Burrill Lake Bridge Community Presentation · New bridge and remove the causeway Replacing the...

31
Community workshop – RMS’ currently favoured option May/June 2013 PLANNING FOR THE FUTURE OF BURRILL LAKE BRIDGE

Transcript of Burrill Lake Bridge Community Presentation · New bridge and remove the causeway Replacing the...

Page 1: Burrill Lake Bridge Community Presentation · New bridge and remove the causeway Replacing the existing bridge and the existing causeway would: √Address the immediate problem of

Community workshop –RMS’ currently favoured option

May/June 2013

PLANNING FOR THE FUTURE OFBURRILL LAKE BRIDGE

Page 2: Burrill Lake Bridge Community Presentation · New bridge and remove the causeway Replacing the existing bridge and the existing causeway would: √Address the immediate problem of

Welcome

1. Housekeeping

2. Agenda and timing

3. Introductions

4. Objectives of the workshop

5. Overview and investigations

6. RMS currently favoured option

7. Workshop – table discussions

8. Next steps

9. Light refreshments and further discussions

RR

Page 3: Burrill Lake Bridge Community Presentation · New bridge and remove the causeway Replacing the existing bridge and the existing causeway would: √Address the immediate problem of

Housekeeping and ground rules

Housekeeping• Fire exits• Toilets• Refreshments• Room set-up: displays and materials

Ground rules• Phones on silent• One person talking at a time• Table facilitators’ role

RR

Page 4: Burrill Lake Bridge Community Presentation · New bridge and remove the causeway Replacing the existing bridge and the existing causeway would: √Address the immediate problem of

Agenda and timing

Overview and investigations:

• The existing bridge• Technical and field studies• Community consultation• Options considered• RMS’ currently favoured option

6:35 pm (30 mins)

Questions 7:05pm (25 mins)

Workshop 7:30pm (45 mins)

Report back 8:15pm (10 mins)

Next steps and close 8:25pm (5 mins)

Page 5: Burrill Lake Bridge Community Presentation · New bridge and remove the causeway Replacing the existing bridge and the existing causeway would: √Address the immediate problem of

Introductions – RMS staff

• Renee Ridley – Senior Communications Officer – facilitator• Adam Berry – Project Manager – for this project• Scott Fayers – Bridge Maintenance Planner • Wade Higgins – Lead Road Designer• Peter Townsend – Project Manager (construction)• Angela Riepsamen – Environment Officer• Bill Healy – Property Acquisition Manager• James Page – Communications Officer

RR

Page 6: Burrill Lake Bridge Community Presentation · New bridge and remove the causeway Replacing the existing bridge and the existing causeway would: √Address the immediate problem of

Objectives of the workshop

• Explain and discuss the RMS currently favoured option.

• Explain and discuss how we got here.

• Obtain your feedback.

• Talk about the next steps.

RR

Page 7: Burrill Lake Bridge Community Presentation · New bridge and remove the causeway Replacing the existing bridge and the existing causeway would: √Address the immediate problem of

Key problem – the bridge is failing

AB

• The bridge is failing - 24 of 35 piles have full length vertical cracking.

• Temporary brackets put in in 2003 have an effective life of 10 to 15 years.

Page 8: Burrill Lake Bridge Community Presentation · New bridge and remove the causeway Replacing the existing bridge and the existing causeway would: √Address the immediate problem of

Other problems – low and flood prone

The crossing floods too frequently for a major highway.

This impacts on highway traffic and on residents by denying you a flood evacuation route.

The frequency of flooding is predicted to increase in the future…

AB

Page 9: Burrill Lake Bridge Community Presentation · New bridge and remove the causeway Replacing the existing bridge and the existing causeway would: √Address the immediate problem of

Low and flood prone

Climate Change

Bridge road level 2.1m AHD

Typical water 0.4 - 1.2m AHDlevel now.

1in100 flood now 2.4m AHD

1 in 100 flood by 2100 3m AHDwith sea level rise

Causeway road level 1.5m AHD

AB

AHD is “Australian Height Datum” which is sea level. So 3 metres AHD means 3 metres above sea level

Page 10: Burrill Lake Bridge Community Presentation · New bridge and remove the causeway Replacing the existing bridge and the existing causeway would: √Address the immediate problem of

Other problems – low and flood prone

AB

Page 11: Burrill Lake Bridge Community Presentation · New bridge and remove the causeway Replacing the existing bridge and the existing causeway would: √Address the immediate problem of

Other problems – poor pedestrian facilities

AB

Page 12: Burrill Lake Bridge Community Presentation · New bridge and remove the causeway Replacing the existing bridge and the existing causeway would: √Address the immediate problem of

Other problems – narrow lanes and shoulders

AB

Page 13: Burrill Lake Bridge Community Presentation · New bridge and remove the causeway Replacing the existing bridge and the existing causeway would: √Address the immediate problem of

What have we done so far?

