Brochure
-
Upload
alessio-de-grano -
Category
Documents
-
view
213 -
download
0
description
Transcript of Brochure
![Page 1: Brochure](https://reader034.fdocuments.in/reader034/viewer/2022042823/568bd9a41a28ab2034a7cde8/html5/thumbnails/1.jpg)
![Page 2: Brochure](https://reader034.fdocuments.in/reader034/viewer/2022042823/568bd9a41a28ab2034a7cde8/html5/thumbnails/2.jpg)
![Page 3: Brochure](https://reader034.fdocuments.in/reader034/viewer/2022042823/568bd9a41a28ab2034a7cde8/html5/thumbnails/3.jpg)
![Page 4: Brochure](https://reader034.fdocuments.in/reader034/viewer/2022042823/568bd9a41a28ab2034a7cde8/html5/thumbnails/4.jpg)
![Page 5: Brochure](https://reader034.fdocuments.in/reader034/viewer/2022042823/568bd9a41a28ab2034a7cde8/html5/thumbnails/5.jpg)
Project ManagementGAM plan and coordinate all project activities from the award of the purchase order to the delivery of the goods in the respect of contractual dates and obligations.The Project Managers are responsible for all project activities and procedures; they are supported by an efficient electronic data processing (EDP) system whose scope is moni-toring all operative units.Their main activities:
• Planning of critical paths;• Define project milestones;• Planning and cooperating with engineering activities;• Reporting of Cost Control;• Purchasing and monitoring raw materials production and delivery;• Monitoring and reporting production process.
Project Managers’ figure consists of giving a constant flow of information from and to the Customers in order to ensure a good result of the Project and the satisfaction of the Cus-tomers.
EngineeringTechnical and Engineering Department is equipped with advanced CAD & CAM systems, CAD workstation and interconnected Personal Computer with internal and external soft-ware packages. Great importance is given to Pressure Vessels design, Stress Analysis and Welding trough following advanced softwares:
- APV by Computer Engineering- Tecno Sap- Tecno Metal- Codeware Compress- Welder Management- Strucad by AceCad Software- Stackdes “FLARESIM”- HTRI
ID Nome attività Durata Inizio Fine
1 Job Starting 149 g mer 14/03/07 ven 05/10/072 ENGINEERING 108 g mer 14/03/07 ven 10/08/073 Job opening 1 g mer 14/03/07 mer 14/03/074 QCP issuing 9 g gio 15/03/07 mar 27/03/075 Welding dossier issuing 13 g gio 15/03/07 lun 02/04/076 Painting Procedure issuing 107 g gio 15/03/07 ven 10/08/077 Other Tests Procedures issuing 31 g lun 19/03/07 lun 30/04/078 MATERIAL PURCHASING 15 g ven 06/04/07 gio 26/04/079 Plates for Shell and Baffles 15 g ven 06/04/07 gio 26/04/07
10 Plates for Water Boxes 15 g ven 06/04/07 gio 26/04/0711 Plates for Condensate Hotwell 15 g ven 06/04/07 gio 26/04/0712 Plates forTubesheets and Bundle 15 g ven 06/04/07 gio 26/04/0713 Material for Expansion Bottle 15 g ven 06/04/07 gio 26/04/0714 Material for Saddle and Cover 15 g ven 06/04/07 gio 26/04/0715 Flanges 15 g ven 06/04/07 gio 26/04/0716 Bolts 15 g ven 06/04/07 gio 26/04/0717 MATERIAL ARRIVAL 39 g mer 06/06/07 lun 30/07/0718 Plates forTubesheets and Bundle 8 g mer 06/06/07 ven 15/06/0719 Plates for Shell and Baffles 11 g lun 16/07/07 lun 30/07/0720 Plates for Water Boxes 11 g lun 16/07/07 lun 30/07/0721 Plates for Condensate Hotwell 11 g lun 16/07/07 lun 30/07/0722 Material for Expansion Bottle 11 g lun 16/07/07 lun 30/07/0723 Material for Saddle and Cover 11 g lun 16/07/07 lun 30/07/0724 Flanges 11 g lun 16/07/07 lun 30/07/0725 Bolts 11 g lun 16/07/07 lun 30/07/0726 WORKSHOP ACTIVITY 62 g gio 12/07/07 gio 04/10/0727 Construction 55 g gio 12/07/07 mer 26/09/0728 Tracing & Cutting Plates 10 g gio 12/07/07 mer 25/07/0729 Rolling Machine Plates Submission 3 