Project ManagementGAM plan and coordinate all project activities from the award of the purchase order to the delivery of the goods in the respect of contractual dates and obligations.The Project Managers are responsible for all project activities and procedures; they are supported by an efficient electronic data processing (EDP) system whose scope is moni-toring all operative units.Their main activities:

• Planning of critical paths;• Define project milestones;• Planning and cooperating with engineering activities;• Reporting of Cost Control;• Purchasing and monitoring raw materials production and delivery;• Monitoring and reporting production process.

Project Managers’ figure consists of giving a constant flow of information from and to the Customers in order to ensure a good result of the Project and the satisfaction of the Cus-tomers.

EngineeringTechnical and Engineering Department is equipped with advanced CAD & CAM systems, CAD workstation and interconnected Personal Computer with internal and external soft-ware packages. Great importance is given to Pressure Vessels design, Stress Analysis and Welding trough following advanced softwares:

- APV by Computer Engineering- Tecno Sap- Tecno Metal- Codeware Compress- Welder Management- Strucad by AceCad Software- Stackdes “FLARESIM”- HTRI

ID Nome attività Durata Inizio Fine

1 Job Starting 149 g mer 14/03/07 ven 05/10/072 ENGINEERING 108 g mer 14/03/07 ven 10/08/073 Job opening 1 g mer 14/03/07 mer 14/03/074 QCP issuing 9 g gio 15/03/07 mar 27/03/075 Welding dossier issuing 13 g gio 15/03/07 lun 02/04/076 Painting Procedure issuing 107 g gio 15/03/07 ven 10/08/077 Other Tests Procedures issuing 31 g lun 19/03/07 lun 30/04/078 MATERIAL PURCHASING 15 g ven 06/04/07 gio 26/04/079 Plates for Shell and Baffles 15 g ven 06/04/07 gio 26/04/07

10 Plates for Water Boxes 15 g ven 06/04/07 gio 26/04/0711 Plates for Condensate Hotwell 15 g ven 06/04/07 gio 26/04/0712 Plates forTubesheets and Bundle 15 g ven 06/04/07 gio 26/04/0713 Material for Expansion Bottle 15 g ven 06/04/07 gio 26/04/0714 Material for Saddle and Cover 15 g ven 06/04/07 gio 26/04/0715 Flanges 15 g ven 06/04/07 gio 26/04/0716 Bolts 15 g ven 06/04/07 gio 26/04/0717 MATERIAL ARRIVAL 39 g mer 06/06/07 lun 30/07/0718 Plates forTubesheets and Bundle 8 g mer 06/06/07 ven 15/06/0719 Plates for Shell and Baffles 11 g lun 16/07/07 lun 30/07/0720 Plates for Water Boxes 11 g lun 16/07/07 lun 30/07/0721 Plates for Condensate Hotwell 11 g lun 16/07/07 lun 30/07/0722 Material for Expansion Bottle 11 g lun 16/07/07 lun 30/07/0723 Material for Saddle and Cover 11 g lun 16/07/07 lun 30/07/0724 Flanges 11 g lun 16/07/07 lun 30/07/0725 Bolts 11 g lun 16/07/07 lun 30/07/0726 WORKSHOP ACTIVITY 62 g gio 12/07/07 gio 04/10/0727 Construction 55 g gio 12/07/07 mer 26/09/0728 Tracing & Cutting Plates 10 g gio 12/07/07 mer 25/07/0729 Rolling Machine Plates Submission 3 g gio 26/07/07 lun 30/07/0730 Fit up & Welding Shell 23 g mar 31/07/07 gio 30/08/0731 Fit up & Welding Water Boxes 24 g mar 31/07/07 ven 31/08/0732 Fit Up & Welding Condensate Hotwell 3 g lun 06/08/07 mer 08/08/0733 Fit up & Welding Flange to Pipes 3 g mer 08/08/07 ven 10/08/0734 Fit up & Welding Nozzles to Shell 4 g lun 27/08/07 gio 30/08/0735 Fit Up & Welding Baffles 4 g mar 04/09/07 ven 07/09/0736 Fit up & Welding Saddles to Shell 2 g lun 17/09/07 mar 18/09/0737 Fit Up & Welding Tubesheets to Shell 6 g mer 12/09/07 mer 19/09/0738 Titanium Tubes Insertion & Welding 5 g gio 20/09/07 mer 26/09/0739 Fit Up & Welding Expansion Bottle 5 g lun 17/09/07 ven 21/09/0740 Tests 3 g gio 27/09/07 sab 29/09/0741 Bubble Tests before Hydrostatic Tests 2 g gio 27/09/07 ven 28/09/0742 Hydrostatic Test Shell Side 1 g ven 28/09/07 ven 28/09/0743 Hydrostatic Test Tube Side 1 g sab 29/09/07 sab 29/09/0744 Surface Treatments 3 g lun 01/10/07 mer 03/10/0745 Water Boxes and Covers Epoxidic Coating 2 g lun 01/10/07 mar 02/10/0746 External Painting 3 g lun 01/10/07 mer 03/10/0747 Packing 1 g gio 04/10/07 gio 04/10/0748 Inspections 62 g gio 12/07/07 gio 04/10/0749 Construction 55 g gio 12/07/07 mer 26/09/0750 Surface Treatments 3 g lun 01/10/07 mer 03/10/0751 Packing 2 g mer 03/10/07 gio 04/10/0752 Final Documentation 1 g gio 04/10/07 gio 04/10/0753 DELIVERY 1 g ven 05/10/07 ven 05/10/07

