElectrification of LOP,Shani Bazar

,K A road in division Nand Nagri.7.16 FY 06-07 LT

5086 NN05LT4109 Nand NagriElectrification of LOP,at Kabir

nagar in division Nand Nagri.9.15 FY 06-07 LT

5087 NN05NF4031 Nand Nagri

Providing new 11KV Feeder from

66KV Loni Road Grid to Primary

School East Gokulpur via MCD in

division Nand Nagri.

24.17 FY 06-07 HT

5088 NN05NF4032 Nand Nagri

Providing inter connector between

Pocket C Sub-Station GTB

Enclave -4 Sub-Station in division

Nand Nagri.

6.83 FY 06-07 HT

5089 NN05NF4034 Nand Nagri

Interlink cable of size 3x300 mm2

XLPE from Gokal pur village

Nehar wala Sub station to

Gokalpur village Sub station near

petrol pump in division Nand

Nagri.

8.40 FY 06-07 HT

5090 NN05NF4036 Nand Nagri

Providing Interconnector between

H Block sub station to Sunder

Nagri via L Block Safai Karamchari

Sunder Nagri with a Single Panel

Board at H BLOCK sub station in

division Nand Nagri.

11.93 FY 06-07 HT

5091 NN05RM4076 Nand NagriTo Reduce Beakdown & Restore

Time & Flexibility4.60 FY 06-07 HT

Page 246: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

5092 NN05RM4081 Nand Nagri Prov. Of RMU at Sudamapuri

S/Stn. No.2 in division Nand Nagri.4.22 FY 06-07 HT

5093 NN05RM4085 Nand NagriProviding RMU at New Kardam

puri in division Nand Nagri.5.94 FY 06-07 HT

5094 NN05RM4089 Nand Nagri

Providing RMU at village Mandoli

substation No. II in division Nand

Nagri.

4.87 FY 06-07 HT

5095 NN05RM4090 Nand Nagri

Providing RMU at village Mandoli

substation No. 4 in division Nand

Nagri.

4.86 FY 06-07 HT

5096 NN05RM4091 Nand Nagri

Providing RMU at Melaram farm

house substation in division Nand

Nagri.

3.96 FY 06-07 HT

5097 NN05RM4094 Nand NagriProviding RMU at E-1 substation

Nand nagri in division Nand Nagri.4.16 FY 06-07 HT

5098 NN05RM4095 Nand NagriProviding RMU at A-1 substation

Nand nagri in division Nand Nagri.4.68 FY 06-07 HT

5099 NN05RM4102 Nand Nagri

Installation of 5 panel board at

Badarpur village Kiosk in division

Nand Nagri.

8.54 FY 06-07 HT

5100 NN05RM4105 Nand Nagri

Replacement 4 panel board at

pocket F substation No. 2 in

division Nand Nagri.

4.65 FY 06-07 HT

5101 NN05RM4116 Nand Nagri

Installation of 1 No. 4 Panel board

of 11 kV sub stationat Durgapuri

Gali No. 10 in division Nand Nagri.

6.85 FY 06-07 HT

5102 NN05RM4117 Nand Nagri

Installation of 1 No. 4 Panel board

of 11 kV sub stationat Gokalpur

Chowk in division Nand Nagri.

7.08 FY 06-07 HT

5103 NN05RM4127 Nand Nagri

Installation of 3 way Motorised

RMU at Kabeer Nagar, A Blk in

division Nand Nagri.

4.23 FY 06-07 HT

5104 NN05RM4128 Nand Nagri

Installation/Replacement of 4

Panel Board with motorised RMU

with SCADA compatibility at -

Ashok.Nagar.B.block.SS in

division Nand Nagri.

10.74 FY 06-07 HT

5105 NN05RM4129 Nand Nagri

Installation/Replacement of 8

Panel Board with Motorised RMU

with SCADA compatibility at -

East.of.Loni.Road.Flats.SS in

division Nand Nagri.

15.14 FY 06-07 HT

5106 NN05RM4130 Nand Nagri

Installation of 3 Panel Board at -

Raghbir.Singh.Garden.SS in

division Nand Nagri.

4.00 FY 06-07 HT

5107 NN05RM4131 Nand Nagri

Installation of 3 Panel Board at -

Kardam.Puri.Gali.8 in division

Nand Nagri.

4.12 FY 06-07 HT

5108 NN05RM4132 Nand NagriInst of 3 W OD RMU at Pkt C LIG

in division Nand Nagri.4.44 FY 06-07 HT

5109 NN05UT4058 Nand Nagri

Augmentation of 630 kVA

Transformerinto 990kVA

Transformer Kardam puri Extn.

Sub station in division Nand Nagri.

7.61 FY 06-07 HT

5110 NN05UT4059 Nand Nagri

Aug. of 630 KVA Tr.into 990KVA

Tr. At East Jyoti Nagar S/Stn in

division Nand Nagri.

7.71 FY 06-07 HT

5111 NN05UT4060 Nand Nagri

Aug. of 630 KVA Tr.into 990KVA

Tr. AtA-4 S/Stn in division Nand

Nagri.

7.70 FY 06-07 HT

5112 NN05UT4061 Nand Nagri

Aug. of 630 KVA Tr.into 990KVA

Tr. AtMandoli Extn. S/Stn. I

G.No.9 in division Nand Nagri.

7.70 FY 06-07 HT

Page 247: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

5113 NN06RM4003 Nand Nagri

Installation of 3 Panel Board at -

O.block Sunder Nagari in division

Nand Nagri.

4.09 FY 06-07 HT

5114 PG04FA4515 Paharganj

Replacement Of sick portion of HT

Cable from P P Qtr. To Ahata

Kidara P/M with 3x300 XLPE in

Paharganj division.

15.14 FY 06-07 HT

5115 PG04FA4651 Paharganj

Replacement of sick PILCA Cable

3x300sq.mm With 3x300sq.mm

XLPE from Sarai Khalil Sub

station. to Chowk Singhara (K) in

Zone-111 in Paharganj division.

3.52 FY 06-07 HT

5116 PG04FA4654 Paharganj

Replacement of sick PILCA Cable

3x300sq.mm With 3x300sq.mm

XLPE from Old Qusab Pura s/stn.

to Idgah (K) Via Nawab Road

no.I,II & Basti Harphool in Zone-

111 in Paharganj division.

25.24 FY 06-07 HT

5117 PG04FA4655 Paharganj

Replacement of sick PILCA Cable

3x300sq.mm With 3x300sq.mm

XLPE from Sarai Khalil Sub

station. to Neem wala Chowk (K)

Nabi Karim in Zone-113 in

Paharganj division.

16.78 FY 06-07 HT

5118 PG04FA4656 Paharganj

Replacement of sick PILCA Cable

3x300sq.mm With 3x300sq.mm

XLPE from Bagichi Alaudin to

Sadar Thana Road and Idgah

Road Xing in Zone-112 in

Paharganj division.

13.40 FY 06-07 HT

5119 PG04LT4525 Paharganj

Augmentation of LV Mains and

laying of additional new LT feeders

of 3.5Cx300 sq. mm XLPE Cable

from existing 630 kVA

Transformer at Idgaha plinth

mounted Sub station in Paharganj

division.

0.70 FY 06-07 LT

5120 PG04LT4527 Paharganj

Laying of additional new LT

feeders of 3.5Cx300 sq. mm

XLPE Cable from proposed

augmented 990 kVA Transformer

at Gali Darzian sub station in

Paharganj division.

2.74 FY 06-07 LT

5121 PG04LT4538 Paharganj

Taking out LT feeder at Ahata

Kindra Chowk sub station in

Paharganj division.

2.33 FY 06-07 LT

5122 PG04LT4540 Paharganj

Augmentation of LV Mains and

laying of additional new LT feeders

of 3.5Cx300 sq. mm XLPE Cable

from existing 630 kVA

Transformer at 4-Pole

P.P.Quarters Sub station in

Paharganj division.

