US 550/160 Connection South Design Build NHPP 5501-029, Sub Account 22420 Page 1 of 2 BP Gas Pipeline Crossing Analysis To: Kevin Walters, CDOT From: Nick Zoller, PE and Michelle Morgan, PE Date: April 01, 2019 Subject: BP gas pipeline crossings along US 550 Introduction In the area of proposed improvements for the US 550/160 Connection South, Design Build Project there are four BP crossings of these four crossings three of which are likely to be relocated. The fourth crossing at Station 862+15 will remain in place. The design evaluated each location for potential design changes/options at each of the four known crossing locations to see if relocation could be avoided. Based on the analysis the four BP crossings, the project reference design does allow for vertical profile and drainage modifications to meet the desired clearance requirement of 5-feet with a minimum of 3-feet each of the subject crossings. In addition to the design changes the other option that can be considered, is the placement of a concrete protection slab. US 550 Station 822+74 Existing survey shows three existing gas pipelines crossing at a skew. The project reference design is shown in a cut on east side of US 550. A vertical profile raise is possible in this location to meet clearance requirements. A profile raise will also affect the following access roads and grading onto their property. o East access road onto the Weasleskin property o West access road onto the Snowcap Sod Farm property o West driveway entrance onto the Bachman property The roadside ditches running along both sides of US 550 should be maintained. The ditch running along the west side of US 550, can be conveyed in an 18-inch to 24-inch culvert under the access road. The proposed culvert will cross the existing gas pipeline and clearance requirements will need to be maintained. A small ditch running along the east side of US 550 may be needed to maintain roadside ditch flows from about Station 834+50 to the south. Gas pipelines pending relocation per BP and CDOT. US 550 Station 843+50 The existing survey shows one existing gas pipeline under existing US 550. Proposed gas pipeline extension under proposed US 550. The project reference design is shown in a cut.

Transcript of BP Gas Pipeline Crossing Analysis · • Gas pipelines pending relocation per BP and CDOT. US 550...

US 550/160 Connection South Design Build

NHPP 5501-029, Sub Account 22420

Page 1 of 2

BPGasPipelineCrossingAnalysis

To: Kevin Walters, CDOT

From: Nick Zoller, PE and Michelle Morgan, PE

Date: April 01, 2019

Subject: BP gas pipeline crossings along US 550

Introduction In the area of proposed improvements for the US 550/160 Connection South, Design Build Project there

are four BP crossings of these four crossings three of which are likely to be relocated. The fourth

crossing at Station 862+15 will remain in place.

The design evaluated each location for potential design changes/options at each of the four known

crossing locations to see if relocation could be avoided. Based on the analysis the four BP crossings, the

project reference design does allow for vertical profile and drainage modifications to meet the desired

clearance requirement of 5-feet with a minimum of 3-feet each of the subject crossings. In addition to

the design changes the other option that can be considered, is the placement of a concrete protection

slab.

US 550 Station 822+74

• Existing survey shows three existing gas pipelines crossing at a skew.

• The project reference design is shown in a cut on east side of US 550.

• A vertical profile raise is possible in this location to meet clearance requirements. A profile raise

will also affect the following access roads and grading onto their property.

o East access road onto the Weasleskin property

o West access road onto the Snowcap Sod Farm property

o West driveway entrance onto the Bachman property

• The roadside ditches running along both sides of US 550 should be maintained.

• The ditch running along the west side of US 550, can be conveyed in an 18-inch to 24-inch

culvert under the access road. The proposed culvert will cross the existing gas pipeline and

clearance requirements will need to be maintained.

• A small ditch running along the east side of US 550 may be needed to maintain roadside ditch

flows from about Station 834+50 to the south.

• Gas pipelines pending relocation per BP and CDOT.

US 550 Station 843+50

• The existing survey shows one existing gas pipeline under existing US 550.

• Proposed gas pipeline extension under proposed US 550.

• The project reference design is shown in a cut.

US 550/160 Connection South Design Build

NHPP 5501-029, Sub Account 22420

Page 2 of 2

• A vertical profile raise of the reference design profile is possible in this location to meet

clearance requirements.

• The proposed roadside ditch running along the east side of US 550 may not be needed. Flows

can continue to sheet flow to the east.

• The existing roadside ditch running along the west side of US 550 should be maintained. This

ditch might not need to be deepened based on capacity.

• Gas pipeline pending relocation per BP and CDOT.

US 550 Station 862+15 (Critical Location)

• The existing survey shows three existing gas pipelines crossing existing and proposed US 550.

• The constraints of nearby driveways and field accesses, limits the vertical profile raise.