g gio 26/07/07 lun 30/07/0730 Fit up & Welding Shell 23 g mar 31/07/07 gio 30/08/0731 Fit up & Welding Water Boxes 24 g mar 31/07/07 ven 31/08/0732 Fit Up & Welding Condensate Hotwell 3 g lun 06/08/07 mer 08/08/0733 Fit up & Welding Flange to Pipes 3 g mer 08/08/07 ven 10/08/0734 Fit up & Welding Nozzles to Shell 4 g lun 27/08/07 gio 30/08/0735 Fit Up & Welding Baffles 4 g mar 04/09/07 ven 07/09/0736 Fit up & Welding Saddles to Shell 2 g lun 17/09/07 mar 18/09/0737 Fit Up & Welding Tubesheets to Shell 6 g mer 12/09/07 mer 19/09/0738 Titanium Tubes Insertion & Welding 5 g gio 20/09/07 mer 26/09/0739 Fit Up & Welding Expansion Bottle 5 g lun 17/09/07 ven 21/09/0740 Tests 3 g gio 27/09/07 sab 29/09/0741 Bubble Tests before Hydrostatic Tests 2 g gio 27/09/07 ven 28/09/0742 Hydrostatic Test Shell Side 1 g ven 28/09/07 ven 28/09/0743 Hydrostatic Test Tube Side 1 g sab 29/09/07 sab 29/09/0744 Surface Treatments 3 g lun 01/10/07 mer 03/10/0745 Water Boxes and Covers Epoxidic Coating 2 g lun 01/10/07 mar 02/10/0746 External Painting 3 g lun 01/10/07 mer 03/10/0747 Packing 1 g gio 04/10/07 gio 04/10/0748 Inspections 62 g gio 12/07/07 gio 04/10/0749 Construction 55 g gio 12/07/07 mer 26/09/0750 Surface Treatments 3 g lun 01/10/07 mer 03/10/0751 Packing 2 g mer 03/10/07 gio 04/10/0752 Final Documentation 1 g gio 04/10/07 gio 04/10/0753 DELIVERY 1 g ven 05/10/07 ven 05/10/07
100% 14/03100% 27/03100% 02/04100% 10/08
100% 30/04
100% 26/04100% 26/04100% 26/04100% 26/04100% 26/04100% 26/04100% 26/04100% 26/04
100% 15/06100% 30/07100% 30/07100% 30/07
80% 30/07100% 30/07
95% 30/0790% 30/07
100% 25/07100% 30/07
100% 30/08100% 31/08
100% 08/08100% 10/08
100% 30/08100% 07/09
100% 18/0980% 19/09
0% 26/0980% 21/09
0% 28/090% 28/090% 29/09
0% 02/100% 03/10
0% 04/10
90% 26/090% 03/10
0% 04/100% 04/100% 05/10
V G M M L D S V G M M L D S V G M M L D S V G M M L D S V G M M L D S V G M M L feb 07 26 mar 07 23 apr 07 21 mag 07 18 giu 07 16 lug 07 13 ago 07 10 set 07 08 ott 07
Attività
Divisione
Avanzamento
Cardine
Riepilogo
Riepilogo progetto
Attività esterne
Cardine esterno
Scadenza
SCHEDULING CHARTClient:
N°1 STEAM CONDENSER - AL JUBAIL (Saudi Arabia)
Job GAM: 7/0995Customer Job N°:
Order N° :
Pagina 1
REV. Data: Issued by:
PAINTING AND SURFACE PREP/ (60-0000-L-SPE-0007)
Surface preparation:PFD Coating System:
NOZZLE DATA
ASME CODE
REQUIRED
U STAMP
A B DC
1) DIMENSIONS IN mm EXCEPT OTHERWISE STATED
2) FLANGE BOLT HOLES STAGGERED ON MAIN AXIS
NOTES
3) PRESERVATION: VESSEL COMPLETELY SEALED WITH VPI DESICCANT ADDED.FLANGE FACES COATED WITH CORROSION INHIBITOR AND FITTED WITH A NEOPRENE GASKET, A METAL BLANK (6 mm THK MIN.) AND 50% M10 BOLTS (4 MIN.).FLANGE RIMS PROTECTED WITH DENSO TAPE AROUND THE CIRCUMFERENCE.
ELEVATION VIEW
VIEW "A"DBL "F"
DTHNBRFK/YFZ GHJTRWBZ
- LFYYST CJGKF
- GHBVTXFYBZ
HF:VTHS PFLFYS D VV TCKB YTN LHEUB[ ERF:FYBQ
JNDTHCNBZ GJL ,JKNS DJ AKFYWF[ INEWTHJD YF UKFDYJQ JCB
GJRHSNBT :FOBNYSVB CVF:RFVB< CJCEL DGJK/YT EGKJNYTY C LJ,FDRJQ LTCCBRRFYNF GJDTH[YJCNB AKFYWF GJRHSNS FYNBRJHHJ:BJYYJQ LJ,FDRJQ
VPI.B J,JHELJDFYYST EGKJNYTYBTV B: YTJGHTYF :FUJNJDRJQ VTNFKKF(6 VV NJKO] VBY) B ,JKNFVB 50% V10 (4 VBY])] CRJ,S AKFYWF :FOBOTYS KTYNJQ NBGF LTYCJ GJDC>LE GTHBVTNHF]
,
YTGJLDB;YJT CTLKJ FIXED SADDLE
PLAN VIEWDBL CDTH[E
L.T.C.S. JACKETED DRAINS TANK
]
-NHT,JDFYBZ- JGTHFWBB
NONENONE
NONE
- YTHF:HEIF>OTT BCGSNFYBT
- RJ;E[
HFCXTN]
- VFNTHBFK-YFBVTYJDFYBT
ASME VIII RJL HF:L] 1 - HTL] 2005 LJG] YTN$RJL] VFHRBH] NHT,JDFYF
BC[JLYST LFYYST LKZ GHJTRNBHJDFYBZ
RJYCNHERNBDYSQ RJL
TITLE
100%NONE100%ALONG AND CIRC. SHELL SEAMS 1/8 in.3/4<t<=1.1/2
* 10" MINIMUM FILM LENGTH
HYDR. PRESSURE TEST
DIMENSIONAL CHECK -
Max O�set (In.)