4.09 FY 06-07 LT

5123 PG04LT4544 Paharganj

Taking out LT Feeders from

Ahata Kidhara Tanki ID SS in

Paharganj division.

4.23 FY 06-07 LT

5124 PG04LT4545 Paharganj

Augmentation of existing 3-phase

LV Mains at Old Qusab Pura in

Paharganj division.

2.61 FY 06-07 LT

5125 PG04LT4553 Paharganj

Augmentation of LV Mains &

laying of 9 nos. additional new LT

feeders of 3.5Cx300 sq. mm

XLPE Cable from proposed

augmented 2 nos. 990 KVA

Transformer at MCD Park S/Stn in

Paharganj division.

4.46 FY 06-07 LT

Page 248: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

5126 PG04LT4556 Paharganj

Laying of additional new LT

feeders of 3.5Cx300 sq. mm

XLPE Cable from proposed

Augmentationmented 630 kVA

Transformer at Shivaji Road plinth

mounted Sub station in Paharganj

division.

2.21 FY 06-07 LT

5127 PG04RM4576 Paharganj

Replacement of existing old 9-

Panel Board by new 9-Panel

Board VCB type at Sarai Khalil

S/Stn in Paharganj division.

24.80 FY 06-07 HT

5128 PG04RM4605 Paharganj

Installation of SF6 type RMU at

Tokriwalan S/Stn in Paharganj

division.

5.89 FY 06-07 HT

5129 PG05AT4025 Paharganj

Installation of 990 KVA

Transformer at Dariba Pan Z-113

in Paharganj division.

1.74 FY 06-07 HT

5130 PG05AT4027 Paharganj

Installation of 630KVA with Single

Panel at Hanuman Mandir Z-113

in Paharganj division.

3.80 FY 06-07 HT

5131 PG05FA4001 Paharganj

Replacement of sick PILCA Cable

3x300sq.mm With 3x300sq.mm

XLPE from Khurshindoor Market

Sub station. to Khurshindoor

Market Sub station. via Fire

Station(I/D), Pathar Wala Chowk,

Teliwara Sub station., Jhabbar Mal

Sub station., Rui Mandi in Zone-

112 in Paharganj division.

31.76 FY 06-07 HT

5132 PG05FA4002 Paharganj

Replacement of sick PILCA Cable

3x300sq.mm With 3x300sq.mm

XLPE from Faiz Road to Filmistan

via Telephone Exchange, Idgah

Road, Mout doorel Basti plinth

mounted in Zone-112 in

Paharganj division.

33.63 FY 06-07 HT

5133 PG05FA4003 Paharganj

Replacement of sick PILCA Cable

3x300sq.mm With 3x300sq.mm

XLPE from B.G. Road to Chimni

Mill via Chimni Mill(K) to Gali

Darjian plinth mounted in Zone-

112 in Paharganj division.

14.32 FY 06-07 HT

5134 PG05FA4004 Paharganj

Replacement of partly sick PILCA

Cable 3x300sq.mm With

3x300sq.mm XLPE from Motia

Khan(Sarai Khalil Gate) to Ram

Nagar in Zone-113

28.93 FY 06-07 HT

5135 PG05FA4005 Paharganj

Replacement of partly sick PILCA

Cable 3x300sq.mm With

3x300sq.mm XLPE from Gali

Jamir Wali to Gali tokriwalan in

Zone-112 in Paharganj division.

14.05 FY 06-07 HT

5136 PG05FA4006 Paharganj

Replacement of partly sick PILCA

Cable 3x300sq.mm With

3x300sq.mm XLPE from Sadar

Thana(K) to Sarai Khalil S/Stn. via

Slaughter House O/D S/Stn. in

Zone-113 in Paharganj division.

11.32 FY 06-07 HT

Page 249: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

5137 PG05FA4007 Paharganj

Replacement of partly sick PILCA

Cable 3x300sq.mm With

3x300sq.mm XLPE from B.G.

Road GridSub station. to Foota

Road via Deputy Ganj(K), Deputy

Ganj plinth mounted , Deputy

Ganj(K) to Gali Bahuji plinth

mounted in Zone-112 in

Paharganj division.

28.51 FY 06-07 HT

5138 PG05FA4008 Paharganj

Replacement of partly sick PILCA

Cable 3x300sq.mm With

3x300sq.mm XLPE from M.M.

Road(K) to Loha Mandi plinth

mounted via M.M. Pl./M. Sub

station. in Zone-112 in Paharganj

division.

12.44 FY 06-07 HT

5139 PG05FA4009 Paharganj

Replacement of sick PILCA Cable

3x300sq.mm With 3x300sq.mm

XLPE from Railway Cly. to 6-

tooti(K) in Zone-113 in Paharganj

division.

5.76 FY 06-07 HT

5140 PG05FA4010 Paharganj

Replacement of sick PILCA Cable

3x300sq.mm With 3x300sq.mm

XLPE from P.P. QTransformer

C.C. to P.P. QTransformer C.C.

via 4-pole P.P. QTransformer,

Chhoti Masjid, New Qasab Pura

and Old Qasab Pura in Zone-111

in Paharganj division.

19.10 FY 06-07 HT

5141 PG05FA4011 Paharganj

Replacement of sick PILCA Cable

3x300sq.mm With 3x300sq.mm

XLPE from Idgah Road Pl./M. to

Sadar Thana(K) in Zone-111 in

Paharganj division.

6.24 FY 06-07 HT

5142 PG05JJ4072 Paharganj

Electrification of JJ Cluster at Gali

Hari Mandir Jhandewalan in

Paharganj division.

0.99 FY 06-07 LT

5143 PG05JJ4073 Paharganj

Electrification OF JJ Cluster at

Motia Khan and Aram Bagh in

Paharganj division.

5.01 FY 06-07 LT

5144 PG05JJ4074 Paharganj

Electrification of JJ Cluster at

Priyadarshni mata market, in

Paharganj division.

2.37 FY 06-07 LT

5145 PG05LT4053 Paharganj

Taking out 3 No. LT 3.5X300sq.

XLPE feeder from Transformer at

B.G. Road Disp. No.1 sub station

in Paharganj division.

0.93 FY 06-07 LT

5146 PG05LT4054 Paharganj

Taking out 2 No. LT 3.5X300sq.

XLPE feeder from Transformer at

Gali Bhauji plinth mounted Sub

station in Paharganj division.

1.77 FY 06-07 LT

5147 PG05LT4055 Paharganj

Taking out 3No. LT 3.5X300sq.

XLPE feeder from Transformer at

Deputy Ganj plinth mounted Sub

station in Paharganj division.

1.44 FY 06-07 LT

5148 PG05LT4056 Paharganj

Taking out 2 No. LT 3.5X300sq.

XLPE feeder from Transformer at

Chitra Gupta Road in Paharganj

division.

2.29 FY 06-07 LT

5149 PG05LT4057 Paharganj

Taking out 3 No. LT 3.5X300sq.

XLPE feeder from Transformer at

B.G. Road Disp. No.2 sub station

in Paharganj division.

4.00 FY 06-07 LT

5150 PG05LT4058 Paharganj

Taking out 2 No. LT 3.5X300sq.

XLPE feeder from Transformer at

Chuna Mandi sub station in

Paharganj division.

1.65 FY 06-07 LT

Page 250: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

5151 PG05LT4060 Paharganj

Taking out 2 No. LT 3.5X300sq.

XLPE feeder from Transformer at

M/M Road plinth mounted Sub

station in Paharganj division.

2.50 FY 06-07 LT

5152 PG05LT4061 Paharganj

Taking out 3 No. LT 3.5X300sq.

XLPE feeder from Transformer at

Hanuman Mandir in Paharganj

division.