100% 14/03100% 27/03100% 02/04100% 10/08

100% 30/04

100% 26/04100% 26/04100% 26/04100% 26/04100% 26/04100% 26/04100% 26/04100% 26/04

100% 15/06100% 30/07100% 30/07100% 30/07

80% 30/07100% 30/07

95% 30/0790% 30/07

100% 25/07100% 30/07

100% 30/08100% 31/08

100% 08/08100% 10/08

100% 30/08100% 07/09

100% 18/0980% 19/09

0% 26/0980% 21/09

0% 28/090% 28/090% 29/09

0% 02/100% 03/10

0% 04/10

90% 26/090% 03/10

0% 04/100% 04/100% 05/10

V G M M L D S V G M M L D S V G M M L D S V G M M L D S V G M M L D S V G M M L feb 07 26 mar 07 23 apr 07 21 mag 07 18 giu 07 16 lug 07 13 ago 07 10 set 07 08 ott 07

Attività

Divisione

Avanzamento

Cardine

Riepilogo

Riepilogo progetto

Attività esterne

Cardine esterno

Scadenza

SCHEDULING CHARTClient:

N°1 STEAM CONDENSER - AL JUBAIL (Saudi Arabia)

Job GAM: 7/0995Customer Job N°:

Order N° :

Pagina 1

REV. Data: Issued by:

PAINTING AND SURFACE PREP/ (60-0000-L-SPE-0007)

Surface preparation:PFD Coating System:

NOZZLE DATA

ASME CODE

REQUIRED

U STAMP

A B DC

1) DIMENSIONS IN mm EXCEPT OTHERWISE STATED

2) FLANGE BOLT HOLES STAGGERED ON MAIN AXIS

NOTES

3) PRESERVATION: VESSEL COMPLETELY SEALED WITH VPI DESICCANT ADDED.FLANGE FACES COATED WITH CORROSION INHIBITOR AND FITTED WITH A NEOPRENE GASKET, A METAL BLANK (6 mm THK MIN.) AND 50% M10 BOLTS (4 MIN.).FLANGE RIMS PROTECTED WITH DENSO TAPE AROUND THE CIRCUMFERENCE.

ELEVATION VIEW

VIEW "A"DBL "F"

DTHNBRFK/YFZ GHJTRWBZ

- LFYYST CJGKF

- GHBVTXFYBZ

HF:VTHS PFLFYS D VV TCKB YTN LHEUB[ ERF:FYBQ

JNDTHCNBZ GJL ,JKNS DJ AKFYWF[ INEWTHJD YF UKFDYJQ JCB

GJRHSNBT :FOBNYSVB CVF:RFVB< CJCEL DGJK/YT EGKJNYTY C LJ,FDRJQ LTCCBRRFYNF GJDTH[YJCNB AKFYWF GJRHSNS FYNBRJHHJ:BJYYJQ LJ,FDRJQ

VPI.B J,JHELJDFYYST EGKJNYTYBTV B: YTJGHTYF :FUJNJDRJQ VTNFKKF(6 VV NJKO] VBY) B ,JKNFVB 50% V10 (4 VBY])] CRJ,S AKFYWF :FOBOTYS KTYNJQ NBGF LTYCJ GJDC>LE GTHBVTNHF]

,

YTGJLDB;YJT CTLKJ FIXED SADDLE

PLAN VIEWDBL CDTH[E

L.T.C.S. JACKETED DRAINS TANK

]

-NHT,JDFYBZ- JGTHFWBB

NONENONE

NONE

- YTHF:HEIF>OTT BCGSNFYBT

- RJ;E[

HFCXTN]

- VFNTHBFK-YFBVTYJDFYBT

ASME VIII RJL HF:L] 1 - HTL] 2005 LJG] YTN$RJL] VFHRBH] NHT,JDFYF

BC[JLYST LFYYST LKZ GHJTRNBHJDFYBZ

RJYCNHERNBDYSQ RJL

TITLE

100%NONE100%ALONG AND CIRC. SHELL SEAMS 1/8 in.3/4<t<=1.1/2

* 10" MINIMUM FILM LENGTH

HYDR. PRESSURE TEST

DIMENSIONAL CHECK -

Max O�set (In.)

ASME VIII DIV. 1 - ED. 2004 addenda 2005/ Code Stamp Req'd

NONE

NOZZLE TO SHELL SEAMS

NONE

DESIGN DATA -

MATERIAL

NON-DESTRUCTIVE TESTING

SHELL

OTHER FILLET SEAMS

HEAD TO SHELL SEAMS

FLANGE TO NECK SEAMS

ACCORD.TO ASME VIII DIV.1 CAT.