• Flood and hydraulic modelling.• Flora, fauna, archaeology, noise, vibration, contamination,

traffic and road safety issues.• Built a picture of the local community that includes business,

tourism, social, pedestrian and other community considerations.

• Surveyed the existing bridge, causeway, highway approaches, landforms and local road connections.

• Road design and engineering investigations.• Geotechnical drilling to understand ground conditions.• Consulted with the community.

AB

Page 14: Burrill Lake Bridge Community Presentation · New bridge and remove the causeway Replacing the existing bridge and the existing causeway would: √Address the immediate problem of

Community consultation in mid 2012

• 5,000 brochures to Burrill Lake, Dolphin Point, Kings Point, Ulladulla and Mollymook.

• Community information sessions at Ulladulla on May 22 and June 2.

• 30 people attended the information sessions and 49 written submissions were received.

AB

Page 15: Burrill Lake Bridge Community Presentation · New bridge and remove the causeway Replacing the existing bridge and the existing causeway would: √Address the immediate problem of

Community consultation – shopper survey in late 2012

AB

Between 11:00am and 3:00pm on a Saturday in November.42 people using the shops were surveyed,70 per cent of whom lived in Burrill Lake or surrounding areas.

Page 16: Burrill Lake Bridge Community Presentation · New bridge and remove the causeway Replacing the existing bridge and the existing causeway would: √Address the immediate problem of

Community consultation – business surveys

• Not exhaustive, snapshot of 9 businesses.• Many depend on trade from tourists to the lake, as well as

passing motorists.• Some businesses more reliant on passing trade than others. i.e.

some serve the local community more.• Access arrangements - both during and after any construction

activity will be important for business.• Highway visibility and convenience of parking are key to the

access arrangements.

AB

Page 17: Burrill Lake Bridge Community Presentation · New bridge and remove the causeway Replacing the existing bridge and the existing causeway would: √Address the immediate problem of

Summary - what you told us in 2012

• Residents value Burrill Lake for its environmental amenity, scenic attributes and quality of life.

• The key local issues raised by the community included:Improving the ecology of the lake (the causeway)Improving traffic congestion (holiday traffic) Improving pedestrian safety and access Avoiding affecting the tourism industryMaintaining business access due to their reliance on passing motorists Opportunity to mitigate flood risks Improving road safety Considering local character and amenity

AB

Page 18: Burrill Lake Bridge Community Presentation · New bridge and remove the causeway Replacing the existing bridge and the existing causeway would: √Address the immediate problem of

Options for solving the problems…

Options have been considered in light of:• Technical investigations.• Environmental and other field studies.• Feedback from the community.• Affordability and value for money.

AB

Page 19: Burrill Lake Bridge Community Presentation · New bridge and remove the causeway Replacing the existing bridge and the existing causeway would: √Address the immediate problem of

Maintenance

Continued maintenance of the existing bridge (only the bridge) would:

√ Address the immediate problem of the bridge piles. × Mean that maintaining the 50 year old bridge already failing will

become increasingly expensive, inefficient and disruptive. × Retain the low bridge and road level and do nothing to improve flood

immunity of the highway or to provide a ‘flood evacuation route’.× Mean retaining the causeway.× Mean retaining the existing road facilities – the poor pedestrian path,

the narrow lanes for cars and trucks and the narrow road shoulders.

AB

Page 20: Burrill Lake Bridge Community Presentation · New bridge and remove the causeway Replacing the existing bridge and the existing causeway would: √Address the immediate problem of

New bridge and keep the causeway

Replacing the existing bridge (only the bridge) would:

√ Address the immediate problem of the bridge piles.× Retain the low bridge and road level and do nothing to improve flood

immunity of the highway or to provide a ‘flood evacuation route’.× Mean retaining the causeway.× Mean retaining the existing road facilities on the causeway – the poor

pedestrian path, the narrow lanes for cars and trucks and the narrow road shoulders.

