Build it Right the First Time: Building Envelope Commissioning/ Retro-Commissioning

NFMT 2016

T. Stephen Kisielnicki, RWC, LEED® AP, BECxPMarch 24, 2016

Page 2: Build it Right the First Time: Building Envelope ... · Building Envelope Commissioning/ Retro-Commissioning NFMT 2016 T. Stephen Kisielnicki, RWC, LEED® AP, BECxP. March 24, 2016.

About Gale

Page 3: Build it Right the First Time: Building Envelope ... · Building Envelope Commissioning/ Retro-Commissioning NFMT 2016 T. Stephen Kisielnicki, RWC, LEED® AP, BECxP. March 24, 2016.

Building Envelope Technology• Roof, walls, fenestrations,

and waterproofing• Construction phase

assistance • Roof and building envelope

management programs• Forensic evaluations • Peer review and design

assist • Commissioning and testing• Historic Preservation

Page 4: Build it Right the First Time: Building Envelope ... · Building Envelope Commissioning/ Retro-Commissioning NFMT 2016 T. Stephen Kisielnicki, RWC, LEED® AP, BECxP. March 24, 2016.

What is Building Envelope Commissioning?

Page 5: Build it Right the First Time: Building Envelope ... · Building Envelope Commissioning/ Retro-Commissioning NFMT 2016 T. Stephen Kisielnicki, RWC, LEED® AP, BECxP. March 24, 2016.

“The process by which the design and constructed performance of building enclosure materials, components assemblies and systems are validatedto meet defined objectives and requirements of the project, as established by the Owner.”

NIBS Guideline 3-2012

Page 6: Build it Right the First Time: Building Envelope ... · Building Envelope Commissioning/ Retro-Commissioning NFMT 2016 T. Stephen Kisielnicki, RWC, LEED® AP, BECxP. March 24, 2016.

How?

Page 7: Build it Right the First Time: Building Envelope ... · Building Envelope Commissioning/ Retro-Commissioning NFMT 2016 T. Stephen Kisielnicki, RWC, LEED® AP, BECxP. March 24, 2016.

1. Compare the Design and Construction to:

• Owner’s Project Requirements• Basis of Design

Page 8: Build it Right the First Time: Building Envelope ... · Building Envelope Commissioning/ Retro-Commissioning NFMT 2016 T. Stephen Kisielnicki, RWC, LEED® AP, BECxP. March 24, 2016.

2. Review Ability of Design to:

• Control heat, air and vapor flow• Control water penetration• Control light and solar radiation

Page 9: Build it Right the First Time: Building Envelope ... · Building Envelope Commissioning/ Retro-Commissioning NFMT 2016 T. Stephen Kisielnicki, RWC, LEED® AP, BECxP. March 24, 2016.

3. Monitor Construction

• Verify quality control by Contractors• Identify and assist with issues

Page 10: Build it Right the First Time: Building Envelope ... · Building Envelope Commissioning/ Retro-Commissioning NFMT 2016 T. Stephen Kisielnicki, RWC, LEED® AP, BECxP. March 24, 2016.

4. Test and Verify Installed Assemblies• Roof, air barrier, curtain wall testing

during installation• Air tightness and infrared testing at

completion

Page 11: Build it Right the First Time: Building Envelope ... · Building Envelope Commissioning/ Retro-Commissioning NFMT 2016 T. Stephen Kisielnicki, RWC, LEED® AP, BECxP. March 24, 2016.

Building Envelope Commissioning Helps to Avoid Common Problems in Building Construction

Water intrusion

Indoor air quality issues

Mold growth

Air infiltration (energy loss and occupant discomfort)

Improves balancing of HVAC equipment

Page 12: Build it Right the First Time: Building Envelope ... · Building Envelope Commissioning/ Retro-Commissioning NFMT 2016 T. Stephen Kisielnicki, RWC, LEED® AP, BECxP. March 24, 2016.

The Building Envelope Commissioning Process

Predesign Design Pre-construction

Construction Post-Occupancy

Page 13: Build it Right the First Time: Building Envelope ... · Building Envelope Commissioning/ Retro-Commissioning NFMT 2016 T. Stephen Kisielnicki, RWC, LEED® AP, BECxP. March 24, 2016.