2.03 FY 06-07 LT

5153 PG05RM4028 Paharganj

Installation of SF 6 RMU at Gali

Bahu ji plinth mounted Sub

station. in Zone-111 District Pahar

Ganj

4.08 FY 06-07 HT

5154 PG05RM4031 Paharganj

Installation of SF 6 RMU at Basti

Harphool Singh Pl/M Sub station.

in Zone-111 District Pahar Ganj

4.00 FY 06-07 HT

5155 PG05RM4037 Paharganj

Installation of SF 6 RMU at

Shyam ji Mal plinth mounted Sub

station. in Zone-113 District Pahar

Ganj

4.14 FY 06-07 HT

5156 PG05RM4049 Paharganj

Installation of SF 6 RMU with

Extn.Single Panel board at Ahata

ki dara Tanki out side plinth

mounted in Zone-111 in

Paharganj division.

4.34 FY 06-07 HT

5157 PG05UT4013 Paharganj

Aug. of Tr. from 2x400 KVA to

2x630 KVA P/M at B.G. Road

Dispensary in Zone-112 in

Paharganj division.

1.21 FY 06-07 HT

5158 PG05UT4015 Paharganj

Aug. of Tr. from 400 KVA to 630

KVA P/M at Deputy Ganj P/M in

Zone-112 in Paharganj division.

0.88 FY 06-07 HT

5159 PG05UT4017 Paharganj

Augmentation of Transformer from

630 KVA to 990 KVA at Chuna

Mandi Complaint Center in

Paharganj division.

0.327 FY 06-07 HT

5160 PG05UT4018 Paharganj

Aug. of Tr. from 630 KVA to 990

KVA P/M at M.M. Road pl./m in

Zone-113 in Paharganj division.

6.39 FY 06-07 HT

5161 PG05UT4019 Paharganj

Augmentation of Transformer from

400 KVA to 990 KVA at Gali Sch

Wali in Paharganj division.

0.57 FY 06-07 HT

5162 PG05UT4020 Paharganj

Aug. of Tr. from 630 KVA to 990

KVA P/M at Idgah Pl./m in Zone-

112 in Paharganj division.

0.388 FY 06-07 HT

5163 PG05UT4021 Paharganj

Augmentation of Transformer from

630KVA to 990 KVA at Ram

Nagar Complaint center in

Paharganj division.

0.387 FY 06-07 HT

5164 PG05UT4023 Paharganj

Augmentation of Transformer from

400 KVA to 630 KVA P/M at Gali

Bahuji P/M in Zone-112 in

Paharganj division.

0.85 FY 06-07 HT

5165 PG06LT4030 Paharganj

Replacement of existing LV Mains

3 phase with Conductor at Gali

No 1 to 12 Multani Dhanda Zone

Chuna Mandi Paharganj.

22.25 FY 06-07 LT

5166 PG06ML2008 Paharganj

Installation of 41 Street light

Fittings in constituency of MLA Sh

Haroon Yusuf.

1.01 FY 06-07 LT

5167 PG06RM4010 Paharganj

Installation of 3 Way O/D RMU at

Tokri walan Substation in

Paharganj division.

4.19 FY 06-07 HT

5168 PG06RM4040 Paharganj

Replacement of 12 panel Board

southern make & Beeco make at

Ram Nagar in Paharganj division.

33.50 FY 06-07 HT

Page 251: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

5169 PG06RM4595 Paharganj

Installation of RMU SF6 at Ahata

Kidara Chowk S/S in Paharganj

division.

9.54 FY 06-07 HT

5170 PN05EL4085 Patel Nagar

Electrification of LOP of Baljeet

Nagar (SH-6: 5 nos LT feeders

from opposite SHiv md. punjabi

basti Baljeet Nagar) in division

Patel Nagar.

16.35 FY 06-07 LT

5171 PN05EL4086 Patel Nagar

Electrification of LOP of Baljeet

Nagar (SH-7: 2 nos LT feeders

from holi ch. Baljeet Nagar) in

division Patel Nagar.

13.75 FY 06-07 LT

5172 PN05EL4088 Patel Nagar

Electrification of LOP of Baljeet

Nagar and Prem Nagar (SH-1:

HT feed from tikona pk. napali md.

punjabi basti Baljeet Nagar to

nehru ng near g.no. 10 anand

parbat) in division Patel Nagar.

8.18 FY 06-07 LT

5173 PN05EL4090 Patel Nagar

Electrification of LOP of Baljeet

Nagar and Prem Nagar( SH-3:3

nos LT feeder from ambedkar park

punjabi basti Baljeet Nagar) in

division Patel Nagar.

6.51 FY 06-07 LT

5174 PN05EL4094 Patel Nagar

Electrification of LOP of Baljeet

Nagar and Prem Nagar ( SH-7:

new 630 kVA transformer at tikona

pk. napali md. punjabi basti

Baljeet Nagar) in division Patel

Nagar.

1.53 FY 06-07 LT

5175 PN05EL4095 Patel Nagar

Electrification of LOP of Baljeet

Nagar and Prem Nagar ( SH-8:

new 630 kVA transformer at

ambedker park punjabi basti

Baljeet Nagar) v

1.56 FY 06-07 LT

5176 PN05EL4096 Patel Nagar

electrification of LOP of Nehru

Nagar(SH-1: HT feed from o/h

Nehru ng. to Nehru ng. g.no. 10

anand parbat) in division Patel

Nagar.

8.15 FY 06-07 LT

5177 PN05EL4099 Patel Nagar

electrification of LOP of Nehru

Nagar ( SH-4: new 630 kVA

transformer at Nehru Nagar near g

no. 10 anand parbat) in division

Patel Nagar.

1.51 FY 06-07 LT

5178 PN05EL4100 Patel Nagar

electrification of LOP of Baljeet

Nagar (SH-3: loop in loop out HT

feeder from Jhandewala to prem

Nagar no 1 for khatta punjabi Basti

Baljeet Nagar near Jhandewala

chowk) in division Patel Nagar.

0.90 FY 06-07 LT

5179 PN05EL4101 Patel Nagar

electrification of LOP of Baljeet

Nagar (SH-9: new 11 kV RMU (

SF-6) at Jhandewala chowk

punjabi Basti ) in division Patel

Nagar.

4.08 FY 06-07 LT

5180 PN05EL4103 Patel Nagar

electrification of LOP of Baljeet

Nagar (SH-11: new 11 kV RMU (

SF-6) at khatta punjabi Basti

Baljeet Nagar near Jhandewala

chowk)

4.34 FY 06-07 LT

5181 PN05EL4105 Patel Nagar

Electrification of of LOP of Baljeet

Nagar (SH:13) in division Patel

Nagar.

0.75 FY 06-07 LT

5182 PN05EL4106 Patel Nagar

electrification of LOP of Baljeet

Nagar ( SH-14: new 630 kVA

transformer at Jhandewala chowk

punjabi Basti Baljeet Nagar) in

division Patel Nagar.

1.99 FY 06-07 LT

Page 252: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

5183 PN05EL4107 Patel Nagar

Electrification of of LOP of Baljeet

nagar (SH:15) in division Patel

Nagar.

1.59 FY 06-07 LT

5184 PN05EL4108 Patel Nagar

Electrification of of LOP of Baljeet

nagar (SH:16) in division Patel

Nagar.

1.62 FY 06-07 LT

5185 PN05EL4111 Patel NagarElectrification of left out Pocket at

Nehru Nagar, Division Patel Nager7.23 FY 06-07 LT

5186 PN05EL4113 Patel Nagar

Electrification of LOP of Anand

Parbat (SH-1: HT feeder from

Anand Parbat grid to toli wala

schochalya Anand Parbat,Patel

Nagar) in division Patel Nagar.