DESCRIPTION

DESIGN CODE

OPERATIONS REQUISITIONS

t<=3/41/4 t

100%

100%100%D

100%

MT

100%

UT

B 100%

-

A

RT *

-

3/4<t<=1.1/2100% 1/8 in.

t<=3/41/4 t

MATERIAL CLASS P.No-Gr.No

WELD JOINT EFFICIENCY

MAX THK OF WELDING

STRESS RELIEVING

1-2

VOLUME

22 mm

NO

100%

1/2

/Pfrfpxbr%/Vtcnjhf;&%

/J,]trn% 200

Zona IndustrialeROMBIOLO (VV)

IL PRESENTE DISEGNO E' PROPRIETA' G.A.M. srl - A TERMINE DI LEGGE OGNI DIRITTO E' RISERVATOTHIS DOCUMENT IS THE PROPERTY OF G.A.M. srl - ALL RIGHTS ARE RESERVED ACCORDING TO LAW

6/0951 E-R-

SRB-US-427/1

ITEM:

COMMESSA/JOB

N°P0021-VE-A005

Filename:

Plant location

Unit

Customer

TITLE

REV DATE

SRB-US-427/1

571502

DATE:SCALE: -

DRAWING No.

31/08/06

3REV

PROJ No

$NTYUB:ITDHJQKTCO ASSET DEVELOPMENT PROJECTS

$NTYUB: - RF:F[CNFYTENGIZ - KAZAKHSTAN

TENGIZCHEVROIL

ENGOPERPROJ

TENGIZCHEVROIL

DESCRIPTIONCH'KBY APP'D

TENGIZCHEVROIL ASSET DEVELOPMENT PROJECTSPROJECT No.: 571502

PFD PROJECT No. - 571502 N°

TCO ASSET DEVELOPMENT PROJECTSGHJTRNS HF:HF,JNRB FRNBDJD NIJ

GHJTRN GAL

G.A.M. Srl

L.T.C.S. JACKETED DRAINS TANK

l.qvs

1 ,fh

= 10

0rGf

IMPE

RIAL T

O M

ETRIC

CONV

ERSIO

N TA

BLE F

OR N

OMIN

AL PI

PE SI

ZES

REPR

ODU

CED

COPI

ED LO

ANED

EXH

IBIT

ED N

OR

USED

EXC

EPT

IN TH

E LI

MIT

ED W

AY A

ND P

RIVA

TE

MER

ELY

LOAN

ED A

ND O

N TH

E BO

RRO

WER

S EX

PRES

S AG

REEM

ENT T

HAT T

HEY

WIL

L NO

T BE

THIS

DRA

WIN

G AN

D TH

E DE

SIGN

IT C

OVE

RS A

RE TH

E PR

OPE

RTY

OF T

ENGI

ZCHE

VRO

IL TH

EY A

RE

USE

PERM

ITTE

D AN

D W

RITT

EN C

ONS

ENT

GIVE

N BY

TENG

IZCH

EVRO

IL TO

THE

BORR

OW

ER.

PIPE D

IA.

NHE,S

LBFV

]

mm

mm

inche

s1"

20 /

15 /"

25

"2"

1140 /

32 /"

50

"3"

32

8065

"/

"

90 /

1 bar

= 10

0kPa

PRES

SURE

26"

650

- LBF

VTNH

S NHE

, < G

THTD

JL FY

UKBQ

CRB[

TLBY

BW B

:VTH

TYBZ

D V

TNHB

XTCR

BT

14"

350

5"4"

6"

125

100

150

10"

8"12

"

250

200

300

20"

500

16"

18"

400

450

24"

22"

550

600

38"

950

32"

800

30"

28"

700

750

36"

34"

850

900

44"

1100

42"

40"

1050

1000

48"

46"

1200

1150

FORM

ULA;

LFDK

TYBT

CRJK/:ZOTT CTLKJ SLIDING SADDLE

N3

N5

N1P1

P1 N5

N1

M2

N3

M1

A

DCT HF:VTHS LFYS D VBKKBVTNHF[| TCKB YT ERF:FYJ BYFXT]A1 BORDER - ALL DIMENSIONS ARE IN MILLIMETRES UNLESS OTHERWISE STATED.

22

13

36

60°

SEE DETAIL "A"

DETAIL "A"

SEE DETAIL "A"

A

N2

MANWAYSEE DETAIL "B"

DETAIL "B"

L1

SEE DETAIL "B"MANWAY M1

S1

S2

S5

S3

SHELL

JACKET

SHELL NOZZLE/JACKET

TYPICAL DETAIL (S1-S2-S3-S5)

NOZZEL

NOZZLE JACKET SLEEVE PIPE

SEE DETAIL "E" SEE DETAIL "E"SEE DETAIL "E"

3

1

8 9

10

1112

6

19

18

17

7

2

5

23

22

21

16

13

14

15

37

38

39

1

3

442

41

7

49

43

98

12

INTERNAL VESSEL:

,Topcoat - 100 microns Low Temperature cure high solids epoxyPrimer - 100 microns Low Temperature cure high solids epoxy

Coating System CK

EXSTERNAL JACKET: Coating System CJ

SEE DETAIL "D"

DESIGN PRESSURE

10" SHOP TEST CAP TRIM PIPEBACK 50mm FOLLOWING SHOPHYDRO-TEST & PREPPIPE FOR SITE WELD.

