CALM Buoy Terminals Major Milestones & Track record€¦ · 2014 2015 Perenco Vietnam Vietnam FPSO...

8
CALM Buoy Terminals Major Milestones & Track record

Transcript of CALM Buoy Terminals Major Milestones & Track record€¦ · 2014 2015 Perenco Vietnam Vietnam FPSO...

Page 1: CALM Buoy Terminals Major Milestones & Track record€¦ · 2014 2015 Perenco Vietnam Vietnam FPSO Turret Offshore Inspection Offshore site visit and report on leaking Swivel Stack

CALM Buoy Terminals

Major Milestones & Track record

Page 2: CALM Buoy Terminals Major Milestones & Track record€¦ · 2014 2015 Perenco Vietnam Vietnam FPSO Turret Offshore Inspection Offshore site visit and report on leaking Swivel Stack

15 + year Track Record of Offshore Success

1998

2007

2009

2013

1999 2000 2002 2004 2005

June Monobuoy Company Ltd is set up in the United Kingdom.

Monobuoy is awarded EPCI contract for two newbuild CALM Buoys for Es Sider Terminal, Libya

Monobuoy fully refurbishes CALM buoy SO1210 for Perenco, Gabon

Monobuoy obtains ISO 9001 accreditation.

Monobuoy SARL, engineering offices opened in Monaco

2010

Monobuoy Ltd awarded EPC of FSO5, for Bach Ho Field in Vietnam

Contract award for change out of Ifrikia II FSO mooring arm hinge, Tunisia

2008

Monobuoy is awarded EPC contract for three newbuild CALM Buoys for Mina Al Fahal, Oman

Monobuoy Ltd is awarded its first buoy contract for the design of the GETIP buoy.

Contract award for Four Rainbow FPSO overhaul work, Singapore

Design & Supply of 300 bar High Pressure Toroidal Swivel, Australia

Design & Supply of double product gas/condensate Swivel for Perenco, DRC

Design and Supply of buoy equipments for SBM and Vietsovpetro, Vietnam.

Monobuoy starts offering oil & gas terminal audits and training services

Representative office opened in Haiphong, Vietnam.

2011

2012

Full Overhaul project management of CALM Buoy, Cyprus

2014

Full Overhaul project management of CALM Buoy, Nigeria

Yard completion of FSO5 at Nasico Yard, Haiphong, Vietnam

Construction of FSO5 in Vinashin’s Nasico shipyard, Haiphong under full supervision from Monobuoy Company Ltd.

2007-2009

2015

Offshore Installation & final commissioning of FSO Back Ho, Vung Tau, Vietnam

Pre-qualified by Total for the design and supply of a Deepwater Turret Buoy, Nigeria

Monobuoy designs & supplies its first subsea umbilical assembly for Petromasila, Yemen

Page 3: CALM Buoy Terminals Major Milestones & Track record€¦ · 2014 2015 Perenco Vietnam Vietnam FPSO Turret Offshore Inspection Offshore site visit and report on leaking Swivel Stack

Compl. Start Client Location Project Description Scope of work

ongoing 2015 PDO/Shell Oman CALM Buoy NewbuildDesign, supply and transport to site of three new 12m CALM buoys. Buoys

fabricated in Dubai

ongoing 2014 Vietsovpetro Vietnam FSO Turret OverhaulEngineering Services for the Overhaul of FSO5 Turret and supply of spare

parts

ongoing 2013 Waha Oil Libya CALM Buoy Newbuild Design, supply and installation two new 12m CALM buoys. Buoys fabricated in

Dubai

TRACK RECORD (Major Projects)

Monobuoy Co. Ltd & Monobuoy SARL.