4.38 FY 06-07 LT

5187 PN05EL4114 Patel Nagar

electrification of LOP of Anand

Parbat (SH-2: HT feeder from toli

wala schochalya to tin market

Anand Parbat,Patel Nagar) in

division Patel Nagar.

5.17 FY 06-07 LT

5188 PN05EL4116 Patel Nagar

electrification of LOP of Anand

Parbat (SH-4: new 11 kv rmu ( SF-

6) at toli wala schochalya Anand

Parbat,Patel Nagar ) in division

Patel Nagar.

4.81 FY 06-07 LT

5189 PN05LT4006 Patel Nagar

Taking out 2 Nos. LT Feeder at Z

Block west Patel Nagar in division

Patel Nagar.

3.61 FY 06-07 LT

5190 PN05LT4007 Patel Nagar

Taking out 2 Nos LT Feeder at 12

Block West Patel nagar in division

Patel Nagar.

5.16 FY 06-07 LT

5191 PN05LT4008 Patel Nagar

Laying of 2 no. feeders from Super

Bazar to Block No. 33 and 29,

West Patel Nagar in division Patel

Nagar.

6.15 FY 06-07 LT

5192 PN05LT4009 Patel Nagar

Laying of 1 no. feeder from 47-

Block East Patel Nagar to

46/1,East Patel Nagar in division

Patel Nagar.

3.50 FY 06-07 LT

5193 PN05LT4011 Patel Nagar

Laying of 1 no. feeder from Shadi

Pur Depot to Hill Marg, Baljeet

Nagar in division Patel Nagar.

3.16 FY 06-07 LT

5194 PN05LT4019 Patel Nagar

Augmentation of LV overhead

mains from Rabbit to DOG

conductor at Gali No. 1,2 and 11

Than Singh Nagar, Anand Parbat

in division Patel Nagar.

3.13 FY 06-07 LT

5195 PN05LT4020 Patel Nagar

Augmentation of LV overhead

mains from Rabbit to DOG

conductor at Gati road Anand

parbat in division Patel Nagar.

2.18 FY 06-07 LT

5196 PN05LT4064 Patel Nagar

Augmentation of LV overhead

mains from Rabbit to DOG

conductor at Bapan nagar in

division Patel Nagar.

4.64 FY 06-07 LT

5197 PN05LT4076 Patel Nagar

Replacement of OH LT circuit at

Nehru Nagar in East Patel Nagar

in division Patel Nagar.

2.37 FY 06-07 LT

5198 PN05LT4077 Patel Nagar

Replacement of OH LT circuit at

Baljit Nagar in East Patel Nagar in

division Patel Nagar.

4.35 FY 06-07 LT

5199 PN05LT4078 Patel Nagar

Replacement of OH LT circuit at

East Patel Nagar in division Patel

Nagar.

5.72 FY 06-07 LT

5200 PN05LT4112 Patel Nagar

Estimate for replacement of very

old sick cable from feeder pillar to

pillar in DDA MIG/LIG Flats in

division Patel Nagar.

10.24 FY 06-07 LT

Page 253: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

5201 PN05LT4130 Patel Nagar

Replacement of LT overhead with

DOG/RABBIT and Single Core in

division Patel Nagar.

9.27 FY 06-07 LT

5202 PN05LT4131 Patel NagarReplacement LT overhead with

DOG Conductor in Patel Nagar.8.51 FY 06-07 LT

5203 PN05LT4143 Patel Nagar

Replacement of LT conductor with

LTAB from T.Park,in division Patel

Nagar.

1.30 FY 06-07 LT

5204 PN05MS4132 Patel Nagar

Providing new earthing at various

Sub-Station in division Patel

Nagar.

28.52 FY 06-07 LT

5205 PN05RM4031 Patel Nagar

Installation of 11kV RMU (SF-6)

at Nandiwala A.Parbat in division

Patel Nagar.

4.07 FY 06-07 HT

5206 PN05RM4033 Patel Nagar

Installation of 11kV RMU (SF-6)

at Ambedkar Park, Baljeet Nagar

in division Patel Nagar.

3.94 FY 06-07 HT

5207 PN05RM4035 Patel Nagar

Installation of 11kV RMU (SF-6)

at 35-Block, West Patel Nagar in

division Patel Nagar.

4.05 FY 06-07 HT

5208 PN05RM4038 Patel Nagar

Installation new 11KV RMU SF6

ghatl road PL A Prabat in division

Patel Nagar.

4.51 FY 06-07 HT

5209 PN05RM4045 Patel Nagar

Installation of 11kV RMU

extensible (SF-6)with additional

Single Panel at Gurudwara,

Military Road, in division Patel

Nagar.

7.51 FY 06-07 HT

5210 PN05RM4047 Patel Nagar

Installation of 11kV RMU

extensible (SF-6)with additional

Single Panel at Super Bazar, East

Patel Nagar in division Patel

Nagar.

7.14 FY 06-07 HT

5211 PN05RM4118 Patel Nagar

Installation/Replacement of 4

Panel board with motorised RMU

with SCADA compatibility at -

H.S.Road.Bapa.Nagar in division

Patel Nagar.

10.20 FY 06-07 HT

5212 PN05RM4121 Patel Nagar

Installation/Replacement of 7

Panel board with Motorised RMU

with SCADA compatibility at -

S.blockW.P.P/D(Kiosk) in division

Patel Nagar.

13.54 FY 06-07 HT

5213 PN05RM4144 Patel NagarInstallationof 3W+1W O/D RMU at

G-8 Dhall, in division Patel Nagar.7.43 FY 06-07 HT

5214 PN05RM4145 Patel NagarInstallation of 3W O/D RMU at

MTNL,Patel Nagar4.13 FY 06-07 HT

5215 PN05RM4146 Patel Nagar

Installation of 3W+1W O/D RMU

at 12block,EPatel Nagar,Patel

Nagar

6.95 FY 06-07 HT

5216 PN05RM4147 Patel NagarInstallation of 3W+1W O/D RMU

at B.Nagar-4,Patel Nagar6.97 FY 06-07 HT

5217 PN05RM4148 Patel NagarInstallation of 3W O/D RMU at

Gali No-5,Patel Nagar4.43 FY 06-07 HT

5218 PN05RS4135 Patel Nagar Civil repair works at complant

center in division Patel Nagar.1.29 FY 06-07 Others

5219 PN05RS4140 Patel NagarExt. & Rep. of fencing at Gali No.7

S/St0.430 FY 06-07 Others

5220 PN05RS4141 Patel NagarExt. & Rep. of fencing at Reev

S/Stn in division Patel Nagar.0.474 FY 06-07 Others

5221 PN05UT4022 Patel Nagar

Augmentation of Transformer

From 630 to 990 kVA at Gali No.

9, Anand Parbat in division Patel

Nagar.

0.75 FY 06-07 HT

5222 PN05UT4025 Patel Nagar

Augmentation 630-990KVA

Transformer at 12 Block West

Patel Nagar in division Patel

Nagar.

0.395 FY 06-07 HT

Page 254: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

5223 PN05UT4026 Patel Nagar

Augmentation of 500 KVA to 630

KVA Transformer at S-Block West

Patel Nagar in division Patel

Nagar.

0.109 FY 06-07 HT

5224 PN05UT4029 Patel Nagar

Augmentation of Transformer

from 2x400 to 2x630 kVA at Super

Bazar, East Patel Nagar in division

Patel Nagar.

1.43 FY 06-07 HT

5225 PN06AT4533 Patel Nagar

Addition of 400 KVA Transformer

at Krishna Tirath in division Patel

Nagar.