Pre-Design Phase Services

Assist in creation of Owner’s Basis of Design

Review prime architect’s early schematic designs

Page 14: Build it Right the First Time: Building Envelope ... · Building Envelope Commissioning/ Retro-Commissioning NFMT 2016 T. Stephen Kisielnicki, RWC, LEED® AP, BECxP. March 24, 2016.

Assist Owner with development of OPR

Design Phase Services

Review conceptual plans for adherence to OPR

Develop commissioning specifications

Peer review DDsand CDS

Testing Matrix and Commissioning Plan

Page 15: Build it Right the First Time: Building Envelope ... · Building Envelope Commissioning/ Retro-Commissioning NFMT 2016 T. Stephen Kisielnicki, RWC, LEED® AP, BECxP. March 24, 2016.

Design Requirements

Combinations of building enclosure components are numerous

Building enclosures must perform as a system with all joints, junctures, and penetrations detailed

Design specifications must be clear and coordinated with drawings

All components must work in conjunction with adjoining assemblies

Page 16: Build it Right the First Time: Building Envelope ... · Building Envelope Commissioning/ Retro-Commissioning NFMT 2016 T. Stephen Kisielnicki, RWC, LEED® AP, BECxP. March 24, 2016.

Typical Review Table

Page 17: Build it Right the First Time: Building Envelope ... · Building Envelope Commissioning/ Retro-Commissioning NFMT 2016 T. Stephen Kisielnicki, RWC, LEED® AP, BECxP. March 24, 2016.

Design Considerations

Page 18: Build it Right the First Time: Building Envelope ... · Building Envelope Commissioning/ Retro-Commissioning NFMT 2016 T. Stephen Kisielnicki, RWC, LEED® AP, BECxP. March 24, 2016.

Design Considerations

Page 19: Build it Right the First Time: Building Envelope ... · Building Envelope Commissioning/ Retro-Commissioning NFMT 2016 T. Stephen Kisielnicki, RWC, LEED® AP, BECxP. March 24, 2016.

Project Time Line

Conception Completion

High

Low

SchematicDesign

Construction Documents

Shop Drawings ConstructionPre-Design

Importance of Design Phase Review

Page 20: Build it Right the First Time: Building Envelope ... · Building Envelope Commissioning/ Retro-Commissioning NFMT 2016 T. Stephen Kisielnicki, RWC, LEED® AP, BECxP. March 24, 2016.

Pre-Construction Phase Services

Assist in Review of Sub-bids

Enclosure coordination meetings

Mock-Up Review and Testing

Update Testing Matrix and Commissioning Plan

Review shop drawings and submittals

Page 21: Build it Right the First Time: Building Envelope ... · Building Envelope Commissioning/ Retro-Commissioning NFMT 2016 T. Stephen Kisielnicki, RWC, LEED® AP, BECxP. March 24, 2016.

Curtain Wall Shop Drawing Review

Page 22: Build it Right the First Time: Building Envelope ... · Building Envelope Commissioning/ Retro-Commissioning NFMT 2016 T. Stephen Kisielnicki, RWC, LEED® AP, BECxP. March 24, 2016.

Curtain Wall Shop Drawing Review

Page 23: Build it Right the First Time: Building Envelope ... · Building Envelope Commissioning/ Retro-Commissioning NFMT 2016 T. Stephen Kisielnicki, RWC, LEED® AP, BECxP. March 24, 2016.

Roofing Shop Drawing Review

Page 24: Build it Right the First Time: Building Envelope ... · Building Envelope Commissioning/ Retro-Commissioning NFMT 2016 T. Stephen Kisielnicki, RWC, LEED® AP, BECxP. March 24, 2016.

Mock-Up

To be built by on-site trades

Full-scale laboratory testing

To include as many typical details as possible

To be tested for compliance with established standards

Access for modifications to address potential problems

Troubleshoot potential problems

Establishes standard of care for trades

Page 25: Build it Right the First Time: Building Envelope ... · Building Envelope Commissioning/ Retro-Commissioning NFMT 2016 T. Stephen Kisielnicki, RWC, LEED® AP, BECxP. March 24, 2016.

On-Site Mock-Up

Page 26: Build it Right the First Time: Building Envelope ... · Building Envelope Commissioning/ Retro-Commissioning NFMT 2016 T. Stephen Kisielnicki, RWC, LEED® AP, BECxP. March 24, 2016.