17

18

19 S1

30

L2

P2

P2

L2

L1

N2

M1

M1

VESSEL C

VESSEL CSEE DETAIL "C"LIFTING LUGS

DETAIL "C"LIFTING LUGS N. 3 PIECES

LIFTING LUGS

PIPE FOR SITE WELD.HYDRO-TEST & PREPBACK 50mm FOLLOWING SHOP10" SHOP TEST CAP TRIM PIPE

G.C.S.Z.F.M.B REVISED WHERE INDICATED

M1M216

13

31 32

3334

35

16

20 24 25

20 24 25

26

26

26

(N5) WITH BLIND COVER

40

SEAL WELDED FOLLOWINGSHOP HYDROTEST-DRAINING

22

1

G.C.S.Z.F.M.1 REVISED WHERE INDICATED

30

SEE DETAIL "D"

2

2

4) PRESERVATION: JACKET SPACE SHALL BE THOROUGHLY DRIED THEN PURGED WITH NITROGENUNDER A PRESSURE OF 0.5 BAR(G)

22YTGJLDB;YJT CTLKJ

FIXED SADDLECRJK/:ZOTT CTLKJ

SLIDING SADDLE

5) MARK ON THE VESSEL JACKET WITH CARACTERS 100 MM HIGH MIN. (ENGLISH & RUSSIAN) :"JACKET SPACE IS PURGED WITH NITROGEN @ 0.5 Bar.g"

2

G.C.S.Z.F.M.2 REVISED WHERE INDICATED

G.C.S.Z.F.M.3 REVISED AS BUILT

A1 BORDER

125

IMPE

RIAL T

O M

ETRIC

CONV

ERSIO

N TA

BLE F

OR N

OMIN

AL PI

PE SI

ZES

PIPE D

IA.

/40

/20m

m15

inche

s/

"

2532

"1"

1/"

13"80

5065

"2"

"/ 2

9010

0

"3/

4"

1 bar

= 10

0kPa

150

200

5"6"

8"

300

250

350

12"

10"

14"

450

400

500

18"

16"

20"

600

550

650

24"

22"

26"

38"

950

32"

800

750

700

30"

28"

900

850

34"

36"

44"

1100

1050

1000 40

"42

"

1150

1200

46"

48"

PRES

SURE

FORM

ULA;

REPR

ODU

CED

COPI

ED LO

ANED

EXH

IBIT

ED N

OR

USED

EXC

EPT

IN TH

E LI

MIT

ED W

AY A

ND P

RIVA

TEM

EREL

Y LO

ANED

AND

ON

THE

BORR

OW

ERS

EXPR

ESS

AGRE

EMEN

T THA

T THE

Y W

ILL

NOT

BETH

IS D

RAW

ING

AND

THE

DESI

GN IT

CO

VERS

ARE

THE

PRO

PERT

Y O

F TEN

GIZC

HEVR

OIL

THEY

ARE

USE

PERM

ITTE

D AN

D W

RITT

EN C

ONS

ENT

GIVE

N BY

TENG

IZCH

EVRO

IL TO

THE

BORR

OW

ER.

ALL DIMENSIONS ARE IN MILLIMETRES UNLESS OTHERWISE STATED.

TENGIZCHEVROIL

Filename:

TCO OPERATIONS TCO ENGINEERING

SCALE: DATE:

DRAWN BY

APPROVED BY

TITLE

REV DATE

PROJ No

DRAWING No.

PROJECTS

CHECKED BY

REVISION

REV

APP'D

ENGOPER

CH'KBY

PROJ

-25.112.75 / 9.00 16.25 -89.3116.25 -90.0916.259.00 -89.31/2.75 -25.11 6.25

S275 JR EN 10025 WITHOUT IMPACT TEST

Main structure (columns, beams, bracings, walkways, brackets ans ladders):

Air Ba�es (Galvanized sheets):

YES (ONE FOR EACH FAN) ("METRIX" TYPE)VIBRATION TRANSMITTER

BUNDLES/UNIT

BAYS/UNIT

BUNDLE TOTAL WEIGHT

BUNDLE EMPTY WEIGHT

LOUVERS / MATERIAL

NOISE LIMITS

VOLUME

1

1

N° 1

SpL 85 dB(A) at 1 m below the fan

6475

652

5823

dB(A)

kg

l

kg

624

94

530

ft-mm

KW-R.P.M.

Hz-V-N°

KW-R.P.M.

SAFETY FACTOR

RATIO

TYPE

FAN DIA

PITCH AP

TYPE

15x2 - 1450

1.8

4.83

Tooth Belt

Eex'de (Zone 1)-IIB-T4

50-660-3

ELECTRICAL (LOHER MANUFACTURER) (VARIABLE SPEED)

5 - ALUMINIUM

9-2743

10x2 -1450

100

%

SEE NOTES "8", "9" AND "10"

TYPE

66.68x58 - 9050

4-4-0

AXIAL FLOW [LOW NOISE 16 dB(A)]

SEE Q.C.P.