1.71 FY 06-07 HT

5226 PN06LT2532 Patel NagarReplacement of LT overhead line

at khalsa Nagar Patel Nagar0.70 FY 06-07 LT

5227 PN06LT4526 Patel Nagar

Conversion of LT O/H into LTAB

cable at Baljeet Nagar in Patel

Nagar

38.19 FY 06-07 LT

5228 PN06LT4530 Patel Nagar

Conversion of LT overhead

condutor into LTAB cable at

Rajasthani colony ,Patel nagar

15.68 FY 06-07 LT

5229 PN06LT4531 Patel Nagar

Conversion of old LT conductor

with LT AB at Dev Nagar in Div

Patel Nagar

15.20 FY 06-07 LT

5230 PN06RM4512 Patel NagarInstallation of 3 way outdoor RMU

at 13B Dev nagar,Patel nagar4.70 FY 06-07 HT

5231 PN06RM4513 Patel Nagar

Installation of 3 Way O/D RMU at

14B Dev Nagar Sub-Station in

division Patel Nagar

4.42 FY 06-07 HT

5232 PN06RM4514 Patel Nagar

Installation of 3 Way O/D RMU at

Khatta Tank Sub-Station in

division Patel Nagar

7.32 FY 06-07 HT

5233 PN06RM4518 Patel Nagar

Installation of 3 Way O/D RMU at

leading G-6 Sub-Station in division

Patel Nagar

7.08 FY 06-07 HT

5234 SR04AT3586 Shankar Road

Providing additional 630 kVA

Transformer at R-Block S/Stn.,

Rajinder Nagar in division Shankar

Road

0.73 FY 06-07 HT

5235 SR04FA4615 Shankar Road

Providing HT 11 kV Duplicate

Feed to 630 kVA Transformer at

Police Post S/Stn. from East Patel

nagar Zonal Office S/Stn., East

Patel Nagar in division Shankar

Road

2.13 FY 06-07 HT

5236 SR04FA4618 Shankar Road

Providing HT 11 kV Duplicate

Feed to 35 Block P/M S/Stn.,

West Patel Nagar from existing 11

kV O/H line to Farid Puri in

division Shankar Road.

4.65 FY 06-07 HT

5237 SR04LT4506 Shankar Road

Laying of 1 no. additional LT

feeder from 630 kVA Transformer

at H-Block Sub station., West

Patel Nagar, in division Shankar

Road

1.67 FY 06-07 LT

5238 SR04LT4517 Shankar Road

Laying of 2 nos. additional LT

feeders from 10 B Rajendra Place

(Patel Auto) S/Stn in division

Shankar Road

8.39 FY 06-07 LT

5239 SR04LT4527 Shankar Road

Laying of 2 nos. addl. LT feeders

from Faiz Road P/M-II S/Stn in

division Shankar Road

2.02 FY 06-07 LT

5240 SR04LT4542 Shankar Road

Laying of 2 nos. additional LT

feeders from Prem Nagar No. 2

Sub station in division Shankar

Road

3.02 FY 06-07 LT

Page 255: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

5241 SR04LT4544 Shankar Road

Laying of 2 nos. additional LT

feeders from Prem Nagar No. 1

Sub station. due to proposed

Augmentation of 630 kVA

Transformer No.-1 into 1000 kVA

in division Shankar Road

3.85 FY 06-07 LT

5242 SR04LT4549 Shankar Road

Laying of 2 nos. addlitional LT

feeders from Janta Park S/Stn.,

Baljeet Nagar in division Shankar

Road

3.75 FY 06-07 LT

5243 SR04LT4558 Shankar Road

Laying of 3 nos. additional LT

feeders from Baljeet Nagar No.1

S/Stn in division Shankar Road

7.74 FY 06-07 LT

5244 SR04LT4629 Shankar Road

Laying of 3 no. additional LT

feeders from Elahibaksh S/Stn. at

Karol Bagh, Zone-1401 in division

Shankar Road

4.24 FY 06-07 LT

5245 SR04LT4633 Shankar Road

Laying of 2 no. addl. LT feeders

from Bapu Bhawan, Sat Nagar

S/Stn. at Karol Bagh, Zone-1401.

1.90 FY 06-07 LT

5246 SR04LT4635 Shankar Road

Laying of 2 no. additional LT

feeders from Padam Singh Road,

Bapa Nagar S/Stn. at Karol Bagh,

Zone-1401 in division Shankar

Road

2.14 FY 06-07 LT

5247 SR04LT4648 Shankar Road

Laying of 3 no. additional LT

feeders from 17-B, Dev Nagar

S/Stn. at Karol Bagh, Zone-1401

in division Shankar Road

3.95 FY 06-07 LT

5248 SR04LT4655 Shankar Road

Laying of 2 no. additional LT

feeders from Post office No. 3

S/Stn. at Karol Bagh, Zone-1401

in division Shankar Road

3.54 FY 06-07 LT

5249 SR04LT4659 Shankar Road

Augmentation of LV Mains in the

area of Karol Bagh, Zone-1401 in

division Shankar Road

8.57 FY 06-07 LT

5250 SR04RM4573 Shankar Road

Replacement of Old unserviceable

11 kV RMU with a new 11 kV SF6

type RMU at Kalindi College, Patel

Nagar in division Shankar Road

7.09 FY 06-07 HT

5251 SR04RM4579 Shankar Road

Replacement of Old unserviceable

11 kV RMU with a new 11 kV SF6

type RMU at Baljeet Nagar No.-1

in division Shankar Road

8.01 FY 06-07 HT

5252 SR04RM4691 Shankar Road

Replacement of damaged 4-Panel

Board with Extensible RMU SF6

type + 1 no. additional Single

Panel at Khanna S/Stn in division

Shankar Road

12.04 FY 06-07 HT

5253 SR04RM4698 Shankar Road

Replacement of Old unserviceable

11 kV RMU with a new 11 kV SF6

type RMU at Duggalwala S/Stn.,

Anand Parbat in division Shankar

Road

5.47 FY 06-07 HT

5254 SR04SS4705 Shankar Road

Augmentation of 2 nos.630 KVA

Transformer with 2 nos.990 KVA

transformer along with 7-Panel

Board at Prem nagar No. 1 plinth

mounted S/Stn. (Gurudwara) in

division Shankar Road

0.227 FY 06-07 HT

5255 SR04SS4711 Shankar Road

Augmentation of Transformer from

400KVA into 990 KVA

Transformer at Baljeet Nagar No-4

in division Shankar Road

1.42 FY 06-07 HT

Page 256: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

5256 SR04SS4713 Shankar Road

Augmentation of 400 KVA

Transformer to 990 KVA

Transformer along with installation

of 11KV Extensible RMU SF6 type

+ 1 no. additional Single Panel at

SOI Brothers no. II pole mounted

S/Stn., Farid Puri in division

Shankar Road

11.80 FY 06-07 HT

5257 SR05AT4144 Shankar Road

Additional 990 Kva transformer at

P O No. 1 Gurudwara Road in

division Shankar Road

0.60 FY 06-07 HT

5258 SR05FA4077 Shankar Road

Replacement of existing old sick

HT PILCA cable by 3*300 sqmm

XLPE from Motia Khan Grid to

Darshana Ram Kumar Chowk in

division Shankar Road

6.81 FY 06-07 HT

5259 SR05JJ4099 Shankar Road

Electrification of JJ Colony at

Behind of Chapperwala Complaint

Center, in division Shankar Road

2.18 FY 06-07 LT

5260 SR05JJ4101 Shankar Road

Electrification of JJ Colony at

Inside Tibia College, in division

Shankar Road

1.88 FY 06-07 LT

5261 SR05LT3047 Shankar Road

Substation management system in

BYPL (Installation of DT Meter

Projects)