AB

Page 21: Burrill Lake Bridge Community Presentation · New bridge and remove the causeway Replacing the existing bridge and the existing causeway would: √Address the immediate problem of

New bridge and remove the causeway

Replacing the existing bridge and the existing causeway would:

√ Address the immediate problem of the bridge piles.√ Allow the bridge and road level to be made higher - above the

predicted 1 in 100 year flood level and would provide a ‘flood evacuation route’.

√ Allow for the causeway to be removed.√ Allow for the existing road facilities to be replaced with a modern

standard, wide pedestrian paths, lanes for cars and trucks and road shoulders.

AB

Page 22: Burrill Lake Bridge Community Presentation · New bridge and remove the causeway Replacing the existing bridge and the existing causeway would: √Address the immediate problem of

New bridge and remove the causeway

• This is RMS currently favoured option.

• This would be more expensive but would provide better value for money long-term solution.

AB

Page 23: Burrill Lake Bridge Community Presentation · New bridge and remove the causeway Replacing the existing bridge and the existing causeway would: √Address the immediate problem of

How will decisions be made?

• No final decision has been made.• RMS and the NSW Government need to make a decision on the

‘preferred option’ before funding is committed.• The decision will be evidence based and take into account:• Technical investigations• Environmental and other field studies• Feedback from the community.• Affordability and value for money.

• It is beyond the scope of this project and this project team to re-examine the Milton-Ulladulla bypass corridor.

AB

Page 24: Burrill Lake Bridge Community Presentation · New bridge and remove the causeway Replacing the existing bridge and the existing causeway would: √Address the immediate problem of

RMS’ currently favoured option: new higher bridge on a new alignment and remove the causeway

AB

Page 25: Burrill Lake Bridge Community Presentation · New bridge and remove the causeway Replacing the existing bridge and the existing causeway would: √Address the immediate problem of

Potential benefits of RMS’ currently favoured option

If selected as the RMS preferred option, a new, higher bridge tothe east of the existing crossing would:

• Improve the overall reliability of the Princes Highway on the south coast by reducing future maintenance issues.

• Provide a lake crossing and road approaches designed above the predicted 1 in 100 year flood level.

• Improve road safety by providing new intersections to modern safety standards connecting the Princes Highway to local roads.

• Provide the opportunity to improve pedestrian and cyclist accessand safety.

AB

Page 26: Burrill Lake Bridge Community Presentation · New bridge and remove the causeway Replacing the existing bridge and the existing causeway would: √Address the immediate problem of

North and south sides...

North side

South side

*Cross sections are indicative only AB

Page 27: Burrill Lake Bridge Community Presentation · New bridge and remove the causeway Replacing the existing bridge and the existing causeway would: √Address the immediate problem of

Questions?

RR

Page 28: Burrill Lake Bridge Community Presentation · New bridge and remove the causeway Replacing the existing bridge and the existing causeway would: √Address the immediate problem of

Workshop – table discussions

At your tables please discuss RMS’ currently favoured option.

In particular RMS would like feedback on:• Parking and access arrangements for businesses on either side

of the bridge.• Local amenity issues around the businesses on both sides.• Connections between existing pathways and new pathways on

the proposed bridge.• Urban design and landscaping.• Potential noise impacts and mitigation measures.• Other comments?

RR

Page 29: Burrill Lake Bridge Community Presentation · New bridge and remove the causeway Replacing the existing bridge and the existing causeway would: √Address the immediate problem of

Next steps

• Workshop and community issues report will be published - late 2013.

• Concept design will be developed – late 2013.

• Environmental assessment will be displayed for further community comments – late 2013 to early 2014.

AB

Page 30: Burrill Lake Bridge Community Presentation · New bridge and remove the causeway Replacing the existing bridge and the existing causeway would: √Address the immediate problem of

We want your feedback

• Feedback forms are available for your individual feedback.

• Submissions close Monday 10 June 2013.

• Email: [email protected]

•Post: RMS Southern Regional Office, PO Box 477, Wollongong, NSW 2520

•Telephone: 02 4221 2586 (during business hours)RR

Page 31: Burrill Lake Bridge Community Presentation · New bridge and remove the causeway Replacing the existing bridge and the existing causeway would: √Address the immediate problem of

Thank you

Thank you for participating

Keep an eye on the project web page for updates:

http://www.rta.nsw.gov.au/roadprojects/projects/princes_hway/burill_lake/index.html

RR