BUILDING REPORT

KRYFS POWER COMPONENTS ,UNIT-III

(KHIRDI, DADRA & NAGAR HAVELI)

SUBMITTED BY:-

ABHINAV CHAUHANIX SEMESTER

REGD. NO. 10809471

Page 2: Building Report KRYFS

8/13/2019 Building Report KRYFS

http://slidepdf.com/reader/full/building-report-kryfs 2/57

ACKNOWLEDGEMENT

I take this opportunity with immense pleasure to thank my project mentor Ar.

KASHYAP BHATT who Inspired me to take this project and also for the Valuable

guidance provided by him at each step.

• I would like to thank my employers Ar. KIRIT BHATT , Er. MANISH BHATT and

Ar. KASHYAP BHATT for giving me a chance to work in their prestigious firm. Who

guided me every time to improve my practical and designing skills by providing me

with exposure towards real work.

• I would also like to thank my seniors and colleagues at ARCHITECTS NOOK PVT.

LTD. , for guiding and helping me towards the successful completion of this report.

• I would also like to express my gratitude towards my college LOVELY SCHOOL

OF ARCHITECTURE AND DESIGN and all my faculty members who were

constantly a guiding and a helping hand in this report.

- ABHINAV CHAUHAN

2

Page 3: Building Report KRYFS

8/13/2019 Building Report KRYFS

http://slidepdf.com/reader/full/building-report-kryfs 3/57

  INDEX  INTRODUCTION

 PROJECT INFORMATION

 LOCATION

  SITE ANALYSIS

  APPROACH AND VALIDITY

  SITE PLANNING

  AREA STATEMENT

  ZONING

 SPACE ALLOCATION SERVICES

 DESIGN CONCEPT

LANDSCAPING

CONSTRUCTION TECHNIQUES

3

Page 4: Building Report KRYFS

8/13/2019 Building Report KRYFS

http://slidepdf.com/reader/full/building-report-kryfs 4/57

  INDEX 

WALL TREATMENTS AND FLOORING TREATMENTS

MATERIAL USED

COST ANALYSIS

PRODUCTION SHED – I

PRODUCTION SHED -II

CIRCULATION

FIRE SAFETY

 STRUCTURAL CONCEPT

OTHER MISCELLANEOUS DETAILS

4

Page 5: Building Report KRYFS

8/13/2019 Building Report KRYFS

http://slidepdf.com/reader/full/building-report-kryfs 5/57

INTRODUCTION

• The kryfs power components ltd. is a factory which manufactures

transformers. This project is located in Khirdi (Dadra & Nagar Haveli) .

This is Unit – III which is near unit – I .

• This Project was stared in the year end of 2011 with commencement of the

first phase which will be completed in feb 2012. Then the second phase of

the building will be started as per schedule.• Current status of the project : 30% completed which includes exterior of

 production shed-I and internal road and security cabin)

5

Page 6: Building Report KRYFS

8/13/2019 Building Report KRYFS

http://slidepdf.com/reader/full/building-report-kryfs 6/57

PROJECT INFORMATION

• ARCHITECT - ARCHITECTS NOOK PVT. LTD .

•  CLIENT - KRYFS POWER COMPONENTS LTD.

•  BUILDERS -SHEEL ENGINERS.

•  STRUCTURAL ENGINEER - ARCHITECTS NOOK PVT. LTD .

•  ELECTRICAL CONSULTANT - ARCHITECTS NOOK PVT. LTD .

• PLUMBING CONSULTANT - ARCHITECTS NOOK PVT. LTD .

•  TECHICAL CONSULTANT - ARCHITECTS NOOK PVT. LTD .

•  LANDSCAPE CONSULTANT - ARCHITECTS NOOK PVT. LTD .

•  COST OF PROJECT - Rs.8.765Crores

6

Page 7: Building Report KRYFS

8/13/2019 Building Report KRYFS

http://slidepdf.com/reader/full/building-report-kryfs 7/57

LOCATION

• The site is located in Khirdi , an industrial sector in Dadra & Nagar Haveli.