31.58 FY 06-07 LT

5262 SR05LT4004 Shankar Road

Laying of 2no. feeders from 52-

Regarpura to feeder pillar

A.S.Road in division Shankar

Road

2.68 FY 06-07 LT

5263 SR05LT4005 Shankar Road

Replacement of old one no. sick

cable from Gali No. 70 Regar Pura

to Kikarwala Chowk in division

Shankar Road

1.10 FY 06-07 LT

5264 SR05LT4010 Shankar Road

Replacement of old one no. sick

cable from Chapparwala Sub

station. to Bank Street in division

Shankar Road

3.26 FY 06-07 LT

5265 SR05LT4013 Shankar Road

Augmentation of LV overhead

mains from Rabbit to DOG

conductor at Gali No. 1 to 24,

Joshi Road and Khazoor Road in

division Shankar Road

9.27 FY 06-07 LT

5266 SR05LT4015 Shankar Road

Augmentation of LV overhead

mains from Rabbit to DOG

conductor at Joshi Road in division

Shankar Road

4.17 FY 06-07 LT

5267 SR05LT4016 Shankar Road

Augmentation of LV overhead

mains from Rabbit to DOG

conductor at Ramjas Road in

division Shankar Road

3.42 FY 06-07 LT

5268 SR05LT4072 Shankar Road

Taking out ONE LT feeder FROM

Transformer at JASub

stationARAM sub station in

division Shankar Road

1.44 FY 06-07 LT

5269 SR05LT4075 Shankar Road

Estimate for taking out two (2)

nos. LT Feeder from the newly

proposed 400 kVA transformer at

Rajender Nagar booster pump in

division Shankar Road.

3.38 FY 06-07 LT

5270 SR05LT4104 Shankar Road

Taking out 1no LT fdr 4m H.S.Rd

Khatta SS,in division Shankar

Road

2.12 FY 06-07 LT

5271 SR05LT4105 Shankar Road

Taking out 1no LT fdr 4m T.Park

SS,R'pura,in division Shankar

Road

2.21 FY 06-07 LT

Page 257: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

5272 SR05LT4106 Shankar Road

Laying of two no. LT under ground

feeder from the 13 Block WEA

Karol Bagh to 13/7 & 13/9 WEA

Karol Bagh, in division Shankar

Road

2.78 FY 06-07 LT

5273 SR05LT4107 Shankar Road

Laying of two no. LT under ground

feeder from 5-Block (K) S/Stn to

5/8 & near Suneja Sons WEA

Karol Bagh, in SRD Division

4.05 FY 06-07 LT

5274 SR05LT4108 Shankar Road

Taking out 2no LT feeder from

Nala A.S.road Sub station,in

division Shankar Road

5.13 FY 06-07 LT

5275 SR05LT4109 Shankar Road

Taking out 1no LT feeder from

40Regharpura Sub station,in

division Shankar Road

1.78 FY 06-07 LT

5276 SR05LT4110 Shankar Road

Laying of one no. LT underground

feeder from Bachheruddin S/Stn to

11/3608 Regarpura, in division

Shankar Road

2.53 FY 06-07 LT

5277 SR05LT4111 Shankar Road

Laying of four nos. LT

underground feeder from Shankar

Road Building to A Block & 2-

Block,in division Shankar Road

6.77 FY 06-07 LT

5278 SR05LT4146 Shankar Road

Augmentation. of conductor at

Gurdwara Road in division

Shankar Road

4.43 FY 06-07 LT

5279 SR05ML2136 Shankar RoadProviding street lightning in

constitution of MLA Sh.P.C.Yogi1.36 FY 06-07 LT

5280 SR05NF4003 Shankar Road

HT Feeder at Karol Bagh P.O. No.

VI to NanakWala Sub station in

division Shankar Road

2.61 FY 06-07 HT

5281 SR05RM4026 Shankar Road

Installation new 11KV RMU SF6

8A at Karol Bagh in division

Shankar Road

3.98 FY 06-07 HT

5282 SR05RM4035 Shankar Road

Installation of new 11KV RMU SF6

at Tibbia collony in division

Shankar Road

4.32 FY 06-07 HT

5283 SR05RM4040 Shankar Road

Replacement of old unserviceable

4 Panel board with a new

extensible RMU (SF-6) + one addl

Panel at JaSub stationa Ram Sub

station in division Shankar Road

6.66 FY 06-07 HT

5284 SR05RM4041 Shankar Road

Replacement of old unserviceable

4 Panel board with a new

extensible RMU (SF-6)+ one addl

Panel at R.K.Dasub station No. 2

in division Shankar Road

10.05 FY 06-07 HT

5285 SR05RM4082 Shankar Road

Replacement of old unserviceable

4 Panel board with new 1 No.

11kV Four Panel board at MCD

Car Parking Karol Bagh in division

Shankar Road

6.88 FY 06-07 HT

5286 SR05RM4084 Shankar Road

Replacement of old unserviceable

5 Panel board with new 1 No.

11kV Four Panel board +Singal

Panel unit at Ramjas Road (K) in

division Shankar Road

14.50 FY 06-07 HT

5287 SR05RM4093 Shankar Road

Installation/Replacement of 7

Panel board with Motorised RMU

with SCADA compatibility at -

R.block.New.Rajendra.Nagar in

division Shankar Road

14.45 FY 06-07 HT

Page 258: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

5288 SR05RM4096 Shankar Road

Installation/Replacement of 7

Panel board with Motorised RMU

with SCADA compatibility at -

Link.Road.I/D in division Shankar

Road

14.17 FY 06-07 HT

5289 SR05RM4097 Shankar Road

Installation/Replacement of 8

Panel board with Motorised RMU

with SCADA compatibility at -

Shastri.Park.I/D in division

Shankar Road

17.56 FY 06-07 HT

5290 SR05RM4098 Shankar Road

Replacementof 3 Panel Board by

1no 3 Way I/D RMU at Old

Telephone Exchange.