• Clearance between existing gas pipelines and reference design median ditch is approximately

4.9-feet.

• There is a current conflict with the proposed roadside ditch running along the east side of US

550. However, this ditch can be eliminated allowing runoff to sheet flow to the east. This ditch is

shown in the reference design to convey flows to a pond or sand filter for water quality

treatment. Permanent water quality is not required for the US 550 project.

• The roadside ditch running along the west side of US 550 may be needed but does not appear to

be an issue for the gas pipelines.

• Casing for the gas pipelines to be extended to the limits of the project ROW per BP and CDOT.

US 550 Station 899+50

• The existing survey shows one existing gas pipeline under existing US 550 and proposed SB US

550.

• Proposed gas pipeline extension under proposed NB US 550.

• The project reference design profile is in approximately 10-feet of fill.

• Roadside ditches might not be required in this area.

• Gas pipeline pending relocation per BP and CDOT.

9420 W. Sam Houston Parkway NorthRoom N1.217Houston, Texas 77064

24" MIN.(See Note 1)

GG

GGGG

EE

CONFIGURATION PROFILE

PROPOSED BASE

POSSIBLE PROFILE RAISE

SEE SHEET 2 FOR X-SECTION

EXISTING GAS LINES

NO

AT

TR

NO

AT

TR

VP

C=820

+15.0

0

EL.=

6607.3

5'

VPI=822

+00.0

0

EL.=

6608.3

7'

VPI=826

+20.0

0

EL.=

6619.0

3'

VP

T=828

+55.0

0

EL.=

6620.5

7'

V.C. = 370.00'

SSD = 2405'

K = 186.31

V.C. = 470.00'

SSD = 809'

K = 250.14

VP

C=826

+50.0

0

EL.=

6621.7

9'

VPI=828

+50.0

0

EL.=

6624.4

5'

VP

T=830

+50.0

0

EL.=

6625.4

5'

1.33%

V.C. = 400.00'

SSD = 1504'

K = 483.41

820

+00

825

+00

830

+00

100'0' 50' 200'

NZ

OL

LE

R

4:1

5:4

9

PM

pw:\\

pw

hdruscen01:H

DR

_U

S_

Central_

01\

Docu

ments\

57

04\

100002

55\

101102

22\

6.0

_C

AD

_BI

M\

6.2

_WIP\

Plot_

Sets\

Exhibits\

2019-05-2

2

Gas

Lin

e

Crossin

g\

2019-05-2

2

Gas

Crossin

g.d

gn

DRAFT: NOT FOR CONSTRUCTION (05/22/19)

819+00 820+00 821+00 822+00 823+00 824+00 825+00 826+00 827+00 828+00 829+00 830+00 831+00818+00817+00816+00

6600

6610

6620

6630

6600

6610

6620

6630

822+74

GAS LINE CROSSINGS

US 550

US 550

Final ROW pendingthis access location

EX

EO

P

EX

EO

P

EXISTING GAS LINE

BASE CONFIGURATION

PROPOSED ACCESS ROAD

BASE CONFIGURATION

PROPOSED US 550POSSIBLE PROFILE RAISE

6600

6610

6620

0 10 20 30 40 50 60 70 80 90 100 110 120 130 140-10-20-30-40-50-60-70-80-90-100-110-120-130-140

STA.822+746600

6610

6620

20'0' 10'

0'

20'

10'

*THE BLUE LINE REPRESENTS THE TOP OF PIPE. PIPELINE DEPTHS ARE ASSUMED TO BE 5' BELOW EXISTING GROUND.

EXIS

T

RO

W

EXIS

T

RO

W

JJ

AH

NK

E 11:2

5:3

1 A

M

pw:\\

pw

hdruscen01:H

DR

_U

S_

Central_

01\

Docu

ments\

57

04\

100002

55\

101102

22\

6.0

_C

AD

_BI

M\

6.2

_WIP\

Plot_

Sets\

Exhibits\

2019-05-2

2

Gas

Lin

e

Crossin

g\

2019-05-2

2

Gas

Crossin

g.d

gn

DRAFT: NOT FOR CONSTRUCTION (05/22/19)822+74 (2)

GAS LINE CROSSINGS

US 550

5'

2'

BM

GG

GG

WW

WW

CONFIGURATION PROFILE

PROPOSED BASE

POSSIBLE PROFILE RAISE

EXISTING GAS LINE

SEE SHEET 2 FOR X-SECTION

PROPOSED GAS LINE

VP

C=84

4+7

5.0

0

EL.=

663

1.2

4'