7

Page 8: Building Report KRYFS

8/13/2019 Building Report KRYFS

http://slidepdf.com/reader/full/building-report-kryfs 8/57

SITE ANALYSIS

• Topography : the site is plain , it has no contours

• Climate : tropical monsoon

• Temperature : 35oC –  25o C

•  Natural physical features : the site is surrounded by trees and open spaces as

the area is not fully developed

•  Neighborhood city : Silvassa (6 km away)

Site area : 28115.00 sq. mt

• Surrounding area : site falls in the industrial sector which is not fully

developed and has more green spaces compared to other industrial sectors.

8

Page 9: Building Report KRYFS

8/13/2019 Building Report KRYFS

http://slidepdf.com/reader/full/building-report-kryfs 9/57

APPROACH AND VALIDITY

• The site can be approached only by road as it is 10 km away from Silvassa

12 km away from NH-8, and 45 km away from Vapi .

• This project is third unit of the company . As the company needed to

increase its production to meet market needs and to provide their staff a

state of art working area. This project meets all the needs of the client.

9

Page 10: Building Report KRYFS

8/13/2019 Building Report KRYFS

http://slidepdf.com/reader/full/building-report-kryfs 10/57

SITE PLANNING

10

Production shed-I

Production shed-II

Security cabin

Page 11: Building Report KRYFS

8/13/2019 Building Report KRYFS

http://slidepdf.com/reader/full/building-report-kryfs 11/57

AREA STATEMENT

1. AREA OF PLOT .................................................................. 28115.00 sq. mt.

2. AREA UNDER ROAD WIDENING & SERVICE ROAD ......3278.60 sq. mt

3. NET AREA OF PLOT .........................................................24836.40 sq. mt

4. PERMISSIBLE BUILT UP AREA ON GROUND FLOOR

(40%).........................9934.56 sq. mt

5. PROPOSED BUILT UP AREA ON GROUND FLOOR -

39.95%........................9922.00 sq. mt.

6. REQUIRED COMMON OPEN PLOT (35%)…….8692.74 sq. mt

7. PROPOSED COMMON OPEN PLOT (38%)…….9526.60 sq. mt

11

Page 12: Building Report KRYFS

8/13/2019 Building Report KRYFS

http://slidepdf.com/reader/full/building-report-kryfs 12/57

BUILT UP AREA STATEMENT

S. NO. DESCRIPTIONGROUND

FLOOR AREA

1ST FLOOR

AREA

2ND FLOOR

AREA

TOTAL AREA

(SQ. MT)

1 PRODUCTION SHED 7500.00 ---- ---- 7500.00

2 SALVAGE SHED 900.00 ---- ---- 900.00

3 SHED 1450.00 1450.00 1450.00 4350.00

4 SECURITY OFFICE 72.00 ---- ---- 72.00

TOTAL  9922.00 1450.00 1450.00 12822.00

12

Page 13: Building Report KRYFS

8/13/2019 Building Report KRYFS

http://slidepdf.com/reader/full/building-report-kryfs 13/57

FSI AREA CALCULATION

S. NO. DESCRIPTION

GROUND

FLOOR

AREA

1ST 

FLOOR

AREA

2ND 

FLOOR

AREA

F.S.I

MULTIPLICATI

ON FACTOR

TOTAL

AREA

(SQ. MT)

1 PRODUCTION SHED 7500.00 ---- ---- 1.50 11250.00

2 SALVAGE SHED 900.00 ---- ---- 1.50 1350.00

3 SHED1450.00 1.25 1812.50

1450.00 1450.00 1 2900.00

4 SECURITY OFFICE 72.00 ---- ---- 1 72

TOTAL 17384.50

13

PERMISSIBLE F.S.I = 0.80

CONSUMED F.S.I = 0.62

Page 14: Building Report KRYFS

8/13/2019 Building Report KRYFS

http://slidepdf.com/reader/full/building-report-kryfs 14/57

ZONING

• Zoning of the site is done very care fully .

• Both the buildings have proper circulation as well as proper access points .

• Building bye-laws are followed as per the rule of local government.

• According to bye-laws common open plot has been provided which can be

used as landscaping area .

14

Page 15: Building Report KRYFS

8/13/2019 Building Report KRYFS

http://slidepdf.com/reader/full/building-report-kryfs 15/57

SPACE ALLOCATION SERVICES

• Proper spaces are allocated for services and general facilities.

