    Report Focus

    1. Describe the state ofthe practice.

    2. Report on lessonslearned.

    3. Provide guidelines forbetter performance.

  • 5/25/2018 Building Better Box Beam Bridges

    4/61

    Issues

    Leaking Joints

    Reflective DeckCracking

  • 5/25/2018 Building Better Box Beam Bridges

    5/61

    AdjacentMember

    Bridges

  • 5/25/2018 Building Better Box Beam Bridges

    6/61

    AASHTO Box Beams

    AASHTO Slab Beams

    Types of Sections

  • 5/25/2018 Building Better Box Beam Bridges

    7/61

    Box Beams

    Slab Beams

    Types of Sections

  • 5/25/2018 Building Better Box Beam Bridges

    8/61Double Tees

    Deck Bulb Tees

    Types of Sections

  • 5/25/2018 Building Better Box Beam Bridges

    9/61

    50,000 adjacent box bridges

    (more than 8%)

    9,000 spread box bridges

    60 Years

    Box Beam Bridges

  • 5/25/2018 Building Better Box Beam Bridges

    10/61

    Spread Box Beam Bridges

    NOT considered adjacent member bridges

  • 5/25/2018 Building Better Box Beam Bridges

    11/61

    Non-Composite Superstructure

  • 5/25/2018 Building Better Box Beam Bridges

    12/61

    Non-Composite Superstructure

  • 5/25/2018 Building Better Box Beam Bridges

    13/61

    Non-Composite Superstructure

  • 5/25/2018 Building Better Box Beam Bridges

    14/61

    Non-Composite Superstructure

  • 5/25/2018 Building Better Box Beam Bridges

    15/61

    Non-Composite Superstructure

  • 5/25/2018 Building Better Box Beam Bridges

    16/61

    Composite Superstructure

  • 5/25/2018 Building Better Box Beam Bridges

    17/61

    Composite Superstructure

  • 5/25/2018 Building Better Box Beam Bridges

    18/61

    Composite Superstructure

  • 5/25/2018 Building Better Box Beam Bridges

    19/61

    Continuity

  • 5/25/2018 Building Better Box Beam Bridges

    20/61

    Continuity

  • 5/25/2018 Building Better Box Beam Bridges

    21/61

    LongitudinalJoints

  • 5/25/2018 Building Better Box Beam Bridges

    22/61

    Shear Key Partial Depth

  • 5/25/2018 Building Better Box Beam Bridges

    23/61

    Shear Key Full Depth

  • 5/25/2018 Building Better Box Beam Bridges

    24/61

    Shear Key - TxDOT

  • 5/25/2018 Building Better Box Beam Bridges

    25/61

    Shear Key - TxDOT

  • 5/25/2018 Building Better Box Beam Bridges

    26/61

    Transverse Tie Rods

  • 5/25/2018 Building Better Box Beam Bridges

    27/61

    Transverse Tie Rods

  • 5/25/2018 Building Better Box Beam Bridges

    28/61

    Transverse Tie Rods

  • 5/25/2018 Building Better Box Beam Bridges

    29/61

    Design

  • 5/25/2018 Building Better Box Beam Bridges

    30/61

    Non-Composite

    Vs.

    Composite

    Design

  • 5/25/2018 Building Better Box Beam Bridges

    31/61

    Design

  • 5/25/2018 Building Better Box Beam Bridges

    32/61

    Structural Overlay

    OR

    Sufficiently connected to act as a unit

    EQUALS

    Better Distribution between Beams

    Live Load Distribution per AASHTO LRFD

  • 5/25/2018 Building Better Box Beam Bridges

    33/61

    Live Load Distribution per AASHTO LRFD

  • 5/25/2018 Building Better Box Beam Bridges

    34/61

    Shear Transfer Joints

    Vs.

    Shear-Flexure Transfer Joints

    Sufficiently connected to act as a unit

    Transverse Connection per AASHTO LRFD

  • 5/25/2018 Building Better Box Beam Bridges

    35/61

    Transverse prestress amount

    determined by strip method

    or two-dimensional analysis

    shall not be less than 0.25 ksi

    through the key.