In Progress Projects

Page 1 of 6

Page 4: CALM Buoy Terminals Major Milestones & Track record€¦ · 2014 2015 Perenco Vietnam Vietnam FPSO Turret Offshore Inspection Offshore site visit and report on leaking Swivel Stack

Compl. Start Client Location Project Description Scope of work

2015 2014Saudi Arabian

ChevronKuwait CALM Buoy Overhaul Supply of spares and Telemetry/Surge System upgrade

2015 2014 Perenco Australia CALM Buoy Overhaul Second hand CALM Buoy Purchase, Reengineering and Overhaul

2015 2014 PetroMasila Yemen CALM Buoy Spare parts supply Supply of two umbilical assemblies + all connectors ( 67mtrs & 75mtrs)

2015 2015 Julius Berger Nigeria CALM Buoy Offshore Inspection Offshore site visit for yearly audit of CALM Buoy Maintenance

2014 2015 Perenco Vietnam Vietnam FPSO Turret Offshore Inspection Offshore site visit and report on leaking Swivel Stack design from FRAMO

2014 2014 PDO Oman CALM Buoy Site InspectionSite inspection of an SBM CPU due to detected leakage. Supply of replacement

CPU seals and Bearing.

2014 2011Britannia Steam

Ship InsuranceChile Consultancy Services Expert witness in CALM Buoy & Tanker Accident, Chile.

2014 2011 Sarost TunisiaMooring system design & CALM Buoy

Overhaul

Design of mooring system for FSO Soft Mooring System. Overhaul of CALM

buoy, supply of new Main Slewing Bearing

2014 2005 Ince & Co UK Expert Witness & Consultancy servicesExperts for alleged collision between tanker with CALM buoy in Lithuania.

Inspection of buoy and dismantling of main slewing bearing.

2014 2013 Hydrodive Nigeria Buoy OverhaulSupply of replacement buoy bearings and equipment + overhaul supervision

expertise

2014 2013PT Bumi Hasta

MuktiIndonesia Buoy Overhaul Supply of replacement buoy bearings and equipment + overhaul supervision

2014 2014Hydrodive /

Shell NigeriaNigeria Refurbishment & Sale of GETIP Buoy Complete overhaul of the GETIP buoy for sale to SPDC

2014 2014Premuda SpA /

AFM PtyCyprus Legal Advise Legal advise in litigation case between FPSO owner & operator

Completed Projects

Page 2 of 6

Page 5: CALM Buoy Terminals Major Milestones & Track record€¦ · 2014 2015 Perenco Vietnam Vietnam FPSO Turret Offshore Inspection Offshore site visit and report on leaking Swivel Stack

Compl. Start Client Location Project Description Scope of work

2013 2013 PetroMasila Yemen CALM Inspection & Supervision Inspection of Buoy and supervision during changeout.

2013 2013Detech Services

LtdCyprus Modification of CALM Buoy

Modification of a new CALM buoy. Conversion from 6 to 8 mooring legs.

Installation of telemetry and electrical system

2013 2013 Conoco Phillips Indonesia Bogey wheel rails. Supply of Bogey wheel rails for Imodco buoy.

2013 2012 BP Egypt Consultancy Services Mooring Analysis of CBM system for VLCC tankers.

2013 2006 Ince & Co UK Expert Witness & Consultancy servicesExperts for collision between tanker with CALM buoy, Spain. Inspection of

buoy and subsea mooring equipment. Case settled favourably.

2012 2012 Serept Tunisia ITT for SBS Overhaul/ Supply Spare Parts Design and supply of new chainstopper bushes and midwater buoyancy arch.

2012 2010Balch & Bingham

LLPUSA Consultancy Services

Expert Witness on Single Point Mooring Systems and damage suffered to the

Irving Oil Canaport SPM System. Case won in US court.

2012 2009 In-House Monaco Turbine Research & Development New Vertical Axis Water Turbine system for offshore renewable energy project.

2011 2011Premuda SpA /

AFM PtyAustralia Consultancy Services Study into the Ballast and Trim of the Four Rainbow FPSO

2011 2010Premuda SpA /

AFM PtyAustralia

FPSO Four Rainbow Engineering &

Procurement

Engineering study into riser damage during buoy disconnection. Engineering

study into swivel pipe vibration.

2011 2010Premuda SpA /

AFM PtySingapore FPSO Four Vanguard. FPSO Upgrading

Design, manufacture and installation of a 300 bar 3”NB toroidal swivel.

