BT-311-Exchangers Shell & Tube

download BT-311-Exchangers Shell & Tube

of 6

Transcript of BT-311-Exchangers Shell & Tube

  • 8/12/2019 BT-311-Exchangers Shell & Tube

    1/6

    To: Date: Revision:

    Inquiry No.: Inquiry Revision:

    Project No: Client: Plant Site:

    Description:

    Item No's.:

    The attached bid evaluation and vendor recommendation are for the following quotations:

    Technically Acceptable

    Evaluated Bids Quote No. Yes No

    1.

    2.

    3.

    4.

    5.

    Quotations are NOT technically acceptable because of the following reasons:

    Recommended Vendor(s):

    Reasons for Recommendation:

    Vendor's Technical Clarifications:

    Other Comments:

    Please complete your commercial evaluation for submittal to Client A.S.A.P.

    Distribution:

    Project Manager: (Name) Originator

    Project Engineer: (Name) Lead Mechanical Engineer

    (Name)

    (Name)

    Technical Bid Evaluation for Shell & Tube Exchangers

    File: 232493894.xls.ms_office, Sheet: Tech. Evalu. (4/98) Page 1 of 6

  • 8/12/2019 BT-311-Exchangers Shell & Tube

    2/6

    Summary of Bids for Shell & Tube

    Project Number: Date: General Notes:

    Inquiry Number: Rev. No.: 1. Shaded areas are Technically Unacceptable Inquiry Revision Number: Engineer: (Name) 2. ARO = After Receipt of Order.

    ** = Data furnished by Vendor 3. ARAD = After Receipt of Approved Drawings.

    Client: Plant Site: ~ = Data not specified by Vendor.

    No. Item No. / Service

    1234 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

    26 27 28 29

    31 Base Price

    32 Price Add for - 100% Spare Gaskets 33 Price Add for - Surface Preparation and Painting 34 35

    36 Total Price37 Estimated Freight Price (Total per Unit) 38 Total Evaluated Price

    39 Shipping Weight, lbs. (Total per Unit)40 Shipping Terms (F.O.B.)41 e very, ee s raw ngs qu pment

    42 Recommended Vendor (YES)

    File: 232493894.xls.ms_office, Sheet: Summary (4/98)

  • 8/12/2019 BT-311-Exchangers Shell & Tube

    3/6

    Technic

    Project Number: Date: GENERAL NOT

    Inquiry Number: Rev. No.: 1. Shaded area

    Inquiry Revision Number: Engineer: (Name) 2. ARO = After

    Item Number: (input) ** = Data furnished by Vendor 3. ARAD = Afte

    Client: Plant Site: ~ = Data not specified by Vendor.

    No. Description Unit Specification

    1 No. of Shells / Size / TEMA Type (input) (input) (input)

    2 Arrangement / Effective Area per Shell & Unit Sq. Ft. xP X xS (input) (input)

    3 Heat Duty, Btu/Hr / Corrected LMTD, F (input) (input)

    4 U-Service / U-Clean (input) (input)

    5 PERFORMANCE OF ONE UNIT Shell Tube Shell Tube Shell

    6 Fluid Name (input) (input)

    7 Flow Rate Lbs/Hr (input) (input)

    8 Temperature - Inlet F (input) (input)

    9 Temperature - Outlet F (input) (input)

    10 Fouling Resistance Hr Ft F/Bt (input) (input)

    11 Pressure Drop Psi (input) (input)

    12 Velocity Ft/Sec (input) (input)

    13 CONSTRUCTION DATA Shell Tube Shell Tube Shell

    14 Pressure - Design / Test Psig xxx/Code xxx/Code

    15 Temperature- Design / MDMT F xxx/xxx xxx/xxx

    16 No. Passes per Shell (input) (input)

    17 Corrosion Allowance In (input) (input)

    18 Shell Nozzles - Inlet (Size / Rating / Type) (input) (input) (input)

    19 Shell Nozzles - Outlet (Size / Rating / Type) (input) (input) (input)

    20 Tube Nozzles - Inlet (Size / Rating / Type) (input) (input) (input)

    21 Tube Nozzles - Outlet (Size / Rating / Type) (input) (input) (input)

    22

    23 Shell - O.D. / I.D. In (input) (input)

    24 Tubes - Number / Nominal Length Ft (input) (input)

    25 Tubes - O.D. / Wall Thickness In (input) (input)

    26 Tubes - Arrangement / Pitch In (input) (input)

    27 Baffle - Type / % Cut / Pitch In (input) (input) (input)

    28 Impingement Protection (Yes / No) (input)

    29 Tube to Tubesheet Joints (Rolled, Seal/Strength Welded) (input)

    30

    31 Material - Shell (input)

    32 Material - Tube (input)

    33 Material - Channel & Channel Covers (input)

    34 Material - Tubesheets (input)

    35 Material - Gaskets - Shellside / Tubeside (input) (Input)

    36 Material - Expansion Joint (F&F, Bellows, Ends) (input)

    37

    38 Radiography - Shellside / Tubeside (input) (input)

    39 API-660 / TEMA Class (input) (input)

    40 ASME Code Design / ASME Code Stamp YES YES

    41 Guarantees - Thermal / Hydraulic YES YES

    42 Guarantees - Mechanical / Vibration YES YES

    43 Shipping Weight lbs. ** 44

    45 TECHNICALLY ACCEPTABLE (YES / NO)

    46 Recommended Vendor (YES / NO)

    File: 232493894.xls.ms_office, Sheet: Item No.