Off-Site Mock-Up

Page 27: Build it Right the First Time: Building Envelope ... · Building Envelope Commissioning/ Retro-Commissioning NFMT 2016 T. Stephen Kisielnicki, RWC, LEED® AP, BECxP. March 24, 2016.

Construction Phase

Page 28: Build it Right the First Time: Building Envelope ... · Building Envelope Commissioning/ Retro-Commissioning NFMT 2016 T. Stephen Kisielnicki, RWC, LEED® AP, BECxP. March 24, 2016.

Construction Phase Services

Finalize commissioning plan based on results of mock-up testing

Verify and document field QA/QC programs

Integration of RFIs and change orders to the Commissioning Plan

Provision and follow-up of ongoing deficiency lists

Page 29: Build it Right the First Time: Building Envelope ... · Building Envelope Commissioning/ Retro-Commissioning NFMT 2016 T. Stephen Kisielnicki, RWC, LEED® AP, BECxP. March 24, 2016.

Construction Administration

Attend periodic progress meetings to discuss envelope construction issues

Document applicable comments/discussions

Address detail modifications due to construction changes

Review and verify ongoing compilations of as-built drawings and conditions to be used for future updates and corrections

Page 30: Build it Right the First Time: Building Envelope ... · Building Envelope Commissioning/ Retro-Commissioning NFMT 2016 T. Stephen Kisielnicki, RWC, LEED® AP, BECxP. March 24, 2016.

Construction Monitoring

Perform periodic on-site observations of contractor’s work

Attend job-site meetings while critical enclosure components are being installed

Summarize observations, concerns, and recommendations in a written report

Witness and verify field tests and field data reports

Review unique interface conditions to verify that they meet the design intent

Confirm that defective conditions are rectified

Page 31: Build it Right the First Time: Building Envelope ... · Building Envelope Commissioning/ Retro-Commissioning NFMT 2016 T. Stephen Kisielnicki, RWC, LEED® AP, BECxP. March 24, 2016.

Deficiency Tracking Log

Page 32: Build it Right the First Time: Building Envelope ... · Building Envelope Commissioning/ Retro-Commissioning NFMT 2016 T. Stephen Kisielnicki, RWC, LEED® AP, BECxP. March 24, 2016.

Acceptance Phase

Testing

Review as-built drawings (building envelope)

Final walk through punch list

Final report

Page 33: Build it Right the First Time: Building Envelope ... · Building Envelope Commissioning/ Retro-Commissioning NFMT 2016 T. Stephen Kisielnicki, RWC, LEED® AP, BECxP. March 24, 2016.

Acceptance Phase Testing

Smoke tests, tracer gas (qualitative)

Chamber tests (quantitative)

Spray nozzle, spray rack leak tests

Infra-red (after enclosure complete or with temp. heat)

Page 34: Build it Right the First Time: Building Envelope ... · Building Envelope Commissioning/ Retro-Commissioning NFMT 2016 T. Stephen Kisielnicki, RWC, LEED® AP, BECxP. March 24, 2016.

Post Commissioning

Maintenance Staff Training

10 month walk-throughWarranty / seasonal evaluation

Review performance with owner / user

Lessons Learned

Post-Occupancy Commissioning

Page 35: Build it Right the First Time: Building Envelope ... · Building Envelope Commissioning/ Retro-Commissioning NFMT 2016 T. Stephen Kisielnicki, RWC, LEED® AP, BECxP. March 24, 2016.

Typical Design/Construction Issues

Page 36: Build it Right the First Time: Building Envelope ... · Building Envelope Commissioning/ Retro-Commissioning NFMT 2016 T. Stephen Kisielnicki, RWC, LEED® AP, BECxP. March 24, 2016.

Design Redlines

Page 37: Build it Right the First Time: Building Envelope ... · Building Envelope Commissioning/ Retro-Commissioning NFMT 2016 T. Stephen Kisielnicki, RWC, LEED® AP, BECxP. March 24, 2016.

Typical Redline Drawing

Page 38: Build it Right the First Time: Building Envelope ... · Building Envelope Commissioning/ Retro-Commissioning NFMT 2016 T. Stephen Kisielnicki, RWC, LEED® AP, BECxP. March 24, 2016.

Unusual Detailing

Page 39: Build it Right the First Time: Building Envelope ... · Building Envelope Commissioning/ Retro-Commissioning NFMT 2016 T. Stephen Kisielnicki, RWC, LEED® AP, BECxP. March 24, 2016.