• Power backup generators are provided in the back of shed – I

• Fire hydrant is laid according to the given plan

• Watchman cabin is constructed adjoining the visitors room and common

toilet

• Common toilet for staffs are provided in the respective buildings

15

6

Page 16: Building Report KRYFS

8/13/2019 Building Report KRYFS

http://slidepdf.com/reader/full/building-report-kryfs 16/57

DESIGN CONCEPT

• The basic design concept of the building is to circulate air naturally and lit

the interiors by natural light. For this purpose we have used louvers and

glass. Louvers gives a effect of tube house to keep the interior at normal

temperature which minimizes the use of electricity.

This tube house is designed by Charles Correa.

16

Page 17: Building Report KRYFS

8/13/2019 Building Report KRYFS

http://slidepdf.com/reader/full/building-report-kryfs 17/57

LANDSCAPING

• As the site falls in industrial sector there is not much care is taken for

landscaping . Common open plot is left as per the bye-laws of local bodies

which can be converted into a proper landscaped area.

• Current status: the building is designed with planter beds so that not much

space is wasted in landscaping and it requires less maintenance.

17

8

Page 18: Building Report KRYFS

8/13/2019 Building Report KRYFS

http://slidepdf.com/reader/full/building-report-kryfs 18/57

CONSTRUCTION TECHNIQUES

• RCC framed structure is used to construct the building. Fundermax

cladding, glass and aluminum louvers are used to enhance the elevation

18

fundermax

Page 19: Building Report KRYFS

8/13/2019 Building Report KRYFS

http://slidepdf.com/reader/full/building-report-kryfs 19/57

WALL TREATMENTS & FLOORING

TREATMENTSWall treatments :

for exterior:

fundermax

louvers

for interior: paint

Flooring treatment: CONCRETE is used for flooring in the machinery area,

vitrified tiles are used in toilets

19

20

Page 20: Building Report KRYFS

8/13/2019 Building Report KRYFS

http://slidepdf.com/reader/full/building-report-kryfs 20/57

MATERIALS USED

• For the construction of building, common building materials are used.

• For elevation treatment glass, fundermax and aluminum louvers are used.

• RCC walls are constructed for furnace as per the details.

• Poly carbonate sheet is recommended for shed – II which will allow natural

light and cut down the uses of artificial lights.

• Aluminum louvers are provided for proper air circulation which will help

to maintain the room temperature.

20

21

Page 21: Building Report KRYFS

8/13/2019 Building Report KRYFS

http://slidepdf.com/reader/full/building-report-kryfs 21/57

COST ANALYSIS

Sr. no. description

Built-up

area(sq. ft) Cost/sft. amount

Contigenci

es(@5%) Grand total

I A-building

1 Ground floor 15669.52 993.27 15564077.27

2 First floor 15669.53 525.20 8229634.37

3 Second floor 15669.53 525.20 8229634.374 Terrace floor 1980413.30

A-building 47008.59 723.35 34003759.31 1700187.97 35703947.28

IICompound

wall

1 A-1 type 545.00 3776.85 2058382.40

2 A-2 type 558.00 4726.94 2637631.80

3 B type 368.00 2201.03 809979.85

4 C type 291.00 4565.26 1328491.85

Compound wall 1762.00 3878.82 6834485.90 341724.30 7176210.20

21

22

Page 22: Building Report KRYFS

8/13/2019 Building Report KRYFS

http://slidepdf.com/reader/full/building-report-kryfs 22/57

22

Sr.no. 

description 

Built-uparea(sq.

ft) 

Cost/sft.   Amount Contigencies(@5%) 

Grandtotal 

III Plot

development –phase-I 

01   WBM road  40000.00  85.11  3404296.00 

02  RCC road  32200.00  192.59  6201260.00 

03 Open swdrainage 

656.00  893.99  586458.00 

04 Covered swdrainings 

230.00  1057.25  243167.00 

05  Containerparking 

25950.00  260.45  6758604.00 

06 Car

parking 8935.00  194.63  1739016.00 

23

Page 23: Building Report KRYFS

8/13/2019 Building Report KRYFS

http://slidepdf.com/reader/full/building-report-kryfs 23/57

07Plinth

protection2475.00 96.74 239425.00

08 Culvert withcattle trap

557224.00

09Earth filling

in plot405920.00

10 U.G tank 300000.00 4.76 1427040.00

Plot development phase-I

21562410.00 1078120.50 22640530.50

III

Plot

development

 –  phase-II

01 WBM road 57430.00 85.24 4895396.00

02 RCC road 48605.00 192.66 9364110.00

03Open SW

drainage1265.00 893.01 1129652.00

23

24

Page 24: Building Report KRYFS

8/13/2019 Building Report KRYFS

http://slidepdf.com/reader/full/building-report-kryfs 24/57

24

Sr.