4.84 FY 06-07 HT

5291 SR05RM4126 Shankar Road

Installation of 3W O/D RMU at

SPM Market,in division Shankar

Road

4.13 FY 06-07 HT

5292 SR05RM4128 Shankar Road

Replacement of 4 Panel board by

4W indoor RMU at G-block,F.Fact

in division Shankar Road

5.71 FY 06-07 HT

5293 SR05RM4129 Shankar Road

Replacement of 4 Panel board by

4W indoor RMU at E-Type,F.Fact

in division Shankar Road

5.71 FY 06-07 HT

5294 SR05RM4130 Shankar Road

Replacement of 4 Panel board by

4W indoor RMU at N'varun Valya

in division Shankar Road

5.65 FY 06-07 HT

5295 SR05RM4131 Shankar Road

Replacement of 7 Panel board by

2*4W indoor RMU at G.Ram Hosp

in division Shankar Road

11.36 FY 06-07 HT

5296 SR05RM4135 Shankar Road

Replacement of 4 Panel board by

4W indoor RMU at Old Salwan,in

division Shankar Road

6.03 FY 06-07 HT

5297 SR05SH4121 Shankar Road

Shifting of 2nos Distribution

transformers at Shankar Road

Grid Sub Station, in division

Shankar Road

4.50 FY 06-07 LT

5298 SR05SS4088 Shankar Road

Establishment of New 400 kVA

substation along with RMU at

Rajinder Nagar Booster Pump in

division Shankar Road

5.48 FY 06-07 HT

5299 SR05UT4018 Shankar Road

Augmentation of Transformer

From 630 to 990 kVA at 8-A

WEA, Karol Bagh in division

Shankar Road

6.58 FY 06-07 HT

5300 SR05UT4020 Shankar Road

Aug. of Tr. from 630 to 990 KVA

at 5- Block WEA, Karol Bagh in

division Shankar Road

6.36 FY 06-07 HT

5301 SR05UT4022 Shankar Road

Aug. of Tr. from 630 to 990 KVA

at H.S.Road Khatta S/stn in

division Shankar Road

6.65 FY 06-07 HT

5302 SR05UT4023 Shankar Road

Augmentation. 400VA to 630 KVA

at 9 A Block WEA KB in division

Shankar Road

0.74 FY 06-07 HT

5303 SR05UT4080 Shankar Road

Estimate fro augmentaion of 630

990 kva Transformer at Sethi

Petrol pump in division Shankar

Road

6.29 FY 06-07 HT

5304 SR05UT4090 Shankar Road

Augmentation of 400kVA to

990KVA Transformer at Rajindra

Park in division Shankar Road

0.67 FY 06-07 HT

5305 SR05UT4091 Shankar Road

Augmentation of transformer from

630kVA to 990kVA at Salwan Old

in division Shankar Road

6.29 FY 06-07 HT

5306 SR05UT4092 Shankar Road

Estimate for augmentation of 400

KVA Tr. To 990 KVA Tr. At Sindhi

Park Old Rajinder Nagar in

division Shankar Road

0.74 FY 06-07 HT

Page 259: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

5307 SR05UT4095 Shankar Road

Augmentation of transformer from

2x630kVA to 2x990kVA at 2E

Jahandewaln in division Shankar

Road

12.94 FY 06-07 HT

5308 SR06LT4028 Shankar Road

Conversion of LT O/H Conductor

into LTAB Cable at Bedanpura in

division Shankar Road

28.84 FY 06-07 LT

5309 SR06LT4029 Shankar Road

Conversion of LT O/H Conductor

into LTAB Cable at 100 QTR in

division Shankar Road

13.00 FY 06-07 LT

5310 SR06RM4010 Shankar Road

Installation of 3 Way O/D RMU at

Street lighting TG-2 Ridge road

ss in division Shankar Road

4.72 FY 06-07 HT

5311 SR06RM4011 Shankar Road

Installation of 3 Way O/D RMU at

Jassa Ram Hospital ss in division

Shankar Road

4.03 FY 06-07 HT

5312 SR06RM4012 Shankar Road

Installation of 3 Way O/D RMU at

73-Regarpura ss in division

Shankar Road

3.97 FY 06-07 HT

5313 SR06RM4014 Shankar Road

Installation of 3 way outdoor RMU

at 14-Block,in division Shankar

Road

4.04 FY 06-07 HT

5314 SR06RM4015 Shankar Road

Installation of 3 way outdoor RMU

at Vijay Chowayk,in division

Shankar Road

4.18 FY 06-07 HT

5315 SR06RM4016 Shankar Road

Installationln of 3way outdoor RMU

at A.Kidara-1,in division Shankar

Road

4.29 FY 06-07 HT

5316 SR06RM4017 Shankar Road

Installation of 3 Way O/D RMU at

39 Block ss in division Shankar

Road

3.97 FY 06-07 HT

5317 SR06RM4018 Shankar Road

Installation of 3 Way O/D RMU at

3A Block WEA ss in division

Shankar Road

4.26 FY 06-07 HT

5318 SR06RM4019 Shankar Road

Installation of 3 Way O/D RMU at

Rajinder Park, old rajinder nagar

ss in division Shankar Road

4.17 FY 06-07 HT

5319 SR06RM4021 Shankar Road

Installation of 3 Way O/D RMU at

andhha mahavidyalaya ss in

division Shankar Road

6.95 FY 06-07 HT

5320 SR06RM4024 Shankar Road

Installation of 4W+1 ID RMU at R-

Blk DIKhan,in division Shankar

Road

10.18 FY 06-07 HT

5321 SR06RM4025 Shankar Road

Installation of 2nos. 4Way + 3nos.

1Way indoor RMU at

Jhandewalan C Transformer No.-3

(Kiosk) SStn, in division Shankar

Road

25.06 FY 06-07 HT

5322 SR06RM4026 Shankar Road

Installation of 3nos. 4Way + 2nos.

1Way indoor RMU at

Chapperwala Complaint Centre

SStn, in SRD division.

27.72 FY 06-07 HT

5323 SR06RS4002 Shankar Road

Repairing of Fencing at Bazar

Marg Rajinder Nagar in division

Shankar Road

0.211 FY 06-07 Others

5324 SR06SH2032 Shankar Road

Replacement and shifting of LV

mains with AB conductor in Police

Station New Rajinder Nagar in

division Shankar Road

1.01 FY 06-07 LT

5325 YV04FA4642 Yamuna Vihar

Augmentation of HT 11 kV cable

3*150 sq.mm. PILCA to 3*300

sq.mm XLPE cable from B Block

Bhajan Pura Gali no.11 to A Block

Bhajan Pura in division Yamuna

Vihar.

14.85 FY 06-07 HT

Page 260: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

5326 YV04FA4644 Yamuna Vihar

Replacement and Augmentation

of Exsisting HT cable 3*150

sq.mm. PILCA to 3*300 sq.mm

XLPE cable between MCD Flat

Sub station. No.1 to E-Block

Shastri Park ( Sub station. NO.2)

in division Yamuna Vihar

22.31 FY 06-07 HT

5327 YV04FA4645 Yamuna Vihar

Replacement of Exsisting HT

cable 3*300 sq.mm. PILCA to

3*300 sq.mm XLPE cable

between MCD Flat Sub station.

NO.1 and MCD Flat Sub station.

NO.3 Via MCD Flat Sub station.

No.2 in division Yamuna Vihar

13.26 FY 06-07 HT

5328 YV04FA4647 Yamuna Vihar

Replacement/Augmentationmentai

on of Exsisting HT cable 3*300

sq.mm. PILCA to 3*300 sq.mm

XLPE cable between Shahindoor

Bhagat Singh Usman Pur and

Primary School Gatum Puri Via

Gatum Puri No.2 Sub station. and

Gatum Puri No.1 Sub station in

division Yamuna Vihar.

19.65 FY 06-07 HT

5329 YV04NF4621 Yamuna Vihar

Providing of 11 KV HT feed to

Gautam Puri (Ghodewale) Sub

Station from Shastri Park Grid in

division Yamuna Vihar.

15.08 FY 06-07 HT

5330 YV04SS4576 Yamuna Vihar

Augmentation of 400 KVA to 630

KVA D/Transformer & Laying of 2

nos additional LT feeders

alongwith replacement of

defective service line at DCP,

Office in division Yamuna Vihar

4.64 FY 06-07 HT

5331 YV05EL4152 Yamuna Vihar

Electrificationectrification of the

Khajuri A and B block in division

Yamuna Vihar

17.56 FY 06-07 LT

5332 YV05EL4180 Yamuna Vihar

Electrification of LOP at Gali no 4

Gautam Vihar in division Yamuna

Vihar

3.15 FY 06-07 LT

5333 YV05FA4002 Yamuna Vihar

Augmentation of existing cable

3X150 SQ MM PILCA to 3X300

SQ MM XLPE between SBI BANK

to Z-2 Block Sub-station Welcome

in division Yamuna Vihar

8.03 FY 06-07 HT

5334 YV05FA4004 Yamuna Vihar

Augmentation at Exsisting cable

3*150 sq.mm. PILCA to 3*300

sq.mm. XLPE between Bharam

Puri No.4 to Rishi Karoad am

Marg in division Yamuna Vihar.

4.15 FY 06-07 HT

5335 YV05FA4011 Yamuna Vihar

Augmentation of HT cable 3*300

sq.mm.Jamalu ka Bagh to Khattey

wala ( road . 66) Sub station in

division Yamuna Vihar.