ASME VIII DIV. 1 - ED. 2004 addenda 2005/ Code Stamp Req'd
NONE
NOZZLE TO SHELL SEAMS
NONE
DESIGN DATA -
MATERIAL
NON-DESTRUCTIVE TESTING
SHELL
OTHER FILLET SEAMS
HEAD TO SHELL SEAMS
FLANGE TO NECK SEAMS
ACCORD.TO ASME VIII DIV.1 CAT.
DESCRIPTION
DESIGN CODE
OPERATIONS REQUISITIONS
t<=3/41/4 t
100%
100%100%D
100%
MT
100%
UT
B 100%
-
A
RT *
-
3/4<t<=1.1/2100% 1/8 in.
t<=3/41/4 t
MATERIAL CLASS P.No-Gr.No
WELD JOINT EFFICIENCY
MAX THK OF WELDING
STRESS RELIEVING
1-2
VOLUME
22 mm
NO
100%
1/2
/Pfrfpxbr%/Vtcnjhf;&%
/J,]trn% 200
Zona IndustrialeROMBIOLO (VV)
IL PRESENTE DISEGNO E' PROPRIETA' G.A.M. srl - A TERMINE DI LEGGE OGNI DIRITTO E' RISERVATOTHIS DOCUMENT IS THE PROPERTY OF G.A.M. srl - ALL RIGHTS ARE RESERVED ACCORDING TO LAW
6/0951 E-R-
SRB-US-427/1
ITEM:
COMMESSA/JOB
N°P0021-VE-A005
Filename:
Plant location
Unit
Customer
TITLE
REV DATE
SRB-US-427/1
571502
DATE:SCALE: -
DRAWING No.
31/08/06
3REV
PROJ No
$NTYUB:ITDHJQKTCO ASSET DEVELOPMENT PROJECTS
$NTYUB: - RF:F[CNFYTENGIZ - KAZAKHSTAN
TENGIZCHEVROIL
ENGOPERPROJ
TENGIZCHEVROIL
DESCRIPTIONCH'KBY APP'D
TENGIZCHEVROIL ASSET DEVELOPMENT PROJECTSPROJECT No.: 571502
PFD PROJECT No. - 571502 N°
TCO ASSET DEVELOPMENT PROJECTSGHJTRNS HF:HF,JNRB FRNBDJD NIJ
GHJTRN GAL
G.A.M. Srl
L.T.C.S. JACKETED DRAINS TANK
l.qvs
1 ,fh
= 10
0rGf
IMPE
RIAL T
O M
ETRIC
CONV
ERSIO
N TA
BLE F
OR N
OMIN
AL PI
PE SI
ZES
REPR
ODU
CED
COPI
ED LO
ANED
EXH
IBIT
ED N
OR
USED
EXC
EPT
IN TH
E LI
MIT
ED W
AY A
ND P
RIVA
TE
MER
ELY
LOAN
ED A
ND O
N TH
E BO
RRO
WER
S EX
PRES
S AG
REEM
ENT T
HAT T
HEY
WIL
L NO
T BE
THIS
DRA
WIN
G AN
D TH
E DE
SIGN
IT C
OVE
RS A
RE TH
E PR
OPE
RTY
OF T
ENGI
ZCHE
VRO
IL TH
EY A
RE
USE
PERM
ITTE
D AN
D W
RITT
EN C
ONS
ENT
GIVE
N BY
TENG
IZCH
EVRO
IL TO
THE
BORR
OW
ER.
PIPE D
IA.
NHE,S
LBFV
]
mm
mm
inche
s1"
20 /
15 /"
25
"2"
1140 /
32 /"
50
"3"
32
8065
"/
"
90 /
1 bar
= 10
0kPa
PRES
SURE
26"
650
- LBF
VTNH
S NHE
, < G
THTD
JL FY
UKBQ
CRB[
TLBY
BW B
:VTH
TYBZ
D V
TNHB
XTCR
BT
14"
350
5"4"
6"
125
100
150
10"
8"12
"
250
200
300
20"
500
16"
18"
400
450
24"
22"
550
600
38"
950
32"
800
30"
28"
700
750
36"
34"
850
900
44"
1100
42"
40"
1050
1000
48"
46"
1200
1150
FORM
ULA;
LFDK
TYBT
CRJK/:ZOTT CTLKJ SLIDING SADDLE
N3
N5
N1P1
P1 N5
N1
M2
N3
M1
A
DCT HF:VTHS LFYS D VBKKBVTNHF[| TCKB YT ERF:FYJ BYFXT]A1 BORDER - ALL DIMENSIONS ARE IN MILLIMETRES UNLESS OTHERWISE STATED.
22
13
36
60°
SEE DETAIL "A"
DETAIL "A"
SEE DETAIL "A"
A
N2
MANWAYSEE DETAIL "B"
DETAIL "B"
L1
SEE DETAIL "B"MANWAY M1
S1
S2
S5
S3
SHELL
JACKET
SHELL NOZZLE/JACKET
TYPICAL DETAIL (S1-S2-S3-S5)
NOZZEL
NOZZLE JACKET SLEEVE PIPE
SEE DETAIL "E" SEE DETAIL "E"SEE DETAIL "E"
3
1
8 9
10
1112
6
19
18
17
7
2
5
23
22
21
16
13
14
15
37
38
39
1
3
442
41
7
49
43
98
12
INTERNAL VESSEL:
,Topcoat - 100 microns Low Temperature cure high solids epoxyPrimer - 100 microns Low Temperature cure high solids epoxy
Coating System CK
EXSTERNAL JACKET: Coating System CJ
SEE DETAIL "D"
DESIGN PRESSURE
10" SHOP TEST CAP TRIM PIPEBACK 50mm FOLLOWING SHOPHYDRO-TEST & PREPPIPE FOR SITE WELD.