110 - 8600

1-1-10

EN 20898-1 BOLTS CL.8.8 - NUTS CL.8

3

REGENERATION GAS

NONEmm

mm

Regeneration cooler

STEAM

Steam coil

NONE

3

PLUGS

GASKETS

FITTINGS

FLANGES

BOLTING

PLATES

MIN DESIGN METAL TEMP.

PIPES

CODE STAMP

FINS

TUBES

SA 320 GR. L7M / SA 194 GR. 7M

SA 350 LF2

SA 350 LF2

SOFT IRON

SA 350 LF2 SA 350 LF2

SA 350 LF2

SA 333 GR. 6

SA 516 GR. 60 N

-43

YES

°C

SA 334 GR. 6 SMLS

ALUMINIUM ALUMINIUM

SA 516 GR. 60 N

SA 333 GR. 6

SA 334 GR. 6 SMLS

YES

-43

-127.78

-5.39

-124.31

80

160

STEAM COIL CONNECTION

S1

S2

DN

INLET

2"

3"

T1 - T2

P1 - P2

2"

1.1/2"

D1 - D2 DRAIN

150

150 RF

RF

WN+PIPE

WN+PIPE 125÷250 AARH

125÷250 AARH

NIPOFLANGE

LWN

LWN

EARTHQUAKE

DIR Y

SNOW

/ 3.57

/ /

//

//

/

-1.65

-

-

-

/NOZZLES

DIR X

DIR X

DIR Y

DIR Z

WIND

/ /

/9.00

//

2.75 /

/

/

/

16.25

3.57

/

/

/

/

/

/

/

DIR Y

DIR X

/ 5.21

3.36 /

16.259.00

//

/

/

2.75

/

-25.11

/

-24.51/2.75 16.259.00

FOR COLUMNS 2A & 3B

BASE STAIR DETAIL

CSN 140

25

LADDER BASE PLATE DTL

3.57

/ -3.74

3.57 10.6110.61

/

/ // / /

-1.65/ / /

10.61

/ -5.39

16.25

/

16.25

/15.7815.78

/ 6.01

7.17/

48.27

4.10

16.25

/

6.01 /

6.2510.32

/

3.574.10

48.27

// / /

/

/

/

/

/

/

/

3.57

//2.75 9.00

16.25 -128.56

/

5.21

3.86

16.25 -125.84

3.86 3.36

/

6.25

6.25

/

-25.11

/

2.75

/

/

/ /

9.00

3.36

/

9.002.75 / -25.11

/

/

48.27

4.10

10.32

/

16.25

/

/

3.86/

-127.78

-124.31

Mx FxMzFy

My

Fz

1000

2200

INLE

T - O

UTLE

TNO

ZZLE

S

STEA

M CO

ILIN

LET N

OZZL

ES

CODES: ASME VIII DIV.1 ED. 2001 ADD. 2002 - API 661 ED. 97 - "U" STAMPED

MAX DESIGN TEMP.

DESIGN PRESSURE

TEST PRESSURE

62-EA-770

320

49.01

34.0

°C

BarG

BarG

STEAM COIL

215

7.0

17.42

Y

A

X

PLAN VIEW

1200

CSN

160

1500 A

1500

1200 600

1200

38800

1

2200

X N2

S1

500

N1/D1

1200

AP

FAN R

ING

AP

62-EA-770

276227

43

1

6400

1

22002200 2200

OUT.

NOZZ

LES

STEA

M CO

IL

(VIEW X)

3

2300

Fz

MAX FOUNDATION LOADS

ELEVATION LONG. ROW

SCH.

80

80

TUBE BUNDLE CONNECTION ITEM:62-EA-770CONNECTION

N3

N1 - N2

DN

2"

INLET

VENT

3"

3"

V1 - V2

OUTLET

SERVICE RATING FACETYPE

300 RF

RF

LWN

WN+PIPE

WN+PIPE

125÷250 AARH

FACE FINISH

125÷250 AARH

-

LOADS

SYMBOLS

COLUMNS

Fx FyFy

2A1A

Fx Fz

3 PEREGORODKA

B

PRIVOD XAL^ZEY2

1PNEUMATICESKIY I RUCNOY

XAL^ZI

A

2200

7350

HEA

140

5050

3

800

2 UPN 100

IPE 270

Mx

MAX ALLOWABLE NOZZLE LOADS:

810

Fy

KN

FzFx Fy

3A

(

FxFzFx Fy

1B

)

FzFx FyFz

3B2B

NOZZLE SIZE

3"

TWO TIMES VALUES DEFINED IN API 661

4005

N.m(

Mz

)

FxMy

MOMENTS

1215

( )N

FzFy

FORCES

3382

2500

(LOUV

ER)

1 B

8800 1800

800

HEA

140

1 3

3

1

lifting points for fan and motor

ELEVATION LONG. SECT.

202

3

1500A

2

800600

1

200

151

2

1500

1500

S2

2200

3400

D2V2

1200

151

X

IPE 220

A

3Z (A

IR B

AFFL

E)27

50

OUTL

ET

200

1000

250

INLE

T

1300

ELEVATION TRANSV. ALL.