    Transverse Connection per AASHTO LRFD

  • 5/25/2018 Building Better Box Beam Bridges

    36/61

    Bearings

    B i

  • 5/25/2018 Building Better Box Beam Bridges

    37/61

    Bearings

  • 5/25/2018 Building Better Box Beam Bridges

    38/61

    Inspection andMaintenance

    Mi hi St d

  • 5/25/2018 Building Better Box Beam Bridges

    39/61

    Michigan Study

    Mi hi St d

  • 5/25/2018 Building Better Box Beam Bridges

    40/61

    Michigan Study

    Mi hi St d

  • 5/25/2018 Building Better Box Beam Bridges

    41/61

    Michigan Inspection Handbook

    Michigan Study

    Mi hi St d

  • 5/25/2018 Building Better Box Beam Bridges

    42/61

    Michigan Study

  • 5/25/2018 Building Better Box Beam Bridges

    43/61

    Survey ofCurrent

    Practice

    D t C ll ti

  • 5/25/2018 Building Better Box Beam Bridges

    44/61

    Data Collection

    D t C ll ti

  • 5/25/2018 Building Better Box Beam Bridges

    45/61

    A. General

    B. Deck Slabs and Overlays

    C. Box Beam ConstructionD. Keyways

    E. Prestressing

    F. Bearings

    G. Experience

    Data Collection

    Q ti i R

  • 5/25/2018 Building Better Box Beam Bridges

    46/61

    Questionnaire Response

  • 5/25/2018 Building Better Box Beam Bridges

    47/61

    Case StudiesSummary

    Case St dies

  • 5/25/2018 Building Better Box Beam Bridges

    48/61

    TxDOT 9-Day Bridge

    Colorado Weekend Bridge

    Ohio 19-Day Box Girder Bridge BNSF Railway over Route 160,

    Springfield, MO

    MoDOT Route 100 over I-44,Gray Summit, MO

    Case Studies

    Route 100 over I 44

  • 5/25/2018 Building Better Box Beam Bridges

    49/61

    Original Bridge

    Route 100 over I-44

    Route 100 over I 44

  • 5/25/2018 Building Better Box Beam Bridges

    50/61

    Original Steel Design Layout

    Route 100 over I-44

    Route 100 over I 44

  • 5/25/2018 Building Better Box Beam Bridges

    51/61

    VE ProposalAdjacent Box Beams

    Route 100 over I-44

    Route 100 over I 44

  • 5/25/2018 Building Better Box Beam Bridges

    52/61

    Route 100 over I-44

    BNSF over Route 160

  • 5/25/2018 Building Better Box Beam Bridges

    53/61

    BNSF over Route 160

    BNSF over Route 160

  • 5/25/2018 Building Better Box Beam Bridges

    54/61

    BNSF over Route 160

  • 5/25/2018 Building Better Box Beam Bridges

    55/61

    Conclusions

    Conclusions

  • 5/25/2018 Building Better Box Beam Bridges

    56/61

    Minimize Longitudinal Cracking

    Water Penetration

    De-Icing Chemicals

    Ensure Long-Term Performance

    Conclusions

    Conclusions

  • 5/25/2018 Building Better Box Beam Bridges

    57/61

    Larger Shear Keys, Full Depth

    Increased Post-Tensioning Force

    Composite Reinforced Concrete Deck

    Design

    Conclusions

    Conclusions

  • 5/25/2018 Building Better Box Beam Bridges

    58/61

    Minimize Skew if Possible

    Three or Four Point Bearing System

    Increase Concrete Cover

    Design

    Conclusions

    Conclusions

  • 5/25/2018 Building Better Box Beam Bridges

    59/61

    Use Polystyrene Forms for Voids

    Properly Anchor Voids

    Use of High Performance Concrete,Corrosion Inhibitors

    Fabrication

    Conclusions

    Conclusions

  • 5/25/2018 Building Better Box Beam Bridges

    60/61

    Sandblast Shear Keys ImmediatelyPrior to Grouting

    Use Non-Shrink Epoxy Grout

    PT Layout and Sequence

    Construction

    Conclusions