17
18
19 S1
30
L2
P2
P2
L2
L1
N2
M1
M1
VESSEL C
VESSEL CSEE DETAIL "C"LIFTING LUGS
DETAIL "C"LIFTING LUGS N. 3 PIECES
LIFTING LUGS
PIPE FOR SITE WELD.HYDRO-TEST & PREPBACK 50mm FOLLOWING SHOP10" SHOP TEST CAP TRIM PIPE
G.C.S.Z.F.M.B REVISED WHERE INDICATED
M1M216
13
31 32
3334
35
16
20 24 25
20 24 25
26
26
26
(N5) WITH BLIND COVER
40
SEAL WELDED FOLLOWINGSHOP HYDROTEST-DRAINING
22
1
G.C.S.Z.F.M.1 REVISED WHERE INDICATED
30
SEE DETAIL "D"
2
2
4) PRESERVATION: JACKET SPACE SHALL BE THOROUGHLY DRIED THEN PURGED WITH NITROGENUNDER A PRESSURE OF 0.5 BAR(G)
22YTGJLDB;YJT CTLKJ
FIXED SADDLECRJK/:ZOTT CTLKJ
SLIDING SADDLE
5) MARK ON THE VESSEL JACKET WITH CARACTERS 100 MM HIGH MIN. (ENGLISH & RUSSIAN) :"JACKET SPACE IS PURGED WITH NITROGEN @ 0.5 Bar.g"
2
G.C.S.Z.F.M.2 REVISED WHERE INDICATED
G.C.S.Z.F.M.3 REVISED AS BUILT
A1 BORDER
125
IMPE
RIAL T
O M
ETRIC
CONV
ERSIO
N TA
BLE F
OR N
OMIN
AL PI
PE SI
ZES
PIPE D
IA.
/40
/20m
m15
inche
s/
"
2532
"1"
1/"
13"80
5065
"2"
"/ 2
9010
0
"3/
4"
1 bar
= 10
0kPa
150
200
5"6"
8"
300
250
350
12"
10"
14"
450
400
500
18"
16"
20"
600
550
650
24"
22"
26"
38"
950
32"
800
750
700
30"
28"
900
850
34"
36"
44"
1100
1050
1000 40
"42
"
1150
1200
46"
48"
PRES
SURE
FORM
ULA;
REPR
ODU
CED
COPI
ED LO
ANED
EXH
IBIT
ED N
OR
USED
EXC
EPT
IN TH
E LI
MIT
ED W
AY A
ND P
RIVA
TEM
EREL
Y LO
ANED
AND
ON
THE
BORR
OW
ERS
EXPR
ESS
AGRE
EMEN
T THA
T THE
Y W
ILL
NOT
BETH
IS D
RAW
ING
AND
THE
DESI
GN IT
CO
VERS
ARE
THE
PRO
PERT
Y O
F TEN
GIZC
HEVR
OIL
THEY
ARE
USE
PERM
ITTE
D AN
D W
RITT
EN C
ONS
ENT
GIVE
N BY
TENG
IZCH
EVRO
IL TO
THE
BORR
OW
ER.
ALL DIMENSIONS ARE IN MILLIMETRES UNLESS OTHERWISE STATED.
TENGIZCHEVROIL
Filename:
TCO OPERATIONS TCO ENGINEERING
SCALE: DATE:
DRAWN BY
APPROVED BY
TITLE
REV DATE
PROJ No
DRAWING No.
PROJECTS
CHECKED BY
REVISION
REV
APP'D
ENGOPER
CH'KBY
PROJ
-25.112.75 / 9.00 16.25 -89.3116.25 -90.0916.259.00 -89.31/2.75 -25.11 6.25
S275 JR EN 10025 WITHOUT IMPACT TEST
Main structure (columns, beams, bracings, walkways, brackets ans ladders):
Air Ba�es (Galvanized sheets):
YES (ONE FOR EACH FAN) ("METRIX" TYPE)VIBRATION TRANSMITTER
BUNDLES/UNIT
BAYS/UNIT
BUNDLE TOTAL WEIGHT
BUNDLE EMPTY WEIGHT
LOUVERS / MATERIAL
NOISE LIMITS
VOLUME
1
1
N°
N° 1
SpL 85 dB(A) at 1 m below the fan
6475
652
5823
dB(A)
kg
l
kg
624
94
530
ft-mm
KW-R.P.M.
Hz-V-N°
KW-R.P.M.
SAFETY FACTOR
RATIO
TYPE
FAN DIA
PITCH AP
TYPE
15x2 - 1450
1.8
4.83
Tooth Belt
Eex'de (Zone 1)-IIB-T4
50-660-3
ELECTRICAL (LOHER MANUFACTURER) (VARIABLE SPEED)
5 - ALUMINIUM
9-2743
10x2 -1450
100
N°
%
SEE NOTES "8", "9" AND "10"
TYPE
66.68x58 - 9050
4-4-0
AXIAL FLOW [LOW NOISE 16 dB(A)]
SEE Q.C.P.