3

A-A

8800

B

X

1550

3

3

550

TRANSMITTER

2750

300

700

VIBRATION

7350

5050

Z

7350

3

A - B

2500

2

850

3400

1

1

1500

1500

2 UPN

120

2500

3

2

3

1400

62-EA-770

190

2300

1

160

3

2

2300

IPE 220

3

1

3N1

31

1400600

31500

DVER[ TOL[KA NA LINII "B"

6

5 q =0.5 kN/m

Zone 1

NOTES

4

3

2

1

V=40 m/s (q=1 kN/m )

8

p=2.5 kN/m 7HOT DIP GALVANIZED ACCORDING ASTM A 123

10

11

9

IL PRESENTE DISEGNO E' PROPRIETA' G.A.M. srl - A TERMINE DI LEGGE OGNI DIRITTO E' RISERVATOTHIS DOCUMENT IS THE PROPERTY OF G.A.M. srl - ALL RIGHTS ARE RESERVED ACCORDING TO LAW

ROMBIOLO (VV)Zona Industriale

SOSTITUISCE IL - REPLACES

DESCRIZIONE - DESCRIPTION

EMISSIONE - ISSUE

REV.

0

N° AC-US-77/1

SCALESCALA

SOSTITUITO DA - REPLACED BY

3/0883

COMMESSA/JOB

-SHEETTAVOLA

1 1E - RLANGUAGE

LINGUA

PREP'D

ITEM:

ESEG.

62-EA-770

CONTR.CHK'D APPR'D

APPR.DATEDATA

28.01.04CHIARELLICHIARELLIC.G.

HEA

160

HEA

160

HEA

140

PROJECT No.: 571502TENGIZCHEVROIL ASSET DEVELOPMENT PROJECTS

12

1"

RF

RF

RF

RF

125÷250 AARH

125÷250 AARH

125÷250 AARH

125÷250 AARH

2 UPN 140

bracing

bracing

350

50

50

5025

0

35025050

HOLES Ø 24BOLTS M 20

THK. 15

BASE PLATE DTL

EARTHING PLATE DTL

HOLE Ø22

SLOTTED HOLE DIA22x40

524

1290

65

L 150x90x10PLATE 65x12

6020 50

90

40

20 DIA. BAR RUNG

(DRG No. 60-0000-Q-STD-0011-01)

ANCHOR BOLT TYPE 1

25

12022

0

ITEM - POZIQI` :

- RASCETNOE DAVLENIE

- ISP\TATEL[NOE DAVLENIE

- PLIT\

- TRUBOPROVOD\

- TRUB\

- REBRA

- FLANQ\

- PROBKI

SERVICE

BOLTINGS

- FITINGI

- UPLOTNENI`

- BOLT\

- BOLT\

- _KSPLUATAQI`

STEELSTRUC. MAT.

PRES

SURE

PART

MAT

ERIA

LMA

TERIA

L CAS

TEY P

OD D

AVL.

CIRCULATING FLUID

HEADERS CORROSION ALLOWANCE

TUBES CORROSION ALLOWANCE

N.D.E.-P.W.H.T.

WAG TRUB: DLINA OREBRENNOY CASTI ROWS-PASSES-SLOPE

- DIAMETR VENTIL`TORA

ABSORB.POWER-R.P.M.POGLOJ. MOJNOST[ OB/MIN

- TIP

CYCLE-VOLT-PHASES N°CASTOTA-NAPR`XENIE-CISLO FAZ

- SOOTNOWENIE

SPEE

D RE

D.RE

DUKT

ORDR

IVER

DRAY

VER

FAN

VENT

IL`TO

R

- AL^MINIY - AL^MINIY

- AL^MINIY

- NET- NET

REBRISTA` TRUBA

SEE Q.C.P.

- DA - DA

ASME VIII NORM\: RAZD.1, V\P. 2001, DOP. 2002-

- MAKSIMAL[N\E NAGRUZKI NA FUNDAMENT

KOLONN\

- SIMVOL\ASSEMBLY LOADSMONTAXN\E NAGRUZKI

TEST LOADSISP\TATEL[N\E NAGRUZKIOPERATION LOADSRABOCIE NAGRUZKI

SOPLA

VETER

ZEMLETR`SENIE

- SNEG

- SIL\- MOMENT\

- OB]EMVES TRUBNOGO PUCKA BEZ VOD\

TRUBN\E PUCKI NA BLOK- SEKQII NA BLOK

- OSEVOY POTOK

- SOEDINENIE TRUBNOGO PUCKA POZIQI6 : 62-EA-770

- TIP

OUTLET

CONNECTION SERVICE TYPE - TIP RATING FACE FACE FINISH SCH.

