Managing Capacity
Transport ForumTshepo Kgobe
Senior Executive Manager
Technical Services
Gautrain Management Agency
![Page 2: Capacity management in large projects](https://reader033.fdocuments.in/reader033/viewer/2022042723/587337db1a28abf21b8b4c11/html5/thumbnails/2.jpg)
Contents
• Context
• Passenger Behavior
• Parking & DFDS Capacity
• Considerations and Conclusion
• Recommendation
• ITMP 25
• Extensions
![Page 3: Capacity management in large projects](https://reader033.fdocuments.in/reader033/viewer/2022042723/587337db1a28abf21b8b4c11/html5/thumbnails/3.jpg)
Capacity Problems– Context
![Page 4: Capacity management in large projects](https://reader033.fdocuments.in/reader033/viewer/2022042723/587337db1a28abf21b8b4c11/html5/thumbnails/4.jpg)
Capacity Challenges – Context
• The success of the Gautrain operation – Y11 ridership in Y3
• 20%+ Percentage cumulative year on year growth in
ridership
• AFC System Capacity and Regulatory compliance
• EMV Compliance
• Physical Rail network and Station layouts
• Reduction in headway
• Rail passenger behaviour
• Parking Capacity
• DFDS challenges
![Page 5: Capacity management in large projects](https://reader033.fdocuments.in/reader033/viewer/2022042723/587337db1a28abf21b8b4c11/html5/thumbnails/5.jpg)
Capacity Problems– Context
Ridership Growth
![Page 6: Capacity management in large projects](https://reader033.fdocuments.in/reader033/viewer/2022042723/587337db1a28abf21b8b4c11/html5/thumbnails/6.jpg)
Capacity Problems– Context
Passenger Behavior
0
100
200
300
400
500
600
700
800
900
1000
05:49 06:01 06:13 06:25 06:37 06:49 07:01 07:13 07:25 07:37 07:49 08:01 08:13 08:25 08:37
N-S MR-MB (25-7-2013)
Usage
Capacity (1.31)
Capacity (1.50)
![Page 7: Capacity management in large projects](https://reader033.fdocuments.in/reader033/viewer/2022042723/587337db1a28abf21b8b4c11/html5/thumbnails/7.jpg)
Capacity Problems– Context
Passenger Behavior
0
100
200
300
400
500
600
700
800
900
1000
05:49 06:01 06:13 06:25 06:37 06:49 07:01 07:13 07:25 07:37 07:49 08:01 08:13 08:25 08:37
N-S MR-MB (12-9-2013)
Usage
Capacity (1.31)
Capacity (1.50)
![Page 8: Capacity management in large projects](https://reader033.fdocuments.in/reader033/viewer/2022042723/587337db1a28abf21b8b4c11/html5/thumbnails/8.jpg)
Capacity Problems– Context
Passenger Behavior
0
100
200
300
400
500
600
700
800
900
1000
05:49 06:01 06:13 06:25 06:37 06:49 07:01 07:13 07:25 07:37 07:49 08:01 08:13 08:25 08:37
N-S MR-MB (16-1-2014)
Usage
Capacity (1.31)
Capacity (1.50)
![Page 9: Capacity management in large projects](https://reader033.fdocuments.in/reader033/viewer/2022042723/587337db1a28abf21b8b4c11/html5/thumbnails/9.jpg)
Capacity Problems– Context
Passenger Behavior
0
100
200
300
400
500
600
700
800
900
1000
05:49 06:01 06:13 06:25 06:37 06:49 07:01 07:13 07:25 07:37 07:49 08:01 08:13 08:25 08:37
N-S MR-MB (13-2-2014)
Usage
Capacity (1.31)
Capacity (1.50)
![Page 10: Capacity management in large projects](https://reader033.fdocuments.in/reader033/viewer/2022042723/587337db1a28abf21b8b4c11/html5/thumbnails/10.jpg)
Capacity Problems– Context
Passenger Behavior
![Page 11: Capacity management in large projects](https://reader033.fdocuments.in/reader033/viewer/2022042723/587337db1a28abf21b8b4c11/html5/thumbnails/11.jpg)
Capacity Problems– Context
Passenger Behavior
![Page 12: Capacity management in large projects](https://reader033.fdocuments.in/reader033/viewer/2022042723/587337db1a28abf21b8b4c11/html5/thumbnails/12.jpg)
Capacity Problems– Context
Passenger Behavior
![Page 13: Capacity management in large projects](https://reader033.fdocuments.in/reader033/viewer/2022042723/587337db1a28abf21b8b4c11/html5/thumbnails/13.jpg)
Capacity Problems– Context
Passenger Behavior
![Page 14: Capacity management in large projects](https://reader033.fdocuments.in/reader033/viewer/2022042723/587337db1a28abf21b8b4c11/html5/thumbnails/14.jpg)
Capacity Problems– Context
Parking Capacity