VPI=84

6+25.0

0

EL.=

6632.2

3'

VP

T=84

7+7

5.0

0

EL.=

6633.8

0'

1.05%

V.C. = 300.00'

SSD = 2809'

K = 771.21

VP

T=84

0+00.0

0

EL.=

6631.8

4'

VP

C=84

1+7

5.0

0

EL.=

6634.6

3'

VPI=84

4+00.0

0

EL.=

6638.2

2'

VP

T=84

6+25.0

0

EL.=

6639.3

4'

1.59%

0.50%

V.C. = 450.00'

SSD = 1211'

K = 410.97

84

0+00 84

5+00

850

+00 100'0' 50' 200'

NZ

OL

LE

R

4:2

6:2

1 P

M

pw:\\

pw

hdruscen01:H

DR

_U

S_

Central_

01\

Docu

ments\

57

04\

100002

55\

101102

22\

6.0

_C

AD

_BI

M\

6.2

_WIP\

Plot_

Sets\

Exhibits\

2019-05-2

2

Gas

Lin

e

Crossin

g\

2019-05-2

2

Gas

Crossin

g.d

gn

US 550

DRAFT: NOT FOR CONSTRUCTION (05/22/19)

CR 219

843+50

GAS LINE CROSSINGS

US 550

839+00 840+00 841+00 842+00 843+00 844+00 845+00 846+00 847+00 848+00 849+00 850+00 851+00 852+00 853+00 854+00

6620

6630

6640

6650

6620

6630

6640

6650

EX

EO

P

EXISTING GAS LINE

BASE CONFIGURATION

PROPOSED US 550POSSIBLE PROFILE RAISE

PROPOSED GAS LINE

6620

6630

6640

0 10 20 30 40 50 60 70 80 90 100 110 120 130 140-10-20-30-40-50-60-70-80-90-100-110-120-130-140

STA.843+506620

6630

6640

20'0' 10'

0'

20'

10'

EXIS

T

RO

W

RO

W

*THE BLUE LINE REPRESENTS THE TOP OF PIPE. EXISTING DEPTH IS ASSUMED AND PROPOSED DEPTH CAN BE ADJUSTED AS NECESSARY.

NZ

OL

LE

R

4:0

6:3

8

PM

pw:\\

pw

hdruscen01:H

DR

_U

S_

Central_

01\

Docu

ments\

57

04\

100002

55\

101102

22\

6.0

_C

AD

_BI

M\

6.2

_WIP\

Plot_

Sets\

Exhibits\

2019-05-2

2

Gas

Lin

e

Crossin

g\

2019-05-2

2

Gas

Crossin

g.d

gn

DRAFT: NOT FOR CONSTRUCTION (05/22/19)843+50 (2)

GAS LINE CROSSINGS

US 550

2'5'

5'

G

G

WW

WW

WW

WW

WW

WW

GG

WW

GG

GGGGGG

WW

GGGG

GG

WW

POSSIBLE PROFILE RAISE

SEE SHEET 2 FOR X-SECTION

EXISTING GAS LINES

CONFIGURATION PROFILE

PROPOSED BASE

VP

C=860

+50.0

0

EL.=

664

7.1

5'

VPI=862

+50.0

0

EL.=

664

9.2

5'

VP

T=864

+50.0

0

EL.=

6650.2

5'

VP

C=869

+00.0

0

EL.=

6652.5

0'

0.50%

V.C. = 400.00'

SSD = 2172'

K = 730.82

VP

C=857

+7

5.0

0

EL.=

664

4.7

4'

VPI=859

+00.0

0

EL.=

664

5.4

3'

VP

T=860

+25.0

0

EL.=

664

7.3

7'

VP

C=862

+00.0

0

EL.=

6650.0

8'

VPI=863

+50.0

0

EL.=

6652.4

1'

VP

T=865

+00.0

0

EL.=

6653.1

6'

VP

C=867

+55.0

0

EL.=

6654.4

3'

VPI=869

+55.0

0

EL.=

6655.4

3'

0.55%

1.55%

1.55%

0.50%0.50%

V.C. = 250.00'

K = 250.12

V.C. = 300.00'

K = 285.71

855

+00

860

+00

865

+00

87

0+00

100'0' 50' 200'