API 661 V\P. 97-S KLEYMOM "U"

AP- WAG

POLN\Y VES TRUBNOGO PUCKA

mm

- PRIMECANI`

/TRUBA

/TRUBA

/TRUBA

/TRUBA

- SOEDINENIE PAROVOGO ZMEEVIKA

NAGRUZKI

DIR = OS[

REGENERAQIONN\Y GAZ

LOHER

MAKS. DOPUST. NAGRUZKI NA SOPLAH V SOOTVET. S UDVOENN\M TREBOVANI`MI

Zona

SECENIE

VID

POPERECNA` V\SOTNA` OTMETKA

PRODOLNA` V\SOTNA` OTMETKA

tocki pod}emaventil>tora i dvigatel>

sv>zi

sv>zi

DATCIK VIBRAQIY

VHOD

V\HO

D

PRODOLNA` V\SOTNA` OTMETKAR`D

VID SVERHU

DETAL[ PLIT\ OSVNOVANI`

DETAL[ PLASTIN\ ZAZEMLENI`DL` KOLONN

(PER

EGOR

ODKA

)

PARO

VOY

ZMEE

VIK-

VHOD

N.-V

\HOD

. SOP

LA-

V\HO

DN\E

SOPL

A-

PARO

VOY

ZMEE

VIK-

V\HO

DN\E

SOPL

A-

XAL^

ZI)

(LOUV

ER-

DETAL[ OSNOV\ LESTNIQ\

PLITA

PROREZN\E OTVERSTI`

OTVERSTIE

DETAL[ PLIT\ OSNOVANI` LESTNIQ\

OTVERSTI`

BOLT\

TOLJINA

ANKERN\Y BOLT TIP 1

PERECEN[ TERMINOV

LEGEND

PNEUMATIC AND MANUAL LOUVER ACTUATOR

AIR BAFFLE

LOUVER1

2

3

VSTROENN\Y

CustomerPlant location

Unit

TENGIZCHEVROIL /TENGIZWEVROYL

TENGIZ - KAZAKHSTANPROPANE DEHYDRATION PACKAGE (62-EA-770)

REBRISTA` TRUBA

VSTROENN\Y

OB`ZANNOSTEY ILI OTVETSTVENNOSTI PO ZAKAZU NA POSTAVKU/KONTAKTU.

AUTHORISATION TO PROCEED DOES NOT RELIEVE VENDOR / CONTRACTOR OF ITS RESPONSIBILITY OR LIABILITY UNDER THE PURCHASE ORDER / CONTRACT.

AVTORIZAQI` NA PEREHOD K DEYSTVI`M NE OSVOBOXDAET POSTAVJIKA/PODR`DCIKA OT EGO

PFD PROJECT No. - 571500

PFD DOC No:

CLIENT DOC No:

VENDOR NAME:IT

PFD REV:

CLIENT REV:

TCO ASSET DEVELOPMENT PROJECTSPROEKT\ RAZRABOTKI AKTIVOV TWO

PROEKT PFD N°

N°P.O.No:

TAG Nos:N°N°

DOC CODE(S):

- VSE RAZMER\ DAN\ V mm (ESLI NE UKAZANO INACE)

DAVL

ENIE

1 bar

= 10

0kPa

- DIA

MET

R\ TR

UB : P

EREV

OD A

NGLIY

SKIH

EDIN

IQ IZ

MER

ENI` V

MET

RICE

SKIE

d<ym

|TR

UB\

DIAM

.

N3

500

3098

N3

600

300

300

300

300

300

10.613.57/

// -3.74

16.25

/

/

/

3.57

6.25

4.10

48.27

7.17

/

5.21

/

16.25

/

/

3.36

6.25

6.01

15.78

3.86

-128.56

16.25

16.25

6.25

6.25

-125.84

-90.09

-GOST/ROK- GOST/ROK

62-MEA 770 1 62-MEA 770 2

S1

S2

N2

V1

810 4005

C.S. BOSS DRILLEDTHROUGH & TAPPED M12

PROSVERLENN\Y S REZ[BOY M12KONTAKT IZ UGLERODISTOY STALI

WAYBA IZ XELTOY MEDI

1- SHAKE PROOF WASHER

2 - M12 BRASS NUTSGAYKI IZ XELTOY MEDI

VIBROSTOYKA` WAYBA

WPIL[KA IZ XELTOY MEDI

1- M12 BRASS WASHER

1 - M12 BRASS STUD

150

5

Ø40

24

32 30

62

CORR. PLATE 1 mm THKGOFRIROVANN\Y LIST

DETAL[ PEREGORODKI

AIR BAFFLE DTL

BOLT\

183

BOLTS M6

20183

366 28

38

I.S.G. S.p.A.