Redesign and replacement of the hydraulic system on the three 165T

reconnection winches. Supervision of the overhaul of the swivel stack ands

associated equipment.

2011 2010Premuda SpA /

AFM PtyAustralia FPSO Maintenance

FPSO Four Rainbow. Design, supply and installation of new production pipe

support system in the turret. Tensioning of Main Slewing Bolts.

Page 3 of 6

Page 6: CALM Buoy Terminals Major Milestones & Track record€¦ · 2014 2015 Perenco Vietnam Vietnam FPSO Turret Offshore Inspection Offshore site visit and report on leaking Swivel Stack

Compl. Start Client Location Project Description Scope of work

2011 2007 Vinashin VietnamDesign of Complete FPSO and supply

special components.

Complete design (basic and detailed) of 150,000 DWT FPSO. Supply of special

equipment such as Main Slewing Bearing, Product Swivel Stack, Chain stopers,

Process Equipment, metering System etc. Supervision of Installation and

startup.

2011 2003Goodyear Eng.

ProductsWorldwide Spare parts supply Sole supplier of all SPM hose system ancillary equipment, 2003 to 2011

2010 2010 Serept Tunisia FSO Ifrikia II FSO mooring hinge inspection. FSO bearing changeout procedure.

2010 2009Premuda SpA /

AFM PtyAustralia

FPSO Four Rainbow Engineering &

Procurement

Engineering study into possibility of changing out subsea equipment.

Changeout of subsea MIB ESD valves during reconnection phase of FSO and

disconnectable buoy.

2009 2009Goodyear Eng.

ProductsBrasil Engineering & Consultancy Riser analysis engineering study

2009 2009 Voga Australia Terminal Audit Inspection of buoy and subsea mooring equipment

2008 2007 Perenco Gabon Double Product Swivel Design and manufacture of a double product (oil/gas) swivel for CALM buoy.

2007 2007Premuda SpA /

AFM Pty

Monaco -

Italy -

Australia

FPSO Four Vanguard - Upgrading Design

Phase

Project management of the procurement of a new swivel stack. Design of new

swivel stack integration, revised process, hydraulic and electrical system. Design

and supply of new turret rotation system. Supervision of installation and

commissioning.

2007 2005Columbus Oil

and GasUK Concept & FEED Study

Conceptual studies and Front-End Engineering for a novel unmanned offshore

oil production system specifically for ultra-marginal oilfields.

2006 2006 BP UK Engineering Study Study into mooring options for FPSO’s located in arctic conditions.

2006 2006Premuda SpA /

AFM PtyAustralia FPSO Four Vanguard. Inspection Investigation into failed high-pressure product swivel stack

2006 2005 Nexen Yemen Installation services Inspection of No1 CALM buoy. Changeout of No1 CALM buoy. Engineering

study into the mooring problems with No2 CALM buoy

2006 2005Premuda SpA /

AFM Pty

Monaco -

Italy -

Australia

FPSO Four Vanguard. Upgrading Design

Phase

Design of chemical injection system for FPSO “Four Vanguard”. Production of

Operation and Maintenance Manual for Turret & Subsea equipment.

2005 2005

South Atlantic

Refining

Company

Brasil FEED Study for CALM buoy.Front end engineering and preparation of “Basis of Design” for two CALM

buoys, and the associated subsea equipment.

2005 2004 Oxxo Ecuador 10m CALM buoy Engineering Phase Design of a 10m CALM buoy

Page 4 of 6

Page 7: CALM Buoy Terminals Major Milestones & Track record€¦ · 2014 2015 Perenco Vietnam Vietnam FPSO Turret Offshore Inspection Offshore site visit and report on leaking Swivel Stack

Compl. Start Client Location Project Description Scope of work

2005 2004 Serept Tunisia FSO Ifrikia II - Inspection & Upgrading Design, supply and installation of new starboard Yoke Mooring Hinge System

offshore Tunisia. Work performed offshore without shutdown.

2004 2004 GIA MexicoAutomatic Greasing System for CALM

buoy bearingsSupply of 2 Main Slewing Bearing greasing systems for Pemex

2004 2004Master

RopemakersUK Spare parts supply Manufacture & supply SPM hose handling equipment & hardware.