110 - 8600
1-1-10
EN 20898-1 BOLTS CL.8.8 - NUTS CL.8
3
REGENERATION GAS
NONEmm
mm
Regeneration cooler
STEAM
Steam coil
NONE
3
PLUGS
GASKETS
FITTINGS
FLANGES
BOLTING
PLATES
MIN DESIGN METAL TEMP.
PIPES
CODE STAMP
FINS
TUBES
SA 320 GR. L7M / SA 194 GR. 7M
SA 350 LF2
SA 350 LF2
SOFT IRON
SA 350 LF2 SA 350 LF2
SA 350 LF2
SA 333 GR. 6
SA 516 GR. 60 N
-43
YES
°C
SA 334 GR. 6 SMLS
ALUMINIUM ALUMINIUM
SA 516 GR. 60 N
SA 333 GR. 6
SA 334 GR. 6 SMLS
YES
-43
-127.78
-5.39
-124.31
80
160
STEAM COIL CONNECTION
S1
S2
DN
INLET
2"
3"
T1 - T2
P1 - P2
2"
1.1/2"
D1 - D2 DRAIN
150
150 RF
RF
WN+PIPE
WN+PIPE 125÷250 AARH
125÷250 AARH
NIPOFLANGE
LWN
LWN
EARTHQUAKE
DIR Y
SNOW
/ 3.57
/ /
//
//
/
-1.65
-
-
-
/NOZZLES
DIR X
DIR X
DIR Y
DIR Z
WIND
/ /
/9.00
//
2.75 /
/
/
/
16.25
3.57
/
/
/
/
/
/
/
DIR Y
DIR X
/ 5.21
3.36 /
16.259.00
//
/
/
2.75
/
-25.11
/
-24.51/2.75 16.259.00
FOR COLUMNS 2A & 3B
BASE STAIR DETAIL
CSN 140
25
LADDER BASE PLATE DTL
3.57
/ -3.74
3.57 10.6110.61
/
/ // / /
-1.65/ / /
10.61
/ -5.39
16.25
/
16.25
/15.7815.78
/ 6.01
7.17/
48.27
4.10
16.25
/
6.01 /
6.2510.32
/
3.574.10
48.27
// / /
/
/
/
/
/
/
/
3.57
//2.75 9.00
16.25 -128.56
/
5.21
3.86
16.25 -125.84
3.86 3.36
/
6.25
6.25
/
-25.11
/
2.75
/
/
/ /
9.00
3.36
/
9.002.75 / -25.11
/
/
48.27
4.10
10.32
/
16.25
/
/
3.86/
-127.78
-124.31
Mx FxMzFy
My
Fz
1000
2200
INLE
T - O
UTLE
TNO
ZZLE
S
STEA
M CO
ILIN
LET N
OZZL
ES
CODES: ASME VIII DIV.1 ED. 2001 ADD. 2002 - API 661 ED. 97 - "U" STAMPED
MAX DESIGN TEMP.
DESIGN PRESSURE
TEST PRESSURE
62-EA-770
320
49.01
34.0
°C
BarG
BarG
STEAM COIL
215
7.0
17.42
Y
A
X
PLAN VIEW
1200
CSN
160
1500 A
1500
1200 600
1200
38800
1
2200
X N2
S1
500
N1/D1
1200
AP
FAN R
ING
AP
62-EA-770
276227
43
1
6400
1
22002200 2200
OUT.
NOZZ
LES
STEA
M CO
IL
(VIEW X)
3
2300
Fz
MAX FOUNDATION LOADS
ELEVATION LONG. ROW
SCH.
80
80
TUBE BUNDLE CONNECTION ITEM:62-EA-770CONNECTION
N3
N1 - N2
DN
2"
INLET
VENT
3"
3"
V1 - V2
OUTLET
SERVICE RATING FACETYPE
300 RF
RF
LWN
WN+PIPE
WN+PIPE
125÷250 AARH
FACE FINISH
125÷250 AARH
-
LOADS
SYMBOLS
COLUMNS
Fx FyFy
2A1A
Fx Fz
3 PEREGORODKA
B
PRIVOD XAL^ZEY2
1PNEUMATICESKIY I RUCNOY
XAL^ZI
A
2200
7350
HEA
140
5050
3
800
2 UPN 100
IPE 270
Mx
MAX ALLOWABLE NOZZLE LOADS:
810
Fy
KN
FzFx Fy
3A
(
FxFzFx Fy
1B
)
FzFx FyFz
3B2B
NOZZLE SIZE
3"
TWO TIMES VALUES DEFINED IN API 661
4005
N.m(
Mz
)
FxMy
MOMENTS
1215
( )N
FzFy
FORCES
3382
2500
(LOUV
ER)
1 B
8800 1800
800
HEA
140
1 3
3
1
lifting points for fan and motor
ELEVATION LONG. SECT.
202
3
1500A
2
800600
1
200
151
2
1500
1500
S2
2200
3400
D2V2
1200
151
X
IPE 220
A
3Z (A
IR B
AFFL
E)27
50
OUTL
ET
200
1000
250
INLE
T
1300
ELEVATION TRANSV. ALL.