![Page 15: Capacity management in large projects](https://reader033.fdocuments.in/reader033/viewer/2022042723/587337db1a28abf21b8b4c11/html5/thumbnails/15.jpg)
Capacity Problems– Context
Parking Capacity
![Page 16: Capacity management in large projects](https://reader033.fdocuments.in/reader033/viewer/2022042723/587337db1a28abf21b8b4c11/html5/thumbnails/16.jpg)
Parking and DFDS
Capacity
![Page 17: Capacity management in large projects](https://reader033.fdocuments.in/reader033/viewer/2022042723/587337db1a28abf21b8b4c11/html5/thumbnails/17.jpg)
Capacity Problems– Rail
Capacity• Link loads reach maximum between Centurion and
Sandton
• Highest link load in Midrand – Marlboro section
• Capacity under pressure for about 1½ of the 3 hour
peak period per day
• Counter flow services are underutilised
• Options on current train timetable exhausted
• Rolling stock availability under pressure
• Challenge is how to alleviate capacity constraints
![Page 18: Capacity management in large projects](https://reader033.fdocuments.in/reader033/viewer/2022042723/587337db1a28abf21b8b4c11/html5/thumbnails/18.jpg)
Capacity Problems– Rail Layout• A double-line section shared by the North-South and
East-West
• Junctions at Marlboro Portal - East-West and North-
South services are merged / diverged.
• Single-line tunnel sections between Sandton and
Rosebank
• An at-grade crossing between Pretoria and Hatfield
• Scheduled crossing in the platforms at Rosebank
Station
• Terminal stations restricted to two platforms each
• No loop lines outside the depot area
• Long signalling blocks
![Page 19: Capacity management in large projects](https://reader033.fdocuments.in/reader033/viewer/2022042723/587337db1a28abf21b8b4c11/html5/thumbnails/19.jpg)
Capacity Problems– Parking &
DFDS• Parking
• Parking capacity is insufficient - Pretoria, Centurion,
Midrand, Park, Rosebank and Rhodesfield.
• Availability of land at stations
• Cost of development vs Recovery/Cost to customers
• DFDS
• J2 Johannesburg CBD and M3 Sunninghill-
Overcrowding
• Long bus cycle times
• The DFDS bus service footprint
![Page 20: Capacity management in large projects](https://reader033.fdocuments.in/reader033/viewer/2022042723/587337db1a28abf21b8b4c11/html5/thumbnails/20.jpg)
Considerations
&Conclusions
![Page 21: Capacity management in large projects](https://reader033.fdocuments.in/reader033/viewer/2022042723/587337db1a28abf21b8b4c11/html5/thumbnails/21.jpg)
Capacity Problems– Trade-off
Consideration• Longer trains are more labour efficient
• Shorter trains are more energy efficient
• Pressure on the available line capacity of the network
• • Higher capital and maintenance costs
• The capital cost of doubling of an existing single tunnel
• Higher service levels/ Consequential delays
• Seating Capacity ratio of 1.50 vs. 1.3 vs Cost of service
• Jumper/step back drivers could alleviate capacity
problems on platform and line capacity.
![Page 22: Capacity management in large projects](https://reader033.fdocuments.in/reader033/viewer/2022042723/587337db1a28abf21b8b4c11/html5/thumbnails/22.jpg)
Capacity – Assessment &
Conclusions Rail• That 84 additional rolling stock coaches - required by 2026
• Longer platforms would be required at OR Tambo - 2013
• The Rosebank to Park Station single tunnel - full capacity
by 2022
• The Sandton to Rosebank single tunnel, full capacity by
2026
• Staging capacity at maintenance depot in Midrand -2016
• The provision of additional line capacity between Marlboro
portal and Sandton - required by 2029
• high level junction capacity at Pretoria station - reach
capacity by 2018.
![Page 23: Capacity management in large projects](https://reader033.fdocuments.in/reader033/viewer/2022042723/587337db1a28abf21b8b4c11/html5/thumbnails/23.jpg)
Assessment & Conclusions
Stations, DFDS & Parking• The station design capacities under pressure
• OR Tambo Station (from 2013),
• Park station entries (2014),
• Midrand Station entries (2015),
• Sandton Station exits (2016).