2004 2004 Vinashin Vietnam Consultancy ServicesAct as adviser to State ship builders on design, build and installation of SPM for

Vietnamese waters.

2004 2003 EPPM Algeria Consultancy ServicesDesign review of 5 CALM buoys, at three locations in Algeria, and their hoses,

chains etc. Manufacturing inspection of SPM equipment.

2004 2002 GALP Portugal Expert Witness & Consultancy servicesProvide expert assistance for mooring and maintenance operations of CALM

buoy and terminal. Audit offshore terminal at two monthly intervals.

2004 2002 Petrogal Portugal Consultancy Services

Perform detailed inspection of failed CALM buoy and hoses. Expert Witness in

arbitration case involving the suitability of a CALM buoy in heavy seas offshore

Portugal.

2003 2003J.S Webber

AssociatesUK Consultancy Services

Marine Consultants for the design of a proposed offshore taker discharge

terminal in Eastern Europe.

2003 2003 Scanna Ramnas Sweden Spare parts supply Design and supply of chain-stoppers for Vietsovpetro “Dai Hung” Field

2003 2002 SBM MonacoAutomatic Greasing System for CALM

buoys

Design, supply and install three SPM main bearing and swivel automatic

greasing systems.

2003 2001 Vietsovpetro Vietnam Supply FPSO Componennts

Supply FSO mooring system components. 5" chains and shackles, mooring

hawsers and ancillary equipment, chain tensioner, greasing systems, unijoint

components, main bearing bolts

2003 2000 SBM MonacoComposite Water Barrage Systems for

CALM buoys

Design and supply as standard equipment, main bearing GRP water protection

assemblies on all new-build buoys. Ten units supplied to date. The first unit

installed by our own engineers.

2002 2002 Marathon Gabon Consultancy Services Audit FSO and tanker offtake facilities.

2002 2002 Petroecador Ecuador Consultancy ServicesAudit of the operations at the Balao Terminal and recommend upgrade

procedures and training.

2002 2001Impac Offshore

EngineeringGermany Consultancy Services

Partners in consortium to develop and propose a system concept for the

offshore shi-to-ship loading of LNG for Exxon Mobil.

Page 5 of 6

Page 8: CALM Buoy Terminals Major Milestones & Track record€¦ · 2014 2015 Perenco Vietnam Vietnam FPSO Turret Offshore Inspection Offshore site visit and report on leaking Swivel Stack

Compl. Start Client Location Project Description Scope of work

2001 2001 Termap S.A Argentina Consultancy ServicesCarry out feasibility study and produce calculations for the re-design of SPM

chain mooring from a six leg to four leg configuration

2001 1999Reliance

Petroleum LtdIndia Consultancy Services

Develop and supply procedures and manuals and conduct training for marine

operations at Jamnagar. Audit of marine facilities at Hazira.

2000 2000 Teeside Refinery UK Consultancy ServicesExpertise and assistance given to client in selection of a suitable offloading

system.

2000 2000 Tesoro Pet. Corp Hawai Consultancy ServicesExpert witness as operations & maintenance expert in SBM floating hose failure

and pollution claim.

2000 2000 Vietsovpetro Vietnam Supply Product Swivel Design and manufacture two 8" product swivels.

2000 1999 Getip SA Turkey 12m CALM buoy Design of 12m Calm Buoy to Monobuoy.

2000 1999 Glencore Switzerland Consultancy ServicesExpert in Time Charter disputes. Expert in CP Speed & Performance claims

and disputes.

1999 1999

Environmental

Resources

Management

UK Consultancy ServicesResearch and produce a report on SPM terminals in environmentally sensitive

areas.

1999 1999London

arbitrationUK Consultancy Services Appointed Arbitrator in Time Charter dispute.

1999 1999 SBM MonacoCALM buoy Terminals - Operating

Procedures

Carry out study of CPC, Sha-Lung terminal and propose recommendations for

upgrading operating procedures and equipment to operate safely, and cost

effectively in heavy weather.

Page 6 of 6