ST. GREGORY’S CATHOLIC PRIMARY SCHOOL We were contacted by St. Gregory’s CP School with a view to supplying and installing a timber trail within their school grounds. Having discussed a couple of options, the school went with our Budget Trail 2 manufactured from Quarter Sawn timber, which was installed onto grass with no additional safer surfacing (as this is all low-level equipment). We also installed a bespoke timber Traverse Wall onto an existing frame underneath a raised outdoor classroom. Installed in October 2018 Value £7,325.00 + Vat Budget Trail 2 in timber - installed onto grass - with a bespoke Traverse Wall. Copyright © 2018 PlayQuest Adventure Play Ltd. before after after before after after
Transcript of Budget Trail 2 in timber - installed onto grass - with a ...€¦ · We were contacted by St....
![Page 1: Budget Trail 2 in timber - installed onto grass - with a ...€¦ · We were contacted by St. Gregory’s CP School with a view to supplying and installing a timber trail within their](https://reader034.fdocuments.in/reader034/viewer/2022052019/60332ec507dc49673862e863/html5/thumbnails/1.jpg)
ST. GREGORY’S CATHOLIC PRIMARY SCHOOL
We were contacted by St. Gregory’s CP School with a view to supplying and installing a timber trail
within their school grounds.
Having discussed a couple of options, the school went with our Budget Trail 2 manufactured from
Quarter Sawn timber, which was installed onto grass with no additional safer surfacing (as this is
all low-level equipment). We also installed a bespoke timber Traverse Wall onto an existing frame
underneath a raised outdoor classroom.
Installed in October 2018 Value £7,325.00 + Vat
Budget Trail 2 in timber - installed onto grass - with a bespoke Traverse Wall.