• Additional parking would be required at seven of the nine
station in the next 5 years
• Centurion (824),Rhodesfield (535),
• Midrand (363), Pretoria (253),
• Hatfield (187), Rosebank (148) and Park (70).
• Adititonal busses and routes will be required by 2019
![Page 24: Capacity management in large projects](https://reader033.fdocuments.in/reader033/viewer/2022042723/587337db1a28abf21b8b4c11/html5/thumbnails/24.jpg)
Recommendations
Timelines
![Page 25: Capacity management in large projects](https://reader033.fdocuments.in/reader033/viewer/2022042723/587337db1a28abf21b8b4c11/html5/thumbnails/25.jpg)
Capacity – Recommendations• 48 rolling stock coaches are procured starting 2015
• OR Tambo platform be extended - 2014
• Rosebank to Park and Sandton to Rosebank single tunnels be
doubled - 2021
• New Depot Staging capacity at the depot in Midrand to be
increased
• Line capacity between Marlboro and Sandton is increased by
2018
• Investigate Centurion – Sandton short turn shuttle service
• A full simulation study of the system to determine bottlenecks
• Configure the seats in GPS train sets – 2014
• Shorter headway and the rolling stock implications
![Page 26: Capacity management in large projects](https://reader033.fdocuments.in/reader033/viewer/2022042723/587337db1a28abf21b8b4c11/html5/thumbnails/26.jpg)
Capacity - Future actions• Network Assessment will be updated on an annual basis
• Integrate land-use strategies for all stations
• Determine the long-term GMA financial implications
• A full transport integration strategy to be finalised
• Prioritise the different activities and create a scheduled
project plan
• Finalise the rolling stock procurement tender
• Finalise the physical infrastructure system optimisation
• Finalise new DFDS routes and add new shuttle services
• Develop a full integrated plan to incorporate NMT and UA
![Page 27: Capacity management in large projects](https://reader033.fdocuments.in/reader033/viewer/2022042723/587337db1a28abf21b8b4c11/html5/thumbnails/27.jpg)
Mobility Paradigm
![Page 28: Capacity management in large projects](https://reader033.fdocuments.in/reader033/viewer/2022042723/587337db1a28abf21b8b4c11/html5/thumbnails/28.jpg)
SUSTAINABLE MOBILITY PARADIGM
![Page 29: Capacity management in large projects](https://reader033.fdocuments.in/reader033/viewer/2022042723/587337db1a28abf21b8b4c11/html5/thumbnails/29.jpg)
TRANSPORT TRENDS
• Sustainable Urban Mobility Planning
• Total Carbon Footprint of Public Transport and Mobility
• The convergence of Public and Personalised Transport
• Smart Mobility
– The First/Last Mile is key in Trip Planning
– Influencing Commuter Behaviour
• Data Centric Mobility
– System Convergence and Standardisation
• Availability of Information
– Information today is pervasive
– Web technologies catalyse instant and standard access
– Smartphones/tablets catalyse personal access
– Open Data
• Designing for Sustainability
– SMRS
– Future Materials
![Page 30: Capacity management in large projects](https://reader033.fdocuments.in/reader033/viewer/2022042723/587337db1a28abf21b8b4c11/html5/thumbnails/30.jpg)
COMMUTER CONNECTIVITY REQUIREMENTS
• Trip planning
• E-commerce – Ticket reloads
• Overall Service Status (Live)
• Next Arrival for Bus and Railway (Scheduled)
• Service maps for bus and train
• Weather reports – Morning and Evening
• Universal Access - Elevator and Escalator Status
• Neighbourhood and station navigation
• Reduced mobility Alerts – Roadworks and Detours
• Emergency messaging
• Advertising/Institutional messages
• Customer Queries
• Camera and microphone for Customer Service - FaceTime
![Page 31: Capacity management in large projects](https://reader033.fdocuments.in/reader033/viewer/2022042723/587337db1a28abf21b8b4c11/html5/thumbnails/31.jpg)
PERSONALISED TRIP INFORMATION REQUIREMENTS
• Provide real-time multimodal information
• Users expectations of a seamless journey with timely traveller
information
• Last mile Connectivity
• Information system data needs to be effectively integrated to make
the information valuable
• User experience
• Intuitive
• Interactive and Adaptive screen
• User Interface – Standardised look and Feel
• Provides a snapshot of various real-time information in default
mode
![Page 32: Capacity management in large projects](https://reader033.fdocuments.in/reader033/viewer/2022042723/587337db1a28abf21b8b4c11/html5/thumbnails/32.jpg)
Thank you