Curtain Wall Detailing

Page 40: Build it Right the First Time: Building Envelope ... · Building Envelope Commissioning/ Retro-Commissioning NFMT 2016 T. Stephen Kisielnicki, RWC, LEED® AP, BECxP. March 24, 2016.

Curtain Wall Detailing

Page 41: Build it Right the First Time: Building Envelope ... · Building Envelope Commissioning/ Retro-Commissioning NFMT 2016 T. Stephen Kisielnicki, RWC, LEED® AP, BECxP. March 24, 2016.

Curtain Wall / Air Barrier Connections

Page 42: Build it Right the First Time: Building Envelope ... · Building Envelope Commissioning/ Retro-Commissioning NFMT 2016 T. Stephen Kisielnicki, RWC, LEED® AP, BECxP. March 24, 2016.

Transition Material Specification

Page 43: Build it Right the First Time: Building Envelope ... · Building Envelope Commissioning/ Retro-Commissioning NFMT 2016 T. Stephen Kisielnicki, RWC, LEED® AP, BECxP. March 24, 2016.

Transition Material at Curtain Wall and AVB

Page 44: Build it Right the First Time: Building Envelope ... · Building Envelope Commissioning/ Retro-Commissioning NFMT 2016 T. Stephen Kisielnicki, RWC, LEED® AP, BECxP. March 24, 2016.

Transition Material at Curtain Wall and AVB

Page 45: Build it Right the First Time: Building Envelope ... · Building Envelope Commissioning/ Retro-Commissioning NFMT 2016 T. Stephen Kisielnicki, RWC, LEED® AP, BECxP. March 24, 2016.

Transition Material at Curtain Wall and AVB

Page 46: Build it Right the First Time: Building Envelope ... · Building Envelope Commissioning/ Retro-Commissioning NFMT 2016 T. Stephen Kisielnicki, RWC, LEED® AP, BECxP. March 24, 2016.

Transition Material at Curtain Wall and AVB

Page 47: Build it Right the First Time: Building Envelope ... · Building Envelope Commissioning/ Retro-Commissioning NFMT 2016 T. Stephen Kisielnicki, RWC, LEED® AP, BECxP. March 24, 2016.

Transition Material at Curtain Wall and AVB

Page 48: Build it Right the First Time: Building Envelope ... · Building Envelope Commissioning/ Retro-Commissioning NFMT 2016 T. Stephen Kisielnicki, RWC, LEED® AP, BECxP. March 24, 2016.

Transition Material at Curtain Wall and AVB

Page 49: Build it Right the First Time: Building Envelope ... · Building Envelope Commissioning/ Retro-Commissioning NFMT 2016 T. Stephen Kisielnicki, RWC, LEED® AP, BECxP. March 24, 2016.

Transition Material at Curtain Wall and AVB

Page 50: Build it Right the First Time: Building Envelope ... · Building Envelope Commissioning/ Retro-Commissioning NFMT 2016 T. Stephen Kisielnicki, RWC, LEED® AP, BECxP. March 24, 2016.

Coordination

Page 51: Build it Right the First Time: Building Envelope ... · Building Envelope Commissioning/ Retro-Commissioning NFMT 2016 T. Stephen Kisielnicki, RWC, LEED® AP, BECxP. March 24, 2016.

Avoid This – Flashing Conflict

Page 52: Build it Right the First Time: Building Envelope ... · Building Envelope Commissioning/ Retro-Commissioning NFMT 2016 T. Stephen Kisielnicki, RWC, LEED® AP, BECxP. March 24, 2016.

Three-Dimensional Sketch

Page 53: Build it Right the First Time: Building Envelope ... · Building Envelope Commissioning/ Retro-Commissioning NFMT 2016 T. Stephen Kisielnicki, RWC, LEED® AP, BECxP. March 24, 2016.

Avoid This – Most Common Issue (Leakage/Business Interruption)

Page 54: Build it Right the First Time: Building Envelope ... · Building Envelope Commissioning/ Retro-Commissioning NFMT 2016 T. Stephen Kisielnicki, RWC, LEED® AP, BECxP. March 24, 2016.

Retro Commissioning

BECx for Existing Buildings

Typically initiated due to inadequate performance

May involve HVAC systems

Need for a baseline evaluation