CALIFORNIA ENERGY COMMISSION Gas Quality Stakeholders’ Technical Committee Meeting September 20, 2005 Natural Gas Quality: Power Turbine Performance During Heat Content Surge Updated Information and Schedule William Walters Aspen Environmental Group Sponsored by the California Energy Commission

Transcript of CALIFORNIA ENERGY COMMISSION Gas Quality Stakeholders’ Technical Committee Meeting September 20,...

Page 1: CALIFORNIA ENERGY COMMISSION Gas Quality Stakeholders’ Technical Committee Meeting September 20, 2005 Natural Gas Quality: Power Turbine Performance During.

CALIFORNIA ENERGY COMMISSION

Gas Quality Stakeholders’ Technical Committee Meeting

September 20, 2005

Natural Gas Quality:Power Turbine PerformanceDuring Heat Content Surge

Updated Information and Schedule

William WaltersAspen Environmental Group

Sponsored by the California Energy Commission

Page 2: CALIFORNIA ENERGY COMMISSION Gas Quality Stakeholders’ Technical Committee Meeting September 20, 2005 Natural Gas Quality: Power Turbine Performance During.

CALIFORNIA ENERGY COMMISSION

Update and Schedule

• Sutter Natural Gas Fuel Wobbe was determined. Los Medanos, Delta, and Redding as used fuel Wobbe cannot be determined with available data.• Western Midway Sunset had events of reduced fuel heat content which caused significant increases in CO emissions, but did not significantly impact NOx emissions.• Study will go out for CEC management and data provider review later this week, and the Draft Study with excel raw data tables should be made public as early as late next week. • Additional work will be funded by the CEC to determine potential natural gas quality emissions/operations impacts to large power boilers. Scope of work should be completed by the end of this week and work should begin in approximately two weeks.

Page 3: CALIFORNIA ENERGY COMMISSION Gas Quality Stakeholders’ Technical Committee Meeting September 20, 2005 Natural Gas Quality: Power Turbine Performance During.

CALIFORNIA ENERGY COMMISSION

Sutter Natural Gas Fuel Heat Content and Wobbe

960

970

980

990

1000

1010

1020

1030

1040

105012

:00

AM

4:00

AM

8:00

AM

12:0

0 P

M4:

00 P

M8:

00 P

M12

:00

AM

4:00

AM

8:00

AM

12:0

0 P

M4:

00 P

M8:

00 P

M12

:00

AM

4:00

AM

8:00

AM

12:0

0 P

M4:

00 P

M8:

00 P

M12

:00

AM

4:00

AM

8:00

AM

12:0

0 P

M4:

00 P

M8:

00 P

M12

:00

AM

4:00

AM

8:00

AM

12:0

0 P

M4:

00 P

M8:

00 P

M12

:00

AM

4:00

AM

8:00

AM

12:0

0 P

M4:

00 P

M8:

00 P

M

9-Jun-05 10-Jun-05 11-Jun-05 12-Jun-05 13-Jun-05 14-Jun-05

Btu

/scf

(H

HV

)

1290

1300

1310

1320

1330

1340

1350

1360

Wo

bb

e In

dex

Heat Content

Wobbe Index

Page 4: CALIFORNIA ENERGY COMMISSION Gas Quality Stakeholders’ Technical Committee Meeting September 20, 2005 Natural Gas Quality: Power Turbine Performance During.

CALIFORNIA ENERGY COMMISSION

Sutter CT2 Uncontrolled NOx vs Wobbe

1300 1320 1340 1360W obbe Index

20

22

24

26

28

30

Pre

-SC

R N

Ox

(pp

m)

95 percent confidence in terva l

best fit line

95 percent confidence in terva l

Page 5: CALIFORNIA ENERGY COMMISSION Gas Quality Stakeholders’ Technical Committee Meeting September 20, 2005 Natural Gas Quality: Power Turbine Performance During.

CALIFORNIA ENERGY COMMISSION

Sutter CT2 Ammonia Use vs Wobbe

1290 1300 1310 1320 1330 1340 1350W obbe Index

70

80

90

100

110

Am

mo

nia

Inje

ctio

n R

ate

(lb

s/hr

)

95 percent confidence in terva l

95 percent confidence in terva l

best fit line

Page 6: CALIFORNIA ENERGY COMMISSION Gas Quality Stakeholders’ Technical Committee Meeting September 20, 2005 Natural Gas Quality: Power Turbine Performance During.

CALIFORNIA ENERGY COMMISSION

Sutter CT2 Controlled NOx vs. Wobbe

Summary:

• Uncontrolled NOx 15% increase for 3.5% increase in Wobbe

• Ammonia use 10% increase for 3.5% increase in Wobbe

• Controlled NOx no increase

1290 1300 1310 1320 1330 1340 1350W obbe Index

2

2.1

2.2

2.3

2.4

Pos

t-S

CR

NO

x (p

pm

)

best fit line

95 percent confidence lim it

95 percent confidence lim it

Page 7: CALIFORNIA ENERGY COMMISSION Gas Quality Stakeholders’ Technical Committee Meeting September 20, 2005 Natural Gas Quality: Power Turbine Performance During.

CALIFORNIA ENERGY COMMISSION

Western Midway Sunset CO Emissionsvs Fuel Heat Content

0.1

1

10

100

1000 1020 1040 1060 1080 1100 1120

Heat Content (Btu/scf)

Car

bo

n M

on

oxi

de

(pp

m)

Post-Modification COPre-Modification COSecond Turbine CO

Page 8: CALIFORNIA ENERGY COMMISSION Gas Quality Stakeholders’ Technical Committee Meeting September 20, 2005 Natural Gas Quality: Power Turbine Performance During.

CALIFORNIA ENERGY COMMISSION

Western Midway Sunset Description

• Cogeneration 7E turbines with SCR and no CO catalyst – 25 ppm CO permit limit.

• No significant controlled NOx impacts (i.e. reduction) during heat content drop.

• Expensive (~$250,000) burner modification fixed problem.

• Subsequent burner modifications to second turbine affected earlier CO emissions fix.