PEO C3T PM AMF PD COMSEC PM JBC-P JTNC PM JTN PM MC PM MNVR PD TNI PM TR PM WIN-T MILTECH
Planning the Network
Objectives
Translating from the conceptual to an integrated, fieldable network architecture
Objective - Executive View
BDE TOC
BN TOC
PEO C3T PM AMF PD COMSEC PM JBC-P JTNC PM JTN PM MC PM MNVR PD TNI PM TR PM WIN-T MILTECH
Leveraging The Agile Process
Concept Fielding
Baseline
Network
Design
SoS Lab
Developmental
Risk Reduction
WSMR
Operational
Validation
PORs
SUEs
Materiel
Alternatives
PEO C3T PM AMF PD COMSEC PM JBC-P JTNC PM JTN PM MC PM MNVR PD TNI PM TR PM WIN-T MILTECH
Integrating the Network
NIE Network IPT Overview
Network IPT
Routing IPT
MC IPT
Ops Lead
PMs/PdMs support all
groups on an as-needed
basis
Transport
Routing
Voice
QoS
Data Products
Network Configs
IP Addressing
MC
FBCB2
DCGS-A
SoSI IA Spt
SoSI LBRR Spt Initialization
IPT
Purpose: The Network IPT is the forum where all SUTs and
SUEs
get integrated into the NIE network
Network IPT Baseline
Products • Network Map (Routing IPT)
• Network-Apps Map (Network/ MC IPT)
• Radio Line Diagram (Routing IPT)
• Routing Description Document (Routing
IPT)
• Server Architecture (MC IPT)
• IP addressing assignment (Init IPT)
• Network Configurations (Init IPT)
• Data Products (Init IPT)
PEO C3T PM AMF PD COMSEC PM JBC-P JTNC PM JTN PM MC PM MNVR PD TNI PM TR PM WIN-T MILTECH
SUE TIM
NIE Bullpen Session
Network IPT
Network IPT meets with SUEs at the Integration
booth
Detailed NIE network design
is worked
NIE
LBRR
SUEs are evaluated. Network IPT leads
the Integration Factor •First engagement with
SUT/SUEs is at the NIE
bullpen sessions held at
FTBTX
•Following bullpen
session, weekly Network
IPT meetings are held to
synchronize the sub-IPTs
•Sub-IPTs hold meetings
as needed to work
specific functional area
issues
Integrating the Network
NIE Network IPT Battle Rhythm
PEO C3T PM AMF PD COMSEC PM JBC-P JTNC PM JTN PM MC PM MNVR PD TNI PM TR PM WIN-T MILTECH
Architecting an NIE Network Map
Establishing top level SATCOM and terrestrial radio network connectivity across the formation
NIE Architecture
HICON
47 BSB
MAINGATE Mid-Tier Possible CS 14 Bridge
No Mid-Tier Possible CS 14 Bridge
ANW2 Mid Tier Capability Set 13 Bridge
1-6 IN 1-35 AR (IBCT BN)
MAINGATE Mid-Tier Possible CS 14 Bridge
1-1 CAV
ANW2 Mid Tier Capability Set 13 Bridge
4-27 FA
OPS/INTEL Convergence
OPS/INTEL Convergence
OPS/INTEL Convergence
OPS/INTEL Convergence
OPS/INTEL Convergence
OPS/INTEL Convergence
COE(v)1
JBC-P LUT
LIFERING
WIN-T INC 2 FIELDED SYSTEM
WNAN
NETT WARRIOR IOT&E
PEO C3T PM AMF PD COMSEC PM JBC-P JTNC PM JTN PM MC PM MNVR PD TNI PM TR PM WIN-T MILTECH
Tech and Ops Leads
• Full time On Site support
• 12 hour shifts
Supporting the Network
PEO C3T NIE Field Support
Network IPT Leads
• 1st Shift/On Site
• 2nd Shift/On Call
Tier 3 Support
• 24/7 Ops
– 2 Lead engineers per day shift
– 1 Lead engineer per night shift/on call
• 2 day overlap between rotations
• 2 week rotations/10 day off
PEO C3T PM AMF PD COMSEC PM JBC-P JTNC PM JTN PM MC PM MNVR PD TNI PM TR PM WIN-T MILTECH
Take Aways
• Collaborative Design – Building the network is a collaborative
process that translates NIE operational vision into technical reality
• Managing Complexity – Ongoing challenge minimizing
warfighter burden using and managing new technology insertions
• NIE Network Objective – Objective end state is to create
fieldable Capability Set architectures based on NIE decisions