no.description

Built-up

area(sq. ft)Cost/sft. Amount

Contigencie

s(@5%)Grand total

04Covered SW

drainage656.00 1053.89 691352.00

05 Car parking 2045.00 194.66 398088.00

06Plinth

 protection

6135.00 96.71 593341.00

07Culvert with

cattle trap557224.00

08Earth filling

in plot3445600.00

Plot development phase-II

21074763.00 1053738.15 22128501.15

Grand total 83475418.21 4173770.9187649189.1

2

25

Page 25: Building Report KRYFS

8/13/2019 Building Report KRYFS

http://slidepdf.com/reader/full/building-report-kryfs 25/57

GROUND FLOOR PLAN (production shed-I)

25

26

Page 26: Building Report KRYFS

8/13/2019 Building Report KRYFS

http://slidepdf.com/reader/full/building-report-kryfs 26/57

FIRST & SECOND FLOOR PLAN (production

shed-I)

26

27

Page 27: Building Report KRYFS

8/13/2019 Building Report KRYFS

http://slidepdf.com/reader/full/building-report-kryfs 27/57

SHED-I GROUND FLOOR MACHINE

DETAIL

27

Page 28: Building Report KRYFS

8/13/2019 Building Report KRYFS

http://slidepdf.com/reader/full/building-report-kryfs 28/57

29

Page 29: Building Report KRYFS

8/13/2019 Building Report KRYFS

http://slidepdf.com/reader/full/building-report-kryfs 29/57

ELEVATIONS AND SECTIONS

29

30

Page 30: Building Report KRYFS

8/13/2019 Building Report KRYFS

http://slidepdf.com/reader/full/building-report-kryfs 30/57

30

31

Page 31: Building Report KRYFS

8/13/2019 Building Report KRYFS

http://slidepdf.com/reader/full/building-report-kryfs 31/57

31

32

Page 32: Building Report KRYFS

8/13/2019 Building Report KRYFS

http://slidepdf.com/reader/full/building-report-kryfs 32/57

32

Detail section of walls

33

Page 33: Building Report KRYFS

8/13/2019 Building Report KRYFS

http://slidepdf.com/reader/full/building-report-kryfs 33/57

33

Page 34: Building Report KRYFS

8/13/2019 Building Report KRYFS

http://slidepdf.com/reader/full/building-report-kryfs 34/57

35

Page 35: Building Report KRYFS

8/13/2019 Building Report KRYFS

http://slidepdf.com/reader/full/building-report-kryfs 35/57

FIRST FLOOR PLAN SHED-II 

35

36

Page 36: Building Report KRYFS

8/13/2019 Building Report KRYFS

http://slidepdf.com/reader/full/building-report-kryfs 36/57

SECOND FLOOR PLAN SHED-II 

3

37

Page 37: Building Report KRYFS

8/13/2019 Building Report KRYFS

http://slidepdf.com/reader/full/building-report-kryfs 37/57

ELEVATION AND SECTION

37

38

Page 38: Building Report KRYFS

8/13/2019 Building Report KRYFS

http://slidepdf.com/reader/full/building-report-kryfs 38/57

  SECTION

3

39

Page 39: Building Report KRYFS

8/13/2019 Building Report KRYFS

http://slidepdf.com/reader/full/building-report-kryfs 39/57

CIRCULATION

• Circulation is major factor in any building, which makes it functional and

easy to move in. in this case outer circulation is provided by 12 m wide

internal road around the building for easy approach of heavy vehicles .

• And for internal circulation lift

and staircases are provided.