  • 8/12/2019 BT-311-Exchangers Shell & Tube

    4/6

    Technic

    Project Number: Date: GENERAL NOT

    Inquiry Number: Rev. No.: 1. Shaded area

    Inquiry Revision Number: Engineer: (Name) 2. ARO = After

    Item Number: (input) ** = Data furnished by Vendor 3. ARAD = Afte

    Client: Plant Site: ~ = Data not specified by Vendor.

    No. Description Unit Specification

    1 No. of Shells / Size / TEMA Type (input) (input) (input)

    2 Arrangement / Effective Area per Shell & Unit Sq. Ft. xP X xS (input) (input)

    3 Heat Duty, Btu/Hr / Corrected LMTD, F (input) (input)

    4 U-Service / U-Clean (input) (input)

    5 PERFORMANCE OF ONE UNIT Shell Tube Shell Tube Shell

    6 Fluid Name (input) (input)

    7 Flow Rate Lbs/Hr (input) (input)

    8 Temperature - Inlet F (input) (input)

    9 Temperature - Outlet F (input) (input)

    10 Fouling Resistance (input) (input)

    11 Pressure Drop Psi (input) (input)

    12 Velocity Ft/Sec (input) (input)

    13 CONSTRUCTION DATA Shell Tube Shell Tube Shell

    14 Pressure - Design / Test Psig xxx/Code xxx/Code

    15 Temperature- Design / MDMT F xxx/xxx xxx/xxx

    16 No. Passes per Shell (input) (input)

    17 Corrosion Allowance In (input) (input)

    18 Shell Nozzles - Inlet (Size / Rating / Type) (input) (input) (input)

    19 Shell Nozzles - Outlet (Size / Rating / Type) (input) (input) (input)

    20 Tube Nozzles - Inlet (Size / Rating / Type) (input) (input) (input)

    21 Tube Nozzles - Outlet (Size / Rating / Type) (input) (input) (input)

    22

    23 Shell - O.D. / I.D. In (input) (input)

    24 Tubes - Number / Nominal Length Ft (input) (input)

    25 Tubes - O.D. / Wall Thickness In (input) (input)

    26 Tubes - Arrangement / Pitch In (input) (input)

    27 Baffle - Type / % Cut / Pitch In (input) (input) (input)

    28 Impingement Protection (Yes / No) (input)

    29 Tube to Tubesheet Joints (Rolled, Seal/Strength Welded) (input)

    30

    31 Material - Shell (input)

    32 Material - Tube (input)

    33 Material - Channel & Channel Covers (input)

    34 Material - Tubesheets (input)

    35 Material - Gaskets - Shellside / Tubeside (input) (Input)

    36 Material - Expansion Joint (F&F, Bellows, Ends) (input)

    37

    38 Radiography - Shellside / Tubeside (input) (input)

    39 API-660 / TEMA Class (input) (input)

    40 ASME Code Design / ASME Code Stamp YES YES

    41 Guarantees - Thermal / Hydraulic YES YES

    42 Guarantees - Mechanical / Vibration YES YES

    43 Shipping Weight lbs. ** 44

    45 TECHNICALLY ACCEPTABLE (YES / NO)

    46 Recommended Vendor (YES / NO)

    File: 232493894.xls.ms_office, Sheet: Item No. (2)

  • 8/12/2019 BT-311-Exchangers Shell & Tube

    5/6

    Technic

    Project Number: Date: GENERAL NOT

    Inquiry Number: Rev. No.: 1. Shaded area

    Inquiry Revision Number: Engineer: (Name) 2. ARO = After

    Item Number: (input) ** = Data furnished by Vendor 3. ARAD = Afte

    Client: Plant Site: ~ = Data not specified by Vendor.