3
A-A
8800
B
X
1550
3
3
550
TRANSMITTER
2750
300
700
VIBRATION
7350
5050
Z
7350
3
A - B
2500
2
850
3400
1
1
1500
1500
2 UPN
120
2500
3
2
3
1400
62-EA-770
190
2300
1
160
3
2
2300
IPE 220
3
1
3N1
31
1400600
31500
DVER[ TOL[KA NA LINII "B"
6
5 q =0.5 kN/m
Zone 1
NOTES
4
3
2
1
V=40 m/s (q=1 kN/m )
8
p=2.5 kN/m 7HOT DIP GALVANIZED ACCORDING ASTM A 123
10
11
9
IL PRESENTE DISEGNO E' PROPRIETA' G.A.M. srl - A TERMINE DI LEGGE OGNI DIRITTO E' RISERVATOTHIS DOCUMENT IS THE PROPERTY OF G.A.M. srl - ALL RIGHTS ARE RESERVED ACCORDING TO LAW
ROMBIOLO (VV)Zona Industriale
SOSTITUISCE IL - REPLACES
DESCRIZIONE - DESCRIPTION
EMISSIONE - ISSUE
REV.
0
N° AC-US-77/1
SCALESCALA
SOSTITUITO DA - REPLACED BY
3/0883
COMMESSA/JOB
-SHEETTAVOLA
1 1E - RLANGUAGE
LINGUA
PREP'D
ITEM:
ESEG.
62-EA-770
CONTR.CHK'D APPR'D
APPR.DATEDATA
28.01.04CHIARELLICHIARELLIC.G.
HEA
160
HEA
160
HEA
140
PROJECT No.: 571502TENGIZCHEVROIL ASSET DEVELOPMENT PROJECTS
12
1"
RF
RF
RF
RF
125÷250 AARH
125÷250 AARH
125÷250 AARH
125÷250 AARH
2 UPN 140
bracing
bracing
350
50
50
5025
0
35025050
HOLES Ø 24BOLTS M 20
THK. 15
BASE PLATE DTL
EARTHING PLATE DTL
HOLE Ø22
SLOTTED HOLE DIA22x40
524
1290
65
L 150x90x10PLATE 65x12
6020 50
90
40
20 DIA. BAR RUNG
(DRG No. 60-0000-Q-STD-0011-01)
ANCHOR BOLT TYPE 1
25
12022
0
ITEM - POZIQI` :
- RASCETNOE DAVLENIE
- ISP\TATEL[NOE DAVLENIE
- PLIT\
- TRUBOPROVOD\
- TRUB\
- REBRA
- FLANQ\
- PROBKI
SERVICE
BOLTINGS
- FITINGI
- UPLOTNENI`
- BOLT\
- BOLT\
- _KSPLUATAQI`
STEELSTRUC. MAT.
PRES
SURE
PART
MAT
ERIA
LMA
TERIA
L CAS
TEY P
OD D
AVL.
CIRCULATING FLUID
HEADERS CORROSION ALLOWANCE
TUBES CORROSION ALLOWANCE
N.D.E.-P.W.H.T.
WAG TRUB: DLINA OREBRENNOY CASTI ROWS-PASSES-SLOPE
- DIAMETR VENTIL`TORA
ABSORB.POWER-R.P.M.POGLOJ. MOJNOST[ OB/MIN
- TIP
CYCLE-VOLT-PHASES N°CASTOTA-NAPR`XENIE-CISLO FAZ
- SOOTNOWENIE
SPEE
D RE
D.RE
DUKT
ORDR
IVER
DRAY
VER
FAN
VENT
IL`TO
R
- AL^MINIY - AL^MINIY
- AL^MINIY
- NET- NET
REBRISTA` TRUBA
SEE Q.C.P.
- DA - DA
ASME VIII NORM\: RAZD.1, V\P. 2001, DOP. 2002-
- MAKSIMAL[N\E NAGRUZKI NA FUNDAMENT
KOLONN\
- SIMVOL\ASSEMBLY LOADSMONTAXN\E NAGRUZKI
TEST LOADSISP\TATEL[N\E NAGRUZKIOPERATION LOADSRABOCIE NAGRUZKI
SOPLA
VETER
ZEMLETR`SENIE
- SNEG
- SIL\- MOMENT\
- OB]EMVES TRUBNOGO PUCKA BEZ VOD\
TRUBN\E PUCKI NA BLOK- SEKQII NA BLOK
- OSEVOY POTOK
- SOEDINENIE TRUBNOGO PUCKA POZIQI6 : 62-EA-770
- TIP
OUTLET
CONNECTION SERVICE TYPE - TIP RATING FACE FACE FINISH SCH.