Typical plan staircase Typical section staircase & lift

Page 40: Building Report KRYFS

8/13/2019 Building Report KRYFS

http://slidepdf.com/reader/full/building-report-kryfs 40/57

41

Page 41: Building Report KRYFS

8/13/2019 Building Report KRYFS

http://slidepdf.com/reader/full/building-report-kryfs 41/57

FIRE

LAYOUT

PLAN

42

Page 42: Building Report KRYFS

8/13/2019 Building Report KRYFS

http://slidepdf.com/reader/full/building-report-kryfs 42/57

FIRE SAFETY DETAILS

43

Page 43: Building Report KRYFS

8/13/2019 Building Report KRYFS

http://slidepdf.com/reader/full/building-report-kryfs 43/57

STRUCTURAL CONCEPT

The building has been designed with full resistance towards the vertical and

horizontal forces due to wind and earth quakes.

• Foundations : As the safe bearing capacity of the soil is good i.e. 20 t/S

q.m., hence the foundations were possible to design as isolated footings

• Super structure : all the slabs and the beams of upper floor are of R.C.C.

with mix M-20 because it is the minimum requirement of relevant I.S. code.

The sizes of the slab and the beam are governed by analysis of structure

deflection requirements.

• Terrace : The terrace slabs and beams are of M-20 R.C.C. mix. The panels

where water storage tanks are to be provided are strengthened accordingly. 

44

Page 44: Building Report KRYFS

8/13/2019 Building Report KRYFS

http://slidepdf.com/reader/full/building-report-kryfs 44/57

STRUCTURAL GRID

Page 45: Building Report KRYFS

8/13/2019 Building Report KRYFS

http://slidepdf.com/reader/full/building-report-kryfs 45/57

46

Page 46: Building Report KRYFS

8/13/2019 Building Report KRYFS

http://slidepdf.com/reader/full/building-report-kryfs 46/57

TOILET

• Toilets are adequately provided in the building for the staff as well as for

the visitors.

Gents toilet Ladies toilet

47

Page 47: Building Report KRYFS

8/13/2019 Building Report KRYFS

http://slidepdf.com/reader/full/building-report-kryfs 47/57

OPENING DETAILS

 Window details

48

Page 48: Building Report KRYFS

8/13/2019 Building Report KRYFS

http://slidepdf.com/reader/full/building-report-kryfs 48/57

Louver detail

49

Page 49: Building Report KRYFS

8/13/2019 Building Report KRYFS

http://slidepdf.com/reader/full/building-report-kryfs 49/57

WATER PROOFING DETAIL

50

Page 50: Building Report KRYFS

8/13/2019 Building Report KRYFS

http://slidepdf.com/reader/full/building-report-kryfs 50/57

51

Page 51: Building Report KRYFS

8/13/2019 Building Report KRYFS

http://slidepdf.com/reader/full/building-report-kryfs 51/57

RAIN WATER HARVESTING

• In the building a 230 mm wide drain with R.C.C. grating is provided around

the periphery of the building. All the storm water gets disposed in this drain

 by 160mm diameter UPVC pipes. The slope given to these pipes is 1:100.

• All the storm water that gets collected in the drain is finally sent to the

distilling chamber and the recharging well. It is here the water is made to

 pass through various layers and gets purified. And hence the water is used

for the landscaping

Procedure in which wecollect rain water and then use it

after purification is called

as RAIN WATER HARVESTING.

52

Page 52: Building Report KRYFS

8/13/2019 Building Report KRYFS

http://slidepdf.com/reader/full/building-report-kryfs 52/57

COMPOUND WALL AND GATE DETAIL

53

Page 53: Building Report KRYFS

8/13/2019 Building Report KRYFS

http://slidepdf.com/reader/full/building-report-kryfs 53/57

VARIOUS WORKING DETAILS

Planter bed detail

54

Page 54: Building Report KRYFS

8/13/2019 Building Report KRYFS

http://slidepdf.com/reader/full/building-report-kryfs 54/57

Page 55: Building Report KRYFS

8/13/2019 Building Report KRYFS

http://slidepdf.com/reader/full/building-report-kryfs 55/57

Page 56: Building Report KRYFS

8/13/2019 Building Report KRYFS

http://slidepdf.com/reader/full/building-report-kryfs 56/57

57

Page 57: Building Report KRYFS

8/13/2019 Building Report KRYFS

http://slidepdf.com/reader/full/building-report-kryfs 57/57