DIVISION OF FACILITIES MANAGEMENT BUILDING 230 – CONVENTION HALL REFRESHMENT PROPOSAL 101 Lobby – Existing ISSUES 1. Bad ceiling 2. Wasted space 3. Boring blank walls, Mismatching colours and Cluttering space 4. Entrance door opens inwards 5. Untidy plants in front of entrance door 6. Toilet doors open directly to foyer 7. Disabled toilet doesn’t comply * Question: Are we going to address 6 & 7 or leave them untouched for the moment ? 5 2 6 6 6 1 7 4 3 3 3 3 3

Transcript of BUILDING 230 – CONVENTION HALL REFRESHMENT PROPOSAL · BUILDING 230 – CONVENTION HALL...

Page 1: BUILDING 230 – CONVENTION HALL REFRESHMENT PROPOSAL · BUILDING 230 – CONVENTION HALL REFRESHMENT PROPOSAL. 101 Lobby – Existing . ISSUES. 1. Bad ceiling 2. Wasted space 3.

DIVISION OF FACILITIES MANAGEMENT

BUILDING 230 – CONVENTION HALL REFRESHMENT PROPOSAL

101 Lobby – Existing

ISSUES

1. Bad ceiling

2. Wasted space

3. Boring blank walls, Mismatching colours and Cluttering space

4. Entrance door opens inwards

5. Untidy plants in front of entrance door

6. Toilet doors open directly to foyer

7. Disabled toilet doesn’t comply

* Question: Are we going to address 6 & 7 or leave them untouched for the moment ?

5

2

666

1

7

4

3

3

3

3

3

Page 2: BUILDING 230 – CONVENTION HALL REFRESHMENT PROPOSAL · BUILDING 230 – CONVENTION HALL REFRESHMENT PROPOSAL. 101 Lobby – Existing . ISSUES. 1. Bad ceiling 2. Wasted space 3.

DIVISION OF FACILITIES MANAGEMENT

BUILDING 230 – CONVENTION HALL REFRESHMENT PROPOSAL

101 Lobby – Proposed

PROPOSALS

1. Replace ceiling

2. Add lounge room

3. See page 3 & 4

4. Change door

5. Trim overgrown plants

6. Relocate toilet doors (out of sight) and relocate sinks ???

7. Make disabled toilet compliant ???

5

266

1

7

4

3

3

3

3

3

Page 3: BUILDING 230 – CONVENTION HALL REFRESHMENT PROPOSAL · BUILDING 230 – CONVENTION HALL REFRESHMENT PROPOSAL. 101 Lobby – Existing . ISSUES. 1. Bad ceiling 2. Wasted space 3.

DIVISION OF FACILITIES MANAGEMENT

PROPOSALS

1. Replace ceiling

2. Paint door to match feature wall colour

3. Paint skirting to match feature wall colour

4. Replace old curtain with white one (This glass wall faces North so curtain would help reduce heat gain during summer)

5. Replace pink table cloth with white or grey one

6. Remove coat rack

7. Remove or replace “copper” stand with white one

8. Add plant to soften the interior

9. Add bright colour painting to blank wall

BUILDING 230 – CONVENTION HALL REFRESHMENT PROPOSAL

101 Lobby – Existing

1

3

2

4

5

6

7

8

Page 4: BUILDING 230 – CONVENTION HALL REFRESHMENT PROPOSAL · BUILDING 230 – CONVENTION HALL REFRESHMENT PROPOSAL. 101 Lobby – Existing . ISSUES. 1. Bad ceiling 2. Wasted space 3.

DIVISION OF FACILITIES MANAGEMENT

BUILDING 230 – CONVENTION HALL REFRESHMENT PROPOSAL

101 Lobby – Proposed

Page 5: BUILDING 230 – CONVENTION HALL REFRESHMENT PROPOSAL · BUILDING 230 – CONVENTION HALL REFRESHMENT PROPOSAL. 101 Lobby – Existing . ISSUES. 1. Bad ceiling 2. Wasted space 3.

DIVISION OF FACILITIES MANAGEMENT

BUILDING 230 – CONVENTION HALL REFRESHMENT PROPOSAL

PROPOSALS

1. Replace ceiling

2. Decluttering: New Joineries to accommodate bins, drink tap…

3. New white paint

4. Add bright colours to feature walls (Indigenous colour scheme)

5. New brighter lights

6. Exhibit Indigenous art works

7. Add plants to soften space and provide “green screens” between seating area and toilet doors

8. Relocate toilet doors (as shown on plan layout) ???

1

2

33

5

44

4

4

6

7

7

7

Page 6: BUILDING 230 – CONVENTION HALL REFRESHMENT PROPOSAL · BUILDING 230 – CONVENTION HALL REFRESHMENT PROPOSAL. 101 Lobby – Existing . ISSUES. 1. Bad ceiling 2. Wasted space 3.

DIVISION OF FACILITIES MANAGEMENT

BUILDING 230 – CONVENTION HALL REFRESHMENT PROPOSAL

Page 7: BUILDING 230 – CONVENTION HALL REFRESHMENT PROPOSAL · BUILDING 230 – CONVENTION HALL REFRESHMENT PROPOSAL. 101 Lobby – Existing . ISSUES. 1. Bad ceiling 2. Wasted space 3.

DIVISION OF FACILITIES MANAGEMENT

BUILDING 230 – CONVENTION HALL REFRESHMENT PROPOSALExisting

ISSUES

1. Overgrown plants

2. Bare and boring exterior

3. Wasted terrace area

4. Facade exposed to North summer sun (resulting in all large windows being covered with thick and dark curtains)

5. Old and “tired” look of the background building

2

13

2

44

5 53

Page 8: BUILDING 230 – CONVENTION HALL REFRESHMENT PROPOSAL · BUILDING 230 – CONVENTION HALL REFRESHMENT PROPOSAL. 101 Lobby – Existing . ISSUES. 1. Bad ceiling 2. Wasted space 3.

DIVISION OF FACILITIES MANAGEMENT

BUILDING 230 – CONVENTION HALL REFRESHMENT PROPOSALExisting

2

13/4/5

2

3/4/5

PROPOSALS

1. Trim Overgrown plants

2. Add low, native plants to soften the exterior and hardscape

3. (and 4, 5) Plant deciduous trees to:

• Create a shady terrace for Convention hall outdoor breakout area

• Provide additional outdoor Learning space

• “Cover” the old building in the background