API 661 V\P. 97-S KLEYMOM "U"
AP- WAG
POLN\Y VES TRUBNOGO PUCKA
mm
- PRIMECANI`
/TRUBA
/TRUBA
/TRUBA
/TRUBA
- SOEDINENIE PAROVOGO ZMEEVIKA
NAGRUZKI
DIR = OS[
REGENERAQIONN\Y GAZ
LOHER
MAKS. DOPUST. NAGRUZKI NA SOPLAH V SOOTVET. S UDVOENN\M TREBOVANI`MI
Zona
SECENIE
VID
POPERECNA` V\SOTNA` OTMETKA
PRODOLNA` V\SOTNA` OTMETKA
tocki pod}emaventil>tora i dvigatel>
sv>zi
sv>zi
DATCIK VIBRAQIY
VHOD
V\HO
D
PRODOLNA` V\SOTNA` OTMETKAR`D
VID SVERHU
DETAL[ PLIT\ OSVNOVANI`
DETAL[ PLASTIN\ ZAZEMLENI`DL` KOLONN
(PER
EGOR
ODKA
)
PARO
VOY
ZMEE
VIK-
VHOD
N.-V
\HOD
. SOP
LA-
V\HO
DN\E
SOPL
A-
PARO
VOY
ZMEE
VIK-
V\HO
DN\E
SOPL
A-
XAL^
ZI)
(LOUV
ER-
DETAL[ OSNOV\ LESTNIQ\
PLITA
PROREZN\E OTVERSTI`
OTVERSTIE
DETAL[ PLIT\ OSNOVANI` LESTNIQ\
OTVERSTI`
BOLT\
TOLJINA
ANKERN\Y BOLT TIP 1
PERECEN[ TERMINOV
LEGEND
PNEUMATIC AND MANUAL LOUVER ACTUATOR
AIR BAFFLE
LOUVER1
2
3
VSTROENN\Y
CustomerPlant location
Unit
TENGIZCHEVROIL /TENGIZWEVROYL
TENGIZ - KAZAKHSTANPROPANE DEHYDRATION PACKAGE (62-EA-770)
REBRISTA` TRUBA
VSTROENN\Y
OB`ZANNOSTEY ILI OTVETSTVENNOSTI PO ZAKAZU NA POSTAVKU/KONTAKTU.
AUTHORISATION TO PROCEED DOES NOT RELIEVE VENDOR / CONTRACTOR OF ITS RESPONSIBILITY OR LIABILITY UNDER THE PURCHASE ORDER / CONTRACT.
AVTORIZAQI` NA PEREHOD K DEYSTVI`M NE OSVOBOXDAET POSTAVJIKA/PODR`DCIKA OT EGO
PFD PROJECT No. - 571500
PFD DOC No:
N°
CLIENT DOC No:
N°
VENDOR NAME:IT
PFD REV:
CLIENT REV:
TCO ASSET DEVELOPMENT PROJECTSPROEKT\ RAZRABOTKI AKTIVOV TWO
PROEKT PFD N°
N°P.O.No:
TAG Nos:N°N°
DOC CODE(S):
- VSE RAZMER\ DAN\ V mm (ESLI NE UKAZANO INACE)
DAVL
ENIE
1 bar
= 10
0kPa
- DIA
MET
R\ TR
UB : P
EREV
OD A
NGLIY
SKIH
EDIN
IQ IZ
MER
ENI` V
MET
RICE
SKIE
d<ym
|TR
UB\
DIAM
.
N3
500
3098
N3
600
300
300
300
300
300
10.613.57/
// -3.74
16.25
/
/
/
3.57
6.25
4.10
48.27
7.17
/
5.21
/
16.25
/
/
3.36
6.25
6.01
15.78
3.86
-128.56
16.25
16.25
6.25
6.25
-125.84
-90.09
-GOST/ROK- GOST/ROK
62-MEA 770 1 62-MEA 770 2
S1
S2
N2
V1
810 4005
C.S. BOSS DRILLEDTHROUGH & TAPPED M12
PROSVERLENN\Y S REZ[BOY M12KONTAKT IZ UGLERODISTOY STALI
WAYBA IZ XELTOY MEDI
1- SHAKE PROOF WASHER
2 - M12 BRASS NUTSGAYKI IZ XELTOY MEDI
VIBROSTOYKA` WAYBA
WPIL[KA IZ XELTOY MEDI
1- M12 BRASS WASHER
1 - M12 BRASS STUD
150
5
Ø40
24
32 30
62
CORR. PLATE 1 mm THKGOFRIROVANN\Y LIST
DETAL[ PEREGORODKI
AIR BAFFLE DTL
BOLT\
183
BOLTS M6
20183
366 28
38
I.S.G. S.p.A.
62-0700-VE-MDE-0102-01
571502-4-9003-01/0141
571502-4-9003-01
P.O.No: N°
PO-2967-251.01
571502-4-9003-01
AC-US-77/1
- 01.12.04
3
PO-2967-251.01
571502-4-9003-01
/TENGIZWEVROYL
PROPANE DEHYDRATION PACKAGE (62-EA-770)TENGIZ - KAZAKHSTAN
P.O. ISG No./
P.O. PFD No./
Plant locationCustomer
Unit
N°
N°
TENGIZCHEVROIL
28.01.040 ISSUE
1 16.03.04 REVISED AS PER CLIENT COMMENTS
REV. SECONDO COMMENTI CLIENTE-REV. AS PER CLIENT COMMENTS1 C.G. CHIARELLI CHIARELLI 16.03.04
REWETKAGRATING 30x50 / = 30x5
1250
TO PROVIDE SUPPORT ON SITEBY CLIENT
REV. SECONDO COMMENTI CLIENTE-REV. AS PER CLIENT COMMENTS2 C.G. CHIARELLI CHIARELLI 03.08.04
2 REVISED AS PER CLIENT COMMENTS03.08.04
OTVERSTIEHOLE Ø22
16
17
15
14
13
AS BUILT3 C.G. CHIARELLI CHIARELLI 01.12.04
3 AS BUILT01.12.04
B-101
CHIARELLI
C.G. CHIARELLI
TUBE BUNDLE AC-US-78/1TRUBN\Y PUCOK
INDEKS\ DETAL[N\H CERTEXEYDETAIL DRAWING REFERENCES
AC-US-79/1PAROVOY ZMEEVIKSTEAM COIL
P1
P2
T2
T1
NONE - NET
NONE - NET
![Page 6: Brochure](https://reader034.fdocuments.in/reader034/viewer/2022042823/568bd9a41a28ab2034a7cde8/html5/thumbnails/6.jpg)
EquipmentThe workshop is equipped with the most modern facilities for proper manufacturing, such as:- Cutting machines (including oxy-cut and plasma with numerical control)- Rolling machines (cold rolling up to 50 mm)- Ton press- Drilling machines (radial & vertical)- Bending machines- Punching machines- Milling machines- Welding positioners- AGV maximum lifting 70 tons- Welding machines for manual, electrode, TIG, MIG, & MAG process- Welding semiautomatic machine for SAW
Factory Non Destructive Testing (NDT)Non-destructive testing are performed in house byqualified operators (UNI EN 473 and ASNT).
