CAD Considerations for Project Managers

27
CAD Considerations for Project Managers An interactive discussion Edward C. Lick IT CAD Support Manager STV, Incorporated Douglassville, PA 19518 610-385-8335

description

CAD Considerations for Project Managers. An interactive discussion Edward C. Lick IT CAD Support Manager STV, Incorporated Douglassville, PA 19518 610-385-8335. How would you handle this requirement?. - PowerPoint PPT Presentation

Transcript of CAD Considerations for Project Managers

Page 1: CAD Considerations for Project Managers

CAD Considerations for Project Managers

An interactive discussion

Edward C. LickIT CAD Support Manager

STV, IncorporatedDouglassville, PA 19518

610-385-8335

Page 2: CAD Considerations for Project Managers

How would you handle this requirement?

Trying to plot a set of mylar's from one of his Port Authority projects (and they are very picky about their print jobs). Need the plotter to be set up to be 22"x34" w/1" top, bottom & right border ( 1 1/4" on the left). Can we help him out? Printing from AutoCAD to the 4th floor JDL5000-A plotter. Please contact Boris @ x3458.

Page 3: CAD Considerations for Project Managers

CAD Integration into the Project Manual - Estimated Investment, $150k

“…Template files and standard processes for Submittals, to be integrated into the evolution of a project especially at the very start.”

“…Forethought must be given and time provided to decide which CAD Standard a project will adhere to and template files should be set up.”

“…In summary, attempts should be made to ensure that the technology we have on hand is maximized and utilized wherever and whenever we can. An integration check list is simply a start.”

STV, Inc. CAD Assessment 2004By Edward C. Lick

Page 4: CAD Considerations for Project Managers

Purpose

Communication Eliminate Errors Speed (real, not perceived) Consistent Quality Performance Save Money

Page 5: CAD Considerations for Project Managers

Major Categoriesfor CAD Considerations for projects

Start / Input Production Output Finish / Close

Page 6: CAD Considerations for Project Managers

The Check List

Page 7: CAD Considerations for Project Managers

Start and Input

Communication

CAD Product for Deliverables

Expertise

Due Dates

Page 8: CAD Considerations for Project Managers

Communication IT CAD Support – help us help you! Meet with a CAD Manager and/or CAD Discipline

Leads to discuss the check list Project Specifications for Design Directory Structure Requirements - By Clients CAD Standard Manuals – Distributed CAD Leads, Discipline Leads Assignments

Page 9: CAD Considerations for Project Managers

CAD Product for Deliverables

AutoCAD Microstation Verticals? i.e. Revit, InRoads, BRADD 3D Rendering? Licensing Additional Software Requirements by Client

Page 10: CAD Considerations for Project Managers

Expertise

AutoCAD Microstation Verticals such as Revit, InRoads, BRADD, GIS 3D Rendering IT CAD Support help find the experts Assist with user evaluations

Page 11: CAD Considerations for Project Managers

Due Dates

Proposals Submittals – 30%, 60%, 100% Plot requirements

Page 12: CAD Considerations for Project Managers

Production Drawing Integrity

REAL WORLD SIZE!!!!!! Philosophy Change – Its Data, not a drawing! Geometry Snaps – Endpoints, intersections

Page 13: CAD Considerations for Project Managers

Production Drawing Efficiency

This work is not acceptable – at any level Geometry Snaps – Endpoints, intersections Associative Hatch and Dimensions

Page 14: CAD Considerations for Project Managers

Standards IT CAD Support Assist CAD Leads for setup of… Naming Conventions

File Names Layer Names Sheet

Sheet Borders Fonts and Hatch Patterns Symbols and Details (Design Center Files) Template/Seed Files

Page 15: CAD Considerations for Project Managers

Template/Seed Files Sheet layouts for plotting, North Arrows,

Standard Notes, etc. Text and Dimension Styles Standards Checking Configuration Referenced Border with Data Fields Layers and their Color and Lineweights Plotting Page Setups – Pen Tables

Page 16: CAD Considerations for Project Managers

Production Document Management

Reference FilesAvoid Replicated Data/DrawingsCollaboration

Image Management

Page 17: CAD Considerations for Project Managers

Document Management

Reference Files Cartoon Set - Preset Block Diagram/Drawing Tree

Avoid Replicated Data/Drawings Collaboration

Multiple Offices Multiple Stakeholders

Buzzsaw Projectwise Skire

Page 18: CAD Considerations for Project Managers

Image Management Reduce image size Referenced Images & CAD files in the same

directory Remove unused Image files

Page 19: CAD Considerations for Project Managers

Output Plot Configuration Files Plotting Submittals Packager and Etransmit Command

Page 20: CAD Considerations for Project Managers

Plot Configuration Files PCFs for Microstation Color Tables for AutoCAD Page Setups

Embed in the Template Files

Page 21: CAD Considerations for Project Managers

Plotting Template file “Layouts” can be preset for

single-click and consistent plotting Batch Plotting

Page 22: CAD Considerations for Project Managers

Submittals Schedule Dates – cut-off date for changes

- two day buffer margin What is the required format?

DWF – Publish multi-sheets in a single filePDF

Page 23: CAD Considerations for Project Managers

Packager-Etransmit Easily creates a compressed version of

DGN/DWG files Includes all referenced files, fonts etc.

Page 24: CAD Considerations for Project Managers

Closing the Project External References

BindPurge CAD Files

Purge File Folders“Junk”

ArchiveProject Archive Procedure

Page 25: CAD Considerations for Project Managers

Now how would you handle this requirement?

Trying to plot a set of mylar's from one of his Port Authority projects (and they are very picky about their print jobs). Need the plotter to be set up to be 22"x34" w/1" top, bottom & right border ( 1 1/4" on the left). Can we help him out? Printing from AutoCAD to the 4th floor JDL5000-A plotter. Please contact Boris @ x3458.

Page 26: CAD Considerations for Project Managers

Summary Communication Setup

Expertise CAD files Directories Collaborative Sites

Output Collaboration & File Sharing Clean/Prepare project files and folders to archival Communication

Page 27: CAD Considerations for Project Managers

Thank you