    No. Description Unit Specification

    1 No. of Shells / Size / TEMA Type (input) (input) (input)

    2 Arrangement / Effective Area per Shell & Unit Sq. Ft. xP X xS (input) (input)

    3 Heat Duty, Btu/Hr / Corrected LMTD, F (input) (input)

    4 U-Service / U-Clean (input) (input)

    5 PERFORMANCE OF ONE UNIT Shell Tube Shell Tube Shell

    6 Fluid Name (input) (input)

    7 Flow Rate Lbs/Hr (input) (input)

    8 Temperature - Inlet F (input) (input)

    9 Temperature - Outlet F (input) (input)

    10 Fouling Resistance (input) (input)

    11 Pressure Drop Psi (input) (input)

    12 Velocity Ft/Sec (input) (input)

    13 CONSTRUCTION DATA Shell Tube Shell Tube Shell

    14 Pressure - Design / Test Psig xxx/Code xxx/Code

    15 Temperature- Design / MDMT F xxx/xxx xxx/xxx

    16 No. Passes per Shell (input) (input)

    17 Corrosion Allowance In (input) (input)

    18 Shell Nozzles - Inlet (Size / Rating / Type) (input) (input) (input)

    19 Shell Nozzles - Outlet (Size / Rating / Type) (input) (input) (input)

    20 Tube Nozzles - Inlet (Size / Rating / Type) (input) (input) (input)

    21 Tube Nozzles - Outlet (Size / Rating / Type) (input) (input) (input)

    22

    23 Shell - O.D. / I.D. In (input) (input)

    24 Tubes - Number / Nominal Length Ft (input) (input)

    25 Tubes - O.D. / Wall Thickness In (input) (input)

    26 Tubes - Arrangement / Pitch In (input) (input)

    27 Baffle - Type / % Cut / Pitch In (input) (input) (input)

    28 Impingement Protection (Yes / No) (input)

    29 Tube to Tubesheet Joints (Rolled, Seal/Strength Welded) (input)

    30

    31 Material - Shell (input)

    32 Material - Tube (input)

    33 Material - Channel & Channel Covers (input)

    34 Material - Tubesheets (input)

    35 Material - Gaskets - Shellside / Tubeside (input) (Input)

    36 Material - Expansion Joint (F&F, Bellows, Ends) (input)

    37

    38 Radiography - Shellside / Tubeside (input) (input)

    39 API-660 / TEMA Class (input) (input)

    40 ASME Code Design / ASME Code Stamp YES YES

    41 Guarantees - Thermal / Hydraulic YES YES

    42 Guarantees - Mechanical / Vibration YES YES

    43 Shipping Weight lbs. ** 44

    45 TECHNICALLY ACCEPTABLE (YES / NO)

    46 Recommended Vendor (YES / NO)

    File: 232493894.xls.ms_office, Sheet: Item No. (3)

  • 8/12/2019 BT-311-Exchangers Shell & Tube

    6/6

    Technic

    Project Number: Date: GENERAL NOT

    Inquiry Number: Rev. No.: 1. Shaded area

    Inquiry Revision Number: Engineer: (Name) 2. ARO = After

    Item Number: (input) ** = Data furnished by Vendor 3. ARAD = Afte

    Client: Plant Site: ~ = Data not specified by Vendor.

    No. Description Unit Specification

    1 No. of Shells / Size / TEMA Type (input) (input) (input)

    2 Arrangement / Effective Area per Shell & Unit Sq. Ft. xP X xS (input) (input)

    3 Heat Duty, Btu/Hr / Corrected LMTD, F (input) (input)

    4 U-Service / U-Clean (input) (input)

    5 PERFORMANCE OF ONE UNIT Shell Tube Shell Tube Shell

    6 Fluid Name (input) (input)

    7 Flow Rate Lbs/Hr (input) (input)

    8 Temperature - Inlet F (input) (input)

    9 Temperature - Outlet F (input) (input)

    10 Fouling Resistance (input) (input)

    11 Pressure Drop Psi (input) (input)

    12 Velocity Ft/Sec (input) (input)

    13 CONSTRUCTION DATA Shell Tube Shell Tube Shell

    14 Pressure - Design / Test Psig xxx/Code xxx/Code

    15 Temperature- Design / MDMT F xxx/xxx xxx/xxx

    16 No. Passes per Shell (input) (input)

    17 Corrosion Allowance In (input) (input)

    18 Shell Nozzles - Inlet (Size / Rating / Type) (input) (input) (input)

    19 Shell Nozzles - Outlet (Size / Rating / Type) (input) (input) (input)

    20 Tube Nozzles - Inlet (Size / Rating / Type) (input) (input) (input)

    21 Tube Nozzles - Outlet (Size / Rating / Type) (input) (input) (input)

    22

    23 Shell - O.D. / I.D. In (input) (input)

    24 Tubes - Number / Nominal Length Ft (input) (input)

    25 Tubes - O.D. / Wall Thickness In (input) (input)

    26 Tubes - Arrangement / Pitch In (input) (input)

    27 Baffle - Type / % Cut / Pitch In (input) (input) (input)

    28 Impingement Protection (Yes / No) (input)

    29 Tube to Tubesheet Joints (Rolled, Seal/Strength Welded) (input)

    30

    31 Material - Shell (input)

    32 Material - Tube (input)

    33 Material - Channel & Channel Covers (input)

    34 Material - Tubesheets (input)

    35 Material - Gaskets - Shellside / Tubeside (input) (Input)

    36 Material - Expansion Joint (F&F, Bellows, Ends) (input)

    37

    38 Radiography - Shellside / Tubeside (input) (input)

    39 API-660 / TEMA Class (input) (input)

    40 ASME Code Design / ASME Code Stamp YES YES

    41 Guarantees - Thermal / Hydraulic YES YES

    42 Guarantees - Mechanical / Vibration YES YES

    43 Shipping Weight lbs. ** 44

    45 TECHNICALLY ACCEPTABLE (YES / NO)

    46 Recommended Vendor (YES / NO)

    File: 232493894.xls.ms_office, Sheet: Item No. (4)