Borroloola Project Highlights · Borroloola Project Highlights Author: Marketing Keywords:...

2
A: 41-43 Bowden Street, Alexandria, NSW, 2015, Australia E: [email protected] W: 5b.com.au Flexible Solar Borroloola Pre-packed, modular design Remote locations are difficult and costly to build on - MAVERICK's prefabricated system drastically reduces the work required onsite. Partnering with Key stats 653 kWp Northern Territory (Cyclone Region) State Utility Simpler, Faster, Smarter Why MAVERICK ? Durability The remote Northern Territory is cyclone prone - MAVERICK can be upgraded to withstand Wind Region C conditions. Speed of deployment A harsh climate mandates rapid deployment - MAVERICK is 50-90% faster than traditional deployment.

Transcript of Borroloola Project Highlights · Borroloola Project Highlights Author: Marketing Keywords:...

Page 1: Borroloola Project Highlights · Borroloola Project Highlights Author: Marketing Keywords: DADddYGDnP0,BADbaoM8ZgM Created Date: 6/16/2020 7:51:13 AM ...

A: 41-43 Bowden Street, Alexandria, NSW, 2015, Australia E: [email protected] W: 5b.com.au

Flexible SolarBorroloola

Pre-packed, modular design

Remote locations are difficult and costlyto build on - MAVERICK's prefabricated

system drastically reduces the workrequired onsite.

Partnering withKey stats653 kWp Northern Territory (Cyclone Region) State Utility

Simpler, Faster, Smarter

Why MAVERICK ?

Durability 

The remote Northern Territory iscyclone prone - MAVERICK canbe upgraded to withstand Wind

Region C conditions.

Speed of deployment

A harsh climate mandates rapiddeployment - MAVERICK is 50-90%faster than traditional deployment.

Page 2: Borroloola Project Highlights · Borroloola Project Highlights Author: Marketing Keywords: DADddYGDnP0,BADbaoM8ZgM Created Date: 6/16/2020 7:51:13 AM ...

A: 46A Euston Road, Alexandria, NSW, 2015, Australia E: [email protected] W: 5b.com.au

Flexible SolarBorroloola

Simpler, Faster, Smarter

A 653 kWp solar system was installed at Borroloola in July of

2018, integrated with existing diesel gen-sets

Roughly 25% of the community's power is now produced

using solar, significantly reducing running costs to PWC

MAVERICK's prefabricated system streamlined and

simplified deployment in the remote community, limiting

labour time in the harsh conditions

The ballasted system has withstood 2 cyclones to date -

cyclone Trevor and cyclone Owen with wind gusts in the

order of 39 m/s

Borroloola

Borroloola is an extremelyremote location, situated

12 hours from Darwin.

Power and Water Corporation (PWC) manage infrastructure across 1.3 million square kilometers of theNorthern Territory. Their role includes providing a continuous supply of water and electricity to 72 remotecommunities, such as Borroloola, a town near the Gulf of Carpentaria. This presents PWC with a unique set ofproblems:

A heavy reliance on dieselgenerators, an increasingly

expensive source of energy.