7.28 FY 06-07 HT

5336 YV05FA4135 Yamuna Vihar

Replacement of HT cable PILCA

to XLPE between C11-B1 in

division Yamuna Vihar

41.51 FY 06-07 HT

5337 YV05JJ4181 Yamuna Vihar

Electrification of JJ Cluster at

C.P.J Block Seelampur,in division

Yamuna Vihar

18.20 FY 06-07 LT

5338 YV05LT4087 Yamuna Vihar

Taking out 2 nos LT Feeders from-

IV Pusta Bhatiwala Sub-Station in

division Yamuna Vihar

4.28 FY 06-07 LT

Page 261: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

5339 YV05LT4088 Yamuna Vihar

Taking out 2 nos LT feeders from

Gali no.23 Bharam puri s-stn in

division Yamuna Vihar

1.76 FY 06-07 LT

5340 YV05LT4102 Yamuna Vihar

Replacement/ Augmentation of LT

overhead Conductor at Ambedkar

Basti Ghonda, Jai Prakash Nagar,

Gautam Viahr in division Yamuna

Vihar

2.35 FY 06-07 LT

5341 YV05LT4144 Yamuna ViharLT Clean up at Chauhan Bangar,

in division Yamuna Vihar19.96 FY 06-07 LT

5342 YV05LT4153 Yamuna ViharLVDS work at SBI welcome in

division Yamuna Vihar16.32 FY 06-07 LT

5343 YV05NF2140 Yamuna Vihar

Providing 11 KV HT feeder

underground cable at DMRC Stff.

Quarters ,Shastri Park Ph -2 ,in

division Yamuna Vihar

4.15 FY 06-07 HT

5344 YV05NF4016 Yamuna Vihar

Providing New feed to proposed

PSS at C-9 in division Yamuna

Vihar

5.80 FY 06-07 HT

5345 YV05NF4017 Yamuna Vihar

Providing New feed to proposed

PSS at C-10 in division Yamuna

Vihar

5.61 FY 06-07 HT

5346 YV05NF4107 Yamuna Vihar

Laying of 11 kV HT feeder to

Brahmpuri Sub station NO 1

from Yamuna Vihar Grid.

34.77 FY 06-07 HT

5347 YV05NF4109 Yamuna Vihar

Laying of 11 kV HT feeder to

Chauhan Banger gali no. 10 from

Yamuna Vihar Grid.

45.00 FY 06-07 HT

5348 YV05NF4110 Yamuna Vihar

Laying of 11 kV HT feeder to

Brahmpuri gali no. 14 from

Yamuna Vihar grid.

60.44 FY 06-07 HT

5349 YV05RM4020 Yamuna Vihar

Proposed HT 11 kV 3 way o/d

RMU at Gautam vihar primary

school in division Yamuna Vihar

4.07 FY 06-07 HT

5350 YV05RM4024 Yamuna Vihar

Providing 11 KV RMU at DP at

Cresent school in division Yamuna

Vihar

4.55 FY 06-07 HT

5351 YV05RM4025 Yamuna Vihar

Providing 11 KV RMU at

Ambedkar basti Ghonda in division

Yamuna Vihar

3.95 FY 06-07 HT

5352 YV05RM4026 Yamuna Vihar

12 KV at DP at G-Block

Seelampur ABC in division

Yamuna Vihar

4.16 FY 06-07 HT

5353 YV05RM4033 Yamuna Vihar

Providing DP at UP guest house

Sub station (outside) in division

Yamuna Vihar

8.31 FY 06-07 HT

5354 YV05RM4034 Yamuna Vihar

Providing HT 11 KV RMU at DP at

Nala No-1 Zafrabaad in division

Yamuna Vihar

11.74 FY 06-07 HT

5355 YV05RM4037 Yamuna Vihar

Replacement of existing RMU to

new RMU Gautam Vihar Kiosk,

Distt. Yamuna Vihar.

14.10 FY 06-07 HT

5356 YV05RM4042 Yamuna Vihar

Replacement of 7 pannel board

make RBL to seven panel board at

SBI Welcome, Distt.Yamuna Vihar

17.02 FY 06-07 HT

5357 YV05RM4063 Yamuna Vihar

Replacement of 4 panel to 5 panel

board at Kabooter Market,in

division Yamuna Vihar

10.63 FY 06-07 HT

5358 YV05RM4113 Yamuna ViharProv ht 4 panel board at nala no 4

in division Yamuna Vihar3.97 FY 06-07 HT

5359 YV05RM4115 Yamuna Vihar

Replacement of 4 Panel board at d

block bhajanpura in division

Yamuna Vihar

6.75 FY 06-07 HT

5360 YV05RM4119 Yamuna Vihar

Replacement of 3 Panel board at

3.5 pusta, Kartar nagar in division

Yamuna Vihar

6.80 FY 06-07 HT

Page 262: Capitalized Cost S.No. Scheme No. Division Scheme Description … Notice/List of Completed Project... · 2015-09-04 · VIhar& Patparganj- Vivek Vihar) near ISBT- Anand Vihar at Road

5361 YV05RM4120 Yamuna Vihar

Replacement of existing old 10

panel board to new ten panel

board at C-7 in division Yamuna

Vihar

28.66 FY 06-07 HT

5362 YV05RM4182 Yamuna Vihar

Installationof 3 W out door RMU at

Telephone Xchange in division

Yamuna Vihar

3.95 FY 06-07 HT

5363 YV05RM4183 Yamuna Vihar

Installationof 3+1Way out door

RMU at Shastri Park E block in

division Yamuna Vihar

6.63 FY 06-07 HT

5364 YV05RM4184 Yamuna ViharInstallation of 3 Way outdoor RMU

at Chet Ram Yamuna vihar4.02 FY 06-07 HT

5365 YV05SH2158 Yamuna Vihar

Shifting of electrical feeder line

from back side of PWD electrical

S/Stn at Shastri Park.

3.85 FY 06-07 HT

5366 YV05UT4053 Yamuna Vihar

Augmentation of 400 KVA P/M

Transformer into 630 KVA at

Brahamapuri Gali No-19 in division

Yamuna Vihar.

0.204 FY 06-07 HT

5367 YV05UT4054 Yamuna Vihar

Augmentation of 400 KVA

Transformer into 630 KVA at

Brahmpuri Gali No.- 7 & 8 in

division Yamuna Vihar.

0.258 FY 06-07 HT

5368 YV05UT4055 Yamuna Vihar

Augmentation of 400kVA plinth

mounted Transformer to 630kVA

at 5th Pusta Mother Dairy in

division Yamuna Vihar

0.272 FY 06-07 HT

5369 YV05UT4075 Yamuna Vihar

Augmentation of existing

Transformer 630 kVA to 990 kVA

at 3 Road pusta vijay colony in

division Yamuna Vihar.

0.311 FY 06-07 HT

5370 YV05UT4076 Yamuna Vihar

Augmentation of existing

Transformer 630 kVA to 990 kVA

at Gamri kisok main road in

division Yamuna Vihar.

0.311 FY 06-07 HT

5371 YV06RM4000 Yamuna Vihar

Installation of 3+1 way RMU at

Barmhpuri no. 4 in division

Yamuna Vihar

4.25 FY 06-07 HT

5372 YV06RM4001 Yamuna Vihar

Installation of 2*4Way RMU at

Gautam Puri-2 in division Yamuna

Vihar

14.11 FY 06-07 HT

5373 YV06RM4002 Yamuna Vihar

Installation of 2*4Way RMU at

Chauhan Bangar no.-10 in division

Yamuna Vihar

14.44 FY 06-07 HT

5374 YV06RM4015 Yamuna ViharProviding RMU at D block Gamri

in division Yamuna Vihar.3.95 FY 06-07 HT

5375 YV06RM4016 Yamuna ViharProviding RMU at Tikona park

gamri in division Yamuna Vihar.3.95 FY 06-07 HT

5376 YV06RM4081 Yamuna Vihar

Replacement of 8 Panel Board

RBL make at C-12 in division

Yamuna Vihar.

17.00 FY 06-07 HT

5377 YV06RM4117 Yamuna Vihar

Providing 5 Panel Board at

Subhash mohalla no 3 in division

Yamuna Vihar.

10.76 FY 06-07 HT

94092.82Total