62-0700-VE-MDE-0102-01

571502-4-9003-01/0141

571502-4-9003-01

P.O.No: N°

PO-2967-251.01

571502-4-9003-01

AC-US-77/1

- 01.12.04

3

PO-2967-251.01

571502-4-9003-01

/TENGIZWEVROYL

PROPANE DEHYDRATION PACKAGE (62-EA-770)TENGIZ - KAZAKHSTAN

P.O. ISG No./

P.O. PFD No./

Plant locationCustomer

Unit

TENGIZCHEVROIL

28.01.040 ISSUE

1 16.03.04 REVISED AS PER CLIENT COMMENTS

REV. SECONDO COMMENTI CLIENTE-REV. AS PER CLIENT COMMENTS1 C.G. CHIARELLI CHIARELLI 16.03.04

REWETKAGRATING 30x50 / = 30x5

1250

TO PROVIDE SUPPORT ON SITEBY CLIENT

REV. SECONDO COMMENTI CLIENTE-REV. AS PER CLIENT COMMENTS2 C.G. CHIARELLI CHIARELLI 03.08.04

2 REVISED AS PER CLIENT COMMENTS03.08.04

OTVERSTIEHOLE Ø22

16

17

15

14

13

AS BUILT3 C.G. CHIARELLI CHIARELLI 01.12.04

3 AS BUILT01.12.04

B-101

CHIARELLI

C.G. CHIARELLI

TUBE BUNDLE AC-US-78/1TRUBN\Y PUCOK

INDEKS\ DETAL[N\H CERTEXEYDETAIL DRAWING REFERENCES

AC-US-79/1PAROVOY ZMEEVIKSTEAM COIL

P1

P2

T2

T1

NONE - NET

NONE - NET

Page 6: Brochure

EquipmentThe workshop is equipped with the most modern facilities for proper manufacturing, such as:- Cutting machines (including oxy-cut and plasma with numerical control)- Rolling machines (cold rolling up to 50 mm)- Ton press- Drilling machines (radial & vertical)- Bending machines- Punching machines- Milling machines- Welding positioners- AGV maximum lifting 70 tons- Welding machines for manual, electrode, TIG, MIG, & MAG process- Welding semiautomatic machine for SAW

Factory Non Destructive Testing (NDT)Non-destructive testing are performed in house byqualified operators (UNI EN 473 and ASNT).

GAM are able to perform:

• X & γ-rays Testing (RT);• Ultrasonic Testing (UT);• Dye Penetrant Testing (PT);

• Magnetic Particle Testing (MT);• Positive Material Identification (PMI);• Hardness Testing.

Page 7: Brochure

QualitySystem

GAM strive for the top quality of the product in order to have the full satisfaction of the Customer.In fact, GAM are operating in accordance with ISO 9001: 2000 with certification released by “ASME”.The quality system is monitored by the quality manager who provides and coordinates the following activities:- Update of quality manual and system’s procedures- Ispections and test durig fabrication and final delivery- Performance of NDT (PT, UT, MT, X-Rays & γ-Rays)- Monitoring and qualification of materials’ suppliers.

GAM have held ASME authorizations to manufacture with ASME Stamps U and U2 since 1999.Quality department operates independently with the target to provide the required qualityassurance through its personnel specialized in the performance of all inspections and tests.Besides GAM are also certified ISO 14001 (2004).

Page 8: Brochure

Air Coolers and Tube Bundles

Flare Tips assembly

Pressure Vesselsand HeatExchangers maintipologies

Thanks to their consolidated experience in designing and manufacturing, combined to a continuous improvement in fabrication concepts, related to scientific research, GAM Oil & Gas are able to give to their customers an important technological contribution in designing and fabrication of petrochemical and ecological plants equipment.

Our ProductsOur ProductsOur Products

Page 9: Brochure

Filter Housesfor Gas Turbines

Flare Systems

Steel Structures

Page 10: Brochure

Major References

Main Customers

1. Steel Structures x Technip / CNRL – Alberta (Canada)

2. Pressure Vessels x Fluor / Petrogal – Porto Refinery (Portugal)

3. Fired Heater x Linde – Hammerfest (Norway)

4. Pressure Vessels / Heat Exchangers x Tecnimont / ENI / Qatargas – Abu Dhabi

5. Derrick Flare System x JZ Int. x Chiyoda – Sakhalin Island (Russia)

6. Air Coolers x ISG SpA x Fluor – Tengiz Chevroil (Kazakhstan)

7. Pressure Vessels and Heat Exchangers x Fluor – Tengiz Chevroil (Kazakhstan)

8. Derrick Flare System x JZ Int. x Fluor – Tengiz Chevroil (Kazakhstan)

9. Filter Houses x GE O&G x Foster Wheeler – Woodside Energy (Karratha – Australia)

10. Derrick Flare System x JZ Int. x La Damietta LNG (Egypt)

11. Heat Recuperators x GE O&G x Snam-progetti / Scogat – Capo Bon

12. Filter Houses x GE O&G x Huntoil – Camisea (Peru’)

13. Geothermal Steam Condenser x GE O&G x Enel x El Salvador

• GE O&G – Nuovo Pignone• Tecnimont S.p.A.• John Zink International• Fluor LTD• Peerless Europe LTD• ISG S.p.A.• Saipem / Snamprogetti S.p.A.• Enppi• Itas S.p.A.• Hamworthy Combustion• Technip• Punj Lloyd

12

3

4

5

6

7

8

9

101112

13

Page 11: Brochure

Post Weld Heat Treatment (PWHT)

Our ServicesOur ServicesTrial Fit UP

Welding Activities

PWHT in Furnace

Local PWHT

GAM perform localized and total Post Weld Heat-Treatment in furnace which is 5 meters wide and 5meters high and a length of 14 meters; further-more, it’s also equipped with a time-temperature recorder device.