NZ

OL

LE

R

10:4

6:2

1 A

M

pw:\\

pw

hdruscen01:H

DR

_U

S_

Central_

01\

Docu

ments\

57

04\

100002

55\

101102

22\

6.0

_C

AD

_BI

M\

6.2

_WIP\

Plot_

Sets\

Exhibits\

2019-05-2

2

Gas

Lin

e

Crossin

g\

2019-05-2

2

Gas

Crossin

g.d

gn

US 550

DRAFT: NOT FOR CONSTRUCTION (05/22/19)862+15

GAS LINE CROSSINGS

US 550

855+00 856+00 857+00 858+00 859+00 860+00 861+00 862+00 863+00 864+00 865+00 866+00 867+00 868+00 869+00 870+00

6630

6640

6650

6660

6710

6630

6640

6650

6660

EX

EO

P

EX

EO

P

EX

CL

EXISTING GAS LINE

POSSIBLE PROFILE RAISE

WEST - 6'

7.5'

BASE CONFIGURATION.

PROPOSED US 550

6630

6640

6650

6660

0 10 20 30 40 50 60 70 80 90 100 110 120-10-20-30-40-50-60-70-80-90-100-110-120

STA.862+156630

6640

6650

6660

20'0' 10'

0'

20'

10'

NZ

OL

LE

R

10:5

6:5

3

AM

pw:\\

pw

hdruscen01:H

DR

_U

S_

Central_

01\

Docu

ments\

57

04\

100002

55\

101102

22\

6.0

_C

AD

_BI

M\

6.2

_WIP\

Plot_

Sets\

Exhibits\

2019-05-2

2

Gas

Lin

e

Crossin

g\

2019-05-2

2

Gas

Crossin

g.d

gn

DRAFT: NOT FOR CONSTRUCTION (05/22/19)862+15 (2)

GAS LINE CROSSINGS

US 550

BEYOND THESE LOCATIONS, PIPELINE DEPTHS ARE ASSUMED TO BE 5' BELOW EXISTING GROUND.

THE BLUE LINE REPRESENTS THE TOP OF PIPE. THE WEST, EX CL, AND EAST DIMENSIONS WERE MEASURED IN THE FIELD.

EX CL - 8'

EAST - 5'

E

WW

WW

WW

GG

GG

SEE SHEET 2 FOR X-SECTION

EXISTING GAS LINE

CONFIGURATION PROFILE

PROPOSED BASE

PROPOSED GAS LINE

VP

C=895

+00.0

0

EL.=

6684.6

7'

VPI=897

+50.0

0

EL.=

6686.8

2'

VP

T=900

+00.0

0

EL.=

6685.5

7' -0.50%

V.C. = 500.00'

SSD = 1044'

K = 367.84

895

+00

900

+00

905

+00 100'0' 50' 200'

NZ

OL

LE

R

11:1

0:4

5

AM

pw:\\

pw

hdruscen01:H

DR

_U

S_

Central_

01\

Docu

ments\

57

04\

100002

55\

101102

22\

6.0

_C

AD

_BI

M\

6.2

_WIP\

Plot_

Sets\

Exhibits\

2019-05-2

2

Gas

Lin

e

Crossin

g\

2019-05-2

2

Gas

Crossin

g.d

gn

US 550

DRAFT: NOT FOR CONSTRUCTION (05/22/19)899+50

GAS LINE CROSSINGS

US 550

892+00 893+00 894+00 895+00 896+00 897+00 898+00 899+00 900+00 901+00 902+00 903+00 904+00 905+00 906+00 907+00

6660

6670

6680

6690

6660

6670

6680

6690

EX

EO

P

EX

EO

P

EXISTING GAS LINEPROPOSED GAS LINE

BASE CONFIGURATION

PROPOSED US 550

6660

6670

6680

6690

0 10 20 30 40 50 60 70 80 90 100 110 120 130 140-10-20-30-40-50-60-70-80-90-100-110-120-130-140

STA.899+506660

6670

6680

6690

20'0' 10'

0'

20'

10'

EXIS

T

RO

W

EXIS

T

RO

W

*THE BLUE LINE REPRESENTS THE TOP OF PIPE. EXISTING DEPTH IS ASSUMED AND PROPOSED DEPTH CAN BE ADJUSTED AS NECESSARY.

NZ

OL

LE

R

5:4

4:1

8

PM

pw:\\

pw

hdruscen01:H

DR

_U

S_

Central_

01\

Docu

ments\

57

04\

100002

55\

101102

22\

6.0

_C

AD

_BI

M\

6.2

_WIP\

Plot_

Sets\

Exhibits\

2019-05-2

2

Gas

Lin

e

Crossin

g\

2019-05-2

2

Gas

Crossin

g.d

gn

DRAFT: NOT FOR CONSTRUCTION (05/22/19)899+50 (2)

GAS LINE CROSSINGS

US 550

5'