Cairo UniversityFaculty of EngineeringDepatment of Arch.Post Graduate Studies2004-2005
Presented to :
Dr. Hatem Elshafai
Presented by:
Reem Mohamad Hegazy
![Page 2: Cairo University Faculty of Engineering Depatment of Arch. Post Graduate Studies 2004-2005 Presented to : Dr. Hatem Elshafai Presented by: Reem Mohamad.](https://reader036.fdocuments.in/reader036/viewer/2022082821/5697bfe31a28abf838cb54ab/html5/thumbnails/2.jpg)
Topic Number: 79 79
PROJECT TEAM RELIED HEAVILY ON DIGITAL COLLABORATION TO REBUILD THE
WINTER GARDEN QUICKLY
By: Victoria Rivkin With D.S Victoria Rivkin With D.S..
Date:Date: March March 2003.
Presented By:Reem Mohamad Hegazy.
Web Site: WWW.arcWWW.archrecord.construction.comrd.construction.com/features/digital/features/digital..
Other Sites:WWW.newsday.com/news/local/newyorkWWW.newsday.com/news/local/newyork WWW.lowermanhattan.info/news/wintergarden-reopensWWW.lowermanhattan.info/news/wintergarden-reopens
![Page 3: Cairo University Faculty of Engineering Depatment of Arch. Post Graduate Studies 2004-2005 Presented to : Dr. Hatem Elshafai Presented by: Reem Mohamad.](https://reader036.fdocuments.in/reader036/viewer/2022082821/5697bfe31a28abf838cb54ab/html5/thumbnails/3.jpg)
The Event ……..
The Winter Garden suffered extensive damage following
the collapse of the World Trade Center towers on September 11, 2001.
The owner turned to Cesar Pelli & Associates, the original architect, for restoring the blg.
The Garden’s
Photos after
the attack.
![Page 4: Cairo University Faculty of Engineering Depatment of Arch. Post Graduate Studies 2004-2005 Presented to : Dr. Hatem Elshafai Presented by: Reem Mohamad.](https://reader036.fdocuments.in/reader036/viewer/2022082821/5697bfe31a28abf838cb54ab/html5/thumbnails/4.jpg)
About The Restoration Project….
- Changing the entire character of the Winter Garden in a
short period of time.
- Creating good transitions between the new and the old details.
Duration: nine months.
Cost: 50 million dollars.
Considerations:
![Page 5: Cairo University Faculty of Engineering Depatment of Arch. Post Graduate Studies 2004-2005 Presented to : Dr. Hatem Elshafai Presented by: Reem Mohamad.](https://reader036.fdocuments.in/reader036/viewer/2022082821/5697bfe31a28abf838cb54ab/html5/thumbnails/5.jpg)
The Restoration Project….
-Rendering Of The Winter Garden’s New Interior Was Used To Help in Selecting
Materials
1-Replacing the marble flooring using 60,000 square feet of tri-color Italian marble.
INT
ER
IOR
…..
2-Replacing nearly 70 percent of the arched ceiling.
![Page 6: Cairo University Faculty of Engineering Depatment of Arch. Post Graduate Studies 2004-2005 Presented to : Dr. Hatem Elshafai Presented by: Reem Mohamad.](https://reader036.fdocuments.in/reader036/viewer/2022082821/5697bfe31a28abf838cb54ab/html5/thumbnails/6.jpg)
3-Replacing half of the grand staircase.
The Restoration Project….IN
TE
RIO
R…
..
4-Redesign the celebrated glass dome.
5-Replacing sixteen 43-feet tall palm trees from Florida.
![Page 7: Cairo University Faculty of Engineering Depatment of Arch. Post Graduate Studies 2004-2005 Presented to : Dr. Hatem Elshafai Presented by: Reem Mohamad.](https://reader036.fdocuments.in/reader036/viewer/2022082821/5697bfe31a28abf838cb54ab/html5/thumbnails/7.jpg)
The Restoration Project….
6-Replacing the ruined east facade by a sheer wall of “u” glass
that spans from floor to the ceiling and overlooks West Street.
New Entrance
EX
TE
RIO
R…
..
7-Designing a new eastern entrance to the atrium instead of the destroyed bridge which was extending from the Winter Garden atrium connected Battery Park City to the World Trade Center.
![Page 8: Cairo University Faculty of Engineering Depatment of Arch. Post Graduate Studies 2004-2005 Presented to : Dr. Hatem Elshafai Presented by: Reem Mohamad.](https://reader036.fdocuments.in/reader036/viewer/2022082821/5697bfe31a28abf838cb54ab/html5/thumbnails/8.jpg)
The Restoration Project Steps….
1-Digitizing the original contract documents from the 1980s By:
Using them as an underlay to create CAD drawings.
Scanning them.
2-Using these drawings to verify key dimensions and struc-
tural elements. Col
lect
ing
Dat
a…..
![Page 9: Cairo University Faculty of Engineering Depatment of Arch. Post Graduate Studies 2004-2005 Presented to : Dr. Hatem Elshafai Presented by: Reem Mohamad.](https://reader036.fdocuments.in/reader036/viewer/2022082821/5697bfe31a28abf838cb54ab/html5/thumbnails/9.jpg)
The Restoration Project Steps….
3-The architect did hand sketches of proposed changes, then turned them over to dboxstudio.
4-Creating a variety of images of the Winter Garden as it underwent redesign.
Red
esig
n pr
oces
s….
5-Making a 3D frame of the project onto which were overlaid
different materials and facade designs to evaluate materials.
![Page 10: Cairo University Faculty of Engineering Depatment of Arch. Post Graduate Studies 2004-2005 Presented to : Dr. Hatem Elshafai Presented by: Reem Mohamad.](https://reader036.fdocuments.in/reader036/viewer/2022082821/5697bfe31a28abf838cb54ab/html5/thumbnails/10.jpg)
The Used Software…..T
he U
sed
Sof
twar
e….
-The architects used softwares in the project like:
For creating visualiz- ations 3D Studio VIZ.
Photo - shop.
For rendering Dbox-studio.
For drawings Autocad.
In The Restoration Proj….
![Page 11: Cairo University Faculty of Engineering Depatment of Arch. Post Graduate Studies 2004-2005 Presented to : Dr. Hatem Elshafai Presented by: Reem Mohamad.](https://reader036.fdocuments.in/reader036/viewer/2022082821/5697bfe31a28abf838cb54ab/html5/thumbnails/11.jpg)
The Restoration Project result ….A
fter
The
Res
tora
tion…
.
It was reopened to the public on September 18, 2002
following an intensive yearlong restoration effort. Today the restoration is completed and the soaring glass
dome returned to its splendor.