GAM are able to perform:
• X & γ-rays Testing (RT);• Ultrasonic Testing (UT);• Dye Penetrant Testing (PT);
• Magnetic Particle Testing (MT);• Positive Material Identification (PMI);• Hardness Testing.
![Page 7: Brochure](https://reader034.fdocuments.in/reader034/viewer/2022042823/568bd9a41a28ab2034a7cde8/html5/thumbnails/7.jpg)
QualitySystem
GAM strive for the top quality of the product in order to have the full satisfaction of the Customer.In fact, GAM are operating in accordance with ISO 9001: 2000 with certification released by “ASME”.The quality system is monitored by the quality manager who provides and coordinates the following activities:- Update of quality manual and system’s procedures- Ispections and test durig fabrication and final delivery- Performance of NDT (PT, UT, MT, X-Rays & γ-Rays)- Monitoring and qualification of materials’ suppliers.
GAM have held ASME authorizations to manufacture with ASME Stamps U and U2 since 1999.Quality department operates independently with the target to provide the required qualityassurance through its personnel specialized in the performance of all inspections and tests.Besides GAM are also certified ISO 14001 (2004).
![Page 8: Brochure](https://reader034.fdocuments.in/reader034/viewer/2022042823/568bd9a41a28ab2034a7cde8/html5/thumbnails/8.jpg)
Air Coolers and Tube Bundles
Flare Tips assembly
Pressure Vesselsand HeatExchangers maintipologies
Thanks to their consolidated experience in designing and manufacturing, combined to a continuous improvement in fabrication concepts, related to scientific research, GAM Oil & Gas are able to give to their customers an important technological contribution in designing and fabrication of petrochemical and ecological plants equipment.
Our ProductsOur ProductsOur Products
![Page 9: Brochure](https://reader034.fdocuments.in/reader034/viewer/2022042823/568bd9a41a28ab2034a7cde8/html5/thumbnails/9.jpg)
Filter Housesfor Gas Turbines
Flare Systems
Steel Structures
![Page 10: Brochure](https://reader034.fdocuments.in/reader034/viewer/2022042823/568bd9a41a28ab2034a7cde8/html5/thumbnails/10.jpg)
Major References
Main Customers
1. Steel Structures x Technip / CNRL – Alberta (Canada)
2. Pressure Vessels x Fluor / Petrogal – Porto Refinery (Portugal)
3. Fired Heater x Linde – Hammerfest (Norway)
4. Pressure Vessels / Heat Exchangers x Tecnimont / ENI / Qatargas – Abu Dhabi
5. Derrick Flare System x JZ Int. x Chiyoda – Sakhalin Island (Russia)
6. Air Coolers x ISG SpA x Fluor – Tengiz Chevroil (Kazakhstan)
7. Pressure Vessels and Heat Exchangers x Fluor – Tengiz Chevroil (Kazakhstan)
8. Derrick Flare System x JZ Int. x Fluor – Tengiz Chevroil (Kazakhstan)
9. Filter Houses x GE O&G x Foster Wheeler – Woodside Energy (Karratha – Australia)
10. Derrick Flare System x JZ Int. x La Damietta LNG (Egypt)
11. Heat Recuperators x GE O&G x Snam-progetti / Scogat – Capo Bon
12. Filter Houses x GE O&G x Huntoil – Camisea (Peru’)
13. Geothermal Steam Condenser x GE O&G x Enel x El Salvador
• GE O&G – Nuovo Pignone• Tecnimont S.p.A.• John Zink International• Fluor LTD• Peerless Europe LTD• ISG S.p.A.• Saipem / Snamprogetti S.p.A.• Enppi• Itas S.p.A.• Hamworthy Combustion• Technip• Punj Lloyd
12
3
4
5
6
7
8
9
101112
13
![Page 11: Brochure](https://reader034.fdocuments.in/reader034/viewer/2022042823/568bd9a41a28ab2034a7cde8/html5/thumbnails/11.jpg)
Post Weld Heat Treatment (PWHT)
Our ServicesOur ServicesTrial Fit UP
Welding Activities
PWHT in Furnace
Local PWHT
GAM perform localized and total Post Weld Heat-Treatment in furnace which is 5 meters wide and 5meters high and a length of 14 meters; further-more, it’s also equipped with a time-temperature recorder device.
Our Services
![Page 12: Brochure](https://reader034.fdocuments.in/reader034/viewer/2022042823/568bd9a41a28ab2034a7cde8/html5/thumbnails/12.jpg)
![Page 13: Brochure](https://reader034.fdocuments.in/reader034/viewer/2022042823/568bd9a41a28ab2034a7cde8/html5/thumbnails/13.jpg)